E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW...

25
8 Spaces @ 75" [1905] = 50'-0" [15240] 4 Spaces @ 37 1/2" [953] = 12'-6" [3810] 4 Spaces @ 18 3/4" [476] = 6'-3" [1905] 2 Spaces @ 37 1/2" [953] = 6'-3" [1905] 25 1/2" 648 89" 2261 25° (5) The upstream end of part a3 is rotated upward 3/4" [19] to Notes: (1) Test shall be performed according to MASH test designation no. 3-21. (2) The impact location is 89" [2261] upstream of the buttress or 26" [660] upstream of the centerline of post no. 18. (3) BCT anchors are placed in 3' [914] diameter holes, then backfilled and tamped with soil. (4) Critical region is located between post nos. 12 and 19. accommodate the 31" [787] MGS guardrail height. 31" 787 a7 a4 a4 a4 a3 a2 Nested a1 34" 864 a5 PLAN VIEW 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Impact 2270P SCALE: 1:110 Thrie_Buttress-1_R6 SHEET: 1 of 23 DWG. NAME. DATE: 1/18/2017 DRAWN BY: TJD/JEK Midwest Roadside Safety Facility REV. BY: KAL/SKR/R KF/JCH UNITS: in.[mm] 34" Thrie-Beam AGT to Concrete Buttress System Layout ELEVATION VIEW F C C B B E E A A D D

Transcript of E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW...

Page 1: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

8 Spaces @ 75" [1905] = 50'-0" [15240]4 Spaces @

37 1/2" [953]= 12'-6" [3810]

4 Spaces @18 3/4" [476]= 6'-3" [1905]

2 Spaces @37 1/2" [953]= 6'-3" [1905]

25 1/2" 648

89" 226125°

(5) The upstream end of part a3 is rotated upward 3/4" [19] to

Notes: (1) Test shall be performed according to MASH test designation no. 3-21.(2) The impact location is 89" [2261] upstream of the buttress or 26"

[660] upstream of the centerline of post no. 18.(3) BCT anchors are placed in 3' [914] diameter holes, then backfilled

and tamped with soil.(4) Critical region is located between post nos. 12 and 19.

accommodate the 31" [787] MGS guardrail height.

31" 787

a7 a4 a4 a4 a3 a2Nesteda1

34" 864

a5

PLAN VIEW

1 2 3 4 5 6 7 8 9 10 11 12 131415

1617 18 19

Impact2270P

SCALE: 1:110

Thrie_Buttress-1_R6

SHEET:

1 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

System Layout

ELEVATION VIEW

FC

C

B

B

E

E

A

A

D

D

Page 2: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

40" 1016

32" 81332" 813

40" 1016

31" 787

Post No. 11SECTION B-B

a3

GroundLine

d2 d9 d7

f1

SCALE: 1:15

Thrie_Buttress-1_R6

SHEET:

2 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Post Nos. 3-11 Details

Post Nos. 3-10SECTION A-A

GroundLine

d1d8

a4

f1

d9f3

Note: (1) No bolt placed in lower hole of post no. 11.

Page 3: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

52" 1321

35" 88934" 86432" 813

40" 1016

34" 863 35" 88832" 813

Post Nos. 17-19SECTION D-D

GroundLine

d5

a1f2

d4

SCALE: 1:17

Thrie_Buttress-1_R6

SHEET:

3 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Post Nos. 12-19 Details

Post Nos. 12-16SECTION C-C

a2

GroundLine

d6

d3

f1

Page 4: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

34" 864

10" 254 12 3/4" 324

LineGround

SECTION E-E(REBAR HIDDEN)

f8a6

g3

f6

g1

Note: (1) g1 washers placed between nuts and thrie beam end connector.

