30
º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ : ACCEPTANCE LETTER No.W.496/GNJA/49 dt.15/06/2016 Ref: Tender Notice no. : CAO/CN/BNC/020/15 dated 02/12/2015 Tender Ref : GNJA/49 dated 02/12/2015 Technical Bid Opened on : 07/01/2016 Price bid Opened on: 06/04/2016 Negotiated offer dated. : 18/05/2016 and 06/06/2016. Dear Sir(s) 1. Your offer for the above work for Rs. 41,36,27,718/‐ (RUPEES FORTY ONE CRORE THIRTY SIX LAKH TWENTY SEVEN THOUSAND SEVEN HUNDRED AND EIGHTEEN ONLY ) is accepted by the competent authority. The accepted schedule of items showing the rates and quantities is enclosed herewith. The completion period of the work is 18 (EIGHTEEN) months from the date of issue of this letter. This Letter of Acceptance constitutes a binding contract between you and the Railway Administration. Please quote UCC in all further correspondence. 2. The Security Deposit (SD) for the contract is Rs. 2,06,81,386/‐ (RUPEES TWO CRORE SIX LAKH EIGHTY ONE THOUSAND THREE HUNDRED AND EIGHTY SIX ONLY). The Earnest Money Deposit of Rs. 19,46,870/- remitted by you along with the offer is adjusted towards a part of the SD. The balance SD of Rs. 1,87,34,516/-will be recovered from the running bills of the contract @ 10% of bill amount from each bill. Please note that no interest will accrue on the Security Deposit. 3. A Performance Guarantee (PG) for Rs. 2,06,81,386/‐ (RUPEES TWO CRORE SIX LAKH EIGHTY ONE THOUSAND THREE HUNDRED AND EIGHTY SIX ONLY) is to be submitted by you within 30 (thirty) days from the date of issue of this letter in the forms mentioned in clause 4.0 (b) of Special Conditions of Contract. The PG shall be valid up to 60 days beyond the stipulated date of completion. 4. Please report to Dy. Chief Engineer/CN/DVG along with the detailed programme of work. Other conditions, details and milestones are mentioned overleaf. This letter consists of three enclosures as given below. Please acknowledge the receipt of this letter. ENCL: 1. PG Form, Yours faithfully, 2. Schedule of items, 3. Mile stone (RAM GOPAL) Chief Engineer/South/Construction South Western Railway,Bangalore-46 for and on behalf of President of India UCC 74149 Name of work: GINIGERA ‐ RAICHUR NEW BG LINK :‐ Earthwork including blanketing and Construction of Bridges from KM 55/000 to 61/000 between Siddapur and Karatagi Stations Value of work : Rs.41,36,27,718/‐ Completion period : 18 months To M/s . SSCC & NRK (JV) “GIRU UMA MAHESHWARA NIVAS” HANUMAN NAGAR, MIRAJ-SANGLI ROAD, MIRAJ-416410 nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä SOUTH WESTERN RAILWAY Office of the Chief Administrative Officer (Construction), 18, Millers’ Road, BANGALORE 560 046

Transcript of º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Page 1: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

`

º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ : ACCEPTANCE LETTER No.W.496/GNJA/49 dt.15/06/2016

    Ref:          Tender Notice no.               :  CAO/CN/BNC/020/15  dated  02/12/2015                   Tender Ref                           :  GNJA/49  dated 02/12/2015                    Technical Bid Opened on  : 07/01/2016    Price bid Opened on: 06/04/2016                      Negotiated offer dated.      : 18/05/2016 and 06/06/2016.  

Dear Sir(s) 

1.  Your  offer   for  the   above  work   for  Rs. 41,36,27,718/‐ (RUPEES  FORTY ONE CRORE THIRTY SIX LAKH TWENTY SEVEN THOUSAND SEVEN HUNDRED AND EIGHTEEN  ONLY ) is accepted by the competent authority. The accepted schedule  of  items  showing  the  rates  and quantities  is  enclosed  herewith.    The  completion period of  the work  is  18 (EIGHTEEN) months  from  the  date  of  issue  of  this  letter.    This  Letter  of  Acceptance  constitutes  a  binding  contract between you and the Railway Administration.  Please quote UCC in all further correspondence. 

 2.      The    Security    Deposit  (SD)  for  the  contract  is  Rs.  2,06,81,386/‐  (RUPEES  TWO  CRORE  SIX  LAKH  EIGHTY  ONE 

THOUSAND THREE HUNDRED AND EIGHTY SIX ONLY). The Earnest Money Deposit of Rs. 19,46,870/- remitted by you along with the offer is adjusted towards a part of the SD.  The balance SD of Rs. 1,87,34,516/-will be recovered from the running bills of the contract @ 10% of bill amount from each bill. Please note that no interest will accrue on the Security Deposit. 

 3.   A Performance Guarantee (PG) for  Rs. 2,06,81,386/‐ (RUPEES TWO CRORE SIX LAKH EIGHTY ONE THOUSAND THREE 

HUNDRED AND EIGHTY SIX ONLY)    is  to be submitted by you within  30  (thirty) days  from the date of  issue of  this letter in the forms mentioned in clause 4.0 (b) of Special Conditions of Contract. The PG shall be valid up to 60 days beyond the stipulated date of completion. 

 4.   Please report to Dy. Chief Engineer/CN/DVG along with the detailed programme of work. Other conditions, details and 

milestones  are mentioned overleaf.  This  letter  consists  of  three  enclosures  as  given below. Please  acknowledge  the receipt of this letter. 

  ENCL:  1. PG Form,                  Yours faithfully,                 2. Schedule of items,                                    3. Mile stone                                 

(RAM GOPAL) Chief Engineer/South/Construction South Western Railway,Bangalore-46 for and on behalf of President of India

UCC 74149  Name  of  work:  GINIGERA  ‐  RAICHUR  NEW  BG LINK  :‐  Earthwork  including  blanketing  and Construction  of  Bridges  from  KM  55/000  to 61/000 between Siddapur and Karatagi Stations  Value of work : Rs.41,36,27,718/‐ Completion period  : 18  months

To M/s . SSCC & NRK (JV) “GIRU UMA MAHESHWARA NIVAS” HANUMAN NAGAR, MIRAJ-SANGLI ROAD, MIRAJ-416410

nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä       SOUTH WESTERN RAILWAY

Office of the  Chief Administrative Officer  

(Construction), 18, Millers’ Road, 

BANGALORE – 560 046 

Page 2: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER No.W.496/GNJA/49 dt.15/06/2016 

 Other conditions and details:  1.   Extension of time for submission of PG beyond 30 (thirty) days and up to 60 (sixty) days from the date of issue of this letter may be accorded by the Contract Agreement signing Authority. However, a penal interest of 15% per annum shall be charged for the delay beyond 30 (thirty) days on a daily basis i.e., from 31st day of the date of issue of LOA. In case you fail to submit the requisite PG even after 60 days from the date of issue of LOA, the contract shall be terminated duly forfeiting the EMD and other dues, if any payable against the contract and you shall also be debarred from participating in re‐tender for the work. The PG will be released after satisfactory completion of the work as per the contract conditions.   2.   You shall execute an agreement for the work within seven days from the date of receipt of notice by Railways regarding readiness of the agreement.  3.  The EMD submitted vide DD No. 340439 dated 06/01/2016 (Revalidated on 15/06/2016)  issued by Union Bank of India, Miraj , is adjusted towards SD as mentioned in para 2 of page 1.  4.    If the contract is rescinded, the SD shall be forfeited and, the PG shall also be encashed. Further, you will be debarred from participating in the tender for executing the balance work.   5.   The detailed programme of work to be submitted by you shall be as stipulated in the special conditions. The programme shall indicate the time schedule of various items of works in the form of Bar Chart/PERT Chart/CPM Chart.  The programme should  also  include  the  details  of  organization  (in  terms  of  labour  and  supervisors),  plant  and machinery  intended  to  be utilized from time to time for execution of the work within the stipulated date of completion.    In case of non‐submission of acceptable programme of work within 15 days of issue of this letter, you are liable for penal action including levying fine up to Rs. 50,000/‐. 

‐‐‐‐‐‐‐‐‐‐‐‐‐‐  

Copy to: CAO/CN,    FA&CAO/CN/BNC,  HQ‐Vigilance branch/UBL,   Ch.OS/Contracts,                  The Regional Labour Commissioner (Central) BUDA complex, Opp. Mothi Talkies,                   BELLARY‐583101  for information.  Copy to :  Dy.CE/CN/DVG,  XEN/CN/Bellary @ Hospet                     NOTE: The rate for Schedule­B is SPECIAL RATE for  specific reach due to  specific                                   site conditions prevailing in this reach of Ginigera­Raichur New line Project.                                  For any  increase in  quantity beyond agreement quantity,   the rate  may  be                                  negotiated. This rate shall not be taken for  comparison for other projects.                    (Encl: 1 copy of TC minutes & LOA with 3 copies of  schedule and conditions). 

Page 3: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Sriramanagara – Siddapur Stations.

Sl No

Description of Work Sketch TDC

1 Mobilization 1 st month 2 Construction of Bridges

i) Km 55 to Km 56 2nd month ii) Km. 56 to Km 57 4th month

iii) Km. 57 to Km 58 6th month iv) Km. 58 to Km 59 8th month v) Km. 59 to Km 60 10th month

vi) Km. 60 to Km 61 12th month 3 Earthwork in banking/cutting, toe wall, tree plantation.

i) Km 55 to Km 56 3rd month ii) Km. 56 to Km 57 6th month

iii) Km. 57 to Km 58 8th month iv) Km. 58 to Km 59 10th month v) Km. 59 to Km 60 12th month

vi) Km. 60 to Km 61 14th month 4 Blanketing

i) Km 55 to Km 56 11th month ii) Km. 56 to Km 57 12th month

iii) Km. 57 to Km 58 13th month iv) Km. 58 to Km 59 14th month v) Km. 59 to Km 60 15th month

vi) Km. 60 to Km 61 16th month 5 Protective works to bridges and finishing works 14th to 17th

month 6 Turfing 8th to 18th

month.

Page 4: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

South Western Railway (Construction)

Annexure -I

LOA No. W496/GNJA/49 Date : 15/06/2016 of UCC Code :74149

 Print Date : 15/06/2016

Name of Work :

GINIGERA  ‐ RAICHUR NEW BG LINK :‐ Earthwork  including blanketing  and Construction of Bridges  from KM55/000 to 61/000 between Siddapur and Karatagi Stations. (TWO PACKET SYSTEM)  

Name of the Contractor : S0760 ‐ SSCC & NRK (JV)

ABSTRACT

Sl. No.

