Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.
Facility Assessment Report
Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors
Campus Summary
Main 1903 16,964 $613,7023
CPC 1996 6,087 $336,5491
Addition 1 1914 55,927 $2,420,8023
Addition 2 1922 21,852 $1,261,2833
Annex 1948 40,499 $1,864,0173
SITE $568,776
Campus Total $7,065,129141,329
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Exterior Doors - Exterior Steel Door Door 3 - Southwest 6EA3 $1,442
Exterior Stairs - Concrete Door 3 - Southwest 6LF9 $736
Foundation
Foundation - Masonry Entire Building 7LF4,241 $0
Superstructure - Heavy Timber Entire Building 7SF16,964 $0
Roof System
Coping - Clay Tile Main Roof 6LF207 $6,648
Coping - Terra Cotta Main Roof 6LF99 $3,180
Downspouts - Exterior Downspouts Main Roof split4LF50 $6,773
Downspouts - Interior Downspouts Main Roof 7LF50 $0
Parapet - 16" - 30" Height Main Roof 6LF163 $6,513
Parapet - Parapet < 16" Height Main Roof 6LF123 $2,621
Roof Structure - Heavy Timber Main Roof 7SF4,241 $0
Roof - Modified Bitumen Main Roof 6SF4,241 $39,905
Page 1 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Walls
Exterior Walls - Brick Entire Building 6SF6,486 $43,592
Exterior Walls - Stone-Cast Entire Building 6SF828 $5,565
Exterior Walls - Stucco Entire Building 6SF1,104 $5,289
Windows
Guard - Guards wire guard Entire Building 6SF405 $5,172
Lintels - Steel Entire Building 7LF116 $0
Lintels - Stone Entire Building 7LF49 $0
Windows - Sash Lexan Entire Building 6SF1,755 $13,100
Building Exterior Subtotal: $140,536
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Emergency A/C Power - Corridors and Stairs Entire Building 6SF3,523 $1,058
Emergency Battery Packs - Corridors and Stairs Entire Building (14) exit signs and (1) combination exit and
emergency light.
6EA15 $3,038
Exit Signs - Corridors and Stairs Entire Building 6EA15 $2,246
Security System - CCTV Entire Building Exterior cameras only. 6SF16,964 $5,094
Security System - Intrusion Detection Entire Building 6SF19,694 $5,069
Main Service
Independent Electrical Service for emergency power Fire Pump Room Secondary service for the fire pump. 6EA1 $2,921
PA System Entire Building Serves main, addition 1 and addition 2. Control console is located in addition 1.
6SF16,964 $5,579
Electrical System Subtotal: $25,005
Building: Main
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm_System Entire Building Obsolete technology. Manual pull stations only. Panel located in Addition 1.
4SF16,964 $33,719
Fire Pump Controller Entire Building / Basement 6EA1 $1,823
Page 2 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Main
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Pump Room Assembly
Fire Pump - Less than 25hp Fire Pump Room Serves main and both additions. 6EA1 $1,558
Sprinkler System
Dry Sprinkler System Entire Building 6SF16,964 $4,367
Sprinkler Heads Entire Building 7SF16,964 $0
Sprinkler Piping Entire Building 7SF16,964 $0
Safty System Subtotal: $41,467
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Heating Devices
Wall Heater - Electric Entire Building Missing cover, exposed wires. Student toilet. 4EA1 $1,083
Wall Heater - Electric Entire Building 6EA3 $417
Temperature Control
Pneumatic System Entire Building Most pneumatic lines cut. Thermostats are damaged or missing. All building is controlled manually via the boilers. Building gets excessively hot.
3SF16,964 $88,301
Thermostats - Pneumatic Entire Building / 1st Floor Missing or damaged thermostats. 4EA4 $2,949
Thermostats - Pneumatic Entire Building Thermostats are past useful life and cannot control temperature.
4EA4 $2,949
Ventilation
Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Roof 6EA1 $592
Exhaust Fans- Roof Mounted - Less than 500 CFM Roof Motor removed.3EA1 $1,942
Mechanical System Subtotal: $98,233
Building: Main
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF16,964 $3,396
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF16,964 $4,124
Domestic Piping-Cold Water Risers Entire Building 6SF16,964 $3,154
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF16,964 $2,668
Page 3 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Main
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Piping
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF16,964 $3,154
Domestic Piping-Hot Water Return Lines Entire Building 6SF16,964 $2,426
Domestic Piping-Hot Water Return Risers Entire Building 6SF16,964 $2,426
Sanitary Piping Entire Building 6SF16,964 $15,525
Storm Piping Entire Building 6SF16,964 $14,798
Vent Piping Entire Building 6SF16,964 $11,402
Plumbing System Subtotal: $63,072
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #103 (Regular Classroom)
Ceiling - Plaster/Drywall 1st Floor 6SF857 $2,966
Ceiling - Plaster/Drywall 1st Floor crack5SF12 $150
Chalk Board 1st Floor 4LF36 $3,305
Doors - Transom Window 1st Floor 6SF8 $135
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Wood 1st Floor 6SF869 $6,126
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Storage/ Closet 1st Floor 6SF61 $442
Walls - Plaster/Drywall 1st Floor 6SF1,376 $3,798
Classroom #104 (Regular Classroom)
Ceiling - Plaster/Drywall 1st Floor 6SF869 $3,007
Chalk Board 1st Floor 4LF28 $2,571
Doors - Transom Window 1st Floor 6SF8 $135
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF844 $1,847
Floor - Tile 1st Floor damaged5SF25 $144
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Storage/ Closet 1st Floor peeling5SF184 $2,968
Walls - Plaster/Drywall 1st Floor 6SF1,376 $3,798
Classroom #203 (Special Education)
Ceiling - Plaster/Drywall 2nd Floor 6SF869 $3,007
Chalk Board 2nd Floor 4LF12 $1,102
Doors - Transom Window 2nd Floor 6SF8 $135
Page 4 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #203 (Special Education)
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Tile 2nd Floor 6SF869 $1,901
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF16 $0
Storage/ Closet 2nd Floor minor peeling6SF184 $1,334
Walls - Plaster/Drywall 2nd Floor 6SF1,376 $3,798
Classroom #303 (Regular Classroom)
Ceiling - Plaster/Drywall 3rd Floor 6SF854 $2,955
Ceiling - Plaster/Drywall 3rd Floor peeling5SF15 $187
Chalk Board 3rd Floor 4LF36 $3,305
Doors - Transom Window 3rd Floor 6SF16 $271
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Wood 3rd Floor 6SF869 $6,126
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Storage/ Closet 3rd Floor peeling paint5SF184 $2,968
Walls - Plaster/Drywall 3rd Floor peeling paint5SF1,376 $10,429
Classroom #304 (Regular Classroom)
Ceiling - Plaster/Drywall 3rd Floor 6SF869 $3,007
Chalk Board 3rd Floor 4LF24 $2,203
Doors - Transom Window 3rd Floor 6SF8 $135
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF869 $6,126
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Storage/ Closet 3rd Floor 10' of closet damaged6SF184 $1,334
Walls - Plaster/Drywall 3rd Floor need painting5SF1,376 $10,429
Classrooms Subtotal: $94,554
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Library
Ceiling - Plaster/Drywall Room 204 6SF869 $3,007
Doors - Transom Window Room 204 6SF8 $135
Doors - Wood Doors inclu hw Room 204 split5EA1 $1,174
Floor - Tile Room 204 cracked throughout5SF869 $3,902
Page 5 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Library
Lighting - Pendent/Surface Room 204 7EA14 $0
Storage/ Closet Room 204 6SF184 $1,334
Walls - Plaster/Drywall Room 204 needs painting5SF1,376 $10,429
Lunch & Multipurpose Room
Ceiling - Plaster/Drywall Basement - Lunch/office 6SF350 $1,211
Doors - Wood Doors inclu hw Basement - Lunch/office 6EA1 $301
Floor - Tile Basement - Lunch/office 6SF344 $753
Floor - Tile Basement - Lunch/office broken, cracked tile5SF6 $35
Lighting - Lay-in Basement - Lunch/office 7EA4 $0
Walls - Plaster/Drywall Basement - Lunch/office 6SF672 $1,855
Walls - Plaster/Drywall Basement - Lunch/office cracked, water damaged plaster5SF8 $41
Mechanical/ Service Rooms
Mechanical/ Service Rooms Basement Includes Pump rm. 6SF78 $559
Storage Room Basement Includes class rm 4, class rm 56SF850 $6,090
Restroom
Accessories 1st Floor Boy's- By 104 6SF263 $2,426
Ceiling - Plaster/Drywall 1st Floor Boy's- By 104 6SF263 $910
Doors - Wood Doors inclu hw 1st Floor Boy's- By 104 6EA2 $602
Floor Drain 1st Floor Boy's- By 104 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st Floor Boy's- By 104 6SF263 $557
Lavatory 1st Floor Boy's- By 104 6EA2 $639
Lighting - Pendent/Surface 1st Floor Boy's- By 104 6EA5 $619
Partitions 1st Floor Boy's- By 104 6EA4 $1,188
Urinals 1st Floor Boy's- By 104 6EA8 $2,688
Walls - Plaster/Drywall 1st Floor Boy's- By 104 damaged5SF2 $10
Walls - Plaster/Drywall 1st Floor Boy's- By 104 6SF329 $908
Walls - Structural Glazed Tile 1st Floor Boy's- By 104 6SF331 $1,041
Water Closet 1st Floor Boy's- By 104 6EA3 $1,008
Accessories 2nd Floor Boy's- By 204 6SF263 $2,426
Ceiling - Plaster/Drywall 2nd Floor Boy's- By 204 6SF263 $910
Doors - Wood Doors inclu hw 2nd Floor Boy's- By 204 6EA2 $602
Floor Drain 2nd Floor Boy's- By 204 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd Floor Boy's- By 204 6SF263 $557
Lavatory 2nd Floor Boy's- By 204 6EA2 $639
Lighting - Pendent/Surface 2nd Floor Boy's- By 204 6EA5 $619
Partitions 2nd Floor Boy's- By 204 6EA4 $1,188
Page 6 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Urinals 2nd Floor Boy's- By 204 6EA8 $2,688
Walls - Plaster/Drywall 2nd Floor Boy's- By 204 6SF331 $914
Walls - Structural Glazed Tile 2nd Floor Boy's- By 204 6SF331 $1,041
Water Closet 2nd Floor Boy's- By 204 6EA3 $1,008
Accessories 3rd Floor Boy's- By 304 6SF263 $2,426
Ceiling - Plaster/Drywall 3rd Floor Boy's- By 304 6SF263 $910
Doors - Wood Doors inclu hw 3rd Floor Boy's- By 304 6EA2 $602
Floor Drain 3rd Floor Boy's- By 304 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd Floor Boy's- By 304 6SF263 $557
Lavatory 3rd Floor Boy's- By 304 6EA2 $639
Lighting - Pendent/Surface 3rd Floor Boy's- By 304 6EA5 $619
Partitions 3rd Floor Boy's- By 304 6EA4 $1,188
Urinals 3rd Floor Boy's- By 304 6EA8 $2,688
Walls - Plaster/Drywall 3rd Floor Boy's- By 304 6SF331 $914
Walls - Structural Glazed Tile 3rd Floor Boy's- By 304 6SF331 $1,041
Water Closet 3rd Floor Boy's- By 304 6EA3 $1,008
Accessories Basement- Boy's- By Rm 5 6SF217 $2,001
Ceiling - Plaster/Drywall Basement- Boy's- By Rm 5 water damaged5SF10 $125
Ceiling - Plaster/Drywall Basement- Boy's- By Rm 5 6SF207 $716
Doors - Wood Doors inclu hw Basement- Boy's- By Rm 5 6EA2 $602
Floor Drain Basement- Boy's- By Rm 5 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain Basement- Boy's- By Rm 5 6SF217 $459
Lavatory Basement- Boy's- By Rm 5 6EA2 $639
Lighting - Pendent/Surface Basement- Boy's- By Rm 5 6EA4 $496
Partitions Basement- Boy's- By Rm 5 6EA3 $891
Urinals Basement- Boy's- By Rm 5 6EA7 $2,352
Walls - Plaster/Drywall Basement- Boy's- By Rm 5 water damaged5SF35 $179
Walls - Plaster/Drywall Basement- Boy's- By Rm 5 6SF329 $908
Walls - Structural Glazed Tile Basement- Boy's- By Rm 5 6SF231 $727
Water Closet Basement- Boy's- By Rm 5 6EA3 $1,008
Rooms (Other Than Classrooms) Subtotal: $83,944
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Page 7 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Plaster/Drywall 1st Floor 6SF705 $4,365
Drinking Fountains - Single Water Cooler 1st Floor 6EA2 $633
Floor - Tile/Sheet 1st Floor 6SF705 $383
Lighting - Pendent/Surface 1st Floor 7EA4 $0
Walls - Plaster/Drywall 1st Floor 6SF1,222 $5,417
Ceiling - Plaster/Drywall 2nd Floor 6SF705 $4,365
Drinking Fountains - Single Fountain 2nd Floor 6EA2 $551
Floor - Tile/Sheet 2nd Floor 6SF705 $383
Lighting - Pendent/Surface 2nd Floor 7EA4 $0
Walls - Plaster/Drywall 2nd Floor 6SF1,222 $5,417
Ceiling - Plaster/Drywall 3rd Floor 6SF705 $4,365
Drinking Fountains - Single Fountain 3rd Floor 6EA2 $551
Floor - Tile/Sheet 3rd Floor 6SF705 $383
Lighting - Pendent/Surface 3rd Floor 7EA4 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,222 $5,417
Ceiling - Exposed Basement 6SF799 $1,188
Drinking Fountains - Single Fountain Basement 6EA2 $551
Floor - Tile Ceramic/ Porcelain Basement 6SF94 $262
Floor - Tile/Sheet Basement 6SF705 $383
Lighting - Pendent/Surface Basement 7EA5 $0
Walls - Metal Panel Basement 6SF1,222 $9,122
Walls - Structural Glazed Tile Basement 6SF318 $1,000
Walls - Structural Glazed Tile Basement efflorescence5SF5 $319
Safety
Security Cameras 6EA2 $388
Security Cameras 6EA1 $194
Stairs
Ceiling - Plaster/Drywall South 6SF842 $6,165
Floor - Tile South 6SF609 $331
Handrails South 6LF212 $1,837
Lighting - Pendent/Surface South 7EA5 $0
Stairs - Asphalt South 5LF60 $2,539
Stairs - Asphalt South asphalt covered in VCT & Metal Treads6LF23 $213
Walls - Plaster/Drywall South 6SF3,661 $10,104
Walls - Plaster/Drywall South cracked5SF10 $62
Page 8 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Building Interior Subtotal: $66,892
Total Building Cost $613,702
Building: CPC
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Exterior Doors - Exterior Steel Door Door 1 - Southwest 6EA1 $481
Exterior Doors - Exterior Steel Door Door 2 - Northwest 6EA1 $481
Exterior Doors - Exterior Steel Door Door 3 - North 6EA1 $481
Exterior Doors - Exterior Steel Door Door 4 - North 6EA1 $481
Exterior Doors - Exterior Steel Door Door 5 - North mech damaged/missing hardware5EA1 $1,341
Exterior Doors - Exterior Steel Door Door 6 - East 6EA2 $961
Exterior Doors - Exterior Steel Door Door 7 - South 6EA1 $481
Exterior Doors - Exterior Steel Door Door 8 - South 6EA1 $481
Foundation
Foundation - Concrete Entire Building 7LF330 $0
Superstructure - Concrete Entire Building 7SF6,087 $0
Lighting
Exterior Lighting - Wall Mounted Entire Building 6EA6 $1,732
Roof System
Chimney - Metal Flue Main Roof 7LF3 $0
Coping - Metal Main Roof 6LF330 $10,599
Downspouts - Interior Downspouts Main Roof 7LF26 $0
Parapet - Parapet < 16" Height Main Roof 6LF330 $7,031
Roof Structure - Steel / Metal Deck/ Concrete Topping Main Roof 7SF60,778 $0
Roof - Asphalt Gravel Ballast Main Roof 5SF6,078 $143,497
Walls
Exterior Walls - Concrete Block Entire Building 7SF4,290 $0
Windows
Guard - Guards wire guard Entire Building 6SF630 $8,045
Lintels - Steel Entire Building 7LF195 $0
