SAP EAM Release 3 Processes• Planning
• Contracts
• Material Requirements Planning
• Inventory / WMS-ACG
• Manufacturing
• STO Overview (Shadow)• Delivery and Shipment Process
• WMS-LE interfaces
• Freight Payment Process
• Inbound Delivery
Table of Contents
2
Direct Procure to Pay End to End
ET
MS
uppl
ier
Oth
er
Le
ga
cyS
AP
WM
S/A
DC
Determine Required Materials Make PO /STO Supplier Fulfillment and Trans Opt . Receive Material Receive Invoice Pay Invoice
Run Tactical
MRP
Review MRP
PRs/STRs
Convert /Create POs/STOs
Receive PO
Transportation Optimization & Load Building
ETMOptimized ?
Create Inbound
Delivery and Shipment
Create Inbound Delivery and
Shipment from ASN or Manual
Create Receipt Authorization
(WMS)
Create PO(ADC)
Receive Goods Confirmation(WMS/ADC )
Post Goods Receipt against inbound delivery
PO updated w /Confirmation
Material Picked Up
Invoice Receipt
(Some Vendor are ERS)
Pay Vendor
Create Invoice
Update Inbound
Delivery and Shipment
Schedule Appointment
Execute Sourcing Rules /flag exceptions
Generate Production Schedule
Auto Create
Planned Orders
Goods Received
(Fruit)
Post Goods Receipt
without PO
Invoice Information
Created(Fruit and
Grainsmart )
Record Goods Received
(CCDS , Hold It, MARS - lot trace )
52 week Planning
File/Report
Receive 52 week Requirements
Mai
ntai
n Co
ntra
cts
Ship Material
WMS site?
Yes
No
Yes
No
P2P End to End Process Flow
3
Plan FG inMIMI in weekly
buckets
FG planned orders
created in SAP
interface
Download schedulefrom MIMI into excel
sheet w/ macroGatorade only
Breakdown schedule forupcoming week fromweekly to daily level
Gatorade only
Use SAP planning table
to breakdown weeklyschedule into daily or
shift buckets
Planned orders in SAP are
in weekly, daily or shift
buckets
Delete past due ordersIn SAP
Monday and Tuesday Tuesday through Thursday
Plan FGs & some SFGs In AMAPS
in daily and/or weekly buckets
FG/SFG planned orderscreated in SAP
interfaceDelete past due ordersIn SAP
Quaker & Gatorade
Tropicana
interface
52 week Prod Schedule from MIMI / AMAPS to SAP
36245interface
Overview Planning – Production Schedule
5
Direct Procure to Pay End to End
ET
MS
uppl
ier
Oth
er
Le
ga
cyS
AP
WM
S/A
DC
Determine Required Materials Make PO /STO Supplier Fulfillment and Trans Opt . Receive Material Receive Invoice Pay Invoice
Run Tactical
MRP
Review MRP
PRs/STRs
Convert /Create POs/STOs
Receive PO
Transportation Optimization & Load Building
ETMOptimized ?
Create Inbound
Delivery and Shipment
Create Inbound Delivery and
Shipment from ASN or Manual
Create Receipt Authorization
(WMS)
Create PO(ADC)
Receive Goods Confirmation(WMS/ADC )
Post Goods Receipt against inbound delivery
PO updated w /Confirmation
Material Picked Up
Invoice Receipt
(Some Vendor are ERS)
Pay Vendor
Create Invoice
Update Inbound
Delivery and Shipment
Schedule Appointment
Execute Sourcing Rules /flag exceptions
Generate Production Schedule
Auto Create
Planned Orders
Goods Received
(Fruit)
Post Goods Receipt
without PO
Invoice Information
Created(Fruit and
Grainsmart )
Record Goods Received
(CCDS , Hold It , MARS - lot trace )
52 week Planning
File/Report
Receive 52 week Requirements
Mai
ntai
n Co
ntra
cts
Ship Material
WMS site?
Yes
No
Yes
No
P2P End to End Process Flow
6
• Contract Administration is an important part of the P2R process. Transactional Contracts are often based on a legal Contract and are created and maintained in SAP.
– There are several activities that occur around Contract Administration:
• Create and maintain a Contract.
• Approve a Contract.
• Manage Source Lists.
Transactional Contract Administration
7
• The notification to create or change a Contract should come from Global Procurement.
– The Buyer must first draft the Contract after negotiations with the vendor.
– The Contract Administrator then enters the information into SAP. The following prerequisites must be in place in order to complete this activity:
• Draft of contract from Global Procurement
• Material Master Record in the system
• Vendor master record in the system
Approve Contract
(if necessary)
Approve Contract
(if necessary)
Create/modify Contract
Create/modify Contract
PO Creation possible
PO Creation possible
Create Source List Record
(if necessary)
Create Source List Record
(if necessary)
Transactional Contract AdministrationContract Creation
8
• A Transactional Contract requires approval (or re-approval) when:
– A new Contract has been created.
– The cumulative change to the target value of an existing contract exceeds +/-10% from the last time the contract was approved.
• The Contract is invalid until re-approval.
– The approval of contracts is handled through SAP and workflow (Universal Worklist).
– When a contract is saved, the approval process is triggered.
Approve Contract
(if necessary)
Approve Contract
(if necessary)
Create/modify Contract
Create/modify Contract
PO Creation possible
PO Creation possible
Create Source List Record
(if necessary)
Create Source List Record
(if necessary)
Transactional Contract AdministrationContract Approval
9
Approve Contract
(if necessary)
Approve Contract
(if necessary)
Create/modify Contract
Create/modify Contract
PO Creation possible
PO Creation possible
Create Source List Record
(if necessary)
Create Source List Record
(if necessary)
• A source list identifies the Transactional Contract lines that can be used to source Purchase Orders for a specific material at a specific plant within a predefined period.
– There is one Source List for each material at each plant.
• Source List can have multiple line items.
– Within the Source List a specific record can be defined as:
• Fixed – Preferred sources over the validity period
• Blocked – The source may not be used for a certain period of time
• Relevant to MRP (Indicated with a 1) – MRP can use these records to assign a source to Purchase Requisitions.
Transactional Contract Administration Source List Overview
10
Transactional Contract Administration Source List Overview (cont.)
• Below is a source list for Barley Flour at Bridgeview. It contains four source list records (Contract line items). This means that there are four possible sources that can be used when creating POs for barley flour at Bridgeview.
Fix or Block
MRP Relevant
Different Source List Records (Contracts)
11
• Key Point:
– Contracts contain the required data to enable Purchase Order creation (releases) by the production facilities.
– IMPORTANT: A Purchase Order (PO) can NOT be created with out a valid Contract and Source List for that material/vendor/plant combination.
• Contract must be approved in order to be valid.
• Contracts must be kept up to date and accurate at all times to ensure PO created are correct.
Approve Contract
(if necessary)
Approve Contract
(if necessary)
Create/modify Contract
Create/modify Contract
PO Creation possible
PO Creation possible
Create Source List Record
(if necessary)
Create Source List Record
(if necessary)
Transactional Contract AdministrationKey Point
13
AD
C/Y
MS
WM
SL
ega
cy (
Site
sp
eci
fic)
SA
PL
ega
cy
Planned Production
Orders Created
Record Production of FG
Clear Production Backflush error log
(End of Shift)
Requirements Source/Produce SFG
Shift Batch Data
(ADC/YMS)
MaterialPlanning
Requirements
Source Materials
Confirm SFG
MARS data confirmation (MTP Only)
Report
Generate Production Schedule
Volume Information(Consumer Complaints)
QA Reporting
(Holdit)
Production Volume
(Test Weights, Cedar Only)
Change Inventory Location(Raw/Pack/SFG. Sites: Oakland, Blue Ridge,
Pryor, Bridgeview, Albany)
Production Receipt
(LPN applied)
Make SFG
Make FG
Clear Production Backflush error log(End of Shift)
Production Receipt
(Batch info as required)
Production Receipt(DCS)
Production Schedule(YODA,Cedar,
Danville)
Production FG,
(SCR/SCDB)
Stage Components
in storage Location
(Optional)
MARS data confirmation (MTP Only)
Confirm FG(End of shift)
Stage Components
(Optional)
Change Inventory Location(Raw/Pack. Sites: Oakland,
Blue Ridge, Pryor, Bridgeview, Albany)
Prod Schedule
(SCR/SCDB)
Create Planned Production Orders
Interface to downstream
systems
MRP IntroductionManufacturing End to End Process Flow
14
• What is MRP ?
• Process used to plan direct materials necessary to support the master production schedule. The goal of MRP is to balance the supply of materials with the demand for materials over time which drives optimum efficiency in inventory levels and enables productivity.
• “Right Material in the Right Place at the Right Time”
MRP Introduction
15
• At PepsiCo, the specific roles that are involved in MRP are:
– Material Planner / Scheduler: Role responsible for scheduling materials to the QTG plant to meet planned production.
– Central Material Planner: Role responsible for central material management by insuring supply is available at the supplier and coordinating across multiple locations.
– DC Re-packer/Display Material Planner: Role responsible for MRP for repack / display materials.
– Co-pack Material Planner / Scheduler: Role responsible for material planning for Co-packers.
MRP IntroductionRoles and Responsibilities
16
Generate Detailed
Schedule
Generate Master
Production Schedule
Continuous Improvement
Determine Run Strategy
• Material Requirements Planning Process
Update Tactical Planning
Parameters
Run Tactical MRP
Tactical Exception
Management
•Planner reviews planning parameters and makes an adjustment of requests adjustments through Data Maintenance Organization.
•Production plan is imported from Manufacturing Planning tool (PP&S) to SAP ECC.