Departmental Value asper Tender

Contractor % ScheduleTotal

Schedule

Description

1

A

Items of works covered by USSOR 2011 2,78,55,938.81 0% 2,78,55,938.81

2

B

Items of works pertains to Earthwork 21,05,23,941.04 Indv. Rate 21,05,23,941.04

3

C

Items of works pertains to Supply of Cement 

4,91,63,184.00 Indv. Rate 4,91,63,184.00

4

D

Items of works pertains to Concrete works

6,00,81,874.00 Indv. Rate 6,00,81,874.00

5

E

Items of works pertains to Supply of Steel 

4,44,35,820.00 Indv. Rate 4,44,35,820.00

6

F

Items of Blanketing for formation 2,10,60,000.00 Indv. Rate 2,10,60,000.00

7

G

Items of pertains to HTS wire 2,67,960.00 Indv. Rate 2,67,960.00

8

J

Items of miscellaneous works 2,39,000.00 Indv. Rate 2,39,000.00

Total Value : 41,36,27,717.85

Discount 0 % 0.00

41,36,27,717.85

Net Value :

( Rupees Forty One Crore Thirty Six Lakh Twenty Seven Thousand Seven Hundred and Seventeen ONLY)

 Signature of Contractor                                                             Schedule Page No: 1  of  

27                                  Signature of Contract Signing Authority

Page 5: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

GNJA/49

Notice Date :-

02/12/2015

Dept : ENGINEERING

Project : 11534 ‐ MUNIRABAD ‐ GINIGERE ‐ RAICHUR NEW BG LINE

Agency: S0760 ‐ SSCC & NRK (JV)

Name  of  the  Work  : GINIGERA ‐ RAICHUR NEW BG LINK :‐ Earthwork including blanketing and Construction of Bridges from KM 55/000 to 61/000 between Siddapur and Karatagi Stations. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

1

181021

Demolishing  plain  cement  concrete  including disposal  of  material  within  50m  lead  :  1:2:4  or richer mix with max. 20 mm coarse aggregate 

Quantity

Rate

Unit

Amount

25.00

555.62

1 CUM

13,890.50

( Rupees  Five Hundred and Fifty Five And Paise  Sixty Two )

Contractor's % : 0       Discount : 0

 

2

181030

Demolishing  R.C.C.  work  including  cutting  and  stacking  of  steel  bars  and  disposal  ofunserviceable material within 50m lead. (Extra payment for scraping, cleaning and straighteningof bars to be made separately) 

Quantity

Rate

Unit

Amount

25.00

810.58

1 CUM

20,264.50

( Rupees  Eight Hundred and Ten And Paise  Fifty Eight )

Contractor's % : 0       Discount : 0

 

3

182033

Demolishing  stone  rubble  masonry  including  stacking  of  serviceable  material  and  disposal  of unserviceable material within 50m lead : In cement mortar 

Quantity

Rate

Unit

Amount

25.00

560.34

1 CUM

14,008.50

( Rupees  Five Hundred and Sixty And Paise  Thirty Four )

Contractor's % : 0       Discount : 0

 

4

192011

Earth work in excavation for foundations and floors of the bridges, retaining walls etc., including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back fillingin  layers with approved material and consolidation of  the  layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with alllabour and material complete as per drawing and technical specification as directed by Engineerin charge : All kinds of soils 

Quantity

Rate

Unit

Amount

20000.00

182.73

1 CUM

36,54,600.00

( Rupees  One Hundred and Eighty Two And Paise  Seventy Three )

Contractor's % : 0       Discount : 0

 

5

192012

Earth work in excavation for foundations and floors of the bridges, retaining walls etc., includingsetting out, dressing of sides, ramming of bottom, getting out the excavated material, back fillingin  layers with approved material and consolidation of  the  layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with alllabour and material complete as per drawing and technical specification as directed by Engineer in charge : Ordinary rock 

Quantity

Rate

Unit

Amount

4000.00

237.64

1 CUM

9,50,560.00

( Rupees  Two Hundred and Thirty Seven And Paise  Sixty Four )

Contractor's % : 0       Discount : 0

 

6

192013

Earth work in excavation for foundations and floors of the bridges, retaining walls etc., includingsetting out, dressing of sides, ramming of bottom, getting out the excavated material, back fillingin  layers with approved material and consolidation of  the  layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with alllabour and material complete as per drawing and technical specification as directed by Engineerin charge : Hard rock ( requiring blasting) 

Quantity

Rate

Unit

Amount

 Signature of Contractor                                                             Schedule Page No: 2  of  

27                                  Signature of Contract Signing Authority

Page 6: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

100.00

371.16

1 CUM

37,116.00

( Rupees  Three Hundred and Seventy One And Paise  Sixteen )

Contractor's % : 0       Discount : 0

 

7

192014

Earth work in excavation for foundations and floors of the bridges, retaining walls etc., includingsetting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in  layers with approved material and consolidation of  the  layers by ramming and watering etc.incl. all lift, disposal of surplus soil upto a lead of 300 M, all types of shoring and strutting with alllabour and material complete as per drawing and technical specification as directed by Engineerin charge : Hard rock (  blasting prohibited ) 

Quantity

Rate

Unit

Amount

50.00

451.19

1 CUM

22,559.50

( Rupees  Four Hundred and Fifty One And Paise  Nineteen )

Contractor's % : 0       Discount : 0

 

8

192020a

Extra for the quantity of works, executed in or underwater and/ or liquid mud including pumpingout water as required : All kinds of soils (corresponding to item no.192011) 

Quantity

Rate

Unit

Amount

6000.00

36.55

1 CUM

2,19,300.00

( Rupees  Thirty Six And Paise  Fifty Five )

Contractor's % : 0       Discount : 0

 

9

192020b

Extra for the quantity of works, executed in or underwater and/ or liquid mud including pumpingout water as required : Ordinary rock (corresponding to item no 192012) 

Quantity

Rate

Unit

Amount

4000.00

47.53

1 CUM

1,90,120.00

( Rupees  Forty Seven And Paise  Fifty Three )

Contractor's % : 0       Discount : 0

 

10

192020c

Extra for the quantity of works, executed in or underwater and/ or liquid mud including pumpingout water as required : Hard rock (requiring blasting) (corresponding to item no 192013) 

Quantity

Rate

Unit

Amount

100.00

74.23

1 CUM

7,423.00

( Rupees  Seventy Four And Paise  Twenty Three )

Contractor's % : 0       Discount : 0

 

11

192020d

Extra for the quantity of works, executed in or underwater and/ or liquid mud including pumpingout water as required : Hard rock (blasting prohibited) (corresponding to item no.192014) 

Quantity

Rate

Unit

Amount

50.00

90.24

1 CUM

4,512.00

( Rupees  Ninety And Paise  Twenty Four )

Contractor's % : 0       Discount : 0

 

12

222280

Supplying,  spreading  and  filling  coarse  sand  (No  cohesive  materials  to  be  used)  of  approvedquality  including watering and ramming  in  foundation, plinth, behind  the abutment, wing wall,retaining wall in layers not exceeding 150mm thick including its compaction as per direction ofEngineer‐in‐charge. The rate  includes all  lead,  lift, ascent, descent, crossing of Railway  line, etc. complete with contractors labour, materials, tools and plant 

Quantity

Rate

Unit

Amount

1300.00

1,270.33

1 CUM

16,51,429.00

( Rupees  One Thousand Two Hundred and Seventy And Paise  Thirty Three )

Contractor's % : 0       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 3  of  

27                                  Signature of Contract Signing Authority

Page 7: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

13

192030

Providing  and  laying  Plain  Cement  Concrete    1:3:6  with  graded  stone  aggregate  of  40  mmnominal size,  in foundation and floors,   retaining walls of bridges    including mechanical mixing,vibrating,    pumping and bailing out   water where ever  required   with all materials  and  labour complete  but  excluding  the  cost  of  cement  and  shuttering  as  per  drawings  and  technicalspecifications as directed by Engineer 

Quantity

Rate

Unit

Amount

1350.00

1,538.08

1 CUM

20,76,408.00

( Rupees  One Thousand Five Hundred and Thirty Eight And Paise  Eight )

Contractor's % : 0       Discount : 0

 

14

252390

Stone Boulder Weighing minimum 35 Kg Each 

Quantity

Rate

Unit

Amount

2900.00

455.40

1 CUM

13,20,660.00

( Rupees  Four Hundred and Fifty Five And Paise  Forty )

Contractor's % : 0       Discount : 0

 

15

222290

Providing  Boulder  backing  behind  wing  wall,  return  wall,  retaining  wall  with  hand  packedboulders & cobbles with smaller  size boulders  toward the back  including all  lead,  lift,  labour &other incidental charges as complete work in all respect. Payment for boulder / cobbles will bedone extra. 

Quantity

Rate

Unit

Amount

4400.00

178.76

1 CUM

7,86,544.00

( Rupees  One Hundred and Seventy Eight And Paise  Seventy Six )

Contractor's % : 0       Discount : 0

 

16

221070

Providing  and  laying  Filter material  As  Per  RDSO  Specifications  underneath  pitching  in  slopescomplete as per drawing and Technical specification 

Quantity

Rate

Unit

Amount

1200.00

1,648.61

1 CUM

19,78,332.00

( Rupees  One Thousand Six Hundred and Forty Eight And Paise  Sixty One )

Contractor's % : 0       Discount : 0

 

17

221060

Providing and  laying Pitching with stone boulders weighing not  less  than   35 kg each with  thevoids  filled  with  cement  sand  mortar  1:4  on  slopes  laid  over  prepared  filter  media  includingboulder  apron  laid dry  in  front  of  toe  of  embankment  complete  as  per  drawing  and Technicalspecifications (Filter media to be paid separately under the relevant item) 

Quantity

Rate

Unit

Amount

710.00

1,667.43

1 CUM

11,83,875.30

( Rupees  One Thousand Six Hundred and Sixty Seven And Paise  Forty Three )

Contractor's % : 0       Discount : 0

 

18

222020

300 mm thick (average) Dry stone flooring with boulders of not  less than 35 kg each in weight , hand packed with surface levelled off to the correct section with hammer dressing as necessaryon the ground including filling the gaps with quarry spalls and ordinary sand complete includingthe cost of supply of all materials, labour, lead, lift, tools, plants, crossing of tracks and the like as per drawing and technical specification as directed by Engineer 

Quantity

Rate

Unit

Amount

205.00

911.26

1 CUM

1,86,808.30

( Rupees  Nine Hundred and Eleven And Paise  Twenty Six )

Contractor's % : 0       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 4  of  

27                                  Signature of Contract Signing Authority

Page 8: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

19

061013

Random  rubble masonry with  hard  stone  in  foundation  and  plinth  including  levelling  up withconcrete  as  per  specifications,  upto  plinth  level with  :  :  Cement mortar  1:6  (1cement:  6coarsesand) 

Quantity

Rate

Unit

Amount

2000.00

2,023.44

1 CUM

40,46,880.00

( Rupees  Two Thousand Twenty Three And Paise  Forty Four )

Contractor's % : 0       Discount : 0

 

20

114041

Pointing on stone work with cement mortar 1:3 (1cement: 3fine sand) : Flush/ Ruled pointing 

Quantity

Rate

Unit

Amount

100.00

84.82

1 SQM

8,482.00

( Rupees  Eighty Four And Paise  Eighty Two )

Contractor's % : 0       Discount : 0

 

21

183062

Dismantling  including  stacking  of  serviceable  material  and  disposal  of  unserviceable  materialwithin 50m lead : Bituminous top layer of road 

Quantity

Rate

Unit

Amount

11000.00

98.72

1 SQM

10,85,920.00

( Rupees  Ninety Eight And Paise  Seventy Two )

Contractor's % : 0       Discount : 0

 

22

183061

Dismantling  including  stacking  of  serviceable  material  and  disposal  of  unserviceable  materialwithin 50m lead : Under layer of road of water bound macadam/ stone soling etc. 

