Ebeen considered virtually impossible has again and again been...

16

Transcript of Ebeen considered virtually impossible has again and again been...

Page 1: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible
Page 2: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

ver since we established Top30 back in 1992 we have watched our sport constantly evolve, i.e. undergo a veritable revolution. What has been considered virtually impossible has again and again been made

E passable and the limits of human achievement constantly pushed.Top30 has been taking part in this rapid change and from year to year increased investments in research, innovation and development and with passion aimed to satisfy the needs and cravings of climbers at all levels – from kids to top-notch athletes. But we've not solely focused on the construction of artificial climbing structures and relevant accessories but also taken a major part in the organization and running of high level events like the Spanish Cup, the Climbing World Cup and recently the IFSC Climbing World Championship – considered by all parties involved to have been a huge success.

In 2011 Top30 was chosen by the IFSC (International Federation of Sport Climbing) as the organization´s Global Partner – a firm recognition of the Top30´s reputable products and services and the company´s active commitment and involvement in climbing.

“Imagine there's no countries,It isn't hard to do”.

ucho han cambiado las cosas en la escalada desde que Top30 iniciase su andadura en el año 1992, nuestro deporte ha vivido una auténtica revolución y los límites se han superado una y otra vez,

M cuando ya parecía que ir más allá era imposible.

Top30 ha acompañado esta evolución del deporte incrementando año a año su inversión en desarrollo e innovación, manteniendo su pasión e ilusión por satisfacer las necesidades de los deportistas. Implicándose no sólo en la construcción e instalación de rocódromos, sino también en la organización de eventos de alto nivel como la Copa de España, la Copa del Mundo y más recientemente en la organización del Campeonato del Mundo, considerado un éxito por todos los implicados.

En 2011 Top30 ha sido elegida por la IFSC (International Federation Sport Climbing) como Global Partner, un reconocimiento al buen hacer y una apuesta clara por los productos y servicios de Top30.

“Imagina que no hay fronteras,no es difícil hacerlo”.

climbing wall has to be a safe installation and this is undoubtedly the main criterion. To achieve this, it is imperative to comply by the very letter with norms and regulations in force. All projects undertaken by Top30 are in compliance with the following regulations:

A- EN 12572-1 (Climbing Wall Normative) - EN 12572-2 (Boulder Normative)- EN 12572-3 (Climbing Holds Normative)- EUROCODE 3 CTE DB-SE A-08 (Normative regarding steel structures in buildings)- EUROCODE 1 CTE DB-SE AE-09 (Static reliability calculations in buildings)

Regardless of the type of panels you select for the climbing surface, the most important part of the installation is the structure that supports the panels. The metallic structure has to undergo meticulous studies to guarantee a safe installation.The technical department of Top30 is composed of a group of designers and engineers who are specialists in the distinctive aspects of metallic structures and having adapted their professional skills to climbing wall construction their knowledge and commitment guarantees complete safety and high quality in all our products.

John Lennon

Security

Seguridad

Design Process / Proceso de diseño

Draft / Boceto 3D Design / Infografía 3D The result / El resultado

2 3

n rocódromo ha de ser una instalación deportiva segura, la seguridad ha de ser sin duda su principal activo. Para lograrlo es importante seguir la normativa en vigor, todos los proyectos realizados por TOP30 cumplen lo dispuesto en las siguientes normativas:U

UNE 12572-1 (Norma Rocódromos)UNE 12572-2 (Norma Búlder)UNE 12572 -3 (Norma Presas)- EUROCODE 3 CTE DB-SE A-08 (Estructuras de acero en edificación)- EUROCODE 1 CTE DB-SE AE-09 (Acciones en la edificación)

Independientemente del tipo de panel que seleccione como superficie escalable para su rocódromo, la parte más importante del mismo es la estructura que lo soporta. Es la parte que ha de ser estudiada con mayor minuciosidad y la que garantiza una instalación segura.Top30 pone a disposición de sus clientes un amplio departamento técnico, compuesto por diseñadores e ingenieros especialistas en estructuras metálicas, que han adaptado sus conocimientos a la escalada con un compromiso claro por la seguridad y la calidad de nuestros productos.

