WATER & ENVIRONMENT CPS INFRAESTRUCTURAS MOVILIDAD Y MEDIO AMBIENTE, S.L. DUNE REGENERATION “PINAR BEACH” CONTRACT DATA ADMINISTRATIVE INFORMATION TECHNICAL INFORMATION TYPE OF CONTRACT: Work Management Technical Assistance CONTRACT NAME: Work Management Assistance for the northern beachfront (Pine Beach) Castellón. LOCATION: Castellón BUDGET: 438.906,18 € WORK BUDGET: 9.670.575,81 € CLIENT: Conselleria de Infraestructuras y Transporte, Generalitat Valenciana. DATE (BEGINNING-END) October 2004-July 2007. Earth Movements: Excavation: 111.352,10 m 3 Tolerable soil filling: 85.620,00 m 3 Riprap filling: 12.261,44 m 3 Remediation network: 1.823 ml Supply network: 1.688 ml Low Voltage Network: 1.764 ml Irrigation Network: Spraying Risk: 10.890 ml Leaking Risk: 6.257 ml Plantations: Bushes: 453.445 units Shrubs: 63.860 units Trees: 3.264 units Dune regeneration: 22.0000 m 2 Concrete walk to wash: 13.452,56 m 2 WORK OBJECTIVE The work objective is to recover the Pine Woods with the characteristic environment of the beach dunes for the community, and create a Coastal Park integrated into the beach and the adjacent green infrastructure, displacing, likewise, the road traffic and the vehicle parking lot to the subsequent roads, clearing the coast and widening the seafront promenade. PERFORMED TASKS Geometric Control Economic Control Quality Control of Materials Initial and Final Report Monthly Reports Modified Project No. 1 Liquidation Project of the Work Price Revisions PREVIOUS STATE FINAL STATE Aerial Photo: Before Work Aerial Photo: After Work

Transcript of DUNE REGENERATION “PINAR BEACH”€¦ · PREVIOUS STATE FINAL STATE Aerial Photo: Before Work...

Page 1: DUNE REGENERATION “PINAR BEACH”€¦ · PREVIOUS STATE FINAL STATE Aerial Photo: Before Work Aerial Photo: After Work . WATER & ENVIRONMENT CPS INFRAESTRUCTURAS MOVILIDAD Y MEDIO

WATER & ENVIRONMENT

CPS INFRAESTRUCTURAS MOVILIDAD Y MEDIO AMBIENTE, S.L.

DUNE REGENERATION “PINAR BEACH”

CONTRACT DATA ADMINISTRATIVE INFORMATION TECHNICAL INFORMATION

TYPE OF CONTRACT: Work Management Technical Assistance

CONTRACT NAME: Work Management Assistance for the northern beachfront (Pine Beach) Castellón.

LOCATION: Castellón

BUDGET: 438.906,18 €

WORK BUDGET: 9.670.575,81 €

CLIENT: Conselleria de Infraestructuras y Transporte, Generalitat Valenciana.

DATE (BEGINNING-END) October 2004-July 2007.

Earth Movements: Excavation: 111.352,10 m3 Tolerable soil filling: 85.620,00 m3 Riprap filling: 12.261,44 m3 Remediation network: 1.823 ml Supply network: 1.688 ml Low Voltage Network: 1.764 ml Irrigation Network: Spraying Risk: 10.890 ml Leaking Risk: 6.257 ml Plantations: Bushes: 453.445 units Shrubs: 63.860 units Trees: 3.264 units Dune regeneration: 22.0000 m2 Concrete walk to wash: 13.452,56 m2

WORK OBJECTIVE

The work objective is to recover the Pine Woods with the characteristic environment of the beach dunes for the community, and create a Coastal Park integrated into the beach and the adjacent green infrastructure, displacing, likewise, the road traffic and the vehicle parking lot to the subsequent roads, clearing the coast and widening the seafront promenade.

PERFORMED TASKS

Geometric Control

Economic Control

Quality Control of Materials

Initial and Final Report

Monthly Reports

Modified Project No. 1

Liquidation Project of the Work

Price Revisions

PREVIOUS STATE FINAL STATE

Aerial Photo: Before Work Aerial Photo: After Work

Page 2: DUNE REGENERATION “PINAR BEACH”€¦ · PREVIOUS STATE FINAL STATE Aerial Photo: Before Work Aerial Photo: After Work . WATER & ENVIRONMENT CPS INFRAESTRUCTURAS MOVILIDAD Y MEDIO

WATER & ENVIRONMENT

CPS INFRAESTRUCTURAS MOVILIDAD Y MEDIO AMBIENTE, S.L.

DESCRIPCIÓN DE LA OBRA

The Beachfront Park of Pine Beach is made up of a washed concrete beachfront promenade combined with Elondo wood. In the higher areas of the promenade, concrete bleachers lined with wood have been installed. The implemented installations have been supply, lighting, irrigation networks, low voltage and rain collectors on the streets adjoining the park.

In total, it includes a large green leisurely space where an important dune regeneration was executed on 1,800 meters of coastline, characteristic of the Comunidad Valencia beaches, with the planting of more than 3,000 trees and the installation of complete urban features.

The basic criteria that have governed the design of the beachfront park are the following: - Creation of a zone integrated between the green zone, beach and sea of approximately 185,000 m2. - Continuation of the traditional pine forest with the beach connecting the Pine forest to the beach. - Connection of the pedestrian route to the sea, through wooden walkways. - Improvement of the accessibility and features, with a design heavily integrated into the park that surrounds it.

- Creation of a beachfront promenade carefully designed to achieve an orderly and palatable route with changing views of the sea, accompanied by the diversity of topography and vegetation.

Dune Regeneration. Elondo Bleachers

Green Paving for Parking. General View of the Work.