EDGE Evolution Outline INSTALLATION INSTRUCTIONS 2013 Website... · Shim Detail Screw Slot Mounting...

19
Outline Installation ............................................................ .2-5 Outline End Filler Installation ...............................................6-9 Outline Outside Corner Installation ...................................10-13 Outline Inside Corner Installation .....................................14-19 EDGE Evolution Outline INSTALLATION INSTRUCTIONS

Transcript of EDGE Evolution Outline INSTALLATION INSTRUCTIONS 2013 Website... · Shim Detail Screw Slot Mounting...

Outline Installation ............................................................ .2-5

Outline End Filler Installation ...............................................6-9

Outline Outside Corner Installation ...................................10-13

Outline Inside Corner Installation .....................................14-19

EDGE Evolution Outline INSTALLATIONINSTRUCTIONS

EDGE Evolution Outline INSTALLATIONINSTRUCTIONS

Shim Detail

Screw Slot Mounting

Flange Detail

Non-Flange Spackle Flange

Wall Line

Shim to Vertical

Wall Line

Shim to Vertical

3/8”

Locking Screw

Mounting Screw

5-5/32”

4-1/4”6-3/16”

5-1/4”

4-1/2”

1” Grid Mounting Options 9/16” Grid Mounting Options

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

3 of 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.

OUTLINE

© 2014 Pinnacle Architectural Lighting

October 2014

Setup and Considerations

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

1. Fixture is to be installed flush with wall.2. Fixture mounts directly to J-Bar. (See Illustration A)

3. If fixture is not full length of wall, fixture should be centered on wall andEnd Fillers should be used to make up the difference in length. (see End Filler installation sheet for details.)

4. J-Bar may need to be shimed prior to fixture installation to accommodatewall inconsistences. (See Illustration B)

EDGEE V O L U T I O N Installation Instructions

Illustration A

Illustration B

Step 2:Installing and Wiring

© 2014 Pinnacle Architectural Lighting

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

4 of 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.

Step 1:Wall Bracket (J Bar)

1. Attach J Bar to wall at desired mount height.2. Use only top holes (2) for mounting J Bar to wall.

1. Fixture mounts on J Bar and against wall.2. Once installed and resting in J Bar put screw into lower screw holes (3) in J Bar to “lock”fixture in.3. Secure and level fixture to building structure with tie offs on non wall side of housing.4. Run building power to fixture, make necessary wire connections via access plate on topof fixture.

October 2014

EDGEE V O L U T I O N

See illustration B

See illustration A on pg. 1

Illustration B

(Note: Each J Bar has 5 screw holes. 2 upper holes for mounting J Bar and 3 lower holes for “locking” fixture to J Bar.)

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

J Bar

Fixture

Mounting Screw

“B”

“A”

Fixture Size Dim “B”

23”

35”

47”

48”

*59”

*71”

*72”

*95“

96”

10-7/8”

16-7/8”

22-7/8”

23-3/8“

23-3/8”

23-3/8”

23-3/8”

23-3/8”

23-3/8”

Dim “A”

6-1/16”

9-1/16”

12-1/16”

12-5/16“

12-5/16”

12-5/16“

12-5/16”

12-5/16”

12-5/16”

J BarPart # K-WG-XX-04

* Indicates getting a 96” J Bar that would be cut to lengthDim “A” is from end of J Bar to first mounting holeDim “B” is from mounting hole to mounting hole

OUTLINEInstallation Instructions

Step 4:Joining Fixtures

© 2014 Pinnacle Architectural Lighting

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

5 of 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.

Step 3:Opening the Driver Cover

1. Open the driver cover by removing the screws in the cover, one screw per end.2. Once the screws are removed the driver cover swings open and remains captive tothe fixture.

1. With the driver covers open, align fixtures with joining biscuits and butt fixtures together.2. Secure fixtures using provided screws through brackets fixture joints.

October 2014

EDGEE V O L U T I O N

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

Biscuit

OUTLINEInstallation Instructions

EDGE Evolution Outline END FILLERINSTALLATION

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

7 of 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.

© 2014 Pinnacle Architectural Lighting

November 2014

EDGEE V O L U T I O N

Unit Breakdown

For incoming row see EVL_WS installation instructions*Adjustable 1” to 12”, recommended max 6”

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

Incoming Run

End Filler Top Hat

#8 Screws (provided)Part # S-832-1/4”

Part # K-EL-001

Part # K-E6-06

Part # K-WGC-XXX

Part # H-EL-016 for Left HatPart # H-EL-017 for Right Hat

Part # H-EL-001 for Left HatPart # H-EL-002 for Right Hat

End Plate

Wall Interface Biscuit

Joining Biscuit

End Filler Rail Piece

Adjustable Range*

OUTLINEEnd Filler Installation Instructions

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

8 of 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.

