East Clayton NCP Expansion Final Presentation · STUDY AREA N Institutional Clayton Heights ... Per...

5
STUDY AREA N Institutional Clayton Heights Secondary School Riparian Protection Area High Density Residential (22 - 45 upa) *See Note 8 6 AVENUE FR ER HI HWAY AS G 0 AV E 7 ENU E UE 72 AV N S 1 88 TR EET Detention Pond East Clayton Elementary School Clayton Park Proposed Commercial (Subject to Final Approval) W way alk W way alk Walkway Walkway y Walkwa S E 186 TRE T 0 7 AVENUE 84 ST EE 1 R T PARTIAL CLAYTON GENERAL LAND USE PLAN PARTIAL EAST CLAYTON NCP 8A V UE 6 A EN 9 AV E 6 ENU * Note: High Density Residential 22 - 45 upa with higher density (within the same density range) south of 68A Avenue cul-de-sac PROPOSED LAND USE PLAN OF THE STUDY AREA DRAFT DECEMBER 8, 2004 EAST CLAYTON NCP EXPANSION - West of 188 Street

Transcript of East Clayton NCP Expansion Final Presentation · STUDY AREA N Institutional Clayton Heights ... Per...

STUDY AREA

NN

Institutional

Clayton Heights

Secondary School

Riparian Protection

Area

High Density Residential

(22 - 45 upa)

*See Note

86 AVENUE

FRER HI

HWAY

AS

G

0 AV E7 ENU

E UE72 AV N

S188

TREE

T

Detention Pond

East Clayton

Elementary School

Clayton Park

Proposed Commercial

(Subject to Final Approval)

W wayalk

W wayalk

Wal

kway

Walkwayy

Walkwa

SE

186

TRE

T

0 7 AVENUE

84 S

TEE

1R

T

PARTIAL CLAYTON

GENERAL LAND USE PLAN

PARTIAL EAST CLAYTON NCP

8A V UE6 A EN

9 AV E6 ENU

* Note:High Density Residential22 - 45 upa with higher density (within the same density range) south of 68A Avenue cul-de-sac

PROPOSED LAND USE PLAN OF

THE STUDY AREA

DRAFTDECEMBER 8, 2004

EAST CLAYTON NCP EXPANSION - West of 188 Street

EAST CLAYTON NCP EXPANSION, WEST OF 188 STDRAFT AMENITY CONTRIBUTIONS

TotalTotal $ 1,171.20Per unit

$ 1,171.20Per unit

$ 1,186.59Per acre

$ 1,186.59Per acre

Library MaterialsLibrary Materials $ 124.80$ 124.80 N/AN/A

Fire ProtectionFire Protection $ 240.81$ 240.81 $ 963.57$ 963.57

Police ProtectionPolice Protection $ 55.55$ 55.55 $ 223.02$ 223.02

Parks and GreenwayParks and Greenway $ 750.04$ 750.04 N/AN/A

AmenityAmenityResidential Contribution

(Per Dwelling unit) (± 280 units)

Residential Contribution(Per Dwelling unit)

(± 280 units)

Non Residential Contribution

(Per Acre) (±3.75 acres)

Non Residential Contribution

(Per Acre) (±3.75 acres)

Surrey City Council’s policy is to require each new neighbourhood to contribute toward the provision of amenities inthe neighbourhood. The proposed amenity contributions for this East Clayton NCP Expansion area will be collected for each new dwelling unit and for each new institutional development on per acre basis. The money will be used toward park and greenway development and upgrading of fire, police, and library services.

* The per unit park amenity contribution will be used towards the following:

• Enhancement of the detention pond area;• Development and improvement of pedestrian trails; and• Development of the proposed east-west greenway along

the south side of the Clayton Heights Secondary School.