Dunkettle Interchange Upgrade Scheme - corkcoco.ie Part... · Dunkettle Interchange Upgrade Scheme...
Transcript of Dunkettle Interchange Upgrade Scheme - corkcoco.ie Part... · Dunkettle Interchange Upgrade Scheme...
Dunkettle Interchange Upgrade Scheme
Transport Infrastructure Ireland
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 | 1
8th November 2017
Shared Use C ycle and Pedes trian Facility Part 8 Pl anning R eport
Transport Infr astr ucture Irel and
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 i
Dunkettle Interchange Upgrade Scheme
Project No: 32107200
Document Title: Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
Document No.: 32107200/P8/CYC/001
Revision: 1
Date: 8th November 2017
Client Name: Transport Infrastructure Ireland
Client No:
Project Manager: Andy Thompson
Author: Greig Houghton
File Name: G:\JI\HW\32107200 Dunkettle Interchange\8-Highways\Cycling Ped\32107200 Part 8
Cycle Report Rev1.docx
Jacobs Engineering Ireland Limited
Merrion House
Merrion Road
Dublin 4, D04 R2C5
Ireland
T +353 1 269 5666
F +353 1 269 5497
www.jacobs.com
© Copyright 2017 Jacobs Engineering Ireland Limited. The concepts and information contained in this document are the property of Jacobs. Use
or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright.
Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the
provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance
upon, this document by any third party.
Document history and status
Revision Date Description By Review Approved
0 29.06.17 Part 8 Planning GMH SN GMH
1 06.11.17 Updated Design EC GMH AMG
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 ii
Contents
Executive Summary ............................................................................................................................................... 1
1. Introduction ................................................................................................................................................ 2
1.1 Background ................................................................................................................................................. 2
1.2 Part 8 Planning Requirements .................................................................................................................... 3
1.3 Proposed Development ............................................................................................................................... 3
1.4 Definitions and Acronyms ............................................................................................................................ 3
2. Purpose of the Proposed Development .................................................................................................. 4
2.1 Project Aims ................................................................................................................................................ 4
2.2 Objectives .................................................................................................................................................... 4
3. Planning and Policy Context .................................................................................................................... 5
3.1 Dunkettle Upgrade Scheme ........................................................................................................................ 5
3.2 Proposed Development Planning and Policy Context ................................................................................. 5
3.2.1 The EuroVelo International Cycle Network ................................................................................................. 5
3.2.2 Smarter Travel: A Sustainable Transport Future 2009 – 2020 ................................................................... 6
3.2.3 National Cycle Policy Framework ................................................................................................................ 6
3.2.4 Cork County Development plan 2013-2019 ................................................................................................ 6
3.2.5 Cork Cycle Network Plan............................................................................................................................. 7
4. Description of the Proposed Development ............................................................................................ 9
4.1 Design Standards ........................................................................................................................................ 9
4.2 Cross-Section .............................................................................................................................................. 9
4.3 Design Speed .............................................................................................................................................. 9
4.4 Route Description ...................................................................................................................................... 10
4.5 Gradient ..................................................................................................................................................... 11
4.6 Pavement .................................................................................................................................................. 11
4.7 Vehicular Access ....................................................................................................................................... 11
4.8 Drainage .................................................................................................................................................... 11
4.9 Public Lighting ........................................................................................................................................... 11
4.10 Signage and Road Markings ..................................................................................................................... 12
4.11 Boundary Fencing ..................................................................................................................................... 12
5. Environmental Summary ........................................................................................................................ 13
5.1 Appropriate Assessment ........................................................................................................................... 13
5.2 Environmental Impact Statement .............................................................................................................. 13
6. Submissions ............................................................................................................................................ 14
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 1
Executive Summary
Transport Infrastructure Ireland in partnership with Cork County Council and Cork City Council proposes to
deliver the upgrade of the Dunkettle Interchange to a free flowing interchange. Following the publication of
statutory documents in July 2012, An Bord Pleanála approved the scheme on 23 April 2013, but included in the
approval a condition to remove the proposed path from the Dunkettle Roundabout to Dunkettle Road due to
“concerns regarding this proposed cycle route from the perspectives of potential for conflicts/accidents and
inefficiencies in traffic flow”.
