EENNVVVIIIRRROOONNNMMMEEENNNTTT M...

170
E E N N V V I I R R O O N N M ME E N N T T I I M MP P A A C C T T A A S S S S E E S S S S M ME E N N T T O O F F G G R R O O U U P P H H O O U U S S I I N N G G C C O O L L O O N N Y Y AT VILLAGE NANGLI UMARPUR, SECTOR 62, GURGAON, HARYANA FOR M/S EMAAR MGF LAND LTD. Prepared By GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified Co.: Accredited by QCI / NABET: Approved by MoEF, GoI) F-374-375, Sector-63, Noida, U.P. Ph.: 0120- 4044630, Telefax: 0120- 2406519 Email: [email protected], [email protected] Website: http://www.grc-india.com GRC INDIA TRAINING & ANALYTICAL LABORATORY (Recognized by NABL &MoEF, GoI) A unit of GRC India

Transcript of EENNVVVIIIRRROOONNNMMMEEENNNTTT M...

Page 1: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

EEENNNVVVIIIRRROOONNNMMMEEENNNTTT IIIMMMPPPAAACCCTTT AAASSSSSSEEESSSSSSMMMEEENNNTTT

OOOFFF

“““GGGRRROOOUUUPPP HHHOOOUUUSSSIIINNNGGG CCCOOOLLLOOONNNYYY”””

AT

VILLAGE NANGLI UMARPUR, SECTOR – 62, GURGAON, HARYANA

FOR

M/S EMAAR MGF LAND LTD.

Prepared By

GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD.

(An ISO 9001:2008 Certified Co.: Accredited by QCI / NABET: Approved by MoEF, GoI)

F-374-375, Sector-63, Noida, U.P.

Ph.: 0120- 4044630, Telefax: 0120- 2406519

Email: [email protected], [email protected]

Website: http://www.grc-india.com GRC INDIA TRAINING & ANALYTICAL LABORATORY

(Recognized by NABL &MoEF, GoI)

A unit of GRC India

Page 2: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

LIST OF CONTENT

Table No. Description Page No.

CHAPTER 1 Introduction 1-8

1.1 Preamble 1

1.2 General Information on Project 1

1.3 Environmental Clearance Process 1

1.4 Validity of Environmental Clearance 2

1.5 Post Environmental Clearance Monitoring 2

1.6 Transferability of Environmental Clearance 2

1.7 Generic Structure of Environment Impact Assessment 3

1.8 Profile of Project proponent 4

1.9 Brief Description of project 4

1.10 Applicable Legal Requirements 5

1.11 Need of the EIA study 6

1.12 Scope of Study 6

1.13 Study Methodology 6

1.14 Environment Impact Assessment Methodology 7

CHAPTER 2 Project Description 09-33

2.1 Introduction 9

2.2 Project Location and Site Surroundings 9

2.3 Estimated Project cost 10

2.4 Brief Project features 10

2.5 Population Details 11

2.6 Power Supply 13

2.7 Parking 13

2.8 Water supply and sullage treatment plant 15

2.9 Fluidized Media Reactor 22

2.10 Rainwater Harvesting 26

2.11 Solid Waste Management 30

2.12 Landscape 32

2.13 Details of Construction Materials 33

2.14 List of Machinery Used during Construction 33

CHAPTER 3 Description of the Environment 34-79

3.1 Introduction 34

3.2 Study period 34

3.3 Study area 34

3.4 Baseline monitoring of environmental component 34

CHAPTER 4 Anticipated Environmental Impacts & Mitigation Measures 80-100

4.1 Introduction 80

4.2 Impact matrix 80

4.3 Pollution sources 83

4.4 Impact identification 84

4.5 Assessment of Environmental Impacts During Development 86

Page 3: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

and Construction Phase

4.6 Assessment of the environmental impacts during post

construction phase

92

CHAPTER 5 Analysis of Alternative 100- 107

5.1 Introduction 101

5.2 Building Materials 101

5.3 Natural Hazard Prone areas 103

5.4 Environment friendly development 103

5.5 Community issues 105

5.6 Energy conservation 106

5.7 Transportation 106

CHAPTER 6 Environmental Monitoring Program 108-104

6.1 Introduction 108

6.2 Performance indicators 108

6.3 Data management 112

6.4 Reporting Schedules 112

CHAPTER 7 Additional Studies 105-122

7.1 Introduction 105

7.2 Risk assessment And Disaster Management Plan 105

7.3 Response case of Earth Quake 113

7.4 Response for LPG Leakage 118

7.5 Response in case of Fire 119

7.6 Resource Conservation 120

7.7 Resettlement & Rehabilitation 122

CHAPTER 8 Project Benefits 123 - 124

8.1 General 123

8.2 Physical infrastructure 123

8.3 Social Infrastructure 123

8.4 Economic Benefits 124

CHAPTER 9 Environmental Management Plan 125-149

9.1 Introduction 125

9.2 Environmental Management Strategies 125

Page 4: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

9.3 Environment Conservation 140

9.3 Management and Maintenance System 141

CHAPTER10 Summary And Conclusion 150-157

10.1 Project background 150

10.2 Project site & Connectivity 150

10.3 Project feature 151

10.4 Environmental setting of the study area 151

10.5 Environment Management Plan 155

CHAPTER11 Disclosure of consultants engaged 158-159

11.1 Accreditations from quality council of India QCI 158

CHAPTER12 Corporate environment responsibility 160-162

12.1 Procedure for environment compliance 160

Page 5: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

LIST OF TABLES

S.NO. Table No. Particulars Page No.

1 1.1 Basic Project Details 4

2 2.1 Area statement 10

3 2.2 Population Breakup (Phase I + Phase II) 12

4 2.3 Population breakup (Phase I) 12

5 2.4 Population Break Up (Phase II) 13

6 2.5 Details of water demand & sullage calculation 15

7 2.6 Calculation for Daily water demand (Phase I) 15

8 2.7 Calculation for daily water demand (Phase II) 16

9 2.8 Sullage calculation for Phase I & II 17

10 2.9 Calculation of solid waste generation 28

11 2.10 Calculation of Solid waste Generation (Phase II) 28

12 2.11 Calculation of Solid waste Generation (Phase I) 28

13 2.12 Break up of Green area 30

14 2.13 List of Trees 31

15 3.1 Summarized metrological data (March – May) 35

16 3.2 Location of Ambient Air quality monitoring station 36

17 3.3 (a) AAQ with respect to PM2.5 37

18 3.3 (b) AAQ with respect to PM10 38

19 3.3 (c) AAQ with respect to SO2 39

20 3.3 (d) AAQ with respect to NO2 40

21 3.3 (e) AAQ with respect to CO 36

22 3.4 Noise level monitoring station 43

23 3.5 Ambient quality standard of Noise 43

24 3.6 Hourly noise level 44

25 3.7 Water Quality Criteria as per Central Pollution

Control Board

46

26 3.8 Location of water sampling sites 47

27 3.9 Land use Pattern 53

28 3.10 (a) Soil sample collection point 54

32 3.10 (b) Frequency and methodology for soil sampling &

monitoring

54

33 3.10 (c) Soil quality data 55

34 3.11 Aspects to be covered in the study for the Project 60

35 3.12 Summary of data collected from various sources 60

36 3.13(a) List of plants in buffer area (100m) 61

37 3.13(b) List of plants in buffer area (10 km) 62

38 3.13(c) List of species in buffer area (100m) 63

39 3.13(d) List of plants in buffer area (5km) 64

40 3.14 Land use pattern of the study area 69

41 3.15 Demographic particulars 70

42 3.16 Basic amenities available in study area 72

43 3.17 Year wise allocation of fund for various CSR

activities

78

45 4.1 Potential environment impact of projects 82

Page 6: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

46 4.2 Pollutant sources 83

47 4.3 Environment aspects of project other than source of

pollution

85

50 4.4 Noise Levels 90

51 4.5 Pollution source details 95

52 4.6 Meteorological data for 24 hour average maximum

predicted concentration under worst condition

96

53 6.1 Environment monitoring plan 110

54 7.1 Activities during Construction and Operation along

with Mitigation Measures

113

55 9.1 Plantation List 137

56 9.2 Environment management plan during construction &

operation phase of project

143

57 10.1 Salient features of the project 151

58 10.2 Plantation List 153

59 12.1 Compliance under various environment acts & rules 160

LIST OF FIGURES

S.NO. Fig No. Particulars Page No.

1 2.1 Water balance diagram (Phase I) 18

2 2.2 Water balance diagram (Phase II) 19

3 2.3 STP schematic diagram 22

4 2.4 Rain Water Harvesting Pit Design 26

5 2.5 Solid waste management scheme (construction phase) 27

6 2.6 Solid waste management scheme (operation phase) 30

7 3.1 Windrose diagram 35

8 3.2 Land Use Pattern of the Project Site within 10 km 53

9 4.1 Windrose diagram 97

10 4.2 Isopleths 98

Page 7: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

LIST OF ANNEXURES

Annexure No. Particulars

I ToR Letter

II ToR Compliance

III Project Location on Master Plan

IV 500m, 10 km & (10+15) km toposheet

V Zoning Plan

VI Ambient Environmental Quality Monitoring Location Map

VII Lab Report

VIII Land Use Map

IX Land Documents

X Contour Plan

XI Master Layout Plan

XII Basement parking cum traffic circulation plan

XIII Section & elevation plan

XIV Perspective View

XV Site Photographs

XVI Affidavit

XVII Water Permission (Construction & Operation phase)

XVIII Dual Plumbing Plan

XIX Forest & Arawalli NOC

XX STP design layout

XXI Landscape Plan

XXII CSR Undertaking

XXIII Noise & Vibration Plan

XXIV Fire Fighting plan & fire fighting Codes

XXV Health safety plan

XXVI Electrical Plan

XXVII Air Modeling

Page 8: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter I

M/s EMAAR MGF Land Ltd. 1

CHAPTER 1

INTRODUCTION

1.1 PREAMBLE

Early identification and characterization of critical environmental impacts allow the public

and the government to form a view about the environmental acceptability of a developmental

project and what conditions should apply to mitigate or reduce those risks and impacts.

EIA is a technical exercise, to establish baseline environmental conditions to predict

environmental impacts, assess their significance and provide recommendations for their

mitigation. The impact assessment covers both construction and operation phase of the

development. The report covers areas such as noise, air quality, ecology, water quality &

hydrology, local architecture, landscape & visual character, sustainability and socio-

economics. The report describes how the project has been improved through the EIA process.

This report has been prepared as per the EIA Notification, 2006 & amendments, EIA

Guidance Manual for Building, Construction, and Area Development projects as guiding

documents.

1.2 GENERAL INFORMATION ON PROJECT

The Group Housing Colony is to be developed by M/s EMAAR MGF Land Ltd. This Group

Housing Colony will be established at Village Nangli Umarpur, Sector-62, Gurgaon, Haryana.

The Residential Group Housing Colony is designed as a self-sufficient residential

establishment, wherein infrastructure facilities such as road network, water supply, electric

supply, emergency power supply, and communication facilities are proposed. Further, the

project proponent has made provisions for waste collection and disposal, rain water harvesting

and sullage treatment to ensure that the project is environment friendly. Social facilities as

club, shopping center, are also planned to provide the residents with a good quality of life.

The project proponent also proposes to arrange for safety, maintenance and security of the

residents.

1.3 ENVIRONMENTAL CLEARANCE PROCESS

As per EIA Notification, 2006 & its amendments, all building construction and area

development Projects covering an area of 50 ha and/ or built up area greater than 1,50,000

sq.m. are designated as 8(b) projects and are required to obtain prior environmental clearance

from respective State Environmental Impact Assessment Authority (SEIAA). The application

for environmental clearance shall comprise submission of Form I, Form IA, Conceptual Plan

and proposed terms of reference to the authorities. After the award of ToR, EIA is prepared.

Following the appraisal of the project to the satisfaction of the State Expert Appraisal

Page 9: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter I

M/s EMAAR MGF Land Ltd. 2

Committee (SEAC), environmental clearance shall be granted by SEIAA (State Environment

Impact Assessment Authority), Haryana.

Since, the project covers an area of 56,757.16 sq.m (14.025 acres) and total built up area

1,75,718.12 sq.m, the project attracts the provisions of the EIA Notification, 2006 and

requires to obtain environmental clearance from the SEIAA, Haryana based on ToR

approved.

As per the requirement of EIA notification, M/s. EMAAR MGF Land Ltd. had submitted the

application to State Level Environment Impact Assessment Authority (SEIAA) Haryana

which comprised of Form I, Form IA, Conceptual Plan and proposed Terms of Reference

(TOR). Then, case was placed before SEAC (State Expert Appraisal Committee), Haryana for

TOR presentation where Terms of Reference (TOR) was awarded vide letter no. F.No.

HR/SEAC/694/1973 dated 16/02/2015 (TOR letter is enclosed as Annexure I). The present

EIA Report has been prepared as per Terms of Reference. The Compliance status to the ToR

is enclosed as Annexure II with EIA/EMP Report.

1.4 VALIDITY OF ENVIRONMENTAL CLEARANCE

As per the provisions of the EIA Notification, 2006 and its amendments, the prior

environmental clearance granted is valid for a period of 7 years. This may be extended by a

maximum of 7 years, provided an application is made to the regulatory authority within the

validity period with updated Form I, Form IA Conceptual Plan and Environmental Impact

Assessment Report (EIA/EMP Report)

1.5 POST ENVIRONMENTAL CLEARANCE MONITORING

It shall be mandatory for the project management to submit half-yearly compliance report in

respect of the stipulated prior environmental clearance terms and condition in hard and soft

copies to the regulatory authorities concerned on 1st June and 1

st December of each calendar

year.

All such compliance report submitted by the project management shall be public documents.

Copies of the same shall be given to any person on application to the concerned regulatory

authority.

1.6 TRANSFERABILITY OF ENVIRONMENTAL CLEARANCE

A prior environmental clearance granted for a specific project or activity to an applicant may

be transferred during its validity to another legal person entitled to undertake the project or

activity on application by the transferor or the transferee with a written “no objection” by the

transferor, to, and by the regulatory authority concerned, on the same terms and conditions

Page 10: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter I

M/s EMAAR MGF Land Ltd. 3

under which the prior environmental clearance was initially granted, and for the same validity

period.

1.7 GENERIC STRUCTURE OF ENVIRONMENT IMPACT ASSESSMENT

The environmental impact assessment has been carried out to assess the impact of the project

on various environmental components. The methodologies and findings of the study are

detailed in the EIA Report along with other relevant information under the different chapter

headings as under:

1. Introduction- provides background information about the project and the developers

along with the legal environmental requirements of the project. The scope and EIA

methodology adopted in preparation of EIA report have also been described in this

chapter.

2. Project Description–briefly discusses the project features while elaborating on

components bearing environmental consequences.

3. Description of the Environment – discusses the environmental setting of the project

area based on primary and secondary data collection.

4. Anticipated Environmental Impacts & Mitigation Measures – predicts the

environmental impacts of the various components of the project during construction

and operation phases to highlight concern areas requiring mitigation measures.

Accordingly, it also suggests controls and mitigation measures to offset/ minimize the

adverse impact while optimizing the positive benefits from the project.

5. Analysis of Alternatives (Technology and site) – explores the alternative sites and

plans that have been considered for the project and evaluates the different scenarios in

the environmental context.

6. Environmental Monitoring Programme – outlines a monitoring programme for the

different environmental components during the construction and operation phase for

evaluation of the environmental status of the area due to the project proponent.

7. Additional Studies – discusses any study that has been carried out for the purpose of

better understanding of the environmental impacts of the project. It also highlights any

pertinent findings from the study that will aid decision-making.

8. Project Benefits – brings out the positive impacts from the project.

9. Environmental Management Plan – organizes the suggested mitigation measures to

aid implementation through formulation of performance indicators, reporting structure

and pronounced implementation periods.

10. Summary & Conclusion – summaries the important report findings and concludes on

the environmental sustainability of the project.

Page 11: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter I

M/s EMAAR MGF Land Ltd. 4

11. Disclosure of Consultants engaged – gives the names of the technical team involved

in the report preparation along with accreditation of consultant from the quality

council of India.

1.8 PROJECT PROPONENT

The Project proponent for the Group Housing Colony is M/s EMAAR MGF Land Ltd. It has

created a niche for itself in development of Real Estate in NCR and north India in a very short

span of time. The vision of the Group is to become one of the biggest icons of the real estate

Industry. The Group follows the basic values of professional services by providing specified

quality with rich/ value based specification, planned delivery coupled with customer care and

comfort level. Innovative design of the project not only provides the highest quality of life to

its residents, but also encourages a society that is both sensitive and responsible towards the

environment.

The contact details for M/s. Emaar MGF Land Ltd. are as follows:

Registered Office Address: MGF House, 17-B, Asaf Ali Road, New Delhi-110002

Phone no: 0124-4793753

E-mail: [email protected]

The Group follows the basic values of professional services by providing specified quality

with rich/value based specification, planned delivery coupled with customer care and comfort

level.

1.9 BRIEF DESCRIPTION OF PROJECT

1.9.1 Project Background

The project is to be developed over an area of 56,757.16 m2 or 14.025 acres along with other

necessary facilities to support a population of 2,985 persons.

There is neither any litigation (s) pending against the project and/or any directions or order

passed by any court of law/any statutory authority against the project that can be detailed out.

All reputed and accredited consultants are involved in the project providing their inputs and

expertise altogether required for a proper and authentic Environmental Impact Assessment

study.

Site Description

The Group Housing Colony is located at Village Nangli Umarpur, Sector-62, Gurgaon. The

basic details of the project including Plot area, Village, Tehsil, District, State and area of the

land are mentioned below in Table 1.1.

Page 12: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter I

M/s EMAAR MGF Land Ltd. 5

Table 1.1: Basic Project details

S.No. Item Details

1 Name of the project Group Housing Colony

2. Location

Village Nangli Umarpur, Sector-62

Tehsil Gurgaon

District Gurgaon

State Haryana

3. Type of project Group Housing Colony

4. Category Category B1; item 8(b) in the Schedule as per EIA

Notification.

5. Plot Area 14.025 acres (or 56,757.16 m2)

6. Built-up Area 1,75,718.12 m2

7. Land-use As per approved land-use plan of Director of Town and

Country Planning, Haryana

8. Project Cost Rs. 480 Crores

Connectivity

The project site is well connected through Sector roads which is adjacent to the project site.

The nearest highway is NH-8 which is 6.64 km away from project site in NW direction. The

nearest railway station Basai Dhankot, about 12 km away from the project site in NW

direction. The nearest airport is Indira Gandhi International Airport, at 16.71 km from the

project site in North direction.

1.10 APPLICABLE LEGAL REQUIREMENT

Under the Environment Impact assessment Notification, 2006 the project will obtain

environment clearance. The project shall abide by all applicable provision of the Environment

Protection Act, 1986 and ruled formed there under. As per Air Pollution (Prevention and

Control) Act 1981, Water Pollution (Prevention and Control) Act 1974, and Hazardous wastes

(Management and Handling) Rules, 1989 the project shall obtain No Objection Certificate

from the Haryana State Pollution Control Board (HSPCB) and continue to obtain consent for

operation from the same as per the guidelines during the operation period.

Page 13: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter I

M/s EMAAR MGF Land Ltd. 6

1.11 NEED OF THE EIA STUDY

The project activities must co-exist in harmony with its surrounding environment to reduce

the environmental impacts, which is likely to arise during various project activities. To

safeguard the environment from adverse effects of developmental activities, the MoEF has

issued some regulations. As per the notification dated 14.09.06 of MoEF, GoI, Environmental

Clearance is mandatory for any construction projects with built-up area of more than 20,000

Sqm and Environment impact assessment report is mandatory for the project having built up

area of more than 1,50,000 Sqm. Since the built-up area of the present project is 1,75,718.12

Sqm, Hence, an Environment Impact Assessment study has been called for.

The study would facilitate M/s EMAAR MGF Land Ltd. to obtain Environmental Clearance

(EC) from SEIAA, Haryana.

1.12 SCOPE OF STUDY

The scope of the study is:-

Compilation of baseline environmental and social scenario of the study area within a

radius of 10 km around the project site based on field studies covering one season

(except monsoon) i.e. March-May 2015 and secondary data collection;

Identification, prediction and evaluation of potential environmental impacts expected

during the construction and operation phase of the project;

Preparation of mitigation measures, Environmental Management Plan (EMP) and

Monitoring Programme for implementation of suggested mitigation measures.

1.13 STUDY METHODOLOGY

The approach followed by Grass Roots Research & Creation India Pvt. Ltd. in conducting the

EIA study is according to the applicable regulatory framework. The main stages followed are

described below:

Stage -I

Review of design and operational information of the Project through Project Report

and identification of sources of major potential impacts.

Stage -II

An initial review of the project site and status of the physical environment around

the project site vicinity;

Understanding regarding project design and operation as well as macro

environmental aspects. The major issues needed to be addressed with due care were

identified and monitoring plan for the environmental baseline was prepared;

Baseline environmental assessment was conducted within the study area of 15 km

radius around the project site;

Page 14: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter I

M/s EMAAR MGF Land Ltd. 7

Intense monitoring and primary field data collection of environmental components

viz. Ambient Air Quality, Water (Ground water) use and its Quality, Soil Quality,

Noise Level, Traffic Volume etc.;

Survey study was carried out in the study area to assess the status of flora & fauna

and socio-economic profile of the study area; and

Information was also collected through Primary and Secondary sources like

Department of Census, Local and City Offices, National Institutions (Survey of

India, National Information Centre etc.), District Head Quarters and other

Government Offices etc. as well relevant Published Literatures.

Stage –III

Compilation of the Environmental Baseline of the Study Area.

Stage -IV

Assessment of Environmental Impacts by predicting the scale and extent of changes

associated with the project and their subsequent effects on the environment against

the environmental baseline condition, and evaluating the significance of such

impacts against accepted criteria.

Stage -V

Identification and preparation of measures to mitigate significant impacts (evaluated

from the impact prediction process) by proposing applicable alternatives and control

measures; and

Finally, development of appropriate Environmental Management and Monitoring

Plan to audit and ensure that the mitigation measures are in place and effective.

1.14 EIA METHODOLOGY

The project may have impact on the physical, biological and socio economic attributes of

surrounding environment. In assessing the environmental impact, collection, collation and

interpretation of baseline data is of prime importance.

The objective of EIA is to predict and address potential environmental problems/ concerns at

an early stage of project planning and design. EIA/EMP assists in the decision making process

by identifying the key impacts/ issues as a results of the activities and formulating mitigation

measures, leading to an improvement in environmental quality.

In order to achieve these objectives, the following procedures have been adopted for the

study:-

Page 15: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter I

M/s EMAAR MGF Land Ltd. 8

Collection, collation and analysis of regional and local environmental status for

various environmental attributes (like topography, geology, ambient air quality,

meteorology, water quality, noise level, soil characteristics and land use, transport,

settlement status and socio economic aspects etc.)

Identification of environmental impacts.

Evaluation of impacts leading to preparation of environmental management and

monitoring plan.

This report is based on scientific principles and professional judgment with resultant

subjective interpretation. Professional judgments expressed herein are based on the available

data and information.

Page 16: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 9

CHAPTER-2

PROJECT DESCRIPTION

2.1 INTRODUCTION

The goal of the project is to develop the Group Housing Colony having superb infrastructure and

utmost care. The project will generate employment opportunities for both skilled and unskilled

workers in the vicinity, which will produce multiple effects on the life and economy of the local

people. The project will not have any adverse effect on the land use pattern; it is earmarked for

residential development as per the Gurgaon- Manesar Urban Complex 2021. (Project site location

earmarked on Gurgaon-Manesar Urban Complex 2021 is attached as Annexure III).

2.2 PROJECT LOCATION AND SITE SURROUNDINGS

2.2.1 Location & Connectivity features

The Group Housing Colony project is located at Village Nangli Umarpur, Sector-62, Gurgaon,

Haryana. The coordinates of the project site are 28°24'13.57"N and 77°05'06.77"E. Google Earth

Image & Toposheet map showing location of project site and surroundings within 500 mtrs,10/15 km

are enclosed as Annexure IV (a & b) respectively. Zoning Plan of the project site is attached as

Annexure V.

Connectivity

The project site is well connected through Sector roads which is adjacent to the project site. The

nearest highway is NH-8 which is 6.64 km away from project site in NW direction. The nearest

railway station Basai Dhankot, about 12 km away from the project site in NW direction. The nearest

airport is Indira Gandhi International Airport, at 16.71 km from the project site in North direction.

2.2.2 GOALS & OBJECTIVES OF THE PROJECT

Promoting a New Lifestyle Order

This new lifestyle that M/s EMAAR MGF Land Ltd. represents has been conceived by some of the

biggest names in the real estate industry.

Green Eco-Habitat

- Green Thread, 32% concrete, Rest is green

- Sustainable Development

- Green within your house with terrace and roof gardens.

Extend Your Home

- Club and Central Recreational Centre Plaza and boulevard as the socio-cultural node of the

complex with cafes, All U Need Stores and other amenities.

- Green Cores for adding vibrancy with green lounges and nature pods.

- Sky Trails, lined with tree pods, take you outdoors, without you leaving the indoors.

Page 17: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 10

2.3 ESTIMATED PROJECT COST

The total estimated cost of the Group Housing Colony Project is Rs. 480 Crores which includes the

cost of the land as well as the developmental cost.

2.4 BRIEF PROJECT FEATURES

The plot area of the Group Housing Colony Project is 56,757.15 m2

(14.025 acres) and total built up

area is 1,75,718.12 m2.

The detailed Area Statement is provided below in Table 2.1.

Table 2.1: Area Statement

S. No. Particulars Area (m2)

1. Total Plot Area 56,757.16

2. Permissible Ground Coverage (@ 35% of the total plot area) 19,865.00

3. Proposed Ground Coverage (@ 31.99% of the total plot area)

Phase- I

Phase- II

18,158

8,810

9,348

4. Permissible FAR (@ 1.75 of the total plot area) 99,325.03

5. Proposed FAR (@ 1.748 of the total plot area) 99,236.51

Proposed FAR for Phase I (a+b+c+d)

a )Residential Towers:

Type A

Type B

Type C

b) EWS

c) Club

d) Convenient shop

59,834.10

57,049.90

27,928.98

22,578.69

6542.23

1,106.84

1,393.55

283.81

Proposed FAR for Phase II (a+b+c)

a)Residential Towers:

Type D

Type E

b)EWS

c)Club

39,402.41

38,092.11

23,227.25

14,864.86

639.54

670.76

6. Total Basement area

Phase I Basement Area

Area for parking

Area for services

59,423.49

39,767.33

22,260

17,507.33

Page 18: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 11

Phase II Basement Area

Area for parking

Area for services

19,656.16

16,380

3,276.16

7. Non FAR

1. Residential Towers:

2. EWS

3. Club

4. Convenient shop

17,058.12

12,745.602

1781.25

2105.59

425.678

8. Built Up Area (5+6+7) 1,75,718.12

9. Proposed Green Area (@30 % of the plot area)

Avenue Plantation (@10 % of the plot area)

Phase-I

Phase-II

Shelter Belt (@10 % of plot area)

Phase-I

Phase-II

Herbs/Shrubs/Climber Plants(@5 % of the plot area)

Phase-I

Phase-II

Water Body (@5 % of the plot area)

Phase-I

17,027.16

5,675.72

3,148.32

2,527.40

5,675.72

3,148.32

2,527.40

2,837.86

1574.16

1263.70

2,837.86

2,837.86

10. Maximum Height of Building (including stack height ) 91 mtrs

2.5 POPULATION DETAILS

The residential population of the project will be 2130 persons and the population for the EWS block is

assumed to be 380 respectively. Total population for the project is 2,985 persons.

The detailed population breakup is given below in the following Table 2.2, 2.3 and 2.4.

