egram.co.carver.mn.us · outlets west side of north proposed box culvert apron (see sheet 11). all...
Transcript of egram.co.carver.mn.us · outlets west side of north proposed box culvert apron (see sheet 11). all...
166TH ST.
PROP. FINISHEDPROFILE GRADE
EXIST.GROUNDLINE
GRADING PROFILEGRADE
EXIST. TOPSOILASSUMED 6"
11'-0" LANE
1:41:2 MAX.
3'-0"SHLDR.
9'-0"CLEAR ZONE
33'-0"EXIST. R/W
-2.0%
11'-0" LANE3'-0"SHLDR.
9'-0"CLEAR ZONE
33'-0"EXIST. R/W
-2.0%
12
1:4
1:2 MAX.
6" MIN.TOPSOIL(TYP.)
6" AGG. SURFACINGCLASS 5
1313
12
DES:CHK:
DR:
CHK:APPROVED:
SHEET NO. OF SHEETSDATELICENSED PROFESSIONAL ENGINEER
LIC. NO.:NAME:
CERTIFIED BY: BRIDGE NO.TITLE:
Plo
tD
ate
:11/
03/2
014
-12:
02pm
Dra
win
gna
me
:V:\
1938
\ac
tive
\193
8029
22\C
AD
\Dw
g\19
3802
922C
001.
dwg
Xre
fs:,
1938
0292
2_BO
RDER
THE
CO
NTR
AC
TOR
SHA
LLV
ERIF
YA
ND
BERE
SPO
NSI
BLE
FOR
ALL
DIM
ENSIO
NS.
DO
NO
TSC
ALE
THE
DRA
WIN
G-A
NY
ERRO
RSO
RO
MIS
SIO
NS
SHA
LLBE
REPO
RTED
TOST
AN
TEC
WITH
OUT
DEL
AY.
THE
CO
PYRI
GH
TSTO
ALL
DES
IGN
SA
ND
DRA
WIN
GS
ARE
THE
PRO
PERT
YO
FSTA
NTE
C.R
EPRO
DUC
TION
OR
USE
FOR
AN
YPU
RPO
SEO
THER
THA
NTH
AT
AUT
HORI
ZED
BYST
AN
TEC
ISFO
RBID
DEN
.
2335 Highway 36 WSt. Paul, MN 55113www.stantec.com
S.A.P. 010-599-018
10J32
9/29/2014
A SHRINKAGE FACTOR OF 140% USED FOR EMBANKMENT CONSTRUCTION.
EARTHWORK BALANCE REFLECTS ROADWAY EARTHWORK SHOWN ON SHEETS 13 - 14 ONLY.
WARNING:
DIAL GOPHER STATE ONE CALL AT 1-800-252-116648 HOURS IN ADVANCE OF CONSTRUCTION OPERATIONSTO OBTAIN COMPLETE UTILITY PROPERTY OWNERSHIPAND LOCATION INFORMATION.
11
1 ALL GRADING QUANTITIES ARE NON-PARTICIPATING FOR STATE BRIDGE BOND FUNDS.
CLEARING AND GRUBBING INCLUDES ALL AREAS WITHIN CONSTRUCTION LIMITS EXCEPT ASNOTED ON SHEET 2 (SEE CONSTRUCTION NOTES). ENGINEER IN THE FIELD SHALL APPROVETREES TO BE CLEARED AND GRUBBED PRIOR TO REMOVAL.
"COMMON EXCAVATION" INCLUDES EXCAVATION AND EMBANKMENT OR DISPOSAL AS REQUIRED.QUANTITY INCLUDES APPROX. 129 CU. YD. OF SALVAGED TOPSOIL (ASSUMED 6" DEEP).
