EGNOS Services and LPV Implementation

17
EGNOS Services and LPV Implementation IWG #25 St Petersburg, June 2013 1 IWG #25

description

EGNOS Services and LPV Implementation. IWG #25 St Petersburg, June 2013. TABLE OF CONTENT. EGNOS Services Status LPV Implementation status. TABLE OF CONTENT. EGNOS Services Status LPV Implementation status. EGNOS Services . Services. Markets. 2009. Location Based Services. - PowerPoint PPT Presentation

Transcript of EGNOS Services and LPV Implementation

Page 1: EGNOS Services and LPV  Implementation

EGNOS Services and LPV Implementation

IWG #25St Petersburg, June 2013

1IWG #25

Page 2: EGNOS Services and LPV  Implementation

TABLE OF CONTENT

2IWG #25

• EGNOS Services Status

• LPV Implementation status

Page 3: EGNOS Services and LPV  Implementation

TABLE OF CONTENT

3IWG #25

• EGNOS Services Status

• LPV Implementation status

Page 4: EGNOS Services and LPV  Implementation

EGNOS Services

4IWG #25

EGNOS Open Service (OS)• Service Declaration: 1st October 2009• http://www.essp-sas.eu/service_definition_documents• Agriculture, maritime, road, rail...

EGNOS Safety-of-Life (SoL) Service• Service Declaration: 2nd March 2011• http://www.essp-sas.eu/service_definition_documents• All phases of flight in aviation• SoL applications in any domain

EGNOS Data Access Service (EDAS)• EDAS Service provided by ESSP since 2009• Service Declaration: 26th July 2012• http://www.essp-sas.eu/service_definition_documents• Service & system evolutions under

development• Commercial/professional multimodal applications

Markets

Aviation

Road

Location Based Services

Maritime

Rail

Professional Applications

2009

2012

2011

Services

Page 5: EGNOS Services and LPV  Implementation

• EGNOS Service Definition Document (SDD) describing the characteristics and conditions of access to each EGNOS service. (EDAS, OS, SoL)

http://www.essp-sas.eu/service_definition_documents

• Service Notices generated whenever there is any complementary information to be provided to users that could affect any SDD content. Three Service Notices published (with several updates)

http://www.essp-sas.eu/service_notices

• EGNOS Performance reports:• Monthly Performance Reports

www.essp-sas.eu/monthly_performance_reports

• Yearly Service Provision Reportshttp://www.essp-sas.eu/printed_documents

EGNOS Services related publications

514/06/2012 IWG #25

Page 6: EGNOS Services and LPV  Implementation

IWG #25 6

EGNOS OS SDD Publication• EGNOS OS Service Definition Document (SDD)

v1.1 -> Published on October 30th 2009 (ESR v2.2)V2.0 -> Published on March 18th 2013 (ESR v2.3.1i)

Page 7: EGNOS Services and LPV  Implementation

IWG #25 7

Page 8: EGNOS Services and LPV  Implementation

EGNOS SoL SDD Publication• EGNOS SoL Service Definition Document (SDD)

v1.0 -> Published on March 2nd 2011 (ESR v2.2)v2.0 -> Planed to be published on June 2013 (ESR v2.3.1i)

8IWG #25

APV-I Availability (99%) Coverage area

v1.0

v2.0

Page 9: EGNOS Services and LPV  Implementation

9

EDAS Service• EDAS (EGNOS Data Access Service) provides through the Internet the

data collected and generated by the EGNOS infrastructure on real time.

EDAS data is provided in different formats and protocols.The main types of information provided by EDAS are:– GPS and GLONASS observations and navigation data collected by the

entire network of RIMS and NLES stations NLES– EGNOS augmentation messages.

