ILC Main Linac Access Hall Design To Install Cryo-Module Atsushi ENOMOTO, Masanobu MIYAHARA KEK ECFA LC2013 DESY May 30, 2013

description

ILC Main Linac Access Hall Design T o Install Cryo -Module Atsushi ENOMOTO, Masanobu MIYAHARA KEK. ECFA LC 2013 DESY May 30, 2013. Main Linac Access Points IN Asian Sites. Cryomodule. 12.652 m. XFEL Cryomodule Transporter. LHC Magnet Cryomodule Transpoerter. - PowerPoint PPT Presentation

Transcript of ECFA LC 2013 DESY May 30, 2013

Page 1: ECFA LC 2013 DESY May 30, 2013

ILC Main Linac Access Hall Design To Install Cryo-

Module

Atsushi ENOMOTO, Masanobu MIYAHARAKEK

ECFA LC2013 DESYMay 30, 2013

Page 2: ECFA LC 2013 DESY May 30, 2013

Main Linac Access Points IN Asian Sites

Page 3: ECFA LC 2013 DESY May 30, 2013

Cryomodule

12.652 m

Page 4: ECFA LC 2013 DESY May 30, 2013

XFEL Cryomodule Transporter

Page 5: ECFA LC 2013 DESY May 30, 2013

LHC Magnet Cryomodule Transpoerter

Page 6: ECFA LC 2013 DESY May 30, 2013

LHC Tunnel Access Point Layout

Page 7: ECFA LC 2013 DESY May 30, 2013

Asian Case Study: Tunnel Access Point Layout

Page 8: ECFA LC 2013 DESY May 30, 2013

Case 1: Use Crane

Page 9: ECFA LC 2013 DESY May 30, 2013

Case 2: Use Special Transporter

Page 10: ECFA LC 2013 DESY May 30, 2013

Case 3: Use DESY/LHC type Transporter