Windows - Sash Aluminum Entire Building 7SF630 $0
Page 9 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: CPC
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Building Exterior Subtotal: $176,091
Building: CPC
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Emergency Battery Packs - Corridors and Stairs Entire Building Emergency lights. 6EA10 $2,025
Emergency Battery Packs - Corridors and Stairs Entire Building Exit signs.6EA7 $1,418
Exit Signs - Corridors and Stairs Entire Building Includes classroom exit signs. 6EA7 $1,048
Security System - Intrusion Detection Entire Building 6SF6,087 $1,567
Main Service
Main Electrical Service - 800 A and Less than 120/208/3PH Mechanical Room 6EA1 $3,398
Power Distribution
Lighting and Power Panels - 100 A Entire Building / Electrical Room Fuses.6EA1 $299
Lighting and Power Panels - 100 A Entire Building / Electrical Room 6EA1 $299
Lighting and Power Panels - Above 100 A Entire Building / Electrical Room 6EA1 $497
Electrical System Subtotal: $10,551
Building: CPC
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm Panel Entire Building / Mechanical Room 6EA1 $6,406
Fire Alarm Strobe Lights Entire Building 6SF6,087 $2,176
Fire Alarm_System Entire Building 6SF6,087 $2,959
Sprinkler System
Sprinkler Heads Entire Building 7SF6,087 $0
Sprinkler Piping Entire Building 6SF6,087 $1,132
Wet Sprinkler System Entire Building 6SF6,087 $1,567
Safty System Subtotal: $14,240
Building: CPC
Category: Mechanical System
Page 10 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Conditioning
Condensing Unit- Roof Mounted - 5-10 tons Roof 6EA1 $3,334
Condensing Unit- Roof Mounted - 5-10 tons Roof 5EA1 $9,590
Condensing Unit- Roof Mounted - 5-10 tons Roof 5EA1 $9,590
Condensing Unit- Roof Mounted - Less than 5 tons Roof 5EA2 $14,757
Heating Devices
Fin Tube - Electric 1st Floor 6LF3 $28
Gas/ Natural Draft Furnace - Less than 100 MBH Mechanical Room 6EA2 $1,208
Gas/ Natural Draft Furnace - Less than 100 MBH Mechanical Room 6EA2 $1,208
Gas/ Natural Draft Furnace - Less than 100 MBH Mechanical Room 6EA2 $1,208
Unit Heater - Gas Mechanical Room 6EA1 $278
Wall Heater - Electric Entry Vestibule 6EA1 $139
Temperature Control
Electric Controls Entire Building / 1st Floor 6SF6,087 $0
Electric Thermostat Entire Building / 1st Floor 6EA6 $0
Ventilation
Exhaust Fans- Indoor - 1501 - 8000 CFM Mechanical Room 6EA1 $592
Mechanical System Subtotal: $41,932
Building: CPC
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Hot Water
Electric Heater - Less than 20 KW 1st Floor 6EA2 $1,364
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF6,087 $1,219
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF6,087 $1,480
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF6,087 $957
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF6,087 $1,132
Domestic Piping-Hot Water Return Lines Entire Building 6SF6,087 $870
Sanitary Piping Entire Building 6SF6,087 $5,571
Storm Piping Entire Building 6SF6,087 $5,310
Vent Piping Entire Building 6SF6,087 $4,091
Plumbing System Subtotal: $21,994
Building: CPC
Page 11 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: CPC
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #103 (Pre School)
Casework 1st Floor 6LF34 $859
Ceiling - Exposed 1st Floor 6SF580 $863
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF580 $1,269
Lighting - Pendent/Surface 1st Floor 7EA12 $0
Storage/ Closet 1st Floor 6SF38 $276
Walls - Concrete Block 1st Floor 6SF489 $1,434
Walls - Plaster/Drywall 1st Floor 6SF589 $1,626
Work Sink 1st Floor 6EA1 $379
Classroom #104 (Pre School)
Casework 1st Floor 6LF34 $859
Ceiling - Exposed 1st Floor 6SF580 $863
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF576 $1,260
Floor - Tile 1st Floor cracked tiles5SF4 $23
Lighting - Pendent/Surface 1st Floor 7EA12 $0
Storage/ Closet 1st Floor 6SF38 $276
Walls - Concrete Block 1st Floor 6SF489 $1,434
Walls - Plaster/Drywall 1st Floor 6SF589 $1,626
Work Sink 1st Floor 6EA1 $379
Classroom #135 (Pre School)
Casework 1st Floor 6LF60 $1,515
Ceiling - Exposed 1st Floor 6SF1,120 $1,666
Chalk Board 1st Floor 4LF12 $1,102
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF1,102 $2,411
Floor - Tile 1st Floor cracked tiles5SF8 $46
Lighting - Pendent/Surface 1st Floor 7EA30 $0
Storage/ Closet 1st Floor 6SF38 $276
Walls - Concrete Block 1st Floor 6SF716 $2,099
Walls - Plaster/Drywall 1st Floor 6SF876 $2,418
Work Sink 1st Floor 6EA1 $379
Classroom #136 (Pre School)
Casework 1st Floor 6LF60 $1,515
Page 12 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: CPC
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #136 (Pre School)
Ceiling - Exposed 1st Floor 6SF1,120 $1,666
Chalk Board 1st Floor 4LF12 $1,102
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF1,120 $2,450
Lighting - Pendent/Surface 1st Floor 7EA30 $0
Storage/ Closet 1st Floor 6SF38 $276
Walls - Concrete Block 1st Floor 6SF716 $2,099
Walls - Plaster/Drywall 1st Floor 6SF876 $2,418
Work Sink 1st Floor 6EA1 $379
Classrooms Subtotal: $40,849
Building: CPC
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Ceiling - Exposed 1st Floor 6SF151 $225
Doors - Wood Doors inclu hw 1st Floor door damaged, needs replacement5EA1 $1,174
Floor - Tile/Sheet 1st Floor 6SF151 $151
Lighting - Pendent/Surface 1st Floor 7EA2 $0
Power Distribution 1st Floor 7EA10 $0
Walls - Concrete Block 1st Floor 6SF663 $1,944
Lunch & Multipurpose Room
Ceiling - Exposed 1st Floor 6SF1,801 $2,678
Doors - Steel Doors incl hw 1st Floor 6EA6 $1,806
Floor - Tile 1st Floor 7SF1,801 $0
Lighting - Pendent/Surface 1st Floor 7EA31 $0
Walls - Concrete Block 1st Floor 6SF2,332 $6,836
Mechanical/ Service Rooms
Mechanical/ Service Rooms 1st Floor 6SF222 $1,590
Restroom
Accessories 103B 6SF40 $369
Ceiling - Exposed 103B 6SF40 $59
Doors - Wood Doors inclu hw 103B 6EA1 $301
Page 13 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: CPC
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Floor Drain 103B 6EA1 $1,059
Floor - Tile 103B 6SF40 $88
Hand Dryer 103B 6EA1 $230
Lavatory 103B 6EA1 $320
Lighting - Pendent/Surface 103B 7EA1 $0
Walls - Plaster/Drywall 103B 6SF310 $856
Water Closet 103B 6EA1 $336
Accessories 104B 6SF40 $369
Ceiling - Exposed 104B 6SF40 $59
Doors - Wood Doors inclu hw 104B 6EA1 $301
Floor Drain 104B 6EA1 $1,059
Floor - Tile 104B 6SF40 $88
Hand Dryer 104B 6EA1 $230
Lavatory 104B 6EA1 $320
Lighting - Pendent/Surface 104B 7EA1 $0
Walls - Plaster/Drywall 104B 6SF310 $856
Water Closet 104B 6EA1 $336
Accessories Room 135B 6SF40 $369
Ceiling - Exposed Room 135B 6SF40 $59
Doors - Wood Doors inclu hw Room 135B 6EA1 $301
Floor Drain Room 135B 6EA1 $1,059
Floor - Tile Room 135B 6SF40 $88
Hand Dryer Room 135B 6EA1 $230
Lavatory Room 135B 6EA1 $320
Lighting - Pendent/Surface Room 135B 7EA1 $0
Walls - Plaster/Drywall Room 135B 6SF302 $833
Walls - Plaster/Drywall Room 135B cracked, water damage5SF8 $41
Water Closet Room 135B 6EA1 $336
Accessories Room 136B 6SF40 $369
Ceiling - Exposed Room 136B 6SF40 $59
Doors - Wood Doors inclu hw Room 136B 6EA1 $301
Floor Drain Room 136B 6EA1 $1,059
Floor - Tile Room 136B 6SF40 $88
Hand Dryer Room 136B 6EA1 $230
Lavatory Room 136B 6EA1 $320
Lighting - Pendent/Surface Room 136B 7EA1 $0
Walls - Plaster/Drywall Room 136B 6SF310 $856
Page 14 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: CPC
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Water Closet Room 136B 6EA1 $336
Rooms (Other Than Classrooms) Subtotal: $30,892
Total Building Cost $336,549
Building: Addition 1
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Entrance Control - Audio and Video Door 1 - East 7EA1 $0
Exterior Doors - Exterior Steel Door Door 1 - East 6EA4 $1,922
Exterior Doors - Exterior Steel Door Door 2 - Southeast 7EA1 $0
Exterior Doors - Exterior Steel Door Door 6 - North auditorium 6EA4 $1,922
Exterior Doors - Exterior Steel Door Door 7 - Fire escape 6EA1 $481
Exterior Doors - Exterior Steel Door Door 8 - North 6EA2 $961
Exterior Doors - Exterior Steel Door Door 9 - North boiler 6EA1 $481
Exterior Doors - Transom Lite Door 1 - East 6EA4 $1,253
Exterior Doors - Transom Lite Door 2 - Southeast 7EA1 $0
Exterior Doors - Transom Lite Door 6 - North auditorium 6EA4 $1,253
Exterior Doors - Transom Lite Door 8 - North 6EA2 $627
Exterior Doors - Transom Lite Door 9 - North boiler 6EA1 $313
Exterior Stairs - Concrete Door 1 - East 6LF14 $1,145
Exterior Stairs - Concrete Door 1 - East 5LF4 $438
Exterior Stairs - Concrete Door 2 - Southeast 7LF60 $0
Exterior Stairs - Concrete Door 6 - North auditorium 6LF12 $981
Exterior Stairs - Concrete Door 8 - North 6LF16 $1,308
Ramp Handrail - Steel_Ramp Handrail Door 2 - Southeast 7LF40 $0
Fire Escape
Fire Escape Entire Building 6LF42 $26,534
Foundation
Foundation - Concrete Entire Building / Boiler Room 7LF180 $0
Foundation - Masonry Entire Building 7LF5,300 $0
Superstructure - Steel with Clay Tile Arch Entire Building 7SF55,927 $0
Page 15 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Lighting
Exterior Lighting - Wall Mounted Entire Building 6EA12 $3,465
Roof System
Chimney - Brick Chimney- Concrete/ Mortar Liner Roof 4 6LF90 $85,921
Coping - Clay Tile Roof 4 6LF109 $3,501
Coping - Stone Roof 4 6LF112 $3,597
Coping - Terra Cotta Roof 1 6LF330 $10,599
Coping - Terra Cotta Roof 2 6LF45 $1,445
Coping - Terra Cotta Roof 3 6LF32 $1,028
Coping - Terra Cotta Roof 5 6LF220 $7,066
Downspouts - Exterior Downspouts Roof 3 6LF11 $366
Downspouts - Exterior Downspouts Roof 4 6LF54 $1,795
Downspouts - Exterior Downspouts Roof 5 6LF110 $3,656
Downspouts - Interior Downspouts Roof 1 7LF183 $0
Downspouts - Interior Downspouts Roof 2 6LF24 $798
Downspouts - Interior Downspouts Roof 4 7LF30 $0
Parapet - 16" - 30" Height Roof 1 6LF80 $3,196
Parapet - 16" - 30" Height Roof 2 6LF45 $1,798
Parapet - 16" - 30" Height Roof 3 6LF32 $1,279
Parapet - 16" - 30" Height Roof 5 6LF220 $8,790
Parapet - Parapet < 16" Height Roof 1 6LF125 $2,663
Parapet - Parapet < 16" Height Roof 4 7LF109 $0
Parapet - Parapet > 30" Roof 1 6LF125 $7,990
Parapet - Parapet > 30" Roof 4 6LF112 $7,159
Roof Structure - Steel with Clay Tile Arch Roof 1 7SF9,451 $0
Roof Structure - Steel with Clay Tile Arch Roof 2 7SF260 $0
Roof Structure - Steel with Clay Tile Arch Roof 3 7SF250 $0
Roof Structure - Steel with Clay Tile Arch Roof 4 7SF6,006 $0
Roof Structure - Steel with Clay Tile Arch Roof 5 7SF5,767 $0
Roof - Modified Bitumen Roof 1 6SF9,451 $88,928
Roof - Modified Bitumen Roof 2 6SF260 $2,446
Roof - Modified Bitumen Roof 3 6SF250 $2,352
Roof - Modified Bitumen Roof 4 6SF6,006 $56,513
Roof - Modified Bitumen Roof 5 6SF5,767 $54,264
Walls
Exterior Walls - Brick Entire Building 6SF24,408 $164,046
Exterior Walls - Stone-Cast Entire Building 6SF2,658 $17,864
Page 16 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Walls
Exterior Walls - Stucco Entire Building 6SF1,155 $5,533
Windows
Guard - Guards wire guard Entire Building 6SF2,255 $28,796
Lintels - Brick Entire Building 6LF16 $0
Lintels - Steel Entire Building 6LF450 $13,063
Lintels - Stone Entire Building 6LF150 $0
Windows - Decorative Entire Building 6SF60 $448
Windows - Sash Lexan Entire Building 6SF6,600 $49,266
Building Exterior Subtotal: $679,251
Building: Addition 1
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Automatic Transfer Switch Kitchen Storage Room Serves main and both additions. 6EA1 $408
Automatic Transfer Switch Kitchen Storage Room Serves main and both additions. 6EA1 $408
Emergency A/C Power - Corridors and Stairs Entire Building 6SF9,746 $2,927
Emergency A/C Power - Lunchrooms Entire Building / Basement 6SF1,152 $428
Emergency Battery Packs - Auditoium and Aisle Lighting Entire Building / 1st Floor Exit signs.6EA4 $810
Emergency Battery Packs - Corridors and Stairs Entire Building (38) exit signs and (2) combination exit sign/emergency light.
6EA40 $8,100
Emergency Battery Packs - Gym Entire Building / 2nd Floor Exit signs.6EA3 $608
Emergency Battery Packs - Lunchrooms Entire Building / Basement Exit signs.6EA2 $405
Exit Signs - Auditoium Entire Building / 1st Floor 6EA4 $599
Exit Signs - Corridors and Stairs Entire Building 6EA40 $5,990
Exit Signs - Gym Entire Building / 2nd Floor 6EA3 $472
Exit Signs - Lunchroom Entire Building / Basement 6EA2 $299
Security System - CCTV Entire Building 6SF55,927 $16,795
Security System - Intrusion Detection Entire Building 6SF55,927 $14,396
UPS - Less than 30 KW Electrical Room Emergency power system. Serves main and two additions.
5EA1 $33,979
Main Service
Main Electrical Service - 1200 A 120/208/3PH Electrical Room Serves main and both additions.6EA1 $5,078
Main Electrical Service - 2001 to 3000 A 120/208/3PH Electrical Room Serves main and both additions.6EA1 $10,867
PA System Entire Building Serves main, addition 1 and addition 2. Control console is located in addition 1.
6SF55,927 $18,394
Page 17 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Main Service
Power Distribution
Lighting and Power Panels - 100 A Entire Building / 1st Floor 6EA1 $299
Lighting and Power Panels - 100 A Entire Building / Mechanical Room 6EA1 $299
Lighting and Power Panels - 100 A Entire Building / Mechanical Room 6EA1 $299
Lighting and Power Panels - Above 100 A Entire Building / Electrical Room 6EA1 $497
Lighting and Power Panels - Above 100 A Entire Building / Electrical Room 6EA1 $497
Lighting and Power Panels - Above 100 A Entire Building 6EA4 $1,988
Main Distribution Panels - 400 - 600 amp Entire Building 6EA5 $2,639
Electrical System Subtotal: $127,482
Building: Addition 1
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm Panel Entire Building / Boiler Room Obsolete technology.3EA1 $49,477
Fire Alarm_System Entire Building Obsolete technology. Manual pull stations only. 4SF55,927 $111,166
Sprinkler System
Dry Sprinkler System Entire Building Fire pump located in Main. 6SF55,927 $14,396
Sprinkler Heads Entire Building 7SF55,927 $0
Sprinkler Piping Entire Building 7SF55,927 $0
Safty System Subtotal: $175,038
Building: Addition 1
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Handling Systems
Air Handling Unit- Built Up-Multi Zone- Steam Coils - 25001 - 35000 Mechanical Room Serves the main building, addition 2, the gym and
auditorium.