Page 3: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

ver since we established Top30 back in 1992 we have watched our sport constantly evolve, i.e. undergo a veritable revolution. What has been considered virtually impossible has again and again been made

E passable and the limits of human achievement constantly pushed.Top30 has been taking part in this rapid change and from year to year increased investments in research, innovation and development and with passion aimed to satisfy the needs and cravings of climbers at all levels – from kids to top-notch athletes. But we've not solely focused on the construction of artificial climbing structures and relevant accessories but also taken a major part in the organization and running of high level events like the Spanish Cup, the Climbing World Cup and recently the IFSC Climbing World Championship – considered by all parties involved to have been a huge success.

In 2011 Top30 was chosen by the IFSC (International Federation of Sport Climbing) as the organization´s Global Partner – a firm recognition of the Top30´s reputable products and services and the company´s active commitment and involvement in climbing.

“Imagine there's no countries,It isn't hard to do”.

ucho han cambiado las cosas en la escalada desde que Top30 iniciase su andadura en el año 1992, nuestro deporte ha vivido una auténtica revolución y los límites se han superado una y otra vez,

M cuando ya parecía que ir más allá era imposible.

Top30 ha acompañado esta evolución del deporte incrementando año a año su inversión en desarrollo e innovación, manteniendo su pasión e ilusión por satisfacer las necesidades de los deportistas. Implicándose no sólo en la construcción e instalación de rocódromos, sino también en la organización de eventos de alto nivel como la Copa de España, la Copa del Mundo y más recientemente en la organización del Campeonato del Mundo, considerado un éxito por todos los implicados.

En 2011 Top30 ha sido elegida por la IFSC (International Federation Sport Climbing) como Global Partner, un reconocimiento al buen hacer y una apuesta clara por los productos y servicios de Top30.

“Imagina que no hay fronteras,no es difícil hacerlo”.

climbing wall has to be a safe installation and this is undoubtedly the main criterion. To achieve this, it is imperative to comply by the very letter with norms and regulations in force. All projects undertaken by Top30 are in compliance with the following regulations:

A- EN 12572-1 (Climbing Wall Normative) - EN 12572-2 (Boulder Normative)- EN 12572-3 (Climbing Holds Normative)- EUROCODE 3 CTE DB-SE A-08 (Normative regarding steel structures in buildings)- EUROCODE 1 CTE DB-SE AE-09 (Static reliability calculations in buildings)

Regardless of the type of panels you select for the climbing surface, the most important part of the installation is the structure that supports the panels. The metallic structure has to undergo meticulous studies to guarantee a safe installation.The technical department of Top30 is composed of a group of designers and engineers who are specialists in the distinctive aspects of metallic structures and having adapted their professional skills to climbing wall construction their knowledge and commitment guarantees complete safety and high quality in all our products.

John Lennon

Security

Seguridad

Design Process / Proceso de diseño

Draft / Boceto 3D Design / Infografía 3D The result / El resultado

2 3

n rocódromo ha de ser una instalación deportiva segura, la seguridad ha de ser sin duda su principal activo. Para lograrlo es importante seguir la normativa en vigor, todos los proyectos realizados por TOP30 cumplen lo dispuesto en las siguientes normativas:U

UNE 12572-1 (Norma Rocódromos)UNE 12572-2 (Norma Búlder)UNE 12572 -3 (Norma Presas)- EUROCODE 3 CTE DB-SE A-08 (Estructuras de acero en edificación)- EUROCODE 1 CTE DB-SE AE-09 (Acciones en la edificación)

Independientemente del tipo de panel que seleccione como superficie escalable para su rocódromo, la parte más importante del mismo es la estructura que lo soporta. Es la parte que ha de ser estudiada con mayor minuciosidad y la que garantiza una instalación segura.Top30 pone a disposición de sus clientes un amplio departamento técnico, compuesto por diseñadores e ingenieros especialistas en estructuras metálicas, que han adaptado sus conocimientos a la escalada con un compromiso claro por la seguridad y la calidad de nuestros productos.