This Part 8 Planning Report proposes an alternative pedestrian and cycle facility to provide the east-west
connectivity for pedestrians and cyclists through the Dunkettle Interchange.
The proposed developed comprises approximately 900m of Shared Use Cycle and Pedestrian Facilities
extending from Dunkettle Roundabout in the townland of Lota, Co Cork to terminate at cul-de-sac on Dunkettle
Road in the townland of Dunkettle. The existing cul-de-sac will be reconfigured as a shared surface street and
will bring pedestrians and cyclists to Dunkettle Road.
The proposed Shared Use Cycle and Pedestrian facility is predominantly off-road but follows the alignment of
the interchange link from N8 eastbound to M8 northbound. The initial section which crosses the Glashaboy
River is adjacent to the N8, but is physically segregated both horizontally through a 1.5m separation strip and
vertically through a kerbed upstand. The width of the proposed facility is 4m with the exception of the initial
section crossing the Glashaboy River which is constrained to 1.75m to fit within the existing structure.
Written submissions or observations with respect to the proposed development may be made in writing to the
Cork National Roads Office.
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 2
1. Introduction
1.1 Background
Transport Infrastructure Ireland in partnership with Cork County Council and Cork City Council proposes to
deliver the upgrade of the Dunkettle Interchange to a free flowing interchange, i.e. an interchange whereby
traffic movements aren’t conflicted by opposing traffic movements either by yielding or stopping at traffic signals,
as is the case with the existing interchange.
The scheme specific need relates to the current operational deficiencies associated with the existing
interchange. Although the existing interchange is of major importance in the context of the national road
network, it is currently operating above capacity in peak traffic conditions resulting in significant congestion, with
queues developing on many of the approaches. These queues result in increased journey times through the
interchange resulting in increased cost to businesses which is impacting on the economic competitiveness of
the region.
The scheme objectives are driven by the need to improve the current operational deficiencies associated with
the existing interchange. In addition to the core objectives associated with addressing the existing operational
issues, the scheme objectives also includes the minimisation of environmental impacts and consideration of
sustainable transport modes including pedestrian and cyclist facilities.
The proposed upgrade included the provision of pedestrian and cyclist facilities connecting Glounthaune to
Glanmire in an east to west and vice versa, direction and connecting Little Island and Glounthaune in a north to
south and vice versa direction. The proposed upgrade therefore caters for all movements in all directions
through the junction.
Following the publication of statutory documents in July 2012, An Bord Pleanála (ABP) conditionally approved
the scheme on 23 April 2013.
The ABP conditions included:
“3. The proposed cycle path from the Dunkettle Roundabout extending along link T1 shall be omitted
in its entirety.
Reason: The Board has concerns regarding this proposed cycle route from the perspectives of
potential for conflicts/accidents and inefficiencies in traffic flow. The Board considered that there may
be preferable cycle routes available to cater for those travelling from Dunkettle Roundabout to Little
Island such as across the tunnel to the East following a route which avoids the busiest junctions and
roads and which might be pursued by the National Roads Authority.”
The proposed cycle path to be omitted as part of the planning approval, commences at the Dunkettle
Roundabout and ran adjacent to the N8, on the northern side of the existing carriageway. The facility continued
along the proposed slip road to Glounthaune, before pedestrians and cyclists have to cross the M8 merge slip
(to avoid the diverge associated with the same link) onto the southern side of the slip road to Glounthaune,
where the facility continue towards Glounthaune. This part of the facility runs as far as the proposed roundabout
with Dunkettle Road and allowed pedestrians or cyclists to either gain access to Dunkettle Road, or alternatively
to the existing Burys Bridge Roundabout, where pedestrians or cyclists can travel east towards Carrigtwohill
and Midleton or go south towards Little Island.
This Part 8 Planning Report proposes an alternative pedestrian and cycle facility to provide the east-west
connectivity for non-motorised users through the Dunkettle Interchange.
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 3
1.2 Part 8 Planning Requirements
In accordance with the requirements of the Planning and Development Regulations, 2001 (as amended), this
report details the proposed development together with the accompanying drawings which together describe the
nature of the proposed development.