999IWG #25

Page 10: EGNOS Services and LPV  Implementation

EDAS SDD Publication1. EDAS Service Level 0 (ASN.1)2. EDAS Service Level 1 (RTCM 3.0)3. EDAS Service Level 2 (RTCM 3.1)

4. EDAS SISNeT ServiceEGNOS GEO satellites messages broadcast using the SISNeT protocol

5. EDAS Data Filtering ServiceAccess to a subset of Service Level 0/2 data (stations groups)

6. EDAS Ntrip ServiceGPS/GLONASS observations and ephemeris information transmitted using the Ntrip protocol.

7. EDAS FTP ServiceHistorical data: EDAS SL raw data, GPS/GLONASS observation and navigation, EGNOS messages and IONEX.

Available since July 2012:EDAS SDD v1.0

101010IWG #25

Page 11: EGNOS Services and LPV  Implementation

EDAS SDD Publication1. EDAS Service Level 0 (ASN.1)2. EDAS Service Level 1 (RTCM 3.0)3. EDAS Service Level 2 (RTCM 3.1)

4. EDAS SISNeT ServiceEGNOS GEO satellites messages broadcast using the SISNeT protocol

5. EDAS Data Filtering ServiceAccess to a subset of Service Level 0/2 data (stations groups)

6. EDAS Ntrip ServiceGPS/GLONASS observations and ephemeris information transmitted using the Ntrip protocol.

7. EDAS FTP ServiceHistorical data: EDAS SL raw data, GPS/GLONASS observation and navigation, EGNOS messages and IONEX.

Available since April 2013:- EDAS SDD v2.0

111111IWG #25

Page 12: EGNOS Services and LPV  Implementation

TABLE OF CONTENT

12IWG #25

• EGNOS Services Status

• LPV Implementation status

Page 13: EGNOS Services and LPV  Implementation

LPV Implementation status March 2013:o 1 LPV procedure in Switzerland: Berne-Belp (LSZB)o 1 LPV procedure in France: Grenoble Isere (LFLS)

Planned for June 2013o 1 LPV procedure in at Roma/Fiumicino airport (Italy)o 1 LPV procedure in at Venezia/Tessera airport (Italy)

13IWG #25

April 2013:o 1 LPV procedures at Metz Nancy Lorraine

May 2013: 7 new LPVs procedures in Franceo 1 LPV procedure at Colmar Houssen airport on 2 May 2013o 1 LPV procedure at Nancy Essey airport on 2 May 2013o 2 LPV procedures at Paris Orly airport on 30 May 2013o 2 LPV procedures at Rennes airport on 30 May 2013o 1 LPV procedure at Epinal Mirecourt airport on 30 May 2013

Planned for July 2013o 1 LPV procedure in at Grenchen airport (Switzerland)

30/05/2013

Page 14: EGNOS Services and LPV  Implementation

LPVs implementation status and forecast (June 2013) (coordinated with Eurocontrol)

14IWG #25

Country  # Airports with

EGNOS procedures

# operational LPV procedures (or Baro

EGNOS enabled)

# Expected new Airports with

EGNOS procedures for 2013-2014

period

#  Expected new  LPV Procedures (or Baro EGNOS enabled) for

2013-2014 period

Austria 0 0 +2 +2

Czech Republic 0 0 +2 +4

Finland 0 0 +1 +2

France 31 38 +60 +92

Germany 39 (32 APV Baro) 84 (73 APV Baro) +2 +1

Guernsey 1 2 0 0

Italy 3 5 +10 +17

Netherlands 0 0 +1 +2

Norway 0 0 +5 +12

Poland 0 0 +2 +6

Slovakia 0 0 +2 +4

Spain 0 0 +9 +22

Sweden 0 0 +1 +2

Switzerland 3 3 +3 +4

UK 0 0 +21 +44

Total 77 (45 with LPV) 132 (59 LPV) +121 +214

30/05/2013

Page 15: EGNOS Services and LPV  Implementation

15

EGNOS-based procedures implementation map and detailed list included in the ESSP website

www.essp-sas.eu

LPV Implementation Status

IWG #25

Page 16: EGNOS Services and LPV  Implementation

16

Questions?

16IWG #25

Page 17: EGNOS Services and LPV  Implementation

EVENT TITLE 1726 Oct 2009

Thanks!