Page 4: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

3D Real Rock

Manresa - Spain +300 sq.m

Lisboa - Portugal +100 sq.m

Tolosa - Spain +350 sq.m

Amman - Jordan +1.000 sq.m

4 5

D R

eal Rock

his is the ultimate choice. Constantly developed and improved since 1992, our current version is 5th generation state-of-the-art panels. It is the preferred climbing surface in all domestic competitions in Spain as it has

T been for the last ten years. The interest and demand for our prime product has always been great but escalated after the World Cup event in Avilés in 2003 where Top30 revealed an amazing and unsurpassed competition wall composed of 3D Real Rock.

A climbing wall made of 3D Real Rock panels is projected using the latest computerized technologies presenting the client with a 3D simulation before the manufacturing process is initiated. The simulation produces all adequate information and parameters necessary for our production department to commence the actual production of the artificial rock including the important technical calculations of the support structure.

The 3D Real Rock panels are manufactured using composite materials making them durable, resistant and vividly rock-like.

The production process is completely mechanized facilitating our extensive quality control.A climbing wall produced of 3D Real Rock panels is characteristically sculptured in one single piece thus taking care of the comprehensive solution aesthetically as well as the quality of the entirety. When finished, the wall is cut in large pieces to facilitate transportation. At the final destination the pieces are meticulously assembled and fitted, the seams sealed and the wall artistically painted in the colours selected by the client.

ste panel es la mejor elección para construir un rocódromo, se trata de la quinta generación de un producto que Top30 comenzó a desarrollar en 1992 y que se ha ido adaptando a las necesidades técnicas de la escalada moderna. Tras diez años siendo el panel más utilizado en Campeonatos de España de Escalada, en el año 2003 un rocódromo con paneles 3D Real

E Rock fue sede de la Copa del Mundo de Escalada UIAA (Unión Internacional de Asociaciones Alpinas), hecho que se repitió en 2004 y 2005. En 2007 los Campeonatos del Mundo de Escalada se celebraron en un rocódromo con paneles 3D Real Rock.

El proceso de fabricación de un rocódromo en paneles 3D Real Rock, está ligado al 100% a las técnicas más modernas de diseño por ordenador, de manera que el cliente puede ver una simulación 3D de su rocódromo antes de comenzar la fabricación. De dicha simulación se obtienen todos los datos y parámetros que permitirán a nuestro departamento de producción iniciar la fabricación, a la par que se obtienen los cálculos técnicos necesarios para la estructura de soporte.

Los paneles 3D Real Rock están compuestos de diferentes materiales como la resina de poliéster, la fibra de vidrio o los áridos de sílice; la aplicación y uso de los mismos está totalmente mecanizado, de manera que la proporción de uso de cada material responde a exigentes controles de calidad.

La característica fundamental de un rocódromo en paneles 3D Real Rock es que es fabricado en una pieza, de este modo el aspecto sólido y unitario está garantizado. Como finalización del proceso de fabricación el rocódromo es cortado para facilitar su transporte. Una vez en el lugar de destino, los diferentes paneles son instalados y ensamblados, y con posterioridad se procede al sellado de las juntas de unión y al pintado final en el color seleccionado por el cliente.

Page 5: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

3D Real Rock

Manresa - Spain +300 sq.m

Lisboa - Portugal +100 sq.m

Tolosa - Spain +350 sq.m

Amman - Jordan +1.000 sq.m

4 5

D R

eal Rock

his is the ultimate choice. Constantly developed and improved since 1992, our current version is 5th generation state-of-the-art panels. It is the preferred climbing surface in all domestic competitions in Spain as it has

T been for the last ten years. The interest and demand for our prime product has always been great but escalated after the World Cup event in Avilés in 2003 where Top30 revealed an amazing and unsurpassed competition wall composed of 3D Real Rock.

A climbing wall made of 3D Real Rock panels is projected using the latest computerized technologies presenting the client with a 3D simulation before the manufacturing process is initiated. The simulation produces all adequate information and parameters necessary for our production department to commence the actual production of the artificial rock including the important technical calculations of the support structure.

The 3D Real Rock panels are manufactured using composite materials making them durable, resistant and vividly rock-like.

