Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and...

33
Duct and Pole Access (DPA) digital map tool: Ordering Co-op and Ancillary Works Version R4150 21/09/2019

Transcript of Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and...

Page 1: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

Duct and Pole Access (DPA) digital map tool: Ordering Co-op and Ancillary Works

Version R4150

21/09/2019

Page 2: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

2 In Confidence

Notice

Openreach maintains that all reasonable care and skill has been used in the compilation of this publication. However, Openreach shall not be under any liability for loss or damage (including consequential loss) whatsoever or howsoever arising as a result of the use of this publication by the reader, their servants, agents or any third party. In the event

of a discrepancy between the contents of this document and the contract, the Terms & Conditions shall take precedence. This is a living document and will be subject to update and change. The information within this document is provided for information purposes only. The Contract and Price List take precedence.

Index

Section Page

Create order for Co-op and Ancillary Works ............................................................................................................ 4

Order Type .......................................................................................................................................................... 5

Order Details ....................................................................................................................................................... 6

Create and select contacts .................................................................................................................................... 7

Product Details .................................................................................................................................................. 11

Pole Replacement .................................................................................................................................. 14

Provide Pole Top Ring Head................................................................................................................... 14

Pull Through Services ............................................................................................................................ 15

Removal of Locked Lids ......................................................................................................................... 15

New Carriageway Box ........................................................................................................................... 16

New Duct ............................................................................................................................................... 16

New Footway Box .................................................................................................................................. 17

New Pole ............................................................................................................................................... 17

Openreach Assist ................................................................................................................................... 18

Accreditation ......................................................................................................................................... 18

Cable Recovery ...................................................................................................................................... 19

Cable Retention Refix and Renewal ....................................................................................................... 19

Duct Blockage Clearance ....................................................................................................................... 20

Co-op Survey ......................................................................................................................................... 20

Issue of Security Key ............................................................................................................................. 21

Joint Box Breakthrough ......................................................................................................................... 21

Confirm Order ................................................................................................................................................... 22

Order Confirmation ............................................................................................................................................ 23

Cancellation of an In-flight Co-op and Ancillary Order ............................................................................................ 24

Cancel/Amend an individual orderline ................................................................................................................... 27

Cancel Line Item ................................................................................................................................... 29

Page 3: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

3 In Confidence

Appendix 1 – Product Attributes .......................................................................................................................... 33

Page 4: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

4 In Confidence

Create order for Co-op and Ancillary Works

To create an order for Co-op and Ancillary Works you must first have placed a Notice of Intent to build a network using Openreach infrastructure and have received the Acknowledgement KCI (KCI-ACK) for that NoI

Once received, use the Search for NoI function on the main menu.

Page 5: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

5 In Confidence

The NoI details will be shown.

Click the (Progress Order Journey) button to start the ordering process.

Order Type

Page 6: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

6 In Confidence

Choose the order type for “Co-op and Ancillary order” Click “Next”.

Order Details

On the “Order Details” screen.

Account Pre-filled with user information

Billing Account Pre-filled with user information

Customer Reference Optional CP own reference - this can be different to the NoI Customer Reference

Required by date Mandatory Pre-set to the next day - can be amended

Customer Group Email for KCI Mandatory The e-mail address which e-mail KCI's will be sent to

Cc Email Optional A second address for the e-mail KCI's

Contact Details Mandatory Person who created the order

Alternate Contact Details Optional Second contact for the order

DFE Authorisation Contact Details Mandatory The person who will authorise changes to the order

Work Description Notes Optional Free text description of the order

Job Contact Details Optional Additional contact details - perhaps contractors/engineering teams

This order has been planned and will be built to meet the relevant Openreach engineering specifications

Mandatory Confirmation of planning/build quality

This order is part of a submitted forecast Mandatory Yes/No. Order will progress if answered No

Note – Customer Reference Field is currently mandatory due to a system defect.

Page 7: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

7 In Confidence

Create and select contacts

Contacts can be created and stored for the following fields: Contact Details Alternate Contact Details

DFE Authorisation Contact Details Job Contact Details

Click the box next to the field

The following screen will appear. A new contact can be created by clicking on “Create Contact”

A stored contact can be found by entering a value in the “Field Name”

Page 8: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

8 In Confidence

Fill in this screen to create a new contact. Click OK

To use a stored contact, select the name using the radio button and click OK

Page 9: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

9 In Confidence

Page 10: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

10 In Confidence

Once all of the fields have been completed on the “Order Details” screen, click Next.

