ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

13
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface

Transcript of ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

Page 1: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

CMS schedule draft v33.1:surface

Page 2: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

CMS schedule draft v33.1 : underground

Page 3: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

Reduced underground magnet test

trackerES mechbeampipecool mag & closetest magnetopen CMS

trackerES mechbeampipetest mag coolingpixel moni

start EE/ES installation

start EE/ES installation

v33.1

v33

Page 4: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

YE1 +/- schedule: draft May 03(assumed 3 month shift wrt v33)

pivotal point is stillEE/ES cable installation

delay will impactHE- RBX connection

Page 5: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

Proposed routings passing critical areas are worked out indetailed designs and are checked on the integration model

YE1 cabling

Page 6: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

Cabling from nose runs under ME/RE1

Page 7: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

HE-coil gap

Page 8: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

20032002 2004 2005

ME1/1+

HE+HE-1004

2

ME1/1-MF-1010

2

MF-1015ME1/1+ 2

HE-1002HE- 2

HE-HE-005

1 HE+ 1

HE-006

MF-1014 ME1/1- 2

HE Delivery to CERN

HE Assembly

HE Cabling&Test HE-012

1

ME1/1 Ready for Installation

ME1/1 Assembly

ME1/1 Cabling&Test MF-071

1

MF-1017

1

Installation Schedule of HE and ME 1/1

Page 9: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

YE1: some possible schedule hang-ups

cooled cableway design & occupancy vs time ( need cartoons of cable-way filling vs time) procurement/manufacture of remaining cableways layout of YE 1 patch panel & cable service loops

RE1/1 link board boxes and cables EE/ES cooling & cable definition for pre-installation latest mid 04.

electronics definition. LV & HV system definitionsLV regulators (rad tolerance, operating margin, noise rejection)LV cable noise immunity/rejectionPatch panel “dummies” & cable storage

Can we converge on a relatively conservative scheme which meets the constraints and gets all EE/ES cables installed on YE1+ by mid-04? What part of the EE/ES services can be installed earlier than this? extra expenditure may be justified to maintain a simple SX5 sequence!

Page 10: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

Cable chains: freeze occupancy in Sept 03

Patch panel on cable chain: fix definition by Sept clear to discusscooling, gas, inertion, sniffers, grounding, other low count HV & LVcollectively oversheathed cables requiring breakout optical fibres start by confirming cable count in YE1 chain (through cabling link-person)

Page 11: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

Precabling of endcap detectors

Hadron Endcap Muon Endcap 1/1

(dummy) Preshower

(dummy) EM endcap

who is responsiblefor PP definitionand dummy fabrication?

Page 12: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

Preshower design

2 completely cabled 1/2 disk (radiator + Si detectors)

front & rear windows + inner drum (moderator)full disk pre-mounted before beampipe installation.

detectors can be installed/removed without removing beampipe or moderator

Rob Loos

logical time to install ES detectors is (just) after EE.

Page 13: ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.

ECAL planning, 10 Jul 2003 AB

EE/ES cable duct occupancy

Studies & CTF reports by W.Funk.EMC, forces due to B-field, integration of HE & RE cables in duct?