The production process is completely mechanized facilitating our extensive quality control.A climbing wall produced of 3D Real Rock panels is characteristically sculptured in one single piece thus taking care of the comprehensive solution aesthetically as well as the quality of the entirety. When finished, the wall is cut in large pieces to facilitate transportation. At the final destination the pieces are meticulously assembled and fitted, the seams sealed and the wall artistically painted in the colours selected by the client.

ste panel es la mejor elección para construir un rocódromo, se trata de la quinta generación de un producto que Top30 comenzó a desarrollar en 1992 y que se ha ido adaptando a las necesidades técnicas de la escalada moderna. Tras diez años siendo el panel más utilizado en Campeonatos de España de Escalada, en el año 2003 un rocódromo con paneles 3D Real

E Rock fue sede de la Copa del Mundo de Escalada UIAA (Unión Internacional de Asociaciones Alpinas), hecho que se repitió en 2004 y 2005. En 2007 los Campeonatos del Mundo de Escalada se celebraron en un rocódromo con paneles 3D Real Rock.

El proceso de fabricación de un rocódromo en paneles 3D Real Rock, está ligado al 100% a las técnicas más modernas de diseño por ordenador, de manera que el cliente puede ver una simulación 3D de su rocódromo antes de comenzar la fabricación. De dicha simulación se obtienen todos los datos y parámetros que permitirán a nuestro departamento de producción iniciar la fabricación, a la par que se obtienen los cálculos técnicos necesarios para la estructura de soporte.

Los paneles 3D Real Rock están compuestos de diferentes materiales como la resina de poliéster, la fibra de vidrio o los áridos de sílice; la aplicación y uso de los mismos está totalmente mecanizado, de manera que la proporción de uso de cada material responde a exigentes controles de calidad.

La característica fundamental de un rocódromo en paneles 3D Real Rock es que es fabricado en una pieza, de este modo el aspecto sólido y unitario está garantizado. Como finalización del proceso de fabricación el rocódromo es cortado para facilitar su transporte. Una vez en el lugar de destino, los diferentes paneles son instalados y ensamblados, y con posterioridad se procede al sellado de las juntas de unión y al pintado final en el color seleccionado por el cliente.

Page 6: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

K1 Dornbirn - Austria +1.000 sq.m

Estatia - Norway +300 sq.m

Fiss - Austria +175 sq.m

Marbella - Spain +400 sq.m

6 7

Aarhus - Denmark +1.500 sq.m

Rum - Austria +100 sq.m

Page 7: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

K1 Dornbirn - Austria +1.000 sq.m

Estatia - Norway +300 sq.m

Fiss - Austria +175 sq.m

Marbella - Spain +400 sq.m

6 7

Aarhus - Denmark +1.500 sq.m

Rum - Austria +100 sq.m

Page 8: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

Quirós

León - Spain +25 sq.m

Hong Kong - China +60 sq.m

Calatayud - Spain +130 sq.m

Estepona - Spain +80 sq.m

Realejos - Spain 250 sq.m

8 9

Quir

os

uirós is a variation on the theme fibreglass panels. The composition has the same characteristics which define the 3D Real Rock

Q panels. But it differs basically in the way it is produced with the use of a moulding system based on two standard measures: 1,5 m x 1,5 m and 1,5 m x 1,2 m. As opposed to its close relative, the 3D Real Rock, Quirós panels are subject to a few fixed parameters that limit it in form and volume.

Quirós is however an exclusive product as the complex vacuum controlled production process results in completely unique panels. No two panels are similar and this quality distinguishes the Quirós panels. This advantage definitely refines the final product, the general impression and increases the opportunities for interesting and demanding climbing routes.

na variante dentro de los rocódromos en paneles de fibra es el Panel Quirós. De similares características en cuanto a

U composición al panel 3D Real Rock, se diferencia básicamente en que es realizado a partir de moldes en dos medidas estándar: 1,5 m x 1,5 m y 1,5 m x 1,2 m, sujetándose por tanto a unos parámetros fijos que lo limitan en forma y volúmenes.

