ECOCRIB · PDF fileFOR ASHLEY HOUSE PLC, SOLIHULL, ... Cheshire, CH2 4DD Page 1 of 8...

6
ECOCRIB The 100% recycled mixed-polymer retaining wall system By P C CONSTRUCTION LIMITED TEL: 01244 851875 FAX: 01244 851874 MOBILE: 07515 385746 WEBSITE: h p://www.pcconstruc n.co.uk EMAIL: pcconstruc [email protected] P.C. construction ltd Chorlton, Chester, Cheshire, CH2 4DD

Transcript of ECOCRIB · PDF fileFOR ASHLEY HOUSE PLC, SOLIHULL, ... Cheshire, CH2 4DD Page 1 of 8...

Page 1: ECOCRIB  · PDF fileFOR ASHLEY HOUSE PLC, SOLIHULL, ... Cheshire, CH2 4DD Page 1 of 8 TECHNICAL APPROVALS FOR CONSTRUCTION ... • formal five-yearly review

ECOCRIB The 100% recycled mixed-polymer retaining wall system

By P C CONSTRUCTION LIMITED

TEL: 01244 851875 FAX: 01244 851874 MOBILE: 07515 385746 WEBSITE: h p://www.pcconstruc n.co.uk EMAIL: pcconstruc [email protected]

P.C.construction ltd Chorlton, Chester, Cheshire, CH2 4DD

ECOCRIB The 100% recycled mixed-polymer retaining wall system

By P C CONSTRUCTION LIMITED

TEL: 01244 851875 FAX: 01244 851874 MOBILE: 07515 385746 WEBSITE: h p://www.pcconstruc n.co.uk EMAIL: pcconstruc [email protected]

P.C.construction ltd Chorlton, Chester, Cheshire, CH2 4DD

Page 2: ECOCRIB  · PDF fileFOR ASHLEY HOUSE PLC, SOLIHULL, ... Cheshire, CH2 4DD Page 1 of 8 TECHNICAL APPROVALS FOR CONSTRUCTION ... • formal five-yearly review

ECOCRIB SCHEMES

Commercial

Housing

Water, environmental

Leisure

Road and rail

100% recycled mixed-polymer ECOCRIB retaining wall system

It has beesystem thwe have achieved this with Ecocrib.

of it’s life cycle.

crib walling products.

It’s durabappearance similar to that of hardwood without any of the cracking problems associated with

If companies are looking for a retaining wall product that can help towards BREEAM excellence, Ecocrib could be the answer.

MATERIALSEcocrib is made using unique ECO44 technology. ECO44 is a family of blended polymers, which are fed into moulds under controlled temperatures and pressures during the manufacturing

the materials. The finished surface is knot-free, evenly coloured and has a textured finish similar

environments where durability is important. Ecocrib’s strength and durability is not affected by moisture,rigorously tested and refined to give maximum performance. Ecocrib has been awarded 120

expectancwall may suitable excavated material from site.

MANUFACTURING

the CNC machines cut and notch all the lengths to suit any design. We can manufacture header widths from 500mm up to 3000mm.

All off cuts, shavings etc are reground and reprocessed to make new ECO44 profiles and new

returned with the company vehicles at the end of the week and reprocessed into new ECO44

reprocess them. All our packaging is designed so it can be reused when not damaged. This means th

using Ecocrib.

CONSTRUCTIONThere are no significant manual handling or health issues with Ecocrib components, the heaviest component is 16.5 KG and is easily handled by one person. The material has no harmful

There are minimal fixings required to build Ecocrib walls, all manufacturing is carried out to a

retaining walls.