Quantity

Rate

Unit

Amount

11000.00

50.52

1 SQM

5,55,720.00

( Rupees  Fifty And Paise  Fifty Two )

Contractor's % : 0       Discount : 0

 

23

231010

Preparation  of  subgrade  by  excavating  earth  upto    22.5cm  depth,  dressing  to  camber  andconsolidating  with  power  road  roller  of  8  to  12  tonne  capacity  including  making  good  theundulations etc. and disposal of surplus earth with lead upto 50 metres 

Quantity

Rate

Unit

Amount

11000.00

49.66

1 SQM

5,46,260.00

( Rupees  Forty Nine And Paise  Sixty Six )

Contractor's % : 0       Discount : 0

 

24

231041

Providing and laying water bound macadam with specified stone aggregate, stone screening and binding  material  including  screening,  sorting,  spreading  to  template  and  consolidation  withpower road roller of 8 to 10 tonne capacity etc. complete. : Sub‐base with stone aggregate 90mm to 45mm including stone screening 13.2mm size 

Quantity

Rate

Unit

Amount

990.00

1,094.75

1 CUM

10,83,802.50

( Rupees  One Thousand Ninety Four And Paise  Seventy Five )

Contractor's % : 0       Discount : 0

 

25

231070

Providing  and  laying  4  cm  thick  moorum  surfacing  (Consolidated  Thickness)  on  platforms, pathways,  etc  including  spreading  watering  and  consolidation  with  3  T  Roller  or  light  powerroller complete 

Quantity

Rate

Unit

Amount

11000.00

22.17

1 SQM

2,43,870.00

( Rupees  Twenty Two And Paise  Seventeen )

Contractor's % : 0       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 5  of  

27                                  Signature of Contract Signing Authority

Page 9: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

26

233011

Providing  and  applying  tack  coat  using  bitumen  emulsion  (Rapid  setting)  complying  with  IS:8887‐ 1995, spraying the bitumen emulsion with mechanically operated spray unit, cleaning andpreparing the existing road surface as per specification : On W.B.M. @ 0.4kg/ sqm 

Quantity

Rate

Unit

Amount

11000.00

19.49

1 SQM

2,14,390.00

( Rupees  Nineteen And Paise  Forty Nine )

Contractor's % : 0       Discount : 0

 

27

233012

Providing  and  applying  tack  coat  using  bitumen  emulsion  (Rapid  setting)  complying  with  IS: 8887‐ 1995, spraying the bitumen emulsion with mechanically operated spray unit, cleaning andpreparing the existing road surface as per specification : On bituminous surface @ 0.25kg/ sqm 

Quantity

Rate

Unit

Amount

11000.00

13.86

1 SQM

1,52,460.00

( Rupees  Thirteen And Paise  Eighty Six )

Contractor's % : 0       Discount : 0

 

28

231061

Providing and laying bitumen penetration macadam with hard stone aggregate, with bitumen ofsuitable  penetration  grade  including  required  key  aggregate  as  specified,  spreading  coarseaggregate with the help of self propelled / tipper tail mounted aggregate spreader and applyingbitumen by a pressure distributor and then spreading key aggregate with the help of aggregatespreader complete including consolidation with road roller of minimum 8 to 10 tonne capacity :For 50mm compacted thickness using 6cum coarse aggregate of size 50‐20mm graded, 1.5cum key aggregate of size 12.5mm graded, and 500kg paving asphalt 80/ 100 per 100sqm 

Quantity

Rate

Unit

Amount

11000.00

263.03

1 SQM

28,93,330.00

( Rupees  Two Hundred and Sixty Three And Paise  Three )

Contractor's % : 0       Discount : 0

 

29

232010

Surface dressing on new surface with paving bitumen of grade A‐90/ S‐90 of approved quality using 2.25 kg of bitumen. per  sqm with 1.65 cum of  stone chippings 13.2mm nominal  size per100  sqm of  road  surface  including  consolidation with  road  roller  of  6  to 8  tonne  capacity  etc.,complete. 

Quantity

Rate

Unit

Amount

11000.00

111.74

1 SQM

12,29,140.00

( Rupees  One Hundred and Eleven And Paise  Seventy Four )

Contractor's % : 0       Discount : 0

 

30

137102

Supplying, laying, jointing, fitting and fixing in position R.C.C. spun pipes and collars  class NP‐2 conforming to I.S.458 with cement sand mortar (1:3) on the cement concrete bed as required tomaintain proper grade & alignment including cutting trenches and refilling the same with all lead.(Extra  Payment  of  bed  concrete  to  be  made  as  provided) : 200mmdia 

Quantity

Rate

Unit

Amount

400.00

529.62

1 METRE

2,11,848.00

( Rupees  Five Hundred and Twenty Nine And Paise  Sixty Two )

Contractor's % : 0       Discount : 0

 

31

137104

Supplying, laying, jointing, fitting and fixing in position R.C.C. spun pipes and collars  class NP‐2 conforming to I.S.458 with cement sand mortar (1:3) on the cement concrete bed as required tomaintain proper grade & alignment including cutting trenches and refilling the same with all lead. (Extra  Payment  of  bed  concrete  to  be  made  as  provided) : 300mm dia 

Quantity

Rate

Unit

Amount

400.00

844.82

1 METRE

3,37,928.00

( Rupees  Eight Hundred and Forty Four And Paise  Eighty Two )

Contractor's % : 0       Discount : 0

 Signature of Contractor                                                             Schedule Page No: 6  of  

27                                  Signature of Contract Signing Authority

Page 10: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

 

32

137105

Supplying, laying, jointing, fitting and fixing in position R.C.C. spun pipes and collars  class NP‐2 conforming to I.S.458 with cement sand mortar (1:3) on the cement concrete bed as required tomaintain proper grade & alignment including cutting trenches and refilling the same with all lead.(Extra  Payment  of  bed  concrete  to  be  made  as  provided) : 400mm dia 

Quantity

Rate

Unit

Amount

50.00

1,450.60

1 METRE

72,530.00

( Rupees  One Thousand Four Hundred and Fifty And Paise  Sixty )

Contractor's % : 0       Discount : 0

 

33

161041

Supplying  and  stacking  at  site  dump  manure  /  farm  manure  /  animal  dung  manure  fromapproved source;  including all  lead and lift etc. (manure measured in stacks will be reduced by 8% for payment) : Screened through sieve of I.S. designation 20mm 

Quantity

Rate

Unit

Amount

176.00

106.81

1 CUM

18,798.56

( Rupees  One Hundred and Six And Paise  Eighty One )

Contractor's % : 0       Discount : 0

 

34

161152

Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manureor sludge in the ratio 2:1 by volume (2parts of stacked volume of earth after reduction by 20% :1part  of  stacked  volume  of  manure  after  reduction  by  8%)  flooding  with  water,  dressingincluding  removal  of  rubbish  and  surplus  earth,  if  any with  all  leads  and  lifts  (cost  of manure,sludge  or  extra  good  earth  if  needed  to  be  paid  for  separately) : Holes/pits 60cm dia. and 60cm deep 

Quantity

Rate

Unit

Amount

5000.00

35.28

1 EACH

1,76,400.00

( Rupees  Thirty Five And Paise  Twenty Eight )

Contractor's % : 0       Discount : 0

 

35

162063

Avenue Plants : Azadirachta Indica (Neem) of height 120‐135 cm in big polybag of size 25‐30cm 

Quantity

Rate

Unit

Amount

5000.00

46.69

1 EACH

2,33,450.00

( Rupees  Forty Six And Paise  Sixty Nine )

Contractor's % : 0       Discount : 0

 

36

043015

Providing,  hoisting  and  fixing  in  position  upto  floor  two  level  M20  Grade  precast  RCC  workincluding  setting  in  cement mortar  1:3  (1  cement  :  3  coarse  sand)  and  finishing  smooth with6mm thick cement plaster 1:3 (1 cement  : 3 fine sand) on exposed surfaces complete includingcost of centering, shuttering, finishing, Admixtures in recommended proportion (as per IS:9103) to  accelerate,  retard  setting  of  concrete,  improve  workability  without  impairing  strength  anddurability, excluding cost of cement and steel reinforcement, as per approved plan & direction ofEngineer incharge. : In slabs for drain covers, manhole covers, flue tops etc. 

Quantity

Rate

Unit

Amount

5.00

3,030.35

1 CUM

15,151.75

( Rupees  Three Thousand Thirty And Paise  Thirty Five )

Contractor's % : 0       Discount : 0

 

37

242150

Providing and fixing 15x15x90cm boundary stone of hard stone with 30cm chisel dressed on all four sides and on top (cost of excavation, refilling and concrete etc to be paid for separately) 

Quantity

Rate

Unit

Amount

280.00

150.53

1 EACH

42,148.40

( Rupees  One Hundred and Fifty And Paise  Fifty Three )

Contractor's % : 0       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 7  of  

27                                  Signature of Contract Signing Authority

Page 11: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'A'

USSOR 2011 ITEMS

Sl. No.

Description of  Items

CODE

38

181022

Demolishing plain cement concrete  including disposal of material within 50m lead  : Mix  leanerthan 1:2:4 with coarse aggregate larger than 20mm 

Quantity

Rate

Unit

Amount

25.00

342.76

1 CUM

8,569.00

( Rupees  Three Hundred and Forty Two And Paise  Seventy Six )

Contractor's % : 0       Discount : 0

 

39

161484

Maintenance of  lawn, shrubs, hedge, trees etc. including watering, trimming, manuring, sprayinginsecticide  and    guarding  as  required.  This  includes  supply  of  labour,  tools &  plants  includingmaterials : Tree 

Quantity

Rate

Unit

Amount

15000.00

24.03

1 EACH/MONTH

3,60,450.00

( Rupees  Twenty Four And Paise  Three )

Contractor's % : 0       Discount : 0

 

2,78,55,938.81

(No. of Items 39 ONLY)

Schedule A Departmental Value : 

0.00

2,78,55,938.81

Schedule A Total :

Rupees in Words ( Rupees  Two Crore Seventy Eight Lakh Fifty Five Thousand Nine Hundred and Thirty Eight And 

 Signature of Contractor                                                             Schedule Page No: 8  of  

27                                  Signature of Contract Signing Authority

Page 12: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

GNJA/49

Notice Date :-

02/12/2015

Dept : ENGINEERING

Project : 11534 ‐ MUNIRABAD ‐ GINIGERE ‐ RAICHUR NEW BG LINE

Agency: S0760 ‐ SSCC & NRK (JV)

Name  of  the  Work  : GINIGERA ‐ RAICHUR NEW BG LINK :‐ Earthwork including blanketing and Construction of Bridges from KM 55/000 to 61/000 between Siddapur and Karatagi Stations. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

EW2‐101

Earthwork  in  cutting  in  all  soils:  Earthwork  for  excavation  in  cuttings  for  all  kinds  of  soils  inconnection with making  formation/side drains/catch water drains/bridges/trolley  refuges etc.,as per  required  cross  section,  L‐  section & profile  including  removing  all  trees,  bushes,  debris,constructions,  etc.,  from  the  site with  contractor`s  equipment, machinery,  labour,  consumablesetc.,as per technical specifications & special conditions,  including removing cut spoils and taking to embankment/outside railway land so as to clear the site with all  leads & lifts, as directed byEngineer‐in‐charge.  Note:  i)  Payment  shall  be  based  on  cross  section  measurement  only. ii) The term  'all soils' mentioned above  include  loose soil, ordinary soil  (workable with spade),hard  soil  including  stiff  clay,  moorum,  shingle,  soft  laterite  etc.,  requiring  close  application  ofpicks  to  loosen  and  small  boulders  measuring  not  more  than  300  mm  in  any  direction. (iii)  No  extra  payment  for  lead  etc.,  is  admisible. (iv) Only 75 percent  payment for the quantity executed is payable in a particular bill initially.  15percent  of  the  balance  amount  shall  be  released  after  the  L  section  and  profile  are  perfectlyreached and   handed over  to Railways.   Remaining 10 percent  shall  be  released only  after  theformation  in  the  full block section or  identified  length  is  completed  in all  respects  and handedover. 