•Tactical MRP generates material requirements for MPS horizon. (MRP is initiated by batch process or planner).
MRP Planners review exception alerts and take appropriate action to resolve exceptions.
Material Requirements Planning OverviewPlanning Process
17
• Planned Orders from MP
• BOM recipes, Material Master Data
• Raw material safety stock targets
• Inventory Balances
• Transactional data (open PO’s, ASN)
Key Inputs
Material Requirement
Planning
• Purchase requisitions by material SKU/location ready to convert to purchase orders
• Visibility to MRP requirements for 52 week horizon
• STO’s for materials utilizing special procurement type
Key Outputs
Material Requirements Planning OverviewKey Integration Points
18
MRP - BOM
BR81464Chep Pallet
BR98323Single StrengthOrange Juice
BR17967CCarton
BR11133Corrugate
BR16618Fitment(Cap)
64oz Bottle Tropicana Pure Premium Orange JuiceBR1004850000102
Bill of MaterialBill of Material
19
FG,SFG PlannedOrders
From ProductionSchedule
FG,SFG PlannedOrders
From ProductionSchedule
Generate Planned Orders
Generate Planned Orders
2 3
Create Stock Transport
Order
Create Stock Transport
Order
Create Purchase
Order
Create Purchase
Order
Manufacturing Planning
Material Requirements Planning
Direct Purchasing
1
2
4a
4b
Generate Purchase
Requisition
Generate Purchase
Requisition
Generate StockTransferRequest
Generate StockTransferRequest
Run MRPRun MRP
2
2
4 5
4 5
MRP Introduction Process Flow Overview
20
•Planner reviews planning parameters and makes an adjustment or requests adjustments through Data Maintenance Organization.
•Production plan is imported from MIMI.
•MRP is initiated by batch process or planner.
• MRP generates material requirements for Master Production Schedule horizon.
•Planned Orders and Purchase Requisitions are generated based on finished goods demands.
•MRP Planners review exception alerts and take appropriate action to resolve.
•Planner reruns MRP if necessary or continues planning activities.
Run MRP ? Run MRP ?
BOMs &MRP
Parameters
BOMs &MRP
Parameters
Generate Planned Order /Purchase
Requisitions
Generate Planned Order /Purchase
Requisitions
3 ReviewExceptions/
Take Action if Necessary
ReviewExceptions/
Take Action if Necessary
5a
Run MRPRun MRP
21 4
4 5bFG ScheduleFG Schedule
1a
5
Y N6
6Review Next Material/Continue
Planning Activities
Review Next Material/Continue
Planning Activities
6 5
MRP IntroductionProcess Flow Overview
21
Enterprise WideSystem
Purchasing and production information flows directly into the tool. No more separate data entry for inventory or vendor updates.
Data Management Additional data will be required to coordinate the enterprise system. Some data will be locally controlled; some will be centrally managed.
Exception Based Alerts
Critical task alerts trigger activity in the time frame set by the material planner.
Advanced MRPCapabilities
Enables the Planner to execute a Single-item Multi-level MRP run; restrict the planning run to a net change within the planning horizon;systematically prevent weekend scheduled deliveries if needed;and provides the ability to perform ad-hoc MRP runs.
SAP Numbering System
Numbering system and descriptions of materials have been changed.New nomenclature will have to be learned.
Drill Down within theTool
The tool can help lead you through your analysis.
SAP Material MasterUse Up Logic
Enables a systematic approach to manage run out of on hand material inventories, reducing material obsolescence.
Key Changes Impacts
MRP IntroductionKey Changes and Impacts
23
Run MRP ? Run MRP ?
BOMs &MRP
Parameters
BOMs &MRP
Parameters
Generate PlannedOrders/Purchase
Requisitions
Generate PlannedOrders/Purchase
Requisitions
1
3 ReviewExceptions/
Take Action if Necessary
ReviewExceptions/
Take Action if Necessary
5a
Run MRPRun MRP
21 4
4 5bFG ScheduleFG Schedule
1a
• To perform the activities above a material planner needs the ability to view MRP results.
– In the new system MRP results are viewed in the Stock/Requirements list and the MRP List.
– Both lists provide the planner with a detailed view of the supply and demand situation for a material to identify any problems.
5
Y N6
6Review Next
Material/Continue Planning Activities
Review Next Material/Continue
Planning Activities
6 5
Stock/Requirements List and MRP ListViewing MRP Results
24
Key Change Benefit• Key changes to viewing MRP results are:
– Data format
• Data organized vertically, not horizontally.
– Exception Messages
• Exception messages are created by changes in supply or demand without re-running MRP.
– Screens ease navigation
• Stock/Requirements List replaces screen types like SDDQ or 23.13.
• All key data within one screen.
Stock/Requirements List and MRP List Viewing MRP Results
25
Data Vertical
vs.Horizontal
Header Info
Organized Differently
Old ViewMMS 23.13
New View
Safety Stock is
Subtracted from the Available Quantity.
Stock/Requirements List and MRP ListViewing MRP Results
26
1.Stock
3. Purchase Requisition
4. Planned Order5. Dependent
Requirement
2.Safety Stock
Stock/Requirements List and MRP List Viewing MRP Results
27
• The Stock/Requirements List and the MRP List provide two ways to view MRP results.
• These lists are detailed views of the supply and demand for a material to identify any problems.
– The Stock/Requirements List is a real-time list that is continually updated with demand requirements, inventory adjustments, and exception messages. It does not display MRP termination messages or new planned order exception messages.
– The MRP List is a static list that is updated at the time of the last MRP run and it does display exception messages for new or changed planned orders and MRP termination messages.
Stock/Requirements List and MRP ListViewing MRP Results
29
• A key component of the stock/requirements list and the MRP List are exception messages. – Exception messages are alerts that notify the material
planner of issues with a material.– Planners need to determine if exception messages
require action and take corrective action if necessary.
Run MRP ? Run MRP ?
BOMs &MRP
Parameters
BOMs &MRP
Parameters
Generate PlannedOrders/Purchase
Requisitions
Generate PlannedOrders/Purchase
Requisitions
3 ReviewExceptions/
Take Action if Necessary
ReviewExceptions/
Take Action if Necessary
5a
Run MRPRun MRP
21 4
4 5bFG ScheduleFG Schedule
1a
5
Y N6
6Review Next Material/Continue
Planning Activities
Review Next Material/Continue
Planning Activities
6 5
Exception Messages Exception Messages Definition
31
2. Exception Message Text will
Display at Bottom of
Screen
1. Double Click on
the Exception Message Number
Exception Messages Stock/Requirements List
32
1. MRP List exceptions are similar
to the Stock Requirement
s List but include new
planned order
exceptions and
termination messages.``
2. Order proposal has been changed.
Exception Messages MRP List
33
• Exception message groups are used to define traffic lights. – Traffic lights are red, yellow, green symbols used to prioritize
exceptions. – Traffic lights appear on both Stock/Requirements List and the MRP
List in the collective display.
1. Exception Message Group
2. Associated Traffic Light
3. Click on Define Traffic Lights to
access Traffic Light Settings
Exception Messages Traffic Lights
36
• The two options to execute MRP are:
– Batch Process – scheduled MRP run (nightly).
– On-line Planning Run – MRP on demand (ad hoc).
1
5a3c4 Run MRP ? Run MRP ?
BOMs &MRP
Parameters
BOMs &MRP
Parameters
Generate PlannedOrders/Purchase
Requisitions
Generate PlannedOrders/Purchase
Requisitions
3 ReviewExceptions/
Take Action if Necessary
ReviewExceptions/
Take Action if Necessary
5a
Run MRPRun MRP
21 4
4 5bFG ScheduleFG Schedule
1a
5
Y N6
6Review Next Material/Continue
Planning Activities
Review Next Material/Continue
Planning Activities
6 5
Generating MRP - MRP Run
37
• For all QTG locations the automatic batch process schedule is: – Nightly (net change) Batch Process – Weekly (regen) Batch Process – The MRP batch process runs plant by plant until all plants are
complete.
Run Definition Frequency Schedule
Net Change Plan materials that have changed since the last planning run.
Daily M-F
Regen Re-plans all materials. Weekly Sunday
No Run Saturday
Generating MRP - Batch Process
38
Generating MRP - On-line MRP Run
• The reasons for executing an on-line MRP run are:
– An adjustment in inventory (inventory change, product on hold, receipt change, actual usage).
– Updated parameters from the DMO.
– Updated parameters by local planner.
– Updated/new production plan is loaded.
39
Generating MRP - Generate MRP Planning Run
• You have three choices to generate an on-line MRP run.
1. MRP by MRP controller• Run MRP by controller number.
• Run MRP for the entire plant.
2. Single-Item, Multi-Level MRP • Run MRP through all levels of the BOM for a finished good, semi-finished good.
3. Single-Item, Single-Level MRP• Run MRP for a single material.
After selecting the MRP run there are three “process key” choices.
–Net change for planning horizon (NETPL), planning horizon is 28 days.
–Net change for total horizon days (NETCH)
–Regenerative planning (NEUPL)
41
MRP Material Master Planning Parameters
• MRP parameters are settings that ensure the material master record accurately reflects the relevant business requirements.
• Material planners will be required to access, review, and update the material master to change the MRP parameters as necessary.
• Conditions which may necessitate a planner to review and/or update parameters include:– Supply impacts – supplier reliability increases leading to a decrease
in safety stock.– Ordering Parameters – delivery days change. – New products – new material added and need to set parameters.
• Any necessary adjustments must take place prior to the MRP run to reflect the changes in MRP output.
42
– The MRP parameters are found on the MRP material master views (MRP 1,2,3,4 tabs ).
