EAST SUFFOLK

INTERNAL DRAINAGE BOARD

Kettlewell House Austin Fields Industrial Estate

Kings Lynn Norfolk

PE30 1PH

RATE ESTIMATES

FOR THE FINANCIAL YEAR 2011/2012

Page 2: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK IDB RATE ESTIMATES FOR 2011/12 EXPLANATORY NOTES

1. NEW WORKS AND IMPROVEMENT WORKS The Health and Safety Report prepared by Chris Mutten has identified some minor works needed at each pumping station in order to comply with health and safety legislation, a copy of which has been given to each Pumping Station Attendant. Chris has also provided estimates for carrying out this work, which have been included in the Budget for 2011/12. At the time of writing this Report the Board still has an allocation for health and safety improvements in the Environment Agency’s (EA) mid-term capital programme next year, which means that such work should attract grant aid at 45%. If it does not the work should proceed as maintenance work and as such will attract a similar highland water contribution from the EA (see item 6 below). The British Pleuger pump at Colony Marsh pumping station has a worn impellor and needs replacing within the next 4 years, which could cost between £20k and £40k to do. It has been scheduled for replacement in the EAs mid-term capital programme for 2013/14, however the level of reserves in the Alderton, Hollesley and Bawdsey Sub District is not sufficient to pay for the balance of this work. It is recommended that the Board should either build up the capital reserve in this sub district by significantly increasing the Rate over the next 3 years or take out a loan from the Public Works Loan Board to finance the upgrade when required. On preparing these Estimates it has been assumed that the latter option would be preferred. The capacity of the pump at Reydon Marsh is inadequate and needs upgrading. Again it is recommended that the Board should either start to build up the capital reserve in the Blyth Sub District by significantly increasing the Rate or take out a loan from the Public Works Loan Board to finance the upgrade when required. On preparing these Estimates it has been assumed that the latter option would be preferred and that no loan repayments will need to be made in 2011/12.

2. CONTRIBUTIONS PAYABLE TO THE ENVIRONMENT AGENCY The EA precept is expected to be the same as it was last year. However the cost of the precept for 2011/12 has been allocated to each Sub District according to its proportion of the Board’s total assessable value for the purposes of Drainage Rating because the EA are no longer able to provide work programmes (and therefore costs) for each of the old districts. In the absence of more detail from the EA this seems to be the most equitable and sustainable way of apportioning EA Precept charges.

1

Page 3: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK IDB RATE ESTIMATES FOR 2011/12 EXPLANATORY NOTES

3. MAINTENANCE WORKS

Maintenance works include pump attendance, power costs; pump repairs and drains maintenance for each sub district, together with a share of the technical support costs that were shown previously as administration costs. The rationale here is that technical support costs support the delivery of front line services (e.g. engineering/environmental consultancy costs), whilst administration costs support the organisation (e.g. the Board’s share of WMA Rating/Finance staff costs). The advantage to the Board of accounting for technical support costs in this way is to maximise the highland water claim from the EA (please see item 6 below). We have been battling with British Gas who currently supply electricity for the Board’s pumping stations and they now appear to be invoicing us for actual usage as opposed to estimated usage at most sites. However we are still waiting for credits at the Colony Marsh pumping station and Sudbourne pumping station. We may need to consider installing SMART meters at each station in future to ensure that automated billing for actual usage continues. The projected out-turn for maintenance in the Lower Alde (Tidal Pumped) Sub District is significantly more than was estimated largely due to the unplanned refurbishment of Gedgrave Outfall (approx. £10,000) and the inclusion of 13% of the technical support costs, previously referred to and accounted for as administration costs. In 2011/12 I recommend that the Board start to depreciate 3 of the 5 Lower Alde pumps, which equates to the same amount as the 4 associated public works loans and interest repayments (approx. £24k pa). This will ensure that the Lower Alde (Tidal Pumped) Sub District raises sufficient cash to make the loan repayments and has an appropriate capital reserve from which to finance the pump refurbishments/replacements in future. We have assumed that the level of maintenance work carried out next year will not change significantly from the projected out-turn for this year in all Sub Districts (2010/11). We have also budgeted for introducing a programme of lifting pumps once every two years, to start in 2011/12.

4. ADMINISTRATION AND OTHER COSTS Administration costs and the technical support costs referred to in item 3 above are allocated to each Sub District according to a ‘distribution factor’ that was agreed by the Board in 2008:

2

Page 4: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK IDB RATE ESTIMATES FOR 2011/12 EXPLANATORY NOTES

River Deben (Tidal Pumped): 12% Lower Alde (Tidal Pumped): 13% AHB (Tidal Pumped): 4% Blyth (Tidal Pumped): 2% Gravity: 69% Administration costs are projected to be significantly lower than was estimated for 2010/11 largely due to not incurring the following costs: Business Plan, set-up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included within the maintenance budget) Biodiversity Action Plan implementation: £3,750 Not replacing Finance Officer: £2,567 Administration costs should also be lower than estimated for 2011/12 if the WMA successfully implements its efficiency and cost reduction programme during the next 6 months.

5. GOVERNMENT GRANTS The health and safety works that have been identified by Chris Mutten in his Report should attract grant aid at 45% from the EA. The grant for each pumping station will therefore be credited to the appropriate Sub District.

6. CONTRIBUTIONS FROM THE ENVIRONMENT AGENCY The Board claims highland water contributions from the EA every year, which are then credited to each of the 5 Sub Districts according to an agreed fraction of the value of the maintenance work that has been carried out in each Sub District, (which includes a proportion of the technical support costs, as previously referred to, applied pro-rata to the value of maintenance work actually carried out in each Sub District). This income is designed to reimburse the Board for the expenditure it incurs managing the drainage and flood risk management infrastructure within its Drainage District that conveys surface water from outside the Drainage District through its arterial network.

7. OTHER INCOME We have assumed that the Board will continue to receive a modest amount of Interest on its working balances. Investment interest has been

3

Page 5: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK IDB RATE ESTIMATES FOR 2011/12 EXPLANATORY NOTES

apportioned to each Sub District according to the actual and projected closing balances of each Sub District as a proportion of the Board’s total closing balances.