Quantity

Rate

Unit

Amount

25000.00

61.20

1 CUM

20,04,300.00

( Rupees  Sixty One And Paise  Twenty )

Contractor's % : 31       Discount : 0

NOTE: The rate for All items of Schedule­B is SPECIAL RATE for  specific reach due to  specific    site conditions prevailing in this reach of Ginigera­Raichur New line Project.     For any  increase in  quantity beyond agreement quantity    the rate  may be         negotiated. This rate shall not be taken for  comparison for other projects

2

EW2‐102

Earthwork  in  cutting  in  Soft  Rock  :  Earthwork  for  excavation  in  cuttings  in  soft  rock  stratacomprising disintegrated  rocks of  lime  stone,  sand  stone,  hard  laterite  etc.,  removable without blasting  in  connection with making  formation/side  drains/catch water  drains/  bridges/trolleyrefuges  etc.,  as  per  required  cross  section,  L‐  section  &  profile  including  removing  all  trees, bushes, debris, constructions, etc., from the site with contractor`s equipment, machinery, labour, comsumables  etc.,as  per  technical  specifications  &  special  conditions,    including  removing  cutspoils and taking to embankment/outside railway land so as to clear the site with all leads & lifts,as  directed  by  Engineer‐in‐charge. Note:  i)  Payment  shall  be  based  on  cross  section  measurement  only. ii)  Soft  rock  means  rock  which  does  not  require  blasting  and  which  can  be  excavated  bycontinuous  operation  of  excavators/picks/bars  etc. (iii)  No  extra  payment  for  lead  etc.,  is  admisible.  (iv) Only 75 percent payment for the quantity executed in a particular bill is payable initially.  15percent  of  the  balance  amount  shall  be  released  after  the  L  section  and  profile  are  perfectlyreached and the formation is handed over to Railways.   Remaining 10 percent shall be releasedonly after the formation in the full block section or identified length is completed in all respectsand handed over. 

Quantity

Rate

Unit

Amount

10000.00

78.00

1 CUM

10,21,800.00

 Signature of Contractor                                                             Schedule Page No: 9  of  

27                                  Signature of Contract Signing Authority

Page 13: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

( Rupees  Seventy Eight )

Contractor's % : 31       Discount : 0

A

3

EW2‐103

Earthwork  in  cutting  in Hard  Rock  requiring  blasting:  Earthwork  for  excavation  in  cuttings  inhard  rock  strata  by  blasting  using  explosives  in  connection  with  making  formation/  sidedrains/catch water drains/bridges/trolley refuges etc., as per required cross section, L‐ section & profile  including  removing  all  trees,  bushes,  debris,  constructions,  etc.,  from  the  site  withcontractor`s  equipment,  machinery,  labour,  consumables  etc.,as  per  technical  specifications  &special  conditions  including  removing  cut  spoils  and  taking  to  embankment  /  outside  railwayland  so  as  to  clear  the  site  with  all  leads  &  lifts,  as  directed  by  Engineer‐in‐charge. Note:  i)  Payment  shall  be  based  on  cross  section  measurement  only. ii)  Hard  rock  requiring  blasting  means  rock  which  require  blasting  and  which  cannot  beexcavated  by  excavators/  picks/  bars  etc. (iii)  No  extra  payment  for  lead  etc.,  is  admisible.  (iv) Only 75 percent payment for the quantity executed in a particular bill is payable initially. 15percent  of  the  balance  amount  shall  be  released  after  the  L  section  and  profile  are  perfectlyreached and the formation is handed over to Railways.   Remaining 10 percent shall be released only after the formation in the full block section or identified length is completed in all respectsand handed over. 

Quantity

Rate

Unit

Amount

2200.00

235.00

1 CUM

6,77,270.00

( Rupees  Two Hundred and Thirty Five )

Contractor's % : 31       Discount : 0

A

4

EW2‐104

Earthwork  in cutting  in Hard Rock requiring controlled blasting or other means Earthwork  forexcavation  in cuttings  in hard rock strata using   explosives   or chemicals,  jack hammers or any other advance methods from authorised manufacturers/ license holders, in controlled manner, inconnection with making formation/ side drains/catch water drains/bridges/trolley refuges etc.,as per required cross section, L‐ section & profile    including  removing all  trees, bushes, debris, constructions, etc.,  from the site   with contractors equipment, machinery,  labour, comsumablesetc.,as per technical specifications & special conditions,  including removing cut spoils and takingto embankment / outside railway land so as to clear the the site with all leads & lifts, as directedby  Engineer‐in‐charge. Note:  i)  Payment  shall  be  based  on  cross  section  measurement  only. ii) Hard rock requiring controlled blasting means rock which cannot be excavated by excavators/ picks/  bars  etc.  and which  require  controlled  blasting  duly  providing  protection measures  forproperties  around  or  which  require  use  of  chemicals  or  other  means  to  loosen  the  rock. (iii)  No  extra  payment  for  lead  etc.,  is  admisible. (iv) Only 75% payment for the quantity executed in a particular bill is payable initially.   15% ofthe balance amount shall be released after the L section and profile are perfectly reached and theformation is handed over to Railways.  Remaining 10% shall be released only after the formation in  the  full  block  section  or  identified  length  is  completed  in  all  respects  and  handed  over. (v)This  item  shall  be  operated  with  specific  prior  approval  of    CE  (construction)  for  worksrequiring blasting near inhabited area/ residential houses within town/ village limits where openblasting is not permitted by the revenue / local authorities. 

Quantity

Rate

Unit

Amount

1000.00

478.00

1 CUM

6,26,180.00

( Rupees  Four Hundred and Seventy Eight )

Contractor's % : 31       Discount : 0

 Signature of Contractor                                                             Schedule Page No: 10  of  

27                                  Signature of Contract Signing Authority

Page 14: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

A

5

EW2‐201

Earth  work  in  filling  with  cut  spoils:  Earthwork  in  embankments  for making  formation    withRailways usable cut spoils excavated from cuttings in speciofied layers not exceeding 300 mm inthickness  with  lead  and  lifts  including  rehandling,  transportation,  unloading  &  spreading  in layers,  benching  of  slopes,  sectioning  to  profile  including  removing  all  trees,  bushes,  debris,constructions, etc., from the site with contractor`s vehicles, machinery, labour, consumables  etc.,complete  as  per  technical  specifications  &  special  conditions  and  as  directed  by  Engineer‐in‐charge.  Note:  i)  Payment  shall  be  based  on  cross  section  measurement  only (ii)  The  rate  includes  testing  of  cut  spoil  for  parameters  to  assess  the  suitability  for  use  inembankments  which  shall  be  done  for  every  10000  cum  and/or  for  every  change  of  layer characteristics.    (iii)  No  extra  payment  for  lead  etc.,  is  admisible. (iv) Only 75 percent payment for the quantity executed in a particular bill is payable initially.  15percent  of  the  balance  amount  shall  be  released  after  the  L  section  and  profile  are  perfectlyreached and the formation is handed over to Railways.   Remaining 10 percent shall be releasedonly after the formation in the full block section or identified length is completed in all respectsand  handed  over. (v)  Formation width  at  top  shall  be made with  500mm extra  on  either  side  initially  and  aftercompaction be cut  to standard profile. No extra payment shall be made  for  this purpose.  If  theextra width as above is not made at any single location of less than 100 m length, payments due shall  be  reduced  by  5  percent  for  that  entire  100  m  stretch. (vi) For  leads upto 500m from the spot of release, accepted rates shall apply. For leads beyond500 m and upto 1 km, 5 percent extra over the accepted rates shall be paid. For all leads beyond 1 km and irrespective of any extent further, another 5 percent over the accepted rates shall be paidand no ther compensation will be eligible. 

Quantity

Rate

Unit

Amount

10000.00

52.50

1 CUM

6,87,750.00

( Rupees  Fifty Two And Paise  Fifty )

Contractor's % : 31       Discount : 0

A

6

EW2‐202

Earth work in filling with COE: Earthwork in embankment in making formation  with contractorsown earth of approved quality in specified layers not exceeding 300mm thickness from approved earth  quarries  outside  railway  limits  in  all  soils  with  loading,  unloading,  all  lead  and  lifts,rehandling, transportation, spreading in layers, benching of slopes, sectioning to profile, clearingof debris/garbage/ vegetation/shrubs etc.,  in the railway alignment using contractor's vehicles, machinery,  labour,  consumables  etc.,  as  per  technical  specification &  special  conditions  and  asdirected  by  Engineer‐in‐charge. Note:  (i)  Payment  shall  be  made  based  on  cross  section  measurement  only.  (ii) The rate includes all charges, taxes, royalty, seignorage etc., and for pretesting of soil qualityat  quarry  for  every  20000  cum  or  change  of  layer  and  testing  at  site  for  every  5000  cum  orchange of layer for assessing the suitability of the soil for use in embankments and all other tests as  specified  in  the  specifications. (iii)  No  extra  payment  for  lead  etc.,  is  admisible. (iv) Only 75 percent payment for the quantity executed in a particular bill is payable initially. 15percent    of  the  balance  amount  shall  be  released  after  the  L  section  and  profile  are  prefectlyreached and the  formation  is handed over  to Railways. Remaining 10 percent shall be releasedonly after the formation in the full block section or identitifed length is completed in all respects and  handed  over.

 Signature of Contractor                                                             Schedule Page No: 11  of  

27                                  Signature of Contract Signing Authority

Page 15: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

 (v)  Only  soils  of  category  I  or  II  or  III  or  IV  as  per  clause  15  of  Technical  Specifications  ispermitted.  Payment  for  category  III will  be  reduced  by  5  percent  and  for  cateogory  IV will  be reduced by 10 percent of the accepted rates.  Accepted rates apply to soil with PI upto 7.  For PIbeyond  7  and  upto  20,  a  further  reduction  of  10  percent  in  accepted  rates  shall  apply.  Use  ofcategory    V    soil    as  per  clause  15  of  Technical  Specifications  is  banned.  (vi)  Formation width  at  top  shall  be made with 500mm extra on  either  side  initially  and  aftercompaction be cut  to standard profile. No extra payment shall be made  for  this purpose.  If  theextra width is not made at any single location of less than 100 m length, payments due shall be reduced by 5% for that entire 100 m stretch. 