MRP Material Master MRP Material Master Views
44
Direct Procure to Pay End to End
ET
MS
uppl
ier
Oth
er L
egac
yS
AP
WM
S/A
DC
Determine Required Materials Make PO/STO Supplier Fulfillment and Trans Opt. Receive Material Receive Invoice Pay Invoice
Run Tactical
MRP
Review MRP
PRs/STRs
Convert/Create POs/STOs
Receive PO
Transportation Optimization & Load Building
ETMOptimized?
Create Inbound
Delivery and Shipment
Create Inbound Delivery and
Shipment from ASN or Manual
Create Receipt Authorization
(WMS)
Create PO(ADC)
Receive Goods Confirmation(WMS/ADC)
Post Goods Receipt against inbound delivery
PO updated w/Confirmation
Material Picked Up
Invoice Receipt
(Some Vendor are ERS)
Pay Vendor
Create Invoice
Update Inbound
Delivery and Shipment
Schedule Appointment
Execute Sourcing Rules/flag exceptions
Generate Production Schedule
Auto Create
Planned Orders
Goods Received
(Fruit)
Post Goods Receipt
without PO
Invoice Information
Created(Fruit and
Grainsmart)
Record Goods Received
(CCDS, Hold It, MARS - lot trace)
52 week Planning
File/Report
Receive 52 week Requirements
Mai
ntai
n Co
ntra
cts
Ship Material
WMS site?
Yes
No
Yes
No
STO Processing Overview P2R End to End Process Flow
45
• All intra-company material transfers in SAP will be managed through the Stock Transport Order (STO) process. The inventory transfers process addresses the intra-company transfer of finished goods, semi-finished goods and raw materials inventory.
• Today, a STO at Quaker is referred to as a Mill Transit and at Tropicana as a Transfer Order.
STO Processing Overview
46
STO Processing Overview Roles and Responsibilities
• At PepsiCo, the specific roles that is involved in the raw material, semi-finished and Finished good Stock Transport Order process is:
– Raw / Semi Material Stock Transport Order (STO) Processor: The Raw Material Stock Transport Order Processor is responsible for creating Stock Transport Orders (STOs) that facilitate the transfer of direct materials from plant to plant. This
profile deals only with raw and semi-finished goods transfers.– Finished Goods Stock Transport Order Processor -
The Finished Goods Stock Transport Order Processor profile is responsible for manually entering STO’s for the movement of finished goods and possibly semi-finished goods between facilities.
47
• Deployment Scenarios
• Key terms
• The Basics
• The Shadow Order Concept / Interfaces
• Tropicana Shadow Interfaces
• Quaker/Gatorade Shadow Interfaces
• STO Document types and Description
• STO Deployed to Deployed FG
STO Overview (Shadows)
48
• Scenario 1: Deployed to Non-Deployed
• Scenario 2: Non-Deployed to Deployed
• Scenario 3: Non-Deployed to Non-Deployed
• Scenario 4: Deployed to Deployed
• End to End STO Process Flows
https://teamwork.pepsico.com/eRoom/anchor/ProjectOneUpQTG2CrossTeam/0_be33e
STO Shadows only occur for Scenarios 1, 2, and 4.
• SAP does not receive shadow orders for Scenario 3, the process remains the same between 2 non-deployed sites, they continue to use legacy processes and the transactional information is entirely contained within legacy.
Deployment Scenarios
49
STO Processing Overview Key Terms (1 of 2)
• Outbound Monitor: Used to provide visibility to all outbound stock transport orders and sales orders. Details of the order, delivery and shipment documents are viewed in the outbound monitor.
• Source List: Master data element that links a specific material/plant to a contract line or supplying plant.
• Stock Overview Report: SAP report that provides the user with current information on the stock of a particular product at all organizational levels. It displays the quantities of the product at each storage location or site, and the inventory status of the stock.
50
STO Processing Overview Key Terms (2 of 2)
• Stock Transport Order (STO): A purchasing document used to accomplish the transfer of Raw Materials (RM), Semi-Finished Goods (SFG), and Finished Goods (FG) materials between PepsiCo locations.
• Stock Transport Requisition (STR): A type of purchase requisition that is used to represent the planned transfer of materials between plants (for semi-finished goods only).
• Storage Location: The physical or virtual location within a plant where the material is stored (Warehouse, etc.) within SAP.
• Plant: In SAP, the distribution centers, mixing centers, and all warehouses are considered plants.
51
• Shipment Document: Expands the order document with transportation relevant information such as mode of transportation, carrier assignment, appointment times, shipment status and contains the transportation data that is downloaded to the WMS.
• Delivery Document: The Delivery Document includes the SKU (slash code), weight/volume, and contains the item details information that is downloaded to the WMS. The delivery is updated after shipping with actual shipped quantities and ship date. (Warehouse Instructions)
• The delivery document is created from information on the sales order and STO before the pick, pack, ship process. After product is picked, packed and shipped, it is updated to reflect exact items that were shipped to the customer.
STO Processing OverviewKey Terms (3 of 3)
52
The Basics
– SAP Term: Stock Transport Order = STO– Legacy Q/G Term: Mill Transit Order = MTO– Legacy Trop Term: Transfer Order = TO
– Q-DCS or QDCS: Quaker/Gatorade’s version of DCS. Known to Q/G Legacy only as DCS. Inventory system for finished goods and semi-finished goods. Interfaces to WMS systems and financial systems, and M204.
– T-DCS or TDCS: Tropicana’s version of DCS. Known to Trop Legacy only as DCS. Contains finished good inventory, and feeds other types of orders (besides STOs) to Legacy Financial systems. Interfaces to WMS systems and financial systems, and M204.
– DCS is the planning system until R4 tools are live, and is financial book of record for inventory until P1 2009
– STOs move materials between locations; Release 3 deployment moves more and more plant-to-plant movements as STOs as more locations become “live.”
• To begin, intra-division movements will be STOs (QG to QG, Trop to Trop)• Inside divisions, Finished Goods (FG) and Semi-Finished Goods (SFG) will be STOs • Canada and Mexico produced FG’s to US locations• GGCS SFG’s to US locations
53
The Shadow STO Concept
• STO Shadows often use the following lingo: “Shadowing” “Shadow Order” “The Order is Shadowed to DCS” “We received a shadow order in SAP” “Writeback” “Sent a writeback/received a writeback”
• The design of the STO Shadows is to keep the planning system and financial book of record in sync with SAP until SAP becomes the financial book of record.
• The design also allows STOs to be seamlessly shipped and received between locations that are non-deployed and deployed, without dual entry and without user intervention or knowledge in some cases.
• The generation and routing of the shadow STO is govern by these four main items:• Deployment Scenario: determines the system that “owns” the order
• SAP Logic & STO Order Types: determines what IDOCs are sent to middleware
• Middleware (aka, TIBCO, which is the software provider name): receives IDOC, determines the type of message that gets sent; stores cross-reference between the 2 systems
• FMS Server: holds the files from middleware for DCS to pick up and process– Outbound files from SAP to DCS are not processed by DCS immediately – there is a batch
schedule for SAP to send them to FMS, AND a batch schedule for DCS to pick up & process them. (aka, “SAP to DCS Train Schedule” is in the works)
– Incoming files from DCS to SAP are processed immediately – however, there is a batch schedule for DCS to send them. Once received by SAP, they are processed immediately.
54
STO Document Types
Code Document TypeType of
goodsETM Optimized? How is it created?
Shadows to Q-DCS / T-DCS
CASS pays freight?
ZBT STO - Bulk Tanker FG No User-created Yes-ZNE5 Yes
ZDIV STO - Diversion FG No User-created Yes-ZNE5 No
ZLG STO - Load and Go FG No User-created Yes-ZNE5 Yes
ZMI STO - Manual Intermodal FG Yes* User-created Yes-ZNE5 Yes
ZMR STO - Manual Rail FG No User-created Yes-ZNE5 Yes
ZMT STO - Manual Truck FG, SFG Yes* User-created Yes-ZNE5 Yes
ZPR STO - Planned Rail FG No User-created Yes-ZNE5 Yes
ZPS STO - Planned Standard FG Yes* System-created Yes-ZNE5 Yes
ZRO STO - Raw Freight Optimized RM, SFG Yes* User-created No Yes
ZUB STO - Raw/Semi RM, SFG No User-created No Yes
ZRD STO - Receipt DiscrepanciesRM, SFG,
FGNo System-created Yes-ZNE5 No
ZSDW STO - Shadow SFG, FG No System-created Yes-ZNE5 Yes
ZMQ STO - Shuttle CASSRM, FG,
SFGNo User-created Yes-ZNE5 Yes
ZMS STO - Shuttle Local FG No User-created Yes-ZNE5 No
ZMO STO - Manual Ocean** SFG No User-created No Yes
FG – Finished Goods; SFG – Semi-Finsihed Goods; RM – Ram Materials *Optimized if the shipping location uses ETM to plan shipments** 30 day transport (Cork and Cidra to Saddle Creek
55
STO Document Type Description
CodeDocument
TypeDescription
ZBT Bulk Tanker The STO Bulk Tanker is used for liquid shipments when an over-the-road bulk tanker trailer will be used to transport the goods. The materials will shadow to QDCS or TDCS
ZDIV Diversion The STO Diversion is used when an in-transit load has been diverted to another facility. See the Diversion Job Aid.
ZLGLoad and
Go
The STO Load and Go is created in Quaker or Gatorade production facilities when the WMS Load and Go functionality will be used to load outbound shipments directly from the production line. The materials will shadow to QDCS to keep book of record and planning systems in sync with SAP.
