E-Procurement in Albania Berlin, December 2016
Electronic procedures
2
• Currently, the use of e-procurement system for contracting
authorities and economic operators in Albania is not a challenge
anymore. It is rather a normal way of conducting procurement
procedures.
• At present, all the procurement procedures in Albania, including
small value purchases (less than 6200 $ per year) conducted
electronically.
• Likewise, since 2012 the electronic system is used for conducting
the first phase of concessions/ppp procedures (publication of
documents and submission of offers) while the offer evaluation is
still paper based.
Electronic procedures in e-Procurement System
Local
Open
Restricted
Negotiated With Notice
Request for Proposal
Consulting (first phase)
Design Contest (first phase)
Small Value Purchase
Concessions/PPP (first phase)
International
Open
Restricted
Negotiated With Notice
3
Electronic procedures-Exceptions
4
• The following procedures are exempted from the use of electronic
means:
Negotiation without prior notice of the contract;
Second phase of the procedures “Consulting Services” and
“Design Contest”;
Procurement procedures with a value under 700€ and those
conducted on emergency cases;
Procurement procedures “Purchase of electrical energy”.
Electronic System- Main features
5
• The e-procurement system is established and can be accessedthrough the website of the Public Procurement Agencyhttps://www.app.gov.al
• PPA website is the only electronic portal in the country providing thee-procurement service.
• The registration on the system and the access of the relevantinformation regarding procurement procedures as well as the onlinesubmission of offers is free of charge.
• The role of the electronic system administrator has beendecentralized designating as such each contracting authority.
• The electronic system includes two separate databases; (i) theplatform for conducting e-procurement procedures, and (ii) theelectronic archive for closed/finalized/cancelled/suspendedprocedures for monitoring and auditing purposes.
E-Procurement Platform
6
E-Procurement Platform
7
E-procurement Platform-Statistics
8
Statistic of awarded e-procurmet procedurs January-Decembre 2015
1 Statistic of awarded e-procurmet procedurs January-Decembre 2015 ALL $
2 Total number of published procedures 4,630 4,630
3 Total Limit Fund for published procedures 90,702,378,325 708,612,331
4 Total number of procedures that have continued 4,269 4,269
5 Total Limit Fund for procedures that have continued 70,811,023,577 553,211,122
6 Total Fund or procedures that have continued 64,324,508,777 502,535,225
7 Total number of awarded procedures 6,975 6,975
8 Total Limit Fund for published procedures 79,545,263,786 621,447,373
9 Total procedured fund 72,935,751,628 569,810,560
10 % of Procured fund towards Limit Fund 91.70% 91.70%
11 Total savings fund 6,609,512,158 51,636,814
12 % Saving fund towards limit fond 8.30% 8.30%
9
E-procurement Platform-Statistics
Use of Hits, Visitors and Time e-procurement system in 2015:
10
• The following type of information is published and publicallyavailable at the procurement portal: Legal and sublegal acts on public procurement, concessions/ppp and public
auctions procedures.
Procurement manuals for Contracting Authorities and Economic Operators.
Standard Tendering Documents.
The Bulletin of Public Notices as well as Contract Notices, Winner Notices, Signed contract notices and Small Value Purchases.
Information on excluded economic operators etc.
Annual Reports prepared by PPA.
• On the other hand the information regarding a specific procurementprocedure in process is restricted and can be accessed byeconomic operators and relevant Contracting Authority only.
• Likewise, all the information regarding archived procedures is alsorestricted and can be accessed by auditors only.
Electronic system- Access to Information
11
• Contracting Authorities :
Procurement Unit Officers;
Members of the Evaluation Commission;
Auditing Officers
• Economic Operators:
International Economic Operators (register online)
Local Economic Operators automatic register through connection with National
Registration Center
• Commission of Public Procurement:
Auditing users
• State Supreme Audit:
Auditing Officers
• Public Procurement Agency:
Publishing Officer
Administrator
Electronic system-Users
12
E-Procurement-Actors/Roles/Steps
13
• Admin Officer: Prepares New Workspace & Contract Notice
• Publisher: Publishes Contract Notice & Call Documents
• Economic Operators: Submit Tender Proposal
• Opening Officers: Open Proposals & Notify Evaluators
• Evaluators: Evaluate Proposals & Notify Admin Officer
• Admin Officer: Prepares Winner ,Contract Award Notice & Archives Call
• Audit Officer: Audit Call in Archive
E-procurement -electronic procedure
14
The e-opening of proposals is based on the following:
Once submitted/uploaded to the system the offers are confidential
(encrypted) and cannot be accessed/viewed by any person, even
by the economic operator itself. The operator can remove the
encrypted offer and submit a new one during this period but cannot
read and edit it in the system.
