EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background •...

40
EIA CONSULTANT REGISTRATION SCHEME 1 EIA Consultation Workshop On Criteria & Training Curriculum 24 th May 2011

Transcript of EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background •...

Page 1: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

EIA CONSULTANT

REGISTRATION SCHEME

1

EIA Consultation Workshop

On Criteria & Training Curriculum

24th May 2011

Page 2: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

PRESENTATION STRUCTURE• Introduction• Registration category• Roles & responsibilities in EIA• Area of expertise• Registration Criteria and Requirements• Other Requirements• Code of Conduct• Appeal• Related Fees

2

• Related Fees• Registration Renewal• Registration Upgrade• Temporary Registration• Deregistration & Suspension• Confidentiality• Professional Indemnity Insurance• Forms• Training

Page 3: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

1.0 INTRODUCTION

Background

• Introduced to replace previous EIA Consultant Registration Scheme

• The document was prepared and discussed in

3

prepared and discussed in stakeholders consultation sessions.

• Prepared specially for Malaysia’s need

Page 4: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

INTRODUCTION (continued)

• Designed to improve professionalism by:

• ensuring consultants have adequate

qualifications and skills required to

conduct EIA study

4

conduct EIA study

Page 5: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

INTRODUCTION

Legal Requirements

• Currently required administratively

• DOE is in the process of gazetting the new

5

• DOE is in the process of gazetting the new

EIA regulations on registration of EIA

consultants

Page 6: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

2. 0 REGISTRATION CATEGORY

• Currently open for individual

• 3 categories – EIA Consultant,

Assistant Consultant & Subject

6

Consultant

Page 7: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

2.1 EIA Consultant

� Min 7 years in general environmental management

� Min 5 years in EIA

� Actively involved in EIA studies

� Good understanding in EIA processes and regulations

� Basic environmental management knowledge and

7

� Basic environmental management knowledge and skills

� Familiar with environmental assessment techniques and mitigating measures

� May choose up to four areas of specialization

Page 8: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

2.2 Subject Consultant

• In depth knowledge in

any field related to

EIA (e.g: list in

Section 4)

8

• Applicant may specify

further in form

Page 9: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

2.3 Assistant Consultant

� trainee level and

work under

supervision of EIA

Consultant

9

� May upgrade to

EIA Consultant

Page 10: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

3.0 ROLES & RESPONSIBILITIES

3.1 EIA Consultants:-

�Conduct the study based on scope of study or approved TOR

�Guide EIA Assistants

10

�Guide EIA Assistants

�Report writing for related sections. Draft may be done by EIA Assistants, however final write-up must be examined and approved by EIA Consultant

Page 11: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

Roles and responsibilities

3.2 Subject Consultant

• Conduct specific study/ assessment based on scope / TOR

• Prepare write up for the relevant section

11

• Prepare write up for the relevant section

Page 12: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

Roles and responsibilities

3.3 Assistant Consultant

• Assisting EIA

Consultant

• Tasks: e.g. sampling,

12

• Tasks: e.g. sampling,

data collection,

literature review

Page 13: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

Roles & Responsibilities

3.4 Special tasks for

EIA Study Team

Leader

13

� Select team members

� Undertake the scoping exercise

� Coordinate and assign tasks to members

� Be responsible over the QC aspects of report (coordination, overall presentation)

Page 14: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

4.0 Area of expertise

• Forestry

• Ecological studies

• Fisheries

• Hydrology

• Water quality

• Waste water

• Noise & vibration

• Air quality and odour

• Health impact assessment

• Quantitative Risk Assessment

• Chemical Processes

• Industrial processes (other than chemical processes)

14

• Air quality and odour

• Landscape & visual

• Geology & soil

• Geotechnical study

• Geomorphology

• Hydrogeological study

• Archaeology

• History

• Traffic impact assessment

• Social impact assessment

• Economic valuation/economic analysis

chemical processes)