Page 19: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 12

Table 2.2: Population Break up (Phase-I + Phase-II)

S. No. Unit Type Total Population

1. Residential 1,350+780=2,130

2. EWS 240+140=380

3. Service Personal 54+32 = 86

4. Staff 68+39=107

5. Community Center (Staff only) 14+7=21

6 Convenient Shopping (Staff only) 10

7. Visitors 159+92= 251

Grand Total 2,985

Table 2.3: Population Break up (Phase-I)

S. No. Unit Type DU/Area PPU Total Population

1. Type –A (3 BR+1) 134 5 670

2. Type- B (4 BR+1) 96 5 480

3. Type- C (3 BR) 40 5 200

4. EWS 48 5 240

5. Service Personal Units 27 2 54

6. Community Center

Staff

1393.55 m2 (@1 Person/

10 Sqm. (139)

(@10% of

community

center)

14

7. Convenient Shopping

Staff

283.81 m2 (@1 Person/ 3

Sqm. (95)

(@10% of

convenient

shopping

center)

10

8. Staff 5 % of (1+2+3) 68

9. Visitors 10 % of (1+2+3+4) 159

Total Population in Phase- I (1+2+3+4+5+6+7+8+9) 1895

Page 20: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 13

Table 2.4: Population Break up (Phase-II)

S. No. Unit Type DU/Area PPU Total Population

1. Type –D (4 BR+1) 104 5 520

2. Type- E (4 BR+2) 52 5 260

3. EWS 28 5 140

4. Service Personal Units 16 2 32

5. Community Center

Staff

670.76 m2 (@1 Person/

10 Sq. m (67)

@10% of

community

center

7

6. Staff 5 % of (1+2) 39

7. Visitors 10 % of (1+2+3) 92

Total Population in Phase- II (1+2+3+4+5+6+7) 1,090

2.6 POWER REQUIREMENT

The power supply shall be supplied by DHBVNL (Dakshin Haryana Bijli Vitaran Nigam Limited).

The demand load for Part-I will be 2,105KW and for Part-II, it will be 1,252KW. Thus, the total

demand load of the project will be 3,357 KW.

Details of D.G Sets

The project will have power back up from 7 nos. of D.G. sets of total capacity 2,780 KVA. There is

provision of 4 nos. of DG sets of total capacity of 1,640 KVA (2 X 500 KVA + 2 X 320 KVA)

capacity for Part-I and 3 nos. of DG sets of total capacity of 1,140 KVA (3X 380 KVA) capacity for

Part-II for power back up in the Group Housing Project. The DG sets will be equipped with acoustic

enclosures to minimize noise generation and adequate stack height for proper dispersion.

2.7 PARKING

Adequate provision will be made for car/vehicle parking at the project site. There shall also be

adequate parking provisions for visitors so as not to disturb the traffic and allow smooth movement at

the site.

Page 21: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 14

Parking Required:

The project is a Group Housing Colony. The parking facilities are given below:

As per MoEF norms:

For residential: = 1 ECS/100 sq. m., FAR

= 96,888.39/100

= 968.89 say 969 ECS

For commercial: = 1 ECS/50 sq. m., FAR

= 2,348.12/50

= 47 ECS

Parking required as per MoEF norms = 1016 ECS

As per Haryana Bye laws:

1.5 ECS / Main DU i.e. (426 x 1.5) = 639 ECS

For EWS 5% of main DU = 32 ECS

Parking required as per Haryana Bye Laws= 639 + 32 = 671 ECS

Parking Proposed:

Area proposed for Phase- I basement parking = 22,260 m2

Area required for 1 ECS of basement parking = 35 m²

Parking proposed in Phase-I basement = 636 ECS

Area proposed for Phase-II basement parking = 16,380 m2

Area required for 1 ECS of basement parking = 35 m²

Parking proposed in Phase-II basement = 468 ECS

Open Parking area in Phase-I = 2800 m2

Area required for 1 ECS of open parking = 25 m²

Parking proposed in open area in Phase-I = 112 ECS

Open Parking area in Phase-II = 1425 m2

Area required for 1 ECS of open parking = 25 m²

Parking proposed in open area in Phase-II = 57 ECS

Page 22: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 15

Total Parking proposed = 636+468+112+57

=1273 ECS

Parking is 20% higher than the MoEF norms/ Haryana bye laws.

2.8 WATER SUPPLY AND SEWAGE TREATMENT PLAN

2.8.1 Water Requirement and supply

The water supply will be provided by HUDA. The total water requirement is approx. 482 KLD, out of

which total domestic water requirement is 360 KLD. The fresh water requirement is approx. 257 KLD

which is 70% of the domestic water demand. The total daily water requirement calculation and sullage

generation is given in Table 6. As the Phase-I & Phase-II are divided by 24 m sector road. So, services

are separate for both the plots. Details for the services for both the plots are given below in Table 2.5,

2.6 & 2.7

Table 2.5: Details of Water Demand & Sullage Generation

S.No. Description Total Water

Requirement(KLD)

Domestic

Water

Requirement

(KLD)

Fresh

Water

(KLD)

Sullage

Generated

(KLD)

STP

Capacity

(KLD)

1. Phase-I 306 228 5+160 =

165

200 240

2. Phase-II 176 132 92 114 135

TOTAL 482 360 257 314 STP of 240

& 135 KLD

Table 2.6: Calculations for Daily Water Demand (Phase- I)

S. No. Particulars Area (m2)

/ No. of

Dwelling

units

Total

Occupancy

Rate of

water

demand

(lpcd)

Total Water

requirement

(KLD)

A Residential 221.94

Main Dwelling Units 270 1350 135 182.25

3 EWS 48 240 135 32.4

Service Personal units 27 54 135 7.29

B Community Center and Convenient Shopping Staff 1.08

Page 23: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 16

*6 hours of D.G. set operations

Table 2.7: Calculations for Daily Water Demand (Phase -II)

S. No. Particulars Area (m2)

/ No. of

Dwelling

units

Total

Occupancy

Rate of

water

demand

(lpcd)

Total Water

requirement

(KLD)

A. Residential 128.52

4 Main Dwelling Units 156 780 135 105.3

5 EWS 28 140 135 18.9

6 Services Personnel 16 32 135 4.32

B. Community Center 0.315

7 Staff 7 45 0.315

C. Staff 39 45 1.76

D. Visitors 92 15 1.38

Domestic Water requirement (A+B+C) 131.975 say

132 KLD

E. Horticulture 6,318.5 m2 6 lt/m

2/day 38

F. D.G. Set Cooling (3 X 380

kVA)

0.9

ltrs/kVA/hr 6

Total Water Requirement (A+B+C+D+E+F) 175.975 say

176 KLD

*6 hours of D.G. set operations

Staff (Community

Center)

14 45 0.63

Staff (Convenient

Shopping)

10 45 0.45

C. Staff 68 45 3.06

D. Visitors 159 15 2.39

Domestic Water requirement (A+B+C+D) 228.47 say 228

KLD

E. Horticulture 10,708.66 m2 6 lt/m

2/day 64

F. D.G. Set Cooling (2X

500 + 2 X 320 kVA)

0.9

ltrs/kVA/hr

9

G. Make Up Water for

Swimming pool

5

Total Water Requirement (A+B+C+D+E+F+G) 306.47 say 306

KLD

Page 24: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 17

Table 2.8: Sullage Calculations for Phase- I & Phase-II

Domestic Water Requirement

(Phase- I & Phase- II)

228+ 132 = 360 KLD

Phase-I 228 KLD

Fresh (@ 70% of domestic) 160 KLD

Flushing (@ 30% of domestic) 68 KLD

Phase-II 132 KLD

Fresh (@ 70% of domestic) 92 KLD

Flushing (@ 30% of domestic) 40 KLD

Sullage Generated 314 KLD

Phase-I (@ 80% fresh +

100% flushing +80% water

from swimming pool)

128 + 68 +4 = 200 KLD

Phase-II (@ 80% fresh +

100% flushing)

74 + 40= 114 KLD

The water balance diagrams for the two phases of project are shown below in Figure 2.1 & 2.2:

Page 25: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 18

Figure 2.1: Water balance diagram for Phase-I

Recycled Water

FRESH WATER (160 KLD)

(@ 70% of Domestic water) SULLAGE GENERATED

(200 KLD)

STP CAPACITY 240 KLD

HORTICULTURE

(64 KLD)

@ 80%

@ 80 %

=

160 KLD

FLUSHING (68 KLD)

(@ 30% of Domestic water)

9 KLD

64 KLD

DG COOLING

(9 KLD)

Sullage

@100%

68 KLD

TO NEARBY

CONSTRUCTION

ACTIVITIES (19 KLD)

19 KLD

MAKE UP WATER FOR

SWIMMING POOL

(5 KLD)

Fresh Water

160 KLD

5KLD

TOTAL FRESH WATER

(5 +160 =165 KLD)

@80%

Page 26: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 19

Fig 2.2: Water Balance for Phase-II

2.8.2 Sullage Treatment and Re-use

It is expected that the project will generate approx. 200 KLD in Phase-I & 114 KLD in Phase-II of

total sullage. The sullage will be treated in the 2 STPs of 240 & 135 KLD capacity within the complex

and the treated wastewater will be used for flushing, horticulture and rest will be discharged to nearby

land for construction purposes.

2.8.3 Sewerage System

MBBR TECHNOLOGY

Sewerage System

An external sewage network shall collect the sewage from all points of the Group Housing Project,

and flow by gravity to the sewage treatment plant.

Recycled Water

FRESH WATER (92 KLD)

(@ 70% of Domestic water) SULLAGE GENERATED

(114 KLD)

STP CAPACITY 135 KLD

HORTICULTURE

(38 KLD)

@ 80%

@ 80 %

= 91 KLD

FLUSHING

(40 KLD)

(@ 30% of Domestic water)

6 KLD

38 KLD

DG COOLING

(6 KLD)

Sullage

@100%

40 KLD

TO NEARBY

CONSTRUCTION

ACTIVITIES (7 KLD)

7 KLD

Page 27: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 20

Following are the benefits of providing the Sewage Treatment Plant in the present circumstances:

The process has long retention time and can absorb shock load situation.

Reduced net daily water requirements, source for Flushing and Horticultural purposes by

utilization of the treated wastewater.

Reduced dependence on the public utilities for water supply and sewerage systems.

The process produces a well-oxidized sludge in small quantities only, which can be

removed and used as manure.

a. Characteristics of inlet /outlet of STP (After tertiary treatment):

Parameters Domestic Outlet

pH 6.5 to 8.5 6.0 to 8

Suspended solids 200 - 600 mg/l <10 mg/l

Biochemical Oxygen

Demand (BOD) 200 - 450 mg/l <20 mg/l

Chemical Oxygen Demand

(COD) 500- 800 mg/l <50 mg/l

Oil & Grease 50 mg/l <5 mg/l

c. Treatment Technology

MBBR TECHNOLOGY

Moving bed biofilm reactor technology is based on the principle of attached growth process.

PROCESS DESCRIPTION

The Sewage Treatment Plant shall be designed to receive continuous sewage inflow within the plant

room allocated on the site plan. The ease of maintenance and operation is of utmost importance in the

design of Sewage Treatment Plant.

The design of the Sewage Treatment Plant shall be such that it can be installed within the allocated

space and shall be subjected to the approval of the Construction Manager / Consultant.

Page 28: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 21

STP is proposed to use Moving Bed Bio Reactor (MBBR) process with UV for the treatment:

The treatment plant shall be designed with a capacity to handle 200 KLD of sullage for Phase I and

114 KLD of sullage for Phase II. Sewage and Wastewater will flow via gravity collection system

through a bar screen chamber to a sump chamber. A bar screen shall be provided at the inlet point in

the bar screen chamber and the sewage will flow through this bar screen into the sump. Bar screen

shall also be designed that it can be cleaned manually by going down to a platform in the chamber.

Two horizontal centrifugal pumps shall be provided in the sump to pump the collected sewage water

to the reactor. Air will be introduced in the sump through pipe grid, to avoid the sewage from

becoming septic.

Wastewater from the sump shall be lifted by means of effluent lifting pumps into Equalised Reactors

where BOD/COD reduction is achieved by virtue of aerobic microbial activity. Reactor would be

running in series. Oxygen required will be supplied through course bubble air diffusers.

The excess bio-solids washed in the biological process are separated in the downstream Clarifier/ Tube

Settler Tank. The clear supernatant will be collected in the Chlorine water tank cum filter feed tank.

The treated sewage is further pumped through filtration units. The sewage after CCT is disinfected and

shall meet the coliform norms of < 1000 counts with minimal dosage of sodium hypochlorite. The

coliform count in the treated effluent shall be almost nil.

The tertiary treatment consists of removing the residual suspended solid load, by filtering through

Dual Media Filter and passing the water through Activated Carbon Filter so that traces of BOD/COD

and excess chlorine are removed. The treated sewage shall be passed through Ultra Violet system (if

required) for water requirement for flushing purpose.

The biological sludge generated from the reactor which is settled in the Clarifier/Tube settler, is

pumped into sludge sump. Sludge shall be stored in the sludge holding tank for final dewatering and

disposal through screw pump and Centrifuge. The treated effluent from the Sewage Treatment Plant

shall be stored in Treated water storage tanks. The treated water is to be used for the horticulture and

flushing purpose. This treated shall be further softened and used for cooling tower make up.

Page 29: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 22

DESIGN PARAMETERS

Total flow rate: 314 m3/ day

Nature of wastewater: Combined Sewage

Figure 2.3: Schematic Diagram of the Sewage Treatment Plant

2.9 RAINWATER HARVESTING

The storm water disposal system for the premises shall be self-sufficient to avoid any

collection/stagnation and flooding of water. The amount of storm water run-off depends upon many

factors such as intensity and duration of precipitation, characteristics of the tributary area and the time

required for such flow to reach the drains. The drains shall be located near the carriage way along

either side of the roads. Taking the advantage of road camber, the rainfall run off from roads shall flow

towards the drains. Storm water from various buildings shall be connected to adjacent drain by a pipe

through catch basins. Therefore, it has been calculated to provide 14 rainwater harvesting pits at

selected locations which will catch the maximum run-off from the area.

Page 30: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 23

1) Since the existing topography is congenial to surface disposal, a network of storm water pipe

drains is planned adjacent to roads. All building roof water will be brought down through rain

water pipes.

2) Proposed storm water system consists of pipe drain, catch basins and seepage pits at regular

intervals for rain water harvesting and ground water recharging.

3) For basement parking, the rainwater from ramps will be collected in the basement storm water

storage tank. This water will be pumped out to the nearest external storm water drain.

4) The peak hourly rainfall of 45 mm/hr shall be considered for designing the storm water

drainage system.

Rain water harvesting has been catered to and designed as per the guideline of CGWA. Peak hourly

rainfall has been considered as 45 mm/hr. The recharge pit of 3 m length, 3 m width and 2.25 m depth

is constructed for recharging the water. Inside the recharge pit, a recharge bore is constructed having

adequate diameter and depth. The ground water level in the area is 30-40 meters bgl. The bottom of

the recharge structure will be kept 5 m above this level. At the bottom of the recharge well, a filter

media is provided to avoid choking of the recharge bore. Design specifications of the rain water

harvesting plan are as follows:

Catchments/roofs would be accessible for regular cleaning.

The roof will have smooth, hard and dense surface which is less likely to be damaged allowing

release of material into the water. Roof painting has been avoided since most paints contain

toxic substances and may peel off.

All gutter ends will be fitted with a wire mesh screen and a first flush device would be

installed. Most of the debris carried by the water from the rooftop like leaves, plastic bags and

paper pieces will get arrested by the mesh at the terrace outlet and to prevent contamination by

ensuring that the runoff from the first 10-20 minutes of rainfall is flushed off.

No sewage or wastewater would be admitted into the system.

No wastewater from areas likely to have oil, grease, or other pollutants has been connected to

the system.

Calculations for storm water load in Phase-I:

Plot Area of Phase-I = 25,454.73 m2

Page 31: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 24

Roof-top area = Ground Coverage of Pocket-A = 8,810 m2

Green Area = 10,708.66 m2

Green Area (without water body) = 7,870.8 m2

Paved Area = Plot Area – (Roof-top Area + Green area)

= 25,454.73 – (8,810 +10,708.66)

= 5,936.07 m2

Runoff Load

Roof-top Area = 8,810 × 0.045 × 0.80

= 317.16m3/hr

Green Area =7,870.8× 0.045 × 0.20

(Without water body) = 70.84 m3/hr

Paved Area = 5,936.07 × 0.045 × 0.70

= 186.986 m3/hr

Total Runoff Load = 317.16+ 70.84 + 186.986 m3/hr

= 574.986 m3/hr

Taking 15 minutes Retention Time, Total volume of storm water = 574.986/ 4

= 143.747 m3

Taking the effective length, width and depth of a Recharge pit 3 m, 3 m and 2.25 m respectively,

Volume of a single Recharge pit = l x b x h = 3 × 3 × 2.25 = 20.25 m3

Hence No. of pits required = 143.747 / 20.25 = 7.1 pits say 7 pits

Calculations for storm water load of Phase-II:

Plot Area of Phase-II= 20,436.62 m2

Roof-top area = Ground Coverage of Pocket-B= 9,348 m2

Green Area = 6318.5 m2

Paved Area = Plot Area – (Roof-top Area + Green area)

= 20,436.62 – (9,348 + 6318.5)

= 4,770.12 m2

Page 32: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 25

Runoff Load

Roof-top Area = 9,348 × 0.045 × 0.80

= 336.528 m3/hr

Green Area =6,318.5× 0.045 × 0.20

= 56.87 m3/hr

Paved Area = 4,770.12 × 0.045 × 0.70

= 150.259 m3/hr

Total Runoff Load = 336.528 + 56.87 +150.259 m3/hr

= 543.657 m3/hr

Taking 15 minutes Retention Time, Total volume of storm water = 543.657 / 4

= 135.914 m3

Taking the effective length, width and depth of a Recharge pit 3 m, 3 m and 2.25 m respectively,

Volume of a single Recharge pit = l x b x h = 3 × 3 × 2.25 = 20.25 m3

Hence No. of pits required = 135.914 / 20.25 = 6.7 Pits say 7 pits

As 1 pit/acre is required so, total 14 rain water harvesting pits will be required for 14.025 acre land.

Total of 14 Rain Water Harvesting pits are being proposed for artificial rain water recharge within the

project premises.

Page 33: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 26

Figure 2.4: Rain Water Harvesting Pit Design

2.10 SOLID WASTE MANAGEMENT

Waste quantification is carried out to estimate the amount of waste generated by different activities in

the project site. For estimation of quantity of solid waste generated from the project, waste generation

factors are selected for each activity based on case studies available for similar type of projects,

assumptions and past experience.

2.10.1 Solid Waste Generation

Solid waste would be generated both during the construction as well as during the operation phase.

The solid waste expected to be generated during the construction phase will comprise of excavated

materials, used bags, bricks, concrete, MS rods, tiles, wood etc. The following steps are proposed to be

followed for the management solid waste:

Construction yards are proposed for storage of construction materials.

The excavated material such as topsoil and stones will be stacked for reuse during later stages

of construction.

Excavated top soil will be stored in temporary constructed soil bank and will be reused for

landscaping of the group housing colony project.

Page 34: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 27

Solid Waste

Construction

Waste

Construction waste,

Broken Bricks,

Waste Plaster

Empty

Cement

Bags

Sold to agency

for recycling

Excavated

Soil

Top soil conserved for

landscaping,rest used

in re-filling

Used in re-filling,

raising site level

Remaining soil shall be utilized for refilling/road work/rising of site level at locations/selling to

outside agency for construction of roads etc.

Figure 2.5: Solid Waste Management Scheme (Construction Phase)

Waste will consist of domestic as well as gardening waste during the operation phase. The solid waste

generated from the project shall be mainly domestic waste and estimated quantity of the waste shall be

approx. 1,370.955 kg per day (@ 0.5 kg per capita per day for residents, 0.25 kg per capita per day for

the staff members, @ 0.15 kg per capita per day for the visitors and horticultural wastes @ 0.2

kg/acre/day). Various arrangements will be made at the site in accordance to Municipal Solid Wastes

(Management and Handling) Rules, 2000

Page 35: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 28

Table 2.9: Calculation of Solid Waste Generation

S. No. Category Waste generated (kg/day)

1. Residents 675+390= 1,065

2. EWS 120+70= 190

3. Service Personnel 27+16 = 43

3. Staff 23+11.5 = 34.5

4. Visitors 23.85+13.8 = 37.65

5. Landscape waste

(4.025 acres) 0.493+0.312 = 0.805

TOTAL SOLID WASTE GENERATED 1,370.955 kg/day

Table 2.10: Calculation of Solid Waste Generation (Phase-I)

S. No. Category kg per capita per day Waste generated

(kg/day)

1. Residents 1350@ 0.5 kg/capita/day 675

2. EWS 240 @ 0.5 kg/capita/day 120

3. Service Personnel [email protected] kg/capita/day 27

4. Staff 92 @ 0.25 kg/capita/day 23

5. Visitors 159@ 0.15 kg/capita/day 23.85

6. Landscape waste

(2.464 acres)

@ 0.2 kg/acre/day

0.493

TOTAL SOLID WASTE GENERATED 869.343 kg/day

Table 2.11: Calculation of Solid Waste Generation (Phase-II)

S. No. Category kg per capita per day Waste generated

(kg/day)

1. Residents 780@ 0.5 kg/capita/day 390

2. EWS 140 @ 0.5 kg/capita/day 70

3 Service Personnel 32 @ 0.5 kg/capita/day 16

4. Staff 46@ 0.25 kg/capita/day 11.5

5. Visitors 92@ 0.15 kg/capita/day 13.8

6. Landscape waste

(1.561 acres)

@ 0.2 kg/acre/day

0.312

TOTAL SOLID WASTE GENERATED 501.612 kg/day

Page 36: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 29

E-waste will be managed as per E-waste (Management & Handling Rules, 2011). It will be handed

over to Govt. approved vendors.

(Source: For Waste Collection, Chapter 3, Table 3.6, Page no. 49, Central Public Health &

Environment Engineering Organization, Ministry of Urban Development, (Government of India,

May 2000))

Collection and Segregation of waste

1. A door to door collection system will be provided for collection of domestic waste in

colored bins from household units.

2. The local vendors will be hired to provide separate colored bins for dry recyclables and

Bio-Degradable waste.

3. For waste collection, adequate number of colored bins (Green and Blue & dark grey bins–

separate for Bio-degradable and Non Bio-degradable) are proposed to be provided at the

strategic locations of the project site.

4. Litter bin will also be provided in open areas like parks etc.

Treatment of waste

Bio-Degradable wastes

1. Bio-degradable waste will be subjected to Organic Waste Converter and the compost will be

used as manure.

2. STP sludge is proposed to be used for horticultural purposes as manure.

3. Horticultural Waste is proposed to be composted and will be used for gardening purposes.

Recyclable wastes

i. Grass Recycling – The cropped grass will be spread on the green area. It will act as manure

after decomposition.

ii. Recyclable wastes like paper, plastic, metals etc. will be sold off to recyclables.

Disposal

Recyclable and non-recyclable wastes will be disposed through Govt. approved agency. Hence,

the Municipal Solid Waste Management will be conducted as per the guidelines of Municipal

Solid Wastes (Management and Handling) Rules, 2000 and amended Rules, 2008. A Solid

waste management Scheme is depicted in the following figure for the Group Housing Colony.

Page 37: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 30

Figure 2.6: Solid Waste Management Scheme (Operation Phase)

2.11 LANDSCAPE

Total green area measures 17,027.16 m2i.e. (30% of the plot area) (for Shelter belt, for Avenue

plantation, for Landscape, herbs, shrubs, water bodies and climbers). Evergreen tall and ornamental

trees like Belonix regia, Polvalthia longfolia, Veronia selowna, Cassia fistula, etc. will be planted

inside the premises.

Table 2.12: Break up of Green Area

Proposed Green Area (@30 % of the plot area) 17,027.16 m2

1 Avenue Plantation (@ 10% of the plot area) 5,675.72

Phase-I 3,148.32

Phase-II 2,527.40

2 Shelter Belt (@ 10% of plot area) 5,675.72

Phase-I 3,148.32

Phase-II 2,527.40

3 Herbs/Shrubs/Climber Plants (@ 5% of the plot area) 2,837.86

Page 38: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 31

Phase-I 1574.16

Phase-II 1263.70

4 Water Body (@ 5% of the plot area) 2,837.86

Phase-I 2,837.86

Table 2.13: List of Trees

S. No. Botanical name Local name

1. Cassia fistula Amaltas

2. Delonix regia Gulmohar

3. Bauhinia purpurea Kachnar

4. B. variegata Kachnar

5. Lagerstroemia flosreginae Pride of India

6. Grevillea robusta Silk oak

7. Callistemon lanceolatum Bottle Brush

8. Anthocephalus cadamba Kadam

9. Polyalthia longifolia Ashok

10. Putranjiva roxburghii Putrajiv

11. Sterculea alata Coconut Buddha

12. Bassia latifolia Mahua

13. Alstonia scholaris Devil Tree

14. Michelia champaca Champak

15. Terminalia arjuna Arjun

16. Ficus retusa Ficus

17. Saraca indica Ashoka

18. Dalbergia sissoo Shisham

19. Maduca latifolia Madhu

20. Ficus infectoria Pilkhan

21. Cassia nodosa Roheda

22. Azadirachta indica Neem

ORNAMENTAL SHRUBS

23. Delonix pulcherima Chhota gulmohar

24. Plumeria alba Champa

25. Lagestroemia indica Dhayti

26. Ervatamia divaricata Chandni

27. Nyctanthes arbor-tristis Harsinghar

28. Yellow duranta Skyflower

Page 39: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 32

29. Hibiscus hirusta Costa Flores

30. Cassia biflora Twin-flowered cassia

31. Nerium indicum Kaner

32. Cassia augustifolia Senna

33. Cassia glauca Kalamona

2.12 DETAILS OF CONSTRUCTION MATERIALS

List of building materials being used at site:

1. Coarse sand

2. Fine sand

3. Stone aggregate

4. Cement

5. Reinforcement steel

6. Pipe scaffolding (cup lock system)

7. Bricks

8. CLC fly ash blocks/ AAC blocks

9. Crazy (white marble) in grey cement

10. P.V.C. conduit

11. MCBs, MCCBs

12. 2 1/2'’ thick red colour paver tiles

13. PVC pipe (ISI marked)

14. PVC sullage lines

15. S.W. sewer line up to main sewer

16. PVC rain water down take

17. Stainless steel sink in kitchen

18. Joinery hardware- ISI marked

There will be no significant use of natural resources that will be utilized during operational phase.

Page 40: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony

Village Nangli Umarpur, Sector-62 EIA/EMP Report

Gurgaon, Haryana Chapter II

M/s: EMAAR MGF Land Ltd. 33

2.13 MATERIALS USED FOR CONSTRUCTION & THEIR U VALUES

2.14 LIST OF MACHINERY USED DURING CONSTRUCTION

(i) Dumper

(ii) Concrete mixer with hopper

(iii) Excavator

(iv) Concrete Batching Plant

(v) Cranes

(vi) Road roller

(vii) Bulldozer

(viii) Concrete Mixing Batching Plant

(ix) Tower Cranes

(x) Hoist

(xi) Concrete pressure pumps

(xii) Mobile transit mixer

Page 41: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 34

CHAPTER-3

DESCRIPTION OF ENVIRONMENT

3.1 INTRODUCTION

Information on the existing environmental status is essential for assessing the likely environmental

impacts of the project. In order to get an idea about the existing state of the environment, various

environmental attributes such as meteorology, air quality, water quality, soil quality, noise level, ecology

and socio-economic environment have been studied/ monitored.

3.2 STUDY PERIOD

Baseline environmental data generation for air, water, noise and soil quality monitoring around the

project site was conducted from March-May, 2015. Apart from field monitoring, additional data was

also collected from secondary sources like Irrigation Department, India Meteorological Department

(IMD), Central Ground Water Board, Geological Survey of India, State Ground Water Department,

State Pollution Control Board, Census of India and Local Forest Department, Non -Governmental

Agencies etc.

3.3 STUDY AREA

The site development area spreading across 56,757.16 m2 (14.025 acres) is a vacant land earmarked for

development of Group Housing Colony as per Gurgaon Manesar Urban Complex 2021. The probability

of impacts from the Group Housing Colony is generally within 2 kms. Field Monitoring has been carried

out beyond 2 km, in case of presence of sensitive receptors. The present report covers baseline

environmental data generated in the study area (10 km radius) all around the project site for land use and

the sample selection for monitoring are done within 5 km radius of the project site. Toposheet map

showing location of project site and surroundings within 10 km is enclosed as Annexure IV (b)

respectively. For biological studies, considering the ecological connectivity and widespread habitats of

wildlife, a 15 km radius around the project area has been considered for secondary data collection and

the map showing the same is attached as Annexure IV (c).