5EA1 $78,608
Air Handling Unit- Built Up-Multi Zone- Steam Coils - 25001 - 35000 Mechanical Room Serves Addition 1. 5EA1 $78,608
Air Intake Mechanical Room / Roof 6EA1 $5,765
Air Intake Mechanical Room / Roof 6EA1 $5,765
Auxiliaries - 25001 - 35000 cfm Mechanical Room 5EA1 $16,577
Auxiliaries - 25001 - 35000 cfm Mechanical Room 5EA1 $16,577
Page 18 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Handling Systems
Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 7LF100 $0
Return Duct Work - Indoor- Vertical Shaft and Ducts Mechanical Room / Entire Building 7LF100 $0
Zone Dampers Mechanical Room Actuator pneumatic lines have been cut. All
dampers operated manually.
6EA24 $19,993
Zone Dampers Mechanical Room Actuator pneumatic lines have been cut. All dampers operated manually.
6EA20 $16,661
Boiler Systems
Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 101 - 150 HP
Boiler Room 5EA1 $12,173
Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 151 - 200
HP
Boiler Room 5EA1 $17,017
Chemical Feed System Boiler Room / Mechanical Room 6EA1 $1,078
Chemical Feeder Boiler Room / Mechanical Room 6EA1 $1,078
Combustion Dampers Boiler Room 6EA2 $818
Condensate Pump Boiler Room / Mechanical Room 6EA2 $4,042
Feed Water Pumps and Tank Boiler Room / Mechanical Room 4 pumps. 6EA1 $2,545
Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure
Boiler - 101 - 150 HP
Boiler Room Serves main and two additions.6EA1 $2,545
Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure
Boiler - 151 - 200 HP
Boiler Room Serves main and two additions.6EA1 $2,545
Piping - Condensate Pipe- Steel Boiler Room / Entire Building 6LF1,000 $1,888
Piping - Steam Pipe- Steel Boiler Room / Entire Building 6LF1,000 $1,888
Steam Traps Boiler Room / Entire Building 60' of fintube heaters and (2) AHU's.5EA22 $28,928
Heating Devices
Unit Heater - Gas Boiler Room With an electric wall thermostat. 6EA1 $278
Wall Heater - Electric Entire Building 6EA4 $556
Temperature Control
Electric Thermostat Entire Building Unit heater and electrical room exhaust fan. 6EA2 $0
Pneumatic System Entire Building Most pneumatic lines cut. Thermostats are
damaged or missing. All building is controlled
manually via the boilers. Building gets excessively
hot.
3SF55,927 $291,111
Thermostats - Pneumatic Entire Building Missing cover, internal components exposed. 4EA4 $2,949
Thermostats - Pneumatic Entire Building Thermostat has been removed from wall and
pneumatic lines left exposed.
4EA6 $4,423
Thermostats - Pneumatic Entire Building Thermostats are past useful life and cannot control temperature.
4EA17 $12,533
Page 19 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Ventilation
Exhaust Fans- Indoor - 500 - 1500 CFM Entire Building / Electrical Room With electric wall thermostat. 6EA1 $592
Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Entire Building / Roof 6EA1 $592
Exhaust Fans- Roof Mounted - Less than 500 CFM Entire Building / Lower Roof 6EA1 $296
Mechanical System Subtotal: $628,430
Building: Addition 1
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Hot Water
Gas Heater - 150000 - 300000 BTU/HR Boiler Room Serves main and both additions. 7EA1 $0
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF55,927 $11,197
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF55,927 $13,596
Domestic Piping-Cold Water Risers Entire Building 6SF55,927 $10,397
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF55,927 $8,797
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF55,927 $10,397
Domestic Piping-Hot Water Return Lines Entire Building 6SF55,927 $7,998
Domestic Piping-Hot Water Return Risers Entire Building 6SF55,927 $7,998
Sanitary Piping Entire Building 6SF55,927 $51,184
Storm Piping Entire Building 6SF55,927 $48,785
Vent Piping Entire Building 6SF55,927 $37,589
Pumps
Pumps - Sump-Simplex Boiler Room 6EA1 $745
Plumbing System Subtotal: $208,682
Building: Addition 1
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #106 (Regular Classroom)
Casework 1st Floor 6LF20 $505
Ceiling - Plaster/Drywall 1st Floor 6SF820 $2,838
Ceiling - Plaster/Drywall 1st Floor peeling5SF10 $125
Chalk Board 1st Floor 4LF20 $1,836
Page 20 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #106 (Regular Classroom)
Doors - Transom Window 1st Floor 6SF1 $17
Doors - Wood Doors inclu hw 1st Floor 6EA2 $602
Floor - Tile 1st Floor 6SF830 $1,816
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Marker Board 1st Floor 7LF8 $0
Storage/ Closet 1st Floor peeling5SF61 $984
Walls - Plaster/Drywall 1st Floor 6SF1,355 $3,740
Classroom #109 (Computer Lab)
AC Units 1st Floor improper bracing5EA2 $3,652
Casework 1st Floor 6LF20 $505
Ceiling - Plaster/Drywall 1st Floor 6SF955 $3,305
Chalk Board 1st Floor 4LF16 $1,469
Doors - Steel Doors incl hw 1st Floor 6EA1 $301
Doors - Transom Window 1st Floor 6SF8 $135
Floor - Tile 1st Floor cracked throughout5SF955 $4,288
Lighting - Pendent/Surface 1st Floor 7EA16 $0
Storage/ Closet 1st Floor 6SF72 $522
Walls - Plaster/Drywall 1st Floor 6SF1,355 $3,740
Classroom #110 (Fitness Room)
Casework 1st Floor 6LF9 $227
Ceiling - Plaster/Drywall 1st Floor 6SF826 $2,858
Ceiling - Plaster/Drywall 1st Floor peeling5SF4 $50
Chalk Board 1st Floor 4LF24 $2,203
Doors - Transom Window 1st Floor 6SF1 $17
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Weight/ Fitness Room Floor Matting 1st Floor 6SF830 $4,344
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Storage/ Closet 1st Floor 6SF61 $442
Walls - Plaster/Drywall 1st Floor 6SF1,355 $3,740
Walls - Plaster/Drywall 1st Floor water damaged5SF2 $10
Classroom #206 (Regular Classroom)
Casework 6LF10 $253
Ceiling - Plaster/Drywall need painting5SF830 $7,608
Chalk Board 4LF36 $3,305
Doors - Transom Window 6SF8 $135
Doors - Wood Doors inclu hw 6EA1 $301
Page 21 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #206 (Regular Classroom)
Floor - Tile 6SF826 $1,807
Floor - Tile cracked5SF4 $23
Lighting - Pendent/Surface 7EA14 $0
Storage/ Closet 6SF61 $442
Walls - Plaster/Drywall need painting5SF1,355 $10,270
Classroom #207 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor needs painting5SF830 $7,608
Chalk Board 2nd Floor 4LF36 $3,305
Doors - Transom Window 2nd Floor 6SF8 $135
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF826 $1,807
Floor - Tile 2nd Floor damaged5SF4 $23
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Storage/ Closet 2nd Floor needs painting5SF61 $984
Walls - Plaster/Drywall 2nd Floor needs painting5SF1,355 $10,270
Classroom #208 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor 6SF822 $2,845
Ceiling - Plaster/Drywall 2nd Floor peeling5SF8 $100
Chalk Board 2nd Floor 4LF36 $3,305
Doors - Transom Window 2nd Floor 6SF8 $135
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF830 $1,816
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Storage/ Closet 2nd Floor 6SF61 $442
Walls - Plaster/Drywall 2nd Floor need painting5SF1,355 $10,270
Classroom #209 (Regular Classroom)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor 6SF824 $2,852
Ceiling - Plaster/Drywall 2nd Floor peeling5SF6 $75
Chalk Board 2nd Floor 4LF28 $2,571
Doors - Transom Window 2nd Floor 6SF8 $135
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF830 $1,816
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Page 22 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #209 (Regular Classroom)
Storage/ Closet 2nd Floor 6SF61 $442
Walls - Plaster/Drywall 2nd Floor peeling5SF1,355 $10,270
Classroom #210 (Store Room)
Casework 2nd Floor 6LF10 $253
Ceiling - Plaster/Drywall 2nd Floor peeling5SF830 $7,608
Chalk Board 2nd Floor 6LF36 $803
Doors - Transom Window 2nd Floor 6SF8 $135
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor chipped throughout5SF830 $3,727
Lighting - Pendent/Surface 2nd Floor 7EA10 $0
Lighting - Pendent/Surface 2nd Floor dont work4EA4 $2,163
Storage/ Closet 2nd Floor 6SF61 $442
Walls - Plaster/Drywall 2nd Floor peeling5SF1,355 $10,270
Classroom #305 (Special Education)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF830 $2,872
Chalk Board 3rd Floor 4LF36 $3,305
Doors - Transom Window 3rd Floor 6SF8 $135
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor 6SF830 $1,816
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Storage/ Closet 3rd Floor 6SF61 $442
Walls - Plaster/Drywall 3rd Floor 6SF1,355 $3,740
Classroom #306 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF830 $2,872
Chalk Board 3rd Floor 4LF18 $1,653
Doors - Transom Window 3rd Floor 6SF8 $135
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF830 $5,851
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Marker Board 3rd Floor 6LF6 $129
Storage/ Closet 3rd Floor peeling5SF61 $984
Walls - Plaster/Drywall 3rd Floor 6SF1,355 $3,740
Page 23 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #307 (Science Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF830 $2,872
Chalk Board 3rd Floor 4LF18 $1,653
Doors - Transom Window 3rd Floor 6SF8 $135
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF830 $5,851
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Storage/ Closet 3rd Floor 6SF61 $442
Walls - Plaster/Drywall 3rd Floor need painting5SF1,355 $10,270
Classroom #308 (Store Room)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF830 $2,872
Chalk Board 3rd Floor 4LF36 $3,305
Doors - Transom Window 3rd Floor 6SF8 $135
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF830 $5,851
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Storage/ Closet 3rd Floor 6SF61 $442
Walls - Plaster/Drywall 3rd Floor peeling, need painting5SF1,355 $10,270
Classroom #309 (Regular Classroom)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF828 $2,865
Ceiling - Plaster/Drywall 3rd Floor peeling5SF2 $25
Chalk Board 3rd Floor 4LF36 $3,305
Doors - Transom Window 3rd Floor 6SF8 $135
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF830 $5,851
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Storage/ Closet 3rd Floor 6SF61 $442
Walls - Plaster/Drywall 3rd Floor 6SF1,346 $3,715
Walls - Plaster/Drywall 3rd Floor cracked5SF9 $46
Classroom #310 (Special Program)
Casework 3rd Floor 6LF10 $253
Ceiling - Plaster/Drywall 3rd Floor 6SF830 $2,872
Chalk Board 3rd Floor 4LF36 $3,305
Doors - Transom Window 3rd Floor 6SF8 $135
Page 24 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #310 (Special Program)
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Wood 3rd Floor 6SF830 $5,851
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Storage/ Closet 3rd Floor peeling5SF61 $984
Walls - Plaster/Drywall 3rd Floor peeling & cracking5SF1,355 $10,270
Classrooms Subtotal: $272,182
Building: Addition 1
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
AC Unit 1st Flr- Asst Principal's Office #1 not braced properly5EA1 $1,826
Ceiling - Lay-in 1st Flr- Asst Principal's Office #1 6SF154 $462
Doors - Wood Doors inclu hw 1st Flr- Asst Principal's Office #1 6EA1 $301
Floor - Wood 1st Flr- Asst Principal's Office #1 6SF154 $1,086
Lighting - Lay-in 1st Flr- Asst Principal's Office #1 7EA4 $0
Power Distribution 1st Flr- Asst Principal's Office #1 7EA8 $0
Walls - Plaster/Drywall 1st Flr- Asst Principal's Office #1 6SF450 $1,242
Ceiling - Lay-in 1st Flr- Asst Principal's Office #2 6SF121 $363
Doors - Wood Doors inclu hw 1st Flr- Asst Principal's Office #2 6EA1 $301
Floor - Wood 1st Flr- Asst Principal's Office #2 6SF121 $853
Lighting - Lay-in 1st Flr- Asst Principal's Office #2 7EA4 $0
Power Distribution 1st Flr- Asst Principal's Office #2 7EA8 $0
Walls - Plaster/Drywall 1st Flr- Asst Principal's Office #2 6SF420 $1,159
AC Unit 1st Flr- Principal's Office not braced properly5EA1 $1,826
Ceiling - Lay-in 1st Flr- Principal's Office 6SF162 $486
Doors - Wood Doors inclu hw 1st Flr- Principal's Office 6EA1 $301
Floor - Wood 1st Flr- Principal's Office 6SF162 $1,142
Lighting - Lay-in 1st Flr- Principal's Office 7EA4 $0
Power Distribution 1st Flr- Principal's Office 7EA8 $0
Walls - Plaster/Drywall 1st Flr- Principal's Office 6SF464 $1,281
Ceiling - Lay-in Engineer's Office 6SF291 $874
Doors - Wood Doors inclu hw Engineer's Office 6EA1 $301
Floor - Tile/Sheet Engineer's Office 6SF291 $291
Lighting - Lay-in Engineer's Office 7EA2 $0
Power Distribution Engineer's Office 7EA6 $0
Page 25 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Walls - Plaster/Drywall Engineer's Office Walls are covered with wood paneling6SF510 $1,408
AC Unit Rm 105- Main Office improper bracing5EA2 $3,652
Ceiling - Plaster/Drywall Rm 105- Main Office 6SF722 $2,499
Doors - Transom Window Rm 105- Main Office 6SF8 $135
Doors - Wood Doors inclu hw Rm 105- Main Office 6EA3 $903
Floor - Tile Rm 105- Main Office 6SF722 $1,580
Lighting - Pendent/Surface Rm 105- Main Office 7EA18 $0
Power Distribution Rm 105- Main Office 7EA8 $0
Storage/ Closet Rm 105- Main Office 6SF251 $1,820
Walls - Plaster/Drywall Rm 105- Main Office 6SF1,357 $3,745
AC Unit Room 108- Teachers Resource Center not braced properly5EA2 $3,652
Ceiling - Plaster/Drywall Room 108- Teachers Resource Center peeling5SF830 $7,608