ZMIManual Intermodal
The STO Manual Intermodal is used for finished good shipments for Intermodal carriers and lanes. The load will be sent to ETM for optimization, and the materials on the order will shadow to TDCS or QDCS to keep book of record and planning systems in sync with SAP
ZMR Manual RailThe STO Manual Rail is used for finished good and semi-finished good rail shipments. This order type is created manually by the user, and is not converted from a rail plan document. The materials on the order will shadow to QDCS or TDCS to keep book of record and planning systems in sync with SAP
ZMTManual Truck
The STO Manual Truck is used for finished good and semi-finished good over-the-road truckload or LTL shipments. The load is sent to ETM for optimization, and the materials on the order will shadow to TDCS or QDCS to keep book of record and planning systems in sync with SAP.
ZPR Planned RailThe STO Planned Rail is used for finished goods rail shipments. This order type is created exclusively for the Tropicana rail network in the Rail Load Builder Monitor, and is converted from a rail plan document. The materials on the order will shadow to TDCS to keep book of record and planning systems in sync with SAP.
ZRORaw Freight Optimized
The STO Raw Freight Optimized is used for Raw or Semi-Finished Goods orders when the load will be sent to ETM for transportation planning and optimization. The materials will not shadow to QDCS or TDCS.
ZUB Raw/SemiThe STO Raw/Semi is used for raw material and Tropicana semi-finished shipments. The load is not optimized by ETM and the materials do not shadow to any book of record or planning systems.This is the most common order type for raw material shipments, and for Tropicana semi-finished good shipments
ZRDReceipt Discrepancies
The STO Receipt Discrepancy document is created by the Receipt Confirmation interface when a discrepancy that includes an additional line item is recorded at the receiving facility.
56
STO Document Type Description
CodeDocument
TypeDescription
ZSDW ShadowThe STO Shadow is created by the QDCS or TDCS Shadow order interfaces when a non-deployed shipping location creates an STO order in QDCS or TDCS for a deployed receiving location.
ZMQ Shuttle CASS
The STO Shuttle CASS is used for two different scenarios:Finished Goods – The STO Shuttle CASS is used for local shuttle shipments. The materials on the order will shadow to TDCS or QDCS to keep book of record and planning systems in sync with SAP. Quaker / Gatorade Semi-Finished Goods – The STO Shuttle CASS is used for non-ETM-optimized truck shipments of semi-finished goods. The materials on the order will shadow to TDCS or QDCS to keep book of record and planning systems in sync with SAP.In both cases, the freight bill for the shipment is paid via CASS
ZMS Shuttle Local
The STO Shuttle Local is used for local shuttles of finished goods. The materials on the order will shadow to TDCS or QDCS to keep book of record and planning systems in sync with SAP.The freight bill is paid locally by the facility.
ZMO Manual Ocean**
The STO Manual Ocean is used only by Semi-Finished Goods Planners who are converting STRs to STOs for GGCS Shipments from PCTI Suppliers inbound to Saddlecreek. This document uses the lead time in the GGCS material master record to be used as the route, which allows for sufficient planning and transportation time to get the product to the receiving facility.
58
• Inventory Management (IM) and Integration with other SAP Modules
• SAP IM interfaces (WMS/ADC)
• Inventory Reconciliation between SAP-WMS-DCS systems
Agenda
59
Inventory Management : Overview
1. Goods Movement: Concept of Movement TypeWhen you enter a goods movement in the system, you must enter a movement type to differentiate between the various goods movements. A movement type is a three-digit identification key for a goods movement.
• Transactions resulting in a change in stock:• Goods receipt - A goods receipt (GR) is a goods movement with which the receipt of goods from a vendor or from
production is posted. A goods receipt leads to an increase in warehouse stock.
• Goods issue -A goods issue (GI) is a goods movement with which a material withdrawal or material issue, a material consumption, or a shipment of goods to a customer is posted. A goods issue leads to a reduction in warehouse stock.
• Stock transfer - A stock transfer is the removal of material from one storage location and its transfer to another storage location. Stock transfers can occur either within the same plant or between two plants.
• Transfer posting - A transfer posting is a general term for stock transfers and changes in stock type or stock category of a material. Examples of transfer postings are: Transfer postings from material to material; Release from quality inspection stock
• When posting a goods movement in the SAP System, the following documents are created:– Material document
• In the Inventory Management system, when a goods movement is posted, a material document is generated that serves as proof of the movement and as a source of information for any applications that follow.
• A material document consists of a header and at least one item. The header contains general data about the movement (for example, its date). Each item describes one movement.
– Accounting document • If the movement is relevant for Financial Accounting (that is, if it leads to an update of the G/L accounts), an
accounting document is created parallel to the material document.
Inventory Management comprises of 3 main tasks:
60
Inventory Management : Overview (Contd)
2. Management of material stocks on a quantity and value basis
• Managing Stocks by Quantity
• Gives an overview of the current stock situation of any given material at any time.
• Managing Stocks By Value
• The system automatically updates the following data each time there is a goods movement:
• Quantity and value for Inventory Management
• Account assignment for cost accounting
• G/L accounts for financial accounting via automatic account assignment
3. Carrying out the Physical Inventory
• This component allows you to carry out a physical inventory of your company’s warehouse stocks for balance sheet purposes
61
IM integration with other SAP Modules
Inventory Management is part of the Materials Management module and is fully integrated in the entire logistics system
62
Key Data elements of IM
1. PLANTo A physical location within a
company, where materials are stored, manufactured, purchased or sold
Settings in IM for plant include whether to turn on shelf life
expiration check at the time of goods receipt if the Goods movement has it set.
Stock type for which physical inventory should be carried out.
2. MATERIAL TYPE
When creating a material master record, you must assign the material to a material type. The material type is a key that assigns the material to a logical group such as semi-finished goods or finished goods.
63
Key Data elements of IM
3. STORAGE LOCATIONThe business entity / function within a Plant
that houses either the raw material, semi or finished products. It could be a
physical or a logical location
4. BATCHMaterials that require such precise identification, for example pharmaceutical products, are identified and managed in stock not only according to material number, but also according to batch number.
Storage Location Description
0001 Raw Materials
0002 Staging
0003 Manufacturing
0004 Warehouse
0005 Whse Inv Hold
0006 Whse Expired
0007 Whse Damaged
0008 Whse QA Hold
64
Key Data elements of IM
Finished goods category
Base UoM
Alt UoMs Proportional UoMs
Examples
Finished Goods (ZFIN) EA – Each CS – Case
PAL – Pallet
Single bottle of GatoradeCase of Gatorade 6 packs
One layer on a palletCap’n Crunch Pallet
Packaging Good (ZPKG)
EA
CYLLB (or IN)RL
RollStock
Semi-Finished Goods (ZSFG)
TPS TGL*GAL
Tropicana Juice
5. UNIT OF MEASURE (UoM)
* Concept of Brix Value
65
Key Data elements of IM
6. Inventory Status
Stock Status notes
Unrestricted use available for general use
Qual. inspectionblocked from being used in SOs, but available for STOs.
Returns available for use in returns only
Blocked not available for general use
66
Stock Overview - Key Data Elements
SAP Unrestricted Status andWarehouse Storage Location
= DLx SHIP Status
SAP Unrestricted Status andWarehouse Storage Location
= DLx SHIP Status
SAP Quality Inspection Status andWarehouse Storage Location
= DLx INCB Status
SAP Quality Inspection Status andWarehouse Storage Location
= DLx INCB Status
SAP Blocked Status andWhse Expired Storage Location
= DLx EXPR Status
SAP Blocked Status andWhse Expired Storage Location
= DLx EXPR Status
SAP Blocked Status andWhse Damaged Storage Location
= DLx DMGD Status
SAP Blocked Status andWhse Damaged Storage Location
= DLx DMGD Status
SAP Blocked Status andWhse QA Hold Storage Location
= DLx QAHD Status
SAP Blocked Status andWhse QA Hold Storage Location
= DLx QAHD Status
67
Batch Number – Data Element
WMS FieldsWMS Fields
ITEM_NUM
LOT_NUM (12 Char)
WH_ID
SAP Batch Number (10 Char)SAP Batch Number (10 Char)
Quaker/Tropicana/GatoradeSAP Batch Number = MMDDYYPP, where MMDDYY = Mfg Date or Exp Date and PP = Plant Designator Code
Quaker/Tropicana/GatoradeSAP Batch Number = MMDDYYPP, where MMDDYY = Mfg Date or Exp Date and PP = Plant Designator Code
Quaker/GatoradeLot Number = MMDDYYPP, where MMDDYY = Mfg Date andPP = Plant Designator Code
Quaker/GatoradeLot Number = MMDDYYPP, where MMDDYY = Mfg Date andPP = Plant Designator Code
TropicanaLot Number = MMDDYYPPLSHH, where MMDDYY = Exp Date,PP = Plant Designator Code,L = Line, S = Shift, and HH = Hour
TropicanaLot Number = MMDDYYPPLSHH, where MMDDYY = Exp Date,PP = Plant Designator Code,L = Line, S = Shift, and HH = Hour
68
SAP / WMS Inventory Management Interfaces
InventoryManagement
Interfaces
InventoryManagement
Interfaces
69
Manufacturing Integration – Production Receipts
Production Receipts (Cal ID # 33501)
– For sites with a WMS, finished goods inventory will be transferred from manufacturing to the warehouse via production receipt interfaces
Finished goods inventory in SAP will be managed at the plant, item, lot, and inventory status level.
The production receiving process will create the lot (SAP batch) and post the inventory to the SAP batch and inventory status.
