EIA EMP Of MJ

download EIA EMP Of MJ

of 234

Transcript of EIA EMP Of MJ

  • 8/8/2019 EIA EMP Of MJ

    1/234

    SSuubbmmiitttteeddttoo::

    Chief Engineer (R&B) & Managing DirectorA.P. Road Development Corporation

    Erramanzil, Hyderabad 500 082, A.P., India

    VVVOOOLLLUUUMMMEEE VVVIII III :::EEENNNVVVIII RRROOONNNMMMEEENNNTTTAAALLL IIIMMMPPP AAACCCTTTAAASSSSSSEEESSSSSSMMMEEENNNTTT

    AAANNNDDDEEENNNVVVIII RRROOONNNMMMEEENNNTTTAAALLL MMMAAANNNAAAGGGEEEMMMEEENNNTTTPPP LLLAAANNN

    SSuubbmmiitttteeddbbyy::

    THE Louis Berger Group, Inc.Engineers Planners Scientists EconomistsPlot No. - 41, Sector 18, Near Maruti Industrial Area,

    Gurgaon 122 015, Haryana, India

    GOVERNMENT OF ANDHRA PRADESHAANNDDHHRRAA PPRRAADDEESSHH RROOAADD DDEEVVEELLOOPPMMEENNTT CCOORRPPOORRAATTIIOONN

    ANDHRA PRADESH ROAD SECTOR PROJECTFFeeaassiibbiilliittyy SSttuuddyy,, DDeessiiggnn aanndd DDeettaaiilleedd EEnnggiinneeeerriinngg

    DETAI LED PROJECT REPORT(UPGRADING OF MYDUKUR - JAMMALAMADUGU ROAD)

  • 8/8/2019 EIA EMP Of MJ

    2/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan ( i )

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    INDEX

    ABBREVIATION

    EXECUTIVE SUMMARY

    CHAPTER - 1: INTRODUCTION

    CHAPTER - 2: DESCRIPTION OF THE PROJECT

    CHAPTER - 3: ENVIRONMENT REGULATORY FRAMEWORK

    CHAPTER - 4: BASELINE ENVIRONMENT

    CHAPTER - 5: STAKEHOLDERS CONSULTATION

    CHAPTER - 6: ANALYSIS OF ALTERNATIVES

    CHAPTER - 7: PROJECT IMPACTS AND ISSUES

    CHAPTER - 8: IMPACT MITIGATION AND ENHANCEMENT

    CHAPTER-9: ENVIRONMENTALMANAGEMENTPLAN

    APPENDICES

  • 8/8/2019 EIA EMP Of MJ

    3/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan Page - 1

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    ABBREVIATIONS

    SOS Strategic Option Study

    R&B Road & Building Department

    APRDC A.P. Road Development Corporation

    APRSP Andhra Pradesh Road Sector Project

    GOI Government of India

    GOAP Government of Andhra Pradesh

    SH State Highway

    MDR Major District Road

    ODR Other District Road

    EIA Environmental Impact Assessment

    EMP Environmental Management Plan

    DoF Department of Forest

    MoEF Ministry of Environment and Forest

    FHWA Federal Highways Authority

    CPCB Central Pollution Control Board

    IMD India Meteorological Department

    COI Corridor of Impact

    PIA Project Influence Area

    PD Project District

    ROW Right of Way

    AAQ Ambient Air Quality

    SPM Suspended Particulate Matter

    RPM Respirable Particulate Matter

    AADT Annual Average Daily Traffic

    PUC Pollution under Control CertificateASI Archaeological Survey of India.

    NOC No Objection Certificates

    RH Relative Humidity

    PAP Project Affected Person

    RAP Resettlement Action Plan

    OMC Optimum Moisture Content

    CSC Construction Supervision Consultant

    EMU Environment Management Unit

    EO Environment Officer

  • 8/8/2019 EIA EMP Of MJ

    4/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan Page - 2

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    PIU Project Implementation Unit

    PU Package Unit

  • 8/8/2019 EIA EMP Of MJ

    5/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan Page - 1

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    EXECUTIVE SUMMARY

    A.1 BACKGROUND

    APRDC has planned to improve the State road network by providing better quality and safer roads

    to the users in sustainable manner with loan assistance from World Bank. Improved quality of roads,better institutional operation and management system of APRDC and safe roads are importantfeatures of the project component. In this connection RDC has selected 38 corridors (cumulativelength of 2002 km) of high-density (traffic) roads through Strategic Option Study (SOS) to bedeveloped in phased manner.

    A.2 OBJECTIVES OF THE ASSIGNMENT

    The main objective would be to alleviate the current unsafe and congested conditions of the roadnetwork connecting the villages and towns by providing better quality and safe roads to the users ina sustainable and environment friendly manner. Government of India, GoI through Ministry ofEnvironment and Forest (MoEF) enforces Environment (Protection) Rules, 1986 forenvironmental protection because of intervention of new projects or activities, or on expansion and

    modernization of existing projects or activity based on their environmental impacts.

    A.3 SCOPE OF ENVIRONMENTAL ASSESSMENT (EA)

    The environmental assessment scope includes screening and scoping, environmental assessment andenvironmental management plans for the individual project roads as required. The EA process alsoenvisages to develop a comprehensive environmental management frame work for the entire project

    which will adopted as part of the corporate environmental policy for AP Road DevelopmentCorporation.

    A.4 DESCRIPTION OF PROJECT ROAD

    The Project road, Mydukuru - Jammalmadugu Road is a section of State Highway No.57, located inRayalseema Region of Andhra Pradesh. The Project road starts from km 153/000 in Mydukuru

    town at the junction with NH-18 in Kadapa district and runs south east direction connecting Jammalmadugu, Vishwandhapuram, Proddutur, Chanduru and terminates at km 194/000 nearJammalmadugu R&B Guest House. The Proddutur bypass between km 171/400 and 177/400 is notincluded in the project scope. Cumulative length of PR is 35.0km. The project road will improveconnectivity to district town Kadapa, important tourist place, through NH-18 and is widely used byinterstate traffic..

    Based on the traffic demand the PR is proposed to be upgraded to 4lane configuration fromMydukuru to Jammalmadugu, except Proddutur Bypass which is out of the scope of this project.

    A.5 KEY ENVIRONMENTAL LAWS AND REGULATIONS

    Table 1 presents the environmental regulations and legislations relevant to AP state road project.

    Table 1: Environmental Regulations and LegislationsSR.No

    Act / Rules PurposeApplicableYes/ No

    Reason for Applicability Authority

    1EnvironmentProtection Act-1986

    To protect and improveoverall environment

    Yes

    As all environmentalnotifications, rules andschedules, are issued under thisact.

    MoEF. Gol; DoE,State Gov. CPCB;SPCB

    2Environmental Impact

    Assessment Notification14th Sep-2006

    To provide environmentalclearance to newdevelopment activitiesfollowing environmentalimpact assessment

    NOThis notification is NOTapplicable to Project road, thestatus of the project road isMajor District Road.

    MoEF. EIAA

    3Notification for use of fly

    ash

    Reuse large quantity of flyash discharged fromthermal power plant tominimize land use for

    disposal

    YesThermal plant within 100kmreaches.

  • 8/8/2019 EIA EMP Of MJ

    6/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan Page - 2

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    SR.No

    Act / Rules PurposeApplicableYes/ No

    Reason for Applicability Authority

    4Coastal Regulation

    Zone(CRZ) Notification1991 (2002)

    Protection offragilecoastal belt

    NORoad is not located alongcoastal belt

    5National Environment

    Appellate Authority Act(NEAA) 1997

    Address Grievancesregarding the process ofenvironmental clearance.

    YesGrievances if any will be dealtwith, within this act.

    NEAA

    6The Land AcquisitionAct 1894 & 1989

    Set out rule foracquisition. of land bygovernment

    Yes

    This act will be applicable to asthere will be acquisition of landfor widening, geometricimprovements andrealignments.

    RevenueDepartment StateGovernment.

    7

    Moef Circular onMarginal LandAcquisition and Bypasses1999

    Defining marginal landacquisition relating to the1997 Notification

    NOSuperseded by 2006Notification

    MoEF

    8

    The Forest(Conservation) Act 1927The Forest(Conservation) Act. 1980forest (conversion ) Rules1981

    To check deforestationby restricting conversionof forested areas intonon- forested areas

    NONO forest area within theproject influence area.

    ForestDepartment,GoAP

    9

    MoEF circular (1998) on

    linear Plantation onroadside, canals andrailway lines modifyingthe applicability ofprovisions of forest(Conversation) Act, tolinear Plantation

    Protection / plantingroadside strip asavenue/strip plantationsas these are declaredprotected forest areas.

    NORoadside tree plantation inAndhra Pradesh does not comesunder the forest act.

    MoEF

    10Wild Life ProtectionAct 1972

    To protect wildlifethrough certain ofNational Parks andSanctuaries

    NOThis act is NOT applicable asthere is NO points of wildlifecrossings along project corridor.

    Chief ConservatorWildlife, WildlifeWing, ForestDepartment,GoAP.

    11Air (Prevention andControl of Pollution)Act, 1981

    To control air pollution by& Transport controllingemission of airDepartment. pollutants asper the prescribedstandards.