Doors - Transom Window Room 108- Teachers Resource Center 6SF8 $135
Doors - Wood Doors inclu hw Room 108- Teachers Resource Center 6EA1 $301
Floor - Tile Room 108- Teachers Resource Center 6SF830 $1,816
Lighting - Pendent/Surface Room 108- Teachers Resource Center 7EA14 $0
Power Distribution Room 108- Teachers Resource Center 7EA23 $0
Walls - Plaster/Drywall Room 108- Teachers Resource Center 6SF1,355 $3,740
Ceiling - Plaster/Drywall Room 205- Nurse/Social Worker/Psychologist
needs painting5SF830 $7,608
Doors - Transom Window Room 205- Nurse/Social
Worker/Psychologist
6SF8 $135
Doors - Wood Doors inclu hw Room 205- Nurse/Social
Worker/Psychologist
6EA1 $301
Floor - Tile Room 205- Nurse/Social Worker/Psychologist
6SF830 $1,816
Lighting - Pendent/Surface Room 205- Nurse/Social Worker/Psychologist
7EA14 $0
Power Distribution Room 205- Nurse/Social Worker/Psychologist
7EA23 $0
Walls - Plaster/Drywall Room 205- Nurse/Social
Worker/Psychologist
needs painting5SF1,355 $10,270
Kitchen
Ceiling - Plaster/Drywall Basement 6SF1,292 $4,471
Doors - Wood Doors inclu hw Basement 6EA2 $602
Floor - Tile Basement 6SF1,292 $2,827
Lighting - Pendent/Surface Basement 7EA27 $0
Storage/ Closet Basement 6SF120 $870
Walls - Masonry Basement 6SF1,566 $4,927
Page 26 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Kitchen
Lunch & Multipurpose Room
Ceiling - Plaster/Drywall Basement 6SF18 $62
Doors - Side-lite Basement 6SF16 $267
Doors - Transom Window Basement 6SF8 $135
Doors - Wood Doors inclu hw Basement 6EA1 $301
Floor - Tile Basement 6SF1,140 $2,494
Floor - Tile Basement cracked tile5SF12 $69
Lighting - Pendent/Surface Basement 7EA18 $0
Serving Line Basement 6LF8 $476
Walls - Masonry Basement 6SF1,542 $4,851
MDF_IDF
AC Unit 1st Flr- Inside of Rm 109 improper bracing5EA1 $1,826
Doors - Steel Doors incl hw 1st Flr- Inside of Rm 109 6EA1 $301
Finishes 1st Flr- Inside of Rm 109 old water damage on walls5SF134 $2,163
Mechanical/ Service Rooms
Janitor's Closet 1st Floor 6SF15 $107
Mechanical/ Service Rooms 1st Floor 6SF18 $129
Storage Room 1st Floor 6SF18 $129
Janitor's Closet 2nd Floor 6SF13 $93
Mechanical/ Service Rooms 2nd Floor 6SF18 $129
Storage Room 2nd Floor 6SF18 $129
Janitor's Closet 3rd Floor door needs new hinges6SF13 $93
Mechanical/ Service Rooms 3rd Floor 6SF18 $129
Storage Room 3rd Floor 6SF18 $129
Air Tunnel Basement 6SF310 $1,919
Boiler Room Basement 6SF1,415 $10,137
Coal Room Basement Now Storage space6SF978 $7,007
Mechanical/ Service Rooms Basement 6SF1,454 $10,417
Storage Room Basement 6SF1,681 $12,043
Restroom
Accessories 1st Floor Girl's- Next to 108 6SF303 $2,795
Ceiling - Plaster/Drywall 1st Floor Girl's- Next to 108 6SF303 $1,049
Doors - Transom Window 1st Floor Girl's- Next to 108 6SF16 $271
Doors - Wood Doors inclu hw 1st Floor Girl's- Next to 108 6EA4 $1,204
Floor Drain 1st Floor Girl's- Next to 108 6EA1 $1,059
Page 27 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Floor - Tile Ceramic/ Porcelain 1st Floor Girl's- Next to 108 6SF303 $641
Lavatory 1st Floor Girl's- Next to 108 6EA2 $639
Lighting - Pendent/Surface 1st Floor Girl's- Next to 108 7EA4 $0
Partitions 1st Floor Girl's- Next to 108 6EA4 $1,188
Walls - Plaster/Drywall 1st Floor Girl's- Next to 108 some FRP behind toilets6SF384 $1,060
Walls - Structural Glazed Tile 1st Floor Girl's- Next to 108 6SF384 $1,208
Water Closet 1st Floor Girl's- Next to 108 6EA5 $1,680
Accessories 2nd Floor Girl's- Next to 208 6SF303 $2,795
Ceiling - Plaster/Drywall 2nd Floor Girl's- Next to 208 6SF303 $1,049
Doors - Transom Window 2nd Floor Girl's- Next to 208 6SF16 $271
Doors - Wood Doors inclu hw 2nd Floor Girl's- Next to 208 6EA4 $1,204
Floor Drain 2nd Floor Girl's- Next to 208 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd Floor Girl's- Next to 208 6SF303 $641
Lavatory 2nd Floor Girl's- Next to 208 6EA2 $639
Lighting - Pendent/Surface 2nd Floor Girl's- Next to 208 7EA4 $0
Partitions 2nd Floor Girl's- Next to 208 6EA4 $1,188
Walls - Plaster/Drywall 2nd Floor Girl's- Next to 208 some FRP behind toilets6SF384 $1,060
Walls - Structural Glazed Tile 2nd Floor Girl's- Next to 208 6SF384 $1,208
Water Closet 2nd Floor Girl's- Next to 208 6EA5 $1,680
Accessories 3rd Floor Girl's- Next to 308 6SF303 $2,795
Ceiling - Plaster/Drywall 3rd Floor Girl's- Next to 308 6SF303 $1,049
Doors - Transom Window 3rd Floor Girl's- Next to 308 6SF16 $271
Doors - Wood Doors inclu hw 3rd Floor Girl's- Next to 308 6EA4 $1,204
Floor Drain 3rd Floor Girl's- Next to 308 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd Floor Girl's- Next to 308 6SF303 $641
Lavatory 3rd Floor Girl's- Next to 308 6EA2 $639
Lighting - Pendent/Surface 3rd Floor Girl's- Next to 308 7EA4 $0
Partitions 3rd Floor Girl's- Next to 308 6EA4 $1,188
Walls - Plaster/Drywall 3rd Floor Girl's- Next to 308 some FRP behind toilets6SF384 $1,060
Walls - Structural Glazed Tile 3rd Floor Girl's- Next to 308 6SF384 $1,208
Water Closet 3rd Floor Girl's- Next to 308 6EA5 $1,680
Accessories Engineer's Office 6SF19 $175
Ceiling - Plaster/Drywall Engineer's Office 6SF19 $66
Doors - Wood Doors inclu hw Engineer's Office 6EA1 $301
Floor - Tile/Sheet Engineer's Office 6SF19 $19
Lavatory Engineer's Office 6EA1 $320
Lighting - Wall Mounted Engineer's Office 7EA1 $0
Page 28 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Showers Engineer's Office 6EA1 $311
Walls - Plaster/Drywall Engineer's Office Walls are covered with wood paneling6SF125 $345
Water Closet Engineer's Office 6EA1 $336
Accessories In Boiler Room 6SF89 $821
Ceiling - Plaster/Drywall In Boiler Room 6SF89 $308
Doors - Wood Doors inclu hw In Boiler Room 6EA1 $301
Floor - Tile/Sheet In Boiler Room 6SF89 $89
Lavatory In Boiler Room 6EA1 $320
Lighting - Pendent/Surface In Boiler Room 7EA1 $0
Walls - Concrete Block In Boiler Room 6SF325 $953
Water Closet In Boiler Room 6EA1 $336
Accessories In Main Office 6SF35 $323
Ceiling - Plaster/Drywall In Main Office 6SF35 $121
Doors - Wood Doors inclu hw In Main Office 6EA1 $301
Floor - Tile Ceramic/ Porcelain In Main Office 6SF35 $74
Lavatory In Main Office 6EA1 $320
Lighting - Pendent/Surface In Main Office 7EA1 $0
Partitions In Main Office 6EA1 $297
Walls - Plaster/Drywall In Main Office FRP on lower 4'6SF125 $345
Water Closet In Main Office 6EA1 $336
Accessories In Room 109 6SF71 $655
Ceiling - Plaster/Drywall In Room 109 peeling5SF71 $651
Doors - Wood Doors inclu hw In Room 109 6EA1 $301
Floor Drain In Room 109 6EA1 $1,059
Floor - Tile In Room 109 6SF71 $155
Lavatory In Room 109 6EA1 $320
Lighting - Pendent/Surface In Room 109 7EA1 $0
Partitions In Room 109 6EA1 $297
Walls - Plaster/Drywall In Room 109 upper walls peeling5SF455 $3,448
Water Closet In Room 109 6EA2 $672
Rooms (Other Than Classrooms) Subtotal: $189,507
Building: Addition 1
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Page 29 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Plaster/Drywall 1st Floor 6SF2,150 $13,313
Drinking Fountains - Single Fountain 1st Floor 6EA1 $276
Floor - Tile/Sheet 1st Floor 6SF2,150 $1,168
Lighting - Pendent/Surface 1st Floor 7EA8 $0
Walls - Plaster/Drywall 1st Floor 6SF2,940 $13,033
Ceiling - Plaster/Drywall 2nd Floor 6SF2,150 $13,313
Drinking Fountains - Single Fountain 2nd Floor 6EA2 $551
Floor - Tile/Sheet 2nd Floor 6SF2,150 $1,168
Lighting - Pendent/Surface 2nd Floor 7EA8 $0
Walls - Plaster/Drywall 2nd Floor 6SF2,940 $13,033
Ceiling - Plaster/Drywall 3rd Floor 6SF2,150 $13,313
Drinking Fountains - Single Fountain 3rd Floor 6EA2 $551
Floor - Tile/Sheet 3rd Floor 6SF2,150 $1,168
Lighting - Pendent/Surface 3rd Floor 7EA8 $0
Walls - Plaster/Drywall 3rd Floor 6SF2,940 $13,033
Ceiling - Exposed Basement 6SF1,950 $2,900
Ceiling - Plaster/Drywall Basement peeling5SF200 $2,974
Ceiling - Plaster/Drywall Basement 6SF651 $4,031
Doors - Transom Window Basement 6EA34 $576
Doors - Wood Doors include hw Basement 6EA8 $2,408
Drinking Fountains - Single Fountain Basement 6EA2 $551
Floor - Tile Ceramic/ Porcelain Basement damaged5SF10 $209
Floor - Tile Ceramic/ Porcelain Basement 6SF207 $577
Floor - Tile/Sheet Basement 6SF2,584 $1,404
Lighting - Pendent/Surface Basement 7EA11 $0
Lighting - Wall Mounted Basement 7EA3 $0
Walls - Plaster/Drywall Basement peeling5SF300 $3,012
Walls - Plaster/Drywall Basement 6SF3,390 $15,028
Walls - Structural Glazed Tile Basement 6SF360 $1,133
Safety
Camera Viewing Station Principal has viewing access6EA1 $683
Security Cameras 6EA2 $388
Security Cameras 6EA1 $194
Stairs
Ceiling - Plaster/Drywall East 6SF729 $5,337
Floor - Tile East 6SF308 $167
Page 30 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 1
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Stairs
Floor - Tile East damaged5SF3 $17
Handrails East 6LF212 $1,837
Lighting - Pendent/Surface East 7EA8 $0
Stairs - Asphalt East 5LF60 $2,539
Stairs - Asphalt East asphalt covered in VCT & Metal Treads6LF23 $213
Walls - Plaster/Drywall East 6SF3,671 $10,132
Building Interior Subtotal: $140,231
Total Building Cost $2,420,802
Building: Addition 2
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Entrance Control - Audio and Video Door 4 - West 7EA1 $0
Exterior Doors - Exterior Steel Door Door 4 - West 6EA3 $1,442
Exterior Doors - Exterior Steel Door Door 5 - North 6EA4 $1,922
Exterior Stairs - Concrete Door 4 - West 6LF9 $736
Exterior Stairs - Concrete Door 5 - North 6LF12 $981
Foundation
Foundation - Masonry Entire Building 7LF5,463 $0
Superstructure - Steel with Clay Tile Arch Entire Building 7SF21,852 $0
Roof System
Chimney - Brick Chimney- Concrete/ Mortar Liner Main Roof 6LF3 $2,864
Coping - Clay Tile Main Roof 6LF172 $5,524
Coping - Terra Cotta Main Roof 6LF127 $4,079
Downspouts - Exterior Downspouts Main Roof 6LF3 $100
Downspouts - Exterior Downspouts Main Roof fallen off4LF3 $406
Parapet - 16" - 30" Height Main Roof 6LF127 $5,074
Parapet - Parapet < 16" Height Main Roof 7LF172 $0
Roof Structure - Steel with Clay Tile Arch Main Roof 7SF5,463 $0
Roof - Modified Bitumen Main Roof 5SF5,463 $114,916
Walls
Exterior Walls - Brick Entire Building 6SF8,584 $57,693
Page 31 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Walls
Exterior Walls - Stone-Cast Entire Building 6SF1,032 $6,936
Exterior Walls - Stucco Entire Building 6SF1,376 $6,592
Exterior Walls - Stucco Entire Building / East Façade 6SF500 $2,803
Windows
Guard - Guards wire guard Entire Building 6SF550 $7,023
Lintels - Steel Entire Building 7LF56 $0
Lintels - Stone Entire Building 7LF165 $0
Windows - Sash Aluminum Entire Building 6SF2,365 $17,654
Building Exterior Subtotal: $236,745
Building: Addition 2
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Emergency A/C Power - Auditoium and Aisle Lighting Entire Building / Basement 6SF4,821 $2,551
Emergency A/C Power - Corridors and Stairs Entire Building 6SF8,927 $2,681
Emergency A/C Power - Gym Entire Building / 3rd Floor 6SF4,620 $1,718
Emergency Battery Packs - Corridors and Stairs Entire Building (24) exit signs and (4) combination exit
sign/emergency light.
6EA28 $5,670
Exit Signs - Corridors and Stairs Entire Building 6EA28 $4,193
Security System - CCTV Entire Building Exterior cameras only. 6SF21,852 $6,562
Security System - Intrusion Detection Entire Building 6SF21,852 $5,625
Main Service
PA System Entire Building Serves main, addition 1 and addition 2. Control console is located in addition 1.
6SF21,852 $7,187
Power Distribution
Lighting and Power Panels - Above 100 A Entire Building / 1st Floor Fuses, emergency power. 6EA1 $497
Lighting and Power Panels - Above 100 A Entire Building 6EA2 $994
Electrical System Subtotal: $37,677
Building: Addition 2
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Page 32 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm_System Entire Building Obsolete technology. Manual pull stations only.
Panel located in Addition 1.
4SF21,852 $43,435
Sprinkler System
Dry Sprinkler System Entire Building Fire pump located in Main. 6SF21,852 $5,625
Sprinkler Heads Entire Building 7SF21,852 $0
Sprinkler Piping Entire Building 7SF21,852 $0
Safty System Subtotal: $49,060
Building: Addition 2
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Boiler Systems
Piping - Condensate Pipe- Steel Entire Building Boilers located in Addition 1. 6LF100 $189
Piping - Steam Pipe- Steel Entire Building Boilers located in Addition 1.6LF100 $189
Steam Traps Entire Building 5EA12 $15,779
Heating Devices
Fin Tube - Steam Entire Building 6LF60 $566
Wall Heater - Electric Entire Building Missing covers, exposed wires. 4EA2 $2,165
Wall Heater - Electric Entire Building 6EA5 $695
Temperature Control
Pneumatic System Entire Building Most pneumatic lines cut. Thermostats are damaged or missing. All building is controlled manually via the boilers. Building gets excessively hot.
3SF21,852 $113,744
Thermostats - Pneumatic Entire Building Damaged internals and housing. 4EA2 $1,474
Thermostats - Pneumatic Entire Building Thermostats are past useful life and cannot control temperature.