1.3 Proposed Development
The proposed developed comprises approximately 900m of Shared Use Cycle and Pedestrian Facilities
extending from Dunkettle Roundabout in the townland of Lota, Co Cork to terminate at cul-de-sac on Dunkettle
Road in the townland of Dunkettle. In addition, the existing cul-de-sac on Dunkettle Road shall be reconfigured
as a Shared Surface Street.
The location and extent of the proposed development is shown on Drawing 32107200/CYC/P8/001 and
Drawing 32107200/CYC/P8/002 respectively accompanying this report.
The proposed Shared Use Cycle and Pedestrian facility s shown on Drawing 32107200/CYC/P8/003 and is
predominantly off-road but follows the alignment of the diverge interchange link from N8 eastbound to M8
northbound. The initial section which crosses the Glashaboy River is adjacent to the N8, but is physically
segregated both horizontally through a 1.5m separation strip and vertically through a kerbed upstand.
The proposed development can be constructed within the boundary of the land acquired for the Dunkettle
Interchange Upgrade Scheme, the existing road bed of the cul-de-sac and no additional land is required.
1.4 Definitions and Acronyms
AA Appropriate Assessment
ABP An Bord Pleanála
Cycle Track
Part of a road, including part of a footway or part of a roadway,
which is reserved for the use of pedal cycles and from which all
mechanically propelled vehicles, other than mechanically propelled
wheelchairs, are prohibited from entering except for the purpose of
access.
EIS Environmental Impact Statement
NCPF National Cycle Policy Framework
NIS Natura Impact Statement
Rural Road A road outside of built-up areas including:
i. Single Carriageway roads;
ii. All-purpose Dual Carriageway roads; or
iii. Motorways.
Shared Surface Street A street where pedestrians, cyclists and vehicles share the main
carriageway and where pedestrians have priority of movement over
other uses.
Shared Use Cycle and Pedestrian
Facilities:
A Cycle Track or Cycleway that is provided for both cycle and
pedestrian use.
SLM Specific Landscape Measures
TII Transport Infrastructure Ireland
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 4
2. Purpose of the Proposed Development
2.1 Project Aims
The aim of the development is to provide an alternative cyclist and pedestrian facility to replace the facility
removed by ABP as part of the planning consent for the Dunkettle Upgrade scheme and re-establish the east-
west pedestrian and cycle connectivity.
2.2 Objectives
The objectives for the Dunkettle Interchange Upgrade Scheme are driven by the need to improve the current
operational deficiencies associated with the existing interchange. In addition to the core objectives associated
with addressing the existing operational issues, the scheme objectives also includes the minimisation of
environmental impacts and consideration of sustainable transport modes including pedestrian and cyclist
facilities within the proposed development.
This objective of the scheme related to the provision of pedestrian and cycling facilities is:
Provide dedicated pedestrian and cycle connectivity through the junction area away from the busy
corridors/arteries
The full list of objectives for the Dunkettle Interchange Upgrade Scheme is set out in the Dunkettle Interchange
Environmental Impact Statement published in 2012 available to view at:
http://www.n8n25dunkettle.ie/scheme_documentation.html
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 5
3. Planning and Policy Context
3.1 Dunkettle Upgrade Scheme
The planning and policy context for the Dunkettle Interchange Upgrade scheme against national, regional and
local policy was established in the EIS published in 2012.
The proposed development was consistent and compatible with the following national, regional and local policy
documents at the time of publication:
National Spatial Strategy for Ireland, 2002 – 2020;
Infrastructure and Capital Investment 2012-16: Medium Term Exchequer Framework;
Smarter Travel, 2009;
Cork Area Strategic Plan 2001 (and update of 2008);
Cork County Development Plan, 2009;
Blarney Local Area Plan, 2011;
Cork City Development Plan, 2009 – 2015; and
South West Regional Authority Regional Planning Guidelines 2010 – 2022.
3.2 Proposed Development Planning and Policy Context
The planning and policy context for the proposed development is set by Dunkettle Interchange Upgrade
Scheme. However, the sections below provide additional context for the proposed shared use pedestrian and
cycling facility with respect to various plans and policies including:
The EuroVelo International Cycle Network;
The Government’s Smarter Travel initiative;
The National Cycle Policy Framework;
The Regional Planning Guidelines;
The Development Plans of the respective affected Local Authorities; and
Cork Cycle Network Plan
3.2.1 The EuroVelo International Cycle Network
The European Cyclists’ Federation is coordinating the development of a network of high-quality cycling routes
that connects Europe and can be used by both long-distance cycle tourists, as well as by local people making
daily journeys. The EuroVelo network currently comprises of 15 routes and it is envisaged that the network will
be substantially complete by 2020.