    Yes

    This act will also be applicableduring construction; forobtaining NOC forestablishment of hot mix plant,workers' camp, constructioncamp, etc.

    SPCB

    12Water Prevention andControl of Pollution)Act1974

    To control waterpollution by controllingdischarge of pollutants asper the prescribedstandards

    Yes

    This act will be applicable duringconstruction for (establishmentsof hot mix plant, constructioncamp, workers' camp, etc.

    SPCB

    13Noise Pollution(Regulation andControl Act) 1990

    The standards for noise forday and night have beenpromulgated by the MoEFfor various land uses.

    Yes

    This act will be applicable asvehicular noise, to assess forfuture years and necessaryprotection measure needs to beconsidered in design.

    SPCB

    14

    Ancient Monumentsand ArchaeologicalSites and Remains

    Act1958

    Conservation of culturaland historical remainsfound in India

    No

    This act not applicable asproject road is not close to anyAncient Monument declared

    protected under the act.

    Archaeological DeptGol, IndianHeritage Society andIndian NationalTrust for Art and

    Culture Heritage(INTACH).

    15Public Liability andInsurance Act 1991

    Protection formhazardous materials andaccidents.

    YesContractor need to stockhazardous material like diesel,Bitumen, Emulsions etc.

    SPCB

    16 Explosive Act 1984Safe transportation,storage and use ofexplosive material

    YesFor transporting and storingdiesel, bitumen etc.

    Chief controllerof Explosives

    17Minor Mineral andconcession Rules

    For opening newquarries.

    YesRegulate use of minor mineralslike stone, soil, river sand etc.

    District Collector

    18Central Motor VehicleAct 1988 and CentralMotor Vehicle Rules1989

    To check vehicular airand noise pollution.

    YesThese rules will be applicable toroad users and constructionMachinery.

    Motor VehicleDepartment

    19

    National ForestPolicy1952National ForestPolicy(Revised) 1988

    To maintain ecologicalstability throughpreservation and

    restoration of biologicaldiversity.

    NOThis policy will NOT beapplicable as NO forest area

    within the CoI.

    ForestDepartment, Gol

    and GoAP

  • 8/8/2019 EIA EMP Of MJ

    7/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan Page - 3

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    SR.No

    Act / Rules PurposeApplicableYes/ No

    Reason for Applicability Authority

    20 The Mining Act(1952)The mining act has beennotified for safe andsound mining activity.

    Yes

    The construction of projectroad will require aggregates.These will be procured throughmining from riverbeds andquarries

    Department ofmining, GoAP

    On the basis of data and information collected during field survey and discussion with local expertand visualise potential associated impact, consultant has categorised this project as category-B,

    which requires a lesser level of environmental investigation.

    A.6 BASE LINE ENVIRONMENT

    Data was collected from secondary sources for the macro-environmental setting like climate,physiography (Geology and slope), biological and socio-economic environment within ProjectInfluence Area, PIU/ Project District, PD . First hand information have been collected to record themicro-environmental features within Corridor of Impact, CoI. Collection of first hand (Primary)information includes preparation of base maps, extrapolating environmental features on proposedroad design, tree enumeration, location and measurement of socio-cultural features abutting project

    road.

    A.7 STAKEHOLDER CONSULTATION

    Consultative procedure, since the inception of the project, has been continued during pre-feasibility,feasibility, Environmental Assessment and Management Plan preparation stage. Considering the factthat involving local communities in the project planning is basis of the participatory planning, oftensuggestion and option given by the people improves technical and economic efficiency of the projectand suggested improvements proposals (if adopted by the project) of the people also generates senseof ownership within communities thus eases implementation process.

    A.8 INFORMATION DISSEMINATION

    While conducting tree enumeration and inventory of road side environmental features (hotspots), the consultant has also conducted information dissemination by one to one campaigningabout proposed improvement,

    Potential project affected families were consulted to inform them about proposed roadimprovement program and possible environmental conflict such as tree cutting, relocation ofhand pumps,

    Pictorial Methods were adopted to explain proposed improvement and possible environmentalimpacts in the concerned villages,

    Information dissemination through pumhlet / Khadapatralu among the villagers explainingproposed road improvement.

    A.9 ANALYSIS OF ALTERNATIVES

    At three location, project road passes through congested areas-

    Peddasettipalli Bypass (Km 178.600 - 179.600), Cudappah Stone Quarry (Km 183.300 - 187.500) and Dhanvulapadu Bypass (Km 186.100 - 186.900)

    Pedasettipalli: Around 1000m length, from km 178/600 to km 179/600, project road passesthrough very congested areas of Pedasettypalli village. There are three reverse curves in this segment.

    The ROW varies from 8m to 12m. The houses are abutting the roadway and location to prone toaccidents. The entire village is situated on the south of the project road; on the northern side thereare four-five houses in scattered form.

  • 8/8/2019 EIA EMP Of MJ

    8/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan Page - 4

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    The approved alignment follows through the left hand side of existing alignment. There is noapparent advantage to follow this bypass alignment along this road, but is the most suitable optionavailable, as other options are eliminated/more problematic

    Cudappah Stone Quarry (Km 183.300 - 187.500)

    The approved alignment follows through the Right hand side of existing alignment. The existingalignment is straight and in good condition but owing to limited width the proposed new 2 lane willbe following the periphery of the quarry on right hand side of existing alignment. This way theexisting alignment will serve as one way for traffic from Mydukuru to Jammalamadugu and newproposed realignment will be used by traffic plying from Jammalamadugu to Mydukuru. There is noapparent advantage to segregate the traffic but land acquisition is a big problem and refilling the siteis not safe.

    Dhanvulapadu Bypass (Km 186.100 - 186.900)

    Around 800m length, from km 186/100 to km 186/900, project road passes through verycongested areas ofDhanvulapadu village. There are two reverse curves in this segment. TheROW varies from 10m to 12m. The houses are abutting the roadway and location to prone

    to accidents. The approved alignment follows through the left hand side of existing alignment. There is no apparent advantage to follow this bypass alignment along this road, but is the mostsuitable option available, as other options are eliminated/more problematic.

    A.10 POTENTIAL IMPACT

    Table 2 below presents the general environmental impacts expected due to the proposed upgradationof the project road. Impacts have been assessed based on the first hand information collected fromthe screening & scoping of environmental attributes. The quanta of all the impacts on NaturalEnvironment are analyzed in detail.

    Table 2: General Impacts on Natural Environment

    ProjectActivity

    Planningand De-sign

    Phase

    Pre-construction Phase Construction PhaseRoad Opera-

    tion

    Indirect effectsof operation orInduced de-velopment

    Env. com-ponent Af-fected

    Land ac-quisition

    Removalof

    Structures

    Removal oftrees and

    vegetation

    Earth works in-cluding quarry-

    ing

    Laying ofpavement

    Vehicle &Machine op-

    eration &maintenance

    Asphalt &crusherplants

    Sanitation& Waste(labour

    campus)

    Vehicleoperation

    Air

    Dust gen-eration

    during dis-mantling

    Reducedbuffering ofair and noise

    pollution,Hotter, driermicroclimate

    Dust generationAsphalt

    odourNoise, dust,

    pollution

    Noise, soot,odour, dust,

    pollution

    Odour /smoke

    Noise, dust,pollution

    other pollution

    LandLoss ofproduc-

    tive Land

    Generationof debris

    Erosion andloss of top

    soil

    Erosion and lossof top soil

    Contamina-tion by fuel

    and lubricantsCompaction

    Contamina-tion Com-paction of

    soil

    Contami-nationfrom

    wastes

    Spill from ac-cidents Depo-sition of lead

    Change in crop-ping pattern

    WaterLoss ofwatersources

    Siltationdue to

    loose earth

    Siltation dueto loose

    earth

    Alteration ofdrainage

    Break in conti-nuity of ditches

    Siltation,Stagnant water

    pools in quarries.

    Reductionof groundwater re-charge area

    Contamina-tion by fuel

    and lubricants

    Contamina-tion by as-

    phalt leakageor fuel

    Contami-nationfrom

    wastesOveruse

    Spill Contami-nation by fuel,lubricants and

    washing of ve-hicles

    Increased con-tamination ofground water

    NoiseNoise Pol-

    lution

    Noise Pol-lution due tomachinery

    Noise PollutionNoise pollu-

    tionNoise Pollu-

    tionNoise Pollu-

    tionNoise pollution

    Flora Loss ofBiomass

    Lowered pro-ductivity

    Loss of ground

    Removal ofvegetation

    Lower pro-ductivity

    Use as fuel

    Felling

    trees forfuel

    Impact of

    pollution onvegetation

    Lowered pro-

  • 8/8/2019 EIA EMP Of MJ

    9/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan Page - 5

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    for vegetation wood ductivityToxicity ofvegetation.

    FaunaDisturbance

    Habitat lossDisturbance Disturbance Disturbance Poaching

    Collision withtraffic

    Distorted habi-tat

    A.11 AVOIDANCE, MITIGATION & ENHANCEMENT

    Prevention or avoidance of impact is better than mitigation of impact. Hence avoidance andreduction of adverse impacts approaches were adopted during the design stage through continuedinteraction between the design and environmental teams. This is reflected in the designs of thehorizontal & vertical alignment, cross sections adopted, construction methods and constructionmaterials. In-depth site investigations have been carried out so that sensitive environmentalresources are effectively avoided, leading to the environmentally best-fit alignment option. As aresult many of the trees, cultural properties, water bodies etc. have been avoided at the design stageitself, as presented in Table 3 below.

