ECE 4-2 Daily Report of Activities 2

download ECE 4-2 Daily Report of Activities 2

of 6

Transcript of ECE 4-2 Daily Report of Activities 2

  • 8/9/2019 ECE 4-2 Daily Report of Activities 2

    1/6

    Republic of the Philippines

    Polytechnic University of the PhilippinesCOLLEGE OF ENGINEERING

    ELECTRONICS AND COMMUNICATIONS ENGINEERING DEPARTMENT3/F, CEA Bldg., Anonas cor. Pureza Sts., NDC Compound, Sta. Mesa, Manila

    On the Job Training Daily Report of Activities

    Name: Jeremias P. Roque, Jr.Year & Section: IV 2Course: Bachelor of Science in Electronics and Communications EngineeringCompany: Globe TelecomDepartment: Transmission Network Division Transmission Facility Management and Service

    Provisioning

    (Instruction: Fill up the table below. Accomplishments should be in bullet format with complete details oftasks completed within the day. The filled tables are intended to be an example. Note: This line is only forinstructions. Please delete this after editing.)

    Date and Time Accomplishments

    Date: April 12, 2010

    Time In: 9:00 AM

    Time Out: 5:00 PM

    Hours Spent: 7 hours

    1. Reported at Globe Telecom BPI Buendia Center fororientation.

    2.Studied the following topics on the module,Fundamentals of Mobile Telephony:a. Plesiochronous Digital Hierarchy (PDH)b. Synchronous Digital Hierarchy (SDH)

    3. Studied and observed Sir Jonathan Tolentino aboutthe basics of mapping of Transmission Networkswhich includes alarm clearing, dt allocation, and theother process of Network Management System.

    4. Saved copies of Files Implementation Orderrenaming them as revised files (225 of 1501 files)

    Date: April 13, 2010

    Time In: 7:45 AM

    Time Out: 5:30 PM

    Hours Spent: 8 hours and 45 minutes

    1.Studied the following topics on the module,Fundamentals of Mobile Telephony:a. Review of PDH and SDH Technologyb. Dense Wavelength Division Multiplexingc. Transmission Overview

    2. Saved copies of Facilities Implementation Orderfiles (781 of 1501 files)

    Date: April 14, 2010

    Time In: 7:45 AM

    Time Out: 5:20 PM

    Hours Spent: 8 hours and 15 minutes

    1.Studied the following topics on the module,Fundamentals of Mobile Telephony:a. Review of DWDM and Transmission Overviewb. Network Synchronizationc. Logical Channelsd. NMS/OSS Basics

  • 8/9/2019 ECE 4-2 Daily Report of Activities 2

    2/6

    e. Networking

    2. Completed saving copies of Facilities ImplementationOrder (1501 of 1501 files)

    Date: April 15, 2010

    Time In: 7:30 AMTime Out: 5: 00 PM

    Hours Spent: 8 hours and 30 minutes

    1. Requested for security pass in Globe Telecom Plaza

    at Pioneer St., Mandaluyong

    2.Studied the GSM/GPRS/WiMax Systems on themodule, Fundamentals of Mobile Telephony

    3. Learned the basics of NMS and how use the softwareinterface c/o Sir Jonathan Tolentino

    Date: April 16, 2010

    Time In: 7:30 AM

    Time Out: 5:30 PM

    Hours Spent: 9 hours

    1. Encoded Fiber Termination Plan files (28 new FTPfiles)

    2. Updated existing FTP files renaming them as revised(8 updated files)

    Date: April 19, 2010

    Time In: 7:30 AM

    Time Out: 5:15 PM

    Hours Spent: 8 hours and 45 minutes

    1.Encoded and/or revised a total of 42 FiberTermination Plan files

    Date: April 20, 2010

    Time In: 7:30 AM

    Time Out: 10:45 AM

    Hours Spent: 3 hours and 15 minutes

    1.Encoded and/or revised a total of 19 FiberTermination Plan files

    Date: April 21, 2010

    Time In: 7:30 AMTime Out: 5:15 PM

    Hours Spent: 8 hours and 15 minutes

    1. Encoded and/or revised 16 Fiber Termination Plan

    files

    2. Learned how to make PDH Channel Assignment byrecording existing trails from NMS c/o Maam ArleneAllas

    Date: April 22, 2010

    Time In: 7:45 AM

    Time Out: 5: 15 PM

    Hours Spent: 8 hours and 30 minutes

    1. Learned how to make Facility ImplementationOrders for FOC c/o Maam Anna Faustino.

    2.Encoded and sent 6 FIOs to their correspondingrequestors.