8. DRAINAGE RATES AND RESERVES Subject to the Board’s agreement with the above, I am recommending a rate freeze for each of the Sub Districts this year, given the current economic climate. However it should be noted that in order to do this the Gravity Sub District will have to take approx. £19.5k from its General Reserve in 2011/12, due to the Rate being incorrectly calculated last year. It is important to note that by holding the Rate this year we will have to increase the Rate in this Sub District by 18% next year. We are now planning for each Sub District to hold a modest General Reserve balance, which should provide the contingency sought by the Board for unplanned work in each of the 5 Sub Districts (a general rule of thumb is that the General Reserve should be somewhere between 20% and 25% of net expenditure). However if the Board would like a single contingency fund as opposed to 5 separate funds then differential rating should ultimately be abolished. Clearly a balance always needs to be struck between fairness and the Board’s ability to raise money, reduce volatility of the Rate(s), optimise use of its Reserves, and, minimise the cost of administration. For example it would not be fair or equitable for those in the Gravity Sub District to abolish differential rating because there is a large difference between this Sub District’s Rate requirement of 5.428p and the single Rate requirement of 7.727p, unless they were going to receive an increased level of service. So if differential rating was ever abolished or the 5 Sub Districts were reduced to say 2 Sub Districts (Tidal Pumped and Gravity), the various funds associated with each of the existing 5 Sub Districts would need to be ring-fenced to each of the 5 areas and only ever used to fund work in these areas. I recommend that the Board reviews each of its 5 Rating Sub Districts to ensure that they are based on mutually exclusive areas of benefit rather than on areas that provide a convenient mechanism through which to harmonise an historic rating profile. We may find that the Board needs more as opposed to fewer Rating Sub Districts, particularly if we are to get involved with reinstating primary sea defences and taking on EA Main River work in the upper reaches. The Board should also ensure that its Electoral Divisions cover the same areas as its Rating Sub Districts because at the moment they are quite different: he who pays must get the say.

4

Page 6: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDCAPITAL WORKS PROGRAMME FOR 2011/12

Actual Estimate Probable EstimateOUR ID NEW WORKS AND IMPROVEMENT WORKS 2009/10 2010/11 2010/11 2011/12

SD1: River Deben (Tidal Pumped) Sub DistrictPMP178P001 Bawdsey: refurb., survey, signage and fencing 28,469 0 450 2,800PMP179P001 King's Fleet: survey, signage and fencing 0 0 450 1,200PMP179P002 Falkenham: survey, signage and fencing 0 0 450 3,000

28,469 0 1,350 7,000

SD2: Lower Alde (Tidal Pumped) Sub DistrictPMP167P001 Butley: survey, signage and fencing 0 0 450 2,000PMP168P001 Chillesford: survey, signage and fencing 0 0 450 1,000PMP170P001 Gedgrave: survey, signage and fencing 0 0 450 1,500PMP172P001 Iken: survey, signage and fencing 0 0 450 2,500PMP171P001 Sudbourne: survey, signage and fencing 0 0 450 3,500

0 0 2,250 10,500

SD3: AHB (Tidal Pumped) Sub DistrictPMP176P001 Colony Marsh: survey, signage and fencing 0 0 450 2,000

0 0 450 2,000

SD4: Blyth (Tidal Pumped) Sub DistrictPMP160P001 Reydon: survey, signage and fencing 0 0 450 2,800

0 0 450 2,800

SD5: Gravity Sub District 0 0 0 0

New Works and Improvement Works £28,469 £0 £4,500 £22,300

5

Page 7: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDMAINTENANCE WORKS PROGRAMME FOR 2011/12

Actual Estimate Probable EstimateOUR ID MAINTENANCE 2009/10 2010/11 2010/11 2011/12

DRAINS MAINTENANCE

SD1: River Deben (Tidal Pumped) Sub DistrictDRN179P0101/4/5 King's Fleet 3,285 0 0 0DRN179P0102 Laurel Farm Delph 0 0 0 0DRN179P0103 Gulpher 0 0 363 375DRN179P0201 Falkenham Delph 0 0 0 0DRN179P0204 Falkenham Marsh Drain 2,645 0 0 1,000DRN179P0202 Kirton Drain 4,175 0 0 0DRN179P0205 King's Fleet Weir Drain 0 1,000 1,000 0DRN178P0301/3 Ramsholt Marsh 0 0 0 0DRN178P0101/4 Queen's Fleet 0 0 640 0DRN178P0201 Bawdsey Marsh 0 0 0 0

£10,105 £1,000 £2,003 £1,375SD2: Lower Alde (Tidal Pumped) Sub DistrictDRN172P0101 Iken Marsh Drain 0 0 0 0DRN171P0101 Ferry Farm Drain 0 0 350 0DRN171P0201 Sudbourne Delph 0 0 0 0DRN171P0202 Church Farm Drain 0 0 0 0DRN171P0201 Oxx Lead Drain 0 0 0 0DRN170P0101 Gedgrave Drain (North) 0 1,570 1,914 1,750DRN170P0201 Gedgrave Drain (South) 0 430 164 200DRN168P0101 Chillesford Drain 0 0 1,200 0DRN167P0101 Butley Marsh Drain 1,225 0 0 0DRN167P0102 Stonebridge Drain 0 0 0 0DRN167P0103 Capel Drain 0 0 0 0

£1,225 £2,000 £3,628 £1,950SD3: AHB (Tidal Pumped) Sub DistrictDRN176P0101 Colony Marsh Drain 0 0 0 0DRN177P0101 Un-Named 0 0 0 0DRN177P0201 Un-Named 0 0 0 0DRN177P0202 Un-Named 0 0 0 0DRN177P0301 Un-Named 0 0 0 0DRN177P0302 Un-Named 0 0 0 0

£0 £0 £0 £0SD4: Blyth (Tidal Pumped) Sub DistrictDRN160P0101 Un-Named 0 3,000 5,786 1,000DRN160P0102 Un-Named 0 0 0 2,000