4EA7 $5,161
Ventilation
Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Roof 6EA1 $592
Mechanical System Subtotal: $140,554
Building: Addition 2
Category: Plumbing System
Page 33 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF21,852 $4,375
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF21,852 $5,312
Domestic Piping-Cold Water Risers Entire Building 6SF21,852 $4,062
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF21,852 $3,437
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF21,852 $4,062
Domestic Piping-Hot Water Return Lines Entire Building 6SF21,852 $3,125
Domestic Piping-Hot Water Return Risers Entire Building 6SF21,852 $3,125
Sanitary Piping Entire Building 6SF21,852 $19,999
Storm Piping Entire Building 6SF21,852 $19,061
Vent Piping Entire Building 6SF21,852 $14,687
Plumbing System Subtotal: $81,246
Building: Addition 2
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #101 (Multi Purpose Room)
AC Units 1st Floor improper bracing, both are old, 1 missing cover4EA2 $12,173
Casework 1st Floor 6LF7 $177
Ceiling - Plaster/Drywall 1st Floor 6SF815 $2,820
Chalk Board 1st Floor 4LF24 $2,203
Doors - Transom Window 1st Floor 6SF7 $119
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF815 $1,783
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Storage/ Closet 1st Floor 6SF61 $442
Walls - Plaster/Drywall 1st Floor 6SF1,340 $3,698
Walls - Plaster/Drywall 1st Floor peeling5SF4 $20
Classroom #102 (Regular Classroom)
Casework 1st Floor 6LF5 $126
Ceiling - Plaster/Drywall 1st Floor peeling 5SF815 $7,471
Chalk Board 1st Floor 4LF22 $2,020
Doors - Transom Window 1st Floor 6SF8 $135
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF815 $1,783
Lighting - Pendent/Surface 1st Floor 7EA14 $0
Storage/ Closet 1st Floor peeling 5SF61 $984
Walls - Plaster/Drywall 1st Floor peeling 5SF1,344 $10,186
Page 34 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #201 (Special Education)
Casework 2nd Floor 6LF5 $126
Ceiling - Plaster/Drywall 2nd Floor 6SF815 $2,820
Chalk Board 2nd Floor 4LF22 $2,020
Doors - Transom Window 2nd Floor 6SF8 $135
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF815 $1,783
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Storage/ Closet 2nd Floor 6SF61 $442
Walls - Plaster/Drywall 2nd Floor lower 5' needs painting5SF1,344 $10,186
Classroom #202 (Regular Classroom)
Casework 2nd Floor 6LF5 $126
Ceiling - Plaster/Drywall 2nd Floor 6SF803 $2,779
Ceiling - Plaster/Drywall 2nd Floor cracked5SF12 $150
Chalk Board 2nd Floor 4LF36 $3,305
Doors - Transom Window 2nd Floor 6SF8 $135
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF815 $1,783
Lighting - Pendent/Surface 2nd Floor 7EA14 $0
Marker Board 2nd Floor 7LF36 $0
Storage/ Closet 2nd Floor 6SF61 $442
Walls - Plaster/Drywall 2nd Floor needs painting5SF1,344 $10,186
Classroom #301 (Store Room)
Casework 3rd Floor 6LF5 $126
Ceiling - Plaster/Drywall 3rd Floor 6SF805 $2,786
Ceiling - Plaster/Drywall 3rd Floor peeling5SF10 $125
Chalk Board 3rd Floor 4LF22 $2,020
Doors - Transom Window 3rd Floor 6SF8 $135
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor 6SF811 $1,774
Floor - Tile 3rd Floor damaged5SF4 $23
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Storage/ Closet 3rd Floor peeling5SF61 $984
Walls - Plaster/Drywall 3rd Floor peeling5SF1,344 $10,186
Classroom #302 (Art Room)
Casework 3rd Floor 6LF7 $177
Ceiling - Plaster/Drywall 3rd Floor 6SF795 $2,751
Page 35 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #302 (Art Room)
Ceiling - Plaster/Drywall 3rd Floor cracked5SF20 $250
Chalk Board 3rd Floor 4LF22 $2,020
Doors - Transom Window 3rd Floor 6SF8 $135
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor chipped throughout5SF815 $3,660
Lighting - Pendent/Surface 3rd Floor 7EA14 $0
Storage/ Closet 3rd Floor peeling5SF61 $984
Walls - Plaster/Drywall 3rd Floor 6SF1,344 $3,709
Walls - Plaster/Drywall 3rd Floor cracked5SF6 $31
Classroom #331 (Special Education)
Ceiling - Plaster/Drywall 3rd Floor 6SF521 $1,803
Ceiling - Plaster/Drywall 3rd Floor water damaged5SF10 $125
Chalk Board 3rd Floor 4LF24 $2,203
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor damaged throughout5SF531 $2,384
Lighting - Pendent/Surface 3rd Floor 7EA7 $0
Storage/ Closet 3rd Floor 6SF100 $725
Walls - Plaster/Drywall 3rd Floor 6SF1,080 $2,981
Walls - Plaster/Drywall 3rd Floor water damaged5SF10 $51
Classrooms Subtotal: $126,817
Building: Addition 2
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Ceiling - Plaster/Drywall Rm 100- Counselors Office peeling5SF46 $575
Ceiling - Plaster/Drywall Rm 100- Counselors Office 6SF426 $1,474
Doors - Side-lite Rm 100- Counselors Office 6SF10 $167
Doors - Transom Window Rm 100- Counselors Office 6SF8 $135
Doors - Wood Doors inclu hw Rm 100- Counselors Office 6EA1 $301
Floor - Tile Rm 100- Counselors Office 6SF462 $1,011
Floor - Tile Rm 100- Counselors Office damaged5SF10 $58
Lighting - Pendent/Surface Rm 100- Counselors Office 7EA3 $0
Lighting - Pendent/Surface Rm 100- Counselors Office cover missing6EA1 $124
Power Distribution Rm 100- Counselors Office 7EA8 $0
Page 36 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Storage/ Closet Rm 100- Counselors Office 6SF32 $232
Walls - Plaster/Drywall Rm 100- Counselors Office 6SF1,177 $3,248
Ceiling - Plaster/Drywall Rm 200- Multi Purpose Rm 6SF472 $1,633
Doors - Transom Window Rm 200- Multi Purpose Rm 6SF8 $135
Doors - Wood Doors inclu hw Rm 200- Multi Purpose Rm 6EA1 $301
Floor - Tile Rm 200- Multi Purpose Rm cracked5SF6 $35
Floor - Tile Rm 200- Multi Purpose Rm 6SF466 $1,020
Lighting - Pendent/Surface Rm 200- Multi Purpose Rm 7EA9 $0
Power Distribution Rm 200- Multi Purpose Rm 7EA8 $0
Walls - Plaster/Drywall Rm 200- Multi Purpose Rm 6SF1,177 $3,248
Ceiling - Plaster/Drywall Rm 300- Reading specialist 6SF472 $1,633
Doors - Transom Window Rm 300- Reading specialist 6SF8 $135
Doors - Wood Doors inclu hw Rm 300- Reading specialist 6EA1 $301
Floor - Tile Rm 300- Reading specialist 6SF472 $1,033
Lighting - Pendent/Surface Rm 300- Reading specialist 7EA4 $0
Power Distribution Rm 300- Reading specialist 7EA8 $0
Walls - Plaster/Drywall Rm 300- Reading specialist 6SF1,177 $3,248
Ceiling - Plaster/Drywall Teacher's Lounge in Basement 6SF887 $3,070
Doors - Wood Doors inclu hw Teacher's Lounge in Basement 6EA1 $301
Floor - Tile Teacher's Lounge in Basement Floor needs to be replaced, badly worn and cracked throughout
5SF887 $3,983
Lighting - Pendent/Surface Teacher's Lounge in Basement 7EA4 $0
Power Distribution Teacher's Lounge in Basement 7EA4 $0
Walls - Plaster/Drywall Teacher's Lounge in Basement 6SF1,495 $4,126
Auditorium & Theater
Ceiling - Plaster/Drywall Basement needs painting5SF3,994 $92,525
Doors - Wood Doors inclu hw Basement 6EA10 $3,010
Floor - Wood Basement 6SF3,994 $28,157
Lighting - Pendent/Surface Basement 7EA12 $0
Lighting - Wall Mounted Basement 7EA10 $0
Main Floor Seating Basement 6EA498 $86,610
Sound System Basement 6EA1 $10,721
Stage Basement 6SF650 $3,755
Stage Curtain Basement 6EA4 $0
Stage Lighting System Basement 7EA1 $0
Stage-Stairs - Wood Basement 6LF10 $117
Stairs - Wood Basement 6LF10 $117
Page 37 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Auditorium & Theater
Walls - Plaster/Drywall Basement needs painting5SF6,708 $58,034
Gymnasia
Bleacher Seating 2nd Floor 6EA30 $868
Ceiling - Plaster/Drywall 2nd Floor 6SF4,608 $25,435
Ceiling - Plaster/Drywall 2nd Floor damaged5SF12 $240
Doors - Transom Window 2nd Floor 6SF32 $542
Doors - Wood Doors inclu hw 2nd Floor delaminating5EA1 $1,174
Doors - Wood Doors inclu hw 2nd Floor 6EA3 $903
Floor - Sport Flooring 2nd Floor 6SF4,620 $9,976
Lighting - Metal Halide/ High Pressure Sodium 2nd Floor 7EA20 $0
Scoreboards 2nd Floor 6EA2 $4,489
Walls - Plaster/Drywall 2nd Floor damaged5SF40 $204
Walls - Plaster/Drywall 2nd Floor FRP applied to lower portion of wall6SF5,800 $16,007
Mechanical/ Service Rooms
Janitor's Closet 3rd Floor 6SF18 $129
Storage Room Basement includes Storage rm 36SF695 $4,979
Restroom
Accessories 1st Flr Girl's- Across from Gym 6SF220 $2,029
Ceiling - Plaster/Drywall 1st Flr Girl's- Across from Gym 6SF220 $761
Doors - Wood Doors inclu hw 1st Flr Girl's- Across from Gym 6EA4 $1,204
Floor Drain 1st Flr Girl's- Across from Gym 6EA1 $1,059
Floor - Tile 1st Flr Girl's- Across from Gym damaged5SF10 $58
Floor - Tile 1st Flr Girl's- Across from Gym 6SF210 $459
Lavatory 1st Flr Girl's- Across from Gym 6EA2 $639
Lighting - Pendent/Surface 1st Flr Girl's- Across from Gym 7EA4 $0
Partitions 1st Flr Girl's- Across from Gym 6EA6 $1,782
Walls - Plaster/Drywall 1st Flr Girl's- Across from Gym 6SF378 $1,043
Walls - Structural Glazed Tile 1st Flr Girl's- Across from Gym 6SF378 $1,189
Water Closet 1st Flr Girl's- Across from Gym 6EA6 $2,016
Accessories 1st Flr- In Rm 100 6SF31 $286
Ceiling - Plaster/Drywall 1st Flr- In Rm 100 6SF31 $107
Doors - Wood Doors inclu hw 1st Flr- In Rm 100 6EA1 $301
Floor - Tile 1st Flr- In Rm 100 6SF31 $68
Lavatory 1st Flr- In Rm 100 6EA1 $320
Lighting - Pendent/Surface 1st Flr- In Rm 100 7EA1 $0
Partitions 1st Flr- In Rm 100 6EA1 $297
Page 38 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Walls - Plaster/Drywall 1st Flr- In Rm 100 FRP on lower 3'6SF173 $477
Water Closet 1st Flr- In Rm 100 6EA1 $336
Accessories 1st Flr- Teachers Toilet by 100 6SF59 $544
Ceiling - Plaster/Drywall 1st Flr- Teachers Toilet by 100 6SF59 $204
Doors - Wood Doors inclu hw 1st Flr- Teachers Toilet by 100 6EA1 $301
Floor - Tile 1st Flr- Teachers Toilet by 100 6SF59 $129
Lavatory 1st Flr- Teachers Toilet by 100 6EA1 $320
Lighting - Pendent/Surface 1st Flr- Teachers Toilet by 100 7EA1 $0
Partitions 1st Flr- Teachers Toilet by 100 6EA1 $297
Walls - Plaster/Drywall 1st Flr- Teachers Toilet by 100 6SF390 $1,076
Water Closet 1st Flr- Teachers Toilet by 100 6EA1 $336
Accessories 2nd Flr Girl's- Across from Gym 6SF220 $2,029
Ceiling - Plaster/Drywall 2nd Flr Girl's- Across from Gym 6SF220 $761
Doors - Wood Doors inclu hw 2nd Flr Girl's- Across from Gym 6EA4 $1,204
Floor Drain 2nd Flr Girl's- Across from Gym 6EA1 $1,059
Floor - Tile 2nd Flr Girl's- Across from Gym 6SF220 $481
Lavatory 2nd Flr Girl's- Across from Gym 6EA2 $639
Lighting - Pendent/Surface 2nd Flr Girl's- Across from Gym 7EA4 $0
Partitions 2nd Flr Girl's- Across from Gym 6EA6 $1,782
Walls - Plaster/Drywall 2nd Flr Girl's- Across from Gym 6SF378 $1,043
Walls - Structural Glazed Tile 2nd Flr Girl's- Across from Gym 6SF378 $1,189
Water Closet 2nd Flr Girl's- Across from Gym 6EA6 $2,016
Accessories 2nd Flr- Teachers Toilet Across from Gym
6SF59 $544
Ceiling - Plaster/Drywall 2nd Flr- Teachers Toilet Across from
Gym
6SF34 $118
Ceiling - Plaster/Drywall 2nd Flr- Teachers Toilet Across from Gym
water damaged5SF25 $269
Doors - Wood Doors inclu hw 2nd Flr- Teachers Toilet Across from Gym
6EA1 $301
Floor - Tile 2nd Flr- Teachers Toilet Across from Gym
6SF59 $129
Lavatory 2nd Flr- Teachers Toilet Across from Gym
6EA1 $320
Lighting - Pendent/Surface 2nd Flr- Teachers Toilet Across from
Gym
7EA1 $0
Partitions 2nd Flr- Teachers Toilet Across from Gym
6EA1 $297
Walls - Plaster/Drywall 2nd Flr- Teachers Toilet Across from Gym
6SF385 $1,063
Page 39 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Walls - Plaster/Drywall 2nd Flr- Teachers Toilet Across from
Gym
water damaged5SF5 $26
Water Closet 2nd Flr- Teachers Toilet Across from Gym
6EA1 $336
Accessories 3rd Flr Girl's- Next to 300 6SF220 $2,029
Ceiling - Plaster/Drywall 3rd Flr Girl's- Next to 300 6SF220 $761
Doors - Wood Doors inclu hw 3rd Flr Girl's- Next to 300 6EA4 $1,204
Floor Drain 3rd Flr Girl's- Next to 300 6EA1 $1,059
Floor - Tile 3rd Flr Girl's- Next to 300 6SF220 $481
Lavatory 3rd Flr Girl's- Next to 300 6EA2 $639
Lighting - Pendent/Surface 3rd Flr Girl's- Next to 300 7EA4 $0
Partitions 3rd Flr Girl's- Next to 300 6EA4 $1,188
Partitions 3rd Flr Girl's- Next to 300 missing doors5EA2 $1,502
Walls - Plaster/Drywall 3rd Flr Girl's- Next to 300 6SF378 $1,043
Walls - Structural Glazed Tile 3rd Flr Girl's- Next to 300 6SF378 $1,189
Water Closet 3rd Flr Girl's- Next to 300 6EA6 $2,016
Accessories 3rd Flr- Teachers Toilet by 300 6SF59 $544
Ceiling - Plaster/Drywall 3rd Flr- Teachers Toilet by 300 6SF59 $204
Doors - Wood Doors inclu hw 3rd Flr- Teachers Toilet by 300 6EA1 $301
Floor - Tile 3rd Flr- Teachers Toilet by 300 6SF51 $112
Floor - Tile 3rd Flr- Teachers Toilet by 300 damaged5SF8 $39
Lavatory 3rd Flr- Teachers Toilet by 300 6EA1 $320
Lighting - Pendent/Surface 3rd Flr- Teachers Toilet by 300 7EA1 $0
Partitions 3rd Flr- Teachers Toilet by 300 6EA1 $297
Walls - Plaster/Drywall 3rd Flr- Teachers Toilet by 300 6SF385 $1,063
Walls - Plaster/Drywall 3rd Flr- Teachers Toilet by 300 peeling5SF5 $26
Water Closet 3rd Flr- Teachers Toilet by 300 6EA1 $336
Accessories Basement Girl's- Across from Auditorium 6SF220 $2,029
Ceiling - Plaster/Drywall Basement Girl's- Across from Auditorium 6SF220 $761
Doors - Wood Doors inclu hw Basement Girl's- Across from Auditorium 6EA4 $1,204
Floor Drain Basement Girl's- Across from Auditorium 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain Basement Girl's- Across from Auditorium 6SF220 $466
Lavatory Basement Girl's- Across from Auditorium 6EA2 $639
Lighting - Pendent/Surface Basement Girl's- Across from Auditorium 7EA4 $0
Partitions Basement Girl's- Across from Auditorium 6EA6 $1,782
Walls - Plaster/Drywall Basement Girl's- Across from Auditorium 6SF378 $1,043
Walls - Structural Glazed Tile Basement Girl's- Across from Auditorium 6SF378 $1,189
Water Closet Basement Girl's- Across from Auditorium 6EA6 $2,016
Page 40 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Accessories Basement- Teachers Toilet Across from
Auditorium
6SF59 $544
Ceiling - Plaster/Drywall Basement- Teachers Toilet Across from Auditorium