"COMMON BORROW (CV)" INCLUDES APPROX. 100 CU. YD. ADDITIONAL QUANTITY FOR FILLUNDER SELECT GRANULAR BORROW OUTSIDE OF EXISTING SLOPES AT CULVERT EXCAVATION.ALSO INCLUDES APPROX. 490 CU. YD. OF COMMON BORROW FROM 2' ABOVE TOP OF CULVERT UPTO GRADING PROFILE GRADE AT CULVERT EXCAVATION (SEE SHEET 2).
QUANTITY BASED ON CONVERSION OF 1.8 TONS = 1 CU. YD. (CV).
SEE SHEET 12 FOR LOCATION OF SEDIMENT CONTROL LOG FOR DITCH CHECKS AND SHEET 19 &20 FOR DETAILS. AN ADDITIONAL 200' HAS BEEN PROVIDED FOR USE AS NEEDED, OR ASDIRECTED BY THE ENGINEER IN THE FIELD.
RAPID STABILIZATION METHOD 4 SHALL ALSO INCLUDE NATIVE SEED MIXTURE 35-241 APPLIEDAT RATE OF 84.5 LB/ACRE OVER ENTIRE AREA OF THE RAPID STABILIZATION. ALL COSTS RELATEDTO RAPID STABILIZATION INCLUDING SEED MIXTURE 35-241 SHALL BE INCLUDED IN "RAPIDSTABILIZATION METHOD 4".
SEE SHEET 11 (NOTE ).
INCLUDES REROUTING YARD DRAIN WITHIN EASEMENT AREA. CONSISTS OF 6" DIA. PIPE THATOUTLETS WEST SIDE OF NORTH PROPOSED BOX CULVERT APRON (SEE SHEET 11). ALLEXCAVATION, BACKFILL, LABOR, AND MATERIALS (SUCH AS CONNECTION, ELBOWS, NEW PIPE,ETC.) NECESSARY TO REROUTE PIPE AS APPROVED BY THE ENGINEER IN THE FIELD SHALL BEINCLUDED IN ITEM "YARD DRAIN".
INCLUDES A QUANTITY OF 1905 LIN. FT. IN ADDITION TO THE LENGTH OF THE OUTLINE ASSHOWN ON SHEET 12, TO ACCOUNT FOR PHASING AND REDUNDANT CONTROL ALONG STREAM.
GRADING NOTES:
NATURAL TOPSOIL SHALL BE SALVAGED FROM ALL AREAS DISTURBED BY CONSTRUCTION ANDPLACED ON ALL CONSTRUCTED SLOPES AND DITCH BOTTOMS WITH A DEPTH OF NOT LESS THAN6". THE CONTRACTOR WILL BE REQUIRED TO TRANSPORT TOPSOIL IF NECESSARY FOR STORAGEDURING GRADING. THE SALVAGING, TRANSPORTING, STORAGE, TEMPORARY STABILIZATION, ANDFINAL PLACING OF TOPSOIL WILL BE INCIDENTAL TO "COMMON EXCAVATION", PAY ITEM.
SELECTED GRADING MATERIALS SHALL BE USED FOR ALL EMBANKMENT CONSTRUCTION ANDSHALL CONSIST OF ALL SOILS ENCOUNTERED EXCEPT TOPSOILS, HIGHLY ORGANIC SOILS,DEBRIS, AND OTHER UNSUITABLE MATERIALS.
IF SELECTED GRADING MATERIALS ARE NOT AVAILABLE OR CANNOT BE OBTAINED FROM THEONSITE EXCAVATIONS, BORROW MATERIAL SHALL BE FURNISHED FROM SOURCES SELECTED BYTHE CONTRACTOR AND SHALL BE APPROVED BY THE ENGINEER PRIOR TO BEING DELIVERED TOTHE PROJECT.
THE DENSITY OF THE SUBGRADE AND THE AGGREGATE SURFACE SHALL BE THAT ATTAINED BYTHE METHOD OF QUALITY COMPACTION IN ACCORDANCE WITH THE REQUIREMENTS OF2105.3.F.2.