Each pallet of finished goods that is received in WMS will be transferred to the SAP warehouse inventory. At the end of the shift, the manufacturing production confirmation process will transfer the legal entity/product cost to the warehouse.
Reconciliation will be done at the end of each shift instead of each day. An SAP shift reconciliation report will compare the production confirmation quantities to the WMS received quantities. Inventory differences will be reconciled by both departments.
The production receipt reversal interface will transfer inventory back to manufacturing for rework if needed.
– For sites without a WMS, finished goods inventory will be manually transferred from manufacturing to the warehouse within SAP
The transfer will be done prior to the production confirmation (once per shift or once per day).
No reconciliation report will be required since all inventory activity will be executed in SAP.
70
Manufacturing Integration – Lot number
Lot number
– Since SAP will manage inventory at the lot level, the WMS lot number will be used to create the SAP batch number
For Quaker/Gatorade sites, the lot number format in WMS will be the same as the batch number format in SAP.
For Tropicana sites, the lot number format is larger than the SAP batch number field, so only the first 8 characters of the lot number will be used to create the SAP batch number.
The manufacturing date and expiration date values will also be stored on the SAP batch number.
71
Incubation Management
• The incubation management process will leverage SAP functionality to provide better inventory visibility and streamline incubation releases
Incubation settings for an item will be stored on the SAP material master.
When these items are received from manufacturing, an SAP inspection lot will be created and the inventory will be stored in quality inspection status.
The inspection lot will provide visibility to the expected incubation release date to the planning systems.
For Quaker/Gatorade WMS sites, a new interface will send an inventory status change to WMS to release the lot from incubation or block the inventory if incubation checks fail. This will replace the manual incubation status change in WMS.
For Tropicana WMS sites, existing DLx quality management applications manage the incubation release and will send the inventory status change to SAP.
72
Physical Inventory Counting
For sites with a WMS (DLx/EDI), the inventory counting process will continue to be executed in WMS ABC count indicators will be updated in SAP once per quarter and
downloaded to DLx via the item master interface. Values can be overridden in SAP or DLx as needed.
Once inventory counting has been conducted and reconciled, results will be sent to SAP and inventory adjusted as required.
For sites without a WMS, the inventory counting process will be executed in SAP The SAP inventory counting process will be similar to the WMS process.
Cycle counts will be scheduled based on the ABC count indicators. Count sheets will be generated by SAP. Count result entry screens and inventory difference evaluations will be
available in SAP. Inventory counting will be managed at the plant, item, lot, and inventory status
level.
73
Cycle Count based on ABC Indicators
ProcessPhysical Inventory Documents for materials with ABC Indicators will be created for Tropicana by an automatic weekly batch process based on the count frequency determined. Any desired changes to the cycle processes will need to be managed through the Data Maintenance Organization (DMO).
Users will not need to create Physical Inventory Documents as the document will be created by the weekly automated batch process. Users will simply need to identify which Physical Inventory Documents were created via the batch process and print the Physical Inventory Documents.
74
Physical inventory – Process Flow Overview
• Inventory Planner creates and prints count sheets from SAP
• Inventory is physically counted and recorded
• Material counts are entered in SAP
• Material variances are verified and posted in SAP
Enter Inventory
Count
Post Inventory
Differences
Create Physical Inventory Document
Print Physical Inventory Document
Count & Record Inventor
y
Initiate Recount
, if Needed
Show results of
post transaction
- SAP transaction
- Non SAP System
- Manual Process
LEGEND
75
SAP / WMS Inventory Management
SAP ItemType
WMSInventory
Status
WMSHost
Location
SAPStorageLocation
LocationType
1SHP
0001Raw
Materials
BULKBulk Material
Storage
0002Staging
0003Manufacturing
0004Warehouse
0005Whse Inv
Hold
0006Whse
Expired
0007Whse
Damaged
0008Whse QA
Hold
0009WhseDWIP
BSTGBulk Material
Staging
PRODProduction
DWIPDisplay
WIP
WHSEWarehouse
WHSEWarehouse
WHSEWarehouse
WHSEWarehouse
WHSEWarehouse
1DMG1EXP1HLDZQAH
1INS
SHIPSHIPALTCRFID
INCB
SHIP
BLOKCASHDESTFDHDFDBKINSP
RHLD
EXPRSECM
WEXP
DMGDSECD
1SHP
1DMG1EXP1HLD
1INS
CRTN
0009WhseDWIP
DASMDisplay
Disassemble
QAHD
SHIP
ZINGZPKG
ZSFGZFIN
Production Line Display LineWarehouse StorageWarehouse
Storage
SAP / WMS Inventory Management SAPUnrestricted
SAP QualityInspection
SAPBlocked
SAPReturn
76
Future Balancing Process
Changes in DLX/DCS Balancing & SAP addition
SnapshotICS ensures all Inventory Variances documented on both Snapshot(s) daily are resolved in the course of balancing each day. Batch level on SAP Snapshot vs. UPC Level DCSInventory Status Changes/Storage Locations overview Reports used include:
WMS/DCS Snapshot Discrepancy Report WMS/SAP Snapshot Exception ReportMeasles Exception Reports247 Inventory Transfer Register (201/300/301) (DCS)Shipment Notification Report (DCS)243 Inventory Adjustment Register (101/400/401/502/503)235 Inventory Receipts Control Register (100)
Exception Reasons – handlingAny exceptions found in balancing shipments/mills/receiving/production/inventory
transactions as outline in previous slides and new SAP nuances as discussed.99/98 location clearing daily Research and resolution through variety of means not captured in previous steps
77
Manufacturing Process
Production Master Data
Material Master BOM Work Center Routing Production Version
Production Process Production Confirmation - GR, GI and time Batch Management Incubation Interfaces
Production Execution Post Production
Period End closing - Variances, WIP, OH and settlement Reconciliation - mfg and WMS Reporting
Demand Planning - Planned orders
78
Material Master Data
• The Material Master contains information on materials that a company manufactures, procures, stores and sells. The information is stored in a database that is a central source of data on materials.
• ECC is the repository for all the master data including customers, vendors, purchasing, etc.
• There are 29 views available in the material master and 5 of these are custom views, specific to PepsiCo.
• Manufacturing is affected by the most views in the material master, some of them being - Basic 1&2, MRP 1-4, PepsiCo 1&2, Work Scheduling, Plant Stock, Plant data 1&2, Accounting 1&2, Costing 1&2.
79
Bill Of Materials(BOM)
• A bill of material is a complete list of components that make up a product or assembly. The list contains material #, description, quantity and unit of measure for each component.
• BOMs can exist at the Plant or client level
BR81464Chep Pallet
BR98323Single StrengthOrange Juice
BR17967CCarton
BR11133Corrugate
BR16618Fitment(Cap)
64oz Bottle Tropicana Pure Premium Orange Juice (BR1004850000102)
81
WORK CENTER
• Location (Production Line) at which a particular operation is executed
Work center 1
WC 2 WC 3
WC 4
WC 5
Work center 6
Bridgeview Near East Plant FloorWC = Work center
Work CentersWork Centers
Work centers are business objects that can represent the following, for example: Machines, machine groups Assembly work centers Employees, groups of employeesThe work center is also where we capture labor, efficiency and machine time.
82
Rate Routing
• A set of operations that must be performed in sequence to manufacture a product – a production cycle.
Operation 20Operation 20
Work centerWork centerTextsTextsActivitiesActivities
Operation 10Operation 10
MaterialMaterial
RoutingRoutinggroupgroup
The planned time for each operation is stored in the routing as standard values.A rate routing is used in repetitive manufacturing to describe the following:
1. Where a product is produced (Work Center(s))2. The time required to produce it (production rate)
83
• A Production Version tells you on what shift and what work center you can produce each BOM version of a material. It defines, shift, line, and where to assign costs. A material can be assigned multiple production versions
Production Version
Production VersionsProduction Versions
Shift 1Shift 2Shift 3
Line 1Line 1Line 3
A Production Version in SAP links the:•Material•Bill of Material (BOM) and BOM Version •Rate Routing•Production Line for Repetitive Manufacturing
84
Production Version– The production version allows you to look at production for a particular
material by shift.
– Production Versions are numbered in the following manner:
2 1 14
2114
Shift #BOM
VersionWork Center
(Production Line)
Note: Since each material exists on a routing group, and each routing group is associated with a work center, if you know the material and the work center, SAP will know what routing group it is a part of
85
Manufacturing Process
Production Master Data
Material Master BOM Work Center Routing Production Version
Production Process Production Confirmation - GR, GI and time Batch Management Incubation Interfaces
Production Execution Post Production
Period End closing - Variances, WIP, OH and settlement Reconciliation - mfg and WMS Reporting
Demand Planning - Planned orders
86
Process FlowA
DC
/YM
SW
MS
Le
ga
cy (
Site
sp
eci
fic)
SA
PL
eg
acy
Planned Production
Orders Created
ManualQTG
(optional)
Create Planned Production Orders Record Production of FG
Process StepLegacy Interface
New Interface
Interface Controls
Source Raw/Pack Materials
(Direct P2R, DIR STO)
Interface to downstream
systems
Clear Production Backflush error log
(End of Shift)
Shift Batch Data
(YMS)
Determine Requirements Source (Raw/Pack/SFG)/Produce SFG
Shift Batch Data
(ADC)
Run Tactical MRP
Source SF Materials(STO SFG)
Confirm SFG
MARS confirmation
data
Report
90330
36245
Generate Production Schedule
(Quaker Prenote)
Generate Production Schedule
(MIMI, AMAPS)
Volume Information
(Consumer Complaints)
QA Reporting(Holdit)
Production Volume
(Test Weights, Cedar Only)
3992737741
34610
36178Change Inventory Location
(Raw/Pack/SFG. Sites: Oakland, Bridgeview)
Production Receipt
(LPN applied)
Make SFG
Make FG
Clear Production Backflush error
log(End of Shift)
3350123800
Production Receipt(Batch info as required)SLOC 003 is NegativeSLOC 004 is Positive
Production Receipt(DCS)
Production Schedule
(YODA,Cedar, Danville)
Production FG, (SCR/SCDB)
Optional Stage
Components in proper Storage
Location
MARS confirmation
data
Confirm FGSLOC 003
(End of shift) (Mvmt 131, 261)
31853
33520
Optional Stage
Components
Change Inventory Location
(Raw/Pack. Sites: Oakland,
Bridgeview)
23800
110048
Prod Schedule(SCR/SCDB)
38169
ManualQG
SFG Production and Material Usage
Recorded(DCS)
Manual SFG
UsageQG
Excel(creates HF
daily schedule)
36245
90323(Trop)
SA
P I
nve
nto
ry
Ba
lan
ces
?????(Trop)
Production Receipt SFG (Bridgeview,
Danville, Cedar)
Production Receipt(Batch info as
required)SLOC 003 is
NegativeSLOC 004 is
Positive
33501
87
Production Confirmation– Production Confirmation is the transaction in MARS or
SAP that consumes raw materials and/or semi-finished goods and associated activities to generate SFGs or FGs.
