EEDI Guidance Notes for Clients

download EEDI Guidance Notes for Clients

of 22

Transcript of EEDI Guidance Notes for Clients

  • 7/22/2019 EEDI Guidance Notes for Clients

    1/22

    Implementing the Energy

    Efficiency Design Index (EEDI)Guidance for owners, operators, shipyards andtank test organisations

  • 7/22/2019 EEDI Guidance Notes for Clients

    2/22

  • 7/22/2019 EEDI Guidance Notes for Clients

    3/22

    i

    Contents

    1. Scope of this document 22. EEDI Purpose 23. EEDI Application 24. Reference lines and reduction factors (required EEDI) 3

    4.1 Reference lines 34.2 Reduction factors and implementation 3

    5. The EEDI equation (attained EEDI) 46. Verification processes for the attained EEDI 5

    6.1 Pre-verification overview 56.2 Final verification overview 5

    7. Verification responsibilities 67.1 Verifier (Classification society/RO) 67.2 Shipbuilder 67.3 Tank test organisation 7

    8. Document submission requirements 88.1 Overall document submission responsibility 88.2 Confidentiality issues 88.3 Pre-verification documents 88.4 Final verification documents 9

    9. Technical methods for EEDI reduction 10Appendices 12

    Appendix 1 Useful references 12Appendix 2 Glossary 12Appendix 3 IMO background on energy efficiency regulation 13Appendix 4 List of parameters that affect the EEDI 13Appendix 5 EEDI reduction phases and cut-off limits 14Appendix 6 Lloyds Register EEDI verification process 15Appendix 7 Review and witness points 16Appendix 8 EEDI technical file contents 18

  • 7/22/2019 EEDI Guidance Notes for Clients

    4/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    2

    1. Scope of this document

    These guidance notes provide advice to owners, operators, shipyards and tank test organisations who arelooking to prepare themselves for mandatory implementation of the Energy Efficiency Design Index (EEDI).

    The guidance covers the following:

    - Current status of the IMO regulations

    - Responsibilities of the different parties involved in EEDI verification

    - Information on what options are currently available for ensuring compliance

    2. EEDI Purpose

    The EEDI is a design index, primarily applicable to new ships, that has been developed by the IMO and is to

    be used as a tool for control of CO2 emissions from ships. The IMO aims to improve the energy efficiency

    of ships via mandatory implementation of the EEDI.

    3. EEDI Application

    The Regulations on Energy Efficiency relating to the EEDI and SEEMP are mandatory from 1st January 2013

    within a new Chapter 4 of MARPOL Annex VI. Within the regulations, there remains the option for

    Administrations to adopt a waiver up to 4 years from the entry-into-force criteria.

    The EEDI affects new ships above 400 gross tonnes1and applies to the ship types shown inTable 1 below.

    A ships attained EEDI (using the equation and verification procedure described in the following sections)

    must be equal to or less than the required EEDI for that ship type and size, which will be a function of the

    reference line value and a reduction factor X i.e.:

    The key documents and guidelines for the calculation and verification of the EEDI are summarised in

    Appendix 1.

    1 At present excludes ships with steam turbine, diesel-electric and hybrid propulsion

    Attained EEDIRequired EEDI = (1-X/100) Reference line value

  • 7/22/2019 EEDI Guidance Notes for Clients

    5/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    3

    4. Reference lines and reduction factors (required EEDI)

    4.1 Reference linesReference lines have been developed by the IMO for a number of ship types. The EEDI reference lines refer

    to statistically average EEDI curves derived from data for existing ships. The reference lines are ship specific

    and dependent on ship type and size. Reference line values are calculated using the following table and

    equation:

    Reference line value = a b-c

    Ship type (as defined in MARPOL Annex VIChapter 4, Regulation 2)

    a b c

    Bulk carrier 961.79 DWT of the ship 0.477

    Gas carrier 1120.00 DWT of the ship 0.456Tanker 1218.80 DWT of the ship 0.488

    Container ship 174.22 DWT of the ship 0.201

    General cargo ship 107.48 DWT of the ship 0.216

    Refrigerated cargo carrier 227.01 DWT of the ship 0.244

    Combination carrier 1219.00 DWT of the ship 0.488

    Passenger shipNot initially subject to reference lines. Attained EEDI

    still needs to be calculated.Ro-ro cargo ship

    Ro-ro passenger shipTable 1: Parameters for determination of reference values for the different ship types (MARPOL Annex VI, Regulation 21)

    4.2 Reduction factors and implementation

    Reduction factors will be used to implement the EEDI in phases so as to gradually reduce the required EEDI

    in much the same way as NOx and SOx limits. These reduction factors will apply to specific ship types and

    sizes given inTable 5 in the Appendix.Figure 1 shows the concept of how these reduction factors will be

    implemented over time.

    EEDI

    [gCO2/te.nm]

    Capacity [DWT or GT]Cut off limit

    0%

    Phase 0: 2013-2015

    -10%

    Phase 1: 2015-2020

    -30%

    Phase 3: 2025 +

    -15%-20%

    Phase 2: 2020-2025

    Figure 1: EEDI concept

  • 7/22/2019 EEDI Guidance Notes for Clients

    6/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    4

    5. The EEDI equation (attained EEDI)

    The EEDI equation calculates the CO2produced as a function of a ships transport work performed. In otherwords, the equation provides a measure of the ships benefit to society byestablishing how much CO2is

    produced per transport work done. This equates to g CO2/ tonne.nm.Figure 2 shows the EEDI calculation

    formula.

    =1 =1

    =1 =1

    =1

    =1

    Main engine(s) Auxiliary engine(s) Energy sav ing technologies (auxiliary power)Energy savingtechnologies (ma in power)

    Transport work

    Figure 2: EEDI equation

    The top line of the EEDI equation is characterised by four key terms, whereby the energy saving

    technologies terms may include, for example, waste heat recovery systems, use of wind power or solar

    power. The CO2produced is based on the product of the power, specific fuel consumption and carbon

    factor for a particular type of fuel used.

    The bottom line of the equation relates the total CO2generated by each of the four terms, to ship capacity

    and speed. In addition, there are a series of correction factors that moderate the equation. These account

    for:Ship design factors (e.g. Ice-Class and shuttle tankers)

    Weather factor for decrease in speed in representative conditions

    Voluntary structural enhancement

    Ships built to Common Structural Rules (CSR)

    Capacity correction for chemical tankers and LNG ships

    The calculation of the EEDI is detailed within the 2012 Guidelines on the Method of Calculation of the

    Attained EEDI for New Ships (IMO Resolution MEPC.212(63)

    A list of parameters that have an effect on the EEDI is included in Appendix 4.

  • 7/22/2019 EEDI Guidance Notes for Clients

    7/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    5

    6. Verification processes for the attained EEDI

    Verification of the EEDI is in two stages; pre-verification which commences at the design stage and final

    verification upon completion of the sea trials and commissioning. Details of the verification methodology

    are given in IMO resolution MEPC.214(63) and the overview process is shown below:

    Figure 3: IMO EEDI Survey and Certification Process (MEPC.214(63))

    6.1 Pre-verification overview

    Pre-verification at the design stage, requires model tests to obtain the ship predicted speed and power in

    the EEDI and sea trial condition and the development of an EEDI Technical File (EEDI-TF) containing

    necessary information to support the verification of the calculated AttainedEEDI.

    6.2 Final verification overview

    Final verification of the AttainedEEDI will normally be done based on completion of commissioning trials

    in order to determine the reference (EEDI) speed from corrected speed-power performance of the ship.

    This will be assessed using the IMO preferred standard of ITTC 7.5-04-01-01.2 or ISO 15016:2002 and

    speed trials should be carried out for at least three points (the range of which to include 75% MCR) for

    each ship in order to establish the reference (EEDI) speed for the calculation. If a trial is not possible under

    EEDI conditions, the results will have to be extrapolated by methods acceptable to the verifier. Allverification will be carried out by an RO.

    Basic Design Tank Test*,

    EEDI Calculation

    Submission of additional

    information

    Sea Trial

    Shipowner Shipbuilder Verifier

    Develo ment of EEDI Technical File

    Application for EEDI pre-verification

    Submission of EEDI Technical

    File

    Application for EEDIverification

    Modification and Resubmission of EEDI Technical File

    Verification- EEDI Technical File- additional information

    Issuance ofReport of pre-verification

    Verification- sea trial condition- ship speed

    - revised EEDI Technical File

    Issuance ofReport of verification

    Start of ship construction

    Delivery of ship* To be conducted by a test

    organisation or a shipbuilder itself.

    Witness Model Tank Test

  • 7/22/2019 EEDI Guidance Notes for Clients

    8/22

  • 7/22/2019 EEDI Guidance Notes for Clients

    9/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    7

    - Revise the EEDI technical file and/or other associated documents if found not to be in accordance with

    IMO guidelines

    - Conduct the sea trial to an agreed standard, for example:

    - ITTC 7.5-04-01-01.1

    - ISO 19019:2005

    - Perform the speed-power results analysis in accordance with the standards accepted by the IMO:

    - ITTC 7.5-04-01-01.2 (IMO preferred method)

    - ISO 15016:2002

    - Make all necessary arrangements for the verifier surveyors to attend the sea trial

    7.3 Tank test organisation

    The tank test organisation has a key role in the pre-verification stage and the key responsibilities are

    summarised below:

    - Provide the verifier with the information and access required in order to check its quality system. If

    previous experience is insufficiently demonstrated, the tank test facility should allow the verifier to

    possibly audit its quality management system.

    - Provide the verifier with the documents required in accordance with the IMO guidelines, summarised

    inTable 2.

    - Make all necessary arrangements for the verifier surveyors to attend part of the model tank tests which

    are directly related to the EEDI.

    - Allow the verifier surveyor to check key points of the process in accordance with the Industry

    Guidelines (MEPC 64/INF22) and as summarised inTable 6.In particular, allow the verifier to check

    that the power curves at full scale are determined in a consistent way between sea trials and EEDIloading conditions, applying the same calculation process of the power curves and considering

    justifiable differences of experience based parameters between the two conditions.

    It is recognised that required IMO procedures for sea trial may differ than existing shipyard

    practices (e.g. the number of speed-power measurements and length of run).

    However, for the purposes of EEDI verification the IMO procedures must be followed,

    otherwise the Verifier may consider the sea trial invalid and, subsequently, be unable to

    issue an International Energy Efficiency Certificate (IEEC)

  • 7/22/2019 EEDI Guidance Notes for Clients

    10/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    8

    8. Document submission requirements

    8.1 Overall document submission responsibility

    Although some of the documents contained below (e.g. tank test reports) may originate from a third party

    (e.g tank test organisation) it is the shipbuilders responsibility to request and ensure that these documents

    are submitted to the verifier.

    8.2 Confidentiality issues

    In line with the IMO Verification Guidelines (4.1.2), it is recognized that the documents listed above may

    contain confidential information of submitters, which requires Intellectual Property Rights (IPR) protection.

    In the case where the submitter requires a non-disclosure agreement with the verifier, the additional

    information should be provided to the verifier upon mutually agreed terms and conditions.In this case, Non-Disclosure Agreements (NDAs) need to be signed between:

    - The shipbuilder and the verifier, for information owned by the shipbuilder

    - The tank test organisation and the verifier, for information owned by the tank test organisation facility

    8.3 Pre-verification documents

    Document Description

    EEDI Technical FileEEDI Technical File as defined in the IMO Verification Guidelines. See example ofthe EEDI Technical File in Appendix 1 of IMO Verification Guidelines

    NOx Technical File

    Copy of the NOx Technical File and documented summary of the SFC correction

    for each type of main and auxiliary engine with copy of EIAPP certificate.Note: if the NOx Technical File has not been approved at the time of thepreliminary verification, the SFC value with the addition of the guaranteetolerance is to be provided by Manufacturer. In this case, the NOx Technical Fileshould be submitted at the final verification stage.

    Electric Power TableIf PAE is significantly different from the values computed using the formula in2.5.6.1 or 2.5.6.2 of the IMO Calculation Guidelines

    Ship lines andmodel particulars

    - Lines of ship- Report including the particulars of the ship model and propeller model

    Verification file ofpower limitationtechnical

    arrangement

    If the propulsion power is voluntarily limited by verified technical means

    Power curvesPower-speed curves predicted at full scale in sea trial condition and EEDIcondition

    Description of thetank test facilityand tank testorganisationquality manual

    If the verifier has no recent experience with the tank test facility and the tanktest organization quality system is not ISO 9001 certified.- Quality management system of the tank test including process control,ustifications concerning repeatability and quality management processes- Records of measuring equipment calibration as described in Appendix 3- Standard model-ship extrapolation and correlation method (appliedmethod and tests description)

    Gas fuel oil generalarrangement plan

    If gas fuel is used as the primary fuel of the ship fitted with dual fuel engines.Gas fuel storage tanks (with capacities) and bunkering facilities bare to bedescribed

    Tank Tests Plan Plan explaining the different steps of the tank tests and the scheduledinspections allowing the verifier to check compliance with the items listed in

  • 7/22/2019 EEDI Guidance Notes for Clients

    11/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    9

    Appendix 1 of the industry guidelines concerning tank tests

    Tank Tests Report

    - Report of the results of the tank tests at sea trial and EEDI condition asrequired in Appendix 4 of the industry guidelines2- Values of the experience-based parameters defined in the standard

    model-ship correlation method used by the tank test organization/shipyard- Reasons for exempting a tank test, only if applicable- Numerical calculations report and validation file of these calculations, only ifcalculations are used to derive power curves

    Ship referencespeed Vref

    Detailed calculation process of the ship speed, which should include theestimation basis of experience-based parameters such as roughnesscoefficient, wake scaling coefficient

    Table 2: Pre-verification documents (Industry Guidelines, MEPC 64/INF.22)

    8.4 Final verification documents

    Document Description

    Sea trials planDescription of the test procedure to be used for the speed trial, with number ofspeed points to be measured and indication of PTO/PTI to be in operation, ifany.

    Sea trials reportReport of sea trials with detailed computation of the corrections allowingdetermination of the reference speed Vref

    Final stability fileFinal stability file including lightweight of the ship and displacement table basedon the results of the inclining test or the lightweight check

    Final power curvesFinal power curve in the EEDI condition showing the speed adjustmentmethodology

    Revised EEDItechnical file

    Including identification of the parameters differing from the calculationperformed at the initial verification stage

    Ship lines Lines of ship as built

    NOx Technical File In case this has not been submitted at the pre-verification

    Table 3: Final verification documents (Industry Guidelines, MEPC 64/INF.22)

    2MEPC 64/ INF.22 or latest revision

  • 7/22/2019 EEDI Guidance Notes for Clients

    12/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    10

    9. Technical methods for EEDI reduction

    There are a number of technical methods, at present, that are being explored in order to help owners

    reduce the EEDI of their ships. All of these methods fall broadly under four key categories:

    Design

    Design for increased capacity and/or lighter ships;

    Innovative / renewable technologies, reducing all or significant portion of CO2 using mainlyrenewable energy;

    Technology

    Engine selection for speed reduction;

    Use of energy efficient technologies requiring less fuel for same amount of power;

    Operation

    Speed reduction

    Fuel

    Use of low carbon fuels.

    The table below describes some of the considerations in regard to some of the potential solutions for each

    of these methods.

    Technicalmethod

    Potentialsolution

    Comments

    Design Increase indeadweight

    There may be scope for increasing the deadweight of a ship via

    reductions in lightweight or improved design. Considerationshould be given to ensuring adequate structural safety margins ifreducing design scantlings.

    Hulloptimisation

    Hull form resistance constitutes about 70% of the powerconsumed. Hull optimisation can yield significant fuel savings,especially if starting from a hydrodynamically poor hull.Improvements can be made to the bulbous bow, hullform, sternbulb, transom or appendages as required.

    Aerodynamicoptimisation

    In a strong headwind, aerodynamic drag can contribute more than10% of the total ship resistance. For many vessel types, this losscan be significantly reduced through superstructure modifications,flow deflectors, fairings and bow visors.

    Propulsiveoptimisation

    Wake field optimisation can improve propeller efficiency, reducefuel consumption, and limit adverse cavitation effects such aserosion, noise and vibration. This is best achieved through localhull form modifications. The location of flow improvement deviceson the hull or rudder can also be optimised

    Wind power

    Offers the potential for considerable CO2 savings. Investment isrequired in terms of installing propulsion systems e.g. sails and kitetechnology. Consideration needs to be given to any requiredstructural enhancements to cater for increased loads. Reliance isplaced on consistent wind conditions in order to benefit from thissource of energy.

    Solar power Photovoltaic cells (solar panels) are another form of renewable

  • 7/22/2019 EEDI Guidance Notes for Clients

    13/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    11

    Technicalmethod

    Potentialsolution

    Comments

    energy that can offer significant CO2 and other emission

    reductions. The cost to benefit ratio of this source is quite high as alarge area of cells are required to produce a small amount ofpower. At present, the efficiency of this technology means energyconcentrations can augment power requirements but not replace aships primary power source.

    Nuclear power

    This source of energy could remove all CO2, NOx and SOxemissions. Other benefits of this technology include smaller spacerequirements for the power source therefore potential forincreased cargo capacity. Nuclear power is becoming morecompetitive given rising fuel oil prices although issues surroundingsafety and disposal of nuclear waste remain.

    Technology Engine selection Many engine manufacturers now offer improved engine designsaimed at optimising performance.

    Efficienttechnologies(hull coatings, hullappendages,waste heatrecovery systemsetc.)

    Many technologies are available off-the-shelf although cansometimes be difficult to quantify their benefits. Some, forexample advanced hull coatings, are being increasingly usedwhereas waste heat recovery and hull-propeller systems could beused if their cost-effectiveness is improved.

    Operation Speed reduction

    Slow steaming is very effective at reducing consumption and CO2

    but may require the ship to operate outside its rated envelopemeaning lower combustion temperatures and pressures leading tohigher maintenance and possible increase in particulate matteremissions. Reducing the speed of the world fleet may also fuel theshift in freight transport to other modes such as land and air inorder to maintain capacity.

    Fuel LNG

    Demand is increasing from owners wishing to use this fuel.Replacing conventional marine fuel oil with LNG would potentiallyeliminate SOx emissions and drastically reduce NOx emissionswhilst reducing CO2 by around 20%. LNG availability is limited incertain global areas with limited refuelling terminals anddevelopment of new terminals is linked to demand and vice versa.Other considerations of the use of LNG relate to safe use and the

    increased storage onboard in specialised tanks. Methane slip fromLNG use is potentially more harmful than the benefits.

    Biofuels

    An attractive alternative to marine diesel in terms of potentialsavings in CO2 emissions although the impact of bio-fuelproduction is not fully clear. Bio-diesel is expensive in comparisonto marine diesel and the lower energy content means largerbunker tanks would be required onboard ships.

    Table 4: Examples of innovative technical and fuel options for EEDI Reduction

  • 7/22/2019 EEDI Guidance Notes for Clients

    14/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    12

    Appendices

    Appendix 1 Useful references1. IMO Resolution MEPC.203(62);

    2. 2012 Guidelines on the Method of Calculation of the Energy Efficiency Design Index (EEDI) for new

    ships, MEPC.212(63);

    3. 2012 Guidelines on Survey and Certification of the Energy Efficiency Design Index (EEDI)

    MEPC.214(63);

    4. Guidelines for Calculation of Reference Lines for use with the Energy Efficiency Design Index (EEDI)

    MEPC.215(63);

    5. BIMCO, CESA, IACS, ICS, INTERCARGO, INTERTANKO, ITTC, OCIMF and WSC, First version of industry

    guidelines on calculation and verification of the Energy Efficiency Design Index (EEDI), MEPC 64/INF.22

    6. International Towing Tank Conference, ITTC Recommended Procedures 7.5-04-01-01.2.1, "Speed and

    Power Trials, Part 1 Preparation and Conduct" and 7.5-04-01-01.2, "Speed/power trials, part 2,analysis of speed/power trial data", MEPC 64/INF.6

    7. International Organization for Standardization, ISO 15016:2002 Guidelines forthe assessment of

    speed and power performance by analysis of speed trial data

    8. Lloyds Register EEDI Frequently Asked Questions (www.lr.org/eedi)

    Appendix 2 Glossary

    Term Definition

    COP Conference Of Parties

    DAD Lloyds Register Design Appraisal Document

    DSO Lloyds Register Design Support Office

    EEDI Energy Efficiency Design Index

    EEDI-TF Energy Efficiency Design Index Technical File

    EEOI Energy Efficiency Operational Indicator

    GHG Greenhouse Gas

    IMO International Maritime Organisation

    MCR Maximum Continuous Rating

    MEPC Marine Environmental Protection Committee

    RO Recognised Organisation

    SEEMP Ship Energy Efficiency Management Plan

    SFC Specific Fuel Consumption

    Tank TestModel towing tests, model self-propulsion tests and model propelleropen water tests. Numerical tests may be accepted as equivalent tomodel tests.

    VerifierAdministration, or any person or organization duly authorized by

    it, which conducts the survey and certification of the EEDI

  • 7/22/2019 EEDI Guidance Notes for Clients

    15/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    13

    Appendix 3 IMO background on energy efficiency regulation

    The International Maritime Organisation (IMO), as the main regulatory body for shipping, has, in recent

    years, devoted significant time and effort in order to regulate shipping energy efficiency and therebycontrol the marine GHG emissions. For this purpose, IMO has developed a number of technical and

    operational measures that include:

    Energy Efficiency Design Index (EEDI);

    Energy Efficiency Operational Index (EEOI);

    Ship Energy Efficiency Management Plan (SEEMP).

    The IMO has also been working on a number of Market-Based Measures (MBMs) for the marine industry.

    The MBMs development is still ongoing.

    The EEDI represents one of the major technical regulations for marine CO2 reduction and the IMO, under

    the banner of the Marine Environmental Protection Committee (MEPC) and its associated Energy Efficiency

    working group, has been finalising the regulations and guidelines for the EEDI with input from each of thevarious flag states and other industry bodies.Figure 5 shows the MEPCs activity timeline.

    Figure 5: IMO timeline

    Appendix 4 List of parameters that affect the EEDI

    The following are provided as a list of typical parameters which may have an effect on the ships EEDI.

    Note: This is not an exhaustive list.

    1. Ship type and design for ice

    2. Type of fuel

    3. Size and specific fuel consumption of main engines (or main propulsion motors)

    4. Specific fuel consumption of auxiliary (power generation) engines

    5. Hull form

    6. Hull appendices

    7. Propeller

    8. Electric power requirement for non-propulsion systems

    9. Capacity at summer load line

    10.Draft and trim at summer load line

    11.Energy saving devices as specified in EEDI Technical File

    Resolution A.963 (23) IMO

    policies and practicesrelated to reduction of GHGemissions from ships

    MEPC Circ.471Energy EfficiencyOperational Indicator

    Dec

    2003Jun

    2005Mar

    2008Jun

    2008

    GHG WorkingGroup 1

    Oct

    2008Feb

    2009Jul

    2009Mar

    2010Jun

    2010Sep

    1997

    Reg text

    Jul2011

    EEDI &SEEMP

    Adopted

    Sep2010

    Resolution 8CO2emissionsfrom ships

    GHG WorkingGroup 2

    MEPC Circ. 681 EEDI Calculation

    MEPC Circ. 682 EEDI VerificationMEPC Circ. 683 SEEMPMEPC Circ. 684 EEOI

    EnergyEfficiency

    orking Group

    MEPC 40 MEPC 53 MEPC 57 MEPC 58 MEPC 59 MEPC 60 MEPC 61 MEPC 62

    Mar

    2012

    Guidelines Adopted:MEPC.212(63) EEDI Calculation

    MEPC.213(63) SEEMPMEPC.214(63) EEDI VerificationMEPC.215 63 EEDI Ref Lines

    MEPC 63 MEPC 64

    Finalisation

    Oct

    2012

  • 7/22/2019 EEDI Guidance Notes for Clients

    16/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    14

    Appendix 5 EEDI reduction phases and cut-off limits

    Ship type Size

    Phase 0

    1-Jan-13 to31-Dec-14

    Phase 1

    1-Jan-15 to31-Dec-19

    Phase 2

    1-Jan-20 to31-Dec-24

    Phase 3

    1-Jan-25onwards

    Bulk carrier 20,000 DWT and above 0 10 20 30

    10,000 20,000 DWT n/a 0-10* 0-20* 0-30*

    Gas carrier 10,000 DWT and above 0 10 20 30

    2,000 10,000 DWT n/a 0-10* 0-20* 0-30*

    Tanker 20,000 DWT and above 0 10 20 30

    4,000 20,000 DWT n/a 0-10* 0-20* 0-30*

    Container ship 15,000 DWT and above 0 10 20 30

    10,000 15,000 DWT n/a 0-10* 0-20* 0-30*

    General cargo ship 15,000 DWT and above 0 10 15 30

    3,000 15,000 DWT n/a 0-10* 0-15* 0-30*

    Refrigerated cargocarrier

    5,000 DWT and above 0 10 15 30

    3,000 5,000 DWT n/a 0-10* 0-15* 0-30*

    Combination carrier 20,000 DWT and above 0 10 20 30

    4,000 20,000 DWT n/a 0-10* 0-20* 0-30*

    Table 5: Reduction factors (X) for Required EEDI versus Attained EEDI (MARPOL Annex VI, Regulation 21)

  • 7/22/2019 EEDI Guidance Notes for Clients

    17/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    15

    Appendix 6 Lloyds Register EEDI verification process

    Figure 6: Lloyds Register EEDI verification and certification process

    Shipyard or Shipowner

    Initial data submission by theyard or owner to DSO

    Preliminary data review byDSO to ensure all required

    data is available

    Contact the yard orowner for additional

    or correct data

    Issuance of Pre-verificationDesign Appraisal Document

    (DAD) b the DSO to the ard

    Verification of the agreedspeed trial by the attending

    surveyor during sea trial

    Final data submission by theyard or owner inclusive ofs eed trial results to DSO

    Preparation and issuance of

    the final verification DAD bythe DSO to yard or owner

    Shipyard or Shipowner

    DSO

    DSO/ LR Field Surveyor

    LR Field Surve or

    DSO/ LR Field Surveyor

    Pre-Verification

    FinalVerification

    Independent calculation ofEEDI and completion of

    checklists

    Independent calculation ofEEDI and completion of

    checklists

    DSO

    DSO

    Issuance of EEDI certificate byLR Surveyor to yard or ownerLR Field Surveyor

    Yard or owner requests LRattendance to witness model

    tank tests for EEDI

    Unless technical justificationprovided why tank test omitted

    for a ship of same type asdefined by IMO Guidelines

    Shi ard or Shi owner

  • 7/22/2019 EEDI Guidance Notes for Clients

    18/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    16

    Appendix 7 Review and witness points

    Ref. FunctionSurveymethod

    Reference documentDocumentation to be

    made available tothe verifier

    Remarks

    01 EEDI Technical File ReviewIMO VerificationGuidelinesIndustry guidelines

    3

    Documents in table 2 ofthe industry guidelines

    02 Limitation of power ReviewIMO CalculationGuidelines

    Verification file oflimitation technicalmeans

    Only If means of limitation are fitted

    03 Electric Power Table ReviewAppendix 2 to IMOCalculation GuidelinesAppendix 2 to IMOVerification Guidelines

    EPTEPT-EEDI form

    Only if PAE is significantly different from the valuescomputed using the formula in 2.5.6.1 or 2.5.6.2 ofthe IMO Calculation Guidelines

    04Calibration of tanktest measuringequipment

    Review &witness

    Appendix 3 of industryguidelines

    Calibration reportsCheck at random that measuring devices are wellidentified and that calibration reports are currentlyvalid

    05Model tests shipmodel

    Review &witness

    Appendix 4 of industryguidelines

    Ship lines plan & offsetstableShip model report

    Checks described in appendix 4.1 of the industryguidelines

    06Model tests propeller model

    Review &witness

    Appendix 4 of industryguidelines

    Propeller model reportChecks described in appendix 4.2 of the industryguidelines

    07

    Model tests Resistance test,Propulsion test,Propeller openwater test

    Review &witness

    Appendix 4 of industryguidelines

    Tank tests report

    Checks described in appendix 4.3 of the industryguidelinesNote: propeller open water test is not needed if astock propeller is used. In this case, the open watercharacteristics of the stock propeller are to beannexed to the tank tests report.

    08Model-shipextrapolation andcorrelation

    Review

    ITTC 7.5-02-03-01.4

    1978 ITTC performanceprediction method(rev.02 of 2011 orsubsequent revision)Appendix 4 of industryguidelinesIndustry guidelines 15.7

    Documents in table 2 ofthe industry guidelines

    Check that the ship-model correlation is based on

    thrust identity with correlation factor according tomethod 1( CPCN) or method 2(CFC -wC) Checkthat the power-speed curves obtained for theEEDI condition and sea trial condition are obtainedusing the same calculation process with justifiedvalues of experience-based parameters

    3MEPC 64/ INF.22 or latest revision

  • 7/22/2019 EEDI Guidance Notes for Clients

    19/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    17

    09Numericalcalculationsreplacing tank tests

    ReviewITTC 7.5-03-01-04 (latestrevision) or equivalent

    Report of calculations

    10Electrical machinerysurvey prior to seatrials

    WitnessAppendix 2 to IMOVerification Guidelines

    Only if PAE is computed from EPT

    11Programme of seatrials

    ReviewIMO VerificationGuidelines

    Programme of sea trialsCheck minimum number of measurement points (3)Check the EEDI condition in EPT (if PAE is computedfrom EPT)

    12 Sea trials WitnessISO 19019:2005 or ITTC7.5-04-01-01.1 (latestrevision)

    Check:- Propulsion power, particulars of the engines- Draught and trim-

    Sea conditions- Ship speed- Shaft power & rpmCheck operation of means of limitations of enginesor shaft power (if fitted)Check the power consumption of selectedconsumers included in sea trials condition EPT (ifPAE is computed from EPT)

    13Sea trials speed/poweranalysis

    ReviewISO 15016:2002 or ITTC7.5-04-01-01.2

    Sea trials report

    Check that the displacement and trim of the ship insea trial condition has been obtained with sufficientaccuracyCheck compliance with ISO 15016:2002 or or ITTC7.5-04-01-01.2

    14

    Sea trials adjustment fromtrial condition toEEDI condition

    Review Industry guidelines 16.2Power curves after seatrial

    Check that the power curve estimated for EEDIcondition is obtained by power adjustment

    15EEDI Technical File revised

    after sea trials

    ReviewIMO VerificationGuidelines

    Revised EEDI technicalfile

    Check that the file has been updated according tosea trials results

    Table 6: Summary of review and witness points (industry Guidelines, MEPC 64/INF..22)

  • 7/22/2019 EEDI Guidance Notes for Clients

    20/22

    Implementing the Energy Efficiency Design IndexVersion 3.0, December 2012

    18

    Appendix 8 EEDI technical file contents

    The EEDI technical file should contain the following information:

    Ship details including principal dimension and particulars;Ships main and auxiliary engines particulars;

    Ship speed-power curve and a description of the source and calculation method of the speed-powercurve;

    Ship speed at 75% main engines MCR together with ship speed-power curve showing thecorresponding speed and power;

    Ship auxiliary power requirement and calculated values of auxiliary power PAE;

    A general schematic diagram of propulsion system and auxiliary power supply and interlink between thetwo systems if any;

    A list of energy saving equipment that has been included in EEDI calculation;

    All the relevant correction factors and reasons for their choice or use;Calculated attained EEDI of vessel including the specific numbers used as input to the equation.

    A sample EEDI technical file is included within the industry guidelines (Appendix 2 of MEPC 64/INF.22).

  • 7/22/2019 EEDI Guidance Notes for Clients

    21/22

  • 7/22/2019 EEDI Guidance Notes for Clients

    22/22

    For further information, contact your local Lloyds Register Group office.

    www.lr.org/eedi

    Lloyd's Register is a trading name of Lloyd's Register Group Limited and its subsidiaries.

    For further details, please see our websitewww.lr.org/entities

    Lloyd's Register Group Limited,its affiliates and subsidiaries and their respective officers,

    employees or agents are, individually and collectively, referred to in this clause as the

    'Lloyd's Register'. Lloyd's Register assumes no responsibility and shall not be liable to any

    person for any loss, damage or expense caused by reliance on the information or advice

    in this document or howsoever provided, unless that person has signed a contract with

    the relevant Lloyd's Register entity for the provision of this information or advice and in

    that case any responsibility or liability is exclusively on the terms and conditions set out in

    that contract.

    http://www.lr.org/entitieshttp://www.lr.org/entitieshttp://www.lr.org/entities