EMAU ISLAND Rev 0 24.03.2015 Cyclone shelter roof missing.
David
Sticky Note
KLENS HILL CONCRETE GRADIENT Rev 0 24.03.2015 Road blocked by landslide; 1 carriage way open. Rev 1 30.03.2015 2 carriageways open; downslope in danger of collapse.
David
Sticky Note
TEOUMA BRIDGE Rev 0 29.03.2015 Bridge needs repair but open now. Abutments scoured temporarily backfilled with rocks, river being realigned.
David
Sticky Note
MELE BRIDGE Rev 0 30.03.2015 Damaged materials have been broken out. Backfilled. One safety rail back up and gabions used as safety rail on other side. Northern approach restricted to 1 lane only; 3 Tonne weight limit. Not observed. Drains cleared river being realigned.
David
Sticky Note
DRY CREEK ETON Rev 0 30.03.2015 Road was blocked with sand now open.
David
Sticky Note
MARONA BRIDGE HAVANAH Rev 0 30.03.2015 Was blocked with sand now open.