East Providence High School December 11, 2017 School Building Committee Meeting 4

Transcript of East Providence High School - · PDF file3 GROUPS Group A - occupying ... 6 New Tennis Courts...

East Providence High School

December 11, 2017

School Building Committee

Meeting 4

Agenda

• Update on RIDE Presentation to SBC & 12/11 meeting

• Educational Program Update

◦ Space Summary 2nd Program Draft

• Preferred Building Plan Option B.1

• Preferred Site Option B.1 (Revised)

• Next Steps & Schedule

RIDE Update

RIDE STAGE II

9-12 Grade Range

Enrollment Projection: 1,600 Students

Met with RIDE on four occasions and will continue to meet throughout the process

Reviewed “Bubble” and organizational diagrams for Building plan Option B.1

Reviewed Preferred Site Option B.1 (revised)

Stage 2 submittal requires 5/10 Year Masterplan updates

Educational Program

& Planning

Existing Conditions

SITE

• EPHS Site: 28.2 acres

• CTC Site: 4.5 acres

Total Site Area: 32.7 acres

BUILDING

• CTC Building: 43,081 GSF*

• EPHS Building: 240,047

GSF**

Total Building Area: 283,128 GSF

* from Jacobs Report

** from SLAM Facilities Cond. Assessment

Stage I Submission

• Enrollment:

1,600 students

• Proposed Program Area:

268,250 GSF

Stage II Current

• Enrollment:

1,600 students

• Proposed Program Area:

318,000 GSF (est.)

Differences between Stage I and Stage II:

• CTE programs

Removed Cosmetology Program

• Review Renovations of CTC Building

Early Childhood Education

Central office

Storage

• Commissary Kitchen

Draft Space Summary:

Organizational Diagrams: Adjacency Concept Diagram

Organizational Diagrams: Adjacency Concept Diagram

Organizational Diagrams: Hubs CTE or MAJOR ACADEMIC PROGRAM

ACADEMIC CLASSROOMS/LABS

SUPPORT

Critical Adjacencies

HUB’s form Integrated Learning Environments

CTE

Support

CTE or MAJOR ACADEMIC PROGRAM

ACADEMIC CLASSROOMS/LABS

Interior

Exterior access

Site and Building Plans

Option B.1 (Revised)

3 GROUPS

Group A -occupying northern portion of site

Group B –occupying eastern portion of site

Group C –occupying southern portion of site

GROUP B

GROUP AOPTION A.1

GROUP ANA

GROUP BNA

GROUP BOPTION B.1

GROUP COPTION C.1

GROUP COPTION C.2

2 Options

Additions & Renovations

3 Options

All New Construction

GROUP BOPTION B.2

GROUP AOPTION A.1

GROUP ANA

GROUP BNA

GROUP BOPTION B.1 (Rev)

GROUP COPTION C.1

GROUP COPTION C.2

2 Options

Additions & Renovations

3 Options

All New Construction

GROUP BOPTION B.2

GROUP B OPTION B.1(Revised) (All New)

• Strong Educational Diagram

• 3 story classroom Hubs/

neighborhoods (TBD)

• 2 separate entries and

drop-off zones

• Strong “Civic” relationship

to Pawtucket Avenue

• Close affinity to CTC

Building/Programs

Gymnasium

Service

Auditorium

MainEntrance

After HoursEntrance

CTE

Student Commons & Media Center

CTECTE

Fine Arts & Music

Transportation Technologies PLTW: Project Lead the Way Building Arts

Hospitality Specialty Sciences Communications Arts

Integrated Learning HUBs

GROUP BOPTION B.1 (Revised)Existing Site Aerial

GROUP BOPTION B.1 (Revised)

• Removes pool to locate school

closer to Pawtucket Avenue

• Majority of classrooms with

south or north facing exposure

• Stronger connection to

CTC/Administration Building

• Orientation creates improved

visibility from Pawtucket Ave

• 2 separate entries and drop-off

GROUP B SITE

OPTION B.1 (Revised)

Gymnasium

Service

Auditorium

MainEntrance

Gym/Public Events Entrance

CTE

Student Commons & Media Center

CTC (New Entrance)

CTE

CTE

Plaza

6 New Tennis Courts

Existing High School Tower Sign

Relocated Site Entrance /Exit

Exiting Site Entrance /Exit

New Turf Soccer Field

New Turf Softball Field

Renovated Track & Field

Renovated Baseball Field

Early Education Outdoor Play Space

Concession & Toilets Building

GROUP B SITE

OPTION B.1 (Revised)

• Fields with correct orientation for

play

• Clear view corridors for site

observation

• Works with current topography

• Expands current football field and

track to support multi-sport fields

• Existing Baseball Field can remain

• Opportunity for spectator seating

in slope along Pawtucket Ave for

soccer field

• Loop for bus circulation & security

• Sufficient tennis courts for

tournament play without lighting

ParentCirculation

Bus Circulation

Student Circulation

Mixed Circulation

RIPTA Bus Shelter

Student Parking

Staff & Visitor Parking

CTC/Admin Parking

Traffic Signal Modifications

GROUP B SITE

OPTION B.1 (Revised) –AM Circulation

• Segregates student traffic

• Encourages drop-offs to occur

on-site to reduce congestion and

improve safety on Pawtucket Ave

• Promote use of RIPTA Buses with

new bus canopy/shelter

• Keeps bus and parent drop-off in

front of school for safety and

security

ParentCirculation

Bus Circulation

Student Circulation

Mixed Circulation

RIPTA Bus Shelter

Student Parking

Staff & Visitor Parking

CTC/Admin Parking

Traffic Signal Modifications

GROUP B SITE

OPTION B.1 (Revised)-PM Circulation

• Segregated bus traffic w/

adequate queue length/stacking

on-site

• Encourages pick-ups to occur

on-site to reduce congestion and

improve safety on Pawtucket Ave

GROUP B SITE

OPTION B.1 (Revised)

Other Site Considerations

• One-way circulation to help control traffic

flow

• Outdoor Dining/Classroom/Study Areas

• Courtyard Areas between CTE wings

• Re-use of Existing Clock Tower

• Fence along Pawtucket Ave

• Other gates, barricades, etc. for safety and

traffic control

• Option to have baseball field and football

field and track renovations as Add-Alternate

GROUP B SITE

OPTION B.1 (Revised)

Site Elements

Site Elements

Site Elements

Gymnasium

Service

Auditorium

MainEntrance

Gym Public EventsEntrance

CTE

CTC (New Entrance)

CTE

CTE

Plaza

GROUP B SITE

OPTION B.1 (Revised)

New Track & Field

Renovated Baseball Field

New Turf Soccer Field

New Softball Field

Existing High School Tower Sign

New Site Entrance

Existing Site Entrance

6 New Tennis Courts

Early Education Outdoor Play Space

Concession & Toilets Building

Next Steps & Schedule

ScheduleToday

Questions?