6SF59 $204
Doors - Wood Doors inclu hw Basement- Teachers Toilet Across from Auditorium
6EA1 $301
Floor - Tile Ceramic/ Porcelain Basement- Teachers Toilet Across from Auditorium
6SF59 $125
Lavatory Basement- Teachers Toilet Across from Auditorium
6EA1 $320
Lighting - Pendent/Surface Basement- Teachers Toilet Across from
Auditorium
7EA1 $0
Partitions Basement- Teachers Toilet Across from Auditorium
rusting5EA1 $751
Walls - Plaster/Drywall Basement- Teachers Toilet Across from Auditorium
water damaged5SF10 $51
Walls - Plaster/Drywall Basement- Teachers Toilet Across from Auditorium
6SF380 $1,049
Water Closet Basement- Teachers Toilet Across from Auditorium
6EA1 $336
Rooms (Other Than Classrooms) Subtotal: $444,989
Building: Addition 2
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Plaster/Drywall 1st Floor peeling & water damage5SF56 $977
Ceiling - Plaster/Drywall 1st Floor 6SF1,944 $12,037
Drinking Fountains - Single Fountain 1st Floor 6EA2 $551
Floor - Tile/Sheet 1st Floor 6SF2,000 $1,087
Lighting - Pendent/Surface 1st Floor 7EA10 $0
Walls - Plaster/Drywall 1st Floor cracks & water damage5SF25 $251
Walls - Plaster/Drywall 1st Floor 6SF3,446 $15,276
Ceiling - Plaster/Drywall 2nd Floor 6SF1,800 $11,145
Ceiling - Plaster/Drywall 2nd Floor peeling5SF200 $3,489
Drinking Fountains - Single Fountain 2nd Floor 6EA2 $551
Floor - Tile/Sheet 2nd Floor damaged5SF11 $63
Floor - Tile/Sheet 2nd Floor 6SF1,989 $1,081
Lighting - Pendent/Surface 2nd Floor 7EA10 $0
Page 41 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Walls - Plaster/Drywall 2nd Floor 6SF3,441 $15,254
Walls - Plaster/Drywall 2nd Floor peeling5SF30 $301
Ceiling - Plaster/Drywall 3rd Floor 6SF1,973 $12,217
Ceiling - Plaster/Drywall 3rd Floor damaged5SF27 $471
Drinking Fountains - Single Fountain 3rd Floor 6EA2 $551
Floor - Tile/Sheet 3rd Floor 6SF1,985 $1,079
Floor - Tile/Sheet 3rd Floor damaged5SF15 $86
Lighting - Pendent/Surface 3rd Floor 7EA10 $0
Walls - Plaster/Drywall 3rd Floor 6SF3,456 $15,320
Walls - Plaster/Drywall 3rd Floor damaged5SF15 $151
Ceiling - Exposed Basement 6SF2,000 $2,974
Ceiling - Plaster/Drywall Basement 6SF279 $1,728
Ceiling - Plaster/Drywall Basement water damaged5SF40 $595
Doors - Side-lite Basement 6EA12 $201
Doors - Wood Doors include hw Basement delaminating5EA3 $3,522
Doors - Wood Doors include hw Basement 6EA4 $1,204
Drinking Fountains - Single Fountain Basement 6EA2 $551
Floor - Concrete Basement 6SF159 $84
Floor - Tile Ceramic/ Porcelain Basement 6SF160 $446
Floor - Tile/Sheet Basement 6SF2,000 $1,087
Lighting - Pendent/Surface Basement 7EA14 $0
Walls - Plaster/Drywall Basement 6SF3,471 $15,387
Walls - Structural Glazed Tile Basement 6SF816 $2,567
Safety
Security Cameras 6EA2 $388
Security Cameras 6EA1 $194
Stairs
Ceiling - Plaster/Drywall North 6SF836 $6,121
Ceiling - Plaster/Drywall North water damaged5SF7 $143
Floor - Tile North 6SF607 $330
Floor - Tile North damaged5SF2 $12
Handrails North 6LF212 $1,837
Lighting - Pendent/Surface North 7EA5 $0
Stairs - Asphalt North 5LF60 $2,539
Stairs - Asphalt North asphalt covered in VCT & Metal Treads6LF23 $213
Walls - Plaster/Drywall North 6SF3,671 $10,132
Page 42 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Addition 2
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Building Interior Subtotal: $144,195
Total Building Cost $1,261,283
Building: Annex
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Entrance Control - Audio and Video Door 1 - East 7EA1 $0
Entrance Control - Audio and Video Door 4 - Northwest 7EA1 $0
Exterior Doors - Exterior Steel Door Door 1 - East 6EA2 $961
Exterior Doors - Exterior Steel Door Door 2 - Southwest 6EA2 $961
Exterior Doors - Exterior Steel Door Door 3 - Northwest kitchen 6EA1 $481
Exterior Doors - Exterior Steel Door Door 4 - Northwest 6EA2 $961
Exterior Doors - Exterior Steel Door Door 4.2 - North 6EA1 $481
Exterior Doors - Exterior Steel Door Door 4.4 - North 6EA1 $481
Exterior Doors - Exterior Steel Door Door 5 - East 6EA2 $961
Exterior Doors - Exterior Steel Door Door 5.5 - Near door 1 6EA1 $481
Exterior Doors - Transom Lite Door 1 - East 7EA1 $0
Exterior Stairs - Concrete Door 2 - Southwest 6LF6 $491
Exterior Stairs - Concrete Door 4 - Northwest 6LF6 $491
Exterior Stairs - Concrete Door 4.2 - North 6LF3 $245
Exterior Stairs - Concrete Door 4.4 - North 6LF3 $245
Exterior Stairs - Concrete Door 5 - East 6LF7 $572
Foundation
Foundation - Concrete Entire Building 7LF586 $0
Superstructure - Concrete Entire Building 7SF40,499 $0
Lighting
Exterior Lighting - Parapet or Roof Mounted Entire Building 6EA9 $4,829
Exterior Lighting - Wall Mounted Entire Building 5EA6 $2,564
Roof System
Coping - Metal Annex roof 1 6LF436 $14,003
Coping - Metal Annex roof 2 6LF271 $8,704
Downspouts - Interior Downspouts Annex roof 1 6LF111 $3,689
Downspouts - Interior Downspouts Annex roof 2 6LF48 $1,595
Page 43 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Roof System
Roof Structure - Steel / Metal Deck/ Concrete Topping Annex roof 1 7SF10,525 $0
Roof Structure - Steel / Metal Deck/ Concrete Topping Annex roof 2 7SF5,931 $0
Roof - Asphalt Gravel Ballast Annex roof 1 blisters, cracking4SF10,525 $294,995
Roof - Asphalt Gravel Ballast Annex roof 2 Blisters, cracks, ballast raked back4SF5,931 $166,234
Walls
Exterior Walls - Precast Panel Wall Entire Building Failing sealant throughout5SF18,950 $156,900
Exterior Walls - Precast Panel Wall Entire Building / East Façade Cracked, damaged, exposed rebar5SF10 $112
Windows
Curtain wall - Louver Entire Building 6SF230 $2,579
Windows - Casement Lexan Entire Building 6SF875 $6,532
Windows - Decorative Entire Building 6SF1,820 $13,586
Building Exterior Subtotal: $684,132
Building: Annex
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Automatic Transfer Switch Electrical Room Nearing end of useful life. 6EA1 $408
Emergency A/C Power - Corridors and Stairs Entire Building 6SF6,003 $1,803
Emergency A/C Power - Gym Entire Building / 1st Floor 6SF2,919 $1,085
Emergency A/C Power - Lunchrooms Entire Building / 1st Floor 6SF1,045 $389
Emergency Battery Packs - Corridors and Stairs Entire Building Emergency light.6EA11 $2,228
Emergency Battery Packs - Corridors and Stairs Entire Building Exit sign.6EA37 $7,493
Emergency Battery Packs - Gym Entire Building / 1st Floor Exit sign.6EA2 $405
Emergency Battery Packs - Gym Entire Building / 1st Floor Emergency light.6EA5 $1,013
Emergency Battery Packs - Lunchrooms Entire Building / 1st Floor Emergency light.6EA3 $608
Emergency Battery Packs - Lunchrooms Entire Building / 1st Floor Exit sign.6EA2 $405
Emergency Battery Packs - Students Toilets Entire Building / 3rd Floor Missing cover and wires are exposed. Emergency light.
4EA1 $579
Emergency Battery Packs - Students Toilets Entire Building Emergency light.6EA5 $1,013
Exit Signs - Corridors and Stairs Entire Building / 1st Floor No battery back-up.2EA3 $1,636
Exit Signs - Corridors and Stairs Entire Building 6EA37 $5,541
Exit Signs - Gym Entire Building / 1st Floor 6EA2 $315
Exit Signs - Lunchroom Entire Building / 1st Floor 6EA2 $299
Security System - Intrusion Detection Entire Building 6SF40,499 $10,424
Page 44 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Main Service
Independent Electrical Service for emergency power Electrical Room 6EA1 $2,921
Main Electrical Service - Greater than 3000 A 120/208/3PH Electrical Room 6EA1 $16,381
PA System Entire Building Serves the Annex only. Control console still
functional but needs to be upgrade. Utilizes a
tape deck.
6SF40,499 $13,320
Power Distribution
Lighting and Power Panels - 100 A Entire Building 6EA1 $299
Lighting and Power Panels - 100 A Entire Building 6EA3 $897
Lighting and Power Panels - Above 100 A Entire Building 6EA3 $1,491
Main Distribution Panels - 400 - 600 amp Entire Building 6EA1 $528
Main Distribution Panels - 400 - 600 amp Entire Building 6EA5 $2,639
Main Distribution Panels - Greater than 600 amp Entire Building 6EA1 $730
Electrical System Subtotal: $74,848
Building: Annex
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm Panel Electrical Room Obsolete technology past useful life. 3EA1 $49,477
Fire Alarm_System Electrical Room Obsolete technology past useful life. Manual pull stations only.
4SF40,499 $80,500
Safty System Subtotal: $129,977
Building: Annex
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Conditioning
Condensing Unit- Roof Mounted - 11-20 tons Roof / Lower Roof Serves the Lunchroom AHU. 5EA1 $11,065
Condensing Unit- Roof Mounted - 11-20 tons Roof / Lower Roof Serves the Gym AHU. 5EA1 $11,065
Condensing Unit- Roof Mounted - 5-10 tons Roof Hasn't run in 15 years, needs full replacement. Space has been operated without cooling. Serves main office.
2EA1 $14,893
Air Handling Systems
Air Handling Unit- Package Single Zone- Indoor- Electric and DX Cooling Coil - 4000-8000 cfm
Mechanical Room Serves the gym and a computer room. Near or past useful life.
5EA1 $26,442
Page 45 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Handling Systems
Air Handling Unit- Package Single Zone- Indoor- Electric and DX
Cooling Coil - Less than 4000 cfm
Mechanical Room Serves the Lunchroom. Unit is near or past useful
life.
5EA1 $20,373
Air Intake Mechanical Room / Roof 7EA1 $0
Air Intake Mechanical Room / Roof 7EA1 $0
Auxiliaries - 4000-8000 cfm Mechanical Room 5EA1 $0
Auxiliaries - Less than 4000 cfm Mechanical Room 5EA1 $0
Fan Coil Unit- Celing Mounted - Electric Main Office Storage Room No nameplate on unit. Refer to condensing unit section for additional information.
6EA1 $820
Heating Devices
Fin Tube - Electric 1st Floor 6LF20 $189
Wall Heater - Electric Entire Building 6EA27 $3,751
Temperature Control
Electric Controls Entire Building 5SF5,202 $0
Electric Thermostat Entire Building 5EA3 $0
Unit Ventilation
Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor
Entire Building / 3rd Floor Past useful life and not operating. With integral thermostats.
2EA2 $45,878
Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor
Entire Building / 3rd Floor Past useful life. Running but missing cover. With integral thermostats.
4EA1 $22,939
Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/
Self Contained Compressor
Entire Building With integral thermostats. 6EA24 $29,945
Ventilation
Exhaust Fans- Roof Mounted - 1501 - 8000 CFM Entire Building / Roof 6EA3 $1,777
Exhaust Fans- Roof Mounted - Greater than 8000 CFM Entire Building / Roof 6EA1 $592
Type II Exhaust Hood- Warming Kitchen Entire Building / 1st Floor Diahwasher and warming oven hoods. 6EA2 $1,840
Mechanical System Subtotal: $191,570
Building: Annex
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Hot Water
Electric Heater - 20 - 50 KW Kitchen, Closet 7EA1 $0
Electric Heater - Less than 20 KW Kitchen, Closet Dishwasher booster heater. 6EA1 $682
Page 46 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building 6SF40,499 $8,108
Domestic Piping-Cold Water Horizontal Lines Entire Building 6SF40,499 $9,845
Domestic Piping-Cold Water Risers Entire Building 6SF40,499 $7,529
Domestic Piping-Hot Water from Risers to Fixtures Entire Building 6SF40,499 $6,370
Domestic Piping-Hot Water Horizontal Lines Entire Building 6SF40,499 $7,529
Domestic Piping-Hot Water Return Lines Entire Building 6SF40,499 $5,791
Domestic Piping-Hot Water Return Risers Entire Building 6SF40,499 $5,791
Sanitary Piping Entire Building 6SF40,499 $37,065
Storm Piping Entire Building 6SF40,499 $35,327
Vent Piping Entire Building 6SF40,499 $27,219
Plumbing System Subtotal: $151,258
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #111 (Regular Classroom)
Ceiling - Lay-in 1st Floor water damage5SF20 $160
Ceiling - Lay-in 1st Floor 6SF300 $901
Chalk Board 1st Floor 4LF8 $734
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor cracked and broken tiles5SF12 $69
Floor - Tile 1st Floor 6SF308 $674
Lighting - Lay-in 1st Floor 7EA6 $0
Walls - Metal Panel 1st Floor 6SF475 $3,546
Classroom #112 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF900 $2,703
Chalk Board 1st Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 1st Floor 6EA5 $1,505
Floor - Tile 1st Floor 6SF900 $1,969
Lighting - Lay-in 1st Floor 7EA12 $0
Marker Board 1st Floor 6LF10 $214
Storage/ Closet 1st Floor 6SF135 $979
Walls - Metal Panel 1st Floor 6SF1,800 $13,436
Classroom #113 (Kindergarten)
Casework 1st Floor 6LF20 $505
Page 47 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #113 (Kindergarten)
Ceiling - Lay-in 1st Floor 6SF990 $2,973
Chalk Board 1st Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF990 $2,166
Lighting - Lay-in 1st Floor 7EA14 $0
Marker Board 1st Floor 7LF8 $0
Walls - Concrete Block 1st Floor 6SF200 $586
Walls - Concrete Block 1st Floor cracked concrete5SF14 $197
Walls - Metal Panel 1st Floor 6SF812 $6,061
Work Sink 1st Floor 6EA1 $379
Classroom #114 (Kindergarten)
Casework 1st Floor 6LF20 $505
Ceiling - Lay-in 1st Floor 6SF990 $2,973
Chalk Board 1st Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF990 $2,166
Lighting - Lay-in 1st Floor 7EA14 $0
Marker Board 1st Floor 7LF8 $0
Walls - Concrete Block 1st Floor 6SF192 $563
Walls - Concrete Block 1st Floor concrete wall damage5SF8 $113
Walls - Metal Panel 1st Floor 6SF812 $6,061
Work Sink 1st Floor 6EA1 $379
Classroom #115 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF704 $2,114
Ceiling - Lay-in 1st Floor water damage5SF6 $48
Chalk Board 1st Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Floor - Tile 1st Floor 6SF710 $1,553
Lighting - Lay-in 1st Floor 7EA10 $0
Walls - Metal Panel 1st Floor 6SF350 $2,613
Walls - Plaster/Drywall 1st Floor cracking and water damage5SF12 $61
Walls - Plaster/Drywall 1st Floor 6SF1,100 $3,036
Classroom #116 (Regular Classroom)
Ceiling - Lay-in 1st Floor 6SF710 $2,132