3.4 BASELINE MONITORING OF ENVIRONMENTAL COMPONENTS

In order to get an idea about the existing state of the environment, various environmental attributes such

as meteorology, air quality, water quality, soil quality, noise level, ecology and socio-economic

environment have been studied/monitored.

3.4.1 Meteorology

A meteorological station was set up at the project premises. Meteorological data was generated during

the March-May 2015.

The following parameters were recorded at hourly intervals continuously during monitoring period:

Page 42: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 35

- Wind speed

- Wind direction

- Air temperature

Table-3.1 gives summarized meteorological data for the worst day. Figure-3.1 gives the wind-rose

diagram for the monitoring period.

Table 3.1: Meteorological Data for the 24-hours average maximum predicted Concentration under

worst meteorological condition (March - May)

Month Temperature (oC) Humidity (%) Wind speed (km/hr)

Max Min Mean Max Min Mean Max Min Mean

March 2015 36 10 23 36 10 48 29 1.2 9

April 2015 38 18 28 38 13 41 30 0.5 10

May 2015 46 22 34 32 7 38 29 1 10

Figure 3.1: Wind-Rose diagram

Page 43: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 36

3.4.2 Air Environment

The prime objective of the baseline study with respect to ambient air quality is to establish the present

air quality and its conformity to National Ambient Air Quality Standards. This data has been further

used during impact assessment to predict the final air quality. This section describes the sampling

locations, frequency of sampling and methodology adopted for monitoring ambient air quality.

To quantify the impact of the project on the ambient air quality, it is necessary at first to evaluate the

existing ambient air quality of the area. The existing ambient air quality, in terms of Particulate Matter-

10(PM10), Particulate Matter-2.5 (PM2.5), Sulphur-dioxide (SO2), Oxides of Nitrogen (NO2), and Carbon

Monoxide (CO), has been measured through a planned field monitoring.

To assess the ambient air quality level, 5 (five) monitoring stations were set up. Table-3.2 gives location

of the ambient air quality monitoring stations. The location showing the air quality monitoring stations is

enclosed as Annexure VI.

Table 3.2: Location of Ambient Air Quality Monitoring Stations

Locations Locations Code Direction Distance (km)

AAQ1 Project site Center Zero

AAQ2 Ullahawas ENE 1.05

AAQ3 Sector- 65 WNW 1.41

AAQ4 Alahawas E 2.40

AAQ5 Tigra NW 2.13

3.4.2.1 Monitoring Schedule

Ambient air quality monitoring was carried out twice a week with a frequency of 24 hours for 12 weeks.

3.4.2.2 Methods of Sampling and Analysis

Fine particulate Sampler APM MFC550 was used for monitoring Particulate Matter (PM2.5 and PM10);

gaseous pollutants like SO2, and NO2 was collected by Gaseous Pollutant Sampler APM 433 and CO

was monitored by Serinous 30 CO Analyser with NDIR detector.

3.4.2.3 Method for measurement of Particulate matter, SO2 & NO2

Method for measurement of Particulate Matter (PM10) in ambient air is done by Cyclonic Flow

Technique. Particles with aerodynamic diameter less than the cut-point of the inlet are collected by a

filter. Ambient air at the monitoring location is sucked through a cyclone. Coarse and non-reparable dust

is separated from the air stream by centrifugal forces acting on the solid particles and these particles fall

through the cyclone's conical hopper and get collected in the sampling cap placed at the bottom. The fine

dust (<10 microns) forming the particulate matter (PM10) passes the cyclone and is retained on the filter

paper. The mass of these particles is determined by the difference in filter weights prior to and after

Page 44: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 37

sampling. The concentration of PM10 in the designated size range is calculated by dividing the weight

gain of the filter by the volume of air sampled. A tapping is provided on the suction side of the blower to

provide suction for sampling air through a set of impingers for containing absorbing solutions for SO2

and NO2. Samples of gases are drawn at a flow rate of 0.2 liters per minute. The APM MFC 550 is used

for PM2.5. This system is a manual method for sampling fine particles (PM2.5 fraction) and is based on

Impactor designs standardized by USEPA for ambient air quality monitoring.

PM2.5 & PM10 have been estimated by gravimetric method. Improved West and Gaeke method (IS-5182

part-II, 1969) has been adopted for estimation of SO2 and Modified Jacobs-Hochheiser method (IS-5182

part-VI, 1975) has been adopted for the estimation of NO2.

3.4.2.4 Method for measurement of Carbon Monoxide – NDIR method

Instrument used: Ecotech Serinus 30 Carbon Monoxide

This analyser is used to measure CO in ambient air, in the range of 0-200 ppm (220 mg/m3) to a

sensitivity of 0.05 ppm 55µg/m3). The Serinus 30 combines the benefits of Microprocess control with

Non-Dispersive Infrared Spectrophotometry technology.CO Concentration is automatically corrected for

gas temperature and pressure changes.

3.4.2.5 Results and Discussions

The results of AAQ are given in details in Annexure VII and summarized in the tabular form. The

results when compared with National Ambient Air Quality Standards (NAAQS) of Central Pollution

Control Board (CPCB) for "Industrial, Residential, Rural and Other Areas" show that the average

values of ambient air quality parameters are well within the stipulated limit.

The results of ambient air quality monitoring are summarized in the Tables below:

Table 3.3 (a) Ambient Air Quality with respect to PM2.5

PM2.5 (µg/m3) March-May 2015

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 81.3 79.2 75.1 78.1 94.1

Max 97.2 97.3 99.3 98.8 115.1

Average 86.4 85.7 83.0 84.6 103.0

98 Percentile 96.3 95.5 98.9 97.0 114.2

Page 45: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 38

The values of PM2.5 in study area are presented in Table 3.3 (a). The seasonal minimum, maximum,

average values and 98 percentile of PM 2.5 were observed 81.3 µg/m3, 97.2 µg /m

3, 86.4 µg/m

3 and 96.3

µg/m3 respectively at the project site. The seasonal minimum, maximum and average values ranged

between 75.1-94.1 µg/m3, 97.3-115.1 µg/m

3 and 83.0 – 103.0 µg/m

3 respectively in the study area.

Table 3.3 (b) Ambient Air Quality with respects to PM10

PM10 (µg/m3) March-May 2015

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 191.5 187.3 179.3 231.4 209.7

Max 221.2 219.6 215.8 273.1 238.2

Average 198.4 199.2 197.8 249.1 219.6

98 Percentile 217.8 217.3 214.5 271.8 237.5

Page 46: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 39

The values of PM10 in study area are presented in Table 3.3 (b). The seasonal minimum, maximum,

average values and 98 percentile of PM10 were observed 191.5 µg/m3, 221.2 µg /m

3, 198.4 µg/m

3 and

217.8 µg/m3 respectively at the project site. The seasonal minimum, maximum and average values

ranged between 179.3 – 231.4 µg/m3, 215.8-273.1 µg/m

3 and 197.8- 249.1 µg/m

3 respectively in the

study area.

Table 3.3 (c) Ambient Air Quality with respect to SO2

SO2 (µg/m3) March-May 2015

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 5 7.8 6.9 7.5 8.1

Max 9.4 10.9 11.2 10.2 13.4

Average 7.8 9.5 8.8 8.7 10.6

98 Percentile 9.4 10.9 10.9 10.0 13.1

Page 47: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 40

The values of SO2 in study area are presented in Table 3.3 (c). The seasonal minimum, maximum,

average values and 98 percentile of SO2 were observed 5 µg/m3, 9.4 µg /m

3, 7.8 µg/m

3 and 9.4 µg/m

3

respectively at the project site. The seasonal minimum, maximum and average values ranged between

6.9-8.1 µg/m3, 10.2-13.4 µg/m

3 and 8.7-10.6 µg/m

3 respectively in the study area.

Table 3.3 (d) Ambient Air Quality with respects to NO2

NO2 (µg/m3) March-May 2015

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 11.6 15.7 13.2 15.2 16.4

Max 23.6 24.8 25.8 24.2 31.9

Average 18.8 21.5 18.6 19.1 25.0

98 Percentile 23.2 24.7 25.2 23.6 31.8

Page 48: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 41

The values of NO2 in study area are presented in Table 3.3 (d). The seasonal minimum, maximum,

average values and 98 percentile of NO2 were observed 11.6 µg/m3, 23.6 µg /m

3, 18.8 µg/m

3 and 23.2

µg/m3 respectively at the project site. The seasonal minimum, maximum and average values ranged

between 13.2-16.4 µg/m3, 24.2-31.9 µg/m

3 and 18.6-25.0 µg/m

3 respectively in the study area

Table 3.3 (e) Ambient Air Quality with respects to CO

CO (µg/m3) March-May 2015

Location AAQ 1 AAQ 2 AAQ 3 AAQ 4 AAQ 5

Min 700 700 820 820 1040

Max 1090 1180 1220 1230 1360

Average 865 972 1006 1014 1223

98 Percentile 1039 1175 1197 1212 1351

Page 49: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 42

The values of CO in study area are presented in Table 3.3 (e). The seasonal minimum, maximum,

average values and 98 percentile of CO were observed 700 µg/m3, 1090 µg/m

3, 865 µg/m

3 and 1039

µg/m3 respectively at the project site. The seasonal minimum, maximum and average values ranged

between 700-1040 µg/m3, 1180-1360 µg/m

3 and 972-1223 µg/m

3 respectively in the study area.

3.4.3 Noise Levels

Noise is one of the most undesirable and unwanted by-products of our modern life style. It may not

seem as insidious or harmful as air and water pollutants but it affects human health and well-being and

can contribute to deterioration of human well-being in general and can cause neurological disturbances

and physiological damage to the hearing mechanism in particular. It is therefore, necessary to measure

both the quality as well as the quantity of noise in and around the site.

3.4.3.1 Methodology

The intensity of sound energy in the environment is measured in a logarithmic scale and is expressed in

a decibel, dB (A) scale. In a sophisticated type of sound level meter, an additional circuit (filters) is

provided, which modifies the received signal in such a way that it replicates the sound signal as received

by the human ear and the magnitude of sound level in this scale is denoted as dB (A). The sound levels

are expressed in dB (A) scale for the purpose of comparison of noise levels, which is universally

accepted by the international community.

Noise levels were measured using an Integrating sound level meter manufactured by Pulsar Instruments

Plc, Model NO. 91 (SL.No.B21625). It has an indicating mode of Lp and Leq. Keeping the mode in Lp

Page 50: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 43

for few minutes and setting the corresponding range and the weighting network in “A” weighting set the

sound level meter was run for one hour time and Leq was measured at all locations.

The day noise levels have been monitored during 6.00 am to 10.00 pm and night noise levels, during

10.00 pm to 6.00 am at all the 5 locations, which covers residential areas, commercial area, industrial

area, Silence area if available within 10 km radius of the study area.

3.4.3.2 Sampling Locations

A preliminary survey was undertaken to identify the major noise generating sources in the area. The

noise survey was conducted to assess the background noise levels in different zones. Gazettes

Notification (S.O. 123(E)) of MoEF dated February 14, 2000 on ambient air quality standards has

different noise levels for different zones viz. project site, industrial, commercial, and residential and

silence zones. Five sampling locations were selected for the sampling of noise levels. The sampling

locations are given in Table-3.4 below.

Table 3.4 Noise Level Monitoring Stations in the study area

Location Code Locations Type of Area Direction Distance

NQ1 Project Site Residential Zone Centre Zero

NQ2 Ullahawas Residential Zone ENE 1.05 km

NQ3 Heritage School Silence Zone NE 0.71 km

NQ4 Masonic Polyclinic Industrial Zone SW 1.18 km

NQ5 Medawas Commercial Zone SW 1.21 km

Ministry of Environment & Forests (MoEF) has notified the noise standards vide gazette notification

dated February 14, 2000 for different zones under the Environment Protection Act (1986). These

standards are given in Table-3.5. Noise monitoring locations map is attached as Annexure VI.

Table 3.5 Ambient Quality Standards in respect of Noise

Area Code Category of Area Noise dB(A) Leq

Day time* Night time*

A Industrial Area 75 70

B Commercial Area 65 55

C Residential Area 55 45

D Silence Zone 50 40

Note:

1. Daytime is from 6.00 am to 10.00 pm and Nighttime is from 10.00 pm to 6.00 am.

Page 51: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 44

2. Silence zone is defined as area up to 100 meters around premises of hospitals, educational

institutions and courts. Use of vehicle hours, loud speakers and bursting of crackers are banned in these

zones.

3.4.3.3 Results and Discussion

The noise data compiled on noise levels during April, 2015 is given in Table-3.6. It can be seen that the

night time Leq (Ln) varies from 38.4 to 43.5 dB (A) and the daytime Leq (Ld) varies from 40.2 to 63.7

dB (A) within the study area. Result of the noise quality data is enclosed as Annexure VII.

Table 3.6: Hourly Leq Noise Level in the study Area (April, 2015)

NOISE QUALITY DATA April, 2015

S.No. PROJECT SITE ZONE LIMIT (as per CPCB

Guidelines), Leq, dB(A)

Observed value

Leq, dB(A)

DAY* NIGHT* DAY* NIGHT*

1 Project site Residential Zone 55 45 40.2 38.4

2 Heritage School Silence Zone 50 40 42.3 38.5

3 Masonic Polyclinic Industrial Zone 75 65 56.4 43.5

4 Medawas Commercial Zone 65 55 63.7 40.3

5 Ullahawas Residential Zone 55 45 53.2 42.1

* Day time Leq (6.00 AM TO 10.00 PM)

Night time Leq (10.00 PM TO 6.00 AM)

Page 52: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 45

3.4.4 WATER ENVIRONMENT

3.4.4.1 Water Quality

Water quality assessment is one of the essential components of EIA study. Such assessment helps in

evaluating the existing health of water body and suggesting appropriate mitigation measures to minimize

the potential impact from development projects. Water quality of ground water has been studied in order

to assess water-uses in construction, drinking, cooling and horticulture purpose.

The water quality at the site and other locations within the 10 km impact zone was monitored during

March 2015- May 2015.

3.4.4.2 Sampling Frequency and Sampling Techniques

Parameters for analysis of water quality were selected based on the utility of the particular source of

water as per MoEF guidance. Hence quality of ground water was compared with IS: 10500: 1991

(Reaffirmed 1993 With Amendment NO -3 July 2010) for drinking purposes. Ground water quality was

analyzed for parameters as mentioned in the ‘Methods of Monitoring & Analysis published by CPCB (in

Annexure –IV of CPCB guidelines)’ and it was rated according to the CPCB Water Quality Criteria

against A, B, C, D & E class of water based on parameters identified in the criteria. Water samples were

collected as Grab water sample from sampling location in a 5 liter plastic jerrycan and 250 ml sterilized

clean glass/pet bottle for complete physico-chemical and bacteriological tests respectively. The samples

Page 53: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 46

were analyzed as per standard procedure / method given in IS: 3025 (Revised Part) and standard method

for examination of water and wastewater Ed. 21st, published jointly APHA, AWWA and WPCF.

The ground water quality is compared with CPCB water quality criteria mentioned in Table 3.7:

Table 3.7: Water Quality Criteria as per Central Pollution Control Board

Designated-Best-Use Class of

water

Criteria

Drinking Water Source

without conventional

treatment but after disinfection

A

Total Coliforms Organism MPN/100ml shall be 50 or

less

pH between 6.5 and 8.5

Dissolved Oxygen 6mg/l or more

Biochemical Oxygen Demand 5 days 20°C 2mg/l or

less

Outdoor bathing (Organised)

B

Total Coliforms Organism MPN/100ml shall

be 500 or less;

pH between 6.5 and 8.5;

Dissolved Oxygen 5mg/l or more

Biochemical Oxygen Demand 5 days 20°C

3mg/l or less

Drinking water source after

conventional treatment and

disinfection

C

Total Coliform Organism MPN/100ml shall

be 5000 or less;

pH between 6 to 9;

Dissolved Oxygen 4 mg/l or more

Biochemical Oxygen Demand 5 days 20°C

3mg/l or less

Propagation of Wild life and

Fisheries

D

pH between 6.5 to 8.5

Dissolved Oxygen 4 mg/l or more

Free Ammonia (as N) 1.2 mg/l or less

Irrigation, Industrial Cooling,

Controlled Waste disposal

E

pH between 6.0 to 8.5

Electrical Conductivity at 25°C micro

mhos/cm Max.2250

Sodium absorption Ratio Max. 26

Boron Max. 2 mg/l

Below-E Not Meeting A, B, C, D & E Criteria

Page 54: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 47

As per the standard practice, one sample from each station was taken each month in the study period.

Sampling was done by standard sampling technique as per the Standard Methods. Necessary precautions

were taken for preservation of samples. Location of Ground Water Sampling Sites is attached as

Annexure VI.

Table 3.8: Location of Water Sampling Sites

3.4.4.3 Result & Conclusion:

The results of analysis of ground water are given in Annexure VII.

The water quality in the impact zone was assessed through physico-chemical and bacteriological

analysis of ground water samples. The results have been compared with the drinking water quality

standards specified in IS: 10500. It was observed that all the physico chemical parameters and heavy

metals from surface and ground water samples are below stipulated drinking water standards.

All the ground water samples analyzed can be considered fit for drinking purpose in the absence of

alternate sources

Comparing the values of pH, DO, BOD and total coliforms with ‘Use based classification of ground

waters’ published by Central Pollution Control Board; it can be seen that the analyzed ground

waters can be compared with class ‘E’ and can be used as drinking water sources after conventional

treatment and disinfection. Bacteriological examination of ground water indicates the presence of total

coli forms, which may be due to human activities observed during the study period.

Rainwater Harvesting:

The main source of ground water recharging in the study area is rainwater, which infiltrates into the

ground through various litho logical units present in the study area. 30 number of rainwater harvesting

pits shall be installed to recharge the ground water. The runoff from the rooftop and storm water shall go

to the recharge pits.

Location No. Sample collected from

Ground Water Samples

GW – 1 Project Site- Centre- 0 km

GW – 2 Nangli Umarpur– North West-0.431 km

GW – 3 Medawas – South West 1.21 km

GW - 4 Ullahawas – ENE 1.05 km

Page 55: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 48

Scheme for Ground Water Recharging

The rainwater will be diverted from the rooftop using rain water pipes to the surface / underground

drainage network. The entire building plot shall be sub divided for recharging structures.

It has been proposed to provide recharge pits for the desired purpose. The rainwater will be diverted into

the desilting tank to remove inorganic impurities and the outflow of the desilting tank will be taken into

the recharge well.

Desilting Tank

The desilting tanks are used to remove silt and other floating impurities from rainwater. Desilting tank is

like an ordinary container having provision for the inflow, outflow and overflow. Apart from removing

silt it holds the excess amount of water till it is soaked up by the recharge structure. The bottom of tank

will have unpaved surface (layers of coarse sand) to allow standing water to percolate into the soil.

Recharge well/pit

Rain water harvesting has been catered to and designed as per the guideline of CGWA. Peak hourly

rainfall has been considered as 45 mm/hr. The recharge pit of 3 m length, 3 m width and 2.25 m depth is

constructed for recharging the water. The ground water level in the area is 30-40 meters below ground

level. The bottom of the recharge structure will be kept 5 m above this level. At the bottom, a filter

media is provided to avoid choking of the recharge bore. Design specifications of the rain water

harvesting plan are as follows:

Catchments/roofs would be accessible for regular cleaning.

The roof will have smooth, hard and dense surface which is less likely to be damaged allowing

release of material into the water. Roof painting has been avoided since most paints contain toxic

substances and may peel off.

All gutter ends will be fitted with a wire mesh screen and a first flush device would be installed.

Most of the debris carried by the water from the rooftop like leaves, plastic bags and paper pieces will

get arrested by the mesh at the terrace outlet and to prevent contamination by ensuring that the runoff

from the first 10-20 minutes of rainfall is flushed off.

No sewage or sullage would be admitted into the system.

No sullage from areas likely to have oil, grease, or other pollutants has been connected to the

system.

It should be therefore concluded that there is no significant impact on surface water quality & hydrology

of the area. The proposed rainwater-harvesting scheme will stabilize the groundwater table in the area.

The schematic diagram of rainwater harvesting pit is shown in Figure-3.2.

Calculations for storm water load

Calculations for storm water load in Phase-I-

Plot Area of Phase-I = 25,454.73 m2

Page 56: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 49

Roof-top area = Ground Coverage of Pocket-A = 8,810 m2

Green Area = 10,708.66 m2

Green Area (without water body) = 7,870.8 m2

Paved Area = Plot Area – (Roof-top Area + Green area)

= 25,454.73 – (8,810 +10,708.66)

= 5,936.07 m2

Runoff Load

Roof-top Area = 8,810 × 0.045 × 0.80

= 317.16m3/hr

Green Area =7,870.8× 0.045 × 0.20

(without water body) = 70.84 m3/hr

Paved Area = 5,936.07 × 0.045 × 0.70

= 186.986 m3/hr

Total Runoff Load = 317.16+ 70.84 + 186.986 m3/hr

= 574.986 m3/hr

Taking 15 minutes Retention Time, Total volume of storm water = 574.986/ 4

= 143.747 m3

Taking the effective length, width and depth of a Recharge pit 3 m, 3 m and 2.25 m respectively,

Volume of a single Recharge pit = l x b x h = 3 × 3 × 2.25 = 20.25 m3

Hence No. of pits required = 143.747 / 20.25 = 7.1 pits say 7 pits

Calculations for storm water load of Phase-II

Plot Area of Phase-II= 20,436.62 m2

Roof-top area = Ground Coverage of Pocket-B= 9,348 m2

Page 57: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 50

Green Area = 6318.5 m2

Paved Area = Plot Area – (Roof-top Area + Green area)

= 20,436.62 – (9,348 + 6318.5)

= 4,770.12 m2

Runoff Load

Roof-top Area = 9,348 × 0.045 × 0.80

= 336.528 m3/hr

Green Area =6,318.5× 0.045 × 0.20

= 56.87 m3/hr

Paved Area = 4,770.12 × 0.045 × 0.70

= 150.259 m3/hr

Total Runoff Load = 336.528 + 56.87 +150.259 m3/hr

= 543.657 m3/hr

Taking 15 minutes Retention Time, Total volume of storm water = 543.657 / 4

= 135.914 m3

Taking the effective length, width and depth of a Recharge pit 3 m, 3 m and 2.25 m respectively,

Volume of a single Recharge pit = l x b x h = 3 × 3 × 2.25 = 20.25 m3

Hence No. of pits required = 135.914 / 20.25 = 6.7 Pits say 7 pits

As 1 pit/acre is required so, total 14 rain water harvesting pits will be required for 14.025 acre land.

Total of 14 Rain Water Harvesting pits are being proposed for artificial rain water recharge within the

project premises.

Page 58: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 51

Figure 3.2: Typical Design of Rainwater Harvesting Pit

3.4.5 LAND ENVIRONMENT

Land is the most vital resource for sustenance of life and degradations of land due to industrialization,

urbanization and population growth is a matter of concern. Therefore, it is necessary to establish the

existing land use pattern to optimize the land use as well as minimize degradation due to the

developmental activities. Also it is necessary to the landform of the project site and the quality of the

soil as soil erosion further deteriorates the quality of the land. Soil erosion can be prevented by

following methods:

Planting vegetation which stabilizes the soil and prevent erosion.

Applying a layer of mulch/fertilizer to the soil top which allows the soil to slowly soak up water,

protects against rain impact.

Using Geotextiles which helps in stabilizing soil.

Page 59: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 52

3.4.5.1 Topography

The landform of the project site is a plain land with average elevation of about 99.25 m-100.25 m. The

land environment is described by landuse / landcover of the study area within 10 km radius and soil

environment of the study area within 5 km radius.

3.4.5.2 Land Use Description

The land use / land cover of the project site was done to identify the land use pattern and land cover

pattern of the study area. The study of land use in the area enables one to know about the land that can

be used for various development activities envisaged in post project scenario. It also enables to envisage

the scenario emerging due to the increase in demand for land with increase in population and the

impacts arising due to the interface with the various project activities.

Objectives of the Study

The objectives of the present study are:

To map the study area with respect to various land use/land cover change over the past 10 years.

To identify the sensitive areas within 10 km radius around the project site.

Methodology

The land use / land cover pattern has been established based on the analysis of the data received from

satellite imagery by making land use/land cover map with the help of GIS technique. References have

been taken from Survey of India. Also the data based on Census of India, 2001 was referred and landuse

study was done within 10 km radius area with limited ground truth verifications. Ground and ancillary

information have been used to identify the sensitive places within 10 km radius of the project.

Land Use Pattern Classification and description

The classification of landuse / landcover pattern of the study area is mainly dominated by the types -

agricultural land, waterbodies, canals, settlements or cultural use, and etc. The agricultural land covers

the majority of the land which is about 74.49% of the study area. The land use data are presented in

Table 3.9 and also highlighted with a pie chart at Figure 3.3. The landuse /land cover map is presented

in Annexure VIII.

Page 60: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 53

Table 3.9: Land use pattern of project area within 500 mtrs

LAND USE CLASS AREA (Ha)

Settlement 6,465.6

Water Bodies 35.16

Vegetation 24.7

Forest 114.22

Open Scrub 11,306.42

Open Land 1,318.8

Agricultural Land 13,287.35

TOTAL 32,552.25

Figure 3.3: Land Use Patten of the Project Site within 10 km

Topography:

Slope form: Contour plan shown that land is flat land with highest RL 100.25 and Lowest RL

99.25. Project will not cause any change in natural slope.

Landform and Terrain analysis: According to the study of 10 km radius around the project in

topographical map of scale 1:10000, it was found that 40.82% is Agriculture, 19.86% is settlement,

0.11% is water bodies, 0.08% area is vegetation, 0.35% is forest, 34.73% is Open scrub & 4.05% is open

land. Complete details are given in Figure 3.3 above. Project site is a vacant land.

Page 61: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 54

Soil:

Soil formation is influenced mainly by climate, geology, relief and other biotic interactions. To assess

the soil quality of the proposed area, following stations were selected. Soil profile and quality was

studied at 3 different locations.

The composite soil samples were collected from different location and were analyzed for

characterization. The locations of the monitoring sites are depicted in Table 3.8 (a), Monitoring maps

are attached as Annexure VI and the results of the monitoring and analysis is presented in the Table

3.10 (c).

Table 3.10(a): Soil Sample Collection Points

Location No. Sample collected from Direction Distance (km)

SQ- 1 Project Site Center Zero

SQ- 2 Ullahawas ENE 1.05 km

SQ- 3 Medawas SW 1.21 km

Methodology

The soil samples were collected in the April, 2015 from 3 locations as given in above Table 3.10(a). At

each of these locations 3 sub-locations were identified randomly from where soil was collected from up

to 30 cm below the surface. The final 5 samples represent homogenously mixed soil from these 3 sub-

locations for each location. The samples were filled in polythene bags, labeled in the field with number

and site name and sent to laboratory for analysis. Table 3.8(b) gives the idea of the frequency and

methodology of selection of soil sampling stations and monitoring process.

Table 3.10(b): Frequency and Methodology for Soil Sampling & Monitoring:

Particulars Details

Frequency Once during the Study Period

Methodology Grab samples of the topsoil were collected from 3 depths, at particular locations

and all samples are mixed to provide a representative sample for analysis. They

were stored in airtight. Polythene Bags and analyzed at the laboratory.

*Grab sample- a single sample or measurement taken at a specific time or over as a short period as

feasible.

Page 62: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 55

Table 3.10 (c): Soil Quality Data

Group Housing Project at Village Nangli Umarpur, Sector-62,Gurgaon by M/s EMAAR MGF Land Ltd.