£0 £3,000 £5,786 £3,000SD5: Gravity Sub DistrictDRN162G0101 Blyth, Tidal, Un-Named 0 0 0 0DRN164G0101 Thorpeness 100, Un-Named 0 0 0 0DRN169G0101 Butley Mill River, Lower Alde 0 0 0 0DRN165G0102 Boyton Marsh Drain, Lower Alde 0 0 0 0DRN165G0101 Boyton Marsh Delph, Lower Alde 0 0 0 0DRN182G0101/7 Shottisham River, Lower Deben 0 0 0 0DRN180G0101/3 Ramsholt Dock Drain, Lower Deben 0 0 0 0DRN163G0101 Eastbridge Drain, Minsmere 5,953 5,953 3,419 600DRN163G0301 Un-Named, Minsmere 0 0 0 2,500

6

Page 8: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDMAINTENANCE WORKS PROGRAMME FOR 2011/12

Actual Estimate Probable EstimateOUR ID MAINTENANCE 2009/10 2010/11 2010/11 2011/12

DRN163G0401 Un-Named, Minsmere 0 0 0 0DRN163G0203 Un-Named, Minsmere 0 0 0 0DRN163G0201 Un-Named, Minsmere 0 0 0 0DRN163G0202 Un-Named, Minsmere 0 0 0 0DRN161G0101 Holton Drain, Blyth 0 0 0 0DRN163G0501 Un-Named, Minsmere 0 0 0 0DRN175G0101 The Canal, FRAT 0 0 0 0DRN175G0201 Sternfield Drain, FRAT 0 0 0 0DRN175G0401 Un-Named, Upper Alde 0 0 0 0DRN175G0501 Bruisyard Hall Drain, Upper Alde 0 0 0 0DRN175G0301 Blackstock Drain, Upper Alde 0 0 0 0DRN183G0101/3 River Fynn, Lower Deben 0 0 0 0DRN184G0801/3 Framsden Drain, Upper Deben 0 0 0 0DRN184G0701 Horsefen Drain, Upper Deben 0 0 0 750DRN184G0601 Moneweden Drain, Upper Deben 0 0 0 0DRN184G0501 Rendlesham Drain, Upper Deben 0 0 0 0DRN184G0101/5 Byng Brook, Upper Deben 0 0 0 0DRN184G0201 Eyke Marsh Drain, Upper Deben 1,556 2,000 2,590 0DRN184G0301/3 Loudham Drain, Upper Deben 0 860 910 0DRN184G0401 Ashe Abbey Drain, Upper Deben 0 0 0 2,000DRN190G0101 Wetherden Stream, River Gipping 0 2,121 2,121 2,200DRN191G0101/3 Wetherden Stream, River Gipping 3,305 4,004 2,200 2,250DRN186G1001 Gipping Stream, River Gipping 503 503 3,200 3,250DRN189G0101 Rattlesden River 0 0 528 550DRN189G0103/3 Golf Course Stream, River Gipping 1,648 1,648 1,700 1,725COW Edgar's Farm Drain, River Gipping 206 206 250 275DRN186G0901/2 Creeting Drain, River Gipping 733 733 750 775DRN186G0801/6 Badley Stream, River Gipping 3,822 3,822 3,500 3,550DRN186G0701/4 Jack's Green Drain, River Gipping 1,143 1,143 1,227 1,250COW Needham Market Drain, River Gipping 824 824 850 875DRN186G0601/5 Coldenham Stream, River Gipping 2,151 2,151 1,444 1,475DRN186G0301/4 Claydon Marsh Drain, River Gipping 595 595 681 700DRN186G0201/3 Claydon Hill Drain, River Gipping 1,008 1,008 1,248 1,275DRN186G0101 Bramford Marsh Drain, River Gipping 1,601 1,601 1,000 1,025DRN186G0401 Barham Marsh Drain, River Gipping 504 504 525 550DRN188G0101/5 River Jordan, River Gipping 1,235 1,235 649 675DRN186G0501 Gallows Hill Drain, River Gipping 389 389 122 150

£27,176 £31,300 £28,914 £28,400

£38,506 £37,300 £40,331 £34,725

PUMPING STATION MAINTENANCE

SD1: River Deben (Tidal Pumped) Sub DistrictPMP178P001 Bawdsey Pumping Station

Power 3,584 3,600 3,600 3,800Superintendence and other costs 150 200 1,821 1,200

3,734 3,800 5,421 5,000PMP179P001 King's Fleet Pumping Station

7

Page 9: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDMAINTENANCE WORKS PROGRAMME FOR 2011/12

Actual Estimate Probable EstimateOUR ID MAINTENANCE 2009/10 2010/11 2010/11 2011/12

Power 5,424 5,500 5,500 5,700Repairs and Maintenance 1,558 3,000 500 1,500

6,982 8,500 6,000 7,200PMP179P002 Falkenham Pumping Station

Power 4,676 4,800 4,800 5,000Superintendence and other costs 150 550 1,167 2,000

4,826 5,350 5,967 7,000

£15,542 £17,650 £17,388 £19,200

SD2: Lower Alde (Tidal Pumped) Sub DistrictPMP167P001 Butley Pumping Station

Power -515 4,250 5,458 5,550Superintendence and other costs 5,080 1,600 1,600 2,000Depreciation 0 0 0 3,679

4,565 5,850 7,058 11,229PMP168P001 Chillesford Pumping Station

Power -3,765 5,000 1,968 2,000Superintendence and other costs 921 1,600 1,622 1,600Depreciation 0 0 0 3,679

-2,844 6,600 3,590 7,279PMP170P001 Gedgrave Pumping Station

Power 1,062 1,200 1,900 2,000Outfall refurbishment work 0 0 9,950 0Superintendence and other costs 2,153 1,600 1,250 2,000Depreciation 0 0 0 3,679

3,215 2,800 13,100 7,679PMP172P001 Iken Pumping Station

Power 597 650 4,483 4,600Superintendence and other costs 1,550 1,600 166 2,000

2,147 2,250 4,649 6,600PMP171P001 Sudbourne Pumping Station

Power 10,733 15,500 8,220 8,500Superintendence and other costs 1,840 1,600 500 2,000

