August 15, 2015 Dear Mr. Casalan This is to formally submit our quotation regarding the technical requirements subject to the following terms and conditions: Event Date: August 18 to Sept 13, 2015 Set up: August 18, 2015 Pull out: September 13, 2015 Venue: WILFREDO GUERRERO THEATER PALMA HALL UNIVERSITY OF THE PHILIPPINES -DILIMAN Client: MR. MANNY CASALAN DULAANG UP PRODUCTION MANAGER P A R T I C U L A R S: RENTAL OF LED VIDEO WALL 1 SET 7’ x 9’ LED VIDEO WALL (P6) 1 UNIT PROCESSOR 1 LOT CABLES & CONNECTORS 1 LOT POWER CORDS TOTAL: Php 50,000.00 (TOTAL VAT INC. TERMS & CONDITION: GOVERNMENT TERMS Thank you, Arnold Sanchez
-
Upload
mark-mirando -
Category
Documents
-
view
212 -
download
0
description
LED
Transcript of Dup Led Wall
![Page 1: Dup Led Wall](https://reader036.fdocuments.net/reader036/viewer/2022083006/563db80e550346aa9a902c56/html5/thumbnails/1.jpg)
August 15, 2015
Dear Mr. Casalan
This is to formally submit our quotation regarding the technical requirements subject to the following terms and conditions:
Event Date: August 18 to Sept 13, 2015Set up: August 18, 2015Pull out: September 13, 2015Venue: WILFREDO GUERRERO THEATER
PALMA HALLUNIVERSITY OF THE PHILIPPINES -DILIMAN
Client: MR. MANNY CASALANDULAANG UP PRODUCTION MANAGER
P A R T I C U L A R S: RENTAL OF LED VIDEO WALL
1 SET 7’ x 9’ LED VIDEO WALL (P6)1 UNIT PROCESSOR 1 LOT CABLES & CONNECTORS1 LOT POWER CORDS
TOTAL: Php 50,000.00 (TOTAL VAT INC.
TERMS & CONDITION: GOVERNMENT TERMS
Thank you,
Arnold SanchezSALES & OPERATIONS
Conformed: MANNY CASALANDUP PRODUCTION MANAGER