Quantity

Rate

Unit

Amount

1112835.00

126.60

1 CUM

18,45,59,233.41

( Rupees  One Hundred and Twenty Six And Paise  Sixty )

Contractor's % : 31       Discount : 0

A

7

EW2‐203

Earth work at bridge approaches: Earthwork  in embankment  in  filling up approaches of majorbridge for  50m either side with soil of GW clasification only including mechanical or special typeof compaction such as water compaction in specified layers from approved earth quarries outside railway limits with loading, unloading, all lead and lifts, rehandling, transportation, spreading inlayers,  benching  of  slopes,  sectioning  to profile,  clearing  of  debris/garbage/  vegetation/shrubsetc.,  using  contractors  vehicles,  machinery,  labour,  consumables  etc.,  as  per  technicalspecification  &  special  conditions  and  as  directed  by  Engineer‐in‐charge. Note:  (i)  Payment  shall  be  made  based  on  cross  section  measurement  only. (ii) The rate includes all charges, taxes, royalty, seignorage etc., and for pretesting of soil quality at  quarry  for  every  20000  cum  or  change  of  layer  and  testing  at  site  for  every  1000  cum  orchange of layer for assessing the suitability of the soil for use in embankments and all other testsas  specified  in  the  specifications. (iii)  No  extra  payment  for  lead  etc.,  is  admisible. (iv) Only 75% payment for the quantity executed in a particular bill is payable initially.   15% ofthe balance amount shall be released after the L section and profile are perfectly reached and the formation is handed over to Railways.  Remaining 10% shall be released only after the formationin  the  full  block  section  or  identified  length  is  completed  in  all  respects  and  handed  over. (v) No payment will be made  for the complete  layer  if soil other than GW classification  is used and/or if mechanical compaction or special compaction is not used. 

Quantity

Rate

Unit

Amount

10000.00

191.00

1 CUM

25,02,100.00

( Rupees  One Hundred and Ninety One )

Contractor's % : 31       Discount : 0

A

8

EW2‐301

Mechanical  compaction  of  earth work: Mechanical  compaction  of  embankment,  approaches  tobridges etc., in specified layers using specified capacity vibratory power rollers as per type of soil,to  achieve  specified dry density of  earth/other material using  contractor`s power  rollers,  toolsand  plants,  consumables,  labour,  watering  etc.,  all  complete  as  per    specification  &  specialconditions  and  as  directed  by  Engineer‐in‐charge. Note:  If any other roller or other equipment  is used  for compaction, payment  for  the complete layer shall be reduced by 20 percent of the accepted rate for mechanical compaction. 

Quantity

Rate

Unit

Amount

1171335.00

10.50

1 CUM

1,61,11,712.93

( Rupees  Ten And Paise  Fifty )

Contractor's % : 31       Discount : 0

A

 Signature of Contractor                                                             Schedule Page No: 12  of  

27                                  Signature of Contract Signing Authority

Page 16: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

9

EW2‐303

Turfing: Turfing the slopes of the bank/cutting with contractors sods of approved quality about20x20x7.5cm  size  collected/  brought  from  outside  railway  limits,  fixing  the  same  over  theslopes/ cess duly dressing  the profile,  losening  to  required depth, gently  ramming after  laying, watering as required, making saucer drains 60cm wide from top to toe with necessary curvaturefor the  free  flow of water collected at  the top at 25m intervals using contractors boulders withcontractors vehicle, labour, consumables, all lead and lift etc., all complete and as per directionsof  Engineer‐in‐charge.  Note  :  (i) 75 percent payment  shall be made  initially  and balance 25 percent  shall be  releasedafter 6 months or maintenance period whichever  is more after satisfactory growth of turfing  is certified by the Engineer‐in‐charge. 

Quantity

Rate

Unit

Amount

145000.00

11.30

1 SQM

21,46,435.00

( Rupees  Eleven And Paise  Thirty )

Contractor's % : 31       Discount : 0

A

10

EW1‐304

Fixing reference pegs: Striking out of centre line of railway alignment using total station or anyother  latest  survey  equipment  and  fixing  centre  line  pegs  of  adequate  size  with  Railway's  tiebars/cut  rails  at  every  100m  on  straight  and  25m  in  curves,  at  bridges  etc.,  with  contractors surveyor,  equipment,  all  consumables,  labour  etc. Note  :  (i)  The  reference  pegs  shall  be  fixed  along  the  alignment  at  appropriate  locations  toprovide  information  for  execution  of  formation,  bridges,  ballasting  and  linking  of  trackthroughout  the  period  of  construction. (ii)  Contractor  is  responsible  for  maintaining  the  reference  pegs  including  shifting  in  case  ofshifting  of  alignment  or  to  facilitate  construction. (iii) The reference pegs shall be usable as temporary bench marks wherever required. 

Quantity

Rate

Unit

Amount

100.00

154.30

1 EACH

20,213.30

( Rupees  One Hundred and Fifty Four And Paise  Thirty )

Contractor's % : 31       Discount : 0

A

11

DD1‐101

Plotting  initial  levels:  Computer  Plotting  of  the theoretical  cross  section  profile  based  on  the initial levels of ground, recorded in the level books for cuttings/embankments at intervals of 25mor  less  including  computation  of  theoritical  profile/quantities  duly  deducting  quantities  forbridges  and  any  other  structure  not  requiring  execution  of  earthwork  in  A4  size  sheet  withcontractor's  material,  man  power,    consumables,  tools  and  plants  etc.,      and  as  directed  byEngineer‐in‐charge.  Note:  i)  Plottings  and  calculations  are  to  be  submitted  to  Railway  in  3  sets.  (ii) One cross section in one A4 size sheet is required. 

Quantity

Rate

Unit

Amount

6.00

4,700.00

1 KM

36,942.00

( Rupees  Four Thousand Seven Hundred )

Contractor's % : 31       Discount : 0

A

12

DD1‐102

Plotting  final  levels:  Computer plotting  of  the  theoretical  &  actual  final  finished  cross  sectionprofile, duly indicating different type of strata available/ excavated in the x‐section, based on the final levels recorded in the level books for banks/ cuttings at intervals of 25m or less, including computation  of  theoritical/actual  quantities  done  as  per  classification  of  different  types  ofsoil/blanketing material as certified by Engineer‐in‐charge duly deducting quantities for bridges and any other structure not requiring execution of earthwork in A4 size sheet with contractor's material, man power, consumables, tools and plants etc.,  and as directed by Engineer‐in‐charge. Note:  i)  Plottings  and  calculations  are  to  be  submitted  to  Railway  in  3  sets

 Signature of Contractor                                                             Schedule Page No: 13  of  

27                                  Signature of Contract Signing Authority

Page 17: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

 ii)  One  cross  section  in  one  A4  sheet  is  required. iii)  For  embankments,  computation  of  different  soils  viz.,  cut  spoils,  contractor's  own  earth,blanketing material are to be shown separately as per measurement recorded. 

Quantity

Rate

Unit

Amount

6.00

4,700.00

1 KM

36,942.00

( Rupees  Four Thousand Seven Hundred )

Contractor's % : 31       Discount : 0

A

13

DD1‐103

Design  of  high  bank/deep  cutting  slope  based  on  slope  stability  analysis  as  specified  byRDSO/theoritical  methods,  for  railway  cuttings/  embankment  more  than  6m  in  height/depth based on the material available in cutting/embankments, including collecting required number ofsoil samples and conducting required laboratory tests as per RDSO specifications so as to find outsoil  parameters  required  in  slope  stablity  analysis, working  out  design  slope based on manualmethod/computer  software  including  furnishing  detailed  calculations  in  a  report  form  withcontractor's  men,  material,  machinery  etc  and  as  directed  by  Engineer‐in‐charge. Note: Recommended slopes designs  shall be  from reputed designers and  shall  include detailedcalculations to be submited in 3 copies. 

Quantity

Rate

Unit

Amount

2.00

17,500.00

1 CS

45,850.00

( Rupees  Seventeen Thousand Five Hundred )

Contractor's % : 31       Discount : 0

A

14

SE1‐101

Soil  investigation  in  all  types  of  soil  including  soft  rock  at  cutting  locations  up  to    2m  belowproposed  formation  level  or  hard  rock  or  at  embankments  upto 2m below  the natural  groundlevel or the formation level as per RDSO guide lines and IS Specifications  including collection of samples  (Disturbed/undisturbed)  at  each    location  at  arate  of  one  number/2m  depth  andconducting the following field tests on each sample. (i) Classification of soil. (ii) Specific gravity ofsoil. (iii) Bulk density and water content. (iv) Grain site analysis (sieve & hydrometer). (v) Liquidand plastic limits. (vi) Chemical tests on soil for Choloride, Sulphur and pH value. (vii) MDD andOMC.  (viii)  Swelling  index.  (ix)  C&Phi  analysis  of  soil  and  Standard  penetration  Test  (SPT)  at every 1.5m interval or where there is change in strata. (x) crushing strength test additionally onsoft rock at 1.0 m depth of rock.(xi) Bore chart should show the layers of soil with SPT value etc.The  report  should  be  submitted  with  recommendations  for  use  of  cut  spoil  for  filling embankment in case of cutting and recommendations for forming embankment over the existingsub‐soil including the necessity and mode of special treatment to be done, if any. 

Quantity

Rate

Unit

Amount

50.00

437.00

1 RM

28,623.50

( Rupees  Four Hundred and Thirty Seven )

Contractor's % : 31       Discount : 0

A

15

SE1‐102

Soil investigation in hard rock at Cutting/other locations up to  2m below formation level as perRDSO guide lines and IS  Specifications including collection of samples (Disturbed/undisturbed)at  each    location  at  one  sample/2m  depth  or  less  and  conducting  the  following  field  tests.  (i)Crushing strength test. (ii) Specific gravity of rock. (iii) Water absorption of rock. (iv) KRD & CWC recovery values of rock. (v) Bore chart should show the layers of rock with SPT value / Recoveryetc.  Report should be submitted with recommendations on slope stability and on use of cut spoilfor filling embankment. 

Quantity

Rate

Unit

Amount

10.00

1,419.00

1 RM

18,588.90

( Rupees  One Thousand Four Hundred and Nineteen )

Contractor's % : 31       Discount : 0

NOTE: The rate for All items of Schedule­B is SPECIAL RATE for  specific reach due to  specific    site conditions prevailing in this reach of Ginigera­Raichur New line Project.     For any  increase in  quantity beyond agreement quantity    the rate  may be         negotiated. This rate shall not be taken for  comparison for other projects

 Signature of Contractor                                                             Schedule Page No: 14  of  

27                                  Signature of Contract Signing Authority

Page 18: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'B'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

21,05,23,941.04

(No. of Items 15 ONLY)

Schedule B Departmental Value : 

0.00

21,05,23,941.04

Schedule B Total :

Rupees in Words ( Rupees  Twenty One Crore Five Lakh Twenty Three Thousand Nine Hundred and Forty One And 

 Signature of Contractor                                                             Schedule Page No: 15  of  

27                                  Signature of Contract Signing Authority

Page 19: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

GNJA/49

Notice Date :-

02/12/2015

Dept : ENGINEERING

Project : 11534 ‐ MUNIRABAD ‐ GINIGERE ‐ RAICHUR NEW BG LINE

Agency: S0760 ‐ SSCC & NRK (JV)

Name  of  the  Work  : GINIGERA ‐ RAICHUR NEW BG LINK :‐ Earthwork including blanketing and Construction of Bridges from KM 55/000 to 61/000 between Siddapur and Karatagi Stations. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'C'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

CE1‐01A

Supply of Ordinary Portland cement of 43 / 53 grade  conforming  to  IS 8112 /  IS 12269  (uptodate)and/or Portland Pozzolana Cement conforming to IS/1489 (upto date), at site of work to theextent of the quantities required for various items of works in schedule items including all cost ofloading,  unloading,leading,  transporting,  stacking,  storing  including  making  proper  storagearrangements and all consumables, machinery, vehicles, labour etc., complete and as directed by the  Engineer‐in‐charge. (a)  Ordinary  Portland  Cement  (43/53  Grade) NOTE  :1)    Use  of  Portland  Pozzolona  cement  shall  be  restricted  strictly  to  the  permittedconstruction  items  only.    Pozzolana  cement  shall  not  be  used  in  PSC  construction.  2)  Admixtures  such  as  super  plasticizers  will  be  permitted  based  on  specific  designs  forpermitted  construction  items with  the  approval  of  the DY.Chief  Engineer‐in‐charge.    However, admixtures proposed shall be supplied free of cost by the Contractor and no compensation willbe  payable. 3. 33 Grade cement shall not be used in railway construction works. 