    Table 3: Environmental features saved through Avoidance measure at design stage

    Environmental Features Potential Impact Under Direct Impact Saved through alignment design

    Trees (nos.) 1163 815 348

    Surface Water source 2 0 2

    Ground Water source 15 8 7

    Cultural Properties 18 7 11

    Bus Shelters 10 6 4

    A.12 ENVIRONMENTAL MANAGEMENT PLAN

    Environmental Management Plan (EMP) deals with the implementation procedure of the guidelinesand measures recommended to avoid, minimize and mitigate environmental impacts of the project.

    It also includes management of measures suggested for enhancement of the environmental qualityalong the highways.

    The institutional arrangement made under project will look into the implementation of project aswell as EMP and the various legal settings applicable to the project are briefly stated in chapter 3 .

    The avoidance, mitigation & enhancement measures for protection of the environment alonghighways have been discussed in detail in previous chapter. Although the social environmentalimpacts, its mitigation and management is an essential component of the EMP, this chapter excludesit for the purpose of clarity and procedural requirements. Social environmental elements have beenseparately dealt in separate volume namely, Resettlement and Rehabilitation Action Plan (RAP).

    A.13 OBJECTIVE OF EMP

    The EMP is a plan of action for mitigation / management / avoidance of the negative impacts ofthe project and enhancement of the project corridor. For each measure to be taken, its location,timeframe, implementation and overseeing / supervision responsibilities are listed. Thesecomponents of the EMP have been given in Chapter 9 which explains the environmental issues andthe avoidance/ mitigation/ minimization or enhancement measures adopted and/or to be adoptedduring different phases of the project. It also provide the references for the suggested measures,responsible agency for its implementation/ management as well as its timeframe.

    A.14 COST ESTIMATES FOR ENVIRONMENTAL MANAGEMENT

    Mitigation measures proposed in the EMP will be implemented by the Contractor. The works to beundertaken by the Contractor have been quantified and the quantities included in the respectiveBOQ items such as earth works, slope protection, noise barriers, road safety features, and shrub

    plantation.

  • 8/8/2019 EIA EMP Of MJ

    10/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan Page - 6

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    Provisional quantities have also been included for additional measures that may be identified duringconstruction and for silt fencing which will depend on the Contractors work methods and sitelocations. Items and quantities have also been included for enhancement measures.

    More general environmental management measures to be followed by the contractor have beenincluded in the specifications and this EMP. These cannot be quantified and are to be included in

    the contract rates. A total of Rs. 12.48 million has been allocated for the environmental managementfor the Project road.

    A.15 ORGANIZATIONAL FRAMEWORK

    The proposed project will be implemented by APRDC through its Environmental Management Unit(EMU). The EMU comprises of officers from Department of Forest, GoAP, and otherenvironmental Engineers. The EMU will be coordinating with the field level implementing agenciessuch as Engineer (Supervision Consultant), Contractor and field level APSHP officials. Role andresponsibilities of important officials is detailed in chapter 9.

    ORGANISATIONAL FRAMEWORK OF PIU - APRSP

    (Supervision and Monitoring of EMP)

    ORGANISATION STRUCTURE AT FIELD LEVEL

    (R&B), APRDC

    (Supervision and Monitoring of EMP)

    Fig. 1: Organization Framework

    Pro ect Director - APRSP

    Environment Management Unit (EMU-APRDC)Environmental Officer APRDC

    Dy. Executive Engineer of Package Unit, APSHP

    Chief Engineer & Managing Director APRDC

    Environment and Safety Manager of Package Unit,Contractor

    Executive Engineer of Package Unit. APSHP

    EnvironmentalEngineer,

    (CSC)

  • 8/8/2019 EIA EMP Of MJ

    11/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 1 - 1

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    TABLE OF CONTENTS

    CHAPTER 1: INTRODUCTION .....................................................................................................1-2

    1.1 BACKGROUND............................................................................................................................................1-2

    1.2 THEPROJECT...............................................................................................................................................1-2

    1.2.1 Project Description .......................... ............................. ............................ ...................................... .1-2

    1.2.2 Objectives of the Assignment .......................... ............................ ........................... .......................1-2

    1.2.3 Scope of Environmental Assessment (EA)............... ............................ ........................... ............1-3

    1.2.4 Project Benefits...... ............................. ............................. ............................ .................................... .1-4

    1.2.5 Structure of the Report................. ............................ ........................... ...................................... ......1-4

  • 8/8/2019 EIA EMP Of MJ

    12/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 1 - 2

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    CHAPTER 1: INTRODUCTION

    1.1 BACKGROUNDAndhra Pradesh is a progressive state with a population of 76 millions. Around 75% of the total

    population is living in the rural areas. Improving infrastructure facilities will promote agricultural andindustrial growth in the state. The Road Policy (2005-15) also aims at providing an efficient, safe andenvironmentally sustainable road network in the state. In order to improve the quality of thecorridors, Road and Building Department (RBD) of Government of Andhra Pradesh (GoAP) hasentrusted the responsibility of maintenance and improvement of key State roads (core network) to

    Andhra Pradesh Road Development Corporation (APRDC1).

    APRDC has planned to improve the State road network by providing better quality and safer roadsto the users in sustainable manner with loan assistance from World Bank. Improved quality of roads,better institutional operation and management system of APRDC and safe roads are importantfeatures of the project component. In this connection RDC has selected 38 corridors (cumulativelength of 2002 km) of high-density (traffic) roads through Strategic Option Study (SOS) to bedeveloped in phased manner.

    The screening and scoping exercise has been carried out as a part of the feasibility study and to listout the priority roads in the state. The environmental assessment and analysis has been documentedin this report.

    1.2 THEPROJECT1.2.1 Project Description

    Feasibility study was carried out on 38 roads (cumulative length 2002 km) selected through StrategicOption Study of 10,040km of key road network of state roads. Considering the economic, social andenvironmental criteria, 21 roads are selected for implementation in two phases, eight in Phase - I andthirteen roads in Phase - II. Further these Phase - I corridors have been agreed for implementationin two years. Four corridors each in year-1 and year-2.

    Corridors selected for implementation in PhaseI, year-1 are

    1. Kandi-Shadnagar (65.60 Km)2. Chittoor-Puttur (60.80 Km)3. Kurnool-Devanakonda (60.60 km)4. Mydukuru Jammalamadugu (41 Km)

    The present report on Environmental Impact Assessment (EIA) deals with the environmentalanalysis of Mydukuru Jammalamadugu Road in accordance with the World Bank's guidelines onEnvironmental Assessment. Figure 1.1 Map showing location & elevation of Mydukuru -

    Jammalamadugu Road.1.2.2 Objectives of the Assignment

    The main objective would be to alleviate the current unsafe and congested conditions of the roadnetwork connecting the villages and towns by providing better quality and safe roads to the users ina sustainable and environment friendly manner. Government of India, GoI through Ministry ofEnvironment and Forest (MoEF) enforces Environment (Protection) Rules, 1986 forenvironmental protection because of intervention of new projects or activities, or on expansion andmodernization of existing projects or activity based on their environmental impacts.

    The report in hand is prepared in accordance with the World Bank's operational policies2 guidelineson Environmental Assessment and to meet the statutory requirement of Ministry of Environmental

    1 GoAP is in the process of operatinalizing RDC as per RDC act to manage core network assigned to APRDC (about 10,000km of

    roads).2 Applicable safeguards instruments are prepared based on Bank guidelines like environmental assessment (O.P. 4.01), Natural

    Habitat(O.P. 4.04), Forests(O.P. 4.06), Involuntary Resettlement(O.P.4.10) and Indigenous Peoples(O.P. 4.12)

  • 8/8/2019 EIA EMP Of MJ

    13/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 1 - 3

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    and Forest (MoEF), State Pollution Control Board, State Forest Department, etc. The objectives ofthis study are stated below:

    To present to decision makers a clear assessment of potential impact associated with theproposed project intervention,

    To apply a methodology which assesses and predict potential impacts and provides a) the meansfor impact prevention and mitigation, b) the enhancement of project benefits, and c) theminimization of long-term impacts;

    To provide a specific forum in which consultation is systematically undertaken in a manner thatallows stakeholders to have direct input to the environmental management process.

    To assess the analysis of alternatives to bring environmental considerations into the upstreamstages of development planning as well as the later stage of site selection, design andimplementation, and

    To recommend the environmental management measures to reduce adverse impacts.In order to achieve these objectives, detailed surveys and other studies have been carried out along

    the project roads to identify Valued Ecosystem Components (VEC) and corridor specific significantenvironmental issues (SEI). For investigation/monitoring purpose the study area has been defined asunder.

    o Corridor of Impact, CoI: is the 20m wide strip on either side, beyond Right of Way, RoW.o Project Influence Area, PIA: is the 10km area on either side along the alignment.o Project District, PD: is/are the district/districts through which project road is passing.