12,573 17,100 8,720 10,500

£19,656 £34,600 £37,117 £43,287

SD3: AHB (Tidal Pumped) Sub DistrictPMP176P001 Colony Marsh Pumping Station

Power 14 1,000 1,000 1,050Superintendence and other costs 150 250 250 300

£164 £1,250 £1,250 £1,350

SD4: Blyth (Tidal Pumped) Sub DistrictPMP160P001 Reydon Pumping Station

Power 8,466 5,500 3,480 3,600Superintendence and other costs 150 250 850 1,000

£8,616 £5,750 £4,330 £4,600

8

Page 10: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDMAINTENANCE WORKS PROGRAMME FOR 2011/12

Actual Estimate Probable EstimateOUR ID MAINTENANCE 2009/10 2010/11 2010/11 2011/12

PUMPING STATION MAINTENANCE £43,978 £59,250 £60,085 £68,437

DIRECT WORKS £82,484 £96,550 £100,416 £103,162

TECHNICAL SUPPORT COSTS £0 £0 £26,664 £29,115

BIODIVERSITY ACTION PLAN IMPLEMENTATION COSTS £0 £3,750 £0 £0

FINANCE COSTS (LOAN INTEREST: LOWER ALDE) £13,833 £0 £13,455 £12,675

MAINTENANCE WORKS £96,317 £100,300 £140,535 £144,952

9

Page 11: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDESTIMATES FOR THE FINANCIAL YEAR 2011/12

ACTUAL ESTIMATE PROBABLE ESTIMATERIVER DEBEN (TIDAL PUMPED) SUB DISTRICT 1 2009/10 2010/11 2010/11 2011/12

New Works and Improvement Works 28,469 0 1,350 7,000Contributions Payable to the Environment Agency 6,911 6,142 6,142 5,174Maintenance Works 25,647 18,650 22,591 24,069Administration Costs and Other Expenses 6,710 9,345 5,910 6,639

£67,737 £34,137 £35,993 £42,882Less:

Government Grants 12,811 0 608 3,150Contributions from the Environment Agency 11,450 11,819 17,762 20,037Other Income 39 540 101 341

£24,300 £12,359 £18,471 £23,528

NET REQUIREMENT £43,437 £21,778 £17,522 £19,354

FINANCED BY:-

SECTION 40, LAND DRAINAGE ACT 1991DRAINAGE RATES AND SPECIAL LEVIES

(Add)/Deduct for adjustment of Balances 11,538 -20,753 -25,009 -23,177Occupiers Drainage Rates 16,945 22,593 22,593 22,593Suffolk Coastal District Council 14,954 19,938 19,938 19,938Mid Suffolk District Council 0 0 0 0Ipswich Borough Council 0 0 0 0Babergh District Council 0 0 0 0Waveney District Council 0 0 0 0

£43,437 £21,778 £17,522 £19,354

DRAINAGE RATE

Penny Rate in the Pound 15.000p 20.000p 20.000p 20.000pAnnual Increase/(Decrease) 0.00% 33.00% 33.00% 0.00%Number of Agricultural Ratepayers 15 15 15 15

GENERAL RESERVE

Balance brought forward at 1 April -1,010 0 0 8,756ADD: Net Surplus/(Deficit) for the year (11,538) 20,753 25,009 23,177Transfer from/(to) Capital Reserve 12,548 (20,753) (16,253) (23,177)Balance carried forward at 31 March £0 £0 £8,756 £8,756

CAPITAL RESERVE

Balance brought forward at 1 April 17,768 5,220 5,220 21,473Transfer from/(to) General Reserve (12,548) 20,753 16,253 23,177Balance carried forward at 31 March £5,220 £25,973 £21,473 £44,650

SECTION 37, LAND DRAINAGE ACT 1991DETERMINATION OF ANNUAL VALUES 31/12/2009 31/12/2010

Agricultural Land and/or Buildings 112,964 112,964Other Land - Suffolk Coastal District Council 99,691 99,691Other Land - Mid Suffolk District Council 0 0Other Land - Ipswich Borough Council 0 0Other Land - Babergh District Council 0 0Other Land - Waveney District Council 0 0

£212,655 £212,655

The current headline rate of inflation as indicated by the National Statistics Office in October 2010 is 4.50%.

10

Page 12: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDESTIMATES FOR THE FINANCIAL YEAR 2011/12

ACTUAL ESTIMATE PROBABLE ESTIMATELOWER ALDE (TIDAL PUMPED) SUB DISTRICT 2 2009/10 2010/11 2010/11 2011/12

New Works and Improvement Works 0 0 2,250 10,500Contributions Payable to the Environment Agency 7,097 7,097 7,097 4,385Maintenance Works 34,714 36,600 57,666 61,697Administration Costs and Other Expenses 9,665 10,211 6,403 7,192

£51,476 £53,908 £73,416 £83,774Less:

Government Grants 0 0 1,013 4,725Contributions from the Environment Agency 24,160 23,052 29,411 31,283Other Income 33 720 620 443

£24,193 £23,772 £31,044 £36,451

NET REQUIREMENT £27,283 £30,136 £42,372 £47,323

FINANCED BY:-

SECTION 40, LAND DRAINAGE ACT 1991DRAINAGE RATES AND SPECIAL LEVIES

(Add)/Deduct for adjustment of Balances -22,272 -19,492 -7,256 -2,232Occupiers Drainage Rates 42,468 42,541 42,541 42,468Suffolk Coastal District Council 7,087 7,087 7,087 7,087Mid Suffolk District Council 0 0 0 0Ipswich Borough Council 0 0 0 0Babergh District Council 0 0 0 0Waveney District Council 0 0 0 0

£27,283 £30,136 £42,372 £47,323

DRAINAGE RATE

Penny Rate in the Pound 27.500p 27.500p 27.500p 27.500pAnnual Increase/(Decrease) 0.00% 0.00% 0.00% 0.00%Number of Agricultural Ratepayers 35 35 35 35

GENERAL RESERVE

Balance brought forward at 1 April 6,941 29,213 29,213 13,977ADD: Net Surplus/(Deficit) for the year 22,272 19,492 7,256 2,232Transfer from/(to) Capital Reserve 0 (22,492) (22,492) (2,232)Balance carried forward at 31 March £29,213 £26,213 £13,977 £13,977

CAPITAL RESERVE

Balance brought forward at 1 April 2,795 2,795 2,795 25,287Transfer from/(to) General Reserve 0 22,492 22,492 2,232Balance carried forward at 31 March £2,795 £25,287 £25,287 £27,519

SECTION 37, LAND DRAINAGE ACT 1991DETERMINATION OF ANNUAL VALUES 31/12/2009 31/12/2010

Agricultural Land and/or Buildings 154,694 154,428Other Land - Suffolk Coastal District Council 25,771 25,771Other Land - Mid Suffolk District Council 0 0Other Land - Ipswich Borough Council 0 0Other Land - Babergh District Council 0 0Other Land - Waveney District Council 0 0

£180,465 £180,199

The current headline rate of inflation as indicated by the National Statistics Office in October 2010 is 4.50%.