ALL DIMENSIONS AND SLOPES SHOWN IN THE TYPICAL SECTION ARE APPROXIMATE.
1
5
2
11
3
BOP STA. 100+87.00 TO EOP STA. 104+87.00
APPROXIMATE 1:40 TAPER AT BOP STA. 100+87.00 TO STA.102+47.00 AND STA. 103+27.00 TO EOP STA. 104+87.00 AS SHOWNIN ROADWAY CROSS SECTIONS. ALSO SEE PLAN VIEW SHEET 11.
SEE SHEET 11 FOR LOCATION AND DIMENSIONS OF EASEMENTSBEYOND EXIST. R/W.
12
3
4
5
6
4
APPROACH GRADINGSCHEDULE OF QUANTITIES 10
RAB
BLF
LMT
BLF
25RONALD BENSON 22737
2
6
7
7
TYPICAL SECTION
13
8
8
8
9
9
3
10
10
X
X
XXXXXXXXXXXX
XXXXXXXXXXXXXX
X
XX
XX
X X
OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP
C-D C-D C-D C-DC-D
C-DC-D
C-D C-D C-D C-D
SILVER CREEK
FLOW
166TH ST.
33'-0
"EX
IST.
R/W
33'-0
"EX
IST.
R/W
100+00 101+00 102+00 103+00 104+00 105+00 106+00
BOP :
1 00 +
87.0
0
EOP:
104+
87.0
0
PROPOSED BRIDGENO. 10J32
MS MS MS MS MS MS MS MS
MS
MS
MS
MS
MS
MS MS MS MS MS
MS
MS
MS
MS
MS MS
MS
MS
MS
MS
MS
MS MS MS MS MS MS
MS
MS
MSMSMSMSMSMSMSMSMS
MS
MS
MSMS
MSMS
MS
FLOTATION SILT CURTAIN(TYP.) SEE SHEET 18
DITCH CHECK (TYP.)SEE SHEETS 19 & 20
2
STA. 103+80.00OFFSET 133.00' L
STA. 103+80.00
STA. 102+25.00
STA. 102+25.00OFFSET 133.00' L
STA. 103+30.00OFFSET 98.00' R
STA. 103+30.00
STA. 102+00.00OFFSET 98.00' R
STA. 102+00.00
TEMPORARYEASEMENT
PERMANENT EASEMENTSEE SHEET 11 FOR
DIMENSIONS.
TEMPORARYEASEMENT
PERMANENT EASEMENTSEE SHEET 11 FORDIMENSIONS.
MS
MSMS
MS
MS
MS
MSMSMSMSMSMS
MS
3 3
3
3
BOX CULVERTS RIPRAP
FLOTATION SILT CURTAIN
SILT FENCE TYPE MS (MACHINE SLICED)MS
RAPID STABILIZATION METHOD4 WITHIN 24 HOURS OFTOPSOIL PLACEMENT.
EROSION CONTROL LEGEND
DITCH CHECK SEDIMENT CONTROL LOG(TYPE WOOD FIBER)
1
2
DES:CHK:
DR:
CHK:APPROVED:
SHEET NO. OF SHEETSDATELICENSED PROFESSIONAL ENGINEER
LIC. NO.:NAME:
CERTIFIED BY: BRIDGE NO.TITLE:
Plo
tD
ate
:11/
03/2
014
-12:
03pm
Dra
win
gna
me
:V:\
1938
\ac
tive
\193
8029
22\C
AD
\Dw
g\19
3802
922C
201.
dwg
Xre
fs:,
1938
0292
2_BO
RDER
,193
8029
22XS
XT,1
9380
2922
XSN
B,19
3802
922X
SNO
THE
CO
NTR
AC
TOR
SHA
LLV
ERIF
YA
ND
BERE
SPO
NSI
BLE
FOR
ALL
DIM
ENSIO
NS.