    1.2.3 Scope of Environmental Assessment (EA)The environmental assessment scope includes screening and scoping, environmental assessment andenvironmental management plans for the individual project roads as required. The EA process alsoenvisages to develop a comprehensive environmental management frame work for the entire project

    which will adopted as part of the corporate environmental policy for AP Road DevelopmentCorporation.

    Environmental Screening and Scoping

    Environmental screening exercise of the project roads were undertaken to facilitate inputs onenvironmental considerations, apart from social, economic, and traffic & transport considerations inselection of project roads out of 2056kms of roads, identified through strategic options study.Further, this report also provides scoping inputs in determining the major environmental issues anddefines the scope of work for conducting environmental assessment. As per the recommendation ofthe Environmental Screening report, detailed Environmental Assessment has been carried out forthe project roads. The scoping exercise defines geographical Boundaries for the project roads forimpact assessment as well as defining the project influence area to assess the impacts due to project

    activities.

    Environmental Assessment

    The EA for selected project roads includes establishing environmental baseline in the study area,identify the range of environmental impacts, specify the measures to avoid, minimize, and mitigatenegative impacts and maximize positive impacts and integrate possible environmental enhancementmeasures. The proposed measures will be formulated in the form of an environmental managementplan with necessary budget and institutional roles for effective implementation. The EMPs forindividual projects and integration of the same in to project implementation agreements, includingconstruction contract documents.

    Environmental Management Framework

    An Environmental Management Framework will be designed for the implementation of the project. The environmental management frame work shall consists of over all framework which will be

  • 8/8/2019 EIA EMP Of MJ

    14/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 1 - 4

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    developed as a guidance document providing environmental planning and design criteria for of thecurrent as well as future project roads, generic environmental management measures, institutionalmechanism for implementation, capacity building and training process, and resource material forRDC to function adequately to mainstream the environmental management.

    1.2.4 Project BenefitsThe implementation of the project will have the following direct benefits:

    (i) Improved quality of life for the population in the project area. Economic boost to the localpopulation by facilitate easy transportation of materials and having better connectivity for thecommercial centres.

    (ii) Provides employment facility for the local population.1.2.5 Structure of the Report

    Chapter-2: Project Description, a brief description of the project corridor is envisaged focusing on various proposed improvements of corridor with a mention on right of way, roadwayimprovements, cross drainage structures, community facilities, traffic projections etc.

    Chapter-3: Environment Regulatory Framework, presents the legal and administrative frameworkof World Bank, Government of India and Government of Andhra Pradesh. This section underlinesvarious clearances involved for the project corridor at the State level and at the Central level.

    Chapter-4 Baseline Environmental Status, the existing environmental conditions along the corridorwas ascertained by conducting a recognizance survey along with collection of secondary informationpertaining to the corridor. Primary data for various environmental parameters was generated usingsuitable monitoring devises. The methodology was strictly adhered to the Central Pollution ControlBoards stipulated guidelines.

    Chapter-5 Public Consultation was carried out in order to know the reactions of local populationand the project affected population. Meetings were held with the stake holders to record their viewson the impacts caused and the suggested remedies to be adopted for the proposed project corridor.

    Chapter-6 Analysis of Alternatives was carried out during feasibility study, covered inEnvironmental Screening and Scooping report, and the approved alternative is discussed in detail inthis chapter along with the alternatives considered in finalizing the alignment.

    Chapter-7 Environmental Impacts, likely impacts caused on various environmental and socialparameters by the various activities proposed for the project corridor was recorded in this chapter.

    Chapter-8 Mitigation & Enhancement Measures, various mitigation & enhancement measures weresuggested for the impacts caused due to various activities.

    Chapter-9 Based on potential impact and proposed mitigation measure EnvironmentalManagement Plan, is prepared. Organizational framework for execution and monitoring of EMP isalso prepared along with cost estimate for Environment management.

  • 8/8/2019 EIA EMP Of MJ

    15/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 1 - 5

    Fig 1.1: Location Map and Elevation Graph of Mydukuru - Jammalamdugu Road

  • 8/8/2019 EIA EMP Of MJ

    16/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 1

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    TABLE OF CONTENTS

    CHAPTER - 2: DESCRIPTION OF THE PROJECT .........................................................................3

    2.1 GENERAL............................................................................................................................................................3

    2.2 PRESENTCHARACTERISTICS ......................... ........................... ............................ ........................... .........3

    2.2.1 Right of Way (ROW)............... ............................ ............................. ............................ .........................3

    2.2.2 Traffic Scenario ......................... ........................... ............................ ...................................... ................4

    2.2.3 Road Width............................ ........................... ............................ ........................... ............................... 4

    2.2.4 Land Use and Roadside Environments.................. ............................ ............................. ...................5

    2.2.5 Villages and Urban-Built Up Sections ......................... ........................... ............................ ................7

    2.3 PROPOSEDIMPROVEMENTS.....................................................................................................................7

    2.3.1 Proposed CW Configuration and Cross Sections................... ........................... ............................ ...7

    2.3.2 Identification of Realignment and Bypass Provisions .......................... ............................ .............11

    2.4 CULVERTSANDBRIDGES ........................ ............................. ............................. ............................ ...........11

    2.5 IDENTIFICATIONOFBORROWAREAS...............................................................................................12

    2.6 GEOTECHNICALINVESTIGATIONS ........................ ........................... ........................... ......................12

    2.7 HYDRAULICANDHYDROLOGICALINVESTIGATIONS ......................... ............................ ........13

    2.8 ROADSAFETYREVIEW ............................ ............................. ............................. ............................ ............13

    2.9 ROADCONSTRUCTIONSTANDARDS,NORMSANDGUIDELINES ......................... ...............18

    LIST OF TABLES

    Table 2.1: Summary of Right of Way ........................... ............................. ............................ .................................... .......3

    Table 2.2: AADT along Homogeneous segments of Mydukur-Jammalmadugu Road............................................4

    Table 2.3: Carriageway Width / lane Configuration along Mydukuru Jamalmadugu Road.................................4

    Table 2.4: Section wise AADT and LOS ........................... .......................... ........................... ....................................... ..4

    Table 2.5: Summary of Land Use......................................................................................................................................5

    Table 2.6: Inhabitation along the Project Road ............................ ............................. ................................. .................... 7

    Table 2.7 Details the typical cross sections adopted for project road.........................................................................7

    Table 2.8: Summary of Proposals for Culverts ......................... ............................ ........................... .............................12

    Table 2.9: Details of Existing Bridges and Proposal....................................................................................................12

    Table 2.10: Realignment sections ........................... ........................... ............................ ................................... ...............13

    Table 2.11: Embankment Raising Locations.................................................................................................................14

    Table 2.12: Summary of Proposed Horizontal Alignment..........................................................................................14

    Table 2.13: Summary of Proposed Minor and Major Junctions ......................... ........................... ............................14

    Table 2.14: Longitudinal Markings Proposed for the Project Road..........................................................................15

    Table 2.15: Locations of proposed Crash Barrier.........................................................................................................16

  • 8/8/2019 EIA EMP Of MJ

    17/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 2

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    Table 2.16: Location of Bus Shelters.......................... ............................. ............................ ..................................... .....17

    LIST OF FIGURES

    Fig. 2.1: Land use plan of Mydukur-Jammalmadugu Road...........................................................................................6

    Fig 2.2: Typical Cross section for 4-Lane road in Builtup Area and Rural Area (Concentric Widening) .............8

    Fig 2.3: Typical Cross section for 4-Lane road in Rural Area (Eccentric Widening and New Formation) ..........9

    Fig 2.4: Typical Cross section with use of Fly ash in Embankment..........................................................................10

  • 8/8/2019 EIA EMP Of MJ

    18/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 3

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    CHAPTER - 2: DESCRIPTION OF THE PROJECT

    2.1 GENERALMydukuru - Jammalmadugu Road, the project

    road is a section of State Highway No.57,located in Rayalseema Region of AndhraPradesh. The Project road starts from km153/000 in Mydukuru town at the junction

    with NH-18 in Kadapa district and runs southeast direction connecting Jammalmadugu,

    Vishwandhapuram, Proddutur, Chanduru andterminates at km 194/000 near

    Jammalmadugu R&B Guest House. TheProddutur bypass between km 171/400 and177/400 is not included in the project scope.Cumulative length of PR is 35.0km. The

    project road will improve connectivity todistrict town Kadapa, important tourist place,through NH-18 and is widely used byinterstate traffic.

    The ROW varies between 12 to 30m. The land use is predominantly agricultural and barren.

    The terrain is plain. The condition of road surface varies between fair to good condition except fewlocations where it is in poor condition.

    There are three critical locations along the project road, which needs special attention. Around 600mlength, from km 178/200 to km 178/800 (Peddasettipalli village), and 400 m length, from 185/800 to186/200 (Dhanvalapadu village), the project road passes through very congested areas. And another

    location between km 183/000 and km 184/000, there is Kadapa stone quarry located adjacent to thePR.

    Bypass have been proposed at the above three locations, as improvement along the existing is notpossible due to poor geometrics and insufficient ROW.