Como aspecto diferenciador del Panel Quirós en relación al resto de paneles de fibra estándar existentes en el mercado, destacar que cada panel es exclusivo, ya que gracias a un complejo sistema de moldes al vacío, no es posible fabricar dos paneles iguales, lo que sin duda enriquece el aspecto final del rocódromo y las posibilidades a la hora de escalar.

Page 9: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

Quirós

León - Spain +25 sq.m

Hong Kong - China +60 sq.m

Calatayud - Spain +130 sq.m

Estepona - Spain +80 sq.m

Realejos - Spain 250 sq.m

8 9

Quir

os

uirós is a variation on the theme fibreglass panels. The composition has the same characteristics which define the 3D Real Rock

Q panels. But it differs basically in the way it is produced with the use of a moulding system based on two standard measures: 1,5 m x 1,5 m and 1,5 m x 1,2 m. As opposed to its close relative, the 3D Real Rock, Quirós panels are subject to a few fixed parameters that limit it in form and volume.

Quirós is however an exclusive product as the complex vacuum controlled production process results in completely unique panels. No two panels are similar and this quality distinguishes the Quirós panels. This advantage definitely refines the final product, the general impression and increases the opportunities for interesting and demanding climbing routes.

na variante dentro de los rocódromos en paneles de fibra es el Panel Quirós. De similares características en cuanto a

U composición al panel 3D Real Rock, se diferencia básicamente en que es realizado a partir de moldes en dos medidas estándar: 1,5 m x 1,5 m y 1,5 m x 1,2 m, sujetándose por tanto a unos parámetros fijos que lo limitan en forma y volúmenes.

Como aspecto diferenciador del Panel Quirós en relación al resto de paneles de fibra estándar existentes en el mercado, destacar que cada panel es exclusivo, ya que gracias a un complejo sistema de moldes al vacío, no es posible fabricar dos paneles iguales, lo que sin duda enriquece el aspecto final del rocódromo y las posibilidades a la hora de escalar.

Page 10: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

Foixarda – Spain + 1.000 sq.m

Top

Aarhus - Denmark +1.500 sq.m

10 11

DWS Bilbao – Spain – 80 sq.m

Boulder World Cup – Spain – 75 sq.m

Top

his concept constitutes the simplest and most affordable choice for making a modular climbing wall. The bedrock is plywood, which is treated to withstand moisture. Polyester fibre, resin and silica are substances introduced to create a resistant but textured surface. In the process smooth but not repetitive forms are

T sculpted adding versatility.

This type of panel is ideal for bouldering facilities. Three variants are available:Smooth Top: Comes without any surface forms but with textured surface.Top Wave: Create your own wall with multi triangles shapes. Boulder Top: Comes with no forms and without frictional texture, just coated.

Common for all Top panels is that they all come with a large number of Ø 8 mm. - 10 mm. t-nuts for fixing moveable holds. The t-nuts are fixed on the backside of the panel using 2 woodscrews. Consequently the t-nuts will not rotate when force is applied on the climbing holds.

os rocódromos de esta opción constituyen la propuesta más sencilla de las ofertadas por Top30 a la hora de realizar una instalación para escalada. La base de este tipo de panel es la madera laminada y encolada con un tratamiento anti-humedad, sobre la que se aplica un tratamiento de textura con áridos de sílice y fibra de

Lpoliéster para darle ligeras formas que lo asemejen más a una superficie rocosa.

Este tipo de panel es ideal para la instalación de zonas de búlder y también es posible su realización en tres variables:Top Liso: Sin volúmenes aunque con textura de áridos.Top Wave: Múltiples formas triangulares. Top Búlder: Sin volúmenes y sin textura, tan sólo pintado y con anclajes de fijaciones de presas.

Para la fijación de las presas, este panel incorpora un anclaje embutido y atornillado en dos puntos, lo que impide su caída accidental o al manipular las presas.

Page 11: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

Foixarda – Spain + 1.000 sq.m

Top

Aarhus - Denmark +1.500 sq.m

10 11

DWS Bilbao – Spain – 80 sq.m

Boulder World Cup – Spain – 75 sq.m

Top

his concept constitutes the simplest and most affordable choice for making a modular climbing wall. The bedrock is plywood, which is treated to withstand moisture. Polyester fibre, resin and silica are substances introduced to create a resistant but textured surface. In the process smooth but not repetitive forms are

T sculpted adding versatility.