DO
NO
TSC
ALE
THE
DRA
WIN
G-A
NY
ERRO
RSO
RO
MIS
SIO
NS
SHA
LLBE
REPO
RTED
TOST
AN
TEC
WITH
OUT
DEL
AY.
THE
CO
PYRI
GH
TSTO
ALL
DES
IGN
SA
ND
DRA
WIN
GS
ARE
THE
PRO
PERT
YO
FSTA
NTE
C.R
EPRO
DUC
TION
OR
USE
FOR
AN
YPU
RPO
SEO
THER
THA
NTH
AT
AUT
HORI
ZED
BYST
AN
TEC
ISFO
RBID
DEN
.
2335 Highway 36 WSt. Paul, MN 55113www.stantec.com
S.A.P. 010-599-018
10J32
9/29/2014EROSION CONTROL PLAN
12
RAB
BLF
LMT
BLF
25RONALD BENSON 22737
20 400
Horizontal Scale In Feet
NOTES:
SEE SHEET 15 FOR SWPPP REQUIREMENTS AND SHEETS 18 - 23 FOR TEMPORARYSEDIMENT CONTROL DETAILS. EROSION CONTROL DEVICES SHALL BE MAINTAINEDFOR NO ADDITIONAL COMPENSATION.
AN ADDITIONAL SEDIMENT CONTROL LOG QUANTITY OF 200 LIN. FT. HAS BEENPROVIDED FOR IN THE SCHEDULE OF ESTIMATED GRADING QUANTITIES,PLACEMENT OF THE SEDIMENT CONTROL LOG SHALL BE APPROVED BY THEENGINEER IN THE FIELD.
SILT FENCE TYPE HI (HAND INSTALLED) TO BE USED IF CONDITIONS DO NOTALLOW SILT FENCE TYPE MS (SUCH AS STEEP SLOPES) FOR NO CHANGE IN UNITBID PRICE. EXACT LOCATION OF SILT FENCE SHALL BE DETERMINED IN THE FIELDBASED ON THE CONTRACTOR'S OPERATIONS.
FINAL LOCATION OF FLOTATION SILT CURTAIN SHALL BE DETERMINED BASED ONCONTRACTOR'S OPERATIONS AND DEWATERING METHOD.
REDUNDANT PERIMETER CONTROL SHALL BE INSTALLED FOR DOWN GRADIENTSLOPES ADJACENT TO THE STREAM, PRIOR TO OR IN CONJUNCTION WITH (WITHIN24 HOURS OF) ANY SOIL DISTURBING ACTIVITIES (SEE CONSTRUCTION PHASING,SHEET 15).
1
2
3
DES:CHK:
DR:
CHK:APPROVED:
SHEET NO. OF SHEETSDATELICENSED PROFESSIONAL ENGINEER
LIC. NO.:NAME:
CERTIFIED BY: BRIDGE NO.TITLE:
Plo
tD
ate
:11/
03/2
014
-9:1
3am
Dra
win
gna
me
:V:\
1938
\ac
tive
\193
8029
22\C
AD
\Dw
g\19
3802
922C
202.
dwg
Xre
fs:,
1938
0292
2_BO
RDER
,193
8029
22_B
ORD
ER_M
OD
THE
CO
NTR
AC
TOR
SHA
LLV
ERIF
YA
ND
BERE
SPO
NSI
BLE
FOR
ALL
DIM
ENSIO
NS.
DO
NO
TSC
ALE
THE
DRA
WIN
G-A
NY
ERRO
RSO
RO
MIS
SIO
NS
SHA
LLBE
REPO
RTED
TOST
AN
TEC
WITH
OUT
DEL
AY.
THE
CO
PYRI
GH
TSTO
ALL
DES
IGN
SA
ND
DRA
WIN
GS
ARE
THE
PRO
PERT
YO
FSTA
NTE
C.R
EPRO
DUC
TION
OR
USE
FOR
AN
YPU
RPO
SEO
THER
THA
NTH
AT
AUT
HORI
ZED
BYST
AN
TEC
ISFO
RBID
DEN
.