Soil Quality Data-April-2015

S.No Parameter Unit SQ-1 SQ-2 SQ-3

Project Site Ullahawas Medawas

1 Texture - Sandy loam Sandy Clay loam Sandy loam

Sand % 62.3 52.8 60.3

Silt % 19.4 25.9 20.2

Clay % 18.3 21.3 19.5

2 pH (1:2) - 7.69 8.32 7.89

3 Electrical Conductivity (1:2) µmhos/cm 365 536 398

4 Cation exchange capacity meq/100 gm 13.3 16.3 15.3

5 Exchangeable Potassium meq/100 gm 0.29 0.35 0.31

6 Exchangeable Sodium meq/100 gm 0.58 0.79 0.86

7 Exchangeable Calcium meq/100 gm 9.5 11.1 10.8

8 Exchangeable Magnesium meq/100 gm 2.9 4.1 3.3

9 Sodium Absorption Ratio - 0.74 0.91 1.02

10 Water Holding Capacity % 24.1 29.2 26.5

11 Porosity % 42.1 37.2 39.1

12 Permeability cm/hrs 2.2 1.7 1.9

13 Total kjehdahl Nitrogen % 0.037 0.043 0.039

14 Phosphorus(Olsen’s) mg/kg 6.5 10.2 7.8

15 Organic Matter % 0.28 0.34 0.31

16 Bulk Density gm/cc 1.34 1.28 1.32

Page 63: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 56

GHP Sector-62 Vill-Nangli Umarpur.Gurgaon.HR

Soil Quality Data-April-2015

S.No Parameter Unit Soil Depth(SQ-1) Project Site

0-15 cm 15-30 cm 30-60 cm 60-100 cm

Texture - Sandy Loam Sandy loam sandy clay Loam sandy clay Loam

1 Sand % 68.1 62.3 60.3 56.8

2 Silt % 16.5 19.4 18.6 20.5

3 Clay % 15.4 18.3 21.1 22.7

Page 64: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 57

GHP Sector-62 Vill-Nangli Umarpur.Gurgaon.HR

Soil Quality Data-April-2015

Soil Quality Data (SQ-2) Ullahawas

S.No Parameter Unit Soil Depth

0-15 cm 15-30 cm 30-60 cm 60-100 cm

Texture -

sandy loam Sandy Clay loam

sandy clay

Loam

sandy clay

Loam

1 Sand % 60.8 52.8 56.8 50.9

2 Silt % 20.4 25.9 21.4 25.6

3 Clay % 18.8 21.3 21.8 23.5

Page 65: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 58

GHP Sector-62 Vill-Nangli Umarpur.Gurgaon.HR

Soil Quality Data-April-2015

S.No Parameter Unit Soil Depth(SQ-3) Medawas

0-15 cm 15-30 cm 30-60 cm 60-100 cm

Texture - sandy loam Sandy loam sandy Clay Loam sandy clay Loam

1 Sand % 66.7 60.3 57.6 54.8

2 Silt % 15.5 20.2 22.1 21.8

3 Clay % 17.8 19.5 20.3 23.4

Page 66: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 59

Result:

Results are summarized in Table 3.10 (c); the result shows that texture of the core is sandy loam. The

results of buffer zone show that texture is Sandy loam. pH ranges from 7.69– 8.32. The amount of

available Potassium is between 0.29-0.35 meq/100 gm. Results of soil quality is enclosed as Annexure

VII.

3.4.6 Biological Environment

3.4.6.1 Biological Environment

Literally environment stands for the totality of surrounding conditions. Animals and plants form a vital

part of this sum total. Flora and fauna of an area are inter-related to each other and have a very crucial

impact on human life. With changes in environmental conditions, structure, density and composition of

plants and animals undergo changes as well. The present study was carried out in two separate headings

for floral and faunal community. The aspects to be covered in the study for the project are given in

Table 3.11.

Page 67: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 60

Table 3.11: Aspects to be covered in the study for the Project

Aspect of Environment Likely Impacts

A. Terrestrial Ecology Impacts on terrestrial flora and fauna

Impacts on wildlife

Impacts on socially/economically/genetically/

biologically important project species

B. Aquatic Ecology Impacts on aquatic fauna/flora

Impacts on spawning and breeding grounds for aquatic

species

The relevant environmental impacts out of the entire gamut of issues outlined in the Table 3.11 were

identified. For these impacts or aspects, environmental baseline data has been collected from

primary as well as secondary data sources. As a part of the study, detailed field studies on various

aspects were conducted. The baseline status has been ascertained for the following aspects:

3.4.6.2 Biological Environment: Terrestrial Ecology/Aquatic Ecology

The information presented in this Chapter has been collected through field studies, consultation

with various government departments and collation of available literature with various institutions

and organizations. The summary of data collected from various sources as a part of the EIA study is

outlined in Table 3.12

Table 3.12: Summary of data collected from various sources

Aspect Mode of data

collection

Parameters

monitored

Frequency Source(s)

Terrestrial

Ecology

Primary secondary and

field survey

Floral and Faunal

Inventory/

Importance

One

Season

(Summer)

Field studies,

Forest

Department and

literature review

Aquatic Ecology Primary and secondary Presence of

various

species/Importance

One

Season

(Summer)

Field studies,

Forest

Department and

literature review

A. Floral Community:

The study area was divided into two zones as given below;

i) Core Zone: within the project area.

Page 68: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 61

ii) Buffer Zone: (A) 100 m radius around the project site.

(B) 10 km radius around the project site.

General Vegetation Pattern:

The prevailing vegetation cover over the area is mainly of tropical dry deciduous forest as per the

Champion and Seth (1968) “Classification of forest type of India”.

i) Core Zone: There was no vegetation within the core zone. Only a few species of Parthenium,

Acacia nilotica and Cynodon dactylon were seen.

ii) Buffer Zone:

In 100 m radius around the project area:

The list of plants recorded in Buffer Zone (100 m Radius) is given in Table 3.13(a).The vegetative

community of the area is mainly under open scrub forest and because of urbanization area is usually

surrounded with planted varieties. The dominant species are Japanese maples (Acer palmatum), Trident

maples (Acer buergerianum), neem (Azadarachta indica), Gulmohar (Cassia sp.), Safeda (Eucalyptus),

Carrot grass (Parthenium sp.), etc. The prominent grass is Cynodon dactylon.

No threatened, rare, endangered or endemic species were observed during the survey in this Buffer Zone

(100m radius around the project area).

Table 3.13(a): List of Plants in Buffer Zone (100 m Radius)

S. No. Local Names Botanical Names

1. Neem Azadirachta indica

2. Safeda Eucalyptus

3. Dhatura Datura sp.

4. Amaltas Cassia fistula

5. Carrot grass Parthenium sp.

6. Gulmohar Cassia sp.

7. Japanese maples Acer palmatum

8. Trident maples Acer buergerianum

In 10 km radius around the project site:

The list of plants recorded in Buffer Zone (10 km Radius) is given in Table 3.13(b). There is no

protected forest area in this zone. The vegetative community of the area is mainly under open scrub

forest and because of urbanization area is usually surrounded with planted varieties. The dominant

species are, Neem (Azadirachta indica), Gulmohar (Cassia sp.), Safeda (Eucalyptus), Carrot grass

(Parthenium sp.), Amaltas (Cassia fistula), Dhatura (Datura sp.), Arandi (Ricinus communis),

Page 69: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 62

Bougainvellia, Peepal (Ficus religiosa), shisham (Dalbergia sissoo), bottle palm, bottle bush

(Callistemon lanceolatus), etc. The prominent grass species is Cynodon dactylon.

Table 3.13(b): List of Plants in Buffer Zone (10 Km Radius)

S. No. Local Names Botanical Names

1. Neem Azadirachta indica

2. Safeda Eucalyptus

3. Dhatura Datura sp.

4. Arandi Ricinus communis

5. Peepal Ficus religiosa

6. Bougainvelia Bougainvelli

7. Bottle palm Beaucarnea recurvata

8. Amaltas Cassia fistula

9. Shisham Dalbergia sissoo

10. Bottle brush Callistemom sp.

11. Carrot grass Parthenium sp.

12. Gulmohar Cassia sp.

13. Oak Quercus sp

14. Japanese maples Acer palmatum

15. Trident maples Acer buergerianum

Agricultural land

The Irrigation facility is proper in the study area, thus, wheat, chana , sarson, ragi, jowar and maize

are the main crops grown in the area. Other crops, which are grown, are Moong, Cajanus, Til, etc.

Where watering facility is available seasonal vegetables are also grown.

Waste land

Wasteland is commonly seen in the area, and is mostly covered with species like Lantana spp,

Ipomea spp, Calotropis procera, Cassia tora, Parthenium spp., Zizyphus spp., Argemone spp. etc.

Grassland

Grassland in the study area is secondary in origin. The common species found in the

area are Euphorbia spp. Desmodium spp., Cynodon dactylon, Cyperus spp., Ipomoea spp. etc.

Page 70: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 63

Vegetation in and around human settlement

Near villages the vegetation pattern changes from rest of the area. The common species grown near

villages are Mangifera indica, Madhuca indica, Sizygium cumini, Bambusa sp., Azadirachta indica,

Delonix regia, Tamarinds indica, Eucalyptus spp. Ficus religiosa, etc.

Avenue trees and projection

The roadside along in the study area are projected with trees in single to double rows. The

common trees are Azadirachta indica, Syzigium cumini. Mangifera indica, Delonix regia, Cassia fistula,

Eucalyptus spp., Saraca asoca etc.

Agricultural crops

Land at some places is used for agriculture purpose. The main crops are maize, bajra, Chana, Sarson,

jowar, ragi, and vegetables. No threatened, rare, endangered or endemic species were observed during

the survey in Buffer Zone (10 km radius around the project area).

B. Faunal Community:

A general faunal study was carried out for the core zone and buffer zone separately as given below;

(i) Core Zone: There was no unique faunal community within the core zone of the project site

(ii) Buffer Zone: In 100 m radius around the project site:

The species observed in Buffer zone (100 m around the project area) are given in Table 3.13(c). No

threatened, rare, endangered or endemic species were observed during the survey in Buffer Zone (100 m

radius around the project site).

Table 3.13(c): List of Species in Buffer Zone (100 m Radius)

Sl. No. Local Names Zoological Names

Amphibians

1. Toad Bufo sp

2. Frog Rana tigrina

Reptiles

3. Indian garden lizards Calotes versicolor

4. house lizards Hemidactylus sp.

Mammals

5. Indian palm squirrel Fumambulus pennanti

6. Cat Felis sp.

Page 71: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 64

Sl. No. Local Names Zoological Names

7. Dog Cuon sp

8. Cow Bos sp.

9. Rat Rattus rattus

Aves

10. Crow Corves splendens

11. Sparrow Passer domesticus

12. Baya Ploceus philippinus

13. Parrot Psittacula krameri

In 10 km radius around the project area list of species observed in this buffer zone is given in Table

3.13(d).

Table 3.13(d): List of Species in Buffer Zone (10 km Radius)

Sl. No. Local Names Zoological Names

Amphibians

1. Toad Bufo sp.

2. Frog Rana tigrina

Reptiles

3. Indian garden lizards Calotes versicolor

4. House lizards Hemidactylus sp.

Mammals

5. Indian palm squirrel Fumambulus pennanti

6. Cat Felis sp.

7. Dog Cuon sp.

8. Cow Bos sp.

9. Horse Equs sp.

10. Rat Rattus rattus

Aves

11. Crow Corves splendens

12. Sparrow Passer domesticus

13. Baya Ploceus philippinus

14. Parrot Psittacula krameri

15. Peafowl Pavo cristatus

16. Pigeon Columba livia

17. Egretta Egretta sp

18. Myna Acridotheres tristis

Page 72: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 65

C. Protected Areas

Asola Wildlife Sanctuary lies at a distance of 12 km from the project site.

D. Wild life and avifauna

Methodology

Detailed survey was conducted to evaluate faunal composition of the study area (core and buffer zone)

within the project area. Primary data like faunal composition was recorded during site visit and

secondary data was collected from the Forest department to get the correct picture of the study area. The

major portion of the study consists of agricultural field and human settlements which support wildlife

habitat insignificantly.

The survey methods used for faunal assessment are:

1. Walkthrough method

2. Direct Count Method- birds, mammals

The major part of the study area lies under agriculture field and human settlements which restricted the

wildlife habitat significantly. Most of the mammalian species reported in the study area are common

fox, and Indian hare. There is neither any wildlife sensitive area nor any corridor for the movement of

wildlife present in the study area. There are many small ponds present in the buffer zone of study area

which are the major attraction sites for avifauna. Common Maina, Kingfisher, Spotted dove, Pintail and

Pond Heron are some dominant bird species present in the study area. There is no information regarding

migratory movement of birds in the study area. As far as the reptiles community was concerned, Krait

and house lizard are reported from the study area.

3.8.3 Aquatic life

The Phytoplanktons in the lakes are basically dominated by filamentous forms. The dominant ones are

Chaetophora sp., Cladophora sp., Spirogyra sp. The Zooplanktons are basically dominated by

Crustaceans and Rotifers.

3.4.7. SOCIO ECONOMIC IMPACT ASSESSMENT

3.4.7.1 Background

Socio-Economic Impact Assessment (SEIA) refers to the systematic analysis of various social and

economic characteristics of the human beings living in a given geographical area during the period of

study. The geographical area is called Study Area or Impact Area. SEIA is carried out separately but

Page 73: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 66

concurrently with Environment Impact Assessment (EIA). The study area consists of core and buffer

area encircling the project area. The Socio-Economic Impact Assessment focuses on the likely effect of

the project on social and economic well-being of the community. The impact may be direct or indirect,

positive or negative.

In this part of the EIA report an attempt has been made to assess the Socio-Economic Impact of Group

Housing Colony Project located at Village Nangli Umarpur, sec-62, District Gurgaon in the state of

Haryana.

OBJECTIVES OF SEIA

The prime objective of the current study is to assess the likely impact of the proposed project on socio-

economic characteristics of people living in the study area. Further, it is to be established whether the

impact would be direct or indirect. Furthermore, it is to be examined whether the said impact would be

positive or negative. Lastly, it is to be comprehended if the impact is positive how long it would sustain

or if it is negative how soon the same could be eased.

SCOPE

The Scope of the study is as follows:

a) To collect baseline data of the study area

b) To comprehend socio-economic status of the people living in the study area.

c) To assess the probable impact of the project on social and economic aspects in the study area.

d) To evaluate the likely impact of the project on Quality of Life of the people living in the study area.

e) To ensure sustainability of the positive impact.

f) To suggest mitigation measures and agency responsible for taking action in case of adverse impact.

METHODOLOGY

For Socio-Economic Impact Assessment of the project, GRC India carries out systematic analysis of the

various socio-economic characteristics, both in terms of quality and quantity. Accordingly, both

qualitative and quantitative data was collected from secondary sources. The secondary data was

Page 74: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 67

collected from the published data/information of the Census Authority. Records of the state and district

administration were also referred to.

For collection of primary data, a sample survey was conducted in the study area. In each selected

habitation (village/town), a specified number of representative households were selected scientifically

for collection of information through face to face interview with head of the household or any

responsible member of the family.

Census-cum Sample Survey in the Core Area

As the likely impact of the project will be greatest in the core area and it diminishes progressively when

move away from the core area to the periphery of the study area, a Census-cum-Sample Survey was

conducted in the core area for the collection of socio-economic data.

It is treated as a Census Survey because all the villages/towns located in the core area were surveyed for

the collection of information. Further, in each village/town a household survey was conducted by

drawing representative samples from a list of households prepared. Since, collection of information from

all the households in a village/town is time consuming and expensive, the Sample Survey approach was

adopted for collection of information from the selected households in the villages/towns.

Sample Survey in the Buffer Area

In the buffer area, where the impact of the project progressively reduces with the distance from the

project area, Sample Survey was conducted for the collection of data.

Sample Design

Two-Stage Sampling Design was adopted in the study area. The First Stage Units were Census

villages/towns and the Ultimate Stage Units were households in the selected villages/towns.

Sample Size

The sample size at each level (village and household) was decided by using the formula = √ {(1.96

*σ)/Δ}; where n= Sample size, 1.96 is the Table Value of Confidence Limit, σ = Standard Deviation

and Δ = Degree of Precision.

Selection of First Stage Units (Villages/Towns)

Page 75: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 68

In buffer area the sample villages/towns were selected from the list of Census villages/towns by

adopting the method of Probability Proportional to Size (PPS), the size being number of households in

a given village/town.

Selection of Ultimate Stage Units (Households)

The sample households were selected from the list of households by adopting the method of Circular

Systematic Sampling. This method was adopted since the sampling frame i.e. the complete list of

households was readily available.

SURVEY INSTRUMENTS

The following Schedules/Questionnaires were developed for collection of Primary data:

Questionnaire-1A: Village Particulars

Questionnaire-1B: Town Particulars

Questionnaire-2: Household Particulars.

Each Questionnaire is divided into several blocks and there are both open-ended and closed-ended

questions.

CHRONOLOGY OF VARIOUS STEPS TO PREPARE THE SEIA REPORT IS AS UNDER:

Page 76: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 69

STUDY AREA

There are 54 identified habitations in the study area which are distributed in rural area and various

municipal wards and colonies of the urban areas of the study area. All the habitations are spread over in

several sub-districts viz., Pataudi, Gurgaon, Farrukhnagar, Manesar and Sohna of district Gurgaon in the

state of Haryana.

The Land Use Pattern of the Study Area is given in the table below:

It may be seen from the above table that 68.4 per cent of the total geographical area is cultivable land,

12.4 per cent is cultivable waste and the remaining 19.2 per cent is the ‘Area not available for

Cultivation’. Of the total cultivable land, 84.6 per cent is irrigated land and the remaining 15.4 per cent

is un-irrigated land.

BASELINE DATA

The baseline data with respect to population and basic amenities in the study area is as under:

Table 3.14: Land Use Pattern of the Study Area

S. No. Land Use Pattern % to the Total

1. Cultivable Land 68.4 (100.0)

2(a). Irrigated Land (84.6)

2(b). Un-irrigated Land (15.4)

3. Cultivable Waste Land 12.4

4. Barren/Fallow Land/Area not available for

Cultivation

19.2

Total 100.0

Page 77: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 70

I. DEMOGRAPHIC PARTICULARS/POPULATION DETAILS:

Table 3.15: Demographic Particulars/Population Details of the Study Area

S. No. Description Number % to Respective

Total

1

Gender wise Total Population 1161146 100.0

Male 629499 54.2

Female 531647 45.8

Sex Ratio 845

2

Gender wise Total Population (0-6

age group)

151811 100.0

Male 82581 54.4

Female 69230 45.6

Sex Ratio 838

3

Total Population of Scheduled Caste

Community

127214 100.0

Male 67378 53.0

Female 59836 47.0

Sex Ratio 888

4 No. of Households 259224

Average Household Size 4

5

Total Population of General

Community (including OBC)

1033932 100.0

Male 562121 54.4

Female 471811 45.6

Sex Ratio 839

Page 78: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 71

6

Total Literates 871260 100.0

Male 496030 56.9

Female 375230 43.1

Overall Literacy Rate 86.3

Male 90.7

Female 81.1

Gender Gap in Literacy Rate 9.6

7

Total Workers 425167 100.0

Male 341860 80.4

Female 83307 19.6

Gender Gap in Work Participation Rate 60.8

8

Total Main Workers 394524 100.0

Male 322928 81.9

Female 71596 18.1

Gender Gap in Work Participation Rate 63.8

9

Total Marginal Workers 30643 100.0

Male 18932 61.8

Female 11711 38.2

Gender Gap in Work Participation Rate 23.6

10

Total Household Industrial Workers 15099 100.0

Male 11886 78.7

Female 3213 21.3

11 Total Agricultural Workers 27832 100.0

Male 21166 76.0

Page 79: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 72

Source: Census 2011

II. BASIC AMENITIES:

Table 3.16: Basic Amenities Available in the Study Area

1. EDUCATION

Educational Institutions

Type

Primary School

Middle School

Secondary School

Senior Secondary School

2. HEALTH

Health Institutions Allopathic Dispensary

Homeopathic Dispensary

Female 6666 24.0

12

Total Cultivators 16841 100.0

Male 12786 75.9

Female 4055 24.1

13

Total Agricultural Labour 10991 100.0

Male 8380 76.2

Female 2611 23.8

14

Total ‘Other Workers’ 382236 100.0

Male 308808 80.8

Female 73428 19.2

Page 80: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 73

Maternity Home

Child Welfare Center

Primary Health Centre

Primary Health Sub-Centre

Family Welfare Centre

Subsidized Medical Practitioners (SMP)

3. WATER

Drinking Water

Means of Drinking Water Available

Tap

Hand pump

Tube well

Well

4. ELECTRICITY

Electricity Supply

Type of Electricity Available

Power for Domestic Uses

Power for Agriculture Uses

Power for Other (Industrial) Uses

5. ROAD

Approach Road

Types of Road (s) Available

Paved Roads

Mud Roads

Foot Roads

Source: Desk Research

Page 81: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 74

SOCIO-ECONOMIC IMPACT OF THE PROJECT

Impact on Demographic Composition

The proposed project will make some change in the demographic composition of the study area as the

additional estimated population of 2,985 including staffs, visitors and residential population increases

after the completion of the project. Whereas the people recruited for providing employment will be met

locally to the maximum extent.

Hence, there is possibility of in-migration of people from outside the study area. Accordingly, there will

be some variation in the total population of the study area including that of sex ratio, when the project

completed.

Employment Opportunities

The proposed project will provide employment to the local people. Indirect employment is also expected

due to the associated activities. It is a positive impact of the project since it will provide employment

opportunities to the local people.

Impetus to Trade & Business in Construction Materials

The proposed project will give much impetus to trade & business on construction materials in the

nearest market to the project area. It is expected that trading and business will flourish on various

construction materials namely coarse sand, fine sand, stone aggregate, cement, reinforcement steel,

pipes, bricks, conduit pipes, PVC overhead tanks, glaze & floor tiles, hardware, stainless sinks etc.

Impetus to Infrastructure Development

The project will pave the way for various infrastructure developments that includes roads, parks, play

grounds, schools, hospitals, bus shelters etc. This is a positive impact which will create further

employment opportunities for the local people.

Impact on Agriculture

There will be no negative impact on agriculture as no cultivation is taking place on the proposed area

and the area is likely to be free from annual floods, which destroy standing crops land and property. This

Page 82: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 75

is a positive impact of the project.

Impact on Road Development

Movement of heavy vehicles to & fro the project site is expected during the construction period. Hence,

there is good scope for road development in the project area. Adequate parking space within the project

site will be developed for loading & uploading of materials.

There shall also be adequate parking provisions for visitors so as not to disturb the traffic and allow

smooth movement at the site.

Impact on Law & Order

As most of the workers to be employed in the proposed project are local residents no law & order

problem is envisaged. It is expected that the workers will attend to their duties from their residence and

return to their homes after the day’s work. However, to meet any untoward incident one police post may

be set up close to the project site.

Impact on Health

There are no chances of any major diseases due to the construction work. However, to meet any

emergency few safety measures are outlined below:

a) Safe Working Environment: The project proponent shall ensure health and safety of all the

employees at work. All efforts will be made to provide and maintain a safe work environment and

ensure that the machinery and equipment in use is safe for employees. Further, it will be ensured that

working arrangements are not hazardous to employees.

b) Provision of First Aid: In case of any accidents arising out of the proposed construction works,

timely and prompt first aid treatment is, often, the most important tool. Suitable first aid

arrangements shall be made at the site for rendering immediate first aid in case of any injury. The

first-aiders will be well trained in handling patients working in the project.

c) Regular Medical Examination: For all construction workers, medical examination will be made on

regular basis.

d) Health Education: Adequate health education and information related to the work will be provided

to the workers so that their health and safety can be ensured.

Page 83: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 76

e) Tie-up with the Nearest Hospital for Medical Assistance: To meet the medical needs of the

construction workers in case of accidents, tie-up with nearest hospitals will be made. Efforts will be

made to reserve a few beds in the said hospitals for the workers to meet any emergency. This will

ensure timely medical aid to the affected persons.

f) Supply of Mask and Gloves: The workers exposed to dust will be provided with dust masks to

prevent them from getting affected by respiratory diseases. Gloves will be provided to workers

working with hand tools, to ensure safety of their hands.

g) Special Telephone Number: A special telephone number will be made available to the workers in

case of emergency so that they can dial the same in case of any accident.

CORPORATE SOCIAL RESPONSIBILITY:

As per the section 135 of the Companies Act, 2013 Corporate Social Responsibility (CSR) is mandatory

part of any development project.

As per the guidelines issued on dated 27th

Feb, 2014 (Schedule-VII) by the Ministry of Corporate

Affairs, Government of India the suggested ten major CSR activities by giving importance to the

corporate philosophy with the objective to improve the quality of life and socio-economic scenario with

special attention to the people residing in the study area are given below:

I. Hunger, Poverty and Malnutrition, Promoting Preventive Health Care & Sanitation and making

available Safe Drinking Water

II. Promoting Education, including Special Education and Employment Enhancing Vocation Skills

Especially among Children, Women, Elderly, and the Differently-Able and Livelihood

Enhancement Projects

III. Promoting Gender Equality, Empowering Women, setting up Homes and Hostels for Women

and Orphans, setting up Old Age Homes, Day Care Centers and such other Facilities for Senior

Citizens and measures for Reducing Inequalities faced by Socially and Economically Backward

Groups

IV. Ensuring Environmental Sustainability, Ecological Balance, Protection of Flora and Fauna,

Animal Welfare, Agro-forestry, Conservation of Natural Resources and Maintaining Quality of

Soil, Air and Water

Page 84: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 77

V. Protection of National Heritage, Art and Culture Including Restoration of Buildings and sites of

Historical Importance and Works of Art, setting up Public Libraries, Promotion and development

of Traditional Arts and Handicrafts

VI. Measures for the benefit of Armed Forces Veterans, War Widows and their Dependents

VII. Training to Promote Rural Sports, Nationally Recognized Sports, Paralympics sports and

Olympic sports

VIII. Contribution to the Prime Minister's National Relief Fund or any other fund set up by the Central

Government for socio-economic development and relief and welfare of the Scheduled Castes, the

Scheduled Tribes, other backward classes, minorities and women

IX. Contributions or funds provided to technology incubators located within academic institutions

which are approved by the Central Government

X. Rural Development Projects.

Based on the above suggested activities by the Government of India, the project proponent may set out

to do the following CSR activities by giving importance to their corporate philosophy in order to achieve

the objective to improve the quality of life and socio-economic scenario with special attention to the

people residing in the study area:

1. In support of Health-

Health Checkups and Medical Camps in the project village and other part of the study

area

Providing free medicines and medical equipments to the Primary Health Centers falling

under the study area

Providing financial assistance to building low cost sanitary facilities to the poor families

living in the study area

Providing financial assistance for installing Safe Drinking Water facilities for the people

living in the study area

2. In support of Education-

Spreading the light of Education by providing sponsorship or financial assistance to

underprivileged children and meritorious students

Providing uniforms and books to the school children

Page 85: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 78

Providing financial assistance to the schools for making play grounds for the school

children

3. In support of Agriculture & Agro-based Activities-

Promotion of Agro-based activities by providing financial backing to the farmers of the

study area for purchasing seeds, fertilizers and pesticides

4. In support of Skill Development-

Providing vocational training to the students and unemployed youths for up gradation of

technical & employment skills

Providing training to the women for self help to be self dependent and to improve their

skill and economic condition.

5. In support of Sports, Art & Culture-

Providing financial assistance for distributing sports goods and musical instruments to the

local clubs located in the study area

Organizing sports events and tournaments and providing financial assistance to the

eligible candidates for coaching and proper training.

6. In support of Rural Development-

Providing financial backing to the villages for their development by installing road side

Solar Lights

Providing financial assistance to the villages for constructing proper Drainage Facilities.

A certain part of budgetary amount (2% of the project cost) i.e., approximately Rs. 960

Lakh has been decided to spend during next five years after commencement of the project

in support of the above mentioned CSR activities.

The estimated budgetary allocation of the amount in the five years for these above activities is given in

the table below:

Table 3.17: Year wise allocation of the Fund for the various CSR Activities

S. No. Activities Allocation of Fund (Rs. Lakhs)

Year-I Year-II Year-

III

Year-IV Year-V Total

Page 86: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter III

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 79

1. In support of Health 32.0 32.0 32.0 32.0 32.0 160.0

2. In support of

Education

32.0 32.0 32.0 32.0 32.0 160.0

3. In support of

Agriculture &

Agro-based

Activities

32.0 32.0 32.0 32.0 32.0 160.0

4. In support of Skill

Development

32.0 32.0 32.0 32.0 32.0 160.0

5. In support of

Sports, Art &

Culture

32.0 32.0 32.0 32.0 32.0 160.0

6. In support of Rural

Development

32.0 32.0 32.0 32.0 32.0 160.0

Total 192 192 192 192 192 960.0

CONCLUSION

The Socio-Economic standard of people living in the study area will improve due to employment

opportunities created due to the project. This will lead to better quality of life and will also set a standard

for future development in the study area.

Due to the project, the infrastructure of the study area will improve by setting up of schools, hospitals,

bus shelters and by the development of roads, parks, play grounds etc. This will give a boost in the

quality of life of people of the study area.