Chalk Board 1st Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 1st Floor 6EA1 $301
Page 48 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #116 (Regular Classroom)
Floor - Tile 1st Floor 6SF710 $1,553
Lighting - Lay-in 1st Floor 7EA10 $0
Walls - Metal Panel 1st Floor 6SF350 $2,613
Walls - Plaster/Drywall 1st Floor 6SF1,100 $3,036
Work Sink 1st Floor 6EA1 $379
Classroom #211 (Regular Classroom)
Casework 2nd Floor 6LF20 $505
Ceiling - Lay-in 2nd Floor 6SF710 $2,132
Ceiling - Lay-in 2nd Floor water damage5SF10 $80
Chalk Board 2nd Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF708 $1,549
Floor - Tile 2nd Floor Cracked tiles5SF12 $69
Lighting - Lay-in 2nd Floor 7EA10 $0
Storage/ Closet 2nd Floor 6SF60 $435
Walls - Concrete Block 2nd Floor 6SF104 $305
Walls - Metal Panel 2nd Floor 6SF549 $4,098
Work Sink 2nd Floor 6EA1 $379
Classroom #212 (Store Room)
Casework 2nd Floor 6LF20 $505
Ceiling - Lay-in 2nd Floor 6SF710 $2,132
Ceiling - Lay-in 2nd Floor water damage5SF10 $80
Chalk Board 2nd Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF720 $1,575
Lighting - Lay-in 2nd Floor 7EA10 $0
Walls - Concrete Block 2nd Floor 6SF104 $305
Walls - Metal Panel 2nd Floor 6SF549 $4,098
Classroom #213 (Regular Classroom)
Casework 2nd Floor 6LF20 $505
Ceiling - Lay-in 2nd Floor 6SF720 $2,162
Chalk Board 2nd Floor 4LF32 $2,938
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF720 $1,575
Lighting - Lay-in 2nd Floor 7EA10 $0
Walls - Concrete Block 2nd Floor 6SF104 $305
Page 49 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #213 (Regular Classroom)
Walls - Metal Panel 2nd Floor 6SF549 $4,098
Classroom #214 (Regular Classroom)
Casework 2nd Floor 6LF20 $505
Ceiling - Lay-in 2nd Floor 6SF705 $2,117
Ceiling - Lay-in 2nd Floor water damage5SF15 $120
Chalk Board 2nd Floor 4LF32 $2,938
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF720 $1,575
Lighting - Lay-in 2nd Floor 7EA10 $0
Walls - Concrete Block 2nd Floor 6SF104 $305
Walls - Metal Panel 2nd Floor 6SF549 $4,098
Classroom #215 (Regular Classroom)
Casework 2nd Floor 6LF20 $505
Ceiling - Lay-in 2nd Floor 6SF708 $2,126
Ceiling - Lay-in 2nd Floor water damage5SF12 $96
Chalk Board 2nd Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF720 $1,575
Lighting - Lay-in 2nd Floor 7EA10 $0
Walls - Concrete Block 2nd Floor 6SF104 $305
Walls - Metal Panel 2nd Floor 6SF549 $4,098
Work Sink 2nd Floor 6EA1 $379
Classroom #216 (Regular Classroom)
Casework 2nd Floor 6LF20 $505
Ceiling - Lay-in 2nd Floor 6SF1,440 $4,324
Ceiling - Lay-in 2nd Floor water damage5SF12 $96
Chalk Board 2nd Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor - Tile 2nd Floor 6SF1,440 $3,151
Lighting - Lay-in 2nd Floor 7EA20 $0
Walls - Concrete Block 2nd Floor 6SF2,040 $5,980
Walls - Metal Panel 2nd Floor (Folding wall, closed away)6SF549 $4,098
Work Sink 2nd Floor 6EA1 $379
Classroom #218 (Regular Classroom)
Casework 2nd Floor 6LF20 $505
Page 50 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #218 (Regular Classroom)
Ceiling - Lay-in 2nd Floor 6SF720 $2,162
Chalk Board 2nd Floor 4LF32 $2,938
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile 2nd Floor 6SF708 $1,549
Floor - Tile 2nd Floor cracked tiles5SF12 $69
Lighting - Lay-in 2nd Floor 7EA10 $0
Walls - Concrete Block 2nd Floor 6SF274 $803
Walls - Metal Panel 2nd Floor 6SF379 $2,829
Classroom #312 (Regular Classroom)
Casework 3rd Floor 6LF20 $505
Ceiling - Lay-in 3rd Floor 6SF1,440 $4,324
Chalk Board 3rd Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Tile 3rd Floor 6SF1,440 $3,151
Lighting - Lay-in 3rd Floor 7EA20 $0
Walls - Concrete Block 3rd Floor 6SF1,850 $5,423
Walls - Metal Panel 3rd Floor folding partition6SF549 $4,098
Classroom #314 (Regular Classroom)
Casework 3rd Floor 6LF20 $505
Ceiling - Lay-in 3rd Floor 6SF711 $2,135
Ceiling - Lay-in 3rd Floor water damage5SF9 $72
Chalk Board 3rd Floor 4LF32 $2,938
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor 6SF720 $1,575
Lighting - Lay-in 3rd Floor 7EA10 $0
Walls - Concrete Block 3rd Floor 6SF1,100 $3,225
Walls - Metal Panel 3rd Floor 6SF549 $4,098
Classroom #315 (Regular Classroom)
Casework 3rd Floor 6LF20 $505
Ceiling - Lay-in 3rd Floor 6SF720 $2,162
Chalk Board 3rd Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor 6SF720 $1,575
Lighting - Lay-in 3rd Floor 7EA10 $0
Walls - Concrete Block 3rd Floor 6SF104 $305
Walls - Metal Panel 3rd Floor 6SF549 $4,098
Page 51 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #315 (Regular Classroom)
Work Sink 3rd Floor 6EA1 $379
Classroom #317 (Regular Classroom)
Casework 3rd Floor 6LF20 $505
Ceiling - Lay-in 3rd Floor 6SF1,440 $4,324
Chalk Board 3rd Floor 4LF32 $2,938
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Tile 3rd Floor 6SF1,440 $3,151
Floor - Tile 3rd Floor cracked tile5SF12 $69
Lighting - Lay-in 3rd Floor 7EA20 $0
Walls - Concrete Block 3rd Floor 6SF1,860 $5,453
Walls - Metal Panel 3rd Floor folding partition 6SF549 $4,098
Work Sink 3rd Floor 6EA1 $379
Classroom #318 (Store Room)
Casework 3rd Floor 6LF20 $505
Ceiling - Lay-in 3rd Floor 6SF720 $2,162
Chalk Board 3rd Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 3rd Floor 6EA1 $301
Floor - Tile 3rd Floor 6SF720 $1,575
Lighting - Lay-in 3rd Floor 7EA10 $0
Storage/ Closet 3rd Floor 6SF97 $703
Walls - Concrete Block 3rd Floor 6SF104 $305
Walls - Metal Panel 3rd Floor 6SF549 $4,098
Classroom #319 (Store Room)
Casework 3rd Floor 6LF20 $505
Ceiling - Lay-in 3rd Floor 6SF720 $2,162
Chalk Board 3rd Floor 4LF16 $1,469
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor - Tile 3rd Floor 6SF705 $1,542
Floor - Tile 3rd Floor cracked tiles5SF15 $86
Lighting - Lay-in 3rd Floor 7EA10 $0
Storage/ Closet 3rd Floor 6SF265 $1,921
Walls - Concrete Block 3rd Floor 6SF104 $305
Walls - Metal Panel 3rd Floor 6SF549 $4,098
Classrooms Subtotal: $259,294
Page 52 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Ceiling - Lay-in Assistant Principal's Office in Main
Office
6SF175 $526
Doors - Wood Doors inclu hw Assistant Principal's Office in Main Office
6EA2 $602
Floor - Tile Assistant Principal's Office in Main Office
6SF175 $383
Lighting - Lay-in Assistant Principal's Office in Main Office
7EA2 $0
Power Distribution Assistant Principal's Office in Main Office
7EA6 $0
Storage/ Closet Assistant Principal's Office in Main
Office
6SF10 $73
Walls - Metal Panel Assistant Principal's Office in Main Office
6SF460 $3,434
Walls - Metal Panel Assistant Principal's Office in Main Office
water damage wall5SF10 $400
Ceiling - Lay-in Gym Office 6SF116 $348
Doors - Wood Doors inclu hw Gym Office 6EA1 $301
Floor - Tile/Sheet Gym Office 6SF116 $116
Lighting - Lay-in Gym Office 7EA1 $0
Power Distribution Gym Office 7EA4 $0
Walls - Metal Panel Gym Office 6SF385 $2,874
Ceiling - Lay-in Kitchen Manager Office 6SF72 $216
Doors - Wood Doors inclu hw Kitchen Manager Office 6EA1 $301
Floor - Tile Kitchen Manager Office 6SF72 $158
Lighting - Lay-in Kitchen Manager Office 7EA1 $0
Power Distribution Kitchen Manager Office 7EA4 $0
Walls - Concrete Block Kitchen Manager Office 6SF184 $539
Ceiling - Lay-in Library Office 6SF90 $270
Ceiling - Lay-in Library Office water damage5SF6 $48
Doors - Wood Doors inclu hw Library Office 6EA1 $301
Floor - Carpet Library Office 6SF96 $205
Lighting - Lay-in Library Office 6EA1 $119
Power Distribution Library Office 7EA4 $0
Walls - Metal Panel Library Office 6SF172 $1,284
Ceiling - Lay-in Main Office 6SF518 $1,556
Doors - Wood Doors inclu hw Main Office 6EA2 $602
Floor - Tile Main Office 6SF518 $1,133
Lighting - Lay-in Main Office 7EA10 $0
Power Distribution Main Office 7EA12 $0
Page 53 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Storage/ Closet Main Office 6SF8 $58
Walls - Concrete Block Main Office 6SF354 $1,038
Walls - Plaster/Drywall Main Office 6SF459 $1,267
Ceiling - Lay-in Media Room in Library 6SF773 $2,321
Ceiling - Lay-in Media Room in Library water damage5SF30 $239
Doors - Wood Doors inclu hw Media Room in Library 6EA1 $301
Floor - Tile Media Room in Library 6SF803 $1,757
Lighting - Lay-in Media Room in Library 7EA12 $0
Power Distribution Media Room in Library 7EA44 $0
Walls - Metal Panel Media Room in Library 6SF1,368 $10,212
Ceiling - Lay-in Room 310:Planning Room 6SF395 $1,186
Doors - Wood Doors inclu hw Room 310:Planning Room 6EA1 $301
Floor - Carpet Room 310:Planning Room 6SF395 $842
Lighting - Lay-in Room 310:Planning Room 7EA6 $0
Power Distribution Room 310:Planning Room 7EA16 $0
Walls - Concrete Block Room 310:Planning Room 6SF145 $425
Walls - Metal Panel Room 310:Planning Room 6SF530 $3,956
Ceiling - Lay-in Room 311: Teacher's Lounge 6SF480 $1,441
Doors - Wood Doors inclu hw Room 311: Teacher's Lounge 6EA1 $301
Floor - Tile Room 311: Teacher's Lounge 6SF480 $1,050
Lighting - Lay-in Room 311: Teacher's Lounge 7EA6 $0
Power Distribution Room 311: Teacher's Lounge 7EA8 $0
Walls - Concrete Block Room 311: Teacher's Lounge 6SF94 $276
Walls - Concrete Block Room 311: Teacher's Lounge cracked concrete5SF10 $141
Walls - Metal Panel Room 311: Teacher's Lounge 6SF559 $4,173
Ceiling - Lay-in Teachers Lunch room 6SF71 $213
Doors - Wood Doors inclu hw Teachers Lunch room 6EA2 $602
Floor - Tile Teachers Lunch room 6SF71 $155
Lighting - Lay-in Teachers Lunch room 7EA1 $0
Power Distribution Teachers Lunch room 7EA4 $0
Walls - Metal Panel Teachers Lunch room 6SF245 $1,829
Gymnasia
Ceiling - Lay-in 1st Floor 6SF2,905 $8,724
Ceiling - Lay-in 1st Floor water damage5SF14 $112
Doors - Steel Doors incl hw 1st Floor 6EA8 $2,408
Floor - Tile 1st Floor 6SF2,919 $6,386
Lighting - Pendent/Surface 1st Floor 7EA40 $0
Page 54 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Gymnasia
Storage/ Closet 1st Floor 6SF180 $1,305
Walls - Concrete Block 1st Floor 6SF2,214 $6,490
Walls - Concrete Block 1st Floor cracked concrete5SF12 $169
Walls - Metal Panel 1st Floor 6SF2,226 $16,616
Kitchen
Ceiling - Lay-in 1st Floor 6SF734 $2,204
Doors - Wood Doors inclu hw 1st Floor 6EA3 $903
Floor - Tile 1st Floor 6SF724 $1,584
Floor - Tile 1st Floor cracked tiles5SF10 $58
Lighting - Lay-in 1st Floor 7EA12 $0
Serving Line 1st Floor 6LF20 $1,190
Storage/ Closet 1st Floor 6SF115 $834
Walls - Plaster/Drywall 1st Floor 6SF1,124 $3,102
Library
Ceiling - Lay-in Room 219 6SF2,063 $6,195
Doors - Steel Doors incl hw Room 219 6EA4 $1,204
Floor - Carpet Room 219 6SF2,063 $4,396
Lighting - Lay-in Room 219 7EA28 $0
Walls - Metal Panel Room 219 6SF1,982 $14,795
Locker/Shower Room
Accessories In Kitchen 6SF76 $298
Ceiling - Lay-In In Kitchen 6SF76 $228
Doors - Wood Doors inclu hw In Kitchen 6EA1 $301
Floor - Tile/Sheet In Kitchen 6SF76 $76
Lavatory In Kitchen 6EA1 $320
Lighting - Pendent/Surface In Kitchen 7EA2 $0
Student Lockers - One Tier In Kitchen 6EA5 $464
Walls - Plaster/Drywall In Kitchen 6SF325 $897
Water Closet In Kitchen 6EA2 $672
Lunch & Multipurpose Room
Ceiling - Lay-in 1st Floor 6SF1,045 $3,138
Doors - Steel Doors incl hw 1st Floor 6EA8 $2,408
Floor - Tile 1st Floor 6SF1,015 $2,221
Floor - Tile 1st Floor cracked tile5SF30 $173
Lighting - Lay-in 1st Floor 7EA28 $0
Page 55 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Lunch & Multipurpose Room
Walls - Plaster/Drywall 1st Floor 6SF1,578 $4,355
MDF_IDF
AC Unit 2nd Floor 6EA1 $496
Doors - Steel Doors incl hw 2nd Floor 6EA1 $301
Mechanical/ Service Rooms
Janitor's Closet 1st Floor 6SF66 $473
Mechanical/ Service Rooms 1st Floor Includes Yard Storage6SF190 $1,361
Storage Room 1st Floor 6SF97 $695
Janitor's Closet 2nd Floor 6SF38 $272
Mechanical/ Service Rooms 2nd Floor 6SF1,735 $12,430
Storage Room 2nd Floor 6SF86 $616
Janitor's Closet 3rd Floor 6SF45 $322
Restroom
Accessories 1st Floor Boy's Room 6SF214 $1,974
Ceiling - Lay-in 1st Floor Boy's Room 6SF214 $643
Ceiling - Lay-in 1st Floor Boy's Room water damage5SF10 $80
Doors - Wood Doors inclu hw 1st Floor Boy's Room 6EA4 $1,204
Floor Drain 1st Floor Boy's Room 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st Floor Boy's Room 6SF214 $453
Lavatory 1st Floor Boy's Room 6EA2 $639
Lighting - Lay-in 1st Floor Boy's Room 7EA2 $0
Partitions 1st Floor Boy's Room 6EA2 $594
Urinals 1st Floor Boy's Room 6EA2 $672
Walls - Metal Panel 1st Floor Boy's Room 6SF486 $3,628
Water Closet 1st Floor Boy's Room 6EA2 $672
Accessories 1st Floor Girl's Room 6SF258 $2,380
Ceiling - Lay-in 1st Floor Girl's Room 6SF248 $745
Ceiling - Lay-in 1st Floor Girl's Room water damage5SF10 $80
Doors - Wood Doors inclu hw 1st Floor Girl's Room 6EA4 $1,204
Floor Drain 1st Floor Girl's Room 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st Floor Girl's Room 6SF258 $546
Lavatory 1st Floor Girl's Room 6EA2 $639
Lighting - Lay-in 1st Floor Girl's Room 7EA2 $0
Partitions 1st Floor Girl's Room 6EA4 $1,188
Walls - Metal Panel 1st Floor Girl's Room 6SF532 $3,971
Water Closet 1st Floor Girl's Room 6EA4 $1,344
Page 56 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Accessories 1st Floor Men's Room 6SF35 $323
Ceiling - Lay-in 1st Floor Men's Room 6SF35 $105
Doors - Wood Doors inclu hw 1st Floor Men's Room 6EA1 $301
Floor - Tile Ceramic/ Porcelain 1st Floor Men's Room 6SF35 $74
Lavatory 1st Floor Men's Room 6EA1 $320
Lighting - Pendent/Surface 1st Floor Men's Room 6EA1 $124
Walls - Metal Panel 1st Floor Men's Room 6SF145 $1,082
Water Closet 1st Floor Men's Room 6EA1 $336
Accessories 1st Floor Women's Room 6SF35 $323
Ceiling - Lay-in 1st Floor Women's Room 6SF35 $105
Doors - Wood Doors inclu hw 1st Floor Women's Room 6EA1 $301
Floor - Tile Ceramic/ Porcelain 1st Floor Women's Room 6SF35 $74
Lavatory 1st Floor Women's Room 6EA1 $320
Lighting - Pendent/Surface 1st Floor Women's Room 7EA1 $0
Walls - Metal Panel 1st Floor Women's Room 6SF240 $1,792
Water Closet 1st Floor Women's Room 6EA1 $336
Accessories 2nd Floor Boy's Room 6SF214 $1,974
Ceiling - Lay-in 2nd Floor Boy's Room 6SF198 $595