11

Page 13: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDESTIMATES FOR THE FINANCIAL YEAR 2011/12

ALDERTON, HOLLESLEY AND BAWDSEY (AHB) ACTUAL ESTIMATE PROBABLE ESTIMATEAHB (TIDAL PUMPED) SUB DISTRICT 3 2009/10 2010/11 2010/11 2011/12

New Works and Improvement Works 0 0 450 2,000Contributions Payable to the Environment Agency 3,668 3,668 3,668 922Maintenance Works 164 1,250 2,317 2,515Administration Costs and Other Expenses 1,227 2,726 1,970 2,213

£5,059 £7,644 £8,405 £7,650Less:

Government Grants 0 0 203 900Contributions from the Environment Agency 1,420 1,102 1,321 1,445Other Income 7 100 150 118

£1,427 £1,202 £1,674 £2,463

NET REQUIREMENT £3,632 £6,442 £6,731 £5,187

FINANCED BY:-

SECTION 40, LAND DRAINAGE ACT 1991DRAINAGE RATES AND SPECIAL LEVIES

(Add)/Deduct for adjustment of Balances -5,843 -3,034 -2,745 -4,289Occupiers Drainage Rates 9,475 9,476 9,476 9,476Suffolk Coastal District Council 0 0 0 0Mid Suffolk District Council 0 0 0 0Ipswich Borough Council 0 0 0 0Babergh District Council 0 0 0 0Waveney District Council 0 0 0 0

£3,632 £6,442 £6,731 £5,187

DRAINAGE RATE

Penny Rate in the Pound 25.000p 25.000p 25.000p 25.000pAnnual Increase/(Decrease) 13.64% 0.00% 0.00% 0.00%Number of Agricultural Ratepayers 8 8 8 8

GENERAL RESERVE

Balance brought forward at 1 April 1,875 7,718 7,718 6,430ADD: Net Surplus/(Deficit) for the year 5,843 3,034 2,745 4,289Transfer from/(to) Capital Reserve 0 (4,033) (4,033) (4,289)Balance carried forward at 31 March £7,718 £6,719 £6,430 £6,430

CAPITAL RESERVE

Balance brought forward at 1 April 0 0 0 4,033Transfer from/(to) General Reserve 0 4,033 4,033 4,289Balance carried forward at 31 March £0 £4,033 £4,033 £8,322

SECTION 37, LAND DRAINAGE ACT 1991DETERMINATION OF ANNUAL VALUES 31/12/2009 31/12/2010

Agricultural Land and/or Buildings 37,903 37,903Other Land - Suffolk Coastal District Council 0 0Other Land - Mid Suffolk District Council 0 0Other Land - Ipswich Borough Council 0 0Other Land - Babergh District Council 0 0Other Land - Waveney District Council 0 0

£37,903 £37,903

The current headline rate of inflation as indicated by the National Statistics Office in October 2010 is 4.50%.

12

Page 14: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDESTIMATES FOR THE FINANCIAL YEAR 2011/12

ACTUAL ESTIMATE PROBABLE ESTIMATEBLYTH (TIDAL PUMPED) SUB DISTRICT 4 2009/10 2010/11 2010/11 2011/12

New Works and Improvement Works 0 0 450 2,800Contributions Payable to the Environment Agency 360 360 360 202Maintenance Works 8,616 8,750 10,649 8,182Administration Costs and Other Expenses 217 1,454 985 1,107

£9,193 £10,564 £12,444 £12,291Less:

Government Grants 0 0 203 1,260Contributions from the Environment Agency 5,405 5,200 7,024 6,211Other Income 2 110 135 87

£5,407 £5,310 £7,362 £7,558

NET REQUIREMENT £3,786 £5,254 £5,082 £4,733

FINANCED BY:-

SECTION 40, LAND DRAINAGE ACT 1991DRAINAGE RATES AND SPECIAL LEVIES

(Add)/Deduct for adjustment of Balances -371 -568 -740 -1,089Occupiers Drainage Rates 4,092 5,730 5,730 5,730Suffolk Coastal District Council 0 0 0 0Mid Suffolk District Council 0 0 0 0Ipswich Borough Council 0 0 0 0Babergh District Council 0 0 0 0Waveney District Council 66 92 92 92

£3,787 £5,254 £5,082 £4,733

DRAINAGE RATE

Penny Rate in the Pound 50.000p 70.000p 70.000p 70.000pAnnual Increase/(Decrease) 47.00% 40.00% 40.00% 0.00%Number of Agricultural Ratepayers 6 6 6 6

GENERAL RESERVE

Balance brought forward at 1 April 6,616 6,987 6,987 6,160ADD: Net Surplus/(Deficit) for the year 371 568 740 1,089Transfer from/(to) Capital Reserve 0 (1,567) (1,567) (1,089)Balance carried forward at 31 March £6,987 £5,988 £6,160 £6,160

CAPITAL RESERVE

Balance brought forward at 1 April 0 0 0 1,567Transfer from/(to) General Reserve 0 1,567 1,567 1,089Balance carried forward at 31 March £0 £1,567 £1,567 £2,656

SECTION 37, LAND DRAINAGE ACT 1991DETERMINATION OF ANNUAL VALUES 31/12/2009 31/12/2010

Agricultural Land and/or Buildings 8,185 8,185Other Land - Suffolk Coastal District Council 0 0Other Land - Mid Suffolk District Council 0 0Other Land - Ipswich Borough Council 0 0Other Land - Babergh District Council 0 0Other Land - Waveney District Council 132 132

£8,317 £8,317

The current headline rate of inflation as indicated by the National Statistics Office in October 2010 is 4.50%.