39" 991

SCALE: 1:10

Thrie_Buttress-1_R6

SHEET:

4 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Thrie Beam Buttress and End Shoe Details

f6

DETAIL F(REBAR HIDDEN)

a6a1

f8 g1

Page 5: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

SCALE 1 : 8DETAIL G

f3

SCALE: 1:30

Thrie_Buttress-1_R6

SHEET:

5 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

End Section and Splice Detail

END SECTION DETAILBACKSIDE

c3

Post 1Post 2

c2

c1 c1

SPLICE DETAILBACKSIDE

Post 5Post 6

GroundLine

d1

g1f2 g1f2H

I

J

G

Page 6: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

2-g1

DETAIL I

c7

c3

c6

c4

f4

DETAIL J

g2

f7

SCALE: 1:6

Thrie_Buttress-1_R6

SHEET:

6 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

BCT Anchor Details

f5

DETAIL H

c5 g1

Page 7: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

PLAN VIEW

6" 1526" 152

PROFILE VIEW

84" 2134 ELEVATION VIEWPart d5

SCALE 1:8

1 3/4" 44

6" 152

4 1/4" 108

7 5/8" 194

3/4" 19(TYP)

PROFILE VIEW

19" 483

8" 203

SCALE: 1:20

Thrie_Buttress-1_R6

SHEET:

7 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Post Nos. 17-19 Components

ELEVATION VIEW

Part d4

3/4" 19(TYP)

1 3/4" 44

4 1/8" 105

7 5/8" 194

Page 8: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

8" 203 4" 102

PROFILE VIEW

19" 483

PLAN VIEW

3 15/16" 100

5 7/8" 150

PROFILE VIEW

12" 305

19" 483

PROFILE VIEW

72" 1829

ELEVATION VIEWPart d6

SCALE 1:8

4 1/4" 108

7 5/8" 194

6" 152

3/4" 19(TYP)

1 3/4" 44

ELEVATION VIEW

6" 152

4 1/4" 108

7 5/8" 194

1 3/4" 44

3/4" 19(TYP)

SCALE: 1:15

Thrie_Buttress-1_R6

SHEET:

8 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Post Nos. 12-16 Components

Alternate Blockout Option

ELEVATION VIEW

Part d3

4 1/8" 105

7 5/8" 194

3/4" 19

3/4" 19

Page 9: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

8" 203 4" 102

ELEVATION VIEW

1 3/4" 44

4 1/4" 108

7 1/8" 181

6" 152

ELEVATION VIEWPart d7

SCALE 1:8

6" 152

4 1/4" 108

7 1/8" 181

1 3/4" 44

3/4" 19(TYP)

PROFILE VIEW

19" 483

PROFILE VIEW

12" 305

19" 483

PLAN VIEW

3 15/16" 100

5 7/8" 150

PROFILE VIEW

72" 1829

Alternate Blockout Option

Note: (1) Top bolt hole in part d2 is for use with asymmetric guardrail segment after 3" [76] roadway overlay.

(2) Top hole not necessary for testing.SCALE: 1:15

Thrie_Buttress-1_R6

SHEET:

9 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Post No. 11 Components

ELEVATION VIEWPart d2

1" 25

1" 253/4" 19

1/4" 63/4" 19

5 3/8" 137

4 1/8" 105

Page 10: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

8" 203 4" 102

PROFILE VIEW

14 1/4" 362

PLAN VIEW

3 15/16" 100

5 7/8" 150

PROFILE VIEW

12" 305

14 1/4" 362

PROFILE VIEW

72" 1829

ELEVATION VIEWPart d8

SCALE 1:8

3/4" 19

7 1/8" 181

1 3/4" 44

6" 152

ELEVATION VIEWAlternate Blockout Option

1 3/4" 44

6" 152

7 1/8" 181

3/4" 19

SCALE: 1:15

Thrie_Buttress-1_R6

SHEET:

10 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Post Nos. 3-10 ComponentsNote: (1) Top bolt hole in part d1 for use to attach rail and blockout after 3" [76]

roadway overlay.(2) Top hole not necessary for testing.

ELEVATION VIEWPart d1

3/4" 19

1" 25

1" 25

3/4" 19

1/4" 6

3" 76

4 1/8" 105

Page 11: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

PLAN VIEW

8" 203

6" 152

3/16" 5

PROFILE VIEW

72" 1829

4" 102

17" 432

1" 25

ELEVATION VIEW

Part c1

3/4" 19

7/8" 22

23 7/8" 606

7 1/8" 181

2 3/4" 70

PLAN VIEW

5 1/2" 140

7 1/2" 191

PROFILE VIEW

46" 1168

17 1/2" 445

3 3/4" 95

2 1/2" 64

SCALE: 1:16

Thrie_Buttress-1_R6

SHEET:

11 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

BCT Timber Post & Foundation Tube Details

ELEVATION VIEW Part c2

1" 25

3/4" 19

3" 76

Page 12: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

4" 102

75" 1905

ELEVATION VIEW

67" 1702

ELEVATION VIEWPart c5

SCALE 1:8

2" 51

4" 102

4" 102

4" 102

2" 51

PROFILE VIEW

5 5/8" 143

1 3/4" 44

55°

PLAN VIEW

Anchor BracketEnd Plate

1/4"[6] 5 1/2"[140]ThreeSides

13/16" 21

ELEVATION VIEW

R1/2" 13

1/2" 13 4 1/4" 1087/8"x2"

[22x51] Slot

PROFILE VIEW

1 1/2" 383" 76

PROFILE VIEW

6" 152

R1/2" 13(TYP)3" 76

1/8" 3

YokeStrut

ELEVATION VIEWPart c3

78" 1981

PLAN VIEWR5/16" 8 (TYP)

3/16" 5

8 1/2" 216

5 1/2" 140 ELEVATION VIEW

Anchor Bracket End PlateSCALE 1:8

3" 76

1 1/2" 38

1 3/8" 35

1 1/8" 29

2 3/4" 70

PROFILE VIEW

3/8" 10

SCALE: 1:16

Thrie_Buttress-1_R6

SHEET:

12 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Ground Strut Details

6"x3" [152x76] 10 Gauge [3.4] Strut

Yoke

PLAN VIEW 3/16"[4.8]

3/16"[4.8]

Page 13: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

5/8" 16

Standard SwagedFitting

SCALE 1 : 4DETAIL K

1"-8 UNC [M24] StudThreaded Entire Length

7" 178 5" 127

15" 381

1 1/4" 32

1 1/2" 38

Part c6

8" 203

8" 203

1 1/8" 295" 127

4" 102

Part c7

ELEVATION VIEW

6" 152

PROFILE VIEW

5/32" 4 2 3/8" 60

PROFILE VIEWELEVATION VIEW

SCALE: 1:8

Thrie_Buttress-1_R6

SHEET:

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility

13 of 23

REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

BCT Anchor Cable

3/4" [19] 6x19 IWRC IPS Cableor

6x25 IWRC IPS with minimum breaking strength of 42.7 kips [190 kN]

ELEVATION VIEWPart b4

K

50" 1270

80" 2032

Page 14: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

7 1/2" 191

35" 889

4" 102

PROFILE VIEW

4 1/2" 114

39" 991

12" 305

PLAN VIEW

1841

2

84" 2134

4" 102

3" 76

SCALE: 1:16

Thrie_Buttress-1_R6

SHEET:

14 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Buttress DetailsNotes: (1) Lower setback has lateral flare of 1:4.(2) Five 1" [25] diameter holes are required for placement of 7/8" [22]

diameter bolts.

ELEVATION VIEW

Part b1

17" 432

22 3/4" 578

24" 610

8" 2037 3/8" 187

3 13/16" 97

3 13/16" 97

3 13/16" 97

3 13/16" 97

1" 25(TYP)

18" 457

22 3/4" 578

Page 15: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

3 1/4" 83

3 1/4" 83

2 3/4" 70

(2) All edges of the top of the buttress are chamfered 1" [25].

(1) Vertical rebar embedded in tarmac with chemical epoxy adhesive with a minimum bond strength of 1,450 psi [10.0 MPa].

Notes:

2 Spaces @ 9 1/4" [235]= 18 1/2" [470]

3 Spaces @ 3 3/4" [95] = 11 1/4" [285]

6 1/4" 159

e5e4

e3e2

e9

e10 e8 12-e1

4 Spaces @ 4 3/4" [121]= 19" [483]

7 Spaces @ 6" [152]= 42" [1067]

4 Spaces @4 1/2" [114]= 18" 457

2 3/4" 70

9" 229

SCALE: 1:16

Thrie_Buttress-1_R6

SHEET:

15 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Rebar Detail

e7e8

e10

6" 152

2" 51CLR (TYP)

2" 51CLR (TYP)

2" 51CLR (TYP)