EuroVelo Route EV1 (Atlantic Coast Route) extends from Norway to Portugal along the west coast of Europe in
Ireland, this route extends from Larne, County Antrim in the northeast, around the northern, western and
southern coasts, via Kerry, Cork and Waterford and ending in Rosslare, County Wexford in the southeast.
The Cork Cycle Network Plan (Refer to Section 3.2.5) has included for connections from the east with an inter-
urban route via Midleton and Carrigtwohill to respond to the strategic intent of the Eurovelo route network.
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 6
3.2.2 Smarter Travel: A Sustainable Transport Future 2009 – 2020
Smarter Travel: A Sustainable Transport Future is defined as the transport policy for Ireland for the period 2009-
2020. The policy recognises the vital importance of continued investment in transport to ensure an efficient
economy and continued social development, but it also sets out the necessary steps to ensure that people
choose more sustainable transport modes such as walking, cycling and public transport.
The policy aims to achieve sustainable transport through a suite of actions that will have complementary
impacts in terms of travel demand and emissions. This includes actions aimed at ensuring that alternatives to
the car are more widely available including investment in cycling and walking.
3.2.3 National Cycle Policy Framework
The National Cycle Policy Framework (NCPF) 2009-2020 operates under the overarching Smarter Travel policy
but focuses specifically on cycling. The mission of the NCPF is to create a strong cycling culture in Ireland with
a vision that all cities, towns, villages and rural areas will be bicycle friendly and an aim that 10% of all trips will
be by bike by 2020.
The framework sets out that all planning should consider the needs of cyclists which should be articulated in all
National, Regional, Local and sub-local plans. Cycling friendly urban planning principles will cover the need to
keep distances between origin and destination short, through making developments permeable (i.e. easy for
pedestrians and cyclists to pass through without making long detours) and well connected. Transportation
infrastructural designs need to be cycling friendly meaning that routes taken by cyclists are safe, direct,
coherent, attractive and comfortable
The framework proposed a hierarchy of measures including the following measures for cycle route development
and states the focus needs to be on:
reducing volumes of through-traffic, especially HGVs, in city and town centres and especially in the
vicinity of schools and colleges;
calming traffic / enforcing low traffic speeds in urban areas; and
making junctions safe for cyclists and removing the cyclist-unfriendly multi-lane one-way street
systems
3.2.4 Cork County Development plan 2013-2019
The Cork County Development plan 2013-2019 sets out an overall strategy for the proper planning and
sustainable development of Cork County over a 6 year period. The Development Plan vision and main aims for
the County is underpinned by the core principles of sustainability, social inclusion, quality of design and climate
change adaptation.
A key aim of the plan includes:
a) Enhanced quality of life for all, based on high quality residential, working and recreational
environments and sustainable transportation patterns;
The plan sets out a number of policies and objectives related to transport and in particular walking and cycling:
TO 7-1:Walking/Cycling and Greenways: Promote the development of walking and cycling routes
throughout the County as an activity for both international visitors and local tourists in a manner that is
compatible with nature conservation and other environmental policies.
TM 1-1: Transport Strategy:
- a) Provide a choice of transport modes for all citizens and visitors. Foster sustainable economic
and population growth by maintaining and developing an efficient and integrated transport system
for the County and, at the same time, encourage balanced investment in less polluting and more
energy efficient modes of public and private transport.
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 7
TM 2-1: Walking
- a) Encourage and facilitate a safe walking route network and a culture of walking where possible
and practical.
TM 2-2: Cycling
- a) Encourage and facilitate a safe walking and cycling route network and a culture of walking and
particularly cycling in the county, as a viable alternative travel choice. Local Area Plans will set
out Active Travel Strategies (cycling and walking) for individual towns and their hinterlands.
- d) Promote the development of an integrated and coherent local and countywide cycle network to
form part of the wider National Cycle Network. Routes will be promoted which generally seek to
avoid or minimise impacts on the environment and on EU designated sites.