    The two homogenous sections of the project road, Mydukur Proddutur and Proddutur Jammalmadugu have medium level of interstate commercial traffic and the improved connectivitywill reduce the travel time considerably.

    The following sections of this chapter provide details of the present characteristics and proposedimprovements of project road.

    2.2 PRESENT CHARACTERISTICS2.2.1 Right of Way (ROW)

    Width of ROW is not uniform along the project road. The following table gives the distribution oflength of Project road and %age length with respect to ROW width.

    Table 2.1: Summary of Right of Way

    Width of Existing ROW

    30m

    TotalLength

    8.0 12.2 10.8 3.2 0.8 35.0

    23% 35% 31% 9% 2% 100%

  • 8/8/2019 EIA EMP Of MJ

    19/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 4

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    From the above table it has been found that 58% of the PR has insufficient ROW for upgrading ofthe road to 4 lane standards and improvement of geometric, if any. This calls for major landacquisition along the PR.

    2.2.2 Traffic ScenarioThe vehicle-wise average daily traffic (ADT) figures were estimated by classified count survey. Table

    2.2 presents a summary of the vehicle-wise AADT on the project road, for each homogenous section.

    Table 2.2: AADT along Homogeneous segments of Mydukur-JammalmaduguRoad

    Vehicle Population: AADT (PCUs)

    Section Description Count Station MotorizedVehicle

    Non-MotorizedVehicles

    TotalVehicle

    MJ-01 Mydukur-Proddutur Km 170/0, Khaderbad 13980 1100 15080

    MJ-02 Proddutur-Jammalmadugu Km 178/0, Peddasettipalli 8457 645 9102

    Based on the base year traffic as presented above, traffic projections have been done to derive thetraffic demand at horizon years which are important inputs in proposing the improvement options.

    Based on the traffic projections and capacity analysis it is concluded to upgrade the existing facility to4 lane configuration.

    2.2.3 Road WidthThe carriageway/ roadway width of the project road is not uniform. The following table gives thedistribution of length of Project road and %age length with respect to carriageway width (Single lane,Intermediate Lane, Double Lane, Double lane with Paved Shoulder).

    Table 2.3: Carriageway Width / lane Configuration along Mydukuru Jamalmadugu Road

    ChainageS No.

    From To

    Length( km )

    Carriageway Type Remarks

    1 153.0 171.4 18.4 2L BT

    2 171.4 177.4 6.0 2L BT Existing Bypass Proddatur town3 177.4 195.2 17.8 2L BT

    From the road inventory it can be summarised that whole of the PR is 2lane with carriageway widthnear 6.5m. The width of earth shoulder, in case of two lane road, varies from 1.0m to 1.5m againstthe standard width of 2.5m.

    Based on the traffic figures and existing lane configurations, the existing Level of Service at which thesections of project road are experiencing is tabulated in table below:

    Table 2.4: Section wise AADT and LOS

    Section Description AADT (PCU) Existing CW Configuration Existing LOS

    MJ-01 Mydukur-Proddutur 15080 2L D-E

    MJ-02 Proddutur-Jammalmadugu 9102 2L C

    LOS A: Represents a condition offree flow.

    LOS B: Represents a condition of stable flow with restricted freedom for selection of speed.

    LOS C: Represents a condition of stable flow with little freedom for selection of speed.

    LOS D: Represents a condition oflimit of stable flowwith condition approaching unstable flow.

    LOS E: Represents a condition ofunstable flowwith volumes close to capacity.

    (Refer IRC 106: 1990)

  • 8/8/2019 EIA EMP Of MJ

    20/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 5

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    From the above analysis, the PR has already crossed LOS C/D and reaching E at some criticallocations. Hence the PR needs to be upgraded to have smoother flow of traffic.

    2.2.4 Land Use and Roadside EnvironmentsThe project road starts from Chittoor and traverses northeast direction to terminate at the outskirt ofPuttur. The following table indicates the distribution of length of Project road and %age Length in

    terms of land use and roadside environments. The existing land use within the project influence area isshown in Fig. 2.1.

    Table 2.5: Summary of Land Use

    Land Use pattern

    Urban Built-up Rural Built-up Agricultural BarrenTotal Length

    4.0 1.0 28 2.0 35.0

    11% 3% 80% 6% 100%

  • 8/8/2019 EIA EMP Of MJ

    21/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan

    Fig. 2.1: Land use plan of Mydukur-JammalmaduguRoad

  • 8/8/2019 EIA EMP Of MJ

    22/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 7

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    2.2.5 Villages and Urban-Built Up Sections Around 86% length of the project road passes through non-built up area; remaining 14% lengthtraverses through inhabited area. There are a number of villages and settlements located along theproject road as tabulated below:

    Table 2.6: Inhabitation along the Project Road

    ChainageS No.

    From To

    Length( km )

    Name of Village/Town Remarks

    1 153.0 155.0 2.0 Mydukuru

    2 156.0 156.5 0.5 Vishwanadapuram Village

    3 163.0 163.5 0.5 Pallavolu Village

    4 171.4 178.0 6.6 Prodhutoru Village Existing Bypass

    5 178.4 178.6 0.2 Pedasettipalli Village

    6 180.0 180.5 0.5 Shankarapalli Village

    7 182.0 183.5 1.5 Chauduru Village

    8 186.0 186.5 0.5 Salivendula Village

    2.3 PROPOSED IMPROVEMENTS2.3.1 Proposed CW Configuration and Cross Sections

    The existing CP road is proposed to be upgraded to 4 lane configuration; the typical cross sectionsfollowed are depicted in Figures 2.2 to 2.4.

    Table 2.7 Details the typical cross sections adopted for project road.

    SlNo

    Cross Section Type Description Location / Remarks

    1 Type-1 4 -Lane road in Built-up Area (ConcentricWidening)

    4-Lane road divided Carriageway 7.25m

    (CW) + 2.5m earthen shoulder (ES) and1.50m Brick Masonry longitudinal drain onboth side of 1.2m wide median.

    In major built-up areas. ES area will

    also be used for utilities. Longitudinaldrain shall be covered partly whereverrequired.

    2 Type-24-Lane road in Rural Area(Concentric Widening)

    4-Lane road divided 7.25m CW + 2.5m ESand trapezoidal unlined drain on both sidesof 1.2m median.

    Widening on both sides of theexisting CW

    3 Type-34-Lane road in Rural Area(Eccentric Widening)

    4-Lane road divided 7.25m CW + 2.5m ESand trapezoidal unlined drain on both sidesof 1.2m median.

    Widening on LHS or RHS of theexisting CW

    4 Type-44-Lane Road in Rural Area(New Formation)

    4-Lane road divided 7.25m CW + 2.5m ESand trapezoidal unlined drain on both sidesof 1.2m median.

    New Formation in Realignmentlocations.

    5 Type-5Embankment Constructionwith Fly ash

    Embankment construction with fly ash inwidening and new formations.

    Proposed at the sections withembankment height more than 2.0m.

  • 8/8/2019 EIA EMP Of MJ

    23/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan

    PROPOSED ROW=24200(Min)

    EXISTING CARRIAGEWAY

    7250 1200

    ANTIGLARE RAILING

    CARRIAGEWAY CARRIAGEWAY

    BC 40mmDBM 50mm

    BM 75mm (Package-1)

    WMM 230mm

    GSB 150mm

    LAMP POST

    BUILT-UPAREA

    2.5%

    X'X

    NO

    DETAIL AT X-X

    25001500

    TYPICAL CROSS S ECTION FOR

    (TYPE-1)

    4-LANE ROAD IN BUILTUP AREA

    PCC

    UTILITY

    1

    HFL

    DBM

    BC

    BM

    WM M

    GSB

    EXISTINGCRUST

    VARYING

    (MIN

    1000)

    3.0%

    7250

    2.5%

    SLECTED SOIL

    ES

    SUBGRADE 500mm(CBRMIN.7)

    DRAIN

    SUBGRADE

    1 A

    2 D

    BM 65mm (Package-2)

    EXISTING CARRIAGEWAY

    1200 7250

    CARRIAGEWAY

    BC 40mmDBM 50mm

    BM 75mm (Package-1)

    WMM 250mm

    GSB 150mm

    2.5%3.3.0%

    7250

    CARRIAGEWAY

    2

    ES

    2500

    ES

    TYPICAL CROSS SECTION FOR

    4-LANE ROAD IN RURAL AREA (CONCENTRIC WIDENING)

    21

    SELECTED

    CBR>10, PI

    (TYPE-2)

    2.5%

    DRAIN

    PROPOSED ROW=30000

    20700

    X'X

    DETAIL AT X-X

    15 0

    10 0

    WM M

    DBM

    BC

    60

    BM

    SUBGRADE 500mm

    (CBR MIN. 7)

    BM 65mm (Package-2)

    Fig 2.2: Typical Cross section for 4-Lane road in Builtup Area and Rural Area (C

  • 8/8/2019 EIA EMP Of MJ

    24/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan

    NOTES:

    1 ALL DIMENSION ARE IN MI2 ES: EARTHEN SHOULDER

    EXISTING FORMATION

    1200 7250

    CARRIAGEWAY

    BC 40mmDBM 50mm

    BM 75mm (Package-1)