In the study area, still there is scope of improving health and educational facilities. It is expected that

same will improve with opening of the project, implementation of the CSR Activities and associated

business activities.

The overall impact of the project is expected to be positive for the habitants of the area and the persons

associated with the project.

Page 87: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 80

CHAPTER-4

ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION

MEASURES

4.1 INTRODUCTION

This chapter discusses identification and appraisal of various environmental impacts due to

Group Housing Colony. Generally, the environmental impacts can be categorized as either

primary or secondary. The development, construction and functional phase of the project

comprise various activities, each of which may have some impact on environmental parameter.

Various impacts during the development, construction and operation phase on the environmental

parameters have been studied to estimate the impact on environment. Group Housing Colony

will be constructed and developed gradually in the time span of 2-3 years (approx.). In

development phase, basic infrastructure facilities like internal road, sewerage system, storm

water drainage, street lighting etc. will be developed.

For proper evaluation and assessment of the environmental impacts due to development,

construction and functional phase of project understanding to the various activities associated

with Group Housing Colony is essential. Various activities related to the project would be

different, in terms of nature during the development, construction and functional phase.

The impact identification and prediction process aims to:

Identify potential source or cause of impact through out the life of project.

Characterize the potential impacts affecting a target or receptor (physical, human and

socio-economic).

Assess the potential of changing likely-hood of impact through Environmental

Management Plan (EMP).

Prediction of the impacts due to the development, construction and functional activities

encompass the developmental processes to be undertaken during construction and functional

phases.

For each category of environmental receptor (such as, ambient air quality, water quality, soils,

land, etc.) the potential impacts of activities during development & construction and functional

phases have been identified. Pollution sources & its characteristics, the potential impacts and

magnitude of the impacts have been assessed and discussed in detail in following sub sections.

In each case, cognizance has been taken to mitigation measures inherited in the development &

construction and functional phase.

4.2 IMPACT MATRIX

Various activities from the Group Housing Colony project are likely to have some impact on the

environmental constituents during its construction as well as operational phase. The impact

assessment matrix given in Table 4.1 reveals the impact associated with each activity of the

project on various environmental parameters during construction and function phase respectively

Page 88: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 81

before any mitigation measures are implanted. To assess the severity of the impacts, they are

categorized as follows:

Page 89: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 82

Table 4.1: Impact Assessment Matrix of Project on environmental components

Environmental

Parameters

Nature of Potential Impacts during Construction and Operation Phases

Local Regional Short

Term

Long

Term

Reversible Irreversible Adverse Beneficial No

Impact

Significant Insignificant

Topography

√ √ √ √

Drainage

√ √ √

Soil

√ √

Water Resources

√ √ √ √

Water Quality

√ √

Land Use

√ √ √ √

Air Quality

√ √ √ √

Noise

√ √ √ √

Flora

√ √ √ √ √

Fauna

√ √ √ √ √

Employment

√ √ √ √ √

Aesthetic

√ √ √ √ √

Page 90: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 83

4.3 POLLUTION SOURCES

Pollutants generated in the development of Group Housing Colony project during both the

construction and functional phases are solid, liquid and gaseous in nature. Also the generation of

pollution could be continuous, periodic or accidental. Sources of pollutants and their

characteristics during the construction and functional phase are given below in Table 4.2.

Table 4.2: Pollutant Sources

SI. No. Activity /

Area Pollutant Sources Frequency

CONSTRUCTION PHASE

1. Site

preparation

and

construction

activities

Air emission-

SO2, & NO2.

Dust from

construction

activities and

excavation.

Particulates matter,

NO2 and CO from

vehicle exhaust

Temporary during

construction phase

only.

Bulk of the

emissions is

expected from

ground work and

leveling.

Earth/Solid waste

Solid waste from

construction

activity and

excavation.

Periodic.

Hazardous waste

generation such

as used oil and

paints.

From D.G. Sets and

painting of the

buildings.

Periodic and

temporary

Noise Noise generated

from construction

equipment and

machinery

Temporary lasting

the construction

phase.

2. Labour

Camps

Sewage Sewage generated

from temporary

labor camps on site.

Temporary-during

the initial

construction phase

Solid Waste Solid Waste

generated from

temporary labor

camps on site.

Temporary- during

the initial

construction phase

Page 91: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 84

SI. No. Activity /

Area Pollutant Sources Frequency

OPERATIONAL PHASE

1. Vehicular

movement

Air emissions and

noise

Vehicle exhaust

emissions

Continuous/

periodic

2. Diesel

generators

Air emissions SO2, NO2, PM, CO

from fuel burning

Occasional- during

power failure

Noise Noise due to

running of

equipment

Occasional - during

power failure

Hazardous Waste Used Oil

Generation

Occasional- during

oil changes

3. Maintenance /

House-

keeping

Sullage Floor washing

Sewage

Continuous

Solid waste Residential,

Commercial and

garden wastes

Continuous

4. Vehicle

Parking

Oil spills Minor oil leaks

Parking space

Continuous

5. Storm water

drains

Rainwater Contamination

discharge from site-

mainly suspended

solids

During rainy

season

4.4 IMPACT IDENTIFICATION

The areas of environmental concerns for which the impacts and their predictions are taken into

consideration are mainly:

Air Environment

Water Environment

Noise Environment

Land Environment

Biological Environment

Socio economic Environment and

Aesthetics Environment

The impacts can be further categorized as positive impacts and negative impacts depending upon

their nature, potential and magnitude.

Page 92: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 85

4.4.1 Environmental Aspects of Development & Construction Operations

Generation, storage and disposal of construction wastes;

Noise pollution due to plant, machinery, equipments and vehicle movement;

Air pollution due to plant, machinery, equipments and vehicle movement;

Generation and disposal of sullage;

Impact on ecology;

Consumption of resources such as water, electricity, and diesel.

Physical change in landscape due to earth work excavation and related activities.

Soil erosion caused due to loss of vegetation and other construction activates.

4.4.2 Environmental Aspects of Building Planning and Use

Impacts identified during operation of the Group Housing Colony and their use includes major

concerns such as:

Disposal of domestic (sewage) effluent generation

Disposal of solid wastes generated in the Group Housing Colony project from house,

commercial and horticulture

Increase in noise levels due to transport

Consumption of water and impact on water resources

Impact on traffic on the road

Storm water during rains

Management and maintenance project

Environmental aspects of the project are not just limited to impact of sources of pollution but

also relate to energy conservation, water conservation and other issues, which are mentioned in

Table 4.3.

Table 4.3: Environment aspects of project other than source of Pollution

S.No. Area Aspect

I. Energy

conservation

Solar Heating, Day Lighting, Design Natural Ventilation,

Thermal Transfer value of Building Material, Energy Efficient

Building Services and Equipment,

Solar and CFL’s Lighting in Public Area.

Solar Street Lighting

II. Water

conservation

Reuse of Recycled Water

Gardening Water sources

Rainwater Harvesting

III. Internal Roads

and Accesses

Pedestrian Access Ramps for Disabled persons Road painting

and Signage Speed Breakers

IV. Material Use Construction Materials Selection

Paint Selection

Page 93: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 86

Use of Recycled Materials

Use of Timber

V. Aesthetics

during

functional Use

Clothes Drying Facilities

Visitors Parking

Playground for children

Service Roads for walking

Flower bed water disposal

Provision for Garden and Group housing

Maintenance Staff

VI. Facilities for

Building

complex

servants

Servant quarters

Rest Rooms with toilets for Security Persons.

4.5 ASSESSMENT OF ENVIRONMENTAL IMPACTS DURING DEVELOPMENT

AND CONSTRUCTION PHASE

4.5.1 Topography

Impact: Topography around the project is almost plain. Therefore, topography and

physiography of the area will not be affected during the construction and post construction phase

of the project. Hence, no significant impact is anticipated on the topography and physiographic

from project by M/s EMAAR MGF Land Ltd.

It is further proposed to maintain 30% of the total area as green through plantation of various

local and aesthetic species to improve the vegetation covers of the area.

Mitigation Measure: Since there is no significant impact on topography from the project, no

detailed mitigation measures are proposed. It is however proposed that apart from the proposed

plantation greens, turfing with local species will be carried out extensively.

4.5.2 Land Use Pattern

Impact: Group Housing Colony will be developed as per Gurgaon- Manesar Urban Complex

2021 which demarcates the project site as residential zone. Hence, no significant impact is

expected from the project which will be constructed after obtaining all necessary permissions.

4.5.3 Land Environment

Impact: At Group Housing Colony, soil would be excavated at project site for foundations of

residential, commercial and other purposes. During the disposal of redundant overburden, soil of

filling area would be covered and lost permanently.

The soil excavated during construction will be first temporarily stored in an area earmarked and

then shall be used to fill up low lying area in and around the project site and rest of the soil shall

Page 94: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 87

be transported by road to fill up low lying areas elsewhere. Proper drainage system shall be

provided to deal with the storm water in case of rain. The impact on soil during construction

phase will be marginal and reversible in the nature.

Mitigation: It is proposed to remove vegetative cover only from the specific site on which

construction is to take place and allowing minimal disturbance to the vegetation in adjacent

areas. Land clearing activities only confined to necessary areas. The top soil will be stripped

from constructional areas and stockpiled for later reuse in landscaping. The number, frequency

and area of movement of heavy machinery will also be restricted.

4.5.4 Water Environment

4.5.4.1 Ground water Quality

Impact: No hazardous chemical and material will be used in the development and construction

phase of Group Housing Colony. Debris and wastes generated during this phase will be collected

and disposed suitably. Therefore, possibility of contamination of ground water will be negligible.

Hence, no impact is anticipated on the ground water quality during the construction phase.

Mitigation: A well planned solid waste management plan will be followed during the

construction phase including timely collection, segregation and disposal as per legal

requirements.

4.5.4.2 Ground Water Hydrology

Ground Water Hydrology

Impact: In the area around the Group Housing Colony, rich aquifers are present. Water

requirement during construction phase will vary depending upon construction activities and will

be met by recycled water from STP. Water will be required for site preparation activities dust

settlement, consolidation, compaction and curing as well as building construction and drinking

water requirement. The requirement of construction water will not put sudden pressure on the

available ground water recourses of area. Therefore, impact on ground water resources will be

insignificant during construction of project.

Mitigation Measures: Although no significant impact is anticipated on the groundwater regime,

it is proposed to carry out the following to further minimize the demand on freshwater resources:

Curing water will be sprayed on concrete structures and free flow of water not allowed.

After liberal curing on the first day, all concrete structures will be painted with curing

chemical to save water to stop daily water curing hence save water.

Concrete structures will be covered with thick cloth/gunny bags and then water sprayed

on them to avoid water rebound and ensure sustained and complete curing.

Page 95: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 88

Ponds will be made using cement and sand mortar to avoid water flowing away from the

flat surface while curing.

Water ponding will be done on all sunken slabs. This will also highlight the importance

of having an impervious formwork.

4.5.5 Air Environment

Emissions Source: The potential sources of air emissions during the construction and

development phase of the project will be as follows:

Dust from earth works (during site clearance and preparation);

Emissions from power generator at site;

Emissions from the operation of construction equipment and machines;

emissions from vehicles running to site;

emissions during the unloading of material at the site;

emissions during mixing of cement with other building materials during development and

construction activities;

Air emissions other than dust arise from combustion of hydrocarbons. The pollutants of

concerns are NO2, SO2, CO, particulate etc.

Potential Impacts: Ambient air quality effects are normally assessed in relation to their

potential to cause;

Health deterioration and nuisance in local communities

Health deterioration amongst onsite workers

Assessment of the impacts from Dust Emissions: During the excavation of channels,

foundations, unloading of construction material, cement bags and mixing of cement with other

building materials such as brick and silica dust, wood dust, fugitive dust emissions may be

emitted at construction site. During construction, curtaining floors from all sides will be done to

prevent cement dust from becoming airborne. It may be noted that all the emissions will be in the

form of coarse particulate matter and settle down ultimately in closed vicinity of construction

site. Therefore, no significant impact is anticipated due to dust emission during development and

construction phase.

Assessment of the impact from Diesel Generators: Emissions from the D.G. Set during

construction phase may cause some localized impact on ambient air quality for short duration, as

it will be operated during power failure only. It may be noted that the D.G. Set power will be

used to operate construction equipment only if required. Adequate height of stacks and acoustic

erective will be provided to the D.G. Set as per guidelines of CPCB to facilitate the dispersion of

flue gases into the atmosphere.

Page 96: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 89

Mitigation Measures: It is proposed to provide adequate dust control systems in the form of

installation of batch plants, and loose material handling in covered sheds. Dust suppression

system is also to be provided where necessary. Provision for treatment of DG Flue Gas emissions

in a scrubber will be considered. It is further proposed to cover scaffolding, hosing down road

surfaces and cleaning of vehicles especially during the dry season. Avenue and curtain plantation

on the internal roads and peripheral plantation around the site will also be developed.

4.5.6 Noise Environment

During the construction phase of project, noise will be generated from the various sources. Some

major sources of noise generation at project site are listed here under:

Generation of noise during movement of vehicles carrying materials and loading &

unloading activities.

Generation of noise from excavation machines, concrete mixer and other construction

machines,

Generation of noise during the operation of D.G. Sets

Generation of noise during concreting, hammering, etc.

All the above-mentioned sources of development and construction activities at Group Housing

Colony would be intermittent and experienced occasionally. It may also be noted that the most

of the construction activities would be carried out only during the daytime.

The expected noise levels from various activities are given hereunder:

From vehicles bringing materials to the site 70 dB (A)

D.G. Set 85 dB (A)

Excavation 80 dB (A)

Concrete Mixtures 80 dB (A)

Hammering 85 dB (A)

Resultant Noise Level:

The combined effect of above sources can be determined as per the following equation:

Lp (total) = 10 log (10(Lpl/10)

+ 10(Lp2/10)

+ 10(Lp3/10)

+……..) ……. (1)

Where: Lp1, Lp2 and Lp3 are noise pressure level at a point due to different sources in dB (A). The

resultant maximum noise level for the above sources as calculated using equation (1) is 89.3 dB

(A).

For an approximate estimation of dispersion of noise in the ambient air from the sources point, a

standard mathematical model for sound wave propagation is used. The sound level generated by

noise source decrease with increasing distance from the source due to wave divergence. An

additional decrease in sound pressure level from the source is expected due to atmospheric effect

or its interaction with objects in the transmission path.

Page 97: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 90

For hemispherical sound wave propagation through homogenous loss of free medium, noise

levels at various locations can be calculated due to different sources using model based on the

first principles as per the following, equation:

Lp2 = Lp1 -20 log (r2) – 8 ………. ( 2 )

Where: Lp2 and Lp1 – Sound Pressure Level (SPLs) at points located at sources and at distance

of r2 from the source respectively in dB (A).

Assuming no environmental attenuation factors, noise modeling has been done, which shows

that noise level will be mingle with baseline noise level with in short distance. Noise modeling

results for construction phase have been given in Table 4.4.

Table 4.4: Noise Levels

NOISE QUALITY DATA April, 2015

S.No. PROJECT SITE ZONE LIMIT (as per CPCB

Guidelines), Leq,

dB(A)

Observed value

Leq, dB(A)

DAY* NIGHT* DAY* NIGHT*

1 Project site Residential Zone 55 45 40.2 38.4

2 Heritage School Silence Zone 50 40 42.3 38.5

3 Masonic Polyclinic Industrial Zone 75 65 56.4 43.5

4 Medawas Commercial Zone 65 55 63.7 40.3

5 Ullahawas Residential Zone 55 45 53.2 42.1

* Day time Leq (6.00 AM TO 10.00 PM)

Night time Leq (10.00 PM TO 6.00 AM)

The noise produced during, development and construction phase will have temporary impacts on

the existing, ambient noise levels at project site but restricted to small distance (maximum up to

4.3 km) and only during daytime. Therefore, the impact of noise levels on surrounding area will

be insignificant during the development and construction phase.

Mitigation: To minimize impacts of noise generation from construction activities, the workers

will be provided with ear muffs and other protection devices. D.G. Sets with proper acoustic

enclosure for controlling noise would be installed.

4.5.7 Terrestrial Ecology

Impact: There is no loss of forestland due to the construction of the Residential Group Housing

Colony. No tree felling is involved, as the site is devoid of vegetation.

Birds and other domesticated biodiversity observed near the project site are common and already

adapted to thrive in human - colonized habitats. The project will not have any major negative

Page 98: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 91

ecological impact. There is no forest near the project site and therefore there will be no effect on

the ecology of the area.

Mitigation Measures: However, it is to develop extensive green areas in the project site to

improve the aesthetics of the area which will also help in reduction of air pollution, noise

pollution and provide suitable habitat for local birds and animal species.

4.5.8 Economic Impacts

Impact: Relatively long-lived economic impacts of the development and construction phase are

likely to be experienced in local area for the duration of construction phase of 2 years as workers

make everyday purchases from local traders in near by areas. This is likely to give a short-lived

stimulus to the traders that may disappear as soon as the construction is complete. Noticeable,

flow-on economic impacts will be experienced in other sectors of economy as a result of

purchase of construction materials and the payment of wages and salaries to the personnel

engaged in the development and construction of colony. Once the development and construction

of residential project will complete, there will be some long-term positive impact on the

economic structure of the area. People in the area will get direct and indirect employment

opportunities and other benefits from the residents of Group Housing Colony. Therefore, overall

positive impact is anticipated on economy of the area due to development and construction

activity of the Group Housing Colony.

4.5.9 Socio-Economic

During the development and construction of Group Housing Colony, about 150 to 200 skilled

and semiskilled and unskilled workers per day will get direct employment opportunity, which

will have beneficial impact on the local people and improve socio-economic conditions of the

area.

4.5.10 Construction Camp

Impact: During the development and construction phase, most of the laborers will be from local

areas as Group Housing Colony will be developed gradually in the time span of about 2 years.

Therefore, laborer camps will be constructed to accommodate the laborers at the project site.

This may lead to sanitation problems in the absence of adequate facilities.

Mitigation: Suitable measures will be taken at the construction camps to mitigate anticipated

impacts due to temporary accommodation of laborers such as provision of clean drinking water,

adequate toilet facilities, water and solid waste disposal system.

Other safety precautions to be maintained at work site including provision of PPEs, guarding of

dangerous machine parts, maintenance of equipments as hoists and lifts etc, and adequate

provision of different types of fire extinguishers will be made. All applicable rules and

regulations pertaining to workplace health and welfare of workers will be adhered to.

Page 99: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 92

4.5.11 Solid Waste Management

Impact: The construction and demolition waste includes debris, concrete (often recycled and

reused at the site), steel and other metals, pallets, packaging and paper products, fluorescent

tubes, wood beams, joists, studs, baseboards, cabinets and cupboards, railings, brick, doors and

casings, interior windows, bathroom fixtures, light fixtures, ceiling grid and tile, furnishings,

replant trees, shrubs. All wastes generated during the construction phase shall be collected and

segregated for disposal as per the standard practice.

During the development and construction phase, some amount of debris, cuttings of construction

materials may be observed at construction site. However, the quantity of these waste materials

would be very small and limited up to the construction site only. There will be no contamination

due to this waste as it will be collected time to time during construction phase and disposed

accordingly.

Mitigation Measures: After due waste segregation, recyclable wastes will be sold off to scrap

dealers and vendors, while inert wastes will be disposed off in landfills. Hazardous wastes will

be disposed off as per the provisions of the Hazardous Wastes (Management & Handling Rules,

1989).

4.5.12 Transport Linkage and Traffic

Impact: During development and construction phase, construction labour and construction

materials bringing vehicles will approach the project site. The residential colony is well

connected to neighborhood, where public transport facility, like, buses and minibuses are easily

available in the area as transport linkage. During construction phase, some impact is anticipated

on the transport linkage of the area, however increase in traffic will not adversely affect the local

traffic pattern since the site is well connected by broad road and present traffic load on these road

are not significant.

Mitigation: Through careful planning, the movement of the heavy vehicles will be scheduled to

reduce load on existing traffic such that the peak hours are avoided. It shall also be ensured that

all the vehicles to the site will be provided with Parking space such that there is no waiting time

along the access roads.

4.6 ASSESSMENT OF THE ENVIRONMENTAL IMPACTS DURING OPERATION

PHASE

4.6.1 Land Environment

Impact: During the operation phase of the project, the soil may get polluted/ contaminated from

littering of various kinds of wastes generated within the site such as food items, paper, wood

Page 100: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 93

pieces, paints, pesticides, oil & grease etc. However, owing to the proposed solid waste

management system, no significant impact is anticipated.

Mitigation Measures: To ensure against any chances of soil pollution, it is imperative to

establish a well planned solid waste collection system covering all areas of the project site apart

from door to door for the residential units. An identified area shall be designated for storage and

segregation of the wastes which will be treated/ disposed as per their characteristics.

4.6.2 Water environment

4.6.2.1 Surface water hydrology

Impact: During the post construction phase, no water will be taken from surface water bodies in

the area. Further, adequate drainage will be provided at the project site to channelize the storm

water for rainwater harvesting.

The sewage effluents generated from the project will be collected through the sewer line network

provided in the project site for treatment in the Sewage Treatment Plant (STP), and the treated

wastewater reused within the site thereafter. Therefore, impact on the surface water hydrology

will be insignificant during the post construction phase.

Mitigation: It is proposed to provide rainwater harvesting across the project site. The roof tops

of buildings will also be connected to the rainwater collection system. This will not only reduce

the pressure of stormwater management system of the city but also recharge groundwater.

4.6.2.2 Ground water hydrology

Impact: During post construction phase, the total water requirement of the Group Housing

Colony is approx. 482 KLD out of which total domestic water requirement is 360 KLD. The

fresh water requirement is approx. 257 KLD (which is 70% of the domestic water demand). The

water will be supplied by HUDA. Therefore, no significant impact is anticipated on ground water

resources due to project.

Mitigation Measures: The rainwater harvesting will recharge groundwater aquifers from the

open areas as well as roof top of the buildings. Treated wastewater from the site will be recycled

for landscaping and flushing to further reduce demand on freshwater resources.

Water meters conforming to ISO standards should be installed at the inlet point of water uptake

and at the discharge point to monitor the daily water consumption. To further lower the water

consumption, options of Low flow flushing systems, sensor based fixtures, waterless urinals, and

tap aerators etc will be explored.

Page 101: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 94

4.6.2.3 Surface Water Quality

Impact: The sewage effluent generated from the Group Housing Colony will be collected

through the sewer line network provided in project and treated in Sewage Treatment Plants

(STP’s) of capacity STP of 240 & 135 KLD.

Mitigation Measures: As no significant impact is anticipated on the water bodies of the region,

no mitigation measures are suggested.

4.6.2.4 Ground Water Quality

Impact: The storm water from the site will be used for recharging groundwater resources after

adequate treatment of the storm water through oil, grease traps and filtration. The wastewater

from the site is proposed to be used for landscaping only after adequate treatment in Sewage

Treatment plant. Hence, no adverse impact is anticipated on the groundwater quality form the

project.

Mitigation Measures: The Group Housing Colony will be well maintained. Solid waste

management practices will be adopted and followed to prevent groundwater pollution through

leaching.

4.6.3 Air Environment

Impact: During the post construction phase, cars, scooter/motorcycle will be owned by the

population of Group Housing Colony. Vehicular emissions will be major source of air pollution

in addition to DG set. Quantum and dispersion of pollutants form vehicular emission will depend

upon the following:

Emission of pollutants from additional traffic on the roads due to the projects,

Meteorological conditions.

Emission sources from D.G. Sets.

From vehicular emissions, PM, NO2, SO2 and CO is pollutants of primary concern released from

traffic movement & DG sets. The dispersion of vehicular emissions would be confined within

300 m from the road and from the line source model it is observed that concentration will

decrease with the increase in distance from road. It is anticipated that the contribution of

vehicular emissions in ambient air quality will be marginal but well within the stipulated

National Ambient.

7 nos. of D.G. sets of total capacity 2,780 KVA (2 X 500 KVA + 2 X 320 KVA+3X 380 KVA)

will be provided for back up electricity supply during power failure. This will cause emission of

PM, SO2, NO2 and CO. However, since the D.G. sets will be operational only during power

failure and low sulphur diesel will be used; therefore, pollutants incremental load in the ambient

air environment will be expected to be minimal. However, an adequate stack height of D.G. Sets

Page 102: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 95

will be provided as per the stipulated guidelines of Central Pollution Control Board (CPCB) to

facilitate proper dispersion of exhaust gases as given below considering height of the building:

ISCST3 dispersion model was used to predict GLC caused by a single point source (3 stacks)

at each receptor of 100 m x 100 m of grid network covering total area of 2000 m x 2000m

around the proposed source with stack & emission values and 1-hourly meteorological data. It

was observed that SO2, NO2, Co and PM were significant pollutants released from the fuel of

the D.G. sets. Emission of PM, CO and SO2 were found insignificant with low values compared

to NO2. In this proposed project, NO2 was the worst affected pollutant released into the

atmosphere (Table 4.5). 24-h GLC were predicted for SO2, NO2, CO and PM but isopleth of

NO2 is only presented in the report as GLC of other pollutants were lower under similar

meteorological conditions.

Table 4.5 Pollution Source Details

Stack

No.

DG set

Capacity

(kVA)

Stack & Flue details Pollutants Emission

Height

(m)

velocity

(m/s)

Temp

(K)

Diameter

(m)

NO2

(g/s)

SO2

(g/s)

PM

(g/s)

CO

(g/s)

1. 2 x 500 91 25 773 0.414 2.63 0.146 0.05 0.612

2. 2 x320 91 25 773 0.29 0.67 0.83 0.013 0.453

3. 3 x380 91 25 773 0.31 1.96 0.96 0.036 0.512

Total Emission in g/s 5.98

1.936 0.099 1.577

Page 103: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 96

Table 4.6: Meteorological data for the 24-hour average maximum predicted Concentration

under worst meteorological condition

Year Month Day Hour Wind

Direction

Wind

Speed

Temperature(K)

2015 5 27 1 247.5 2.6 310

2015 5 27 2 247.5 2.6 309

2015 5 27 3 247.5 2.6 307

2015 5 27 4 247.5 2.6 307

2015 5 27 5 247.5 2.6 305

2015 5 27 6 247.5 2.6 305

2015 5 27 7 225 2.1 305

2015 5 27 8 247.5 2.1 307

2015 5 27 9 270 2.1 308

2015 5 27 10 270 2.6 311

2015 5 27 11 270 2.6 312

2015 5 27 12 270 3.1 313

2015 5 27 13 270 3.1 315

2015 5 27 14 270 3.1 317

2015 5 27 15 270 3.1 317

2015 5 27 16 302.5 5.7 318

2015 5 27 17 302.5 5.7 318

2015 5 27 18 302.5 5.7 318

2015 5 27 19 270 5.1 318

2015 5 27 20 302.5 3.6 315

2015 5 27 21 270 3.1 311

2015 5 27 22 270 3.1 310

2015 5 27 23 302.5 5.1 310

2015 5 27 24 315 4.6 309

Page 104: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 97

Figure 4.1: Wind rose

Spatial distribution of NO2 is shown in isopleth Figure 2. 24-h maximum value was 1.86 µg/m3 occurred

at the distance 1600 m East of the project site.

Page 105: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 98

Figure 4.2: Spatial distribution of 24-hours average NO2 concentrations (µg/m

3)

Mitigation Measures: In the group housing colony, green belt will be developed inside the

premises of the project site and along the internal road, which will work as barrier for the

movement of pollutants and help in pollution control.

4.6.4 Noise Environment

Impact: The main sources of noise from the project are running of D.G. Sets and vehicular

traffic. D.G. Sets will provide emergency electricity supply during power failure. This will be

intermittent and for short durations. The vehicles playing within the site will be mainly of the

residents and are hence not expected to cause unnecessary noise. Hence, during this phase, no

major impact on noise environment is anticipated.

Mitigation Measures: D.G. Sets will be fitted in acoustic enclosures to control the noise

generated within 25 dB (A) insertion loss or for meeting the ambient noise standard whichever is

on higher side as per E (P) Act, GSR 371 (E) and its amendments. Adequate personnel protective

Page 106: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 99

equipment (PPE) will be provided to the personnel engaged in D.G. Set room. The traffic noise

will diminish within a short distance from the source of origin. Honking within the site will be

discouraged. Proposed rows of plantation will further restrict the noise on other side of the

plantation i.e. outside the boundary.