2335 Highway 36 WSt. Paul, MN 55113www.stantec.com
S.A.P. 010-599-018
10J32
9/29/2014SWPPP REQUIREMENTS
15
RAB
BLF
LMT
BLF
25RONALD BENSON 22737
NAME OF WATER BODY
NO YES
LOCATION OF EROSION & SEDIMENTCONTROL REQUIREMENTS
PLAN
LOCATION
RECEIVING SURFACE WATERS
SPECIALWATER
IMPAIREDWATER
SAN FRANCISCO TOWNSHIP, CARVER COUNTYSILVER CREEK
PROJECT LOCATION AND GENERAL SITE INFORMATION
THIS PROJECT CONSISTS OF REPLACING OLD BRIDGE NO. L2818 AND MINIMAL APPROACHWORK ON SAN FRANCISCO TWP ROAD 108 IN CARVER COUNTY TO ACCOMMODATE THENEW BRIDGE.
THIS PROJECT WILL REQUIRE THE DISTURBANCE OF 0.97 ACRES OF SOILS.
THIS PROJECT SWPPP WAS PREPARED BY RON BENSON, PE CERTIFIED IN THE DESIGN OFSWPPP BY THE UNIVERSITY OF MINNESOTA.
LONG TERM OPERATION AND MAINTENANCE
SAN FRANCISCO TOWNSHIP, CARVER COUNTY, MN WILL BE RESPONSIBLE FOR THE LONGTERM OPERATION AND MAINTENANCE OF THE PERMANENT STORMWATER MANAGEMENT.
RECEIVING SURFACE WATERS, DISCHARGE TO IMPAIRED WATERS & SPECIAL WATERS
THE TABLE BELOW IDENTIFIES ALL SURFACE WATERS WITHIN 1 MILE OF THE DISTURBEDSOIL PROJECT BOUNDARIES, WHICH WILL RECEIVE STORMWATER RUNOFF FROM THECONSTRUCTION SITE, DURING OR AFTER CONSTRUCTION.
STORMWATER FROM A DISCHARGE POINT ON THE PROJECT THAT FLOWS TO A SURFACEWATER IDENTIFIED AS IMPAIRED AND/OR SPECIAL MUST INCLUDE THE FOLLOWINGADDITIONAL BMP REQUIREMENTS:
1. ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMITSOIL EROSION BUT IN NO CASE LATER THAN SEVEN (7) DAYS AFTER THECONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY ORPERMANENTLY CEASED.
2. TEMPORARY SEDIMENT BASINS MUST BE USED FOR COMMON DRAINAGE LOCATIONSTHAT SERVE AN AREA WITH FIVE (5) OR MORE ACRES DISTURBED AT ONE TIME.THIS PROJECT AS DESIGNED DOES NOT HAVE FIVE (5) DISTURBED ACRES DRAININGTO A COMMON LOCATION AND TEMPORARY SEDIMENT BASINS WILL NOT BEREQUIRED.
DESCRIPTION
PLAN VIEW
QUANTITY TABULATIONCONTRACTOR RESPONSIBILITIES
CONSTRUCTION SHALL BE GOVERNED BY THE MN/DOT SPEC BOOK (2014 EDITION).
THE CONTRACTOR WILL NEED TO IDENTIFY A MN/DOT CERTIFIED EROSION CONTROLSUPERVISOR FOR THIS SITE, THAT IS IN GOOD STANDING WHO WILL BEKNOWLEDGEABLE AND EXPERIENCED IN THE APPLICATION OF EROSION PREVENTIONAND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES.
THE CONTRACTOR IS RESPONSIBLE FOR EROSION AND SEDIMENT CONTROL ON THISPROJECT.