    WMM 250mm

    GSB 150mm

    2.5%3.0%3.0%

    7250

    CARRIAGEWAY

    2500

    ES

    2500

    ES

    TYPICAL CROSS SECTION FOR

    4-LANE ROAD IN RURAL AREA (ECCENTRIC WIDENING)

    21

    (TYPE-3)

    2.5%

    DRAIN

    PROPOSED ROW=30000

    20700

    SUBGRADE 500mm(CBR MIN. 7)

    BM 65mm (Package-2)

    TYPICAL CROSS SECTION FOR

    4-LANE ROAD IN RURAL AREA (NEW CONSTRUCTION)

    (TYPE-4)

    1200 7250

    CARRIAGEWAY

    BC 40mmDBM 50mm

    BM 75mm (Package-1)

    WMM 250mm

    GSB 150mm

    2.5%3.0%

    7250

    CARRIAGEWAY

    2500

    ES

    2500

    ES

    21

    SELECTED SO

    CBR>10, PI

  • 8/8/2019 EIA EMP Of MJ

    25/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan

    EXISTING CARRIAGEWAY

    CARRIAGEWAY

    BC 40mmDBM 50mmBM 75/65mm

    WMM 250mm

    GSB 230mm

    2.5%3.0%3.0%

    CARRIAGEWAY ESES

    21

    2

    1

    SELECTED SOILCBR>10, PI

  • 8/8/2019 EIA EMP Of MJ

    26/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 11

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    2.3.2 Identification of Realignment and Bypass ProvisionsThere are three locations on the Project Road (PR) which are critical from geometric and land usepoint of view. From km 183/00 to 184/00 and from km 185/800 to 186/400 project road passesthrough village Dhanvalapadu with sub-standard horizontal geometrics which need improvement.

    The details of these locations are discussed below:

    Pedasettipalli: Around 600m length, from km 178/200 to km 178/800, project road passes through very congested area of Peddasettipalli village. There are three reverse curves in this segment. TheROW varies from 8m to 12m. The houses are abutting the roadway and location is prone toaccidents. The entire village is situated on the south of the project road; on the northern side thereare four-five houses in scattered form.

    Consultants have explored the possibility of bypass on left (south) and right (north) of the village. The take-off and merging points for both alternatives are broadly kept same. Based on thepreliminary examinations of two alternatives and the discussion with the APRDC officials, it wasconcluded that Alternative -2, new alignment on RHS (north side of Peddasettipalli village), would beproposed for the Project.

    Kadapa Stone Quarry & Dhanvalapadu village Realignment: The PR road is passing through

    Kadapa stone quarry area between km 183/00 to km 184/00. There is deep excavation on both sidesof existing road right, abutting to outer edge of shoulders. The widening of road to four lane,

    whether concentric or eccentric, would necessitate construction of retaining wall of more than 15mheight; still it would be a accident prone area. The Consultants explored the possibility to providerealignment on LHS/RHS of project road. On RHS, realignment is considered more appropriate dueto Penneru River on LHS. This realignment will also bypass the Dhanvalapadu village for Mydukurbound traffic. A small realignment will be proposed on LHS of Dhanvalapadu village for

    Jammalmadugu bound traffic. The proposed realignment is shown in Fig. 2.5.

    183200.

    000

    183

    300.000

    1834

    00.000

    18350

    0.000

    183600.0

    00

    183700.000

    183800.000

    183900.000

    184000.000

    184100.000

    184200.000

    184300.000

    184400.0

    00

    18450

    0.000

    184600

    .000

    184700.00

    0

    1848

    00.000

    184

    900 .

    000

    1 8

    5 0 0

    0 . 0

    0 0

    1 8

    5 1

    0 0

    . 0

    0 0

    1 8

    5 2

    0

    0 .

    0 0

    0

    1 8

    5 3

    0 0

    . 0

    0 0

    1 8 5 4

    0 0

    . 0 0

    0

    18

    5 5

    0 0

    . 0 0 0

    1 8 5

    60

    0 . 0 0

    0

    1 8

    5 7

    0 0

    . 0

    0 0

    1 8

    5 8

    0 0

    . 0 0 0

    18

    5 9

    0 0

    . 0

    0 0

    1 8

    6 0

    0 0

    . 0

    0 0

    1 8 6 1 0 0

    . 0 0 0

    1 8 6 2 0 0

    . 0 0 0

    1 8 6 3 0 0

    . 0 0 0

    1 8 6 4 0 0

    . 0 0 0

    1 8 6 5

    0 0

    . 0

    0 0

    1 8 6 6 0 0

    . 0 0

    0

    1 8 6 7 0 0 . 0

    0 0

    1 8 6 8 0 0

    . 0 0 0

    1 8 6 9 0 0

    . 0 0 0

    1 8 7 0 0

    0 .

    0 0

    0

    1 8 7 1 0 0 . 0

    0 0

    1 8 7 2 0 0 . 0

    0 0

    1 8 7 3 0 0 . 0

    0 0

    1 8 7 4 0

    0 .

    0 0 0

    1 8 7 5

    0 0

    . 0 0

    0

    18

    7600

    .0001

    87700 .

    000

    18320

    0.0

    18330

    0.0

    183

    400.

    0

    18350

    0.0

    1836

    00.0

    1837

    00.0

    183

    800.0

    183

    900.0

    184

    000.

    0

    18410

    0.0

    18420

    0.0

    184300

    .0

    184400

    .0

    18450

    0.0

    184

    600

    .0

    184700.0

    1848

    00.0

    184900.0

    185000

    .0

    1851

    00.0

    185200

    .0

    18530

    0.0

    1854

    00.0

    1855

    00.0

    185600

    .0

    18570

    0.0

    1858

    00.0

    185900.0

    186000.0

    18610

    0 .0 1

    8 6

    2 0

    0 .

    0

    1 8 6 3 0 0

    . 0

    1 8 6 4 0 0

    . 0

    1 8

    6 5 0

    0 . 0

    186600

    .0

    18670

    0.0

    186

    800.0

    18690

    0.0

    1870

    00

    .0

    Fig. 2.5: Realignment at Kadapa Stone Quarry and Dhanvalapadu Village

    2.4 CULVERTS AND BRIDGESThe Bridge and culvert inventory was carried out to assess the existing condition and the hydrologicaladequacy. The detailed information on all the structural components, HFL, LWL dimensions of allthe components, linear water way, vertical clearances, drainage spouts, handrails etc. are recorded.

    There are 107 culverts and 15 bridges on the project road. Some additional culverts have been

    proposed depending on the hydrological requirements. A summary of improvement proposals forcross-drainage structures are given in Table 2.8 and 2.9.

  • 8/8/2019 EIA EMP Of MJ

    27/234

  • 8/8/2019 EIA EMP Of MJ

    28/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 13

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    of various strata and to ascertain the sub surface profile of soils and bed rock to determine the mostsuitable foundation levels of structures.

    2.7 HYDRAULIC AND HYDROLOGICAL INVESTIGATIONS All the hydraulic data for bridges has been collected from the field and it has been analyzed andstudies carried out to determine the adequacy of waterway of the existing bridges proposed to be

    retained and new bridges to be constructed as per provisions ofIRC:5-1998 and IRC: SP-13. 50 yearreturn flood was considered.

    2.8 ROAD SAFETY REVIEWThe basic aim for road safety review is to identify areas of major concern, including black spots andaccident-prone stretches on project road and to propose measure to be taken for improving theengineering design with respect to road safety aspects.

    Consultants have carried out a detailed reconnaissance along the project roads and identified areas ofmajor concern, including black spots and accident-prone stretches on each project road. Based oncritical analysis of accident-prone stretches, the observed main causes for accidents are as list below:

    1. Inadequate width, of shoulders, varies from 1.0m to 1.5m, which is not sufficient for parking of

    disabled vehicles and space for emergency stops for vehicles away from the carriageway.

    2. Majority of horizontal curves are not provided with transition curve and do not have sufficientsetback distance and safe stopping distance.

    3. The vertical alignment of project roads traverses through plain to hilly terrain and do not havesufficient safe stopping distance and compatibility between horizontal and vertical alignment ismissing.

    4. Lack of segregation of traffic in both direction and lack of access control in built-up area

    5. Non-provision of acceleration and deceleration lanes and intersection / junction.

    Following measures have been taken up for improve the traffic safety:

    1. Geometric Design Aspects

    2. Design of Intersections

    3. Traffic Control and Road Safety Features

    4. Roadside facilities

    5. Traffic Calming

    A) Geometric Design Aspects

    All geometric design elements have been carried out as per Design standards stipulated for Project inconsonance with IRC codal provisions. Comprehensive design standards, which link individualdesign elements to best estimates of actual speed have been utilised. The objective is that drivers

    must not be presented with the unexpected. The emphasis has been given on maintaining continuityor giving adequate warning where it could not be made.

    Following realignment locations have been identified to improve the horizontal geometrics of theproject road.

    Table 2.10: Realignment sections

    Realignment Locations

    From To

    Length(km)

    Remarks

    178.500 179.650 1.150 Peddasettipalli Bypass realignment

    183.200 187.550 4.350 Major realignment at Kadapa Stone Quarry

    Total(km)

  • 8/8/2019 EIA EMP Of MJ

    29/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 14

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    Following embankment raising locations have been identified to improve the vertical geometrics andsubmergence locations along the project road.