L

L

O

O

P

P

M

M

N

N

Page 16: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

6 1/2" 165

2 1/4" 57

7 1/2" 191

2 1/4" 57

4 3/4" 121

2 1/4" 57

5 7/8" 149

2 1/4" 57

3 1/2" 892 1/4" 57

SECTION O-O

e2

e6

e8

e10

e7

e9

2 15/16" 756 1/8" 155

SECTION P-P

e1

e8

e10

e7

e9

2 15/16" 756 1/8" 155

e10

SECTION M-M

e4 e7

e8

e9

e6

2 15/16" 75

6 1/8" 155

e6

SECTION N-N

e3

e10

e8

e9

e7

2 15/16" 75

6 1/8" 155

SCALE: 1:16

Thrie_Buttress-1_R6

SHEET:

16 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Buttress SectionsNote: (1) All stirrups have minimum 2" [51] concrete clear cover.

SECTION L-L

e5

e8

e9

e7

e10

2 15/16" 75

6 1/8" 155

Page 17: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

3" 76

39 3/4" 1008

5" 127

2" 51(TYP)

Y

5" 1272" 51(TYP)

43" 1092

Bar e5

37 3/4" 957

4" 102

Bars e2, e3, e4

24 1/4" 616

X8" 203

Z

Bar e6

40 1/4" 1022

Bill of BarsPart No. QTY Size X Y Z Unbent Length

e1 12 #4 41 1/2" [1,054] 43" [1,092] - 92" [2,337]e2 1 #4 40 1/2" [1,029] 42" [1,067] 16 1/4" [413] 65 3/4" [1,670]e3 1 #4 39 1/2" [1,003] 41" [1,042] 15 1/4" [387] 63 1/2" [1,612]e4 1 #4 38 3/4" [984] 40 1/4" [1,022] 14 1/2" [368] 62 1/4" [1,581]e5 1 #4 37 3/4" [959] 39 3/4" [1,010] - 80 3/4" [2,051]e6 1 #4 - - - 40 1/4" [1,022]

SCALE: 1:12

Thrie_Buttress-1_R6

SHEET:

17 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Vertical Rebar Details

Bar e1

41 1/2" 1054

8" 203

Page 18: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

2" 51

6" 152

7 3/8" 187

2" 51

Bar e9

80" 2032

Bar e10

4 5/8" 116166°

63 1/2" 1614

80" 2034

Bar e8

3 7/8" 98

76 1/2" 1943

80" 2032

SCALE: 1:12

Thrie_Buttress-1_R6

SHEET:

18 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Horizontal Rebar Details

Bill of Bars

Part No. QTY Size Unbent Length

e7 2 #4 80 1/4" [2,038]e8 4 #4 85 1/2" [2,171]e9 5 #4 80" [2,032]e10 1 #4 80 1/2" [2,045]

Bar e7

80" 2033

171°

58 3/16" 1478

4 1/8" 105

Page 19: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

7/8-9 UNC

Part f7

8" 203

1 7/8" 487/8" 22

1/8" 3

Part g1

1 3/4" 4411/16" 17

3/16" 4

Part g2

2 1/4" 5715/16" 24

5/8-11 UNCPart f8

2" 51

5/8" 16

5/8" 16

7/8" 22

5/8-11 UNCPart f3

1 1/4" 32

7/8-9 UNCPart f6

14" 3561 1/2" 38

5/8-11 UNCPart f2

10" 2544" 102

5/8-11 UNCPart f5

1 1/2" 38

5/8-11 UNCPart f4

10" 2541 3/8" 35

5/8" 16

5/8" 16

5/8" 16

5/8" 16

SCALE: 1:3

Thrie_Buttress-1_R6

SHEET:

19 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Fastener Details

5/8-11 UNCPart f1

14" 3564" 102

Page 20: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

6 1/4" 159

37 1/2" 953(TYP)

37 1/2" 953(TYP)

6 1/4" 159

18 3/4" 476 (TYP)

6 1/4" 159

8 1/2" 216 2" 51

6 1/4" 159

18 3/4" 476 (TYP)

3/4"x2 1/2" [19x64] Slot

(TYP)ELEVATION VIEWPart a5

R57 1/2" 1461

162 1/2" 4128

3/4"x2 1/2" [19x64] Slot (TYP)

ELEVATION VIEWPart a4

Q

162 1/2" 4128

3/4"x2 1/2" [19x64] Slot (TYP)

ELEVATION VIEWPart a2

87 1/2" 2223

PROFILE VIEW

12-gauge [2.7]