4.6.5 Terrestrial Ecology

Impact: The project proposes 17,027.16 m2 of green area (30% of Total plot area) that will be

planted with local species with aesthetic appeal that will attract local bird and insect species. As

against the existing barren stretch of land, the project will add to the greenery and beauty of the

region.

Mitigation Measures: Various kinds of plantation such as curtain, avenue and ornamental

plantation and lawns will be started during the construction phase itself and maintained during

the operation phase. Open space and Parks will be fenced through the grasses and ornamental

plants. Local and low water demanding plants that will also be effective as sinks for various

pollutants and attract birds will be grown in the site that will contribute in positive to the local

ecology.

4.6.6 Socio-economic Impact

Impact: During operational phase of Group Housing Colony, more than 200 persons will get

employment opportunities as staff for management, maintenance and security. As an estimate,

during post construction phase, more than 300 persons will get marginal employment

opportunities from the residents of Group Housing Colony project who would work as domestic

helpers. This will help in improving the quality of life of economically weaker sections of the

local area.

Mitigation Measures: To further improve the socio-economic conditions of the area, it may be

proposed to employ mainly local people as workers. Much of the maintenance arrangements may

also be made with local companies and purchase of new parts from the local market.

4.6.7 Transport Linkage and Traffic

Impact: The vehicle from the project will increase car and two wheeler traffic load along the

road during peak hours. However, since present load is lean, increase in traffic load may not lead

to traffic congestion problem.

Mitigation Measures: As per the conceptual plan, the entrance to the project site is proposed

along the road. The available width provided shall have sufficient merging space for the vehicles

while meeting the road.

Page 107: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur Chapter IV

Sector-62, Gurgaon, Haryana

M/s: EMAAR MGF Land Ltd. 100

4.6.8 Energy Resources

Impact: During the operation phase of the project, electric supply will be provided from

Dakshin Haryana Bijli Vitran Nigam. The proponents will make arrangements for meeting any

electricity shortage for the project. Therefore, energy resources of the region will not be affected

significantly.

Mitigation Measures: To promote energy conservation, it is proposed to provide the buildings

with low energy consuming fixtures maximize availability of natural light.

Page 108: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter V

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd

101

CHAPTER-5

ANALYSIS OF ALTERNATIVES

5.1 INTRODUCTION

This chapter discusses the assessment of various options that may be available for different

components of the project in terms of environmental suitability. Lately, there are a number of

options available for the use of building materials, means of energy conservation and methods of

transportation. The various applicable options are thus evaluated for their suitability to project

and environment.

5.2 BUILDING MATERIALS

The choice of building materials plays an important role in terms of energy efficiency of the

building. The manufacturing of building materials should also be assessed to ensure the use of

environment friendly and recycled/recyclable construction materials.

5.2.1 Wall

Conventionally, sun burnt clay bricks are cemented in the construction of walls. The strength of

these construction materials cannot be compromised which will otherwise pose a threat to the life

and property of the occupants. However, presently, materials with similar properties are easily

available that are made of waste products, thereby reducing the waste burden and conserving

natural resources. Thus, the project proposes the use of the following for walls:

Brick and block products with waste and recycled contents such as fly ash (15 to 35%),

blast furnace slag (20 to 25%), sewage sludge, waste wood fibre etc.

Fly ash based lightweight aerated concrete blocks (CLC blocks) – flyash being a waste

product of thermal power plant poses the challenge of disposal. Hazardous in powder

form, it is rendered harmless when moulded as bricks. Fly ash-based lightweight aerated

concrete blocks are manufactured for walling and roofing purposes by mixing fly ash,

quick lime, or cement and gypsum with a foaming agent like aluminium powder

Fal-G products – are manufactured by use of two waste products being fly ash, calcined

gypsum (a byproduct of phosphogypsum or natural gypsum) along with lime.

Perforated bricks

Materials proposed for use in the wall openings such as doors and windows include:

Precast thin lintels, use of ferrocement-sunshade cum lintel etc.

Renewable timber

Steel manufactured from recycled content

Aluminum manufactured from verified recycled content

Page 109: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter V

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 102

Saw dust based doors and window frames

Ferrocement shutters, PVC doors and windows, Rice husk boards, Natural fibre-

reinforced

Polymer composite door panels

The finishing for the openings will be by the use of Fly ash, Ceramic tiles, Terrazzo

floors.

5.2.2 Roof

The conventional material used for roofing is RCC, as it is suitable for longer spans. The

constituents of RCC, i.e. cement, sand, aggregate and steel are energy intensive materials and

high embodied energy content.

Alternately, it is proposed to use lightweight synthetic aggregates such as fly ash based

aggregates, which is suitable for manufacture of brick, blocks, and is good substitute for clinker

and natural aggregates. When pre-cast/aerated cellular concrete walling blocks and roofing slabs

are used in multi- storied structures, they reduce the weight, resulting in a more economical

design. They have high rating to fire resistance and provide better insulation and thus improved

energy efficiency. These are manufactured by the aerated cellular concrete manufacturing

process.

5.2.3 Superstructure

Structural frame of building comprises of footing, columns, beams and lintels, over which the

envelope of building is supported. A variety of metals are used in buildings, but the major

building material used structurally is steel. Steel has a high-embodied energy and recyclable

content, as well as scrap value. Aluminum forms the second most common material used for

roofing sheets, window frames, and cladding systems, which has the highest recyclable content.

Hence, bulk of the metal needs for the building shall be met by steel and aluminum.

Problem with RCC. The choice of cement will be:

Use of fly ash and/or blast furnace slag concrete: The amount of cement used in

concrete can be reduced by replacing a portion of the cement with coal fly ash (waste

material from coal burning power plants) and/or GGBF (ground granulated blast furnace)

slag in conventional mixes.

Recycled aggregates: Recycled aggregates include crushed concrete, brick, glass, or

other masonry waste can also be used in conventional mixes

Lightweight concrete: Aluminum powder when added to lime reacts and form hydrogen

bubbles, and a lightweight cementitious material is formed which could be used in

conventional mixes.

Page 110: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter V

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 103

5.2.4 Roads and open spaces

Roads and open spaces consist of compound walls, grills, roads, sidewalks, parking lots, drains,

curbs, landscaped areas, street furniture, tree covers, and flowerbeds.

In line with environment friendly design it is proposed to provide:

Permeable paving- Permeable (porous) paving will be provided to control surface water

runoff by allowing storm water to infiltrate the soil and return to the ground water. The

traffic areas will however continue to be impermeable.

Gravel/crusher fines- Loose aggregate materials from masonry wastes will be used to

cover pedestrian surfaces.

Use of grass pavers on the road, parking and pedestrian areas to reduce the heat island

effect.

Use of steel in fencing, grills, tree covers, and benches and even in streetlights will be

replaced by bamboo in the parks and green landscaped areas.

5.3 NATURAL HAZARD PRONE AREAS

The project will be situated in earthquake risk area (Seismic zone- IV). Special attention is thus

given to the structural design of foundation, elements of masonry, timber, plain concrete,

reinforced concrete, pre-stressed concrete, and structural steel. All applicable guidelines will also

be followed in this regard to ensure safety of the building and its residents.

5.4 ENVIRONMENT FRIENDLY DEVELOPMENT

Without compromising on the safety and comfort of the occupants, care will be taken to achieve

an energy efficient, water conscious project the benefits of which will be enjoyed in monetary

terms by the residents and other intangible benefits will result for the society at large. This will

be achieved by:

a. Minimal disturbance to landscapes and site condition

The project aims to integrate the new development with the local existing surroundings. Efforts

are made to minimize on-site tree cutting by careful and detailed layout planning. Tree felling

shall be undertaken only after receiving requisite permissions and under strict supervision. The

original landscape of the site has also been integrated with the design of the group housing

colony such that there is no alteration the site topography.

b. Resource Conservation and Environmental Friendly Building Materials

To reduce the ecological footprint of the development, use of recycled material for construction

and conserving natural resources is of primary importance. In this light, the use of recyclable

building materials has been proposed for various building materials. It is also proposed to reuse

building components, minimization of construction wastes etc.

Page 111: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter V

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 104

The project is also committed towards conservation of water. This includes use of treated

sullage, rainwater harvesting, provision of low water flow fixtures and raising awareness on

means of water conservation.

c. Efficient use of Water and Water Recycling

The need for water conservation in the face of impending water crisis cannot be overemphasized.

The project will follow a three pronged management for water resource viz water resource

development, minimize use of water and recycle sullage generated within the site.

Rainwater harvesting across the entire project area is proposed to recharge groundwater. A

detailed storm water drainage system and water harvesting procedures are proposed to achieve

this.

The water demand is proposed to be brought down by the use of water efficient fixtures,

implement best management practices for water in both the Residential Group Housing Colony

and horticultural activities. An important means for achieving this is spreading awareness to the

occupants for generating water conservation awareness.

To reduce the freshwater demand of the project, sullage from site will be treated in a STP and

recycled for landscaping and flushing.

d. Use of Energy Efficient design and Eco-Friendly Equipment

The project will be designed such that there is optimal solar energy utilization, especially for

natural light availability. Shading will be provided on sides that will otherwise reduce the energy

efficiency of the building. Energy conservation will be one of the focuses during the planning,

development, construction and post construction stages.

e. Use of Renewable Energy

The electrical supply is largely dependent on thermal power plants that are largely responsible

for accelerating the phenomenon of global warming and consumption of limited natural

resources. It is of paramount importance to shift focus on other renewable sources of energy to

achieve sustainable development in the energy sector. The project area in Gurgaon receives

adequate hours and intensity of sunlight for effective solar energy generation. Taking full

cognizance of the availability of natural sunlight and technology, the project proposes the use of

solar energy to reduce the power demand of the project.

Solar energy will be used for the purpose of heating of the water.

f. Indoor Air Quality for Human Safety and Comfort

To provide the occupants with a safe building is the primary responsibility of a developer. Indoor

pollution sources that release gases or particles into the air are the primary cause of indoor air

Page 112: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter V

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 105

quality problems in homes. Inadequate ventilation can increase indoor pollutant levels by not

bringing in enough outdoor air to dilute emissions from indoor sources and by not carrying

indoor air pollutants out of the home. High temperature and humidity levels can also increase

concentrations of some pollutants. Likewise, it is proposed to use all user safe building materials

such as:

i. The buildings will be painted with low VOC, ammonia free paints.

ii. Asbestos will not be used.

iii. Adequate ventilation will be provided in each residential unit and floor.

iv. Adequate openings for sunlight to enter the building, thereby reducing chances of

microbial growth.

v. All building maintenance and cleaning materials will be kept in an isolated and well

ventilated room with restricted entry.

g. Effective Controls and Management Systems

It is proposed to establish a Management System that will comprise modern equipment’s as well

as an efficient team of maintenance staff.

i. Each tower as well as common area will be provided with fire alarm as well as water

sprinklers. All essential services such as lifts and water supply will be provided with

power back up.

ii. A security system for the entire group housing will be provided comprising intercom

facility, closed circuit camera to the entrance and round-the-clock manning.

iii. Separate entries and exits of residents from the guests are proposed. The staffs’ vehicles

will be provided with identification stickers while visitors’ vehicles will be monitored

through security guards at the entrances.

The project further proposes extensive green areas as avenues, parks and roadside plantations.

The plants not only serve various direct environmental facilities, but also have indirect positive

environmental impacts such as reduction in overall energy use in buildings. The balcony garden

is a natural development of the balcony’s role as a link between interior and exterior

environments. Efforts will be made to cover walls with climbers, as feasible.

5.5 COMMUNITY ISSUES

Apart from the site occupants, all efforts will be made to ensure that the exiting neighborhood is

not adversely affected by the project.

While, the site will not act as a thorough fare for vehicles, there shall be no restriction to

movement of on-foot visitors and cyclists.

Page 113: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter V

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 106

5.6 ENERGY CONSERVATION

To achieve conservation of energy, appropriate design of a building is of paramount importance.

Accordingly, it is proposed to incorporate the guidelines of Energy conservation Building Code,

2005 for the structures of the Group Housing Colony.

The concept of passive solar design emphasizes architectural design approaches that minimize

building energy consumption by integrating conventional energy-efficient devices, such as

mechanical and electrical pumps, fans, lighting fixtures, and other equipment, with passive

design elements, such as building siting, an efficient envelope, appropriate amounts of

fenestration, increased day lighting design, and thermal mass. The basic idea of passive solar

design is to allow daylight, heat, and airflow into a building only when beneficial.

The project layout has been finalized after careful siting consideration of various group housing

colony components to optimize availability of natural sunlight. Advanced Solar Passive

Techniques are employed to achieve energy efficiency.

Glazed windows are located to receive maximum sunlight in winter. To reduce

heat losses during the night these windows are often double-glazed and have

insulating curtains.

Thermal storage wall is placed between the glazing and habitable space to prevent

solar radiation from directly entering the living space.

Passive cooling systems i.e. cooling directly from evaporation, convection

radiation without using any intermediate electrical devices.

Provisions for use of desert cooler (Indirect evaporative cooling which comprises

water, evaporative pads, a fan and a pump).

Effective measures have been incorporated to minimize the energy consumption in following

manners:

• Use of CFL lamps instead of GLS lamps for Flats.

• Use of CFL lamps instead of GLS lamps for Common area.

• T5 lamps are used instead of Normal Flourescent lamps in Basements

• Using electronic ballast for Discharge Lamps.

• Solar water heating systems shall be provided as per HAREDA norms.

5.7 TRANSPORTATION

A well planned road network is proposed within the project premises. Adequate parking will be

provided during construction phase to ensure that all heavy vehicles visiting the site are provided

parking space within the site. There shall be no parking on the access roads. The movement of

the vehicles will also be scheduled such that the peak hours are avoided.

In the operation phase, entry and exits will be from separate gates to minimize disturbance to the

approach roads to the project site. To avoid congestion of the approach roads, space will be

Page 114: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter V

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 107

provided for vehicles waiting checking. Adequate parking is also proposed to ensure there is no

parking along the roads. Within the site, adequate wide roads are proposed. To achieve the same,

speed humps will be provided.

Page 115: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VI

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 108

CHAPTER-6

ENVIRONMENTAL MONITORING PROGRAM

6.1 INTRODUCTION

The purpose of the monitoring programme is to ensure that the specified mitigative measures

defined in the EMP are complied with and leads to the desired benefits for the target area and its

population. To ensure the effective implementation of the EMP and gauge the efficiency of the

mitigative measures, monitoring shall be undertaken both during the construction and operation

period of the project.

6.2 PERFORMANCE INDICATORS (PIs)

The physical, biological and social components are of particular significance to the project is as

listed below:

Air quality

Water quality

Noise levels

Solid Waste Management

Replantation success / survival rate

Of these, the following are selected as the Performance Indicators (PIs) and shall be monitored,

since these are well known and comparative data series exist:

Air Quality

Noise levels

Water Quality

Flora

To ensure the effective implementation of the mitigation measures and environmental

management during construction and operation phase of project road, it is essential that an

effective Environmental Monitoring Plan be designed and followed as given in Table 6.1.

6.2.1 Ambient Air Quality (AAQ) Monitoring

Ambient air quality parameters recommended for monitoring with regard to constructional

activities are PM, CO, SO2, and NO2. Monitoring shall be carried out twice a week for one

month in each season during construction phase in accordance to the National Ambient Air

Quantity Standards. The locations with the pollution parameters to be monitored are detailed out

in the Environmental Monitoring Plan (Table 6.1).

6.2.2 Noise Level Monitoring

The measurements of noise levels will be carried out at all designated locations in accordance to

the ambient Noise Standards formulated by MoEF as given. Noise level will be monitored on

twenty-four hourly bases. Noise should be recorded at “A” weighted frequency using a slow time

Page 116: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VI

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 109

response mode of the measuring instrument. The measurement location, duration and the noise

pollution parameters to be monitored are detailed in the Environmental Monitoring Plan (Table

6.1).

6.2.2.1 Success of Vegetation

To ensure the proper maintenance and monitoring of the proposed plantation activities, a regular

survey of the survival rate of the planted trees is being up to a period of 2 years from the start of

operation of the project.

Page 117: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VI

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 110

Table 6.1: Environmental Monitoring Plan

Environment

Component

Project

stage

Parameter Standards Location Duration / Frequency

Ground Water Quality Construction

Stage

Drinking

water

parameters

Drinking

water

standards

(IS:10500)

Treated Water

from nearby

STP

Half-yearly

Operation

Phase

Drinking

water

parameters

Drinking

water

standards

(IS:

10500)

HUDA water

supply

Once every year

Drinking water Construction

Stage

Drinking

water

parameters

Drinking

water

standards

(IS 10500)

Supply water after

treatment

Half-yearly

Operation

Phase

Drinking

water

parameters

Drinking

water

standards

(IS 10500)

Supply water after

treatment

Half-yearly

Treated wastewater Operation

Phase

pH, BOD,

COD, TDS

, TSS, DO,

General

Standards

for

discharge

of

effluents

Outlet of the Sewage

Treatment Plant

Half-yearly

Air Construction

Phase

PM, SO2,

NO2, CO

National

Ambient

Air

Quality

Standards

Project site

Ullahawas

Sector- 65

Alahawas

Tigra

Half-yearly

Page 118: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VI

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 111

Environment

Component

Project

stage

Parameter Standards Location Duration / Frequency

Operation

Phase

PM, SO2,

NO2, CO

National

Ambient

Air

Quality

Standards

Project Site

Half-yearly

Noise Construction

Phase

Noise

Level in

dB (A)

As per

Ambient

Noise

Standards

Project site

Ullahawas

Heritage School

Masonic Polyclinic

Medawas

Half-yearly

Operation

Phase

Noise

Level in

dB (A)

As per

Ambient

Noise

Standards

Project site Half-yearly

Rainwater harvesting Operation

Phase

Inspection

of storm

water

drains and

rainwater

harvesting

pits

Design

parameters Project site Prior to monsoons

Page 119: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VI

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 112

6.3 DATA MANAGEMENT

The monitoring has been carried out through MoEF/ NABL approved laboratory. All

results shall be maintained at the project site and submitted to the SPCB as per the

reporting requirements in the Environmental Clearance.

6.4 REPORTING SCHEDULES

The environment management cell shall be responsible for timely conduct of the

monitoring activities. The results of the analysis shall be intimated to the project head. Any

anomaly in test results shall be investigated into and proper corrective actions shall be

undertaken.

A complaint register shall also be maintained to note any complaints from the staff and

visitors in the project or any other stakeholder. Corrective actions taken against the

complaints shall also be noted.

6.5 EMERGENCY

Alarming levels of pollutants in any of the monitored component may raise alarm in the

Group Housing Colony project. However, such information should be made available to

the residents/ occupants through notices. The latter may also be consulted on necessary

steps to be taken on an immediate and long term basis to tide over the problem.

Page 120: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 113

CHAPTER-7

ADDITIONAL STUDIES

7.1 INTRODUCTION

This chapter broadly looks at various aspects related to disaster management, resource

conservation.

7.2 RISK ASSESSMENT AND DISASTER MANAGEMENT PLAN

Residential Group Housing Colony project encompasses the lives of a large number of

people owing to the occupants in case of an accident. It is thus considered necessary to

carry out a risk assessment and disaster management plan of the project.

7.2.1 Risk Hazard & its control measures

It is attempted to plan and construct the buildings following all safety norms. However, it is

not always possible to totally eliminate such eventualities and random failures of

equipment or human errors. An essential part of major hazard control has therefore, to be

concerned with mitigating the effects of such emergency and restoration of normalcy at the

earliest. A detailed table showing activities during construction and operation phase along

with mitigation measures are given in Table 7.1

Table 7.1: Activities during construction and operation along with mitigation measures

HAZARDS ASSOCIATED WITH

ACTIVITIES

(During Construction & Operation)

CONTROL/MITIGATION MEASURES

Manual Handling

- Strains and sprains due to incorrect lifting

- too heavy loads

-twisting - bending - repetitive movement - body

vibration.

- Exercise/warm up

- get help when needed

- control loads

- rest breaks/no exhaustion

- no rapid movement /twisting/ bending / repetitive

movement

- good housekeeping.

Falls - Slips - Trips

- Falls on same level

- falls to surfaces below

- poor housekeeping

- slippery surfaces

- Good Housekeeping

- tidy workplace

- guardrails, handholds, harnesses, hole cover,

hoarding, no slippery floors/trip hazards

Page 121: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 114

- uneven surfaces

- poor access to work areas climbing on and off

plant

- unloading materials into excavations wind

- falling objects.

- clear/ safe access to work areas

- egress from work areas

- dust/water controlled

- PPE.

Fire

- Flammable liquids/Gases like LPG, Diesel

Storage area and combustible building

materials

- poor housekeeping

- grinding sparks

- open flames, absence of Fire hydrant net

work.

- Combustible/flammable materials properly

stored/used

- good housekeeping

- fire extinguishers made available & Fire hydrant

Network with reserve Fire water (As per NFPA

Code)

- Emergency Plan in case of Fire or collapse of

structure.

Absence of Personal Protective Equipment

- Lack of adequate footwear

- head protection

- hearing/eye protection

- respiratory protection

- gloves

-goggles.

- Head/face

- footwear

- hearing/eye

- skin

- respiratory protection provided

- training

- maintenance

Defective or wrong Hand Tools

- Wrong tool

- defective tool

- struck by flying debris

- caught in or on

- missing guards

- Right tool for the job

- proper use of tools

- good condition/ maintenance guards

- isolation/ proper demarcation of work space

- eye/face protection

- flying debris controlled

Electricity

- Electrocution

- overhead/underground services

- any leads damaged or poorly insulated

- temporary repairs

-no testing and tagging

- circuits overloaded

- non use of protective devices.

- Leads good condition and earthed

- no temporary repairs

- no exposed wires

- good insulation

- no overloading

- use of protective devices

- testing and tagging

- no overhead/ underground services

Scaffolding

- Poor foundation

- lack of ladder access insufficient planking

- lack of guardrails and toe boards

- insufficient ties or other means

- All scaffolds correctly braced and stabilized

- 3:1 height to base ratio

- firm foundation, plumb and level

- ladder access provided and used

Page 122: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 115

- all scaffolds incorrectly braced or stabilized to

prevent overturning.

- proper platform (3 planks/675 mm)

- planks secured

- guardrails and toe boards

- 900mm to 1100mm high, within 200mm of working

face, mid-rail.

Ladders

- Carrying loads

- not secured against dislodgement

- defective ladders

- not sufficient length

- wrong positions

- incorrectly placed (angles, in access ways,

vehicle movements.

- Secured against movement or footed

- ladders in good condition

- regularly inspected

- extend 1m above platform

- 4:1 angle

- out of access ways, vehicle movements

- not carrying loads

- 3 points of contact

- no higher than 3rd

step down

- use for access only, not working platforms

Excavations

- Trench collapse

- material falling in undetected underground

services

- falls

- hazardous atmosphere struck by traffic and

mobile plant.

- Soil stability known

- no water accumulation

- existing services known

- material 600mm from edge

- clear of suspended loads

- hardhats/PPE

- ladders

- public protection

– atmospheric testing

- traffic controls

- Emergency Plan.

Gas Cutting and Welding

- Fire

- welding flash, burns, fumes, electrocution in

wet conditions

- flashback in oxygen set, leaking cylinders,

acetylene cylinders lying down

- poorly maintained leads.

- Welding flash and burns controlled with PPE and

shields

- fumes controlled with ventilation and PPE (in good

condition and properly positioned),Gas cylinders be

kept upright & secured position (properly tied)

- combustible materials to be kept at secured place to

avoid fire & Fire Extinguishers to be kept in fire

prone area with training to people for its use.

Noise

- Unknown noise levels

- known noise levels over 85 decibels

- Levels below 85 decibels

- proper protection.

Falling Material

- Fall during carrying/Lifting materials-

dislodged tools and materials from overhead

- Materials to be secured

- kept away from edge

Page 123: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 116

work areas. - toe boards

- Use of hard hats.

Craneage & Lifts

- Display of carrying capacity i.e. load (No. Of

person), incorrectly slung, defective lifting

equipment, unsecured loads, craning in close

proximity to building people and plant

- falls

- falling materials.

- Periodic testing by competent authority

- correctly slung/secured loads, lifting equipment good

condition

- use of proper hand signals

- falls while unloading controlled.

Visitors Presence at site

- Falls

- struck by dropped materials

- road accidents

- insufficient hoarding or fencing

- pedestrian access past site

- mechanical plant movement on and off site.

- Sufficient hoarding

- fencing and barricades

- safe pedestrian access past site traffic management

for loading and delivery

- construction separated from occupied areas of

projects.

7.2.2 Emergency Response Plan (ERP)

The overall objective of an Emergency Response Plan (ERP) is to make use of the combined

resources at the site and outside services to achieve the following:

1. To localize the emergency and if possible eliminate it;

2. To minimize the effects of the accident on people and property;

3. Effect the rescue and medical treatment of casualties;

4. Safeguard other people;

5. Evacuate people to safe areas;

6. Informing and collaborating with statutory authorities;

7. Initially contain and ultimately bring the incident under control;

8. Preserve relevant records and equipment for the subsequent enquiry into the cause

and circumstances of the emergency;

9. Investigating and taking steps to prevent reoccurrence

The ERP is therefore related to identification of sources from which hazards can arise and

the maximum credible loss scenario that can take place in the concerned area. The plan

takes into account the maximum credible loss scenario - actions that can successfully

Page 124: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 117

mitigate the effects of losses/ emergency need to be well planned so that they would require

less effort and resources to control and terminate emergencies, should the same occur.

Main hazards identified for the project include hazards pertaining to fires in buildings and fire in

diesel storage areas, earthquake and LPG leakage and an ERP pertaining to these is described in

the following section.

7.3 RESPONSE IN CASE OF EARTHQUAKE

7.3.1 Response Procedures for Occupants

If indoors:

1. Take cover under a piece of heavy furniture or against an inside wall and hold on.

2. Stay inside: The most dangerous thing to do during the shaking of an earthquake is to try to

leave the building because objects can fall on you.

If outdoors:

Move into the open, away from buildings, streetlights, and utility wires. Once in the open, stay

there until the shaking stops.

If in a moving vehicle:

Stop quickly and stay in the vehicle. Move to a clear area away from buildings, trees, overpasses,

or utility wires. Once the shaking has stopped, proceed with caution. Avoid bridges or ramps

that might have been damaged by the quake.

After the quake

1. After the quake be prepared for aftershocks.

2. Although smaller than the main shock, aftershocks cause additional damage and may bring

weakened structures down. Aftershocks can occur in the first hours, days, weeks, or even

months after the quake.

Help injured or trapped persons.

1. Give first aid where appropriate. Do not move seriously injured persons unless they are in

immediate danger of further injury. Call for help.

Page 125: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 118

2. Remember to help those who may require special assistance--infants, the elderly, and people

with disabilities.

3. Stay out of damaged buildings.

4. Use the telephone only for emergency calls.

7.3.2 Response Procedure for Emergency Team

1. Formulate an Emergency Response Team for earthquake response.

Using the public address system, inform residents of response procedures discussed above.

2. Inform the necessary authorities for aid.

3. Ensure no person is stuck beneath any debris, in case of a structural failure.

4. Ensure that all occupants standing outside near the buildings are taken to open areas.

5. Ensure that the first aid ambulance and fire tender vehicles are summoned if necessary.

6. Inform the nearby hospitals if there are any injuries.

7. Check the utilities and storage tanks for any damage.

7.4 RESPONSE FOR LPG LEAKAGE

1. The affected area should be evacuated and cordoned off immediately

2. Initiate an Emergency Response Team for LPG leakage.

3. Shut down the main valves in the gas bank.

4. Ensure that only concerned personnel are present in the affected area and all other personnel

and visitors are moved to the nearest assembly points.

5. Rescue trapped personnel, also check if any personnel are unconscious in the area and

immediately move them outside and provide first aid. Ambulance should be summoned to take

injured personnel to the nearest hospital.

6. Personnel in the nearby buildings to close all doors and windows to prevent entry of the leaked

gas.

7. Source of leakage to be traced and isolated from all the other areas. And if required use

pedestal fans to bring down the gas concentration.

8. In case of a fire follow the instructions in case of fire.

Page 126: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 119

7.5 RESPONSE IN CASE OF FIRE

1. Required response during in the event of a fire should be described in signs located in the

lobby.

2. On sighting a fire, it should be immediately informed to the environment manager

giving the exact location and type of fire in detail.