Quantity

Rate

Unit

Amount

8160.00

6,342.00

1 T

4,91,63,184.00

( Rupees  Six Thousand Three Hundred and Forty Two )

Contractor's % : ‐5       Discount : 0

 

4,91,63,184.00

(No. of Items 1 ONLY)

Schedule C Departmental Value : 

0.00

4,91,63,184.00

Schedule C Total :

Rupees in Words ( Rupees  Four Crore Ninety One Lakh Sixty Three Thousand One Hundred and Eighty Four And Paise  

 Signature of Contractor                                                             Schedule Page No: 16  of  

27                                  Signature of Contract Signing Authority

Page 20: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

GNJA/49

Notice Date :-

02/12/2015

Dept : ENGINEERING

Project : 11534 ‐ MUNIRABAD ‐ GINIGERE ‐ RAICHUR NEW BG LINE

Agency: S0760 ‐ SSCC & NRK (JV)

Name  of  the  Work  : GINIGERA ‐ RAICHUR NEW BG LINK :‐ Earthwork including blanketing and Construction of Bridges from KM 55/000 to 61/000 between Siddapur and Karatagi Stations. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

BRPC1

Plain  Cement  Concrete  (M15  to  M30  design  mix)  Cast‐in‐situ  work  (cement  will  be  paid separately) with Contractors all materials including 40mm or below graded hard crushed stoneaggregate,  sand,  admixture,  water,  etc.,  of  approved  quality  in  foundations,  abutments,  piers,wing walls,  return walls  etc.,  of  bridges  and  other  structures  as  required,  including  fixing  and removal  of  contractors  shutter/  form  work/  supports,  vibrating/compacting,  providing  weepholes  with  contractors  AC  pipes  75  to  100mm  dia  wherever  necessary,  providingnormal/approved expansion  joints with necessary materials  as per design/drawings,  curing ofconcrete, pumping/bailing out of water  wherever necessary with Contractors own pump, power,fuel  etc;,  finishing  the  surfaces  wherever  required,  etc.,  complete,  with  all  lead,  lift,  transport,consumables,  labour,  tools  and  plant,  materials,  etc.,  as  per  approved  drawings/specification/conditions  and  as  directed  by  the  Engineer‐in‐charge. NOTES: (1)  Single  rate will  apply  for  all mixes  (M15,M20,M25  and M30)  irrespective  of  proportion  ofmaterials  used  (per  cubic  metre  (  cum)  of  concrete).(2) All  concrete  shall  be weigh  batched, machine mixed,  compacted with mechanical  vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and otherrelevant  specifications  as  prescribed.   Weigh  batching  is mandatory  for  all  PCC,  RCC  and  PSC works. (3) Rates shall include all materials, operations, etc.,  complete except for Cement, which will bepaid for separately.  Steels including fabrication, if used, and excavations for foundations will bepaid  under  relevant  SSR  or  other  schedules  separately.(4) Shuttering and supporting form work shall be of good quality materials only.   For PSC/RCCgirders/slabs/beams/columns,  only  rigid  plate  steel  shutters  shall  be  used.(5)  Mix  design  with  requirement  of  all  tests  shall  be  arranged  by  the  Contractor  at  his  cost.(6)  Admixtures  as  required/  as  per  designs  shall  be  arranged  by  the  Contractor  at  his  cost.(7) All material  and  concrete  tests  as  required  shall  be  arranged by  the  contractor  at  his  cost.(8) Rate includes placing of concrete in position for all heights by manual/concrete pump/craneetc., 

Quantity

Rate

Unit

Amount

14100.00

2,500.00

1 CUM

3,98,32,500.00

( Rupees  Two Thousand Five Hundred )

Contractor's % : 13       Discount : 0

 

2

BRPC2

Plain  Cement  Concrete  (M15  to  M30  design  mix)  Cast‐in‐situ  work  (cement  will  be  paid separately) with Contractors all materials  including 20mm/12.5mm graded hard crushed stoneaggregate, sand, admixture, water, etc., of approved quality  in bed blocks, wearing coat, coping,ballast  walls  etc.  of  bridges  and  other  structures  as  required,  including  fixing  and  removal  of contractors  shutter/form  work/  supports,  vibrating/compacting,  providing  weep  holes  withcontractors  AC  pipes  75  to  100mm  dia  wherever  necessary,  providing  normal/approvedexpansion joints with necessary materials as per design/drawings, curing of concrete, pumping/ bailing out of water  wherever necessary with Contractors own pump, power, fuel etc;, finishingthe surfaces wherever required, etc., complete, with all lead, lift, transport, consumables, labour,tools  and  plant,  materials,  etc.,  as  per  approved  drawings/specification  /  conditions  and  asdirected  by  the  Engineer‐in‐charge. NOTES: (1)  Single  rate will  apply  for  all mixes  (M15,M20,M25  and M30)  irrespective  of  proportion  ofmaterials  used  (per  cubic  metre  (cum)  of  concrete)(2) All  concrete  shall  be weigh  batched, machine mixed,  compacted with mechanical  vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and otherrelevant specifications as prescribed.  Weigh batching is mandatory for all PCC, RCC and PSC 

 Signature of Contractor                                                             Schedule Page No: 17  of  

27                                  Signature of Contract Signing Authority

Page 21: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

works. (3) Rates shall include all materials, operations, etc.,  complete except for Cement, which will bepaid for separately.  Steels including fabrication, if used, and excavations for foundations will be paid  under  relevant  SSR  or  other  schedules  separately.(4) Shuttering and supporting form work shall be of good quality materials only.   For PSC/RCCgirders/slabs/beams/columns,  only  rigid  plate  steel  shutters  shall  be  used.(5)  Mix  design  with  requirement  of  all  tests  shall  be  arranged  by  the  Contractor  at  his  cost.(6)  Admixtures    as  required/  as  per  designs  shall  be  arranged  by  the  Contractor  at  his  cost.(7)     All material and concrete tests as required shall be arranged by the contractor at his cost.(8) Rate includes placing of concrete in position for all heights by manual/concrete pump/craneetc., 

Quantity

Rate

Unit

Amount

223.00

2,600.00

1 CUM

6,55,174.00

( Rupees  Two Thousand Six Hundred )

Contractor's % : 13       Discount : 0

 

3

BRRC1

Reinforced  Cement  Concrete  (M20  to  M40    design  mix)  work  (Cement  &    Steel  will  be  paidseparately),with Contractors all materials including 20mm graded hard crushed stone aggregate,sand,  admixture,  water  etc.,  of  approved  quality  in  foundations  including  below  ground  level, abutments,  piers,  pile  caps,  bed  blocks,  trestle  beams,  girders,  pedestals,  retaining  walls,boxes/slabs for flat top bridges, deck slabs, girders, kerb walls, diaphrams, cross frames etc., ongirder bridges and other structures of any design/shape as required, above or below ground levelof any size and shape, including fixing and removal of contractors shutters/form work/ supports,vibrating/compacting,  and  providing  weep  holes  with  AC  pipes  75mm  to  100mm  dia  andnormal/approved expansion joints with necessary materials as per designs/drawings wherevernecessary,  curing  of  concrete,  pumping/bailing  out  of  water  wherever  necessary  withContractors own pump, power, fuel etc., finishing the surfaces wherever required etc., complete and  including  handling,  uncoiling,  cutting,  bending,  cranking,  tying M.S./Tor Rods/wires/othersteel  to  form  reinforcement  with  Contractors  galvanizsed  binding  wire  of  size  18/20SWG(0.90mm) to IS280, etc., fixing in position reinforcement gauge complete as required with all lead, lift, transport, materials, consumables, labour, tools and plant, etc., and including 2 coats ofcement  painting  as  per  approved  drawings/specifications/  conditions  and  as  directed  by  theEngineer‐in‐charge.    Plant  produced  Ready‐mix  concrete  shall  be  used  only  with  the  specific approval  of  the  Dy.Chief  Engineer. NOTES: (1) Single rate will apply for all mixes (M20,M25, M30, M35 and M40) irrespective of proportionof materials used (per cubic metre  (cum) of concrete). Rate is for site mixed concrete.  For plant produced  Ready‐mix  concrete,  an  extra  payment  of  Rs.500/‐  per  cum  will  be  applicable. (2) All  concrete  shall  be weigh  batched, machine mixed,  compacted with mechanical  vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and other relevant  specifications  as  prescribed.   Weigh  batching  is mandatory  for  all  PCC,  RCC  and  PSCworks.  (3) Rates shall include all materials, operations, etc.,   complete except for Cement and Steel andexcavation for foundations and substructure, if required, which will be paid for separately underrelevant  SSR/other  schedules.    Similarly,  neoprene  bearing  pads,  expansion  joints  and  steelladders  attached  to  the  PSC  girder/slab  will  also  be  paid  for  separately. (4) Shuttering and supporting form work shall be of good quality materials only.   For PSC/RCCgirders/slabs/beams/columns,  only  rigid  plate  steel  shutters  shall  be  used. (5)  Mix  design  with  requirement  of  all  tests  shall  be  arranged  by  the  Contractor  at  his  cost. (6) Admixtures, binding wires, clamps/anchors etc., as required/ as per designs shall be arrangedby  the  Contractor  at  his  cost. (7)   75% of the value of the work completed will be paid initially and remaining 25% will be paidafter all tests connected with concrete including materials and 7 days cube tests are 

 Signature of Contractor                                                             Schedule Page No: 18  of  

27                                  Signature of Contract Signing Authority

Page 22: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

completed  and  results  are  accepted.    Any  concrete  which  is  not  passing  the  design/codalrequirements  shall  be  summarily  rejected. (8)   Rates include cost of  launching, lifting and placing of slabs/ girders on bearings if required. (9) This item will apply for all standard/special designs required in the work where such designis  not    specially  provided  for  in  any  other  schedule/item. (10) Rate includes placing of concrete in position for all heights by manual/concrete pump/craneetc., 

Quantity

Rate

Unit

Amount

3850.00

3,600.00

1 CUM

1,56,61,800.00

( Rupees  Three Thousand Six Hundred )

Contractor's % : 13       Discount : 0

 