13

Page 15: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDESTIMATES FOR THE FINANCIAL YEAR 2011/12

ACTUAL ESTIMATE PROBABLE ESTIMATEGRAVITY SUB DISTRICT 5 2009/10 2010/11 2010/11 2011/12

New Works and Improvement Works 0 0 0 0Contributions Payable to the Environment Agency 49,935 50,703 50,703 57,287Maintenance Works 27,176 35,050 47,312 48,489Administration Costs and Other Expenses 52,106 76,894 33,985 38,174

£129,217 £162,647 £132,000 £143,950Less:

Government Grants 0 0 0 0Contributions from the Environment Agency 14,581 13,264 13,563 15,193Other Income 436 2,210 1,764 931

£15,017 £15,474 £15,327 £16,124

NET REQUIREMENT £114,200 £147,173 £116,673 £127,826

FINANCED BY:-

SECTION 40, LAND DRAINAGE ACT 1991DRAINAGE RATES AND SPECIAL LEVIES

(Add)/Deduct for adjustment of Balances 5,963 39,047 8,547 10,105Occupiers Drainage Rates 21,427 21,248 21,248 23,289Suffolk Coastal District Council 25,884 25,884 25,884 28,135Mid Suffolk District Council 29,545 29,545 29,545 32,114Ipswich Borough Council 27,867 27,867 27,867 30,290Babergh District Council 1,316 1,316 1,316 1,430Waveney District Council 2,200 2,266 2,266 2,463

£114,202 £147,173 £116,673 £127,826

DRAINAGE RATE

Penny Rate in the Pound 4.600p 4.600p 4.600p 5.000pAnnual Increase/(Decrease) Assort 0.00% 0.00% 8.70%Number of Agricultural Ratepayers 750 750 750 750

GENERAL RESERVE

Balance brought forward at 1 April 48,638 42,675 42,675 17,833ADD: Net Surplus/(Deficit) for the year (5,963) (39,047) (8,547) (10,105)Transfer from/(to) Contingency Reserve 0 (16,295) (16,295) 0Balance carried forward at 31 March £42,675 -£12,667 £17,833 £7,728

CONTINGENCY RESERVE

Balance brought forward at 1 April 48,342 48,342 48,342 64,637Transfer from/(to) General Reserve 0 16,295 16,295 0Balance carried forward at 31 March £48,342 £64,637 £64,637 £64,637

SECTION 37, LAND DRAINAGE ACT 1991DETERMINATION OF ANNUAL VALUES 31/12/2009 31/12/2010

Agricultural Land and/or Buildings 461,909 465,783Other Land - Suffolk Coastal District Council 562,692 562,692Other Land - Mid Suffolk District Council 642,289 642,289Other Land - Ipswich Borough Council 605,806 605,806Other Land - Babergh District Council 28,601 28,601Other Land - Waveney District Council 49,253 49,253

£2,350,550 £2,354,424

The current headline rate of inflation as indicated by the National Statistics Office in October 2010 is 4.50%.

14

Page 16: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARDESTIMATES FOR THE FINANCIAL YEAR 2011/12

ACTUAL ESTIMATE PROBABLE ESTIMATEALL SUB DISTRICTS (5) 2009/10 2010/11 2010/11 2011/12

New Works and Improvement Works 28,469 0 4,500 22,300Contributions Payable to the Environment Agency 67,971 67,970 67,970 67,970Maintenance Works 96,317 100,300 140,535 144,952Administration Costs and Other Expenses 69,925 100,630 49,253 55,325

£262,682 £268,900 £262,258 £290,547Less:

Government Grants 12,811 0 2,027 10,035Contributions from the Environment Agency 57,016 54,437 69,081 74,169Other Income 517 3,680 2,770 1,920

£70,344 £58,117 £73,878 £86,124

NET REQUIREMENT £192,338 £210,783 £188,380 £204,423

FINANCED BY:-

SECTION 40, LAND DRAINAGE ACT 1991DRAINAGE RATES AND SPECIAL LEVIES

(Add)/Deduct for adjustment of Balances -10,985 -4,800 -27,203 -20,682Occupiers Drainage Rates 94,407 101,588 101,588 103,556Suffolk Coastal District Council 47,925 52,909 52,909 55,160Mid Suffolk District Council 29,545 29,545 29,545 32,114Ipswich Borough Council 27,867 27,867 27,867 30,290Babergh District Council 1,316 1,316 1,316 1,430Waveney District Council 2,266 2,358 2,358 2,555

£192,341 £210,783 £188,380 £204,423

DRAINAGE RATE (WITHOUT DIFFERENTIAL RATING)

Penny Rate in the Pound 7.288p 7.727p 7.727p 7.727pAnnual Increase/(Decrease) 2.00% 6.03% 6.03% 0.00%Number of Agricultural Ratepayers 814 814 814 814

GENERAL RESERVE

Balance brought forward at 1 April 63,060 86,593 86,593 53,156ADD: Net Surplus/(Deficit) for the year 10,985 4,800 27,203 20,682Transfer from/(to) Capital and Contingency Reserves 12,548 (65,140) (60,640) (30,787)Balance carried forward at 31 March £86,593 £26,253 £53,156 £43,051

CAPITAL AND CONTINGENCY RESERVES

Balance brought forward at 1 April 68,905 56,357 56,357 116,997Transfer from/(to) General Reserve (12,548) 65,140 60,640 30,787Balance carried forward at 31 March £56,357 £121,497 £116,997 £147,784

SECTION 37, LAND DRAINAGE ACT 1991DETERMINATION OF ANNUAL VALUES 31/12/2009 31/12/2010

Agricultural Land and/or Buildings 775,655 779,263Other Land - Suffolk Coastal District Council 688,154 688,154Other Land - Mid Suffolk District Council 642,289 642,289Other Land - Ipswich Borough Council 605,806 605,806Other Land - Babergh District Council 28,601 28,601Other Land - Waveney District Council 49,385 49,385

£2,789,890 £2,793,498

The current headline rate of inflation as indicated by the National Statistics Office in October 2010 is 4.50%.