TM 3-1: National Road Network: Seek the support of the National Roads Authority in the
implementation of the following major projects:
Projects Critical to the Delivery of Planned Development:
N28 (Cork – Ringaskiddy).
M8 (Dunkettle Interchange Upgrade).
Cork Northern Ring Road (N22/N20/M8)
Key NSS Projects
M 20 (Blarney – Mallow – Limerick).
N 25 (Carrigtwohill – Midleton – Youghal).
The plan recognises that a number of strategies, studies and other projects have already been developed or are
underway in the County which seek to put cycling to the forefront including in the County Metropolitan Area the
County, a cycle strategy that identifies both strategic and future local cycle links both within and from the
Metropolitan Towns.
3.2.5 Cork Cycle Network Plan
Cork City Council and Cork County Council prepared a Cycling Network Plan for the Cork City Metropolitan
Area and surrounding towns. The objective of the plan is to provide a clear plan for the future development of
the cycling network within the Metropolitan Area to encourage greater use of cycling for trips to work, school,
recreation and leisure.
The network has been categorised into different categories including:
Urban Cycle Network
- Primary: Main cycle arteries that cross the urban area and carry most cycle traffic
- Secondary: Link between principal cycle routes and zones
- Feeder: Cycle routes within local zones and/or connections from zones to the network levels
above (primary and secondary)
Inter-Urban Cycle Network: Links the towns and city across rural areas and includes elements of the
National Cycle Network
Green Network: Cycle routes developed predominantly for tourist, recreational and leisure purposes
but may also carry elements of the utility cycle route network above
The Plan sets proposals for the cycle network with Cork City and the metropolitan towns and includes corridors
to connect the Metropolitan Towns to Cork City and also to connect the suburban areas to Cork City Centre.
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 8
This includes key inter-urban routes (IU-1) which comprises:
Segregated cycle path from Midleton to Dunkettle Roundabout via Carrigtwohill, Little Island and the
Dunkettle Interchange where it can collect trips from Glanmire.
The proposed development is located in the Glanmire, Glounthaune and Little Island metropolitan network. The
plan highlights that lack of facilitates in the area and in particular Little Island which has no dedicated cycling
facilities going to or from the Island and is accessed via the Dunkettle interchange, the N25 junction slip roads
or via an overbridge which connects it with the Old Dublin Road north of the N25.
The following networks are proposed in the vicinity of the proposed development and the Dunkettle Interchange
Upgrade Scheme.
Interurban
- IU-1: Parallel to Midleton Rail Corridor and Old N25 (Midleton to Dunkettle Roundabout/Lower
Glanmire Road)
Primary
- CCN-U26: Lower Glanmire Road (Dunkettle Roundabout to Pemrose Quay)
- GL-U1: Glanmire Road (Dunkettle Roundabout to Lower Glanmire)
- GL-U3 Dunkettle Road (East Cliff Road to N25)
- LI-U2 R623 Eastgate Entrance to St. Lappans Church/Island Cross
- LI-U6 To R623 (Future Link to Dunkettle Interchange)
Potential Primary
- LI-U10: Little Island to Lower Glanmire Road (From Dunkettle Interchange Link to Dunkettle
Roundabout via waterfront)
Secondary
- LI-U9: Factory Hill (Dunkettle Road to Old N25)
The proposed development is consistent with part of the route of the proposed IU-1 Parallel to Midleton Rail
Corridor and Old N25 Inter-urban corridor for the section between Dunkettle Roundabout and Dunkettle Road.
The plan proposes that the infrastructure should be fully segregated cycle track (physically segregated from
motorised traffic) running parallel to the rail line from Midleton to the west of Carrigtwohill village where it is
proposed to provide a two way segregated cycle track within the corridor of the old N25. The plan proposes that
this route can form part of the Eurovelo Network between Waterford and Kerry, connecting to the west through
the proposed network in the City Centre.
The proposed development, as part of the proposed IU-1 directly links with the proposed networks CCN-U26,
GL-U1, and GL-U3. In addition, the other north-south cycling facilities provided as part of the Dunkettle
Interchange form network LI-U6 and link to LI-U9, LI-U2, LI-U10 and connect back to IU-1.
The proposed development in the context of the Dunkettle Interchange Upgrade Scheme and the Cork Cycle
Network Plan is shown on Drawing 32107200/CYC/P8/002.
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 9
4. Description of the Proposed Development
4.1 Design Standards
The proposed shared use cycle and pedestrian facility has been designed in accordance with TII Publications
Standards including:
DN-GEO-03036 Cross-Sections and Headroom; and
DN-GEO-03031 Rural Road Link Design.
The facility shall be provided within the road boundary of the Dunkettle Upgrade Scheme but as far from the
edge of the carriageway as possible to increase the safety and comfort of users.
Table 4.1 : Design Standard
Criteria Standard Adopted
Type of Facility Cycle Track
Type of Use Shared Use with pedestrians
Direction Two Way
The Shared Surface Street shall be designed in accordance with the Design Manual for Urban Roads and
Streets.
4.2 Cross-Section
The following cross-section has been adopted for the scheme. References to Left Hand and Right Hand are
with respect to the direction of travel with increasing chainage (i.e. travel from Dunkettle Roundabout to
Dunkettle Road)
Table 4.2 : Cross-Section
Approximate
Chainage
Section Description Cross-Section
Left Hand Verge
(Lateral Clearance)
Facility Width Right Hand Verge
(Separation Distance)
Start to 100m N8 Glashaboy River 0.25m hardened verge 1.75m 1.5m hardened verge
100m to 200m N8 Cycletrack 0.5m min grass verge 4m 0.5m grass verge
200m to 800m Off-road Cycletrack 0.5m min grass verge 4m 0.5m grass verge
800mm to cul-
de-sac
Off-road Cycletrack 0.5m min grass verge 3m 0.5m grass verge
Length of cul-de-
sac
Shared surface street Varies 4.8m max Varies
4.3 Design Speed
The design speed of the cycle facility shall be 50 km/h in accordance with TII Publications DN-GEO-03031
Rural Road Link Design. However, on approach to junctions a reduced design speed of 10 km/h is acceptable.
In addition, on long downward slope sections (steeper than 5% and longer than 150 m), a design speed of 50
km/h should be implemented.
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 10
4.4 Route Description
The proposed development is shown on Drawing 32107200/CYC/P8/003 accompanying this report.
The proposed facility commences at the Dunkettle Roundabout. The roundabout will be signalised as part of
the Dunkettle Upgrade Scheme and includes crossings for pedestrians and cyclists but does not form part of
this Part 8 Planning submission.
The facility heads eastbound to cross the Glashaboy River. A new kerb line will be constructed across the
structure to create a raised verge on which the segregated facility will run. The 1.75m wide shared facility will
be separated from the carriageway horizontally by a 1.5m wide separation strip and vertically by the kerb. A
0.25m horizontal clearance will be provided between the facility and the parapet which will be replaced with a
new 1.4m high parapet.
Figure 4.1 : Cross-Section across Glashaboy River Bridge
Having crossed the river, the facility will widen to its full 4m width with a 1.5m separation zone maintained to the
carriageway. The cycleway crosses a private residential access before diverging from the N8 carriageway
approximately 200m from the start of the facility. The cross-section of the facility comprises a 4m shared cycle
track with 0.5m grass verges on each side. The facility is physically separated from the carriageway by a large
horizontal distance and vertically by a difference in elevation between the road and the shared facility. In
addition, a boundary fence is provided at the back of the shared facility verge.
Figure 4.2 : Cross-Section of facility remote from the road
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 11
The route of facility continues eastwards following the line of the road boundary from approximately 400m
before heading north following the line of road boundary of the M8. The shared facility is segregated from the
M8 motorway through a horizontal separation zone in addition to a 2.4m high security fence positioned at the
back of the verge of the shared facility. To minimise vegetation loss at the northern end of the facility the width
of the shared surface will reduce to 3m at the 800m mark and continue to the end of the new facility where it ties
in with the cul-de-sac. The overall length of the new facility is 913m.
The proposed off road cycletrack terminates at a cul-de-sac on Dunkettle Road where it will continue as a
shared surface street. The shared surface will be retrofitted over the length of the cul-de-sac where it ties in with
future primary network GL-U6 as highlighted in the Cork Cycle Network Plan 2015.
The Propose Shared Street will be finished with a contrasting surfacing to indicate that the carriageway is an
extension of the pedestrian domain. The shared street shall have a maximum carriageway width of 4.8m which
will be demarcated with flush kerbs fully embedded within the surface of the street. The remaining width
between the existing walls shall act as refuge zones allowing pedestrians to step on and off the carriageway to
let cars pass.
4.5 Gradient
The elevation of the route rises from 4 mOD east of the Glashaboy River to approximately 22 mOD at the tie-in
at the Dunkettle Road cul-de-sac at an average gradient of 2.2%. The gradient follows the natural topography
and increases towards the tie-in to the Dunkettle Road cul-de-sac with a section of 4.4% gradient for
approximately 165m to the tie-in with the shared surface street.
4.6 Pavement
Construction of the shared facility shall consist of bound flexible pavement with the exception of the length of
the Glashaboy River Structure which shall be concrete. The shared surface street shall be in accordance with
the Design Manual for Urban Roads and Streets. The exact specification and design of the pavement shall be
determined in the detailed design.
4.7 Vehicular Access
The route crosses a single private residential access. The crossing facility shall; be a bend out crossing in
accordance with TII Publications DN-GEO-03060 Geometric Design of Junctions.
The bend out junction treatment includes a straight approach for cyclists to ensure that cyclists are provided
with full visibility on entry to the junction treatment. The horizontal radii of 10 metres on the cycle facility shall be
introduced to encourage lower cycle speeds on approach to the junction. A colour contrast treatment shall be
provided along the cycle route warning cyclists of the upcoming conflict with motorised traffic.
4.8 Drainage
The cycle facility shall be constructed with a crossfall generally between 1.0% and 3.0%, with a maximum of
5.0% permitted over short sections. Surface water runoff from the cycletrack will be collected by direct runoff
into combined surface water and ground water filter drains.
4.9 Public Lighting
The new section will be fully lit.
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 12
4.10 Signage and Road Markings
At the start and end of a cycle facility and where the cycle facility connects with a public road, Sign RUS 058
(Traffic Signs Manual) for facilities shared between pedestrians and cyclists will be erected.
Figure 4.3 : RUS 058 Sign
In addition, road markings will be provided on Dunkettle Road in advance of the junction with the shared surface
street to warn of the presence of cyclists.
4.11 Boundary Fencing
Permanent road side boundary fencing will be erected as part of the Dunkettle Interchange Upgrade Scheme at
the extent of the land purchased for the scheme. In addition, boundary fencing will be erected at the back of the
right hand verge of the cycle facility in the off-road section between chainage 200m and chainage 900m. The
fencing shall be timber post and tensioned mesh with the exception of the section adjacent to the M8 motorway
between chainage 670m and 900m which shall be 2.4m high palisade fencing for security purposes.
Shared Use Cycle and Pedestrian Facility Part 8 Planning Report
32107200/P8/CYC/001 13
5. Environmental Summary
5.1 Appropriate Assessment
An AA Screening for the Dunkettle Interchange Upgrade Scheme was undertaken by Scott Cawley on behalf of
Jacobs in 2011 and concluded that an Appropriate Assessment (AA) would be required for the scheme. The
Appropriate Assessment was undertaken and a Natura Impact Statement (NIS) published in 2012. As a result of
the appropriate design of the Dunkettle Upgrade and proposed mitigation measures, the NIS concluded that the
proposed development will have not result in impacts on the integrity of any European Sites.
The NIS can be downloaded from the Dunkettle Interchange Upgrade Scheme website:
http://www.n8n25dunkettle.ie/scheme_documentation.html
5.2 Environmental Impact Statement
The Environmental Impact Statement for the Dunkettle Scheme was published in 2012 including a schedule of
environmental commitments. The purpose of these environmental commitments is to mitigate or ameliorate
potentially significant adverse impacts that have been identified in the EIS.
This is included Specific Landscape Measures (SLM01) to the boundary of Dunkettle House comprising the
retention and protection of the existing vegetation to Dunkettle House boundary to maximum extent feasible.
Upon completion of new earthworks and road alignment plant low canopy woodland with high percentage of
evergreen species (EW1) to embankments. This mitigation will also be implemented for the construction of the
shared facility.
The EIS can be downloaded from the Dunkettle Interchange Upgrade Scheme website:
http://www.n8n25dunkettle.ie/scheme_documentation.html