Page 11: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

11 In Confidence

Product Details

The “Product Details” screen is where you enter the details of the Co-op/Ancillary products you wish to order together with the location details and where you wish to complete the work yourselves (Self Provide)

Click “+ Add a Product”.

Select which products you wish to order. There is a maximum of 10 on each order and the works must be relevant to the NoI this order is attached to. Click “OK” to proceed.

Page 12: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

12 In Confidence

The sum of the “Quantity” column must equal 10 or less.

To enter multiple requests for one product, increase the quantity and then click on “Ungroup” to create separate order lines.

There is a known issue where the Line Item numbers start at 2. This will be resolved in a later system development.

Ungroup Add additional line items of a product

Customise Add work/location details to the order

Remove Remove the line item

Cancel Cancel the whole Co-op/Ancillary order

Back Back one stage

Next Proceed to next stage

Note that all line items must be updated using “Customise” before clicking on “Next” as they contain mandatory items.

Page 13: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

13 In Confidence

This screen shows an additional Pole Replacement line item following the “Ungroup” request.

Each line item needs additional information entering, some of it is mandatory.

All data needs to be relevant to the NoI this order is attached to.

Enter the data and click “Save”. This takes you back to the line item list.

Page 14: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

14 In Confidence

Pole Replacement

Provide Pole Top Ring Head

Quotation Price should be £0 if Self-Provide =Yes selected

Page 15: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

15 In Confidence

Pull Through Services

Removal of Locked Lids

Page 16: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

16 In Confidence

New Carriageway Box

New Duct

Page 17: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

17 In Confidence

New Footway Box

New Pole

Page 18: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

18 In Confidence

Openreach Assist

Accreditation

Page 19: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

19 In Confidence

Cable Recovery

Cable Retention Refix and Renewal

Page 20: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

20 In Confidence

Duct Blockage Clearance

Co-op Survey

Page 21: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

21 In Confidence

Issue of Security Key

Joint Box Breakthrough

Page 22: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

22 In Confidence

Once all line items have been completed using the “Customise” link, press “Next” to proceed to the Confirm Order stage

Confirm Order

This screen gives you a summary of the Co-op/Ancillary order.

Use “View Details” to look at the data entered for each line item. If all details are correct then click “Submit”

Page 23: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

23 In Confidence

Order Confirmation

This screen gives you the Openreach Reference which should be used with the NoI Reference.

You should upload the supporting information such as the build report and photographs via the Upload Documents icon on the NoI Details screen (See separate Upload Documents User Guide). Use the PIANOI reference in the file description in the upload functionality. The PIA Operation team will not be able to validate and acknowledge this order until they receive this and may place the order into delay.

Page 24: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

24 In Confidence

Cancellation of an In-flight Co-op and Ancillary Order

Find the order through:

Search by Notice of Intent

Progress Co-op and Ancillary Order

Choose “View orders” and click next

A list of orders will be displayed

Choose the order required and click next

Page 25: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

25 In Confidence

The order details will be shown

Page 26: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

26 In Confidence

Choose the relevant cancellation reason and Submit

The cancellation will show as Pending.

When using View Orders the order line items will show as Cancellation Pending.

Page 27: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

27 In Confidence

Cancel/Amend an individual orderline

To amend a co-op & ancillary order search for the NOI and click on Progress Order Journey

Choose View Orders

Choose the order you wish to amend and click Next

Page 28: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

28 In Confidence

On this screen you can view the product details prior to amending Click on Amend order

Contact details and Work Description notes can be changed at any time after you receive the KCI Acknowledge until the order is either completed or cancelled.

Page 29: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

29 In Confidence

If contact details are amended then you will receive this KCI – Contact Details Amend to confirm we have received the changes.

Cancel Line Item

Page 30: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

30 In Confidence

At this stage you may wish to cancel an individual line item Choose the line item and click Cancel Product

You will get a warning message. Click Yes if you wish to continue. Click Next of the return screen.

Click Next. View details if required and click Submit

Page 31: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

31 In Confidence

This screen will confirm that the amend request has been submitted

Your cancellation request will be processed by the PIA team. You will receive a KCI – Amend when the cancellation request is submitted.

Page 32: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

32 In Confidence

Page 33: Duct and Pole Access (DPA) digital map tool: Ordering Co ...€¦ · Create order for Co-op and Ancillary Works ... Mandatory Confirmation of planning/build quality ... Select which

will be available from 1st April 2019.

Appendix 1 – Product Attributes

Self-Provide is currently only available for: Duct Blockage Clearance, provide Pole Top Ring-head and Joint Box Breakthrough. Other self-provide options