The Ecocrheights in excess of 10 metres possible. Simple or complex designs can be catered for. The

we can help develop this. We can design, supply and install or supply only, the decision is yours.

email or telephone +44 (0) 1244 851875

Page 3: ECOCRIB  · PDF fileFOR ASHLEY HOUSE PLC, SOLIHULL, ... Cheshire, CH2 4DD Page 1 of 8 TECHNICAL APPROVALS FOR CONSTRUCTION ... • formal five-yearly review

ECOCRIB DIMENSIONS

Nominal length

Tolerance

Header lengths See below +/- 4mm Header width 50mm +/- 2mm Header height 125mm +/- 2mm Notch from end of header

50mm +/- 2mm

Header notch width 50mm +/- 0.25mm Header notch depth 12.5mm +/- 2mm Pillow blocks height 100mm +/- 0.5mm Stretcher length 3000mm +/- 10mm Stretcher width 50mm +/- 0.25mm Stretcher height 125mm +/- 2mm

TYPICAL HEADER LENGTHS AVAILABLE*

1 490 mm 2 590 mm 3 740 mm 4 890 mm 5 990 mm 6 1190 mm 7 1490 mm 8 1990 mm 9 2390 mm 10 3000 mm

*Any header lengths between 490-3000mm may be cut to meet site specific requirements

COLOURS AND FINISH

Brown Grey

COST EFFECTIVENESS The costs associated with Ecocrib over its design service life are

30% lower than concrete crib. However, its life span is more

and labour on site.

water and resistant to UV and algae. Vandalism has caused significant issues with crib walls in the past. Should vandalism of Ecocrib occur, paint can be easily removed from the surface. Ecocrib

APPEARANCE

durability of a ECO44 product. The appearance can be further

give a more natural and pleasing look. Ecocrib elements are available in brown or black.

STRENGTH AND STABILITY ECO44 technology give the

system high overall strength, with superior load bearing capacity when compared to similar systems. The use of free-draining backfill

DESIGN AND SIMPLICITY

for complex shapes and curves. Structures in excess of 7 metres in height and kilometres in length can be achieved.

Page 4: ECOCRIB  · PDF fileFOR ASHLEY HOUSE PLC, SOLIHULL, ... Cheshire, CH2 4DD Page 1 of 8 TECHNICAL APPROVALS FOR CONSTRUCTION ... • formal five-yearly review

LUTON TO DUNSTABLE BUSWAY, HIGHWAYS CONTRACT

Client: BAM Nuttall Ltd PROJECT DETAILS

The proposals were to widen the existing railway corridor north-west of Skimpot Road Bridge to accommodate the proposed bus way alignment. To achieve this within the site boundary it was necessary to remove an existing wooden crib wall and replace with a more robust crib wall at the toe of the slope. The Ecocrib wall was 60m long and had a maximum retained height of 3.8m. The design was based on a 2m wide mass gravity structure, approximately 223m2. Construction of the wall commenced on site 23rd January 2012. Construction was completed in 2 weeks, which included placing 1200m³ of backfill to the Ecocrib wall.

REBUILD OF FAILED GABION RETAINING WALL. HIGHWAYS CONTRACT, MELDON, OAKHAMPTON, DEVON

Client:

South West Highways, Devon Highways PROJECT DETAILS

Ecocrib walling was used to retain a cycle path alongside a railway platform at Meldon quarry. The cycle path is part of the National Cycle Network between Oakhampton and Lydford Gorge. The cycle path was retained by a gabion wall which was failing due to corrosion caused by the aggressive acidity of the soils. Devon Council chose Ecocrib walling because it would not be affected by the aggressive acidity of the soils and the environmentally friendly nature of the Ecocrib.

Ecocrib 120m², maximum 3.5 m retained, Commenced on site 12th January 2012, Completed 15th January 2012.

WOBURN, BEDFORDSHIRE

Client :

Bowmer & Kirkland

PROJECT DETAILS Reinforced Earth Ecocrib and Reinforced Earth block walling. Ecocrib, 8.7 metres high and 115 metres long. Block walling, 5.5 metres high and 90 metres long. Commenced on site 29th October 2012, Completed 19th December 2012. All fill material used in the construction of the walling was excavation material from site.

ECOCRIB WALLING, BIRLEY COMMUNITY COLLEGE, SHEFFIELD

Client Vinci Construction PROJECT DETAILS Ecocrib cladding and retaining wall – 180 m², maximum height 4.5 metres. Ecocrib was used as a feature and part retaining wall to the front elevation on a newly constructed college. Work commenced on site 18th June 2012, Completed 28th June 2012.