15

Page 17: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARD (''the Board'')LAND DRAINAGE ACT 1991 ("the Act")THE INTERNAL DRAINAGE BOARDS (FINANCE) REGULATIONS 1990 (as amended) ("the Regulations")BOOK OF DRAINAGE RATES AND SPECIAL LEVIES

On the 19th day of January 2011 the Board resolved as follows:-

1.

2.

3.

RIVER DEBEN (TIDAL PUMPED) SUB DISTRICT 1 RIVER DEBEN (TIDAL PUMPED) SUB DISTRICT 1p p £ %

New Works and Improvement Works 3.292 Suffolk Coastal District Council £19,938 46.879%Contributions to the Environment Agency 2.433 Mid Suffolk District Council £0 0.000%Maintenance Works 11.318 Ipswich Borough Council £0 0.000%Administration and Other Expenses 3.122 20.165 Babergh District Council £0 0.000%

Waveney District Council £0 0.000%LESS:-Government Grants 1.481Contributions from the Environment Agency 9.422Other Income 0.160 11.064

9.101

Add/(deduct) for adjustment of balances 10.899

20.000 £19,938 46.88%

THE COMMON SEAL of the Board is affixed in the presence of:-

E GREENWELL P J CAMAMILECHAIRMAN CHIEF EXECUTIVE OFFICER

CERTIFICATE

I certify as follows:-

1. That notice of the drainage rates and special levies was given on the 27th January 2011 as required by section 48 of the Act and regulation 8(4) of the Regulations.

2. That the special levies were issued on the 19th day of January 2011.

P J CAMAMILECHIEF EXECUTIVE OFFICER

DRAINAGE RATE SPECIAL LEVIES

That in respect of the financial year ending 31st March 2012 the proportions of expenditure to be raised by drainage rates with regard to agricultural land and/or buildings and byspecial levies on local billing authorities are 53.12% and 46.88% respectively in the River Deben (Tidal Pumped) Sub District.

To make the drainage rates and special levies set out below and that the seal of the Board be affixed to those drainage rates and special levies.

That the proportions between the local billing authorities of the amount to be raised by special levies are as set out below, against the special levy for each local billing authority.

16

Page 18: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARD (''the Board'')LAND DRAINAGE ACT 1991 ("the Act")THE INTERNAL DRAINAGE BOARDS (FINANCE) REGULATIONS 1990 (as amended) ("the Regulations")BOOK OF DRAINAGE RATES AND SPECIAL LEVIES

On the 19th day of January 2011 the Board resolved as follows:-

1.

2.

3.

LOWER ALDE (TIDAL PUMPED) SUB DISTRICT 2 LOWER ALDE (TIDAL PUMPED) SUB DISTRICT 2p p £ %

New Works and Improvement Works 5.827 Suffolk Coastal District Council £7,087 14.301%Contributions to the Environment Agency 2.433 Mid Suffolk District Council £0 0.000%Maintenance Works 34.238 Ipswich Borough Council £0 0.000%Administration and Other Expenses 3.991 46.489 Babergh District Council £0 0.000%

Waveney District Council £0 0.000%LESS:-Government Grants 2.622Contributions from the Environment Agency 17.360Other Income 0.246 20.228

26.261

Add/(deduct) for adjustment of balances 1.239

27.500 £7,087 14.30%

THE COMMON SEAL of the Board is affixed in the presence of:-

E GREENWELL P J CAMAMILECHAIRMAN CHIEF EXECUTIVE OFFICER

CERTIFICATE

I certify as follows:-

1. That notice of the drainage rates and special levies was given on the 27th January 2011 as required by section 48 of the Act and regulation 8(4) of the Regulations.

2. That the special levies were issued on the 19th day of January 2011.

P J CAMAMILECHIEF EXECUTIVE OFFICER

That the proportions between the local billing authorities of the amount to be raised by special levies are as set out below, against the special levy for each local billing authority.

To make the drainage rates and special levies set out below and that the seal of the Board be affixed to those drainage rates and special levies.

DRAINAGE RATE SPECIAL LEVIES

That in respect of the financial year ending 31st March 2012 the proportions of expenditure to be raised by drainage rates with regard to agricultural land and/or buildings and byspecial levies on local billing authorities are 62.69% and 14.30% respectively in the Lower Alde (Tidal Pumped) Sub District.

17

Page 19: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARD (''the Board'')LAND DRAINAGE ACT 1991 ("the Act")THE INTERNAL DRAINAGE BOARDS (FINANCE) REGULATIONS 1990 (as amended) ("the Regulations")BOOK OF DRAINAGE RATES AND SPECIAL LEVIES

On the 19th day of January 2011 the Board resolved as follows:-

1.

2.

3.

AHB (TIDAL PUMPED) SUB DISTRICT 3 AHB (TIDAL PUMPED) SUB DISTRICT 3p p £ %

New Works and Improvement Works 5.276 Suffolk Coastal District Council £0 0.000%Contributions to the Environment Agency 2.432 Mid Suffolk District Council £0 0.000%Maintenance Works 6.635 Ipswich Borough Council £0 0.000%Administration and Other Expenses 5.838 20.183 Babergh District Council £0 0.000%

Waveney District Council £0 0.000%LESS:-Government Grants 2.374Contributions from the Environment Agency 3.812Other Income 0.311 6.498

13.685

Add/(deduct) for adjustment of balances 11.315

25.000 £0 0.00%

THE COMMON SEAL of the Board is affixed in the presence of:-

E GREENWELL P J CAMAMILECHAIRMAN CHIEF EXECUTIVE OFFICER

CERTIFICATE

I certify as follows:-

1. That notice of the drainage rates and special levies was given on the 27th January 2011 as required by section 48 of the Act and regulation 8(4) of the Regulations.

2. That the special levies were issued on the 19th day of January 2011.

P J CAMAMILECHIEF EXECUTIVE OFFICER

To make the drainage rates and special levies set out below and that the seal of the Board be affixed to those drainage rates and special levies.