Ceiling - Lay-in 2nd Floor Boy's Room water damage5SF16 $128
Doors - Wood Doors inclu hw 2nd Floor Boy's Room 6EA4 $1,204
Floor Drain 2nd Floor Boy's Room 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd Floor Boy's Room 6SF214 $453
Lavatory 2nd Floor Boy's Room 6EA2 $639
Lighting - Lay-in 2nd Floor Boy's Room 6EA214 $25,461
Partitions 2nd Floor Boy's Room 6EA2 $594
Urinals 2nd Floor Boy's Room 6EA2 $672
Walls - Metal Panel 2nd Floor Boy's Room 6SF486 $3,628
Water Closet 2nd Floor Boy's Room 6EA2 $672
Accessories 2nd Floor Girl's Room 6SF258 $2,380
Ceiling - Lay-in 2nd Floor Girl's Room 6SF258 $775
Doors - Wood Doors inclu hw 2nd Floor Girl's Room 6EA4 $1,204
Floor Drain 2nd Floor Girl's Room 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd Floor Girl's Room 6SF250 $529
Floor - Tile Ceramic/ Porcelain 2nd Floor Girl's Room cracked tile5SF8 $167
Lavatory 2nd Floor Girl's Room 6EA2 $639
Lighting - Lay-in 2nd Floor Girl's Room 6EA2 $238
Partitions 2nd Floor Girl's Room 6EA4 $1,188
Page 57 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Walls - Metal Panel 2nd Floor Girl's Room 6SF532 $3,971
Walls - Metal Panel 2nd Floor Girl's Room water damage5SF16 $639
Water Closet 2nd Floor Girl's Room 6EA4 $1,344
Accessories 2nd Floor Men's Room 6SF35 $323
Ceiling - Lay-in 2nd Floor Men's Room 6SF35 $105
Doors - Wood Doors inclu hw 2nd Floor Men's Room 6EA1 $301
Floor - Tile Ceramic/ Porcelain 2nd Floor Men's Room 6SF35 $74
Lavatory 2nd Floor Men's Room 6EA1 $320
Lighting - Pendent/Surface 2nd Floor Men's Room 7EA1 $0
Walls - Metal Panel 2nd Floor Men's Room 6SF240 $1,792
Water Closet 2nd Floor Men's Room 6EA1 $336
Accessories 2nd Floor Women's Room 6SF35 $323
Ceiling - Lay-in 2nd Floor Women's Room 6SF29 $87
Ceiling - Lay-in 2nd Floor Women's Room water damage5SF6 $42
Doors - Wood Doors inclu hw 2nd Floor Women's Room 6EA1 $301
Floor - Tile Ceramic/ Porcelain 2nd Floor Women's Room 6SF29 $61
Floor - Tile Ceramic/ Porcelain 2nd Floor Women's Room broken tile5SF6 $111
Lavatory 2nd Floor Women's Room 6EA1 $320
Lighting - Pendent/Surface 2nd Floor Women's Room 7EA1 $0
Walls - Plaster/Drywall 2nd Floor Women's Room 6SF240 $662
Water Closet 2nd Floor Women's Room 6EA1 $336
Accessories 3rd Floor Boy's Room 6SF214 $1,974
Ceiling - Lay-in 3rd Floor Boy's Room 6SF214 $643
Doors - Wood Doors inclu hw 3rd Floor Boy's Room 6EA4 $1,204
Floor Drain 3rd Floor Boy's Room 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 3rd Floor Boy's Room 6SF214 $453
Lavatory 3rd Floor Boy's Room 6EA2 $639
Lighting - Lay-in 3rd Floor Boy's Room 6EA2 $238
Partitions 3rd Floor Boy's Room 6EA2 $594
Urinals 3rd Floor Boy's Room 6EA2 $672
Walls - Metal Panel 3rd Floor Boy's Room 6SF480 $3,583
Walls - Metal Panel 3rd Floor Boy's Room water damage5SF6 $240
Water Closet 3rd Floor Boy's Room 6EA2 $672
Accessories 3rd Floor Girl's Room 6SF258 $2,380
Ceiling - Lay-in 3rd Floor Girl's Room 6SF258 $775
Doors - Wood Doors inclu hw 3rd Floor Girl's Room 6EA4 $1,204
Floor Drain 3rd Floor Girl's Room 6EA1 $1,059
Page 58 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Floor - Tile Ceramic/ Porcelain 3rd Floor Girl's Room 6SF258 $546
Lavatory 3rd Floor Girl's Room 6EA2 $639
Lighting - Lay-in 3rd Floor Girl's Room 7EA2 $0
Partitions 3rd Floor Girl's Room 6EA4 $1,188
Walls - Metal Panel 3rd Floor Girl's Room 6SF516 $3,852
Walls - Metal Panel 3rd Floor Girl's Room dented, damaged walls5SF14 $559
Water Closet 3rd Floor Girl's Room 6EA4 $1,344
Accessories 3rd Floor Men's Room 6SF35 $323
Ceiling - Lay-in 3rd Floor Men's Room 6SF35 $105
Doors - Wood Doors inclu hw 3rd Floor Men's Room 6EA1 $301
Floor - Tile Ceramic/ Porcelain 3rd Floor Men's Room 6SF35 $74
Lavatory 3rd Floor Men's Room 6EA1 $320
Lighting - Pendent/Surface 3rd Floor Men's Room 6EA1 $124
Walls - Metal Panel 3rd Floor Men's Room 6SF240 $1,792
Water Closet 3rd Floor Men's Room 6EA1 $336
Accessories 3rd Floor Women's Room 6SF35 $323
Ceiling - Lay-in 3rd Floor Women's Room 6SF35 $105
Doors - Wood Doors inclu hw 3rd Floor Women's Room 6EA1 $301
Floor - Tile Ceramic/ Porcelain 3rd Floor Women's Room 6SF35 $74
Lavatory 3rd Floor Women's Room 6EA1 $320
Lighting - Pendent/Surface 3rd Floor Women's Room 7EA1 $0
Walls - Metal Panel 3rd Floor Women's Room 6SF240 $1,792
Water Closet 3rd Floor Women's Room 6EA1 $336
Accessories In Main Office 6SF27 $249
Ceiling - Lay-in In Main Office 6SF27 $81
Doors - Wood Doors inclu hw In Main Office 6EA1 $301
Floor - Tile Ceramic/ Porcelain In Main Office 6SF27 $57
Lavatory In Main Office 6EA1 $320
Lighting - Pendent/Surface In Main Office 7EA1 $0
Walls - Metal Panel In Main Office 6SF200 $1,493
Water Closet In Main Office 6EA1 $336
Accessories In Mechanical space 6SF22 $203
Ceiling - Lay-in In Mechanical space 6SF22 $66
Doors - Wood Doors inclu hw In Mechanical space 6EA1 $301
Floor - Tile Ceramic/ Porcelain In Mechanical space 6SF22 $47
Lavatory In Mechanical space 6EA1 $320
Lighting - Lay-in In Mechanical space 7EA1 $0
Page 59 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Walls - Metal Panel In Mechanical space 6SF185 $1,381
Water Closet In Mechanical space 6EA1 $336
Accessories In Room 113 6SF30 $277
Ceiling - Lay-in In Room 113 6SF30 $90
Doors - Wood Doors inclu hw In Room 113 6EA1 $301
Floor - Tile Ceramic/ Porcelain In Room 113 6SF30 $63
Lavatory In Room 113 6EA1 $320
Lighting - Pendent/Surface In Room 113 7EA1 $0
Walls - Metal Panel In Room 113 6SF200 $1,493
Water Closet In Room 113 6EA1 $336
Accessories In Room 114 6SF30 $277
Ceiling - Lay-in In Room 114 6SF30 $90
Doors - Wood Doors inclu hw In Room 114 6EA1 $301
Floor - Tile Ceramic/ Porcelain In Room 114 6SF30 $63
Lavatory In Room 114 6EA1 $320
Lighting - Pendent/Surface In Room 114 6EA1 $124
Walls - Metal Panel In Room 114 6SF200 $1,493
Water Closet In Room 114 6EA1 $336
Rooms (Other Than Classrooms) Subtotal: $291,966
Building: Annex
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Lay-in 1st Floor 6SF2,067 $6,207
Ceiling - Lay-in 1st Floor water damage5SF30 $268
Doors - Steel Doors incl hw 1st Floor 6EA2 $602
Drinking Fountains - Double Fountain 1st Floor 6EA1 $336
Floor - Tile/Sheet 1st Floor 6SF2,065 $1,122
Floor - Tile/Sheet 1st Floor cracking5SF32 $184
Lighting - Lay-in 1st Floor 7EA6 $0
Walls - Plaster/Drywall 1st Floor 6SF2,588 $11,473
Walls - Plaster/Drywall 1st Floor water damage5SF12 $120
Ceiling - Lay-in 2nd Floor 6SF2,248 $6,751
Drinking Fountains - Double Fountain 2nd Floor 6EA1 $336
Floor - Tile/Sheet 2nd Floor cracked tile5SF24 $138
Page 60 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Building: Annex
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Floor - Tile/Sheet 2nd Floor 6SF2,224 $1,209
Lighting - Lay-in 2nd Floor 7EA6 $0
Walls - Plaster/Drywall 2nd Floor 6SF2,782 $12,333
Walls - Plaster/Drywall 2nd Floor water damage5SF18 $181
Ceiling - Lay-in 3rd Floor 6SF1,400 $4,204
Drinking Fountains - Double Fountain 3rd Floor 6EA1 $336
Floor - Tile/Sheet 3rd Floor 6SF1,400 $761
Lighting - Lay-in 3rd Floor 7EA6 $0
Walls - Plaster/Drywall 3rd Floor 6SF1,824 $8,086
Stairs
Ceiling - Lay-in East Stairwell 6SF327 $982
Ceiling - Lay-in East Stairwell water damage5SF12 $107
Floor - Terrazzo East Stairwell 6SF156 $1,309
Handrails East Stairwell 6LF80 $693
Lighting - Lay-in East Stairwell 7EA3 $0
Stairs - Terrazzo East Stairwell 6LF40 $371
Walls - Plaster/Drywall East Stairwell 6SF2,100 $5,796
Ceiling - Lay-in North Stairwell water damage5SF6 $54
Ceiling - Lay-in North Stairwell 6SF250 $751
Floor - Tile North Stairwell 6SF102 $55
Handrails North Stairwell 6LF60 $520
Lighting - Lay-in North Stairwell 6EA3 $357
Stairs - Terrazzo North Stairwell 6LF30 $278
Walls - Metal Panel North Stairwell dented walls5SF30 $1,199
Walls - Metal Panel North Stairwell 6SF1,856 $13,854
Building Interior Subtotal: $80,973
Total Building Cost $1,864,017
SITE
Category: Site
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Civil/Drainage
Civil/ Drainage - Catch Basin Entire Site 7EA11 $0
Civil/ Drainage - Site Manhole Entire Site 7EA7 $0
Page 61 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
SITE
Category: Site
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Civil/Drainage
Fencing
Fencing - Chain Link Entire Site 6LF1,471 $27,619
Fencing - New Standard Ornamental Entire Site 7LF442 $0
Landscape
Benches Entire Site 6EA7 $3,010
Parkway trees Entire Site 7EA18 $0
Planting Beds/ Area Entire Site 7SF1,458 $0
Play Area - Asphalt/ Hardscape Entire Site Wear and tear5SF14,000 $63,864
Play Area - Asphalt/ Hardscape Entire Site cracks and ponding4SF1,552 $16,445
Retaining Wall - Masonry Entire Site 7SF315 $0
Trash Receptacles Entire Site 7EA2 $0
Parking Lot
Concrete Curbs Entire Site 5LF128 $3,361
Surface - Asphalt Entire Site cracks and ponding5SF62,147 $283,496
Surface - Concrete Entire Site cracks and ponding5SF2,133 $19,948
Trash Compactor Entire Site 6EA1 $0
Vehicular Screening Entire Site 7LF128 $0
Playground
Equipment - Combo 3-12 NE site 5EA1 $95,838
Surface - Wood Chips NE site 5SF4,332 $16,292
Sidewalks
Sidewalks - Internal Walks Entire Site 6LF676 $8,120
Sidewalks - Perimeter Sidewalks Entire Site 6SF13,819 $27,468
Signage
Flag Pole - Flag Pole Entire Site 6EA2 $3,314
Marquee - Free Standing Back Lighted Entire Site 6EA1 $0
Site Subtotal: $568,776
Total Site Cost $568,776
Campus Total ² ³ $7,065,129
Page 62 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates;
it does not reflect a complete project cost.
³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are
estimates only and are based solely on the data that was collected as of the assessment date in the footer below.
¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report;
by the time the report is compiled, they have been resolved.
Definitions
● Quantity
● Unit
means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,
depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and
additional work triggered by building codes.
means, for each item, the total number (or amount) of that item that exists and was evaluated.
means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like
chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).
● Cost
● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.
● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to
alleviate overcrowding; these are viewed as separate capital needs.
Page 63 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
Main
NNN40801802381869103103Regular ClassroomRegular Classroom 1st Floor
NNN40801802381869104104Regular ClassroomRegular Classroom 1st Floor
NNN40801802381869303303Regular ClassroomRegular Classroom 3rd Floor
NNN40801802381869304304Art RoomRegular Classroom 3rd Floor
NNN40801802381869203203Regular ClassroomSpecial Education 2nd Floor
CPC
NNN4040100820580103103Pre SchoolPre School 1st Floor
NNN4040100820580104104Pre SchoolPre School 1st Floor
NNN40641608201,120105135Pre SchoolPre School 1st Floor
NNN40641608201,120106136Pre SchoolPre School 1st Floor
Addition 1
YNN408018064531955109109KindergartenComputer Lab 1st Floor
NNN40801802381830110110Regular ClassroomFitness Room 1st Floor
NNN40801802381830106106Regular ClassroomRegular Classroom 1st Floor
NNN40801802381830206206Regular ClassroomRegular Classroom
NNN40801802381830207207Regular ClassroomRegular Classroom 2nd Floor
NNN40801802381830208208Regular ClassroomRegular Classroom 2nd Floor
NNN40801802381830209209Regular ClassroomRegular Classroom 2nd Floor
NNN40801802381830306306Regular ClassroomRegular Classroom 3rd Floor
NNN40801802381830309309Regular ClassroomRegular Classroom 3rd Floor
NNN40801802381830307307Regular ClassroomScience Classroom 3rd Floor
NNN40801802381830305305Regular ClassroomSpecial Education 3rd Floor
NNN40801802381830310310Regular ClassroomSpecial Program 3rd Floor
NNN40801802381830210210Regular ClassroomStore Room 2nd Floor
NNN40801802381830308308Regular ClassroomStore Room 3rd Floor
Addition 2
NNN40801802381815302302Regular ClassroomArt Room 3rd Floor
NNN40801802381815101101Regular ClassroomMulti Purpose Room 1st Floor
NNN40801802381815102102Regular ClassroomRegular Classroom 1st Floor
NNN40801802381815202202Regular ClassroomRegular Classroom 2nd Floor
NNN40801802381815201201Regular ClassroomSpecial Education 2nd Floor
NNN403264601531311331OfficeSpecial Education 3rd Floor
NNN40801802381815301301Regular ClassroomStore Room 3rd Floor
Page 64 of 65BOUCHET Assessment Date: 11/24/15
Edward A Bouchet Math & Science Academy ES7355 S Jeffery Blvd Chicago, IL 60649
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
Annex
NYN400105800990108113KindergartenKindergarten 1st Floor
NYN400105800990110114KindergartenKindergarten 1st Floor
NNN40060811320Teachers Lounge111OfficeRegular Classroom 1st Floor
NNN400801001900104112Regular ClassroomRegular Classroom 1st Floor
NYN40052801710109115Regular ClassroomRegular Classroom 1st Floor
NYN40052801710107116Regular ClassroomRegular Classroom 1st Floor
NYN400105800720204211Regular ClassroomRegular Classroom 2nd Floor
NYN400105800720208213Regular ClassroomRegular Classroom 2nd Floor
NYN400105800720210214Regular ClassroomRegular Classroom 2nd Floor
NYN400105800720209215Regular ClassroomRegular Classroom 2nd Floor
NYN4001058001,440207216Regular ClassroomRegular Classroom 2nd Floor
NYN400105800720200218Regular ClassroomRegular Classroom 2nd Floor
NYN4001058001,440306312Regular ClassroomRegular Classroom 3rd Floor
NYN400105800720310314Regular ClassroomRegular Classroom 3rd Floor
NYN400105800720309315Regular ClassroomRegular Classroom 3rd Floor
NYN4001058001,440305317Regular ClassroomRegular Classroom 3rd Floor
NYN400105800720206212Regular ClassroomStore Room 2nd Floor
NYN400105800720303318Regular ClassroomStore Room 3rd Floor
NYN400105800720302319Regular ClassroomStore Room 3rd Floor
Page 65 of 65BOUCHET Assessment Date: 11/24/15