This type of panel is ideal for bouldering facilities. Three variants are available:Smooth Top: Comes without any surface forms but with textured surface.Top Wave: Create your own wall with multi triangles shapes. Boulder Top: Comes with no forms and without frictional texture, just coated.

Common for all Top panels is that they all come with a large number of Ø 8 mm. - 10 mm. t-nuts for fixing moveable holds. The t-nuts are fixed on the backside of the panel using 2 woodscrews. Consequently the t-nuts will not rotate when force is applied on the climbing holds.

os rocódromos de esta opción constituyen la propuesta más sencilla de las ofertadas por Top30 a la hora de realizar una instalación para escalada. La base de este tipo de panel es la madera laminada y encolada con un tratamiento anti-humedad, sobre la que se aplica un tratamiento de textura con áridos de sílice y fibra de

Lpoliéster para darle ligeras formas que lo asemejen más a una superficie rocosa.

Este tipo de panel es ideal para la instalación de zonas de búlder y también es posible su realización en tres variables:Top Liso: Sin volúmenes aunque con textura de áridos.Top Wave: Múltiples formas triangulares. Top Búlder: Sin volúmenes y sin textura, tan sólo pintado y con anclajes de fijaciones de presas.

Para la fijación de las presas, este panel incorpora un anclaje embutido y atornillado en dos puntos, lo que impide su caída accidental o al manipular las presas.

Page 12: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

climbing wall, as any other sports facility, needs maintenance. Two options are available:

A

A) Self-maintenance:As soon as the climbing wall is finished, Top30 will issue the client a self-maintenance manual a.k.a. a checklist. The manual describes point by point what needs attention and what actions to take. In order to follow the instructions, no formal competence or prior knowledge of climbing wall construction is required. However it is recommended. The above ment ioned manual inc ludes information on how and when to contact Top30 in case faults or defects are suspected or identified.

B) Preventive service contract:This contract between Top30 and the client goes beyond identification and repair of concrete defects and covers all tasks subject to periodical maintenance in order to assure a high level of safety as well as an installation offering sporting challenges. E.g. inspection and/or replacement of hangers, holds, top anchors and other parts subject to wear and tear. Furthermore a quality control of panels, structure, fixations and a general review of the complete installation. Routesetting is also offered as an available option. This contract regulates the level of precautionary maintenance defined by the type of climbing wall, the conditions of use and the individual needs of the client.

As a general rule every contract establishes two visits of maintenance per year, i.e. every six months. However, the number can b e i n c r e a s e d ( o r decreased) by request and mutual consent. If you want more information concerning this available service and its conditions, do not hesitate to contact us.

n rocódromo, como cualquier otra instalación deportiva, necesita de un trabajo de mantenimiento. En este sentido, dos son las posibles actuaciones a llevar a cabo:

U

A) Auto mantenimiento.Una vez que el rocódromo está terminado, Top30 pone a disposición de sus clientes las fichas de auto mantenimiento, en ellas se recogen todos los aspectos a revisar en la instalación. Para revisar estos puntos no es necesario contar con una formación específica en rocódromos, aunque sí es aconsejable; asimismo en dichas fichas se incluyen los criterios de aceptación y cómo contactar con Top30 para dar aviso en caso de una incidencia.

B) Contrato de mantenimiento preventivo.Este contrato cubre todas aquellas tareas que se realizan a los equipos sin que se haya presentado un daño, por ejemplo, sustitución de seguros y presas, control estructural, mejora de acabados y revisión general de la instalación. Este contrato establece un número de visitas de mantenimiento preventivo que son definidas de acuerdo al tipo de rocódromo, a las condiciones de uso y a las necesidades del cliente. Por regla general cada contrato establece dos visitas de mantenimiento preventivo al año (una en cada semestre), pero esta cifra puede ser incrementada a petición del cliente. Si quiere más información acerca de este servicio y de sus condiciones no dude en ponerse en contacto con nosotros.