LUTON TO DUNSTABLE BUSWAY.HIGHWAYS CONTRACT

REBUILD OF FAILED GABION RETAINING WALL. HIGHWAYS CONTRACT, MELDON, OAKHAMPTON, DEVON

WOBURN, BEDFORDSHIRE ECOCRIB WALLING.BIRLEY COMMUNITY COLLEGE, SHEFFIELD

Client: BAM Nuttall Ltd

Project detailsThe proposals were to widen the existing railway corridor north-west of Skimpot Road Bridge to accommodate the proposed bus way alignment. To achieve this within the site boundary it was necessary to remove an existing wooden crib wall and replace with a more robust crib wall at the toe of the slope. The Ecocrib wall was 60m long and had a maximum retained height of 3.8m. The design was based on a 2m wide mass gravity structure, approximately 223m2. Construction of the wall commenced on site 23rd January 2012. Construction was completed in 2 weeks, which included placing 1200m³ of backfill to the Ecocrib wall.

Client: South West Highways, Devon Highways

Project detailsEcocrib walling was used to retain a cycle path alongside a railway platform at Meldon quarry. The cycle path is part of the National Cycle Network between Oakhampton and Lydford Gorge. The cycle path was retained by a gabion wall which was failing due to corrosion caused by the aggressive acidity of the soils. Devon Council chose Ecocrib walling because it would not be affected by the aggressive acidity of the soils and the environmentally friendly nature of the Ecocrib. Ecocrib 120m², maximum 3.5 m retained, Commenced on site 12th January 2012, Completed 15th January 2012.

Client: Bowmer & Kirkland

Project detailsReinforced Earth Ecocrib and Reinforced Earth block walling. Ecocrib, 8.7 metres high and 115 metres long. Block walling, 5.5 metres high and 90 metres long. Commenced on site 29th October 2012, Completed 19th December 2012. All fill material used in the construction of the walling was excavation material from site.

Client: Vinci Construction

Project detailsEcocrib cladding and retaining wall – 180 m², maximum height 4.5 metres. Ecocrib was used as a feature and part retaining wall to the front elevation on a newly constructed college. Work commenced on site 18th June 2012, Completed 28th June 2012.

ECOCRIB CASE STUDIES

Page 5: ECOCRIB  · PDF fileFOR ASHLEY HOUSE PLC, SOLIHULL, ... Cheshire, CH2 4DD Page 1 of 8 TECHNICAL APPROVALS FOR CONSTRUCTION ... • formal five-yearly review

DUXBURY MANOR HOUSING DEVELOPMENT.MYLES STANDISH WAY, CHORLEY

DUXBURY MANOR HOUSING DEVELOPMENT.MYLES STANDISH WAY, CHORLEY

BALSALL COMMON MEDICAL CENTRE.FOR ASHLEY HOUSE PLC, SOLIHULL, WEST MIDLANDS

DUXBURY MANOR HOUSING DEVELOPMENT.MYLES STANDISH WAY, CHORLEY

Client: Arley Homes North West Ltd

Project detailsReinforced Earth Ecocrib 795m², maximum 7m retained. Commenced on site 12th August 2011, completed 16th September 2011.

Client: Arley Homes North West Ltd

Project detailsReinforced Earth Ecocrib 220m², maximum 4.2m retained. Faced with Novabrik Commenced on site 1st August 2011, completed 11th August 2011.

Client: Wildgoose Construction Ltd

Project detailsEcocrib - 80m², maximum 3m retained. Commenced on site 23rd July 2011, Completed 25th July 2011.

Client: Arley Homes North West Ltd

Project detailsEcocrib 290m², maximum 3m retained. Commenced on site 12th August 2011, completed 16th September 2011.

ECOCRIB CASE STUDIES

BALSALL COMMON MEDICAL CENTRE FOR ASHLEY HOUSE PLC, SOLIHULL, WEST MIDLANDS

Client: Wildgoose Construction Ltd

Project Details Ecocrib - 80m², maximum 3m retained. Commenced on site 23rd July 2011, Completed 25th July 2011.