EDGEE V O L U T I O N

1. Attach end plate through holes in end of approaching fixture and nut(provided) from inside the fixture.2. Make sure J rail is cut back to the end of the fixture.

1. Measure the distance from the end of the fixture to the wall.2. Cut the End Filler Rail Piece to the above measured dimension.3. Insert both Wall Interface Biscuit and Joining Biscuit into End Filler Piece.4. Level End Riller Rail and slide Joining Biscuit to join the End Filler Rail tothe Fixture Rail.5. Secure the Wall Interface Biscuit to the wall with screw (by others).

Step 1:End Plate

Step 2:Filler Rail

© 2014 Pinnacle Architectural Lighting

November 2014

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

Wall Interface Biscuit

End Filler Rail Piece

Joining Biscuit

OUTLINEEnd Filler Installation Instructions

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

9 of 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Do not assemble fixture together on ground and then install.

EDGEE V O L U T I O N

1. If electircal access is needed, trim End Filler Top Hat to needed length.2. Place Top Hat on top of fixture and butt up to wall.3. Attach top hat through slot using #8 screws provided. If Top Hat wastrimmed, utilize Top Hat Bracket to attach Hot Hat to incoming fixture4. Screw Top Hat to wall (screws by others).

1. Optional End Trim used with grid, flanged, or spackle flange mountingoptions.2. Secure end trim using 3 screws (provided)

Step 3:Top Hat

Optional:End Trim

© 2014 Pinnacle Architectural Lighting

November 2014

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

#8 Screws (Provided)

End Filler Top Hat

Top HatBracket

Break tab off when using shallow configuration

OUTLINEEnd Filler Installation Instructions

EDGE Evolution Outline OUTSIDE CORNERINSTALLATION

Left Fixture

Right FixtureTop Hat BracketsPart # K-EL-002

Part # K-WGC-XX

Part # K-EL-001

Part # K-WGC-XXPart # E-EL-001 for LeftPart # E-EL-002 for Right

Part # H-EL-003 Part # H-EL-004

Top Hats

Left Mitered Rail

Right Mitered Rail

Corner Joining Biscuit

End Plates

Outside corner min. distance: 0”Outside corner max. distance: 9-1/2”

© 2014 Pinnacle Architectural Lighting

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

11 of 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.

EDGEE V O L U T I O N

Unit Breakdown

For incoming rows see EVL installation instructions

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

October 2014

OUTLINEOutside Corner Installation Instructions

© 2014 Pinnacle Architectural Lighting

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

12 of 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.

EDGEE V O L U T I O N

1. Measure the above noted distances to determine the length of eachflange piece.2. Cut the Mitered Rails and the End Plates to fit the measurements.

1. Install End Plates using supplied nuts inside of fixture. 2 nuts per EndPlate.

Step 1:Prepping The Flange Pieces

Step 2:End Plates

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

Wall

Measure this distance for Mitered Right Rail & Right End Plate

Measure this distance for Mitered Left Rail & Left End Plate

End Plates

October 2014

OUTLINEOutside Corner Installation Instructions

© 2014 Pinnacle Architectural Lighting

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

13 of 19

www.pinnacle-ltg.com October 2014

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.

EDGEE V O L U T I O N

1. Secure top hat(s) to housing though slot using provided #8 screws2.If screw location is not available trim Top Hat to reveal holes. And useTop Hat Bracket to attach Top Hat to fixture.

1. Using the Rail pieces cut in Step 1 and the corner joining biscuit, you willhave the corner Rail piece.2. Attach the corner Rail piece with the supplied joining biscuits.3. If using the EVL fixture (5-1/4” tall) add double sided tape to the tabs onthe top hats. If using EVLS fixture (4-1/4” tall) remove the tabs.

Step 3:Top Hats and Top Hat Brackets

Step 4:Corner Flange Pieces

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

Top Hats

Top Hat Bracket

Tabs

OUTLINEOutside Corner Installation Instructions

EDGE Evolution Outline ILLUMINATED INSIDECORNER INSTALLATION

8-32 Flanged Nuts (x4)

Left Top Hat (H-EL-008)

Top Hat Holder (K-EL-002)

Left End Plate (E-EL-017)

Left Mitered Rail

Incoming Left Fixture

Inside Corner Light Engine Assembly Left Inside Corner Light Engine Assembly Right

Incoming Right Fixture

Right Mitered Rail

Right End Plate (E-EL-016)

Right Top Hat (H-EL-007)

Leads for LED boardLeads for LED board

© 2015 Pinnacle Architectural Lighting

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

15 o

f 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.