• Land use planning

• Mining

• Quarrying

• Scheduled Waste Management

• Solid Waste Management

• Chemical processes

• Other Industrial Processes

• General environmental management

• OTHERS (can be specified in the application form)

Page 15: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

REGISTRATION CRITERIA AND

REQUIREMENTSCriteria EIA Consultant

Academic qualification Degree in science, technology or engineering. Applicants

with other non-technical or science degrees may only

work within their specialization

General environmental

management experience

Minimum 7 years

15

EIA-related experience Minimum 5 years

Minimum number of EIA

reports approved

5 reports

Core competencies i. Attendance of formal EIA Training

ii. Sufficient understanding of EIA process, environmental

planning, law and regulations in Malaysia

iii. For specialized area or expertise- specific training/

academic qualification is required. Evidence - certificates

or examination results

Page 16: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

REGISTRATION CRITERIA AND

REQUIREMENTSCriteria Subject Consultant

Academic qualification &

working experience

•Degree with a minimum of 7 years of working

experience in the selected field OR

•Masters with minimum 5 years working experience

•PhD with 3 years working experience

General environmental Not required

16

General environmental

management experience

Not required

EIA-related experience Not required

Minimum number of EIA

reports approved

Not required

Core competencies •Must be highly competent in the selected field (evidence

to be supplied)

•Must be able to perform detailed assessment which may

include modeling

Page 17: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

REGISTRATION CRITERIA AND

REQUIREMENTSCriteria EIA Assistant

Academic qualification Degree in science, technology or engineering. Applicants

with other non-technical or science degree may only

work within their specialization

Or Diploma

General environmental

management experience

Minimum 1 year

17

management experience

EIA-related experience Not required

Minimum number of EIA

reports approved

Not required

Core competencies i. Attendance of EIA training (evidence must be

attached) to ensure sufficient understanding of EIA

process (DOE is preparing compulsory EIA training)

ii. Basic understanding of EIA processes

iii.Basic understanding of the environmental planning,

law and regulations in Malaysia

Page 18: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

6.0 OTHER REQUIREMENTS

6.1 Portfolio of Work

For EIA Consultant

• Covering five (5) of most relevant EIA reports (Format in Appendix 2)

18

reports (Format in Appendix 2)

For Subject Consultant

• Samples of work/ related sections/ summary. Must highlight areas chosen

Page 19: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

6.2 References

• Applicants must name two (2) referees to verify their capabilities, skills, knowledge and experiences (Form B : Referee Assessment)

19

Assessment)

Page 20: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

6.3 Interview

• Special interview session may be conducted if needed

20

Page 21: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

6.4 Personal Attributes

� Competent

� Good interpersonal skills

� Independent

� Skills of personal organization

� Able to make professional judgment

21

� Able to make professional judgment

� Able to react with sensitivity to the conventions and culture of the organization, site or region in which EIA study is performed

Page 22: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

7.0 CODE OF CONDUCT

All applicants must sign and agree to abide by the Code of Conduct

22

Page 23: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

8.0 PROFESSIONAL INDEMNITY

INSURANCE

• Under study

• May be required for project that exceeds certain limit (cost, etc)

23

Page 24: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

9.0 APPEAL

• Applicants are entitled to appeal in writing and must be received by Secretariat within 1 month from date of rejection letter issued by DOE

24

by DOE

Page 25: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

10.0 RELATED FEES

• Processing fee of RM500 (USD 150) for EIA Consultant application and RM300 (USD 85) for Subject Consultant and Assistant Consultant

25

Assistant Consultant

Page 26: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

10.0 REGISTRATION RENEWAL

EIA Consultants

• Renewal every three years – RM300 (USD 85)

• No minimum number of EIA Reports

26

• No minimum number of EIA Reports required

• Must fulfill 5 qualifying EIA experiences (in 3 years)

• Minimum 50 hours CPD peryear (Appendix 5 : CPD Log sheet)

Page 27: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

Registration renewal

Subject Consultant

• Renewal every 5 years

• 20 hours CPD/ year – may cover his area of expertise or relevant environmental field

