Economic Stimulus Information Meeting
Project Information Overview
March 18, 2009W. H. Stuart Center
![Page 2: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/2.jpg)
Presentation Agenda• Project Categories• Contract Types• Project Overviews
– Capacity– Resurfacing– Bridge– Operational– Enhancement
• Sidewalk• Trail• Landscaping
• CEI
![Page 3: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/3.jpg)
Project Categories• State Priorities
• Local Priorities
• Enhancements
• Transit
• Aviation
![Page 4: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/4.jpg)
Project Categories• State Priorities
– Smaller number, larger cost, capacity
• Local Priorities
• Enhancements
• Transit
• Aviation
![Page 5: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/5.jpg)
Project Categories• State Priorities
• Local Priorities– Larger number, districtwide, different types
• Enhancements
• Transit
• Aviation
![Page 6: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/6.jpg)
Project Categories• State Priorities
• Local Priorities
• Enhancements– Local roadways, smaller amounts, primarily sidewalks
• Transit
• Aviation
![Page 7: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/7.jpg)
Project Categories• State Priorities
• Local Priorities
• Enhancements
• Transit– Mostly bus and other vehicle purchases
• Aviation
![Page 8: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/8.jpg)
Project Categories• State Priorities
• Local Priorities
• Enhancements
• Transit
• Aviation– Grants directly through FAA to airports
![Page 9: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/9.jpg)
Contract Types
• Local Agency Program Projects
• State Produced– Design/Build– Construction– CEI
![Page 10: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/10.jpg)
Example Projects• More detailed project descriptions on disc
• Consist primarily:– Capacity– Resurfacing– Bridge– Operational– Enhancement
![Page 11: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/11.jpg)
Example Capacity Projects• Projects likely
let Design/Build• Most are in final
stages of Design• May be required
to obtain permits
• Construction must be complete within 3 years SR 559 in Aurburndale
![Page 12: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/12.jpg)
Example Capacity Projects• Projects likely
let Design/Build• Most are in final
stages of Design• May be required
to obtain permits
• Construction must be complete within 3 years US 301 in Sarasota County
![Page 13: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/13.jpg)
Example Capacity Projects• Projects can be
conventionally let as a construction bid
• Likely have 5-10 capacity projects districtwide
• Cost range from $12 M to $60 M
SR 739 in Lee County
![Page 14: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/14.jpg)
Example Resurfacing Projects• Most will be let
as a Design/Build
• Construction must be complete within 3 years
• A few will have distance defined by bid CR 832 from SR 29 East
![Page 15: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/15.jpg)
Example Resurfacing Projects• Most will be let
as a Design/Build
• Construction must be complete within 3 years
• Others have defined limits
CR 17 from Poinsettia St to W Interlake
![Page 16: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/16.jpg)
Example Resurfacing Projects• Most will be let
as a Design/Build
• Construction must be complete within 3 years
• Scopes will define curb and gutter, shoulders,or edge of pavement
10th St from 8th Ave to 14th Ave
![Page 17: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/17.jpg)
Example Resurfacing Projects• Most will be let
as a Design/Build
• Projects can be several miles or couple hundred feet
• Between 15-20 resurfacing projects expected
Home Ave Resurfacing
![Page 18: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/18.jpg)
Example Bridge Projects
• Most will be let as conventional, some design build
• Projects may be culvert replacement/ improvement
9th Ave W bridge replacement at Wares Creek
![Page 19: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/19.jpg)
Example Bridge Projects
• Most will be let as conventional, some design build
• Projects may be culvert replacement/ improvement
SE 43rd Ave bridge replacement
![Page 20: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/20.jpg)
Example Bridge Projects
• Most will be let as conventional, some design build
• Projects may be culvert replacement/ improvement
Cape Haze Bridge Culvert Replacement
![Page 21: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/21.jpg)
Example Bridge Projects
• Most will be let as conventional, some design build
• Projects may be culvert replacement/ improvement
• Between 5-7 bridge jobs
Jolley Bridge Replacement
![Page 22: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/22.jpg)
Example Operational Projects• Most will be let
as conventional, some design build
• Consist of intersection improvements, turn lanes, resurfacing, mast arms,
SR 776 at Coliseums Blvd
![Page 23: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/23.jpg)
Example Operational Projects• Most will be let
as conventional, some design build
• Consist of intersection improvements, turn lanes, resurfacing, mast arms,
US 41 at Midway Blvd
![Page 24: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/24.jpg)
Example Operational Projects• Most will be let
as conventional, some design build
• Consist of intersection improvements, turn lanes, resurfacing, mast arms,
Murdock Circle add turn lanes
![Page 25: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/25.jpg)
Example Operational Projects• Most will be let
as conventional, some design build
• Consist of intersection improvements, turn lanes, resurfacing, mast arms,
East Bay Dr./Gulf Dr. Signal upgrade
![Page 26: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/26.jpg)
Example Operational Projects• Most will be let
as conventional, some design build
• Consist of intersection improvements, turn lanes, resurfacing, mast arms,
Siesta Drive Drainage Improvements
![Page 27: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/27.jpg)
Example Operational Projects• Most will be let as
conventional, some design build
• ITS Improvements also possible
• Between 15-20 projects districtwide
Manatee County Phase 2 ATMS System
![Page 28: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/28.jpg)
Example Enhancement Projects• Most will be let
as design build
• Consist of sidewalk, bikepath/trails, or landscaping
City of Bradenton on 23rd Ave between 26th St. and 27th St. W
![Page 29: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/29.jpg)
Example Enhancement Projects• Most will be let
as design build
• Consist of sidewalk, bikepath/trails, or landscaping
Gulf Blvd from Palm to Magnolia
![Page 30: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/30.jpg)
Example Enhancement Projects• Most will be let
as design build
• Consist of sidewalk, bikepath/trails, or landscaping
Bald Eagle Pathway Shared Use Path
![Page 31: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/31.jpg)
Example Enhancement Projects• Most will be let
as design build
• Consist of sidewalk, bikepath/trails, or landscaping
• Between 15-25 projects
Ft. Fraser Trail in Polk County
![Page 32: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/32.jpg)
Example Project Summary• Mix of Design/Build and Conventionally Let
construction projects
• Wide range of projects available from bridge, resurfacing, sidewalks, landscaping, minor intersection improvements, drainage, and capacity
• Spread over all the district and most municipalities
• Project costs also range from several thousand to multi million
![Page 33: Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.](https://reader035.fdocuments.net/reader035/viewer/2022062421/56649cf75503460f949c7837/html5/thumbnails/33.jpg)
CEI• Consultant CEI’s will be used for all Stimulus Projects
• Contracts will be competitively selected using Expanded Letter of Response
• Number of CEI contracts will be based on number of construction projects
• Email notification will go to all firms on our CEI Contact List when contract groupings are confirmed
• If you have not met our Operation Center Staff, please schedule time with them before project advertisements