- GR of SFG’s and FG’s to Stock (Movt Type 131)
- GI of Raw materials ( Movt Type 261)
- Time ( Labor/ Machine)
– Across the plant all SFG confirmations must be performed prior to all FG confirmations since packaging will consume the semi-finished liquid produced in the processing confirmation. Not following this sequence might lead to backflush errors.
89
Production Data Collection Systems•Production confirmation data will be captured and entered using different methods. Some confirmation data will be captured using legacy systems (both automatically and manually) and interfaced to SAP. Other data will require manual input into SAP. This will vary by site and by operation within a site. We have various ways to complete production confirmation:• 1. MARS interfaces to SAP (Q & G)• 2. ADC interfaces to SAP (Tropicana only)• 3. YMS interfaces to SAP (Cedar Rapids only)• 5. SAP user directly enters into SAP (Tropicana)
Accurate data entry into all systems is key!
92
Production Execution – External Integrations
End-State QTG2 Interface
Temporary QTG1 InterfaceLegacy Interface
Temporary QTG2 Interface
Retouch (Original Deployment)
Connectors
Retouch (New Deployment)Reporting
Legacy
SAP
External ISCP
Manual
Systems
• Inventory Management• Production Master Data• Shop Floor Activities
SAP ECC 6.0Production Data
62455MARS
YMS
ProductionData33520
ADC
Production Data31853
Material MasterProduction Data
34610 ConsumerAffairs
Material MasterProduction Data
36178Test Weights
Fiinished GoodProduction
37741 HoldIT
YODA
Production Schedule38169
Material Master62454
Tank Balances33243
Juice Shipments33173
MMMI/AMAPS
Planned Orders
SAP PortalCo- PackerProduction
62450
Co- PackerPO / STO / Receipt
62453Display
Planning Pre- Note
Planned Orders90330
ElectronicComerceGateway
Canada ASN90328
• Inventory Management• Production Master Data• Shop Floor Activities
93
Manufacturing Process
Production Master Data
Material Master BOM Work Center Routing Production Version
Production Process Production Confirmation - GR, GI and time Batch Management Incubation Interfaces
Production Execution Post Production
Period End closing - Variances, WIP, OH and settlement Reconciliation - mfg and WMS Reporting
Demand Planning - Planned orders
95
Warehouse and Manufacturing Handshake
• Production outputs are reconciled with warehouse and the total number is agreed upon
• MFG team inputs production, raw material usage actuals, and labor hours.
Both Individuals sign the PepsiCo
Audit Form
Warehouse tabulates FG output
Manufacturingtabulates
FG outputs
If error in Warehouse
receipts, adjust WMS
Both IndividualsCompare results
and agree onoutput
Manufacturing confirms FG batch in SAP
or MARS
99
MFG Reports – ECC & BW
Caliber ID Description Source
33315 Compare Inventory Balances - Red Prairie and SAP ECC
62315 Material Stock Report ECC
65355 Inventory by Batch Characteristic Report ECC
77737 PTD Cost Center Performance ECC
30541 Shift Performance Summary ECC
30545 Material Variance Report BW
37021 Material Efficiency Report BW
30542 Production Attainment and Adherence Report BW
42733 Labor Variance Report BW
37118 Labor Efficiency Report BW
65353 Tolling Variance Report BW
37105 Overtime Hours Report BW
37330 Production Performance Report BW*
39932 Enterprise Performance Report BW*
37025 Composite Ranking Report BW*
100
Stock Transport Orders (STO) DEPLOYED TO DEPLOYED FG
-2 L
egac
yW
MS
QD
CS
/TD
CS
SA
PE
TM
CA
SS
23840ZETM_SHIPMENT
23539ZSHPDEL
37629ZORDTIB
No
56765(QG)
Shipped from non WMS site
ZDLV_ASN
90999(QG)
ZSHPT_ASN
23836ZRECPTCONF
Trop
91001(QG)
ZRECPTCONF
Trop
62353Z210CASS
Trop
QG
53533(Trop)
ORDERS
56149(QG)
PORDCR 56147(QG)
ORDERS
QG
25912ZVESLCHK_TIB_QTG2
QG
ECG3rd Party Warehouse ECG
3rd Party Warehouse
ECG3rd Party Warehouse
ECGCHEP
3rd Party Warehouse
56727Trop
Order & Master Shipment created
in WMS(SHP)
ManualQTG
*Including IRP
TCode On
FACSShipment Receipt
FB
Update Deliveryand Shipment
RT
ManualTrop Rail
RT
Genesis Inventory
Accounting
Order “Recieved” in DCS/TDCS
(VTTS/LIPS)
POCs On
Shipment Processor / Delivery Processor
Dr. Freight (COPA)(6701100)Cr. GR/IR Freight (2010001)
Vessel Check in(SHP)
Dr. INV FG (1020000)Cr. INV FG (1020000)Cr. Price Diff (COPA)(6700074)
Create STO
STO CREATED
Create Freight Accrual/Payments
Receive Shipment Confirmation
Final
(BSEG)
TCode Off
Trans Opt.
ETMOptimized?
(VTTS/LIPS)
Process Step
FB
TBL Off
FG Inventory Execution Processor
M
Update Delivery and Shipment
Shipment Confirmation
(SHP)
Delivery Processor / Shipment Processor
Post Goods Receipt
RT
Delivery Processor / Shipment Processor
RTDelivery Processor /
Shipment Processor
VL02N
TBL On
IF On
FB
Create STR using
Rail Load Builder
STO CREATED(Rail STO created
from Rail Load Builder)
Create Inbound Shipments
RT
1UP Reviewed
RTF
B
Vessel Check-in
RT
POCs Off
VL32N/MIGO
(VTTS/LIPS)
Transportation Optimization & Load Building
Draft
FB
FB
ZV02
Create Delivery and Ship Docs Ship Product
Post Goods Issue(641)
RT
Phoenix
FB
FG STO Processor
NB
Rate Shipment
Order in Picking status - Pick List
generated(SHP)
Acct On
EPROOn
Delivery Processor
Vessel Checkout(SHP)
NB
RT
Receive Product
IF Off
(BSEG)
Update Inbound Delivery
New Interface
Order “Shipped” in DCS/TDCS
Acct Off
BIL Reviewed
Freight Payment Analyst
RT
(VTTS/LIPS)
Create Receipt Authorization
(RECV)
EPRO Off
RT
Receive Goods Confirmation
(RECV)Appointment Time Update
(SHP)
Xref
VL01N/VT01N
Auto Create Inbound Delivery
and Shipment
RT
(BSEG)
GenesisInventory
Accounting
Create Delivery and Shipment(Outbound Monitor)
ME21N
Legacy Interface
(VTTS/LIPS)
Interface FrequencyRT = real time
FB = frequent batchNB = nightly batch
PB = periodic batchM = manual
53551ZAPPCAR_TIB_QTG2
23288ZPICKSTAT_TIB_QTG2
48560ZDMPLUS_DLX_SHIPMENT_CONF
25912ZVESLCHK_TIB_QTG2
25619SHPMNT
62352ZSHPT_ASN
25912ZVESLCHK_TIB_QTG2
EDI ADMIN EAM P2P
STO Deployed to Deployed FG
102
Stock Transport Orders (STO) DEPLOYED TO DEPLOYED FG
-2 L
egac
yW
MS
QD
CS
/TD
CS
SA
PE
TM
CA
SS
23840ZETM_SHIPMENT
23539ZSHPDEL
37629ZORDTIB
No
56765(QG)
Shipped from non WMS site
ZDLV_ASN
90999(QG)
ZSHPT_ASN
23836ZRECPTCONF
Trop
91001(QG)
ZRECPTCONF
Trop
62353Z210CASS
Trop
QG
53533(Trop)
ORDERS
56149(QG)
PORDCR 56147(QG)
ORDERS
QG
25912ZVESLCHK_TIB_QTG2
QG
ECG3rd Party Warehouse ECG
3rd Party Warehouse
ECG3rd Party Warehouse
ECGCHEP
3rd Party Warehouse
56727Trop
Order & Master Shipment created
in WMS(SHP)
ManualQTG
*Including IRP
TCode On
FACSShipment Receipt
FB
Update Deliveryand Shipment
RT
ManualTrop Rail
RT
Genesis Inventory
Accounting
Order “Recieved” in DCS/TDCS
(VTTS/LIPS)
POCs On
Shipment Processor / Delivery Processor
Dr. Freight (COPA)(6701100)Cr. GR/IR Freight (2010001)
Vessel Check in(SHP)
Dr. INV FG (1020000)Cr. INV FG (1020000)Cr. Price Diff (COPA)(6700074)
Create STO
STO CREATED
Create Freight Accrual/Payments
Receive Shipment Confirmation
Final
(BSEG)
TCode Off
Trans Opt.