3. Initiate the Emergency Response Team for fires.

4. If the fire is small, engage in extinguishing the fire using the nearest fire extinguisher.

5. Guide the Emergency Response Team staff to the emergency assembly point.

6. The Emergency Response Team should immediately inform the nearest dispensary and

security force. If required a fire tender should be summoned.

7. The response team should immediately move to the point of fire and take all necessary steps to

stop the fire. If the fire is not controllable and spreads then the manager in charge should inform

the district authorities and call for external help.

8. The Emergency Response Team will provide immediate relief to the injured residents at the

scene of incident. Any injured persons should be evacuated on priority to the dispensary or one

of the nearest hospitals based on their condition.

Instructions for occupants

1. Get out of buildings as quickly and as safely as possible.

2. Use the stairs to escape. When evacuating, stay low to the ground.

3. If possible, cover mouth with a cloth to avoid inhaling smoke and gases.

4. Close doors in each room after escaping to delay the spread of the fire.

5. If in a room with a closed door.

6. If smoke is pouring in around the bottom of the door or if it feels hot, keep the door

closed.

7. Open a window to escape or for fresh air while awaiting rescue.

8. If there is no smoke at the bottom or top and the door is not hot, then open the door

slowly.

9. If there is too much smoke or fire in the hall, slam the door shut.

Page 127: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 120

10. Stay out of damaged buildings.

11. Check that all wiring and utilities are safe.

A state of the art fire fighting system is proposed for the project to prevent and control fire

outbreaks. The fire fighting system will consist of portable fire extinguishers, hose reel, wet riser,

yard hydrant, automatic sprinkler system, and manual fire alarm system. The group housing

buildings will also be provided with automatic fire detection and alarm system.

7.6 RESOURCE CONSERVATION

The project will lead to utilization of various natural resources. As an environmentally

responsible corporate, the developers endeavor to conserve these resources by judicious

management and recycling and strive to build up these resources where possible.

Water Resources: The project will use treated water from nearby STP during construction

phase and HUDA supply during operation phase of the project. Given the national water

scenario, where availability if fresh water is fast dwindling, judicious use of the same cannot be

over emphasized. Following means are proposed to be adopted for conservation of this life

sustaining resource:

Limited withdrawal of groundwater: There will be no use of groundwater both during

construction and operational phase of the project. The construction phase will make use of

recycled water from STP of HUDA while water demand for operational phase will be met by

HUDA water supply.

Reduced use of water: To further minimize the use of available freshwater, various low flow

fixtures may be provided such as Low flow flushing systems, sensor based fixtures, waterless

urinals, tap aerators. Awareness will also be spread amongst the residents on the following lines:

Timely detection and repair of all leakages;

Turning off tap while brushing teeth;

Use of mug rather than running water for shaving;

Avoiding/minimizing use of shower/bath tub in bathroom;

Turning off faucets while soaping and rinsing clothes;

Using automatic washing machine only when it is fully loaded;

Page 128: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 121

Avoiding use of running water while hand-washing;

Avoiding use of running water for releasing ice tray ahead of time from freezer;

Turning off the main valve of water while going outdoor;

Avoiding use of hose for washing floors; Use of broom may be preferred;

Watering of lawn or garden during the coolest part of the day (early morning or

late evening, hours) when temperature and wind speed are lowest. This reduces

losses due to evaporation.

Planting of native and/or drought tolerant grasses, ground covers, shrubs and

trees. Once fully grown, they need not to be watered frequently.

Avoiding over watering of lawns. Good rains eliminate the need for watering for

more than a week.

Setting sprinklers to water the lawn or garden only, not the street or sidewalk;

Avoiding installation or use of ornamental water features unless they recycle the

water and avoiding running them during drought or hot weather;

Installation of high-pressure, low-volume nozzles on spray washers;

Replacement of high-volume hoses with high-pressure, low-volume cleaning

systems;

Equipping spring loaded shutoff nozzles on hoses;

Installation of float-controlled valve on the make-up line, closing filling line

during operation, provision of surge tanks for each system avoid overflow;

Washing vehicles less often, or using commercial car wash that recycles water;

Treatment and Recycling: The sullage generated from the sites will be treated in an on-

site Sewage Treatment Plant of 240 KLD & 135 KLD capacity each. This will enable the

treated sullage to be used for flushing and landscaping thereby reducing the requirement of

freshwater for these purposes.

Rainwater harvesting: The increased hard surface of group housing increases the runoff

as compared to the otherwise barren land. It is proposed to harvest this rainwater runoff

that will recharge the groundwater resource while reducing the burden of storm water

Page 129: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 122

management of the city and eventually natural water bodies. Apart from the open spaces, it

is proposed to harvest the roof top rainwater. The storm water will be treated through an oil

and grease trap and allowed to flow through layers of sand and gravel for filtration prior to

reaching the water table, to avoid any possibility of groundwater contamination.

Construction materials: As a large construction, the project will require various kinds of

natural construction materials such as sand, gravel etc. It is proposed for prior estimation of

required quantities of these materials and procurement only as per requirement. This will

also result in cost-efficiency. Excavated soil from the project site will be used within the

site to the extent feasible. Excess soil will be made available to the construction sites, as

per need.

Energy: To conserve the energy resources, good practices will be followed during the

construction phase such as turning off lights and equipments when not in use, ensuring fuel

efficiency of motors and vehicles through proper maintenance and minimal work at night.

The principles of energy conservation will also be embedded in the buildings through use

of energy efficient fixtures, maximum availability of natural light and use of solar energy

for street lighting.

7.7 RESETTLEMENT AND REHABILITATION

The project will not result in displacement of any local population and hence, does not

require a resettlement and rehabilitation study.

Page 130: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VIII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 123

CHAPTER-8

PROJECT BENEFITS

8.1 GENERAL

The project site is situated at Village-Nangli Umarpur, Sector-62, Gurgaon. The project will be

developed on a total area of 56,757.15 m2

(or 14.025 acres).

The project site is well connected through Sector roads which is adjacent to the project site. The

nearest highway is NH-8 which is 6.64 km away from project site in NW direction. The nearest

railway station Basai Dhankot, about 12 km away from the project site in NW direction. The

nearest airport is Indira Gandhi International Airport at 16.71 km from the project site in North

direction.

There are few educational institutions and colleges in the nearby area around the project site.

The salient features of the project include:

Rain Water Harvesting

Fire Fighting system as per NBC

Emergency Alarm System

Basement parking

Multi-tiered security

Advanced fire protection systems

Seamless telecommunication networks

Backup power supply

8.2 PHYSICAL INFRASTRUCTURE

The Group Housing Colony will help in meeting the growing residential needs of people; it also

provides state-of-the-art apartments and modern terms of comfort and safety of its residential

units. Care has been taken to provide the occupants and visitors with necessary facilities as

power, water supply, parking spaces, and broad roads that are safe and secure.

8.3 SOCIAL INFRASTRUCTURE

A Group Housing Colony project of this scale sets in an overall development of the region,

maintenance of existing roads, power supply and water supply, since a large construction

generally brings the focus of the development authorities in the locality.

Page 131: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter VIII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 124

8.4 ECONOMIC BENEFITS

The project will entail positive impact on the local economy in a convenient way. The

construction phase of the project will engage a large number of construction workers, whether

skilled, semi-skilled or unskilled. The workers will also be ensured welfare facilities such as

drinking water, sheds for resting, medical aids, and aid in children’s education.

In meeting the day-to-day and recreational demands of the residents of the site, the region is also

likely to develop a number of shopping and amusement facilities, thereby, further stimulating the

local economy.

Page 132: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 125

CHAPTER-9

ENVIRONMENTAL MANAGEMENT PLAN

9.1 INTRODUCTION

Identification and prediction of impacts further needs to suggest the mitigative measures which

would play a vital role in prevention of environmental degradation during construction and

operational phase of the Group HousingColony. This leads to preparation of Environmental

Management Plan (EMP), therefore EMP forms an imperative part of EIA process.

The Environmental Management plan is a site specific plan developed to ensure that the project

is implemented in an environmentally sustainable manner where all contractors and

subcontractors, including consultants if any, understand the potential environmental risks arising

from the project and take appropriate actions to minimize those risks. EMP also ensures that the

project implementation is carried out in accordance with the planned design and by taking

appropriate mitigates actions to reduce adverse environmental impacts during project’s life cycle.

The project will create certain inevitable impacts, mainly during construction phase, although

within permissible limits as mentioned in Chapter 4 and can be reduced significantly with the

help of effective implementation of a well-designed EMP. The potential environmental impacts,

which need to be regulated, are mentioned below:

Air pollution due to the emission of particulate matter and gaseous pollutants from

operation of D.G.Sets during power failure and vehicular movement;

Noise pollution due to various noise generating equipment as well as vehicular

movement;

Water resource management to ensure continuous water supply.

Sullage generation from sanitary/domestic activities; and

Generation of municipal solid wastes from residences, maintenance of roads, parks,

common areas including constructional, electrical and plumbing wastes.

Energy conservation methods.

Maintenance of Building Management Systems and emergency aids.

To ensure better environment in & around the project site, effective EMP is developed separately

for construction and operational phase.

9.2 ENVIRONMENTAL MANAGEMENT STRATEGIES

Strategy for environmental management in construction work should be based on three-pronged

approach comprising of:

Pollution prevention.

Pollution control.

Protection of pollution recipients.

Page 133: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 126

9.2.1 Topography and Physiography

During the development, construction and post construction phase of the Group Housing Colony,

no significant impact is anticipated on local or regional topography and Physiography, hence

exhaustive management plan is not required. It is however proposed to carry out extensive

turfing with local species apart from proposed plantations and greens.

9.2.2 Soil

9.2.2.1 Development & Construction Phase

During the construction phase, various kinds of wastes are generated that will be disposed in

varied ways. The following measures will be taken to prevent soil contamination at site and

ensure waste management:

Vegetation and top soil management:

Remove vegetative cover only from the specific site on which construction will take

place.

Plantation as proposed shall be started at the earliest.

The top soil will be stripped from constructional areas and stockpiled for later reuse in

landscaping.

Promote use of organic fertilizers.

Construction of erosion prevention troughs, as deemed necessary.

To prevent the erosion of excavated loose soil produced as a result of excavation, site

preparation activities and excavation work would be undertaken during dry season after

monsoon is over.

Construction Debris:

Fuel and oil would be stored in cement lined storage yard and handled carefully to

prevent soil contamination through leakage or spillage.

All metal, paper, plastic wastes, debris and cuttings would be collected from site as soon

as particular construction activity is over.

During construction of flexible pavement, bitumen wastes will be collected (if any) and

disposed in environmentally sound manner.

The number, frequency and area of movement of heavy machinery will also be restricted.

Recycling of construction wastes into aggregates for use in the project site.

Used oil from DG Sets should be stored in HDPE drums in isolated covered facility and

disposed off as per the Hazardous Wastes (Management &Handling) Rules, 1989.

Wastes from the labor camps will be collected and disposed as per the existing practices

in the site.

Page 134: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 127

9.2.2.2 Post Construction Phase

To prevent soil contamination at site, the most important aspect is to manage the solid wastes

that will be generated during the operation phase. The Environmental Management Plan for the

solid waste focuses on three major components during the life cycle of the waste management

system i.e. collection, transportation, and treatment or disposal.

Collection and segregation of wastes

Solid waste generated from project would be collected door to door and segregated into

decomposable, recyclable and inert wastes.

Decomposable wastes will be decomposed and converted to manure to be used for

horticulture.

Recyclable waste would be sold to vendors.

Inert waste which comprises a very small amount of the total solid waste generated

would be temporarily stored within the project premises.

Waste bins would be placed at the strategic locations such as inter section of internal

roads, parks, common places, etc.

To minimize littering and odors, waste will be stored in well-designed containers/ bins

that will be located at strategic locations to minimize disturbance in traffic flow.

Care would be taken such that the collection vehicles are well maintained and generate

minimum noise and emissions. During transportation of the waste, it will be covered to

avoid littering.

Transportation:

Only the non-recyclable and non-biodegradable waste will be transported to the Govt. approved

agency. The segregation, transportation and disposal of wastes will be done by the authorized

agency that will take care of the waste management of the project during the operational phase of

the project.

Page 135: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 128

Figure 9.1: Waste Management Flow Diagram

Disposal

With regards to the disposal/ treatment of waste, the management will take the services of the

authorized agency for waste management and disposal of the same on the project site during its

operational phase.

9.2.3 Hydrology

9.2.3.1 Ground water Hydrology

Development & Construction Phase

The water requirement during the construction period will be met by recycled water from STP.

The following are also proposed to further reduce the demand of freshwater:

Curing water will be sprayed on concrete structures and free flow of water not allowed.

After liberal curing on the first day, all concrete structures will be painted with curing

chemical to save water to stop daily water curing hence save water.

Concrete structures will be covered with thick cloth/gunny bags and then water sprayed

on them to avoid water rebound and ensure sustained and complete curing.

Pools will be made using cement and sand mortar to avoid water flowing away from the

flat surface while curing.

Page 136: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 129

Water ponding will be done on all sunken slabs. This will also highlight the importance

of having an impervious formwork.

Post Construction Phase

It is proposed to conserve groundwater resources through the combined means of water resource

development, minimized water consumption and reuse of treated sullage to reduce freshwater

demand.

9.2.3.2 Water Resource Development

Keeping in view the rainfall, storm water drainage system will be developed to carry the runoff.

The storm water disposal system for the premises shall be self-sufficient to avoid any

collection/stagnation and flooding of water. The amount of storm water run-off depends upon

many factors such as intensity and duration of precipitation, characteristics of the tributary area

and the time required for such flow to reach the drains. The drains shall be located near the

carriage way along either side of the roads. Taking the advantage of road camber, the rainfall run

off from roads shall flow towards the drains. Storm water from various buildingsbe connected to

adjacent drain by a pipe through catch basins. Therefore, it has been calculated to provide 14

rainwater harvesting pits at selected locations, which will catch the maximum run-off from the

area.

1) Since the existing topography is congenial to surface disposal, a network of storm water

pipe drains is planned adjacent to roads. All building roof water will be brought down

through rain water pipes.

2) Storm water system consists of pipe drain, catch basins and seepage pits at regular

intervals for rain water harvesting and ground water recharging.

Rain water harvesting has been catered to and designed as per the guideline of CGWA. Peak

hourly rainfall has been considered as 45 mm/hr. The recharge pit of adequate diameter and

depth is constructed for recharging the water. Inside the recharge pit, a recharge bore is

constructed having adequate diameter and depth. The ground water level in the area is 30-40

meters bgl. The bottom of the recharge structure will be kept 5 m above this level. At the bottom

of the recharge well, a filter media is provided to avoid choking of the recharge bore. Design

specifications of the rain water harvesting plan are as follows:

Catchments/roofs would be accessible for regular cleaning.

The roof will have smooth, hard and dense surface which is less likely to be damaged

allowing release of material into the water. Roof painting has been avoided since most

paints contain toxic substances and may peel off.

All gutter ends will be fitted with a wire mesh screen and a first flush device would be

installed. Most of the debris carried by the water from the rooftop like leaves, plastic bags

Page 137: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 130

and paper pieces will get arrested by the mesh at the terrace outlet and to prevent

contamination by ensuring that the runoff from the first 10-20 minutes of rainfall is

flushed off.

No sewage or sullage would be admitted into the system.

No sullage from areas likely to have oil, grease, or other pollutants has been connected to

the system.

Calculations for storm water load

Plot Area of Phase-I = 25,454.73 m2

Roof-top area = Ground Coverage of Pocket-A = 8,810 m2

Green Area = 10,708.66 m2

Green Area (without water body) = 7,870.8m2

Paved Area = Plot Area – (Roof-top Area + Green area)

= 25,454.73 – (8,810 +10,708.66)

= 5,936.07m2

Runoff Load

Roof-top Area = 8,810 × 0.045 × 0.80

= 317.16m3/hr

Green Area =7,870.8× 0.045 × 0.20

(without water body) = 70.84 m3/hr

Paved Area = 5,936.07× 0.045 × 0.70

= 186.986 m3/hr

Total Runoff Load = 317.16+ 70.84 + 186.986 m3/hr

= 574.986m3/hr

Taking 15 minutes Retention Time, Total volume of storm water = 574.986/ 4

= 143.747 m3

Page 138: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 131

Taking the effective length, width and depth of a Recharge pit 3 m, 3 m and 2.25 m respectively,

Volume of a single Recharge pit = l x b x h = 3 × 3 × 2.25 = 20.25 m3

Hence No. of pits required = 143.747 / 20.25 = 7.1 pits say 7 pits

Calculations for storm water load of Phase-II

Plot Area of Phase-II= 20,436.62 m2

Roof-top area = Ground Coverage of Pocket-B= 9,348 m2

Green Area = 6318.5 m2

Paved Area = Plot Area – (Roof-top Area + Green area)

= 20,436.62 – (9,348 + 6318.5)

= 4,770.12m2

Runoff Load

Roof-top Area = 9,348 × 0.045 × 0.80

= 336.528 m3/hr

Green Area =6,318.5× 0.045 × 0.20

= 56.87 m3/hr

Paved Area = 4,770.12× 0.045 × 0.70

= 150.259 m3/hr

Total Runoff Load = 336.528 + 56.87 +150.259 m3/hr

= 543.657m3/hr

Taking 15 minutes Retention Time, Total volume of storm water = 543.657/ 4

= 135.914 m3

Taking the effective length, width and depth of a Recharge pit 3 m, 3 m and 2.25 m respectively,

Volume of a single Recharge pit = l x b x h = 3 × 3 × 2.25 = 20.25 m3

Hence No. of pits required = 135.914 / 20.25 = 6.7 Pits say 7 pits

Page 139: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 132

As 1 pit/acre is required so, total 14 rain water harvesting pits will be required for 14.025 acre

land.

Total of 14 Rain Water Harvesting pitsare being proposed for artificial rain water recharge

within the project premises.

Figure 9.2: Typical Rain Water Harvesting Pit Design

The rainwater from the terraces and related clean paved areas and the green areas of individual

areas shall be collected in the collection chambers and shall be ultimately connected to the main

storm-water drainage system. The run-off collected from the terraces/ roof area and the green

areas will be diverted to the “Rain Water Harvesting pits” for underground aquifer charging.

Proper “De-silting Chamber” filtration Media and Bye-Pass arrangement shall be prior to

harvesting. Overflow from these wells shall continue into the main drainage system. In the event

of an excessive rain, the discharge will be disposed off outside the site as per local conditions.

Run-off from other paved/ road/ green areas shall be diverted into the underground aquifer

through collection wells and trenches for rainwater harvesting. It is proposed to provide

pretreatment i.e. Grease/ Oil separator etc. as may be the requirement.

Page 140: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 133

Storm water management system

Since the storm water on site will be harvested for ground water recharge, proper management of

this resource is necessary to prevent contamination. Hence, regular inspection and cleaning of

storm drains shall be carried out. Use of fertilizers and pesticides will be avoided prior to and

during monsoons. Clarifiers or oil/ water separators shall also be installed in all the parking

areas.

Minimal Water Consumption

To reduce the water consumption, awareness along the following lines will be spread amongst

the management and maintenance team:

Installation of water meters conforming to ISO standards at inlet and outlet point of

water supply.

To further lower the water consumption, options of Low flow flushing systems,

sensor based fixtures, and tap aerators etc. will be explored.

Leak detection

Drip irrigation for shrubs and trees

Use of low-volume, low-angle sprinklers for lawn areas

The message of water conservation will be spread amongst the residents through awareness

campaigns and pamphlets. Following tips shall be provided to the residents for conserving water.

Timely detection and repair of all leakages;

Turning off tap while brushing teeth;

Use of mug rather than running water for shaving;

Avoiding/minimizing use of shower/bath tub in bathroom;

Turning off faucets while soaping and rinsing clothes;

Using automatic washing machine only when it is fully loaded;

Avoiding use of running water while hand-washing;

Avoiding use of running water for releasing ice tray ahead of time from freezer;

Turning off the main valve of water while going outdoor;

Avoiding use of hose for washing floors; Use of broom may be preferred;

Watering of lawn or garden during the coolest part of the day (early morning or late

evening, hours) when temperature and wind speed are lowest. This reduces losses

due to evaporation.

Planting of native and/or drought tolerant grasses, ground covers, shrubs and trees.

Once fully grown, they need not to be watered frequently.

Avoiding over watering of lawns. Good rains eliminate the need for watering for

more than a week.

Setting sprinklers to water the lawn or garden only, not the street or sidewalk;

Page 141: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 134

Avoiding installation or use of ornamental water features unless they recycle the

water and avoiding running them during drought or hot weather;

Installation of high-pressure, low-volume nozzles on spray washers;

Replacement of high-volume hoses with high-pressure, low-volume cleaning

systems;

Equipping spring loaded shutoff nozzles on hoses;

Installation of float-controlled valve on the make-up line, closing filling line during

operation, provision of surge tanks for each system avoid overflow;

Washing vehicles less often, or using commercial car wash that recycles water.

Re-use of treated sullage

It is expected that the project will generate approx. 200 KLD in Phase-I & 114 KLD in Phase-II

of total sullage. The sullage will be treated in the 2 STPs of 240 & 135 KLD capacity within the

complex and the treated wastewater will be used for flushing, horticultureand rest will be

discharged to nearby land for construction purposes.

9.2.3.3 Ground water Quality

Development and Construction Phase

To ensure against any groundwater pollution through leaching of soil, solid waste management

plan ensuring timely collection of wastes will be followed. The collected wastes will be stored at

designated area and disposed as per the standard procedures in line with the statutory

requirements.

Post Construction Phase

The ground water pollution can arise from improper waste handling or by recharge of

groundwater through contaminated storm water. A well planned solid waste management as

discussed in chapter 2 is proposed for the operation phase that will ensure against any chances of

soil or groundwater pollution on this account.

Storm water collects dirt and garbage along its flow. Contamination of this water with spilled oil/

grease is especially of concern when recharging is proposed. Hence, preliminary treatment for oil

and grease and filtration through layers of sand and gravel is proposed prior to recharge of the

groundwater.

Landscaping water enters the soil and finally the groundwater. It is thus of utmost importance

that only clean water is used for horticulture purposes. The water from the households will

contain significant amounts of detergent and soap that is undesirable for plants, soil and in

groundwater. Hence, it is proposed to treat sullage from the sites up to tertiary level, and be used

for landscaping only thereafter. Regular monitoring of treated sullage shall be carried out to

ensure that all parameters are within acceptable levels.

Page 142: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 135

9.2.4 Air Quality

9.2.4.1 Development and Construction Phase

The construction phase for the group housing colonyis about 2-3years, causing only marginal

impact on ambient air quality from constructional activities, unloading of construction materials,

cement, soil and vehicular movement etc. The main pollutant of concern is PM 2.5, PM10 (dust).

Likewise, following mitigation measures will be adopted during this phase to mitigate the

impacts on ambient air:

Installation of batch plant at isolated place and providing cover shed around

plants.

Loading and unloading of cement and other material in covered shed.

Providing dust suppression system in unloading area (as per requirement).

Developing avenue and curtain plantation on the internal roads and peripheral

plantation around the site to protect the movement of dust and other pollutants.

Cover scaffolding, hosing down road surfaces and cleaning of vehicles.

On-Road- Inspection for black smoke generating machinery.

Vehicles having pollution under control certificate will be allowed to ply.

Use of covering sheets for trucks to prevent dust dispersion from the trucks.

Reducing the speed of a vehicle to 20 km/hr to reduce emissions on site.

All material storages will be adequately covered and contained.

Training to the workers to reduce idling time of machines that otherwise tends to

produce hydrocarbons ad carbon monoxide.

Best practices for maintenance and repair of all machineries and equipments.

9.2.4.2 Post Construction Phase

During the post construction phase, following measures will be adopted for pollution control in

the Group Housing Colony:

Adequate stack height for DG Sets

Traffic pollution management

Plantation development

DG Sets:The project will have power back up from 7 nos. of D.G. sets of total capacity 2,780

KVA. There is provision of 4 nos. of DG sets of total capacity of 1,640 KVA (2 X 500 KVA + 2

X 320 KVA) capacity for Part-I and 3 nos. of DG sets of total capacity of 1,140 KVA (3X 380

KVA) capacity forPart-II for power back up in the Group Housing Project. The DG sets will be

equipped with acoustic enclosures to minimize noise generation and adequate stack height for

proper dispersion.

Page 143: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 136

Traffic pollution management: Internal roads would be maintained in good conditions to

control the dust emissions. Awareness will be raised amongst the residents for use of low sulphur

fuel.

Plantation development: Vegetation is an effective means for controlling air pollution due its

dual action of acting as a barrier between the source of emission and receptors and also as a sink

for various pollutants. It is proposed to develop plantation of species effective in absorption of

expected pollutants at site, along the internal roads and on the periphery of the Group Housing

Colony. Suggested species for plantation are:

Cassia Fistula(Amaltas)

Bauhinia purpurea(Kachnar)

Saracaasoca(Sitaashok)

Jacaranda mimosifolia (Neeligulmohar)

Astoniascholaris (Scholar tree)

Roystoniaregia (Royal palm)

9.2.5 Noise Levels

9.2.5.1 Development and Construction Phase

During the construction phase, some noise will be generated through the operation of

construction machines, excavators, DG sets, etc. Following measures would be taken; into

consideration to mitigate the noise at construction site:

Use of well-maintained equipment fitted with silencers and providing noise

shields near the heavy construction operations

Acoustic enclosures would be provide to DG sets at the construction site,

Earmuff and other protection devices shall be provided to laborers working in

high noise generating machines.

High noise activities shall be carried out during daytime.

9.2.6 Post Construction Phase

The main sources of noise during this phase are the intermittent use of DG Sets and traffic. The

principles of noise emission control and screening are proposed for the two different scenarios of

noise generation.

9.2.6.1 Noise emission control

All the D.G. Sets will be provided with acoustic enclosures ensuring 25 dB (A) insertion loss or

for meeting the ambient noise standards whichever is higher as per CPCB norms. It will be

ensured that the manufacturer provides acoustic enclosures as an integral part with Diesel

Generator Sets.

Page 144: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 137

Barriers:

Trees having thick and fleshy leaves with flexible petioles having capacity to withstand vibration

are suitable. Heavier branches and trunk of the trees also deflect or refract the sound waves. The

following species are proposed to be used in a greenbelt especially surrounding housing groups

and along the periphery of the project.

Saracaasoca(Sita Ashok)

Cassia fistula(Amaltas)

Choriosaspeciosia(Choriosaspeciosia)

Jacaranda mimosifolia (Neeligulmohar)

AstoniaScholaris (Scholar Tree)

Roystoniaregia (Royal palm)

Bauhinia variegated(Kachnar)

9.2.7 Biological Environment

9.2.7.1 Development and construction phase

During the development, construction and post construction phase, no tree will be cut and

therefore no impact is anticipated on terrestrial ecology. Site clearing shall be carried out strictly

as per plan. Workers shall be advised against cutting, uprooting, coppicing of trees or small trees

present in and around the project site for cooking. Workers shall also be discouraged from

wandering in nearby areas with plantation or dense vegetation.

Further, green belt will be developed on the periphery and along the internal roads of project site

during the construction phase itself that will act as a curtain to restrict the movement of

pollutants from either side of the project and improve site aesthetics.

9.2.7.2 Post construction phase

During the post construction phase, green belt will be developed and maintained. Ornamental

plant species and grasses will be planted in open space within the premises. 30% area of total

area is proposed to be maintained green in the project site. Proposed list of species for plantation

is given below in Table 9.1:

Table 9.1: Plantation List

SYMBOL BOTANICAL NAME COMMON NAME

TREES

1 Saracaasoca Sitaashok

2 Cassia fistula Amaltas

3 Choriosaspeciosia Choriosaspeciosia

Page 145: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 138

4 Jacaranda mimosifolia Neeligulmohar

5 Astoniascholaris Scholar tree

6 Roystoniaregia Royal palm

7 Bauhinia variegated Kachnar

SHRUBS

S-1 Tecomastans Yellow Elder

S-2 Hibiscus rosa Jaba

CREEPERS

C-1 Veroniaselowna Curtain Creeper

C-2 Bouganvalia Paper Flowers

GROUND COVERS

GC-1 Lantana selowina Wild Sage

GC-2 Tradescantiaflumen Wandering Jew

GC-3 Ipomia palmate Railway Creeper

GRASSES

GR-1 Cynodondactylon Doob Grass

9.2.8 Demographic and Socio-Economic Environment

9.2.8.1 Development and Construction Phase

During the development and construction phase of the Group Housing Colony, more than 150

skilled, semiskilled and unskilled workers will get direct and indirect employment opportunities

which will have beneficial impact on the socio-economic conditions of the area.

