Steam Turbine Failure During Overspeed Test Eskom Duvha Unit No. 4 9 February 2011 Republic of South Africa

Transcript of Duvha

Page 1: Duvha

Steam Turbine Failure During Overspeed Test

Eskom Duvha Unit No. 49 February 2011

Republic of South Africa

Page 2: Duvha

Updated Presentation Rev 2

• 2 May 2011 expansion of the original presentation from 7 April 2011.

• Additional pictures received via e-mail showing ‘missle’ damage

• Three slides from Eskom presentation on power impact, photographs and explanation that no root cause analysis information will be released until completion of the investigation.

Page 3: Duvha

Severe damage to Unit No. 4 after failed overspeed test

Page 4: Duvha

Turbine Failure During OverspeedTesting

• Statutory turbine testing (later reported as an overspeed test) ended in severe mechanical damage

• Performed Wednesday night 9 February 2011• The unit was not on load. • Protection on the unit failed leading to rupture• A fire broke out and it was rapidly brought under

control.• Technical review has been launched• Outage estimated up to 18 months

Page 5: Duvha

Duvha Station

• 600 MW GEC Alstom Units• Tandem Compound Four Casing Units• 3,000 rpm• Station came on line in November 1975• Common turbine hall• Five sister units undamaged and remained

available for generation

Page 6: Duvha

News Release

Page 7: Duvha

Intact Unit from Generator End

Page 8: Duvha

Damage to Low Pressure (LP) Casings and Cross Over Piping

Page 9: Duvha

Severe outer casing rupture LP2

Page 10: Duvha

Fire damage at High Pressure (HP) Turbine

Page 11: Duvha

Damage at Generator (left) to Exciter (right) Coupling

Page 12: Duvha

Coupling Shaft thrown from unit

Page 13: Duvha

Shaft thrown from unit

Page 14: Duvha

Structural Damage

Page 15: Duvha

Damage to roof(20 m above the turbine deck)

Page 16: Duvha

Duvha LSB Failure 2003

• Sister Unit No. 2 suffered a last stage blade (LSB) failure on 8 January 2003.

• Similar damage as seen on Unit No. 4 with a fire, ruptured shafts & components leaving the building

• Minimal visible damage to outside of LP casings

Page 17: Duvha

Eskom Update

• On 8 April 2011 Eskom issued the ‘Quarterly Update: State of the Power System’

• The following three slides are from that document covering the Duvha incident.

• Source http://www.eskom.co.za/content/PowerSystemUpdateWinter2011final.pdf

Page 18: Duvha

Eskom Update

Page 19: Duvha
Page 20: Duvha
Page 21: Duvha

Additional Pictures

• The following pictures were received in April 2011, after the initial batch, and continue to show the damage to the turbine generator set.

• The pictures also show extensive damage done to the plant by ‘missiles’ created by thrown machine components.

Page 22: Duvha
Page 23: Duvha
Page 24: Duvha
Page 25: Duvha
Page 26: Duvha
Page 27: Duvha
Page 28: Duvha
Page 29: Duvha
Page 30: Duvha
Page 31: Duvha
Page 32: Duvha
Page 33: Duvha
Page 34: Duvha
Page 35: Duvha
Page 36: Duvha
Page 37: Duvha
Page 38: Duvha
Page 39: Duvha
Page 40: Duvha

The End

More to be learnt