Maintenance

Mantenimiento

Persbraten - Norway +159 sq.m

Ørnes - Norway +140 sq.m 12 13

Glitre - Norway + 40 sq.m

Goteborg - Sweden +1.000 sq.m

Ørnes - Norway +140 sq.m

Page 13: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

climbing wall, as any other sports facility, needs maintenance. Two options are available:

A

A) Self-maintenance:As soon as the climbing wall is finished, Top30 will issue the client a self-maintenance manual a.k.a. a checklist. The manual describes point by point what needs attention and what actions to take. In order to follow the instructions, no formal competence or prior knowledge of climbing wall construction is required. However it is recommended. The above ment ioned manual inc ludes information on how and when to contact Top30 in case faults or defects are suspected or identified.

B) Preventive service contract:This contract between Top30 and the client goes beyond identification and repair of concrete defects and covers all tasks subject to periodical maintenance in order to assure a high level of safety as well as an installation offering sporting challenges. E.g. inspection and/or replacement of hangers, holds, top anchors and other parts subject to wear and tear. Furthermore a quality control of panels, structure, fixations and a general review of the complete installation. Routesetting is also offered as an available option. This contract regulates the level of precautionary maintenance defined by the type of climbing wall, the conditions of use and the individual needs of the client.

As a general rule every contract establishes two visits of maintenance per year, i.e. every six months. However, the number can b e i n c r e a s e d ( o r decreased) by request and mutual consent. If you want more information concerning this available service and its conditions, do not hesitate to contact us.

n rocódromo, como cualquier otra instalación deportiva, necesita de un trabajo de mantenimiento. En este sentido, dos son las posibles actuaciones a llevar a cabo:

U

A) Auto mantenimiento.Una vez que el rocódromo está terminado, Top30 pone a disposición de sus clientes las fichas de auto mantenimiento, en ellas se recogen todos los aspectos a revisar en la instalación. Para revisar estos puntos no es necesario contar con una formación específica en rocódromos, aunque sí es aconsejable; asimismo en dichas fichas se incluyen los criterios de aceptación y cómo contactar con Top30 para dar aviso en caso de una incidencia.

B) Contrato de mantenimiento preventivo.Este contrato cubre todas aquellas tareas que se realizan a los equipos sin que se haya presentado un daño, por ejemplo, sustitución de seguros y presas, control estructural, mejora de acabados y revisión general de la instalación. Este contrato establece un número de visitas de mantenimiento preventivo que son definidas de acuerdo al tipo de rocódromo, a las condiciones de uso y a las necesidades del cliente. Por regla general cada contrato establece dos visitas de mantenimiento preventivo al año (una en cada semestre), pero esta cifra puede ser incrementada a petición del cliente. Si quiere más información acerca de este servicio y de sus condiciones no dude en ponerse en contacto con nosotros.

Maintenance

Mantenimiento

Persbraten - Norway +159 sq.m

Ørnes - Norway +140 sq.m 12 13

Glitre - Norway + 40 sq.m

Goteborg - Sweden +1.000 sq.m

Ørnes - Norway +140 sq.m

Page 14: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

Top30 has an own service offering technical assistance. Our crew of skilled technicians will move to correct any problem in your installation. This service is available via a specific e-mail address in relation to our after-sales department, which will attend to your inquiry within 48 hours*.

* Service may have limited application depending on location. Please consult the Top30 office or agent in your country.

Technical

assistance service

Top30 belongs on the short list of companies producing climbing walls having been granted the ISO Certification 9001:2008 for Quality Management Systems. This is without doubt the most valid warranty that Top30 consistently provides products that meet customer and regulatory requirements – in other words a 100 % tested wall prior to installation.

Additionally all Top30 walls comes with an extensive 2-year warranty* * In certain countries/regions customer request or applicable laws can extend warranties. Check availability.

Top30 forma parte del reducido número de empresas del sector que cuenta con la certificación de calidad ISO9001:2008, sin lugar a dudas la mejor garantía posible y prueba de que su rocódromo es verificado a fondo antes de ser instalado.