4

BRPS1A

Pre‐stressed Cement Concrete (M35 to M50 design mix) post‐tensioned work (cement, steel, HTS wire/strands  will be paid separately) in girders/slab of any design/shape, with Contractor's allmaterials including 20mm graded hard crushed stone aggregate, sand, admixture, water, etc., ofapproved quality and all  special materials  for prestressed concrete  including Flexible GI/Othersheathing,  coupler,  bearing  plates,  anchorages,  wedges,  grout,  anticorrosive  treatment  etc.,  ofspecial/approved quantity and quality as per designs/drawings,  including post‐tensioning with contractor's own  jack, power and other equipment complete,  fixing and removal of contractorsshutter/form work/ supports vibrating/compacting, providing weep holes with contractor's ACpipes 75 to 100mm dia wherever necessary, providing normal expansion  joints with necessary materials  as per design/drawings,  curing of  concrete, pumping/bailing out of water   wherevernecessary with Contractors own pump, power, fuel etc;, finishing the surfaces wherever required,etc., and including handling, uncoiling, cutting, bending, cranking, tying HTS/MS/TOR rods/othersteel  to  form  tendons    and  reinforcement  gage  with  contractor's  galvanised  binding  wire  of18/20 SWG(0.90mm) to IS 280, etc., fixing the tendons and reinforcement in position as required, complete, with all  lead,  lift,  transport,  consumables,  labour,  tools and plant, materials,  etc.,  andincluding 2 coats of cement painting, as per approved drawings/specification/conditions and asdirected by the Engineer‐in‐charge.  Plant produced Ready‐mix concrete shall be used only with the  specific  approval  of  the  Dy.Chief  Engineer. (a)  For  PSC  slabs NOTES: (1) Single rate will apply  for all mixes  (M35, M40, M45 and M50)  irrespective of proportion ofmaterials  used  (per  cubic metre‐cum‐of  concrete).    Rate  is  for  site mixed  concrete.    For  plant produced  Ready‐mix  concrete,  an  extra  payment  of  Rs.500/‐  per  cum  will  be  applicable. (2) All  concrete  shall  be weigh  batched, machine mixed,  compacted with mechanical  vibratorsand should conform to IRS Concrete Bridge Code and relevant IS Codes/Specifications and otherrelevant  specifications  as  prescribed.   Weigh  batching  is mandatory  for  all  PCC,  RCC  and  PSCworks.  (3) Rates shall include all materials, operations, etc.,  complete except for Cement, Reinforcement steel, and HTS prestressing wire/strands, which will be paid for separately under relevant itemsof  other schedules. Similarly, neoprene bearing pads, expansion joints and steel ladders attachedto  the  PSC  girder/slab  will  also  be  paid  for  separately. (4) Shuttering and supporting form work shall be of good quality materials only.   For PSC/RCCgirders/slabs/beams/columns,  only  rigid  plate  steel  shutters  shall  be  used. (5)  Mix  design  with  requirement  of  all  tests  shall  be  arranged  by  the  Contractor  at  his  cost. (6) Admixtures,  binding wires,  clamps/anchors,  sheathing,  bearing plates,  anchorages, wedges,couplers, grout, anticorrosive treatment and all other materials required for prestressed concreteconstruction,  as required/ as per designs shall be arranged by the Contractor at his 

 Signature of Contractor                                                             Schedule Page No: 19  of  

27                                  Signature of Contract Signing Authority

Page 23: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

cost.  (7)  75%  of  the  value  of  the  work  completed  will  be  paid  after  casting/initial  stressing    andremaining  25%  will  be  paid  after  all  tests  connected  with  concrete  including  materials  and necessary cube tests and load tests specified, if any, are completed and results are accepted.  Anyconcrete  which  is  not  passing  the  design/codal  requirements  shall  be  summarily  rejected. (8) Rates  include cost of  launching,  lifting and placing of slabs/girders on bearings as required. (9) This item will apply for all standard/special designs required in the work where such designis  not  specially  provided  for  in  any  other  schedule/item. (10) Rate includes placing of concrete in position for all heights by manual/concrete pump/crane etc., 

Quantity

Rate

Unit

Amount

100.00

11,000.00

1 CUM

12,43,000.00

( Rupees  Eleven Thousand )

Contractor's % : 13       Discount : 0

 

5

BRPS5

Conducting  and  load  test  on  PSC  superstructure  of  all  designs/dimensions  duly  creating  and removing  all  loads  and  providing  all  staging  and  instrumentation with  all  lead,  lift,  transport,materials,  consumables,  tools  and  plant,  labour  etc.,  complete  as  required  as  per  relevantSpecifications/Codes and as directed by the Engineer‐in‐charge.(Per metric  tonne (t) of  loading to  be  quoted) NOTES:  (1) Load tests shall be carried out as per IRS Bridge Rules/ IRS Codes/ IRC codes as applicable.All load may be created with available local material in gunny bags or any other approved type of loading at the cost of contractor.  The loads for PSC girders and slabs will be in the range of 150 to500 t depending upon the designs.     Rails or other materials,  if available, will be spared free ofcost but it is not binding on the Railway to provide the same.  Rates include the cost of disposing all  the  waste  materials  appropriately  away  from  the  site. (2) Loading calculations and procedure shall be submitted by the contractor in advance and gotapproved.    Report  shall  be  submitted  by  the  Contractor  after  the  test  in  a  proper  format specifying  the calculations  for  loads, deflections and other parameters (specified and actual) asper relevant specifications. 

Quantity

Rate

Unit

Amount

900.00

600.00

1 T

6,10,200.00

( Rupees  Six Hundred )

Contractor's % : 13       Discount : 0

 

6

BRGL1A

Supply and laying of RCC Hume pipes of dia 900mm/1200mm of NP4/RDSO designs suitable forall types of Railway loading standards including providing levelling course, jointing, compactionas  per  approved  drawings  with  contractor's  fixing  materials,  collars,  aggregates  and  all  othermaterials  as  required  with  all  lead,  lift,  transport,  consumables,  labour,  tools  and  plant,  etc.,complete as directed by the Engineer‐in‐charge. (per running metre length of pipe to be quoted). (a)  Laying  with  900mm  pipe NOTES:  (1) Rates include all materials, operations etc., complete except cement used which will be paidfor  separately. (2)  Contractor  shall  produce  design/  test  reports  to  prove  the  suitability  of  the  Hume  Pipe.Decision regarding standard of pipe to be used by the Engineer‐in‐charge is final and binding on 

 Signature of Contractor                                                             Schedule Page No: 20  of  

27                                  Signature of Contract Signing Authority

Page 24: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

the  contractor. (3)  Rates  include  local  transport  within  the  section  only.    Transport  from  factory  upto  thesection/office of the Engineer‐in‐charge will be paid under relevant SSR items. 

Quantity

Rate

Unit

Amount

100.00

5,000.00

1 RM

5,65,000.00

( Rupees  Five Thousand )

Contractor's % : 13       Discount : 0

 

7

BRGL1B

Supply and laying of RCC Hume pipes of dia 900mm/1200mm of NP4/RDSO designs suitable for all types of Railway loading standards including providing levelling course, jointing, compactionas  per  approved  drawings  with  contractor's  fixing  materials,  collars,  aggregates  and  all  othermaterials  as  required  with  all  lead,  lift,  transport,  consumables,  labour,  tools  and  plant,  etc., complete as directed by the Engineer‐in‐charge. (per running metre length of pipe to be quoted). (b)  Laying  with  1200mm  pipe NOTES:  (1) Rates include all materials, operations etc., complete except cement used which will be paid for  separately. (2)  Contractor  shall  produce  design/  test  reports  to  prove  the  suitability  of  the  Hume  Pipe.Decision regarding standard of pipe to be used by the Engineer‐in‐charge is final and binding onthe  contractor. (3)  Rates  include  local  transport  within  the  section  only.    Transport  from  factory  upto  thesection/office of the Engineer‐in‐charge will be paid under relevant SSR items. 

Quantity

Rate

Unit

Amount

190.00

5,800.00

1 RM

12,45,260.00

( Rupees  Five Thousand Eight Hundred )

Contractor's % : 13       Discount : 0

 

8

BRGL3

Supply, fabricating and fixing of gratings for inspection chambers, inspection ladders, platforms,hand railing on bridges, Box girder doors etc.,  to facilitate  inspection/locking with contractorãs M.S  rods/  plates/  flats/  pipes  of  appropriate  sizes  including  anti‐corrosive  painting  and providing  anchorage,  locking  arrangement  as  required  complete  with  all  lead,  lift,  transport,consumables, labour, tools & plants etc., complete and as directed by the Engineer‐in‐charge. 

Quantity

Rate

Unit

Amount

0.50

46,000.00

1 T

25,990.00

( Rupees  Forty Six Thousand )

Contractor's % : 13       Discount : 0

 

9

BRGL4

Drilling  of  25mm/40mm  dia  holes  in  concrete/stone  masonry/hard  rock  underground/overground,  to  a  depth  of  400mm  for  dowelling/  anchoring  including  fixing  of  steeldowels/angles/flats    and  grouting  with  cement  mortar  (1:3)  with  Contractors  all  materials,drilling  equipment,  lead,  lift,  labour,  transport,  tools  &  plant,  consumables,  etc.,  complete (excluding  cement  &  steel)  as  per  specifications  and  as  directed  by  the  Engineer‐in‐charge. NOTES:‐  (1) Rate  includes  all materials,  operations  etc.,  excluding  cement  and  steel, which will  be  paidunder other relevant schedules. 

Quantity

Rate

Unit

Amount

100.00

150.00

1 NOS

16,950.00

( Rupees  One Hundred and Fifty )

Contractor's % : 13       Discount : 0

 

 Signature of Contractor                                                             Schedule Page No: 21  of  

27                                  Signature of Contract Signing Authority

Page 25: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'D'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

10

BRGL5

Supplying, providing and removing heavy duty shoring for excavation in foundation trenches for bridges and buildings only near existing bridge/track/building to a depth not less than 3.0m asper  specific  shoring plans  issued by  the Dy.Chief Engineer‐in‐charge based on Railways Sketch No:ST/CN/BNC/06‐2009, with Contractorãs all materials  (excluding rails  to be supplied by  theRailways free of cost but to be returned by the Contractor), with all  lead,  lift,  labour,  transport,tools  &  plant,  consumables,  etc.,  complete  and  as  directed  by  the  Engineer‐in‐charge. NOTES:‐   (1)  Rate  is  per  square  metre  (sqm)  of  elevational  area  of  the  shoring. (2)  The  item  shall  be  operated with  the  specific  approval  and  drawing  issued  by  the  Dy.ChiefEngineer and shall be used only in unsafe/instability conditions involving depth of excavations to more  than  3.0m  below  the  ground  level/existing  foundations/to  slope  of  existing  formationsleeper  than  1:1. (3) Total payment under this  item shall be restricted to a maximum of 10% of the payment forearthwork  and/or  concreting  done  upto  3.0m  below  ground  level/existing  foundation  levelonly.as specified. 