    Date: April 23, 2010Time In: 7:45 AM

    Time Out: 5:30 PM

    Hours Spent: 8 hours and 45 minutes

    1. Encoded 7 FTP files.

    2.Transferred newly encoded FTP files to the mainserver updating those who have the same file name.

    3.Encoded and sent FIOs to the correspondingrequestors.

    Date: April 26, 2010

    Time In: 7:45 AM1. Sent FIOs to the corresponding requestors.

  • 8/9/2019 ECE 4-2 Daily Report of Activities 2

    3/6

    Time Out: 1:00 PM

    Hours Spent: 4 hours and 15 minutes

    2. Organized the elements of core output files checkingfor redundancy, transferring unique elements to a newfile.

    Date: April 27, 2010

    Time In: 7:45 AM

    Time Out: 5:30 PMHours Spent: 8 hours and 45 minutes

    1. Continued organizing the elements of Core Outputfile.

    2.Checked for the availability of fibers for the givenlocations by Maam Anna Faustino.

    3. Incorporating revised FTP files on the previous ones.

    Date: April 28, 2010

    Time In: 7:30 AM

    Time Out: 4:30 PM

    Hours Spent: 7 hours and 40 minutes

    1.Continued organizing the elements of Core outputfiles.

    Date: May 4, 2010

    Time In: 7:50 AM

    Time Out: 5: 00 PM

    Hours Spent: 8 hours and 10 minutes

    1.Organized the elements of Core Output file (workdeffered).

    2. Updated an FIO file and sent it to the requestor, SirRepuyan.

    3. Updated the FTP of Ermita TOC and Ermita MSC.

    Date: May 5, 2010

    Time In: 8:20 AM

    Time Out: 5:35 PM

    Hours Spent: 8 hours and 45 minutes

    1. Established back-up files of D:\sgd of server toan external drive

    2. Started the research work for the case study

    Date: May 6, 2010

    Time In: 9:00 AMTime Out: 5:00 PM

    Hours Spent: 7 hours

    1. Created an FTP for Bacolod BSC and updated the

    existing files.

    2. Continued the research for the case study.

    3.Learned how to make an FIO for E1 level c/o SirJonathan Tolentino.

    Date: May 7, 2010

    Time In: 11:45 AM

    Time Out: 5:00 PM

    Hours Spent: 4 hours and 15 minutes

    1. Submitted the list of all the created FIO for FOC filesto Maam Anna Faustino.

    2. Created an FIO for Makati Host and sent the file to therequestor.

    3. Continued with the research for the case study.

    Date: May 11, 2010

    Time In: 7:40 AM

    Time Out: 5:00 PM

    Hours Spent: 8 hours and 20 minutes

    1. Started drafting the case study.

  • 8/9/2019 ECE 4-2 Daily Report of Activities 2

    4/6

    Date: May 12, 2010

    Time In: 7:30 AM

    Time Out: 5: 35 PM

    Hours Spent: 9 hours and 5 minutes

    1. Created and issued FIO files for Manda TimogTayuman Ermita

    2.Mapping of Manda Host Timog through NMS c/oMaam Mara Cruz.

    3.Created and issued FIO file for FOC allocation ofUgongval Dalandanan and sent the file to MaamAnna Faustino

    Date: May 13, 2010

    Time In: 7:30 AM

    Time Out: 5:05 PM

    Hours Spent: 8 hours and 35 minutes

    1. Created an FIO for Tayuman Ermita which requires5X core and mapped the locations on NMS c/o MaamMara Cruz

    2. Updated the FTP of Kalambaguhan BSC and LumbiaBTS

    3. Mapping of Manda Host Timog and sent thefile to Maam Mara Cruz

    Date: May 14, 2010

    Time In: 7:50 AM

    Time Out: 5:15 PM

    Hours Spent: 8 hours and 25 minutes

    1.Created FIO for FOC of Lambia KalambaguhanLink.

    2. Continued drafting of the case study.

    3. Updated the TFM daily broadcast c/o Maam Anna.

    Date: May 17, 2010

    Time In: 9:00 AM

    Time Out: 12:15 PM

    Hours Spent: 3 hours and 15 minutes

    1. Familiarization on Network Operations Center (NOC)area at Globe Valero Building.

    Date: May 18, 2010

    Time In: 12:25 PM

    Time Out: 7:30 PM

    Hours Spent: 7 hours and 5 minutes

    1.Reviewed the 2G, 3G and WiMax Networkarchitecture c/o lecture given by Sir Ryan Nato.