DRAINAGE RATE SPECIAL LEVIES

That in respect of the financial year ending 31st March 2012 the proportions of expenditure to be raised by drainage rates with regard to agricultural land and/or buildings and byspecial levies on local billing authorities are 100.00% and 0.00% respectively in the Alderton, Hollesley and Bawdsey (Tidal Pumped) Sub District.

That the proportions between the local billing authorities of the amount to be raised by special levies are as set out below, against the special levy for each local billing authority.

18

Page 20: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARD (''the Board'')LAND DRAINAGE ACT 1991 ("the Act")THE INTERNAL DRAINAGE BOARDS (FINANCE) REGULATIONS 1990 (as amended) ("the Regulations")BOOK OF DRAINAGE RATES AND SPECIAL LEVIES

On the 19th day of January 2011 the Board resolved as follows:-

1.

2.

3.

BLYTH (TIDAL PUMPED) SUB DISTRICT 4 BLYTH (TIDAL PUMPED) SUB DISTRICT 4p p £ %

New Works and Improvement Works 33.665 Suffolk Coastal District Council £0 0.000%Contributions to the Environment Agency 2.429 Mid Suffolk District Council £0 0.000%Maintenance Works 98.375 Ipswich Borough Council £0 0.000%Administration and Other Expenses 13.310 147.779 Babergh District Council £0 0.000%

Waveney District Council £92 1.587%LESS:-Government Grants 15.149Contributions from the Environment Agency 74.677Other Income 1.046 90.873

56.907

Add/(deduct) for adjustment of balances 13.093

70.000 £92 1.59%

THE COMMON SEAL of the Board is affixed in the presence of:-

E GREENWELL P J CAMAMILECHAIRMAN CHIEF EXECUTIVE OFFICER

CERTIFICATE

I certify as follows:-

1. That notice of the drainage rates and special levies was given on the 27th January 2011 as required by section 48 of the Act and regulation 8(4) of the Regulations.

2. That the special levies were issued on the 19th day of January 2011.

P J CAMAMILECHIEF EXECUTIVE OFFICER

DRAINAGE RATE SPECIAL LEVIES

That in respect of the financial year ending 31st March 2012 the proportions of expenditure to be raised by drainage rates with regard to agricultural land and/or buildings and byspecial levies on local billing authorities are 98.41% and 1.59% respectively in the Blyth (Tidal Pumped) Sub District.

That the proportions between the local billing authorities of the amount to be raised by special levies are as set out below, against the special levy for each local billing authority.

To make the drainage rates and special levies set out below and that the seal of the Board be affixed to those drainage rates and special levies.

19

Page 21: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARD (''the Board'')LAND DRAINAGE ACT 1991 ("the Act")THE INTERNAL DRAINAGE BOARDS (FINANCE) REGULATIONS 1990 (as amended) ("the Regulations")BOOK OF DRAINAGE RATES AND SPECIAL LEVIES

On the 19th day of January 2011 the Board resolved as follows:-

1.

2.

3.

GRAVITY SUB DISTRICT 5 GRAVITY SUB DISTRICT 5p p £ %

New Works and Improvement Works 0.000 Suffolk Coastal District Council £28,135 23.899%Contributions to the Environment Agency 2.433 Mid Suffolk District Council £32,114 27.280%Maintenance Works 2.059 Ipswich Borough Council £30,290 25.731%Administration and Other Expenses 1.621 6.114 Babergh District Council £1,430 1.215%

Waveney District Council £2,463 2.092%LESS:-Government Grants 0.000Contributions from the Environment Agency 0.645Other Income 0.040 0.685

5.429

Add/(deduct) for adjustment of balances (0.429)

5.000 £94,432 80.22%

THE COMMON SEAL of the Board is affixed in the presence of:-

E GREENWELL P J CAMAMILECHAIRMAN CHIEF EXECUTIVE OFFICER

CERTIFICATE

I certify as follows:-

1. That notice of the drainage rates and special levies was given on the 27th January 2011 as required by section 48 of the Act and regulation 8(4) of the Regulations.

2. That the special levies were issued on the 19th day of January 2011.

P J CAMAMILECHIEF EXECUTIVE OFFICER

That in respect of the financial year ending 31st March 2012 the proportions of expenditure to be raised by drainage rates with regard to agricultural land and/or buildings and byspecial levies on local billing authorities are 19.78% and 80.22% respectively in the Gravity Sub District.

That the proportions between the local billing authorities of the amount to be raised by special levies are as set out below, against the special levy for each local billing authority.

To make the drainage rates and special levies set out below and that the seal of the Board be affixed to those drainage rates and special levies.

DRAINAGE RATE SPECIAL LEVIES

20

Page 22: EAST SUFFOLK INTERNAL DRAINAGE BOARD - …...Business Plan, set -up costs: £11,366 Digitisation of hereditaments and maps: £20,000 Technical support costs: £13,694 (now included

EAST SUFFOLK INTERNAL DRAINAGE BOARD (''the Board'')LAND DRAINAGE ACT 1991 ("the Act")

DRAINAGE RATES AND SPECIAL LEVIES FOR 2011/12

AS REQUIRED by Section 48 of the Act, the Board gives notice as follows:

1. On the 19th January 2011 the Board made the following Drainage Rates:-

River Deben (Tidal Pumped) 20.000pLower Alde (Tidal Pumped) 27.500pAlderton, Hollesley and Bawdsey (Tidal Pumped) 25.000pRiver Blyth (Reydon Marsh, Tidal Pumped) 70.000pGravity Catchments 5.000p

2.

Suffolk Coastal District Council £55,160Mid Suffolk District Council £32,114Ipswich Borough Council £30,290Babergh District Council £1,430Waveney District Council £2,555

to raise the balance of their expenditure for the same year.

Dated 27th Day of January 2011

P J CAMAMILECHIEF EXECUTIVE

Kettlewell House, Austin Fields Industrial Estate,KING'S LYNN, Norfolk PE30 1PH

in respect of agricultural land and agricultural buildings in their district toraise £103,556 of their expenditure for the financial year ending on 31March 2012.

Also on 19th January 2011 the Board made a special levy of £121,549 onthe following billing authorities:-

Sub District Drainage Rate in the Pound (£)

21