Quantity

Rate

Unit

Amount

200.00

1,000.00

1 SQM

2,26,000.00

( Rupees  One Thousand )

Contractor's % : 13       Discount : 0

 

6,00,81,874.00

(No. of Items 10 ONLY)

Schedule D Departmental Value : 

0.00

6,00,81,874.00

Schedule D Total :

Rupees in Words ( Rupees  Six Crore Eighty One Thousand Eight Hundred and Seventy Four And Paise  Sixty ONLY )

 Signature of Contractor                                                             Schedule Page No: 22  of  

27                                  Signature of Contract Signing Authority

Page 26: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

GNJA/49

Notice Date :-

02/12/2015

Dept : ENGINEERING

Project : 11534 ‐ MUNIRABAD ‐ GINIGERE ‐ RAICHUR NEW BG LINE

Agency: S0760 ‐ SSCC & NRK (JV)

Name  of  the  Work  : GINIGERA ‐ RAICHUR NEW BG LINK :‐ Earthwork including blanketing and Construction of Bridges from KM 55/000 to 61/000 between Siddapur and Karatagi Stations. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'E'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

ST1‐001

Supply  of  High  Yield  Strength  Deformed  reinforcement  steel  bars/wires    of  grade  FE415/500/550  confirming  to  IS  1786‐1985  (upto  date)  at  site  of  work  to  the  extent  actually required  for  the  work  including  all  cost  of  loading,  unloading,  leading,  transporting,  stacking,storing, labour, consumables, machinery, vehicles etc., complete and as directed by the Engineer‐in‐charge.  NOTE:  (1) The rate quoted  for  this  item  is applicable  for both  Fe500 and Fe550.   FE 415 steelused will  be paid with a  reduction of Rs.2000/‐  from  the agreed  rates.  Steel  shall  be procured only  from  any  of  the  following  manufacturer's  SAIL,  TISCO,  IISCO,  RINL. (2)  Stage  payment  for  supply  of  steel  shall  be  limited  to  75%  of  the  agreed  rates  subject  toproduction  of  Bank  Guarantee/Indemnity  Bond  as  specified,  Test  certificates,  Insurance,limitation  in  quantity  supplied  at  a  time,  conditions  for  stacking/storing/  preserving  at  site. However, this payment will be restricted to a maximum of 30% of the Schedule quantity at anypoint  of  time. (3) Payment  for reinforcement rods/wires will be made as per actual used  including over  laps,cranks, bends, etc., if any, as per approved drawing and as per Special Conditions for use of steel.However,  no  payment will  be made  for  any wastages.  Quantity will  be  calculated  for  nominaldiameter  of  the  bars  using  standard  weights  per  running  metre  or  as  per  actual  weightswhichever  is  less. (4) Binding wire, clamping materials etc., used in construction will not be treated as supply itemsunder  this  schedule  and  will  be  governed  by  the  Schedule  and  Special  Conditions  under  therelevant  items  of  concreting  etc.,  and  no  extra  payment  shall  be  eligible. (5)  Reinforcement  steel  shall  be  supplied  and  used  as  per  approved  drawings  and  as  perinstructions  of  the  Engineer‐in‐charge. (6) The steel shall be as per specified code and the process of manufacturing shall be the latestand as recommended by the relevant IS Specifications. However, the rates quoted shall apply toall types of manufacturing and no extra payment is admissible in this regard. 

Quantity

Rate

Unit

Amount

858.00

51,790.00

1 T

4,44,35,820.00

( Rupees  Fifty One Thousand Seven Hundred and Ninety )

Contractor's % : 0       Discount : 0

 

4,44,35,820.00

(No. of Items 1 ONLY)

Schedule E Departmental Value : 

0.00

4,44,35,820.00

Schedule E Total :

Rupees in Words ( Rupees  Four Crore Forty Four Lakh Thirty Five Thousand Eight Hundred and Twenty And Paise  

 Signature of Contractor                                                             Schedule Page No: 23  of  

27                                  Signature of Contract Signing Authority

Page 27: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

GNJA/49

Notice Date :-

02/12/2015

Dept : ENGINEERING

Project : 11534 ‐ MUNIRABAD ‐ GINIGERE ‐ RAICHUR NEW BG LINE

Agency: S0760 ‐ SSCC & NRK (JV)

Name  of  the  Work  : GINIGERA ‐ RAICHUR NEW BG LINK :‐ Earthwork including blanketing and Construction of Bridges from KM 55/000 to 61/000 between Siddapur and Karatagi Stations. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'F'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

EW2‐302

Blanketing  of  formation:  Manufacturing,  supplying,  transporting  to  site,  spreading  in  layers,compacting the blanketing material and dressing/finishing the formation to profile as per RDSOspecification No.GE:G‐1 with upto date correction slips conforming to upper blanket layer guidingenveloping  curves  as  per  sketch  B  RDSO's  Drawing  No.GT/SD/0011/  Rev.2/2001  of  the  saidspecification  including  spreading  and  compacting  with  vibratory  rollers  of  adequate  capacity,duly  sprinkling  water/  allowing  to  dry  to  achieve  optimum  moisture  content  as  specified,complete  in  all  respects  and  as  directed  by  Engineer‐in‐charge.    Rate  includes  all  materials, transporting/leading/unloading,  spreading,  labour,  manufacturing,  mixing  &  blending  by  any means,  all  tests  on  materials,  to  obtain  the  specified  gradation,  leads,  lifts,  assent,  dissent,crossing of nalla /stream and all other obstructions, all machinery, tools and plants, handling andre‐handling  of  the  materials,  fuel,  royalty,  octroi,  licensing  charges,  incidentals,  etc,  complete. Note:(i) The blanket material should be manufactured, if necessary, for the purpose of achievingthe distribution curve, by blending various materials such as crushed stone aggregates, naturallyavailable  mineral  materials  such  as  gravel/river  sand/soil  of  various  gradations. (ii):  Blanket  material  produced  should  generally  conform  to  following  specifications: (a)  It  should  be  coarse,  granular  and  well  graded (b)  Skip  graded  material  is  not  permitted.  (c) Non‐plastic fines (particles of size less than 75 micron) are limited maximum to 12% whereasplastic  fines  (particles  of  size  less  than  2  micron)  are  limited  maximum  to  5%. (d)  The  blanket  material  should  have  particle  size  distribution  curve  within  upper  layer  of enveloping  curves  shown  in  sketch  B  (RDSO's  Drawing  No.GT/SD/0011/Rev.2/2001). (e)  The  material  should  be  well  graded  with  Cu  and  Cc  as  under:  Uniformity  coefficient,Cu=D60/D10  >  4    Co‐efficient  of  curvature,  Cc  =  D302/D60xD10      between  1  &  3  (iii) The net payable blanketing quantity will be based on cross section measurements and whatis  within  the  required  profile  of  blanketing. (iv)    The  tenderer must  ensure  following  before  submitting  his  offer:  (a)  The  tenderer  shouldsurvey  the  work  area,  quarries  for  the  raw  materials  for  blanketing  and  all  relevant  factorsaffecting  the      progress  of  work.  (b)  The  tenderer  should  complete  the  testing,  work  out  themodalities  of  producing  blanketing  material  as  per  specification  and  the  required  progress, submit  the  types  of  materials  and  their  proportions  required  for  mixing  to  get  the  desiredmaterial.  (v) Blending   by mechanical means by using pug mill  is preferable  to achieve uniformity of  thefinished  blanket material.  Extra payment for mechanical blending by using pug mill will be paid @  10%  of  the  quoted  rate  against  this  item. (vi)  If  the quantity of  blanketing  is more  than 30,000  cum,  then  the work of  blending  shall  beexecuted  by  mechanical  means  using  pug  mill  only.    No  other  means  will  be  permitted  for blending of blanketing material.  Additional payment @ 10% of the quoted rate against this itemfor mechanized blending work with pug mill shall be applicable  in this case as per  item no.5 ofthe note. 

Quantity

Rate

Unit

Amount

 Signature of Contractor                                                             Schedule Page No: 24  of  

27                                  Signature of Contract Signing Authority

Page 28: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'F'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

58500.00

360.00

1 CUM

2,10,60,000.00

( Rupees  Three Hundred and Sixty )

Contractor's % : 0       Discount : 0

 

2,10,60,000.00

(No. of Items 1 ONLY)

Schedule F Departmental Value : 

0.00

2,10,60,000.00

Schedule F Total :

Rupees in Words ( Rupees  Two Crore Ten Lakh Sixty Thousand And Paise  Twenty One ONLY )

 Signature of Contractor                                                             Schedule Page No: 25  of  

27                                  Signature of Contract Signing Authority

Page 29: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

GNJA/49

Notice Date :-

02/12/2015

Dept : ENGINEERING

Project : 11534 ‐ MUNIRABAD ‐ GINIGERE ‐ RAICHUR NEW BG LINE

Agency: S0760 ‐ SSCC & NRK (JV)

Name  of  the  Work  : GINIGERA ‐ RAICHUR NEW BG LINK :‐ Earthwork including blanketing and Construction of Bridges from KM 55/000 to 61/000 between Siddapur and Karatagi Stations. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'G'

VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

ST002

Supplying of High Tensile Steel wires/strands to IS 14268 (upto date) of suitable dia as approvedin designs/ drawings/ conditions from approved manufacturer at the site of work  to the extentof quantity required for various items of works  in schedule of items including all cost of loading,leading,  transporting,  storing,  unloading,  handling,  rehandling,  stacking,  protecting  etc.,  in  the contractor's    store    godowns as per  IS  specifications with  all  lead,  lift,  transport,  consumables,labour,  tools  &  plant  and  all  other  incidental  charges  etc.,  complete  and  as  directed  by    theEngineer‐in‐charge.    NOTE:‐  (1) Payment will be made only for HTS wire/strands used in the structure for lengths measuredfrom bearing plate to bearing plate or face to face of the structure and no extra for wastage etc.,will  be  allowed.  (2)  50%  of  the  agreement  rate  will  be  paid  for  the  HTS  wire/strand  brought  to  the  site    on production  of  Indemnity  Bond/Bank Guarantee  as  per  Special  Conditions  and  other  necessarycertificates  and  the  balance  will  be  paid  only  after  completion  of  all  works  connected  toprestressing and certification of the quality of the slab/girder/etc., where the HTS materials areused. 

Quantity

Rate

Unit

Amount

4.20

63,800.00

1 MT

2,67,960.00

( Rupees  Sixty Three Thousand Eight Hundred )

Contractor's % : 0       Discount : 0

 

2,67,960.00

(No. of Items 1 ONLY)

Schedule G Departmental Value : 

0.00

2,67,960.00

Schedule G Total :

Rupees in Words ( Rupees  Two Lakh Sixty Seven Thousand Nine Hundred and Sixty And Paise  Twenty Six ONLY )

 Signature of Contractor                                                             Schedule Page No: 26  of  

27                                  Signature of Contract Signing Authority

Page 30: º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ ACCEPTANCE LETTER …

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :-

GNJA/49

Notice Date :-

02/12/2015

Dept : ENGINEERING

Project : 11534 ‐ MUNIRABAD ‐ GINIGERE ‐ RAICHUR NEW BG LINE

Agency: S0760 ‐ SSCC & NRK (JV)

Name  of  the  Work  : GINIGERA ‐ RAICHUR NEW BG LINK :‐ Earthwork including blanketing and Construction of Bridges from KM 55/000 to 61/000 between Siddapur and Karatagi Stations. (TWO PACKET SYSTEM)  

Schedule of Items   LOA No. W496/GNJA/49 Date 15/06/2016 of UCC 74149 

Schedule 'J'

NON VETTED ITEMS

Sl. No.

Description of  Items

CODE

1

066825

Improving bearing capacity by removing loose soil, filling with boulders, sand, rolling with vibro roller in layers of 30cm thick. 

Quantity

Rate

Unit

Amount

380.00

550.00

1 CUM

2,09,000.00

( Rupees  Five Hundred and Fifty )

Contractor's % : 0       Discount : 0

 

2

082854

Conducting Plate load test and submitting report 

Quantity

Rate

Unit

Amount

2.00

15,000.00

1 NOS

30,000.00

( Rupees  Fifteen Thousand )

Contractor's % : 0       Discount : 0

 

2,39,000.00

(No. of Items 2 ONLY)

Schedule J Departmental Value : 

0.00

2,39,000.00

Schedule J Total :

Rupees in Words ( Rupees  Two Lakh Thirty Nine Thousand And Paise  Twenty Three ONLY )

 Signature of Contractor                                                             Schedule Page No: 27  of  

27                                  Signature of Contract Signing Authority