THE CONTRACTOR WILL DEVELOP A CHAIN OF COMMAND WITH ALL OPERATORS ON THESITE TO ENSURE THAT THE EROSION AND SEDIMENT CONTROL WILL BE IMPLEMENTEDAND STAY IN EFFECT UNTIL THE CONSTRUCTION PROJECT IS COMPLETE, THE ENTIRESITE HAS UNDERGONE FINAL STABILIZATION, AND A NOTICE OF TERMINATION (NOT)HAS BEEN SUBMITTED TO THE MPCA.
FINAL STABILIZATION TO BE COMPLETED PRIOR TO SUBMITTING THE NOT INCLUDES:APPROXIMATELY 70% UNIFORM VEGETATIVE COVER OVER ALL PERVIOUS SURFACE, ALLTEMPORARY BMPS CLEANED OUT AND REMOVED, DITCHES STABILIZED, AND FINALMAINTENANCE/CLEANOUT OF PERMANENT STORMWATER SYSTEMS.
THE CONTRACTOR SHALL MAINTAIN THE SEDIMENT AND EROSION CONTROL MEASURESIDENTIFIED ON THIS PLAN UNTIL THE SITE IS STABILIZED. ALL EROSION AND SEDIMENTCONTROL DEVICES SHALL BE INSPECTED AFTER EACH RUNOFF PRODUCING RAIN EVENT.ALL NONFUNCTIONAL DEVICES SHALL BE REPAIRED OR REPLACED WITH NO ADDITIONALCOMPENSATION MADE THEREFOR.
IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATION OFSEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TOMINIMIZE OFF-SITE IMPACTS. NO FILLING EXCEPT THAT SPECIFICALLY DETAILED IN THEPLAN SHALL OCCUR WITHIN THE AREA CONTAINED BETWEEN THE UPPER STREAM BANKSOR ANY WETLAND.
THE DISTURBED SURFACE AREA AT ANY ONE TIME SHALL MEET THE FOLLOWINGINSPECTION AND MAINTENANCE REQUIREMENTS:
1. THE CONTRACTOR'S INSPECTOR SHALL INSPECT THE CONSTRUCTION SITE ONCEEVERY SEVEN (7) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURSAFTER A STORM EVENT GREATER THAN 0.5 INCHES IN 24 HOURS.
2. THE CONTRACTOR SHALL KEEP A RECORD OF ALL INSPECTIONS AND MAINTENANCECONDUCTED DURING CONSTRUCTION. RECORDS SHALL INCLUDE:
- DATE AND TIME OF INSPECTIONS- NAME OF PERSON(S) CONDUCTING INSPECTIONS- FINDINGS AND RECOMMENDATIONS FOR CORRECTIVE ACTIONS- CORRECTIVE ACTIONS TAKEN (INCLUDE DATE AND TIMES)- DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5 INCHES IN 24 HOURS- DOCUMENTATION OF CHANGES MADE TO THE EROSION CONTROL PLANS
3. ALL SILT FENCE AND DITCH CHECKS SHALL BE CLEANED OF SEDIMENT WHEN THESEDIMENT REACHES 1/3 THE HEIGHT OF THE SILT FENCE OR BALE CHECK.
CONSTRUCTION PHASING - EROSION AND SEDIMENT CONTROL SEQUENCING
SILT FENCE, CONSTRUCTION ENTRANCES, AND/OR OTHER SUITABLE PERIMETER BMP'SAS DEPICTED IN THE TEMPORARY EROSION AND SEDIMENT CONTROL PLANS WILL BEINSTALLED PRIOR TO THE START OF ANY LAND DISTURBING ACTIVITY. CONSTRUCTIONWILL BE REQUIRED TO BE PHASED SO THAT ALL DOWN GRADIENT SEDIMENT CONTROLMEASURES ARE INSTALLED PRIOR TO OR IN CONJUNCTION WITH ANY SOIL DISTURBINGACTIVITIES.
