    Subject Preparing to synchronize a generator to the grid

    From EEP - Electrical Engineering Portal ([email protected])

    To [email protected];

    ate Wednesday, March 27, 2013 7:04 PM

    Technical articles receive 16,284 electrical engineers worldwide. Email not displaying correctly?View it in your browser.

    Published on Mar 27, 2013 01:20 amby Edvard | Subscribe to Monthly Download Updates

    Recom mended - Capacitor Application IssuesForwardthis article to your colleagues

    Preparing to synchronize a generator to the grid (on photo: General Electric steam turbine generator)

    http://us.mg1.mail.yahoo.com/dc/launch?.gx=1&.rand=88mniifk1e

    4/1/2013 1

  • 8/9/2019 EEP - Preparing to Synchronize a Generator to the Grid

    2/5

    Conditions

    In order to synchronize a generator to the grid, four condit ions must be met:

    Phase Sequence1.

    Voltage Magnitude2.

    Frequency3.

    Phase Angle4.

    Figure 1 - Synchronizing a Generator to the Grid

    1. Phase Sequence

    The phase sequence(or phase rotation) of the three phases of the generatormust be the same as the

    phase sequence of the three phases of the electrical system(Grid).

    The only time that the phase sequence could be wrong is at initial installation or after maintenance. There

    are two possible problem sources.

    The generator or transformer power leads could actually be interchanged during maintenance orthe potentialtransformer leads could be interchanged during maintenance.

    2. Voltage Magnitude

    The magnitude of the sinusoidal voltage produced by the generator must be equal to the magnitude of the

    sinusoidal voltage of the grid.

    If all other conditions are met but the two voltages are not the same, that is there is a voltage differential,

    closing of the AC generator output breaker will cause a potentially l arge MVAR flow .

    Recall that before a generator is synchronized to the grid, there is no current flow, no armature reaction andtherefore the internal voltage of the generator is the same as the terminal voltage of the generator.

    If the generator voltage is higher than the grid voltage, this means that the internal voltage of the

    generator is higher than the grid voltage. When it is connected to the grid the generator will be overexcited

    and it will put out MVAR.

    If the generator voltage is less than the grid voltage, this means that the internal voltage of the

    generator is lower than the grid voltage. When it is connected to the grid the generator will be under-excited

    and it will absorb MVAR.

    http://us.mg1.mail.yahoo.com/dc/launch?.gx=1&.rand=88mniifk1e

    4/1/2013 1

  • 8/9/2019 EEP - Preparing to Synchronize a Generator to the Grid

    3/5

    3. Frequency

    The frequency of the sinusoidal voltage produced by the generator must be equal to the frequency of the

    sinusoidal voltage produced by the grid.

    Figure 2 - Generator Slower than Grid

    In Figure 2 above the generator is slower than the grid.

    The synchroscope would be rotating rapidly counter clockwise. If the generator breaker were to be

    accidentally closed, the generator would be out of step with the external electrical system. It would behave

    like motor and the grid would try to bring it up to speed.

    In doing so, the rotor and stator would be slipping poles and damage (possibly destroy) the generator as

    described previously. The same problem would occur if the generator were faster than the grid.

    The grid would try to slow it down, again resulting in slipping of poles.

    Figure 3 - Generator at Same Speed asGrid

    but not in Phase

    Figure 3shows the condition where the generator and grid have matching speed. The high points and

    zero crossings of the sinusoidal voltages occur at the same rate of speed.

    However, if you notice in 2 with the grid and a phase angle exists between them. This would appear as a

    http://us.mg1.mail.yahoo.com/dc/launch?.gx=1&.rand=88mniifk1e

    4/1/2013 1

  • 8/9/2019 EEP - Preparing to Synchronize a Generator to the Grid

    4/5

    non-rotating synchroscope (both generator and grid at same frequency), where the pointer would appear

    stuck at about 9:00 oclock (generator lagging grid).

    If the generator breaker were to be closed at this time, the grid would pull the generator i nto step.

    However, this again would cause a large current in-rush to the generator and high stresses on the

    rotor/stator with subsequent damage to the generator. If the generator were leading the grid, it would try

    to immediately push power into the grid with the same destructive forces as mentioned.

    Hence the generator must be brought to a point where the grid voltage waveform exactly matches what it is

    producing.

    4. Phase Angle

    As previously mentioned, the phase anglebetween the voltage produced by the generator and the voltage

    produced by the grid must be zero.

    The phase angle (0 to 360) can be readily observed by comparing the simultaneous occurrence of the

    peaks or zero crossings of the sinusoidal waveforms.

    If the generator breaker is closed when they match exactly, the connection w ill appear smooth and

    seamless.

    At that instance (Figure 4 below), the pointer on the synchroscope would indicate 12:00 oclock.

    The worst case occurs if the generator i s exactly out -of phase, with a phase angle of 180 and the

    synchroscope pointing at 6:00 oclock.

    Figure 4 - Generator in Phase with Grid

    Synchronisation o f Generators to a Busbar (VIDEO)

    Cant see this video? Click hereto watch it on Youtube.

    Resource:Science and Reactor Fundamentals Electrical CNSC Technical Training Group

    Jump to original technical article at EEP - Preparing to synchronize a generator to the grid

    Category & Tags: Energy and Power, frequency, generator, grid, phase angle, phase sequence,

    synchroscope, voltage magnitude

    http://us.mg1.mail.yahoo.com/dc/launch?.gx=1&.rand=88mniifk1e

    4/1/2013 1

  • 8/9/2019 EEP - Preparing to Synchronize a Generator to the Grid

    5/5

    Subscribe to Monthly Download Updates

    Recently published technical articles:

    Induction Motor Startup And Losses Calculation

    Hospitality lighting design, Why it matters

    Lightning Protection System Germany Regulations

    The Rheostat In Few Simple Words

    Starting Motor With Auto-transformer

    Torque Of Three-Phase Induction Motor Explained

    Sources and Contributors To Short Circuit Current

    What Is The Purpose Of Wind Farm Lighting?

    Defining Size and Location of Capacitor in Electrical System (2)

    Share with your friends!

    Copyright 2013 EEP - Electrical Engineering Portal, All rights reserved.You're receiving this newsletter because you opted in at our website EEP forreceiving technical articles.Our mailing address is:

    EEP - Electrical Engineering PortalMurska 10Belgrade 11000Serbia

    Add us to your address book

    unsubscribe from this list | update subscription preferences

    http://us.mg1.mail.yahoo.com/dc/launch?.gx=1&.rand=88mniifk1e