    Table 2.11: Embankment Raising Locations

    ChainageSr.No. From To

    Length of Emb.Raising (m)

    Height of Emb.Raising (m) Reason for raising

    1. 4.100 4.650 550 0.8 Vertical improvement

    2. 10.050 10.450 300 0.8 Bridge

    3. 11.950 12.300 350 0.8 Vertical improvement

    4. 12.650 16.300 3650 1.0 Bypass, viaduct

    5. 17.100 17.450 350 1.0 Viaduct

    6. 20.500 20.750 250 1.0 Bridge

    7. 27.850 28.400 550 1.0 Bridge

    8. 29.150 29.400 250 0.7 Vertical improvement

    9. 44.100 44.850 750 1.1 Bridges

    10. 46.300 46.750 450 1.1 Bridges

    11. 47.500 47.750 250 0.7 Vertical improvement

    12. 50.500 51.000 500 1.0 Bridge

    13. 53.100 53.450 350 0.5 Vertical improvement

    14. 63.050 63.350 300 1.1 Bridge

    15. 64.100 64.450 350 0.8 Vertical improvement

    16. 67.850 68.150 300 0.7 Vertical improvement

    Adequate measures have been taken so that the raising if any in settlement areas should beminimum possible and in no case exceed 0.5m..

    The design speed has been kept quite consistent, and speed difference between two consecutivecurves is not exceeded. All horizontal curves are designed for 100 kmph or 80 kmph or the lowest

    one is 65kmph, as detailed in table 2.12 below:Table 2.12: Summary of Proposed Horizontal Alignment

    Radius of Curve (m) Design speed (kmph))Total Noof Curves 150-200 200-400 400-800 800 -2000 >2000 65 80 100

    70 - 5 12 13 40 - 2 68

    All horizontal curves have been designed with proper transition curves and super-elevation runoff.All vertical curves have been design for minimum stopping sight distance. Due care has been taken toavoid the raising of profile at urban/builtup locations and in any case the raising has been restrictedto 0.5m.

    In built-up areas, the cross-section 1 and 3 (provision of drain and footpath) has been adopted tosegregate the local pedestrians from through motorised traffic.

    B) Design of Intersections

    Accident data reveals number of accidents at intersection account for almost 30 -40% of all reportedroad accidents in India. During the detailed design proposal, all major and minor junctions have beenstudied thoroughly with respect to traffic volume and geometric. The important minor junctionsleading to villages and major settlements have been identified and proper junction layouts (includingroad markings and traffic signs) have been applied as per IRC-SP: 41-1994. Design of major junctionshas been carried out based on peak hour traffic data. List of major and minor junctions is givenbelow:

    Table 2.13: Summary of Proposed Minor and Major JunctionsSl. Chainage Type/ Width Road Leads to Type of Remarks

  • 8/8/2019 EIA EMP Of MJ

    30/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 15

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    No. Intersection1 153/000 BT/7 Kurnool/Badwel/ Kadapa + Jn with NH-18

    2 171/400 BT/7Jammalmadugu/Proddutur town

    Y Proddutur Bypass take off

    3 177/400 BT/7Jammalmadugu/Proddutur town

    Y Proddutur Bypass end

    C) Traffic Control and Road Safety Features

    Traffic control devices and road safety features, comprising of following, plays a key role ininfluencing driver behaviour, orientation and information:

    Traffic Signs

    Road Markings

    Delineators

    Road lighting

    Crash Barrier

    (i) Traffic Signs

    Traffic signs are divided into three broad categories; Warning signs, Regulatory signs and informatorysigns. Warning sign play a crucial role in terms of road safety, in giving advance information abouthazards ahead. Typical examples of warning signs are Curve ahead, Pedestrian crossings, gap inmedian etc. Regulatory/ Mandatory signs regulates the side road or through traffic in order to have asafe movement. STOP, speed limit, NO parking etc, are some of the regulatory traffic signs.Informatory signs are provided to give information and guidance about the facilities available to theroad users. Village sign boards, Fuel stations, Hospitals etc are some of the information sign boards.

    All critical locations were identified after the proposed geometric improvements along the projectroad and cross roads, where warning, Regulatory and Informatory signs are required.

    Traffic signs have been designed to convey clear and unambiguous messages to road users so thatthey can be understood quickly and easily. IRC-67:1977, code for Practice of Road Sign, has beenfollowed for finalisation of sign installation. On unkerbed roads segments, the extreme edge of thesign would be 2 to3m from the edge of the carriageway. On kerbed roads it is proposed as not lessthan 60cm away from the edge of the kerb.

    (ii) Road Markings

    Road markings play a very important role in guiding the driver and providing him/ her with theinformation necessary to negotiate conflict points on the road network. It is given a high priority forimproving safety. IRC-35: 1997, Code of Practice for Road Markings, provides the recommendedpractice for use of road markings. Road markings are lines, words and Symbols attached to thecarriageway or adjacent to the carriageway, for controlling, warning, guiding and informing the users.

    Yellow, white and black colours are the standard colours used for marking. Road marking areclassified as longitudinal marking, marking at intersections, marking at hazardous locations, markingfor parking, word messages. The longitudinal marking proposed along the project road as givenbelow:

    Table 2.14: Longitudinal Markings Proposed for the Project Road

    Type of line Figure Description

    Broken line

    SINGLE BROKEN LINE

    Broken lines are permissive in characterand may be crossed with discretion, iftraffic permits.

  • 8/8/2019 EIA EMP Of MJ

    31/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 16

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    Type of line Figure Description

    Solid lines

    SINGLE SOLID LINE

    Solid lines are restrictive in character andindicate that crossing is not permittedexcept for entry or exit from a side road.

    Double solidlines

    PAIR OF SOLID LINES

    Double solid lines indicate maximumrestrictions and are not to be crossedexcept in emergent usage.

    Combination ofbroken and solidlines

    COMBINATION OF BROKEN & SOILD LINES

    In a combination of broken and solidlines, a solid line may be crossed, withdiscretion, if the broken line is nearer tothe direction of travel. Vehicle from theopposite directions are not permitted tocross the solid line.

    Thermoplastic road markings have been proposed considering their long-lasting effect.

    (iii) Delineators

    The delineators are most likely to be effective on dangerous bends, on approaches to intersectionsand on embankments. Though all horizontal curves are design to the IRC standards, delineators havebeen proposed for additional guidance and information to the commuter at curves (Radius less that1000m). Locations along the high embankment have also been provided with delineators. Delineators

    with reflectorised panels have been considered.

    (iv) Road lighting

    Night-time accidents in urban areas can be substantially reduced by the implementation of adequatestreet lighting. The stretches of the project road traversing through the built-up/urban areas are

    proposed with adequate lighting. Road lighting has also been proposed at all major junctions. One/Two/ Three arm bracket Sodium vapour lamps have been considered

    (v) Crash Barrier

    In addition to the adequate provisions of roadway width and roadside design, crash barrier/guardrails have been proposed to be installed along the roadway edge on either side based on the sectionsof the project road having:

    At all the bridge approaches

    Embankment with >3 m height

    Horizontal curves with deflection angle >30 degrees and Radius

  • 8/8/2019 EIA EMP Of MJ

    32/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 17

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    Bus Lay-byes and Shelters

    (i) On-street Parking

    At quite a few locations, project road traverses through built-up areas where small commercialactivities are carried out on both side of the road. The proposed 1.5m paved shoulder may be utilisedfor short time parking of the vehicles. This kerbside parking is permitted only if stationary vehicles donot unduly interfere with free and safe movement of vehicles. Besides, bus laybyes and truck laybyesare proposed for off-street parking,

    (ii) Bus Lay-byes and Shelters

    Consultants have identified the location/site for the proposed bus-lay bye for each village or built-uplocations based on the following criteria:

    18 no.s Bus shelters are proposed near to residences to minimise walking distance and majorintersection/junction should have direct pedestrian links segregated from motorised traffic.

    It should be positioned in straight and level sections of road and should be visible from a longdistance in both directions.

    Table 2.16: Location of Bus Shelters

    LocationSl.No

    DescriptionLHS RHS

    Remarks

    1 Shelter 153.050 153.100 Mydukuru

    2 Shelter 156.350 156.400 Vishwanadapuram Village

    3 Shelter 161.100

    4 Shelter 162.600 162.650

    5 Shelter 168.100 168.150

    6 Shelter 170.950 170.900 Prodhutoru Village

    7 Shelter 177.800

    8 Shelter 177.400

    9 Shelter 183.150

    10 Shelter 183.350 Chauduru Village

    11 Shelter 187.000 187.050 Salivendula Village

    12 Shelter 190.650

    E) Traffic Calming

    Speed is arguably a factor in every accident. Lower speeds reduce both the likelihood of the accidenthappening and the severity, if it does occur. Speed reduction benefits have received much attention inrecent years and an international review of speed and accidents concluded that, on an average, each

    5km reduction in speed would result in a 22% reduction in fatal accidents.(1 mile leads to 7%)

    Traffic calming measures need to be applied in a formal structured manner. All features should onlybe constructed where approach speeds are such that all road users can perceive the calming featureand traverse it safely. They should not be used in isolation but as part of a strategy covering a stretchof road or an area. Accordingly following two types of Traffic calming measures, i.e Speed humpsand rumble strips have been proposed along the project road.