WHEN THE EXISTING TOPSOIL IS DISTURBED, THE TOPSOIL WILL BE STRIPPED ANDSTOCKPILED IN SOIL BERMS AT THE TOE OF THE STRIPPED SLOPES ALONG THE PROJECTLIMITS OR OTHER LOCATION DETERMINED BY THE CONTRACTOR. STOCKPILED TOPSOILBERMS WILL NOT BE PLACED IN ANY STORMWATER CONVEYANCES.
SEDIMENT DAMAGE FROM STOCKPILES WILL BE MINIMIZED BY PLACING A ROW OF SILTFENCE 5 FEET FROM THE TOE (INCIDENTAL).
ALL STOCKPILES LEFT FOR A PERIOD OF 7 DAYS SHALL BE TEMPORARILY STABILIZED.TEMPORARY STABILIZATION SHALL CONSIST OF RAPID STABILIZATION METHOD 3(INCIDENTAL).
AFTER STRIPPING THE TOPSOIL THE EXPOSED SOIL INSLOPES WILL BE STABILIZED WITHA RAPID STABILIZATION METHOD TYPE 3 WITHIN 7 DAYS AFTER THE CONSTRUCTIONACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.
UPON COMPLETION OF THE APPROACH GRADING FILL WILL BE ADDED TO THE EXISTINGINSLOPES AND TAPERED BACK TO MATCH EXISTING GROUND. THE STOCKPILED TOPSOILBERMS WILL BE SPREAD ON THE NEW SLOPES AND PERMANENT VEGETATION WILL BEESTABLISHED AS PROVIDED IN THE PLAN.
THE CONTRACTOR MAY SKIP TEMPORARY OR RAPID STABILIZATION METHODS IF ANAREA IS STABILIZED WITH PERMANENT STABILIZATION IMMEDIATELY AFTER WORK ISCOMPLETE.
TEMPORARY SEDIMENT BASINS
THIS ROAD CONSTRUCTION PROJECT AS DESIGNED DOES NOT MEET ANY OF THETEMPORARY SEDIMENT BASIN DISTURBED AREA THRESHOLD REQUIREMENTS ANDTEMPORARY SEDIMENT BASINS WILL NOT BE REQUIRED.
PERMANENT STORMWATER MANAGEMENT SYSTEM
ALL STORMWATER MUST BE DISCHARGED IN A MANNER THAT DOES NOT CAUSENUISANCE CONDITIONS, EROSION IN RECEIVING WATERS OR ON DOWNSLOPEPROPERTIES, OR INUNDATION IN WETLANDS CAUSING A SIGNIFICANT ADVERSE IMPACTTO THE WETLAND.
THIS ROAD CONSTRUCTION PROJECT HAS 0.23 ACRES OF IMPERVIOUS SURFACE ( 0.05ACRES INCREASE).
EROSION PREVENTION PRACTICES
STABILIZATION OF ALL EXPOSED SOIL AREAS MUST BE COMMENCED IMMEDIATELY TOLIMIT SOIL EROSION, AND COMPLETED WITHIN 7 DAYS AFTER THE CONSTRUCTIONACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.FOR AREAS WHERE DISTURBED SOILS DRAIN TO AN IMPAIRED OR SPECIAL WATER THEEXPOSED SOIL MUST BE STABILIZED NO LATER THAN 7 DAYS AFTER THE CONSTRUCTIONACTIVITY IN THAT AREA CEASED. SEE THE IMPAIRED & SPECIAL WATERS SECTION OFTHIS SHEET FOR ADDITIONAL BMP REQUIREMENTS FOR DISTURBED AREAS THAT DRAINTO A SPECIAL OR IMPAIRED WATER.
THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCHOR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, ORDIVERTS WATER AROUND THE SITE, MUST BE STABILIZED WITHIN 200 LINEAL FEETFROM THE POINT OF DISCHARGE INTO ANY SURFACE WATER. STABILIZATION OF THELAST 200 LINEAL FEET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING TOA SURFACE WATER WITH RAPID STABILIZATION METHOD 4.