PROFILE VIEW

12-gauge [2.7]

PROFILE VIEW

12-gauge [2.7]

DETAIL QSCALE 1 : 15

1"x1 1/4"[25x32] Slot

(TYP)

DETAIL RSCALE 1 : 15

3/4" [19](TYP)

4" 102(TYP)

SCALE: 1:30

Thrie_Buttress-1_R6

SHEET:

20 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Guardrail Details

3/4"x2 1/2" [19x64] Slot (TYP)

ELEVATION VIEWPart a1

162 1/2" 4128

Page 21: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

37 1/2" 953 37 1/2" 953

22 3/4" 578

2 5/8" 66

8 1/2" 216

34°(TYP)

SECTION S-S

10-gauge [3.4]

SECTION U-USCALE 1 : 12

10-gauge [3.4]

1"x1 3/16" [25x30] Slot (TYP)

3/4"x2 1/2" [19x64] Slot (TYP)

ELEVATION VIEWPart a3

87 1/2" 2223

6 3/16" 156

12 5/16" 31319 15/16" 507

12 1/2" 318 12 1/2" 31862 1/2" 1588

4 1/8" 1054 5/16" 110

S

S

T

T

ELEVATION VIEWPart g3

3" 76

3" 76

1 1/16" 27

1 1/2" 38

1 1/2" 38

PROFILE VIEW

1/4" 6

SECTION T-T

SCALE: 1:15

Thrie_Buttress-1_R6

SHEET:

21 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Rail Transition and Component Details

1"x2" [25x51]Slot (TYP)

3/4"x2 1/2"[19x64] Slot

(TYP)

ELEVATION VIEWPart a6

4" 102

4" 102

2 7/16" 62

3 13/16" 97

3 13/16" 97

3 13/16" 97

3 13/16" 97

1" 25(TYP)

3/4" 19

3/4" 19

30" 762

20 3/16" 512

R1" 25(TYP)

2" 51

U

U

Page 22: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

SCALE: None

Thrie_Buttress-1_R6

SHEET:

22 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Bill of Materials

Item No. QTY. Description Material Specification Galvanization Specification Hardware Guide

a1 2 12'-6" [3,810] 12-gauge [2.7] Thrie Beam Section AASHTO M180 ASTM A653 RTM08a

a2 1 6'-3" [1,905] 12-gauge [2.7] Thrie Beam Section AASHTO M180 ASTM A653 RTM19a

a3 1 10-gauge [3.4] Symmetrical W-beam to Thrie Beam Transition AASHTO M180 ASTM A653 RWT01b

a4 3 12'-6" [3,810] 12-gauge [2.7] W-Beam Section AASHTO M180 ASTM A653 RWM04a

a5 1 12'-6" [3,810] 12-gauge [2.7] W-Beam MGS End Section AASHTO M180 ASTM A653 RWM14a

a6 1 10-gauge [3.4] Thrie Beam End Shoe Section AASHTO M180 ASTM A653 RTE01b

a7 1 6'-3" [1,905] 12-gauge [2.7] W-Beam MGS Section AASHTO M180 ASTM A653 RWM04a

b1 1 Concrete - 21.9 cubic ft [0.62 cubic m] Min. f'c = 4,000 psi [27.6 MPa] - -

c1 2 BCT Timber Post - MGS HeightSYP Grade No. 1 or better (No knots +/- 18" [457]

from ground on tension face)- PDF01

c2 2 72" [1,829] Long Foundation Tube ASTM A500 Gr. B *AASHTO M111 (ASTM A123) PTE06

c3 1 Ground Strut Assembly ASTM A36 *AASHTO M111 (ASTM A123) PFP02

c4 1 BCT Cable Anchor Assembly - - FCA01

c5 1 Anchor Bracket Assembly ASTM A36 *AASHTO M111 (ASTM A123) FPA01

c6 1 8"x8"x5/8" [203x203x16] Anchor Bearing Plate ASTM A36 *AASHTO M111 (ASTM A123) FPB01

c7 1 2 3/8" [60] O.D. x 6" [152] Long BCT Post Sleeve ASTM A53 Gr. B Schedule 40 *AAHSTO M111 (ASTM A123) FMM02

d1 8 W6x8.5 [W152x12.6] or W6x9 [W152x13.4], 72" [1,829] Long Steel Post ASTM A992 *AASHTO M111 (ASTM A123) -