DUXBURY MANOR HOUSING DEVELOPMENT , MYLES STANDISH WAY, CHORLEY

Client: Arley Homes North West Ltd

Project details Reinforced Earth Ecocrib 795m², maximum 7m retained. Commenced on site 12th August 2011, completed 16th September 2011.

DUXBURY MANOR HOUSING DEVELOPMENT, MYLES STANDISH WAY, CHORLEY

Client: Arley Homes North West Ltd

Project Details

Reinforced Earth Ecocrib 220m², maximum 4.2m retained. Faced with Novabrik Commenced on site 1st August 2011, completed 11th August 2011.

DUXBURY MANOR HOUSING DEVELOPMENT, MYLES STANDISH WAY, CHORLEY

Client: Arley Homes North West Ltd Project Details Ecocrib 290m², maximum 3m retained. Commenced on site 12th August 2011, completed 16th September 2011.

Page 6: ECOCRIB  · PDF fileFOR ASHLEY HOUSE PLC, SOLIHULL, ... Cheshire, CH2 4DD Page 1 of 8 TECHNICAL APPROVALS FOR CONSTRUCTION ... • formal five-yearly review

ECOCRIB The 100% recycled mixed-polymer retaining wall system

By P C CONSTRUCTION LIMITED

TEL: 01244 851875 FAX: 01244 851874 MOBILE: 07515 385746 WEBSITE: h p://www.pcconstruc n.co.uk EMAIL: pcconstruc [email protected]

P.C.construction ltd Chorlton, Chester, Cheshire, CH2 4DD

Page 1 of 8

TECHNICAL APPROVALS FOR CONSTRUCTION

APPROVAL

INSPECTION

TESTING

CERTIFICATION

H A P A SPC Construction LtdPoplar HallPoplar Hall LaneChorltonChesterCH2 4DDTel: 01244 851875 Fax: 01244 851874e-mail: [email protected]: www.pcconstruction.co.uk

HAPAS Certificate12/H194

Product Sheet 1

British Board of Agrément tel: 01923 665300Bucknalls Lane fax: 01923 665301Watford e-mail: [email protected] WD25 9BA website: www.bbacerts.co.uk©2012

The BBA is a UKAS accredited certification body — Number 113. The schedule of the current scope of accreditation for product certification is available in pdf format via the UKAS link on the BBA website at www.bbacerts.co.uk

Readers are advised to check the validity and latest issue number of this Agrément Certificate by either referring to the BBA website or contacting the BBA direct.

ECOCRIB RETAINING WALLS

ECOCRIB RANGE OF POLYMER CRIB EARTH RETAINING WALL SYSTEMS

This Certificate relates to the Ecocrib Range of Polymer Crib Earth Retaining Wall Systems, comprising interlocking, polymer headers and stretchers for use when constructing earth retaining wall systems.

CERTIFICATION INCLUDES:• factors relating to compliance with HAPAS

requirements• factors relating to compliance with Regulations

where applicable• independently verified technical specification• assessment criteria and technical investigations• design considerations• installation guidance• regular surveillance of production• formal five-yearly review.

KEY FACTORS ASSESSEDStructural performance — the components, when used in accordance with this Certificate, have satisfactory structural characteristics when used in an earth retaining wall system (see section 6).

Durability — the wall system can achieve a design life greater than 120 years (see section 8).

This HAPAS Certificate Product Sheet(1) is issued by the British Board of Agrément (BBA), supported by the Highways Agency (HA) (acting on behalf of the Overseeing Organisations of the Department for Transport; Transport Scotland; the Welsh Assembly Government and the Department for Regional Development, Northern Ireland), the Association of Directors of Environment, Economy, Planning and Transport (ADEPT), the Local Government Technical Advisers’ Group and industry bodies. HAPAS Certificate Product Sheets are normally each subject to a review every five years.(1) Hereinafter referred to as ‘Certificate’.

The BBA has awarded this HAPAS Certificate to the company named above for the systems described herein. These systems have been assessed by the BBA as being fit for their intended use provided they are installed, used and maintained as set out in this Certificate.

On behalf of the British Board of Agrément

Date of First issue: 12 December 2012 Brian Chamberlain Greg Cooper