PIPE CULVERT OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGYDISSIPATION WITHIN 24 HOURS AFTER CONNECTION TO A SURFACE WATER. THIS WILLINCLUDE DRAINAGE DITCHES THAT DRAIN WATER FROM ANY PORTION OF THECONSTRUCTION SITE.
SEDIMENT CONTROL PRACTICES
TEMPORARY STOCKPILED TOPSOIL BERMS MUST INCLUDE PERIMETER BMP'S ASPROVIDED ON THIS SHEET.
IN ORDER TO MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, THERESHALL BE NO UNBROKEN SLOPE LENGTH OF GREATER THAN 75 FEET FOR SLOPES WITH AGRADE OF 1:3 OR STEEPER.
ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMP'S DURINGCONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL DISCHARGE TO THE INLET HAVEBEEN STABILIZED.
VEHICLE TRACKING OF SEDIMENT FROM THE CONSTRUCTION SITE MUST BE MINIMIZED.STREET SWEEPING MUST BE USED IF SEDIMENT IS BEING TRACKED OFF THECONSTRUCTION SITE ON PAVED SURFACES.
POLLUTION PREVENTION MEASURES
THE CONTRACTOR WILL IMPLEMENT THE POLLUTION PREVENTION MANAGEMENTMEASURES AS DIRECTED IN THE NPDES PERMIT PART IV.F 1-4 AS PERTAINING TO SOLIDWASTE, HAZARDOUS MATERIALS, EXTERNAL TRUCK WASHING, AND CONCRETE WASHOUTONSITE.
THESE MANAGEMENT MEASURES FOR POLLUTION PREVENTION WILL BE STRICTLYENFORCED.
ALL LIQUID AND SOLID WASTE GENERATED BY CONCRETE WASHOUT OPERATIONS MUSTBE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINERONSITE. NO LIQUID OR SOLID WASTE MUST CONTACT THE GROUND AND NO RUNOFF ISALLOWED FROM THE CONCRETE WASHOUT OPERATIONS OR AREA. ALL WASTE MUST BEPROPERLY DISPOSED IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BEINSTALLED NEAR EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENTOPERATORS TO UTILIZE THE PROPER FACILITIES.
ALL CONSTRUCTION DEBRIS AND OTHER WASTES SHALL BE DISPOSED OF BY THECONTRACTOR IN A MANNER THAT COMPLIES WITH MPCA DISPOSAL REQUIREMENTS.ONSITE BURIAL OF WASTE IS EXPRESSLY PROHIBITED.
BURNING OF TREES, BRUSH, OR OTHER VEGETATED MATERIALS IS NOT ALLOWEDWITHIN PROJECT BOUNDARIES.
ALL BRIDGE DEMOLITION AND REMOVAL OPERATIONS SHALL BE PREFORMED IN AMANNER WHICH CONTAINS ALL DEBRIS FROM ENTERING THE STREAM. IF REMOVALOPERATIONS RESULT IN DEBRIS ENTERING THE STREAM, REMOVAL OPERATIONS SHALLBE SUSPENDED AND METHODS CORRECTED PRIOR TO RESUMING. ANY DEBRIS WHICHDOES ENTER THE STREAM SHALL BE REMOVED.
PAYMENT
NO DIRECT COMPENSATION WILL BE MADE FOR COMPLIANCE TO THE REQUIREMENTS ONTHIS SHEET INCLUDING TEMPORARY STABILIZATION, MAINTENANCE OR REPAIR OFTEMPORARY OR PERMANENT EROSION AND SEDIMENT CONTROL MEASURES, OR CLEANUP OF SEDIMENT OR ERODED MATERIAL. PAYMENT FOR INSTALLATION OF INDIVIDUALCONTROL MEASURES IS PROVIDED FOR AS TABULATED AND NOTED ON OTHER SHEETS.
TEMPORARY SEDIMENT CONTROL
12
10
18 - 23
SWPPP REQUIREMENTS: