EE/CS 480/481
104/21/23 05:45 PM University of Portland School of Engineering
Project Gallon House Program Review 5
TeamEvan McNichols
Brian Myles
Joe Oletti
AdvisorsProf. Nuxoll, Dr. Crenshaw, Dr. Osterberg
Industry RepresentativeWalt Harrison
Intel, etc
EE/CS 480/481
2University of Portland School of Engineering
Overview
• Introduction
• Scorecard
• Additional Accomplishments
• Plans
• Issues/Concerns
• Conclusions
04/21/23 05:45 PM
EE/CS 480/481
3University of Portland School of Engineering
Introduction• 24 hour clock with bells and whistles
– Time, Day, Class, Greeting, Ten-minute count down till next class
04/21/23 05:45 PM
EE/CS 480/481
4University of Portland School of Engineering
Scorecard
• Acquired CPLD– Big relief
• Created logic to drive 10-min countdown LEDs
• Polished up PCB and displays boards even more
04/21/23 05:45 PM
EE/CS 480/481
5University of Portland School of Engineering
Additional Accomplishments
• Acquired 1 Hz clock
• Mock-up of display boards
04/21/23 05:45 PM
EE/CS 480/481
6
Display Boards
Machine-information-systems.com, http://www.machine-information-systems.com/DisplayBoards.html, 2007
04/21/23 University of Portland School of Engineering
EE/CS 480/481
7
PCB
04/21/23 University of Portland School of Engineering
EE/CS 480/481
8University of Portland School of Engineering
Plans
• Program CPLD
• Order PCB (end of the month)
• Begin assembling component boards
• Have front face constructed
04/21/23 05:45 PM
EE/CS 480/481
9University of Portland School of Engineering
MilestonesNumber Description Original
08 Oct 09Previous29 Jan 09
Present27 Feb 09
16 CPLD Testing Completed 31 Jan 31 Jan 6 Mar
17 Finalize PCB design 31 Jan 31 Jan 28 Feb
17 Receive MOSIS Chip 15 Mar 15 Mar 15 Mar
18Complete System Test with
MOSIS22 Mar 22 Mar 22 Mar
19 Case Build Completed 31 Mar 31 Mar 31 Mar
04/21/23 05:45 PM
EE/CS 480/481
10University of Portland School of Engineering
Concerns/Issues
• Testing with CPLD– Behind almost 1 month
• Group members and AFROTC
• Finalizing PCB
04/21/23 05:45 PM
EE/CS 480/481
11University of Portland School of Engineering
Conclusions
• Scorecard– 99.9% finished with PCB
• Additional Accomplishments– Mock-up of display boards, 1 Hz clock
• Plans– CPLD burn and test run
• Issues/Concerns– AFROTC and PCB
04/21/23 05:45 PM
EE/CS 480/481
12
Questions
Newsday.com, http://weblogs.newsday.com/news/local/longisland/politics/blog/2008/12/substance_questions_caroline_d.html, 2008
04/21/23 University of Portland School of Engineering