d2 1 W6x8.5 [W152x12.6] or W6x9 [W152x13.4], 72" [1,829] Long Steel Post ASTM A992 *AASHTO M111 (ASTM A123) -

d3 5 W6x8.5 [W152x12.6] or W6x9 [W152x13.4], 72" [1,829] Long Steel Post ASTM A992 *AASHTO M111 (ASTM A123) -

d4 3 W6x15 [W152x22.3], 84" [2,134] Long Steel Post ASTM A992 *AASHTO M111 (ASTM A123) PWE12

d5 3 6"x8"x19" [152x203x483] Timber Blockout SYP Grade No.1 or better - PDB17

d6 5 6"x12"x19" [152x305x483] Timber Blockout SYP Grade No.1 or better - -

d7 1 6"x12"x19" [152x305x483] Timber Blockout SYP Grade No.1 or better - PDB18

d8 8 6"x12"x14 1/4" [152x305x368] Timber Blockout SYP Grade No.1 or better - PDB10a

* Component does not need to be galvanized for testing purposes.

Page 23: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

Item No. QTY. Description Material Specification Galvanization Specification Hardware Guide

d9 9 16D Double Head Nail - - -

e1 12 1/2" [13] Dia., 92" [2,337] Long Bent Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

e2 1 1/2" [13] Dia., 65 3/4" [1,670] Long Bent Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

e3 1 1/2" [13] Dia., 63 1/2" [1,612] Long Bent Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

e4 1 1/2" [13] Dia., 62 1/4" [1,581] Long Bent Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

e5 1 1/2" [13] Dia., 80 3/4" [2,051] Long Bent Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

e6 3 1/2" [13] Dia., 40 1/4" [1,022] Long Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

e7 2 1/2" [13] Dia., 80 5/16" [2,039] Long Bent Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

e8 4 1/2" [13] Dia., 85 1/2" [2,171] Long Bent Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

e9 5 1/2" [13] Dia., 80" [2,032] Long Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

e10 1 1/2" [13] Dia., 80 1/2" [2,045] Long Bent Rebar ASTM A615 Gr. 60 **Epoxy-Coated -

f1 19 5/8" [16] Dia. UNC, 14" [356] Long Guardrail Bolt and Nut

Bolt - ASTM A307 Gr. A Nut - ASTM A563A

AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 FBB06

f2 8 5/8" [16] Dia. UNC, 10" [254] Long Guardrail Bolt and Nut

Bolt - ASTM A307 Gr. A Nut - ASTM A563A

AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 FBB03

f3 52 5/8" [16] Dia. UNC, 1 1/4" [32] Long Guardrail Bolt and Nut

Bolt - ASTM A307 Gr. A Nut - ASTM A563A

AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 FBB01

f4 2 5/8" [16] Dia. UNC, 10" [254] Long Hex Head Bolt and Nut

Bolt - ASTM A307 Gr. A Nut - ASTM A563A

AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 FBX16a

f5 8 5/8" [16] Dia. UNC, 1 1/2" [38] Long Hex Head Bolt and Nut

Bolt - ASTM A307 Gr. A Nut - ASTM A563A

AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 FBX16a

f6 5 7/8" [22] Dia. UNC, 14" [356] Long Heavy Hex Bolt and Nut

Bolt - ASTM A325 Type 1 or ASTM A449 or SAI J429 Gr. 5 Nut - ASTM A563DH or ASTM

A194 Gr. 2H

AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 FBX22b

f7 2 7/8" Dia. [22] UNC, 8" [203] Long Hex Head Bolt and Nut

Bolt - ASTM A307 Gr. A Nut - ASTM A563A

AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 FBX22a

f8 24 5/8" [16] Dia. UNC, 2" [51] Long Guardrail Bolt and Nut

Bolt - ASTM A307 Gr. A Nut - ASTM A563A

AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 FBB02

g1 34 5/8" [16] Dia. Plain Round Washer ASTM F844 AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 FWC16a

g2 4 7/8" [22] Dia. Plain Round Washer ASTM F844 AASHTO M232 (ASTM A153) for Class C or AASHTO M298 (ASTM B695) for Class 50 -

g3 5 3"x3"x1/4" [76x76x6] or 3 1/2"x3 1/2"x1/4" [89x89x6] Square Plate Washer ASTM A572 Gr. 50 *AASHTO M111 (ASTM A123) FWR10

* Component does not need to be galvanized for testing purposes.

