Wolf Lake Aquatic Restoration Project
![Page 2: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/2.jpg)
Location Map
![Page 3: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/3.jpg)
Project Background• Initiated by the U.S. Army Corps of Engineers (USACE) Chicago District under
Section 206 of the Water Resources Development Act of 1996
• $6.5 million project cost
• The city of Hammond, IN was a major project collaborator, providing a percentage of matching funds
![Page 4: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/4.jpg)
Project Background• Designed by the Chicago ACOE and Tetra Tech as habitat restoration and to
restore portions of the lake to wetlands similar to pre-settlement conditions
• Islands created by hydraulic dredging of sand from lake bottom
![Page 5: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/5.jpg)
Project Features• 20 acres of islands created and ½ mile of shoreline restored• Over 14 acres of native seed installed• 115,000 native plants and shrubs planted• Over five miles of goose predation fence constructed• Sand prairie, wet prairie, emergent, and deep aquatic habitats created
![Page 6: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/6.jpg)
Project Challenges: sterile sand substrate• Newly constructed island surface similar to that of Mars
![Page 7: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/7.jpg)
• Arid sand had no organic matter, soil structure, microorganisms, yet design called for seeding of species found only in advanced successional stages of ecological progression
![Page 8: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/8.jpg)
• Nutrient deficiency exhibited as red coloration
![Page 9: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/9.jpg)
Project Challenges: Geese
![Page 10: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/10.jpg)
• Goose predation barriers of chicken wire and string were only marginally effective
![Page 11: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/11.jpg)
![Page 12: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/12.jpg)
Goose Repellants
• Predator silhouettes worked for one week until geese caught on
![Page 13: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/13.jpg)
Project Challenges: Exotic Species
Including:
•Phragmites
•Purple Loosestrife
•Eurasian Watermilfoil
![Page 14: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/14.jpg)
Project challenges: water levels
• Note floating algae a top strings, evidence of high water levels
• Record rains destroyed portions of plantings early planting phase
![Page 15: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/15.jpg)
Project Challenges: Water levels
• Beavers plugged outlets, causing altered water levels which delayed planting
![Page 16: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/16.jpg)
Project Challenges: Erosion
![Page 17: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/17.jpg)
Erosion barriers
• Cabled log barriers failed after one winter in high wave energy zones
![Page 18: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/18.jpg)
Sand Prairie after five months of high winds, heavy rains, and goose grazing.
![Page 19: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/19.jpg)
![Page 20: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/20.jpg)
Project Successes
Before
After
![Page 21: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/21.jpg)
Project success: emergent zones
![Page 22: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/22.jpg)
Project Success: Sand Prairie
![Page 23: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/23.jpg)
Project Success: Wet Prairie
![Page 24: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/24.jpg)
Design island shapes for greatest area-to-perimeter ratio…skinny islands can disappear
before stabilization
Lessons Learned
2007, immediately after construction 2009
![Page 25: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/25.jpg)
Lessons learned: use straw blankets on all seeded areas
Blanket No Blanket
![Page 26: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/26.jpg)
Lessons Learned: Protect vulnerable shorelines during vegetative establishment
![Page 27: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/27.jpg)
Lessons Learned: Focus on vegetative stabilization above shoreline
Most vegetative stabilization occurred after a dense sod of native grasses, sedges, and forbs became established in the wet prairie zone adjacent to waterline. Emergent zone plant mortality was very high.
![Page 28: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/28.jpg)
Lessons Learned: Miscellaneous
• Allow island materials to settle and consolidate before planting• Build islands larger than final desired dimensions to allow for erosive attrition• Limit emergent zone plantings to “pods” and protect them rigorously from
predation by geese, carp, and muskrats• Post-planting maintenance is essential• And, be prepared for Nature to trump your plan!
![Page 29: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/29.jpg)
![Page 30: Ecological Consulting Native Plant Nursery Restoration Services Cultural Resource Management](https://reader036.fdocuments.net/reader036/viewer/2022081501/56813d44550346895da70231/html5/thumbnails/30.jpg)
Direct Additional Questions to:
Tony St. Aubin
Operations Manager
708-932-9306
www.cardnojfnew.com