    Road Humps

    Rumble Strips

    (i) Road Humps

    Road Humps or Speed breakers are formed by providing a rounded hump of 3.7m width(17m radius) and 100mm height for the preferred advisory crossing speed of 25kph for general trafficas per the IRC: 991988. The basic material for construction is bituminous concrete formed torequired shape. Road humps have been proposed on minor roads at junctions /intersections with

  • 8/8/2019 EIA EMP Of MJ

    33/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 18

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    major roads, School and Hospital zones. Proper signboards and markings are provided to advise thedrivers in advance of the situation. Road humps are extended across carriageway up to the edge ofpaved shoulder. Proper signboards and marking are proposed to advise the drivers in advance of theRoad humps.

    (ii) Rumble Strips

    Rumble Strips are formed by a sequence of transverse strips laid across a carriageway with maximumpermitted height of 20mm. These rumble devices produce audible and vibratory effects to alertdrivers to take greater care and do not normally reduce traffic speeds in themselves. The typicaldesign details of rumble strips proposed are transverse strips of Pre-mix bituminous concrete 500mm

    wide and overall thickness 20mm laid across a carriageway up to the end of paved shoulder. Therewill be 6 such transverse strips spaced at 0.5 m c/c. Rumble strips are proposed at:

    Sharp curves with radius less than 170m.

    Transition zones (speed limit zones).

    Village/built-up approaches.

    Sensitive receptors (Schools and hospitals)

    Proper signboards and marking are proposed to caution the drivers in advance of the situation.

    Photographs of Some of the Activities on Mydukuru - Jammalamadugu Road

    2.9 ROAD CONSTRUCTION STANDARDS, NORMS AND GUIDELINESFollowing the road construction standards and norms and management procedure has been adoptedto keep the standards and guidelines maintained by the Indian Roads Congress (IRC):

    i) Guidelines for Environmental Impact Assessment of Highway Projects, IRC: 104- 1988.

    ii) Recommended Practice for Treatment of Embankment slopes for erosion control, IRC: 36-1974.

    iii) Recommended Practice for Borrow pits for Road Embankment for Road manual operation, IRC:10-1961.

  • 8/8/2019 EIA EMP Of MJ

    34/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Environmental Impact Assessment & Environmental Management Plan 2 - 19

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    iv) Recommended Practice for the construction of Earth Embankments for Road Works, IRC: 36-1970.

    v) Highway Safety Code, IRC, special publication no. 44.

    vi) Guidelines on Bulk Bitumen Transportation and Storage Equipment, IRC, special publication 39.

    vii) Recommended Practice for Tools Equipment and Appliances for Concrete PavementConstruction, IRC: 43-1972.

    viii)Recommended Practice for use and Upkeep of Equipment, Tools and Appliances forBituminous Pavement Construction, IRC: 72-1978.Road Accident Forms A-1 and 4, IRC: 33-1982.

    ix) The factories act 1956 for hygiene and safety requirements of construction workers.

    x) Other relevant codes of BIS and National Building Codes.

  • 8/8/2019 EIA EMP Of MJ

    35/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Volume-VII:Environmental Impact Assessment & Environmental Management Plan 3 - 1

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    TABLE OF CONTENTS

    CHAPTER-3: ENVIRONMENT REGULATORY FRAMEWORK.................................................. 2

    3.1 APPLICABLEREGULATIONS ........................ ........................... ............................ ........................... ......... 2

    3.1.1 Legal Framework.... ............................. ............................ ............................. .................................... .... 2

    3.1.2 Key Environmental Laws and Regulations....................... .......................... ........................... .......... 2

    3.1.3 Environmental Requirements of the State ........................... .......................... ........................... ....... 3

    3.1.4 Other Legislation Applicable to Road Construction Projects ........................ ........................... ... 4

    3.1.5 World Bank Environmental Requirements...... .......................... ........................... ........................... 5

    3.1.6 Summary of Clearance Requirements ........................... ............................ ............................. ........... 5

    LIST OF TABLES

    Table 3.1: Environmental Regulations and Legislations ................................................................................ 2Table 3.2: Applicability of WB Safe Guard Policies .................................................................................... 5

  • 8/8/2019 EIA EMP Of MJ

    36/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Volume-VII:Environmental Impact Assessment & Environmental Management Plan 3 - 2

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    CHAPTER-3: ENVIRONMENT REGULATORY FRAMEWORK

    3.1 APPLICABLE REGULATIONSThe chapter presents a review of the existing institutions and legislations relevant to the project at

    the National and State level. The various statutory clearances from various state and centralgovernment authorities and the institutional and legal frameworks are discussed in the followingparagraphs.

    3.1.1 Legal FrameworkThe Government of India has laid out various policy guidelines, acts and regulations pertaining toenvironment. The Environment (Protection) Act, 1986 provides umbrella legislation for theprotection of environment. As per this Act, the responsibility to administer the legislation has beenjointly entrusted to the Ministry of Environment and Forests (MoEF) and the Central PollutionControl Board (CPCB)/Andhra Pradesh State Pollution Control Board (APPCB) in the presentcontext. More details on the legal framework of Government of India and State Governmentregulations and clearance procedures are envisaged in the following paragraphs.

    3.1.2 Key Environmental Laws and RegulationsTable 3.1 presents the environmental regulations and legislations relevant to AP state road project.

    Table 3.1: Environmental Regulations and Legislations

    SR.No

    Act / Rules PurposeApplicableYes/ No

    Reason for Applicability Authority

    1EnvironmentProtection Act-1986

    To protect and improveoverall environment

    Yes

    As all environmentalnotifications, rules andschedules, are issued under thisact.

    MoEF. Gol; DoE,State Gov. CPCB;SPCB

    2Environmental Impact

    Assessment Notification14th Sep-2006

    To provide environmentalclearance to newdevelopment activitiesfollowing environmental

    impact assessment

    NOThis notification is NOTapplicable to Project road, thestatus of the project road isMajor District Road.

    MoEF. EIAA

    3Notification for use of fly

    ash

    Reuse large quantity of flyash discharged fromthermal power plant tominimize land use fordisposal

    YesThermal plant within 100kmreaches.

    4Coastal Regulation

    Zone(CRZ) Notification1991 (2002)

    Protection offragilecoastal belt

    NORoad is not located alongcoastal belt

    5National Environment

    Appellate Authority Act(NEAA) 1997

    Address Grievancesregarding the process ofenvironmental clearance.

    YesGrievances if any will be dealtwith, within this act.

    NEAA

    6The Land AcquisitionAct 1894 & 1989

    Set out rule foracquisition. of land bygovernment

    Yes

    This act will be applicable to asthere will be acquisition of landfor widening, geometricimprovements and

    realignments.

    RevenueDepartment StateGovernment.

    7

    Moef Circular onMarginal LandAcquisition and Bypasses1999

    Defining marginal landacquisition relating to the1997 Notification

    NOSuper seeded by 2006notification.

    MoEF

    8

    The Forest(Conservation) Act 1927The Forest(Conservation) Act. 1980forest (conversion ) Rules1981

    To check deforestationby restricting conversionof forested areas intonon- forested areas

    NONO forest area within theproject influence area.

    ForestDepartment,GoAP

    9

    MoEF circular (1998) onlinear Plantation onroadside, canals andrailway lines modifyingthe applicability ofprovisions of forest(Conversation) Act, tolinear Plantation

    Protection / plantingroadside strip asavenue/strip plantationsas these are declared

    protected forest areas.

    NORoadside tree plantation inAndhra Pradesh does not comesunder the forest act.

    MoEF

  • 8/8/2019 EIA EMP Of MJ

    37/234

    The Louis Berger Group, Inc.

    Detailed Project Report, Volume-VII:Environmental Impact Assessment & Environmental Management Plan 3 - 3

    Andhra Pradesh Road Sector ProjectFeasibility Study, Design and Detailed Engineering

    SR.No

    Act / Rules PurposeApplicableYes/ No

    Reason for Applicability Authority

    10Wild Life ProtectionAct 1972

    To protect wildlifethrough certain ofNational Parks andSanctuaries

    NOThis act is NOT applicable asthere is NO points of wildlifecrossings along project corridor.

    Chief ConservatorWildlife, WildlifeWing, ForestDepartment,GoAP.

    11Air (Prevention andControl of Pollution)Act, 1981

    To control air pollution by

    & Transport controllingemission of airDepartment. pollutants asper the prescribedstandards.

    Yes

    This act will also be applicable

    during construction; forobtaining NOC forestablishment of hot mix plant,workers' camp, constructioncamp, etc.

    SPCB

    12Water Prevention andControl of Pollution)Act1974

    To control waterpollution by controllingdischarge of pollutants asper the prescribedstandards

    Yes

    This act will be applicable duringconstruction for (establishmentsof hot mix plant, constructioncamp, workers' camp, etc.

    SPCB

    13Noise Pollution(Regulation andControl Act) 1990

    The standards for noise forday and night have beenpromulgated by the MoEFfor various land uses.

    Yes

    Thi