27

of expertise or relevant environmental field

Assistant Consultant

• Encouraged to attend training etc

Page 28: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

EIA Qualifying Experiences

e.g: Preparation in:

• TOR for EIA

• EIA Report

• Environmental Assessment/ Site Assessment

28

• Environmental Assessment/ Site Assessment

• EMP

• EIA/ environmental/ technical/ guidance

documents

• Study/ research based on consultant’s expertise

Page 29: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

Continuous Professional Development (CPD)

• 50 CPD hours/year

• Guidelines on CPD

• Activities e.g : – Participation in EIA Panel Meeting as Expert

Panel

29

Panel

– Related Workshop

– Related Training

– Resource person for related seminar/training

– Technical meeting related to environmental management/ planning or consultant’s expertise

Page 30: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

Continuous Evaluation Process

• Using special form with set of criteria and guidelines

• Evaluation by DOE officers will be channeled to Secretariat and individual file

30

channeled to Secretariat and individual file

• Comments will be considered for renewal purpose

Page 31: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

Summary :Requirements for Renewal

Requirements

for renewal

EIA Consultant Subject

Consultant

Renewal fee RM 300

(USD 85)

Not required

EIA Qualifying 5 Not required

31

EIA Qualifying

experience

5 Not required

CPD 50 hours 20 hours

Continuous

Evaluation

Process

Demonstrate

satisfactory

performance

Demonstrate

satisfactory

performance

Page 32: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

11.0 REGISTRATION UPGRADE

• Assistant Consultant needs to submit fresh application under EIA Consultant category

• Subject Specialist may apply to be registered as EIA Consultant after fulfilling

32

registered as EIA Consultant after fulfilling all related criteria

Page 33: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

12.0 TEMPORARY

REGISTRATION

• DG may grant temporary registration to foreign expert, as Subject Consultant

• Minimum requirements are applicable

• Proven with supporting documents

33

• Proven with supporting documents

Page 34: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

13.0 DEREGISTRATION AND

SUSPENSION

• May be deregistered/ suspended if;

– Fail to comply with Code of Conduct

– Fail to fulfill minimum CPD/ qualifying EIA

experience

34

experience

– Other reasonable grounds

– Decision by committee appointed by DG

– So far, a number of consultants’ registration

have been revoked & suspended

Page 35: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

14.0 CONFIDENTIALITY

• All information and materials submitted to DOE

are confidential. However, for purpose of

ensuring the provision of correct information to

potential users, DOE may publish relevant

information on registration scheme website.

35

information on registration scheme website.

Page 36: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

15.0 PROFESSIONAL

INDEMNITY INSURANCE

All registered individuals are encouraged to obtain Professional Indemnity Insurance

36

Page 37: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

16.0 DOCUMENTATION

Additional documentation to be submitted:

• Portfolio of Work (EIA Consultant/ Subject Consultant)

• Referee Assessment Form

37

• Referee Assessment Form

• CPD Log Sheet (*for renewal)

• EIA Log Sheet (*for renewal)

Page 38: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

17.0 TRAINING

• Registered consultants and potential applicants are required to attend EIA Induction Course and other relevant trainings

• In 2009, a total of 7 courses have been conducted; and attended by about 300 consultants

38

conducted; and attended by about 300 consultants

• In 2010, a total of 11 courses will be conducted

• Need to pass the course assessment

• In 2011, the effort has been continued

• Those who did not attend, were dropped from the list

Page 39: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

Recent Development

• More Continuous Professional Developments – seminar, talk, colloquium

• Certification courses- CPESC / CESSWI & others

39

• Draft new regulation on Erosion & Sediment Control

• Guidance Documents for EIA, EMP & ESCP

• Others – Registration of Environmental Auditors

Page 40: EIA CONSULTANT REGISTRATION SCHEME for · PDF file1.0 INTRODUCTION Background • Introduced to replace previous EIA Consultant Registration Scheme • The document was prepared and

THANK YOU

40