Unit Breakdown

For incoming rows see EVL installation instructions

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

May 2015

OUTLINEInside Corner Installation InstructionsEDGE

E V O L U T I O N

Note: Incoming fixtures are specific to corner and contain an extra driver. See submittal for more information.

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

16 o

f 19

www.pinnacle-ltg.com

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.

1. Install the Left Top Hat over the top of the left side of incoming fixture.(Note: The Top Hat might need to be cut to allow access to electrical cover.)2. If Top Hat is cut, install using Top Hat Holder.3. Top Hat or Top Hat Holder installs with two (2) #8 Screws (provided)

1. Before installing the Corner Light Engine Assembly, measure back to the beginning of theincoming fixture. Use this measurement, trim fold over tab to expose LED diodes up into thecorner.2. Installing the Corner Light Engine Assembly is done by attaching the assembly to theinside of the Top Hat using two (2) #8 Flanged Nuts (provided)

Step 1:Left Top Hat

Step 2:Getting Light in Your Corner

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

May 2015

OUTLINEInside Corner Installation InstructionsEDGE

E V O L U T I O N

Left Top Hat (H-EL-008)

Top Hat Holder (K-EL-002) Fold over tab

Inside Corner Light Engine Assembly Left

Leads for LED board

© 2015 Pinnacle Architectural Lighting

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

17 o

f 19

www.pinnacle-ltg.com May 2015

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.

1.Once the Top Hat and the Light Engine Assembly is installed you caninstall the End Plate.2. From inside the corner slide End Plate into place, Pems will go throughtwo (2) holes in end of fixture.

Step 3:End Trim

Step 4:Right Top Hat

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

OUTLINEInside Corner Installation InstructionsEDGE

E V O L U T I O N

Right Top Hat (H-EL-007)

Left End Plate (E-EL-017)

© 2015 Pinnacle Architectural Lighting

1. Install the Right Top Hat over the top of the right side of incoming fixture.(Note: The Top Hat might need to be cut to allow access to electrical cover.)2. If Top Hat is cut install using Top Hat Holder.3. Top Hat or Top Hat Holder installs with two (2) #8 Screws (provided)

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

18 o

f 19

www.pinnacle-ltg.com May 2015

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

OUTLINEInside Corner Installation InstructionsEDGE

E V O L U T I O N

Fold over tabRight End Plate (E-EL-016)

Leads for LED board

© 2015 Pinnacle Architectural Lighting

1. Before installing the Corner Light Engine Assembly, measure back to the begin-ning of the incoming fixture. Use this measurement, trim fold over tab to expose LEDdiodes up into the corner.2. Installing the Corner Light Engine Assembly is done by attaching the assembly tothe inside of the Top Hat using two (2) #8 Flanged Nuts (provided)

Step 5:Getting Light in Your Corner

1.Once the Top Hat and the Light Engine Assembly are installed, you caninstall the End Plate.2. From inside the corner, slide End Plate into place, pems will go throughtwo (2) holes in end of fixture.

Step 6:End Trim

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568

19 o

f 19

www.pinnacle-ltg.com May 2015

1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiarwith the construction and operation of the product.2. Minimum 90ºC supply conductors3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.4. Fixtures must be mounted directly to structure.

1. Cover the low voltage leads coming from the Light Engine Assemblies usingthe provided white shielding.2. Run the shielded leads through the top of the Top Hat and back to the cor-responding fixture as called out in the submittal.3. Make electrical connections inside fixture using provided quick disconnect.

1. Measure and cut provided Mitered Rails to fit into corner.2. Attach rails together using provided Corner Joining Biscuit.3. Slide Joining Biscuits (one each) into the outside ends of each side of corner rails.4. Insert corner rails into corner and slide Joining Biscuits into place between corner railsand fixture rails.

Step 7:Powering the Corner

Step 8:Corner Flange Pieces

MUST BE INSTALLED PRIOR TO CEILING INSTALLATION.

OUTLINEInside Corner Installation InstructionsEDGE

E V O L U T I O N

Right Mitered RailLeft Mitered Rail

Corner Biscuit

Joining Biscuits

© 2015 Pinnacle Architectural Lighting