E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.

6
E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM

Transcript of E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.

Page 1: E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.

E. IhloffFebruary 8, 2008

FNPB-UCN building usage by nEDM

Page 2: E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.

E. IhloffFebruary 8, 2008

People involved in Building Layout

• Rick Allen – ORNL SNS Lead Engineer FNPB

• Walter Sondhiem – LANL Integration Engineer

• Jan Boissevain – Chief nEDM Engineer

• Ernie Ihloff – MIT

• John Ramsey - LANL

• Martin Cooper – LANL nEDM Project Leader

• Geoff Greene – ORNL

• Vince Cianciolo – ORNL

• David Hasse and Paul Huffman – NCSU

• Jlab Cryogenic experts – Rao Ganni, Dana Arenius, Jonathon Creel

• George Mulholland – ACT Cryogenic Consultant

Page 3: E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.

E. IhloffFebruary 8, 2008

ORNL-SNS Layout Complete

Page 4: E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.

E. IhloffFebruary 8, 2008

Status as of February 2008

• nEDM and SNS engineers agreed on documents to go to an A & E firm for design of building - December 2007

• Meeting at Jlab to discuss cryogenic layout- Oct 2007

• Preliminary phone meetings with Linde and Cryogenic consultant George Mulholland on system design

• Goal to have cryogenic layout done by A&E review at SNS

Page 5: E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.

E. IhloffFebruary 8, 2008

Location of FNPB Build at SNS

Page 6: E. Ihloff February 8, 2008 FNPB-UCN building usage by nEDM.

E. IhloffFebruary 8, 2008

Questions still to be addressed

• Satisfy DOE that design is function and safe

• Water cooling in FNPB building

• Make sure we claim external space we need

• Clean power requirements in hall

• Best use of Cryogenic consultants

• …other things ??