Following suggestions are given to strengthen the beneficial impacts on the socio-economical

environment.

All the applicable guidelines under relevant acts and rules related to labor welfare and

safety shall be implemented during the construction work activities.

Proper sanitary and drinking water facilities should be provided to workers living in the

construction camps within the project premises.

Workers will be provided with appropriate PPEs during work.

Guarding of dangerous machine parts, maintenance of equipments as hoists and lifts will

be ensured.

Adequate provision of different types of fire extinguishers will be made.

Construction Camps will be provided with clean and safe drinking water and toilet

facilities. Domestic refuse generated at the construction camps will be disposed off on a

Page 146: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 139

regular basis. First Aid Medical facilities will also be provided for the construction

workers.

9.2.8.2 Post Construction Phase

The project envisages addressing the wider goal of environmental protection through a social

investment strategy for the communities around the project. The project seeks to increase the

benefits to the local population and contribute towards meeting community’s expectation of

benefits from the project.

Some of the concerns raised by local people relate directly to the project. Concerns and

aspirations not directly related to the project were also solicited so as to identify areas that could

be addressed through socially responsible initiatives and interventions. These were:

a) Demand for employment opportunities.

b) Infrastructure development

The proposed strategy envisages addressing the wider goal of sharing benefits with the local

community. The following activities would be undertaken.

Income Generation Opportunity for local community

The local people will be given preference, although they will be recruited on their individual

merit. Tender specification for post construction services will include favorable employment

opportunities towards the local population. The main principles of employment are outlined

below:

Employment strategy will provide for preferential employment during operation phase.

General recruitment procedures will be transparent, public and open to all.

Recruitment procedures will be publicized at locally prominent locations in advance.

There will be no discrimination on basis of gender, caste or other factors.

Contractors would be required to abide by the Indian labor laws regarding standards on

employee working conditions, minimum wages for workers, safety and welfare measures.

Following the appointment of the contractor, information on employment will be

available to the local community at the Panchayat office or other prominent places like

the school, frequently visited spots in the village etc. Information on the following

aspects would be provided- scale and duration of employment, type of available work and

demand projection.

Improved working conditions

The project would provide safe working conditions for the labor and other workers employed at

the facility during construction and operation phase. Conditions of employment should address

issues like minimum wages and medical care for the workers.

Page 147: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 140

9.2.9 Vehicle Parking and Traffic Management

9.2.9.1 Development and Construction Phase

To ensure that the heavy vehicles transporting construction material to the site does not burden

the local traffic, it is proposed to:

Plan the movement of the heavy vehicles avoiding the peak hours (day time).

All the vehicles to the site will be provided with parking space such that there is no

waiting time along the access roads.

9.2.9.2 Post Construction Phase

It is to be ensured that there will not be any sudden influx of vehicles from the Group Housing

Colony at the entrance to the project site from access road. The available width will provide

sufficient merging space for the vehicles while meeting the road.

Adequate provision has been made for car/vehicle parking for the residential areas of the project.

Besides, wide internal road will also provide space for off street parking.

9.3 ENERGY CONSERVATION

The Project will be designed in such a way that natural light and air will be enhanced in the

residences. Houses at the Group Housing Colony will be energy efficient through use of low

energy consuming fixtures. Energy conservation will be achieved through various means as

given below.

Site Plan and building design:

Maximum utilization of solar light will be done

Public areas will be cooled by natural ventilation as opposed to air-conditioning

Maximize the use of natural lighting through design

The orientation of the buildings will be done in such a way that maximum daylight is

available

The water bodies and green areas will be spaced, so that a significant reduction in the

temperature can take place.

Energy saving:

Energy efficient lamps will be provided within the complex.

Constant monitoring of energy consumption and defining targets for energy conservation

Adjusting the settings and illumination levels to ensure minimum energy used for desired

comfort levels

Awareness:

Promoting resident awareness on energy conservation

Training staff on methods of energy conservation and to be vigilant to such opportunities

Page 148: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 141

9.4 MANAGEMENT AND MAINTENANCE SYSTEM

Management and maintenance system is an important issue for the Group Housing Colony.

During the construction phase M/sEMAAR MGF Land Ltd. will take care for the

implementation of environmental management plan for the project. They will review the

effectiveness of implemented mitigation measures adopted by contractors and sub-contractors

from time to time. The houses will be provided with water sprinklers and fire alarms and there

will be provision of adequate number of fire extinguishers. Back up service will be provided for

all emergency equipments and machineries.

Post construction, management and maintenance of the internal services laid in Group Housing

Colonyproject will be done by M/s Emaar MGF Land Ltd. and subsequently the same shall be

transferred to the local Municipality/designated authority.

9.4.1 Institutional Capacity Building

a. Reporting: For effective implementation of any system/ plan, a systematic reporting

system is essential. An Environmental Management Cell shall be set up for

implementation of the proposed Management Plan. Reporting of the results of all the

management and monitoring plan shall be submitted to the designated Project Head. The

reports shall be reviewed and parameters exceeding their limits should be identified and

the reason for the same investigated. Any requisite mitigation plan shall be taken up

accordingly.

The Environment Management Cell will be a permanent organizational set up charged

with the task of ensuring its effective implementation of mitigation measures and conduct

environmental monitoring. The major duties and responsibilities of Environmental

Management Cell shall be as given below:

To implement the environmental management plan

To assure regulatory compliance with all relevant rules and regulations

To ensure regular operation and maintenance of pollution control devices

To minimize environmental impact of operations as by strict adherence to the EMP

To initiate environmental monitoring as per approved schedule

b. Review and interpretation of monitored results and corrective measures in case

monitored results are above the specified limit.

c. Maintain documentation of good environmental practices and applicable environmental

laws for a ready reference

d. Maintain environmental related records

e. Coordination with regulatory agencies, external consultants, monitoring laboratories

Page 149: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

VillageNangliUmarpur, Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd 142

f. Maintenance of log of public complaints and the action taken.

9.4.2 Hierarchical Structure of Environmental Management Cell

Normal activities of the EMP cell would be supervised by a dedicated person who will report to

the project Head.

9.4.3 Awareness and Training

Training and human resource development is an important link to achieve sustainable operation

of the facility and environment management. For successful functioning of the project, relevant

EMP would be communicated to residents and contractors.

Occupants must be made aware of the importance of waste segregation and disposal, water and

energy conservation. The awareness can be provided by periodic Integrated Society meetings.

They would be informed of their duties.

9.4.4 Environmental Audits and Corrective Action Plans

To assess whether the implemented EMP is adequate, periodic environmental audits will be

conducted by the project proponent’s Environmental division. These audits will be followed by

Correction Action Plan (CAP) to correct various issues identified during the audits.

9.5 OVERALL MITIGATION MEASURES AND ENVIRONMENTAL

MANAGEMENT PLAN

Overall impact assessment of anticipated environmental impacts and mitigation measures &

environmental management plan to mitigate the potential impacts during the development &

construction and operation phase are summarized in Table 9.2.

Page 150: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land 143

Table 9.2:Environmental Management Plan during construction and operation phases of the project

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

1. Groundwater

Quality

Ground water

contamination

Construction Phase

Sullage generated

from Labor tents.

1. Modular STP/

Mobile

toilets

No significant

impact as majority

of laborers would

be locally deployed.

Operation Phase

Sewage treatment,

sludge disposal on

land.

Sewage will be

treated in Sewage

Treatment Plant.

Sludge will be used

for horticultural

purpose as manure.

No significant

negative impact on

ground water

quality envisaged.

In an unlikely event

of soil and ground

water

contamination,

remediation

measures shall be

implemented.

2. Groundwater

Quantity

Ground Water

Depletion

Construction Phase

Ground water will

not be used for

construction

activity.

Not Applicable

Not Applicable

Page 151: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land 144

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

Operation Phase

Water will be

supplied by

HUDA.

Recycling of treated

sullage to reduce

freshwater

requirement

Storm water

collection for Water

Harvesting.

Awareness

Campaign for

reduced water use by

occupants.

No significant

impact on ground

water quantity

envisaged.

3. Air Quality

Dust

Emissions

Construction Phase

All heavy

construction

activities.

Dust suppression

through water

sprinkling using

water trucks,

handheld sprays and

automatic sprinkler

systems.

Vehicles

transporting loose

construction material

should be covered.

Contractors will be

advised to provide

dust masks for the

employed labor.

Not significant

because dust

generation will be

temporary and will

settle fast due to

dust suppression

techniques used.

Page 152: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land 145

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

Emissions of

PM, SO2, NO2

and CO

Construction Phase

Operation of

construction

equipment and

vehicles during site

development.

Rapid on site

construction

Improved

maintenance of

equipment’s.

Not significant

Regular monitoring

of emissions and

control measures to

reduce the emission

levels.

Operation Phase

Power generation

through D.G. Set

Operation.

Emissions from

vehicular traffic.

Use oflow Sulphur

diesel.

Stacks will be

provided of adequate

height as per CPCB

guideline.

Green belt to be

provided with

specified species to

help reduce PM

levels.

Not significant as

D.G. Set would be

used as power

back-up only.

Page 153: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land 146

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

4. Noise

Environment

Noise

emissions

Construction Phase

Operation of

construction

equipment and

vehicles during site

development.

Equipments should

be fitted with

silencers, where

applicable and

maintained well.

Providing noise

shields near heavy

construction

operations.

Construction activity

will be limited

mostly to daytime

hours only.

Use of Personal

Protective

Equipment (PPE)

like earmuffs and

earplugs during

construction

activities.

Operation Phase

Noise from

vehicular

movement.

Noise from D.G.

sets operation.

Peripheral

plantations.

Providing Acoustic

Enclosures on D.G.

Sets.

Not significant

Short-term

exposure within

permissible limit.

Page 154: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land 147

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

5. Land

Environment

Soil

contamination

Construction Phase

Disposal of

construction

debris.

Construction debris

will be collected and

suitably used on site

as per construction

waste management

plan.

Impact will be

local, as any waste

generated will be

reused for

construction

activities. Not

significant.

Operation Phase

Dumping of

municipal solid

waste on land.

Handling of used

oil from D.G. Sets.

Solid waste from site

will be collected on

a daily basis and

disposed as

municipal wastes.

The segregation,

transportation and

disposal of wastes

will be handled by a

private agency

authorized by

government.

Used oil generated

will be sold to

authorized recyclers

Not Significant

Negligible impact

Page 155: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land 148

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

6. Biological

Environment

(Flora and

Fauna)

Removal of

Flora and

Fauna on site.

Increase of

Green Cover

Construction Phase

Site development

during

construction.

The site comprises

of small grasses.

No negative impact

--

Operation Phase

Plantations along

the periphery of

the complex.

Plantations of

species that are

native to the area,

fast growing and

with good canopy

cover.

Beneficial impact

7. Socio -Economic

Environment

Population

displacement

and economic

impact

Construction Phase

No relocation is

involved.

Constructional

activities

Compensation has

been provided to the

land owners by

development

authority.

Employment for

laborers

No negative impact

Beneficial impact

--

Operation Phase

Site operation.

Project will provide

employment

opportunities.

Boost to local

market for increased

demand in goods of

daily need.

Beneficial impact

--

Page 156: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter IX

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land 149

Sl.

No.

Environmental

Components

Potential

Impacts

Potential source of

Impact

Controls through

EMP & Design Impact Evaluation

Remedial

Measures

8. Traffic Pattern Increase of

Vehicular

traffic

Construction Phase

Heavy vehicular

movement during

construction.

Heavy vehicular

movement will be

restricted to daytime

only and adequate

parking facility will

be provided.

No negative impact

Operation Phase

Increased traffic

from the project.

Vehicular movement

will be regulated

inside the site

Adequate parking

space provided.

Moderate negative

impact

Page 157: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter X

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 150

CHAPTER-10

SUMMARY AND CONCLUSION

10.1 PROJECT BACKGROUND

M/s Emaar MGF Land Ltd. intends to constructtheGroup Housing Colony at Village-

NangliUmarpur, Sector-62, Gurgaon.As per EIA Notification, 2006 & its amendments for all

Group Housingand area development projects covering an area of 50 ha and/ or built up area

greater than 1, 50,000m2 are designated as category 8 (b) projects and are required EIA Report to

obtain prior environmental clearance from respective State Environmental Impact Assessment

Authority (SEIAA). The project is thus categorised as 8(b) under Schedule of the Environmental

Impact Assessment Notification and requires Environmental Clearance from the State

Environment Impact Assessment Authority, Haryana since the built up area is1,75,718.12m2. So,

EIA/EMP study is required.The EIA/EMP study has been carried out by Grass Roots Research &

Creation IndiaPvt. Ltd.

For this study, the impact zone shall confine within an angular radius of 5 km from the project

boundary. For the purpose of certain environmental components, the radius has extended up to

10 km as well. The EIA is conducted to establish the baseline environmental setting in the study

area, assessment of potential impacts on different environmental components, design of

mitigation measures so as to keep impacts within acceptable limits and strengthen the positive

impacts.

The Executive Summary summarizes the findings of the EIA study to aid in decision making and

provides project related information and environmental impacts to non-technical sections of

society. The summary highlights the baseline environmental status, key environmental issues and

their likely impacts and also lists the major recommended mitigation measures to attenuate the

impacts.

10.2 PROJECT SITE& CONNECTIVITY

The project is located at Village-NangliUmarpur, Sector-62,Gurgaon,Haryana. The project site is

well connected through Sector roads which is adjacent to the project site. The nearest highway is

NH-8 which is 6.64 km away from project site in NW direction. The nearest railway station

BasaiDhankot, about 12 km away from the project site in NW direction. The nearest airport is

Indira Gandhi International Airport, at 16.71 km from the project site in North direction.

Page 158: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter X

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 151

10.3 PROJECT FEATURES

The design population of the site is2985. Salient features of the project are:

Table 10.1:Salient Features of the project

S. No. Facility Values

1. Power Supply 3,357 KW

2. D.G. Set 7DG sets of total capacity of 2,780 kVA

(2 X 500 KVA + 2 X 320 KVA+ 3X 380

kVA)

3. Parking Required – 1016ECS (As per MoEF

norms)

Required – 671 ECS (As per Haryana bye

laws)

Proposed – 1273ECS

4. Water Supply Operational Phase: HUDA

Construction Phase: Treated water from

nearby STP (HUDA)

5. Water Demand Fresh water- 482 KLD

6. Sullage generation 314KLD

7. STP Capacity 2 STPs of 240 & 135 KLD capacity

8. Solid waste generation 1,370.955 kg/day

9. Manpower requirement 150-200 persons

The project will be implemented over a span of two to three years from the commencement of

construction.

10.4 ENVIRONMENTAL SETTING OF THE STUDY AREA

The baseline environmental status was assessed based on primary and secondary data collected

either through in-site field observation or obtained from agencies such as Irrigation Department,

India Meteorological Department (IMD), Central Ground Water Board, Geological Survey of

India, State Ground Water Department, State Pollution Control Board, Census of India and Local

Forest Department, Non -Governmental Agencies. The baseline status established from analysis

of secondary and primary data and predicted impacts are discussed below. The proposed

mitigation measures are also provided along with.

Page 159: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter X

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 152

10.4.1 Land Environment

The land use pattern of the study area is mainly residential, agricultural and open & degraded

vegetation. The site falls under residential land use as per Gurgaon-Manesar Urban Complex,

2021. When awarded to the project proponent, the land was a barren stretch.

The project will be developed as per the provisions of the Gurgaon-Manesar Urban Complex

2021. The construction phase of any construction project poses the threat of soil contamination

and soil erosion, mainly during the construction phase. Inadequate solid waste management may

also cause soil contamination during operation phase. The estimated waste generation during

operation phase is 1,370.955 kg/day.

During construction phase, excavation related work will be avoided during the monsoons and

site clearing will be carried out for specific areas being developed. All wastes from site will be

regularly removed and disposed/ sold. An efficient solid waste management is proposed

comprising door-to-door waste collection, segregation of solid waste management facility within

the site, and their disposal. Solid waste will be disposed by sale of recyclable wastes to vendors.

10.4.2 Water environment

The project site is located at Village-NangliUmarpur, Sector-62, Gurgaon.The water requirement

during construction phase will be met by treated water from nearby STP (HUDA). A

combination of efficient water management to reduce water consumption, reuse of treated

wastewater to reduce freshwater demand and rainwater harvesting to replenish groundwater is

proposed to have a positive bearing on the water environment of the region.

Sewage Treatment Plants (STP’s) of capacity 240 & 135 KLDwill be set up to treatwaste water.

10.4.3 Air Environment

During construction phase, the major air pollutant of prime concern is PM2.5,PM10as impacts of

other emissions such as SO2, NO2, and CO will not be significant because the nature of sources

is such that the emissions are distributed spatially as well as temporal. Monitored average

PM2.5,PM10 level exceeded NAAQS at all the five locations. The levels of PM 2.5,PM10,NO2, SO2

and CO at all the five locations were within the standards prescribed by NAAQS at all the five

locations. Thus dust emissions from construction activities shall require comprehensive

mitigation measures and best construction practices.

Adequate stack heights will be proposed for D.G. Sets of2780 KVAcapacity (2 X 500 KVA + 2

X 320 KVA+3X 380 KVA)above the ground to provide for sufficient dispersion of pollutants.

Water sprinklers will be used to suppress dust during construction. During the operation phase,

green belt and green area development is proposed to restrict and absorb air pollutants.

Page 160: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter X

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 153

10.4.4 Noise Environment

Noise levels were observed at four locations within the study area. Levels of background noise

monitored in exceed the limits at 55 dB (A) and 45dB (A) for daytime and night time

respectively.

The noise emitted from heavy-duty construction equipments during construction period being

high shall require occupational preventive measures and temporary noise barriers for noise

attenuation. The construction period being about four to five year duration, will require

significant mitigation measures such as restricted loud noise activities to daytime, provision of

PPEs and acoustic enclosures for D.G. Sets.

In the operation phase, noise pollution will be checked through acoustic enclosures of DG Sets

and green belt plantation.

10.4.5 Biological environment

There is also no tree cutting involved in the project. Additionally, there will be avenue

plantations, green walls and roof tops. The landscaping will include native species that will

attract local birds and insects, reduce pollution and improve aesthetics and micro-climate of the

region. Total green area measures 17,027.16m2i.e30% of plot area which will be area under tree

plantation at periphery and along the roads. Evergreen tall and ornamental trees like Acacia

auriculiformis, Acacia delbata, Aeglemarmelos, Adina cordifolia and ornamental shrubs like

Bambusaarundinacia, Bambusa vulgaris have been proposed to be planted inside the premises.

Parks will also be developed by the project proponent.

List of the plants is given below in Table 10.2.

Table 10.2: Plantation List

SYMBOL BOTANICAL NAME COMMON NAME

TREES

1 Saracaasoca Sitaashok

2 Cassia fistula Amaltas

3 Choriosaspeciosia Choriosaspeciosia

4 Jacaranda mimosifolia Neeligulmohar

5 Astoniascholaris Scholar tree

6 Roystoniaregia Royal palm

7 Bauhinia variegated Kachnar

Page 161: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter X

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 154

SHRUBS

S-1 Tecomastans Yellow Elder

S-2 Hibiscus rosa Jaba

CREEPERS

C-1 Veroniaselowna Curtain Creeper

C-2 Bouganvalia Paper Flowers

GROUND COVERS

GC-1 Lantana selowina Wild Sage

GC-2 Tradescantiaflumen Wandering Jew

GC-3 Ipomia palmate Railway Creeper

GRASSES

GR-1 Cynodondactylon Doob Grass

10.4.6 Socio-economic environment

The group housing colony does not call for any land acquisition and no change in the existing

land use pattern. The execution of the project will not disturb the people living in area as there

will be no blasting and large scale digging. The project will generate employment opportunities

for both skilled and unskilled workers in the vicinity, which will produce multiple effects on the

life and economy of the local people. Thus from socio-economic point of view the project is

beneficial to the people and can be executed with little hesitation.

10.4.7 Energy efficiency

The power supply shall be supplied by DHBVNL (Dakshin Haryana BijliVitaran Nigam

Limited). The demand load for Part-Iwill be 2,105KW and for Part-II it will be 1,252KW. Thus,

the total demand load of the project will be 3,357 KW.The project will have power back up from

7 nos. of D.G. sets of total capacity 2,780 KVA. There is provision of 4 nos. of DG sets of total

capacity of 1,640 KVA (2 X 500 KVA + 2 X 320 KVA) capacity for Part-I and 3 nos. of DG sets

of total capacity of 1,140 KVA (3X 380 KVA) capacity for Part-II for power back up in the

Group Housing Projectare proposed to provide backup in case of power failure.Various

provisions are made to reduce the energy efficiency of the building, such as use of solar energy,

provision of low energy fixtures, design features to maximise sunlight and use of materials to

improve energy efficiency.

Page 162: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter X

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 155

10.4.8 Others

Resource Conservation:A concerted effort is made towards resource conservation by way of

using recycled building materials, reduced water consumption and improving energy efficiency

of the building.

Indoor Air Quality: Special attention will be given to maintaining indoor air quality through

use of low VOC paints, provision of adequate ventilation, proper storage of chemical and

cleaning materials.

Safety:A network of manned security gates, security men, closed circuit TV and intercom

facilities are proposed to ensure safety of the occupant. The buildings will also be provided with

adequate fire tenders, fire alarms and water sprinklers.

10.5 ENVIRONMENTAL MANAGEMENT PLAN Adequate environmental management measures will be incorporated during the entire planning,

construction and operating stages of the project to minimize any adverse environmental impact

and assure sustainable development of the area.

For the effective and consistent functioning of the campus, an Environmental Management

System (EMS) will be established at the site including an Environmental Management cell for

implementation of the EMP and monitoring plan, training and awareness, audits and

maintenance of records.

The total estimated cost of the Group Housing Colony is Rs. 480Crores which includes the cost

of the land as well as the developmental cost.

Based on the environmental assessment, the associated potential adverse environmental impacts

can be mitigated to an acceptable level by adequate implementation of the measures as stated in

the EIA and the EMP. Some of the benefits from the project are:

Use of solar energy for street lighting

Provision of green walls and green terraces

Use of CLC blocks (containing approx. 33% flyash)

Use of steel manufactured from recycled content.

Provide permeable paving to control surface water runoff

Rainwater harvesting

Meet all requirements for buildings in moderate earthquake prone areas.

Provision of fire alarms and water sprinklers.

Provision of welfare schemes to workers.

Extending educational and healthcare facilities to the local people.

Page 163: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village NangliUmarpur,Chapter X

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. Page 156

Commitment to engaging local people and businessmen for maintenance and

repair work.

Hence, it may be concluded that the project will have significant positive economic and social

impact on the local community apart from meeting the housing needs of the occupants, without

bearing any significant adverse environmental impact.

Page 164: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter XI

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 157

CHAPTER-11

DISCLOSURE OF CONSULTANTS ENGAGED

Project Name: Group Housing Colony Project

Name and address of

the Consultant

GRC, India (P) Ltd.

F-374, 375, Sector: 63,

Noida, India

ISO 9001:2008 Certified,

QCI-NABET Accredited.

Personnel’s involved

in preparation of

EIA/EMP report

V.N.S Pillai (Empanelled)

Mr. Rajesh Bhaskaran

Ms. Priyanka Anand

Mr. Shashank Srivastava

Base line data GRC, India Training and

Analytical Laboratory

Sector: 63, F- 374, 375,

Noida, India

NABL & MoEF Accredited

Laboratory.

A unit of GRC, India (P) Ltd.

Under the guidance of following Coordinators & Functional Area Experts:

EIA Coordinator Mr. K.D Choudhury

FAE-LU Mr. P. Radhakrishnamoorthy (Empanelled)

FAE-AP Mr. K.D. Choudhury

FAE-AQ Prof. B. Padmanabha Murty (Empanelled)

FAE-WP Dr. P.R. Chaudhari

FAE-EB Dr. P.R. Chaudhari

FAE-NV Mr. K.D. Choudhury

FAE-SE Mr. K.N. Dutta

FAE-HG Prof. Tapan Majumdar

FAE-GEO Prof. Tapan Majumdar

FAE-SC Dr. S.R. Maley (Empanelled)

FAE-RH Mr. K.D. Choudhury

FAE-SHW (MSW) Mr. Rajesh. B

Page 165: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter XI

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 158

11.1 ACCREDITION/ FROM QUALITY COUNCIL OF INDIA, QCI

AND LIST OF COORDINATORS

GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD HAS GOT

ACCREDITION FROM QCI AS PER MOEF, GOI REQUIREMENTS.

Page 166: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter XI

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 159

Page 167: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter XII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 160

CHAPTER-12

CORPORATE ENVIRONMENTAL RESPONSIBILITY

12.1 PROCEDURES FOR ENVIRONMENTAL COMPLIANCE

M/s Emaar MGF Land Ltd. has standard operating procedures to identify and bring into

focus any infringement/ deviation/ violation of the environmental/ forest norms and

conditions. The details of procedures are given in the Table 12.1 below:

Table 12.1 Compliance under various Environmental Acts & Rules

S. No. Environmental Acts & Rules Compliance

1 The Environment (Protection)

Act, 1986 and EIA Notification

dated 14.09.2006

Obtaining Environmental Clearance (EC)

from State Environment Impact

Assessment Authority (SEIAA)/ MOEF-

before start of construction.

Submission of Six-monthly Report of

Compliance of Stipulated EC Conditions

to MOEF/SEIAA/other authority as

mentioned in EC order- Twice a year: 1st

June and 1st December.

Submission of Environmental Statement

(ES) in Form-V to State Pollution Control

Board (SPCB) - Once in a year by 30th

September.

2 The Environment (Protection)

Rules, 1986 Monitoring of stack emission and

compliance to Emission Limits for DG

sets

Monitoring of STP effluent and

compliance to Standards for Discharge of

Effluents

Monitoring of air quality and compliance

to National Ambient Air Quality

Standards

Monitoring of DG noise level and

compliance to Noise limits for DG sets

3 The Water (Prevention &

Control of Pollution) Act, 1974,

and The Air (Prevention &

Control of Pollution) Act, 1981

Obtaining Consent to Establish (NOC)

from HSPCB before establishing the

project

Obtaining Consent to Operate (CTO)

from HSPCB and its periodic renewal.

4 Noise Pollution (Regulation

and Control) Rules, 2000 Monitoring of ambient noise quality and

compliance to Ambient Noise Standards

Page 168: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter XII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 161

S. No. Environmental Acts & Rules Compliance

5 Hazardous Wastes

(Management, Handling &

Transboundary Movement)

Rules, 2008:

Obtaining Authorization for storage &

disposal of hazardous waste (in Form-1)

from SPCB and its periodic renewal

Submission of Annual Return for

hazardous waste (in Form-4) to HSPCB-

Once in a year by 30th

June

Disposal of hazardous waste to authorized

recycler (once in every three months)

Maintaining records of disposal and

transportation

maintaining proper storage space with

display board

6 Water (Prevention and Control

of Pollution) Cess Act, 1977

and Water (Prevention and

Control of Pollution) Cess

Rules, 1978

Submission Monthly Returns for Water

Cess (Form-1) to HSPCB for extraction

of groundwater- Once a month before 5th

of current calendar month

Payment of Cess- when claimed by SPCB

7 Municipal Solid Wastes

(Management and Handling)

Rules, 2000

Segregation of solid wastes in

biodegradable and non-biodegradable

(recyclable) in point of generation and

storage into separate color coded bins.

Disposal of wastes to authorized vendors

12.2Organizational Structure for Environmental Compliance

M/s Emmar MGF Land Ltd. has adequate organizational structure to deal with the

environmental issues and for ensuring compliance with the conditions of

environmental approvals. The organisation structure is shown in the following chart at

Figure 12.1.

Page 169: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT

Group Housing Colony EIA/EMP Report

Village Nangli Umarpur, Chapter XII

Sector-62, Gurgaon, Haryana

M/s EMAAR MGF Land Ltd. 162

Figure 12.1 - Organizational Structure for Environmental Compliance

Page 170: EENNVVVIIIRRROOONNNMMMEEENNNTTT M …environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/...EENNVVVIIIRRROOONNNMMMEEENNNTTT M IIIMMPPPAAACCCTTT S AAASS SSSEEESSSSSMMMEEENNNTTT