    2.Learned new mapping techniques using NMSsoftware of different vendors such as Huawei, ECI,and Alcatel. Learned to set loopbacks for testingpurposes c/o Sir Ryan Nato and Sir MarvinVeneracion.

    3.Mapped and tested the loopback of the NetworkElement (Malvar XDM1000 Batangas2 ATS)applying all the techniques learned.

    Date: May 19, 2010

    Time In: 8:45 AM

    Time Out: 8:30 PM

    Hours Spent: 11 hours and 45 minutes

    1. Mapped the connectivity between two RNCs(IUR).

    2. Re-mapped the previous Network Element (MalvarXDM1000 Batangas2 ATS) by giving protection tothe loop.

    3.Mapped another Network element (Dulag ALU Lahug 5F ADX).

  • 8/9/2019 ECE 4-2 Daily Report of Activities 2

    5/6

    4. Visited the equipments at switch room at 7th

    floor of Globe Valero Building. Equipments visitedwere BSC, MSS, RNC, ODF, SDR, BTS, Node B,ODF Rack, and Multiplexers of the following vendors:Huawei, ECI, Alcatel, Nokia, Ericsson, and ZTE.

    5. Actual testing of the site (with phone patch from thesite).

    6.Testing of loopback of Valero Canero (editing ofendpoints).

    Date: May 20, 2010

    Time In: 8:15 AM

    Time Out: 2:35 PM

    Hours Spent: 5 hours and 20 minutes

    1. Visited the equipments at switch room at 7th

    floor of Globe Valero Building c/o of Sir Ram Derez

    2. Actual testing of site (with phone patch).

    Date: May 21, 2010

    Time In: 8:30 AM

    Time Out: 6:30 PM

    Hours Spent: 9 hours

    1.Checked and corrected issued FIO for FOC andrevised those who have wrong entry at BPI Building.

    2. Checked, edited, and simplified FTPs with multipleentries.

    3. Documenting Core Audits at Globe Valero.

    Date: May 24, 2010

    Time In: 8:30 AM

    Time Out: 6:00 PM

    Hours Spent: 8 hours and 30 minutes

    1. Familiarization on Service Provisioning Group ofGlobe Telecom at 5th floor of Globe Valero Building.

    2. Lecture about 2G, 3G, and WiMax provisioning c/o SirJonathan Ng.

    Date: May 25, 2010

    Time In: 8:45 AM

    Time Out: 6:30 PM

    Hours Spent: 8 hours and 45 minutes

    1. Tour on the switch room at 5th floor of Globe Valero Building with lecture on basic cabling of copperfacility, tone testing, and making physical cross-connection c/o Sir Jonathan Ng and Sir Richard.

    2.Service provisioning at Market! Market!, BonifacioGlobal City, Taguig City.

    Date: May 26, 2010

    Time In: 9:00 AM

    Time Out: 7:00 PM

    Hours Spent: 9 hours

    1.Service provisioning and tour at different sites ofBulacan such as Malolos, Plaridel, Pulilan, andGuiguinto which include lectures and discussion about

    the technicalities of provisioning and cabling of copperfacility and optical fibers c/o Sir Ames Chua.

    2. Actual making of physical cross-connect at PulilanSite.

    Date: May 27, 2010

    Time In: 9:00 AM

    Time Out: 6:00 PM

    Hours Spent: 8 hours

    1. Thorough discussion about the equipmentsinside the switch room at Guiguinto site c/o Sir JoseGonzalogo.

  • 8/9/2019 ECE 4-2 Daily Report of Activities 2

    6/6

    2. Tour at Calumpit West site.

    Date: May 28, 2010

    Time In: 9:00 AM

    Time Out: 6:00 PM

    Hours Spent: 8 hours

    1. Service Provisioning at Meralco FoundationInstitute Site at Pasig City c/o Sir Romeo Cartago, Jr.

    Date: May 31, 2010

    Time In: 8:30 AM

    Time Out: 11:00 AM

    Hours Spent: 2 hours and 30 minutes

    1.Completion of requirements on accomplishmentreports and finalizing of case study.

    Date: June 1, 2010

    Time In: 1:30 PM

    Time Out: 3:00 PM

    Hours Spent: 1 hour and 30 minutes

    2. Final Examinations

    Date: June 3, 2010

    Time In: 2:00 PM

    Time Out: 5:00 PM

    Hours Spent: 3 hours

    1. Presentation of case study and assessment of all thethings learned at Globe Telecom.

    Acknowledged By:

    _________________________________________Engr. Anna Maria Faustino

    Immediate Supervisor

    *Signature line of I.S. is optional.