ETMOptimized?
(VTTS/LIPS)
Process Step
FB
TBL Off
FG Inventory Execution Processor
M
Update Delivery and Shipment
Shipment Confirmation
(SHP)
Delivery Processor / Shipment Processor
Post Goods Receipt
RT
Delivery Processor / Shipment Processor
RTDelivery Processor /
Shipment Processor
VL02N
TBL On
IF On
FB
Create STR using
Rail Load Builder
STO CREATED(Rail STO created
from Rail Load Builder)
Create Inbound Shipments
RT
1UP Reviewed
RTF
B
Vessel Check-in
RT
POCs Off
VL32N/MIGO
(VTTS/LIPS)
Transportation Optimization & Load Building
Draft
FB
FB
ZV02
Create Delivery and Ship Docs Ship Product
Post Goods Issue(641)
RT
Phoenix
FB
FG STO Processor
NB
Rate Shipment
Order in Picking status - Pick List
generated(SHP)
Acct On
EPROOn
Delivery Processor
Vessel Checkout(SHP)
NB
RT
Receive Product
IF Off
(BSEG)
Update Inbound Delivery
New Interface
Order “Shipped” in DCS/TDCS
Acct Off
BIL Reviewed
Freight Payment Analyst
RT
(VTTS/LIPS)
Create Receipt Authorization
(RECV)
EPRO Off
RT
Receive Goods Confirmation
(RECV)Appointment Time Update
(SHP)
Xref
VL01N/VT01N
Auto Create Inbound Delivery
and Shipment
RT
(BSEG)
GenesisInventory
Accounting
Create Delivery and Shipment(Outbound Monitor)
ME21N
Legacy Interface
(VTTS/LIPS)
Interface FrequencyRT = real time
FB = frequent batchNB = nightly batch
PB = periodic batchM = manual
53551ZAPPCAR_TIB_QTG2
23288ZPICKSTAT_TIB_QTG2
48560ZDMPLUS_DLX_SHIPMENT_CONF
25912ZVESLCHK_TIB_QTG2
25619SHPMNT
62352ZSHPT_ASN
25912ZVESLCHK_TIB_QTG2
EDI ADMIN EAM P2P
STO Deployed to Deployed FG
104
Stock Transport Orders (STO) DEPLOYED TO DEPLOYED FG
-2 L
egac
yW
MS
QD
CS
/TD
CS
SA
PE
TM
CA
SS
23840ZETM_SHIPMENT
23539ZSHPDEL
37629ZORDTIB
No
56765(QG)
Shipped from non WMS site
ZDLV_ASN
90999(QG)
ZSHPT_ASN
23836ZRECPTCONF
Trop
91001(QG)
ZRECPTCONF
Trop
62353Z210CASS
Trop
QG
53533(Trop)
ORDERS
56149(QG)
PORDCR 56147(QG)
ORDERS
QG
25912ZVESLCHK_TIB_QTG2
QG
ECG3rd Party Warehouse ECG
3rd Party Warehouse
ECG3rd Party Warehouse
ECGCHEP
3rd Party Warehouse
56727Trop
Order & Master Shipment created
in WMS(SHP)
ManualQTG
*Including IRP
TCode On
FACSShipment Receipt
FB
Update Deliveryand Shipment
RT
ManualTrop Rail
RT
Genesis Inventory
Accounting
Order “Recieved” in DCS/TDCS
(VTTS/LIPS)
POCs On
Shipment Processor / Delivery Processor
Dr. Freight (COPA)(6701100)Cr. GR/IR Freight (2010001)
Vessel Check in(SHP)
Dr. INV FG (1020000)Cr. INV FG (1020000)Cr. Price Diff (COPA)(6700074)
Create STO
STO CREATED
Create Freight Accrual/Payments
Receive Shipment Confirmation
Final
(BSEG)
TCode Off
Trans Opt.
ETMOptimized?
(VTTS/LIPS)
Process Step
FB
TBL Off
FG Inventory Execution Processor
M
Update Delivery and Shipment
Shipment Confirmation
(SHP)
Delivery Processor / Shipment Processor
Post Goods Receipt
RT
Delivery Processor / Shipment Processor
RTDelivery Processor /
Shipment Processor
VL02N
TBL On
IF On
FB
Create STR using
Rail Load Builder
STO CREATED(Rail STO created
from Rail Load Builder)
Create Inbound Shipments
RT
1UP Reviewed
RTF
B
Vessel Check-in
RT
POCs Off
VL32N/MIGO
(VTTS/LIPS)
Transportation Optimization & Load Building
Draft
FB
FB
ZV02
Create Delivery and Ship Docs Ship Product
Post Goods Issue(641)
RT
Phoenix
FB
FG STO Processor
NB
Rate Shipment
Order in Picking status - Pick List
generated(SHP)
Acct On
EPROOn
Delivery Processor
Vessel Checkout(SHP)
NB
RT
Receive Product
IF Off
(BSEG)
Update Inbound Delivery
New Interface
Order “Shipped” in DCS/TDCS
Acct Off
BIL Reviewed
Freight Payment Analyst
RT
(VTTS/LIPS)
Create Receipt Authorization
(RECV)
EPRO Off
RT
Receive Goods Confirmation
(RECV)Appointment Time Update
(SHP)
Xref
VL01N/VT01N
Auto Create Inbound Delivery
and Shipment
RT
(BSEG)
GenesisInventory
Accounting
Create Delivery and Shipment(Outbound Monitor)
ME21N
Legacy Interface
(VTTS/LIPS)
Interface FrequencyRT = real time
FB = frequent batchNB = nightly batch
PB = periodic batchM = manual
53551ZAPPCAR_TIB_QTG2
23288ZPICKSTAT_TIB_QTG2
48560ZDMPLUS_DLX_SHIPMENT_CONF
25912ZVESLCHK_TIB_QTG2
25619SHPMNT
62352ZSHPT_ASN
25912ZVESLCHK_TIB_QTG2
EDI ADMIN EAM P2P
STO Deployed to Deployed FG
105
WMS Vessel Check In at ShipperPicking Status from Shipper
Shipment Confirmation
WMS Vessel Check Out at Shipper
Shipment
106
Stock Transport Orders (STO) DEPLOYED TO DEPLOYED FG
-2 L
egac
yW
MS
QD
CS
/TD
CS
SA
PE
TM
CA
SS
23840ZETM_SHIPMENT
23539ZSHPDEL
37629ZORDTIB
No
56765(QG)
Shipped from non WMS site
ZDLV_ASN
90999(QG)
ZSHPT_ASN
23836ZRECPTCONF
Trop
91001(QG)
ZRECPTCONF
Trop
62353Z210CASS
Trop
QG
53533(Trop)
ORDERS
56149(QG)
PORDCR 56147(QG)
ORDERS
QG
25912ZVESLCHK_TIB_QTG2
QG
ECG3rd Party Warehouse ECG
3rd Party Warehouse
ECG3rd Party Warehouse
ECGCHEP
3rd Party Warehouse
56727Trop
Order & Master Shipment created
in WMS(SHP)
ManualQTG
*Including IRP
TCode On
FACSShipment Receipt
FB
Update Deliveryand Shipment
RT
ManualTrop Rail
RT
Genesis Inventory
Accounting
Order “Recieved” in DCS/TDCS
(VTTS/LIPS)
POCs On
Shipment Processor / Delivery Processor
Dr. Freight (COPA)(6701100)Cr. GR/IR Freight (2010001)
Vessel Check in(SHP)
Dr. INV FG (1020000)Cr. INV FG (1020000)Cr. Price Diff (COPA)(6700074)
Create STO
STO CREATED
Create Freight Accrual/Payments
Receive Shipment Confirmation
Final
(BSEG)
TCode Off
Trans Opt.
ETMOptimized?
(VTTS/LIPS)
Process Step
FB
TBL Off
FG Inventory Execution Processor
M
Update Delivery and Shipment
Shipment Confirmation
(SHP)
Delivery Processor / Shipment Processor
Post Goods Receipt
RT
Delivery Processor / Shipment Processor
RTDelivery Processor /
Shipment Processor
VL02N
TBL On
IF On
FB
Create STR using
Rail Load Builder
STO CREATED(Rail STO created
from Rail Load Builder)
Create Inbound Shipments
RT
1UP Reviewed
RTF
B
Vessel Check-in
RT
POCs Off
VL32N/MIGO
(VTTS/LIPS)
Transportation Optimization & Load Building
Draft
FB
FB
ZV02
Create Delivery and Ship Docs Ship Product
Post Goods Issue(641)
RT
Phoenix
FB
FG STO Processor
NB
Rate Shipment
Order in Picking status - Pick List
generated(SHP)
Acct On
EPROOn
Delivery Processor
Vessel Checkout(SHP)
NB
RT
Receive Product
IF Off
(BSEG)
Update Inbound Delivery
New Interface
Order “Shipped” in DCS/TDCS
Acct Off
BIL Reviewed
Freight Payment Analyst
RT
(VTTS/LIPS)
Create Receipt Authorization
(RECV)
EPRO Off
RT
Receive Goods Confirmation
(RECV)Appointment Time Update
(SHP)
Xref
VL01N/VT01N
Auto Create Inbound Delivery
and Shipment
RT
(BSEG)
GenesisInventory
Accounting
Create Delivery and Shipment(Outbound Monitor)
ME21N
Legacy Interface
(VTTS/LIPS)
Interface FrequencyRT = real time
FB = frequent batchNB = nightly batch
PB = periodic batchM = manual
53551ZAPPCAR_TIB_QTG2
23288ZPICKSTAT_TIB_QTG2
48560ZDMPLUS_DLX_SHIPMENT_CONF
25912ZVESLCHK_TIB_QTG2
25619SHPMNT
62352ZSHPT_ASN
25912ZVESLCHK_TIB_QTG2
EDI ADMIN EAM P2P
STO Deployed to Deployed FG
107
• Vessel Check Out sets Shipment Start status– ASN Generated:
• Send EDI 856 to Customer
• Ship Confirmation to ETM
• EDI204 to Cass for Rating
• Shipped status to QDCS
– PGI of Delivery:• Inventory Posting
• Cost Of Goods Sold
• Billing Index Populated
• Create Inbound Shipment and Delivery
Effects of Vessel Checkout
108
Freight Payment & Freight Accounting
RATE
MATCH
PAY
CARRIER
S
Shipment Cost
Doc
ACH FUNDS
Shipment
Inbound or Outbound
Optimized Loads
Manual Build
Supplier ASN’s
1
2
Outbound Ship Confirm
Inbound Receipt
Allocate to Products
$100
Acct 1 Acct 2$100
Post to G/L
3
Accrue Freight Costs
• Linehaul• Fuel & Stop Offs• Unload Labor• Detention
Reverse Accrual & Book Actuals
5
Feed CO-PA
Profitability AnalysisCost–to–Serve 6
Fund Cass from the appropriate Legal Entities
CARRIER
S
APPLY CASH
INVOICE
Or
EDI 210
4
7
113
Stock Transport Orders (STO) DEPLOYED TO DEPLOYED FG
-2 L
egac
yW
MS
QD
CS
/TD
CS
SA
PE
TM
CA
SS
23840ZETM_SHIPMENT
23539ZSHPDEL
37629ZORDTIB
No
56765(QG)
Shipped from non WMS site
ZDLV_ASN
90999(QG)
ZSHPT_ASN
23836ZRECPTCONF
Trop
91001(QG)
ZRECPTCONF
Trop
62353Z210CASS
Trop
QG
53533(Trop)
ORDERS
56149(QG)
PORDCR 56147(QG)
ORDERS
QG
25912ZVESLCHK_TIB_QTG2
QG
ECG3rd Party Warehouse ECG
3rd Party Warehouse
ECG3rd Party Warehouse
ECGCHEP
3rd Party Warehouse
56727Trop
Order & Master Shipment created
in WMS(SHP)
ManualQTG
*Including IRP
TCode On
FACSShipment Receipt
FB
Update Deliveryand Shipment
RT
ManualTrop Rail
RT
Genesis Inventory
Accounting
Order “Recieved” in DCS/TDCS
(VTTS/LIPS)
POCs On
Shipment Processor / Delivery Processor
Dr. Freight (COPA)(6701100)Cr. GR/IR Freight (2010001)
Vessel Check in(SHP)
Dr. INV FG (1020000)Cr. INV FG (1020000)Cr. Price Diff (COPA)(6700074)
Create STO
STO CREATED
Create Freight Accrual/Payments
Receive Shipment Confirmation
Final
(BSEG)
TCode Off
Trans Opt.
ETMOptimized?
(VTTS/LIPS)
Process Step
FB
TBL Off
FG Inventory Execution Processor
M
Update Delivery and Shipment
Shipment Confirmation
(SHP)
Delivery Processor / Shipment Processor
Post Goods Receipt
RT
Delivery Processor / Shipment Processor
RTDelivery Processor /
Shipment Processor
VL02N
TBL On
IF On
FB
Create STR using
Rail Load Builder
STO CREATED(Rail STO created
from Rail Load Builder)
Create Inbound Shipments
RT
1UP Reviewed
RTF
B
Vessel Check-in
RT
POCs Off
VL32N/MIGO
(VTTS/LIPS)
Transportation Optimization & Load Building
Draft
FB
FB
ZV02
Create Delivery and Ship Docs Ship Product
Post Goods Issue(641)
RT
Phoenix
FB
FG STO Processor
NB
Rate Shipment
Order in Picking status - Pick List
generated(SHP)
Acct On
EPROOn
Delivery Processor
Vessel Checkout(SHP)
NB
RT
Receive Product
IF Off
(BSEG)
Update Inbound Delivery
New Interface
Order “Shipped” in DCS/TDCS
Acct Off
BIL Reviewed
Freight Payment Analyst
RT
(VTTS/LIPS)
Create Receipt Authorization
(RECV)
EPRO Off
RT
Receive Goods Confirmation
(RECV)Appointment Time Update
(SHP)
Xref
VL01N/VT01N
Auto Create Inbound Delivery
and Shipment
RT
(BSEG)
GenesisInventory
Accounting
Create Delivery and Shipment(Outbound Monitor)
ME21N
Legacy Interface
(VTTS/LIPS)
Interface FrequencyRT = real time
FB = frequent batchNB = nightly batch
PB = periodic batchM = manual
53551ZAPPCAR_TIB_QTG2
23288ZPICKSTAT_TIB_QTG2
48560ZDMPLUS_DLX_SHIPMENT_CONF
25912ZVESLCHK_TIB_QTG2
25619SHPMNT
62352ZSHPT_ASN
25912ZVESLCHK_TIB_QTG2
EDI ADMIN EAM P2P
STO Deployed to Deployed FG
117
Stock Transport Orders (STO) DEPLOYED TO DEPLOYED FG
-2 L
ega
cyW
MS
QD
CS
/TD
CS
SA
PE
TM
CA
SS
23840ZETM_SHIPMENT
23539ZSHPDEL
37629ZORDTIB
No
56765(QG)
Shipped from non WMS site
ZDLV_ASN
90999(QG)
ZSHPT_ASN
23836ZRECPTCONF
Trop
91001(QG)
ZRECPTCONF
Trop
62353Z210CASS
Trop
QG
53533(Trop)
ORDERS
56149(QG)
PORDCR 56147(QG)
ORDERS
QG
25912ZVESLCHK_TIB_QTG2
QG
2353
9(94
0)
ZDLVDEL
ECG3rd Party Warehouse
48560(945)
ZEDI945_SHIPMENT_
CONF
ECG3rd Party Warehouse
2383
6(94
4)
ZRECPTCONF
ECG3rd Party Warehouse
2343
8(85
6)
ZDLV
_AS
N
ECGCHEP
3rd Party Warehouse
56727Trop
Order & Master Shipment created
in WMS(SHP)
ManualQTG
*Including IRP
TCode On
FACSShipment Receipt
FB
Update Deliveryand Shipment
RT
ManualTrop Rail
RT
Genesis Inventory
Accounting
Order “Recieved” in DCS/TDCS
(VTTS/LIPS)
POCs On
Shipment Processor / Delivery Processor
Dr. Freight (COPA)(6701100)Cr. GR/IR Freight (2010001)
Vessel Check in(SHP)
Dr. INV FG (1020000)Cr. INV FG (1020000)Cr. Price Diff (COPA)(6700074)
Create STO
STO CREATED
Create Freight Accrual/Payments
Receive Shipment Confirmation
Final
(BSEG)
TCode Off
Trans Opt.
ETMOptimized?
(VTTS/LIPS)
Process Step
FB
TBL Off
FG Inventory Execution Processor
M
Update Delivery and Shipment
Shipment Confirmation
(SHP)
Delivery Processor / Shipment Processor
Post Goods Receipt
RT
Delivery Processor / Shipment Processor
RTDelivery Processor /
Shipment Processor
VL02N
TBL On
IF On
FB
Create STR using
Rail Load Builder
STO CREATED(Rail STO created
from Rail Load Builder)
Create Inbound Shipments
RT
1UP Reviewed
RTF
B
Vessel Check-in
RT
POCs Off
VL32N/MIGO
(VTTS/LIPS)
Transportation Optimization & Load Building
Draft
FB
FB
ZV02
Create Delivery and Ship Docs Ship Product
Post Goods Issue(641)
RT
Phoenix
FB
FG STO Processor
NB
Rate Shipment
Order in Picking status - Pick List
generated(SHP)
Acct On
EPROOn
Delivery Processor
Vessel Checkout(SHP)
NB
RT
Receive Product
IF Off
(BSEG)
Update Inbound Delivery
New Interface
Order “Shipped” in DCS/TDCS
Acct Off
BIL Reviewed
Freight Payment Analyst
RT
(VTTS/LIPS)
Create Receipt Authorization
(RECV)
EPRO Off
RT
Receive Goods Confirmation
(RECV)Appointment Time Update
(SHP)
Xref
VL01N/VT01N
Auto Create Inbound Delivery
and Shipment
RT
(BSEG)
GenesisInventory
Accounting
Create Delivery and Shipment(Outbound Monitor)
ME21N
Legacy Interface
(VTTS/LIPS)
Interface FrequencyRT = real time
FB = frequent batchNB = nightly batch
PB = periodic batchM = manual
53551ZAPPCAR_TIB_QTG2
23288ZPICKSTAT_TIB_QTG2
48560ZDMPLUS_DLX_SHIPMENT_CONF
25912ZVESLCHK_TIB_QTG2
25619SHPMNT
62352ZSHPT_ASN
25912ZVESLCHK_TIB_QTG2
EDI ADMIN EAM P2P
STO Deployed to Deployed FG