** Rebar does not need to be epoxy-coated for testing purproses.

SCALE: None

Thrie_Buttress-1_R6

SHEET:

23 of 23

DWG. NAME.

DATE:

1/18/2017

DRAWN BY:

TJD/JEKMidwest Roadside Safety Facility REV. BY:

KAL/SKR/RKF/JCH

UNITS: in.[mm]

34" Thrie-Beam AGT to Concrete Buttress

Bill of Materials

Page 24: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

System: Thrie Beam Buttress Transition

Drawing: Thrie_Buttress-1

Revision History

REV. DATE OF ISSUE Page NATURE OF CHANGES REVIEWER REVISED BY

0 10/6/2016 - Originated from drawing AGT Buttress_R11. - TJD/JEK

-Nested rail attachment hardware changed to 2" bolts. Dimension style

change. Dimension movement throughout.

1 Post numbering reversed.

9 Physical change: d7.

14 Dimension additions.

16 Dimension additions.

17 Dimension additions.

18 Part f8 added. Physical change: f3, f7.

20 Physical change: g3. Dimension additions.

21 HWG edits: a1-2, a6, d1-5, d7. Galvanization column header edit.

22New: f8. Quantity edit: f3. Description edit: f3, f7, g3. Material edit: f6, g3.

HWG edit: f6, g2-3. Galvanization column header edit.

-Lower bolt removed from transition post (post 10). Washers added to end

shoe rail attachment. Section lettering. Page added for buttress sections.

1 Note edits.

4 Washers added.

6 Washer bubbles edited.

9 Part d2 physical change. Note added.

10 Note added.

14 Dim shifts.

15 Sections L-P added (p16). Text edits. Dimensions removed.

16 New Page.

17 Table edit. Bars e2-4 variable additions. Physical change: b5, b6.

18 Table edit. Dim rounding.

22Description edit: a1-6. Material edit: a1-6, c1, d1-4. Galv edit: c2-3, c5-

7, d1-4. HWG edit: a3. Note added.

23 Quantity edit: f1, g1. Galv edit: e1-11, g3. Notes added.

-Rebar total length rounding. Rebar part renumbering per disuse of bar e7

(replaced by e6). E6 physical change.

4 Note added. Minor movement.

14 Dim shifts.

3 10/20/2016 SKR JEk

1 10/13/2016 KAL JEK

2 10/14/2016 SKR JEK

Page 25: E A B C D E ELEVATION VIEW€¦ · ELEVATION VIEW 1 3/4"44 4 1/4"108 7 1/8"181 6"152 ELEVATION VIEW Part d7 SCALE 1:8 6"152 4 1/4"108 7 1/8"181 1 3/4"44 3/4"19 (TYP) PROFILE VIEW

System: Thrie Beam Buttress Transition

Drawing: Thrie_Buttress-1

Revision History

15 Dim add.

16 Dimension edits. Note added.

17 Bar e7 removed. Table edits. Length rounding.

18 Bar numbering/naming edits.

23 Rebar (e series) naming and length edits.

-

6'-3" w-beam span and post added. Buttress rebar - additional top bar.

Document title edit.

1Post numbering. Dimension edit to correspond to additional post. All notes

edited.

2 Post numbering. Sheet title.

3 Post numbering. Sheet title. Nail removed.

4 Dimensions added.

9 Note edit.

14 Dim add. Note adds.

15 Dim add. Note 1 edit.

16 Additional top bar, dimensions to correspond.

18 e7 quantity.

BOM (22,23)

New: a7. Quantity edit: d1, d8, d9, e7, f1, f3. Description edit: a1-a6, g3.

Column header edits.

2 Note added.

7 Sheet title.

8 Sheet title.

9 Sheet title. Note added.

10 Sheet title. Note added. Note edit.

1 Note 5 edit.

8 Part d3 change.

20 Gauge thickness dim added.

21 Gauge thickness dim added.

23 Description edit: g3. Material edit: f6.

6 1/18/2017 JCH JEK

5 11/18/2016 KAL JEK

3 10/20/2016 SKR JEK

4 11/18/2016 RKF/SKR JEK