The contracting authority sets and publish the exact date and time
for opening the bids.
The bids are opened by at least 3 or more persons (always an odd
number) as established case by case by the responsible contracting
authority.
In order for the offers to be accessible all the designated persons
shall enter the system through their own user/password and
authorize the opening. Only in this moment the offer is decrypted.
E-Procurement-electronic opening of proposals
15
From the opening of the offers untill the closing of the evaluation
process all the designated members of the evaluation commission
may access all the documents including the financial offer.
From the opening of the offers untill the closing of the evaluation
process all the economic operators who have submitted an offer is
notified automatically regarding the status of the process such as: (i)
closed for submission, (ii) opening for evaluation, (iii) closed
evaluation etc.
Once the evaluation is closed the system notifies automatically the
final classification and the reasons for disqualification/rejection of
the offer.
No other interested person, except for bidders (for their own offer)
and Evaluation Commission, has access on the above procedure.
E-Procurement-electronic opening of proposals (cont.)
Electronic Archive
16
• The electronic archive is an important feature of the electronic system which
makes the functioning of the operational system easier because:
The archive database has been divided from the operational database
reducing, this way, substantially the amount of data in the working server .
The transfer of data from the operational database to the archive one is done
in real time.
The archive database, as the
operational database, is on line
and easily accessible (by auditors
only).
The archive database is a great
tool for the auditors wishing to
audit procurement procedures
conducted earlier which can be
found and accessed on the
archive.
E-procurement Benefits
17
• The use of the electronic means on procurement procedures has the
following benefits:
Saves time and facilitates the work of Contracting Authorities and
Economic Operators;
Reduces the costs for both the Contracting Authorities and the
Economic Operators since all the tendering documents are prepared
and submitted online;
Increases transparency regarding the conduction of the procurement
procedures;
Reduces the corruptive practices since the submitted offers can be
accessed by Evaluation Committee members only and only at the
appointed date and time for opening.
E-procurement Initial Challenges
18
• The establishment of a totally new platform for conducting public
procurement procedures was a great challenge for Albania due to the lack
of knowledge and lack of previous experience on this regard.
• Passing from a paper-based procedure to an electronic one needed first
and foremost to educate people (especially public officials) and change their
mentality and behavior towards this issue.
• PPA had to bear the burden of training and providing continuous technical
assistance to all the platform users in order to overcome all the technical
difficulties they encountered in the process.
E-procurement Future objectives
19
In order to improve further the performance of the electronic system and at
the same time increase further the system monitoring and security a new
perception for the e-procurement system through the following actions is
needed:
Re-engineering of the data structure and improvement of the existing
system framework in the newest versions in order to increase the
performance of the e-procurement system and decrease as much as
possible the occurring incidents.
Adding of the electronic services in the e-Albania portal to increase
transparency and notify the users on all the published tenders.
Submitting of offers for small value procedures through mobile and
design of relevant applications for iOS and Android platforms .
Adding of missing functionalities which hinders the normal work
performance.
Adding “CPV codes” in e-procurement system.
E-procurement Future objectives(cont.)
20
Designing and establishing a new archive system and infrastructure for
finalized procedures.
Designing Business Intelligence system for reporting and complex
analysis.
Designing of a testing infrastructure for methodical work during
interventions or developments.
Designing a Business Continuity Infrastructure within PPA premises.
Audit Vault System monitoring.
Automatization of forecast and realization registers.
21
Thank you!Eng.Gjergji Moçka
Director of Information Technology and Publication
Eduard Ahmeti
General Director
Public Procurement Agency
Albania