Al margen de ello, Top30 ofrece garantía de 2 años en todas sus instalaciones*.

*Consulte condiciones y posibilidades de ampliar la misma.

Calidad

Servicio de

asistencia tecnica

Quality

IN OUT

Available colours(Additional colours are available by request.)

Colores disponibles(Otros colores se fabrican bajo pedido.)

14 15

Top30 dispone de un servicio propio de Asistencia Técnica que se desplazará para subsanar cualquier problema en su instalación. Este servicio cuenta con una dirección de mail específica desde la que nuestro departamento post-venta le atenderá en un plazo no superior a 48 horas*.

* Este plazo de asistencia puede variar en función de la zona, consulte con la oficina de Top30 en su país.

3D Real Rock Quirós Top

Berta MartínBerta Martín

Bruno MaciasBruno Macias

Cedric LachatCedric Lachat

Maja VidmarMaja Vidmar

Angela EiterAngela Eiter

Eduard Marín Eduard Marín

Ramón JuliánRamón Julián

Patxi ArocenaPatxi Arocena

TEAM

Gris/Grey

7001

Marfil/Ivory

1015

Ocre/Ochre

8001RAL RAL RAL

TOP

TEAM

Page 15: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

Top30 has an own service offering technical assistance. Our crew of skilled technicians will move to correct any problem in your installation. This service is available via a specific e-mail address in relation to our after-sales department, which will attend to your inquiry within 48 hours*.

* Service may have limited application depending on location. Please consult the Top30 office or agent in your country.

Technical

assistance service

Top30 belongs on the short list of companies producing climbing walls having been granted the ISO Certification 9001:2008 for Quality Management Systems. This is without doubt the most valid warranty that Top30 consistently provides products that meet customer and regulatory requirements – in other words a 100 % tested wall prior to installation.

Additionally all Top30 walls comes with an extensive 2-year warranty* * In certain countries/regions customer request or applicable laws can extend warranties. Check availability.

Top30 forma parte del reducido número de empresas del sector que cuenta con la certificación de calidad ISO9001:2008, sin lugar a dudas la mejor garantía posible y prueba de que su rocódromo es verificado a fondo antes de ser instalado.

Al margen de ello, Top30 ofrece garantía de 2 años en todas sus instalaciones*.

*Consulte condiciones y posibilidades de ampliar la misma.

Calidad

Servicio de

asistencia tecnica

Quality

IN OUT

Available colours(Additional colours are available by request.)

Colores disponibles(Otros colores se fabrican bajo pedido.)

14 15

Top30 dispone de un servicio propio de Asistencia Técnica que se desplazará para subsanar cualquier problema en su instalación. Este servicio cuenta con una dirección de mail específica desde la que nuestro departamento post-venta le atenderá en un plazo no superior a 48 horas*.

* Este plazo de asistencia puede variar en función de la zona, consulte con la oficina de Top30 en su país.

3D Real Rock Quirós Top

Berta MartínBerta Martín

Bruno MaciasBruno Macias

Cedric LachatCedric Lachat

Maja VidmarMaja Vidmar

Angela EiterAngela Eiter

Eduard Marín Eduard Marín

Ramón JuliánRamón Julián

Patxi ArocenaPatxi Arocena

TEAM

Gris/Grey

7001

Marfil/Ivory

1015

Ocre/Ochre

8001RAL RAL RAL

TOP

TEAM

Page 16: Ebeen considered virtually impossible has again and again been …3project.es/.../uploads/2016/05/catalogo_Cwalls_201125-1.pdf · 2016-05-31 · Ebeen considered virtually impossible

Pol. de Maqua 18,19 / 33418 Asturias Spain

Tel: +34 985511078 / Fax: +34 985510279

[email protected]

Top30 NorgeEdvard Griegs Vei 1 (2. etg)1410 Kolbotn - [email protected]

Top30 AustriaBildgasse 106850 Dornbirn - [email protected]

Top30 PortugalRua Julio Dinis 728 sala 8114050-321 Porto - [email protected]

S A L A S D E E S C A L A D A:Climb

ww

w.fa

cebo

ok.c

om/t

op30

@to

p30

Official partner: Global partner: