WELCOME EFRTC General Meeting, Paris, 11th June 2010 Franz Messerli.
EFRTC GENERAL MEETING Ny Tiana TOURNIER
description
Transcript of EFRTC GENERAL MEETING Ny Tiana TOURNIER
1
EFRTC GENERAL MEETINGNy Tiana TOURNIER
11.06.2010 EFRTC General Meeting
Content
1. Current EU processes2. Future EU processes3. Particular case of OTM
211.06.2010 EFRTC General Meeting
3
1 - Current authorisation processes for placing vehicles in service in EU MSs
11.06.2010 EFRTC General Meeting
A transition phase
1. Most MS have implemented partially the Directives either in force or to be transposed
2. The technical rules used for vehicles Placing In Service (PIS) differs Difficulty to establish equivalence
3. Cross-Acceptance agreements settled between Member States (MSs)/National Safety Authorities (NSAs) apply
411/06/2010 EFRTC General Meeting
• With NSAs on the current state of play including figures on vehicles PIS (2004 to 2009)o Different processes Number of interfaces vary from
12 to 57o Increase of the number of vehicles PIS (2004 to 2009)o Very low number of vehicles authorised per type
Some figures
511/06/2010 EFRTC General Meeting
Wagons Loco Passenger Fixed formation trains
New Existing New Existing New Existing New Existing
69 157 7 12 17 19 22 27
Identified issues
• Need for better understanding of some Directive requirements:o Scope of authorisation o Extent of modification requiring a new PISo Independence criteria of checking bodieso NSA involvement in the processo Vehicle type definitiono Handling of grandfather rights
611/06/2010 EFRTC General Meeting
Identified issues
• Management of the transition phase:o Consistent and workable national legal frameworkso Evolution of the existing cross-acceptance agreements
• Practical issues:o Use of several languages for cross-border vehicles o Disparity of rules requires the applicant/manufacturer
to adjust each time
711/06/2010 EFRTC General Meeting
8
2- Future authorisation processes for vehicles placing in service in EU MSs
11/06/2010 EFRTC General Meeting
Transposition of Directive 2008/57
1. Deadline: 19/07/20102. Not all MS will be in time but are working on3. Better definition of the authorisation
processes:• Subsystem & vehicle authorisation• Type authorisation• 1st authorisation• Additional authorisation• Cross-acceptance (XA)
911/06/2010 EFRTC General Meeting
Common understanding
1. Pre-requisite to avoid inconsistent implementations by the MS
2. Transparency of rules necessary for all actors• First version of the Reference Document end
2010• Second version mid-2011
3. Current XA agreements will evolve towards the reference document
1011/06/2010 EFRTC General Meeting
11
3- Particular case of authorisation of OTM
11/06/2010 EFRTC General Meeting
Legal base before 19/07/2010
NRs
TSIs Recast
Machinery Directive
2006/42/EC
NoBo1
CR Interoperability
Directive2001/16
NoBo2 11/06/2010 EFRTC General Meeting 12
Moving from today to 19/07/2010
13
‘’OTM may be included in the
scope of Interoperability
Directive’’
‘’ OTM under the scope of CR Interoperability Directive but is
not the first priority’’
Art 23.1 of Dir. 2008/57
+Amended WAG TSI 2009/107/EC for hauled OTM 11/06/2010 EFRTC General Meeting
Within ~ 3 to 5 years
14
Annex C specifies requirements for OTM both Self propelling and hauled vehicles
Entry into force of LOC PASS TSI
11/06/2010 EFRTC General Meeting
Contact: [email protected]
EFRTC General Meeting 1511/06/2010