1 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
DRIVE TEST REPORT
SITE SEDJE-DENOU
Is an exiting mono band site with 900MHZ band
2 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
TABLE OF CONTENTS
1. INTRODUCTION 42. SITE AUDIT 42.1 General Information 42.2 Site Engineering Parameter Checking 42.3 CDD Checking 43. DRIVE TEST ANALYSIS 53.1 Serving Cell (in Idle mode) Plot for Pre Drive test and after 53.2 Coverage (RxLev in Idle Mode) Plot for Pre Drive test and after 63.3 Coverage (RxLev in Dedicated Mode) Plot for Pre Drive test and after 73.4 Signal Quality (RxQual in Dedicated) Plot for Pre Drive test and after 84. HOSR Performance for Pre Drive test and after 85. KPI STATISTICS 96. CONCLUSION 97. DRIVE TEST ACCEPTANCE CERTIFICATE 10
3 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
ABBREVIATIONS
BA BCCH AllocationBCCH Broadcast Control ChannelBTS Base Transceiver StationCDD Cell Design DataCGI Cell Global IdentityKPI Key Performance IndicatorMF Measurement FrequencyHOSR Hand Over Success RateRND Radio Network DesignTCH Traffic ChannelCSSR Call Setup Success Rate
4 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
1 INTRODUCTION
2 SITE AUDIT
2.1 General information
SEDJE-DENOUis an existing mono band site with 900MHZ serving in their designated areas
2.2 Sites Engineering Parameters Checking
PHYSICAL PARAMETERS MEDED1 MEDED2 MEDED3 Remarks
Longitude (deg) 2.37704 2.37704 2.37704 As plannedLatitude (deg) 6.72442 6.72442 6.72442 As plannedBTS Type 6102 6102 6102 As plannedNo of TRU's 4 4 4 As plannedFrequency Band GSM900 GSM900 GSM900 As plannedRBS Antenna Quantity 1 1 1 As plannedRBS Antenna Azimuth 0 140 250 As planned
2 2 2
0 0 0
41 41 41
Tower Height (m) 45 45 45 As planned
2.3 CDD Checking (compare sites founding and CDD)
MEDED1 MEDED2 MEDED3 Remarks
BSC ERIBSC1 ERIBSC1 ERIBSC1 As plannedCGI As planned
BCCH Frequencies 56 64 58
BSIC 14 17 14
TCH Frequencies
Comments:
The objective of the report is to document fulfilment of the agreed Responsibility Matrix concerning Radio Network Design service related to the densification, as offered by Ericsson.
RBS Antenna Electrical Down tilt (deg)
RBS Antenna Mechanical Down tilt (deg)RBS Antenna Height above Ground (m)
616-02-7-42071
616-02-7-42072
616-02-7-42073
5 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
3 DRIVE TEST RESULTS
3.1 Serving Cell (in Idle mode) Plot for Pre Drive test Before Swap SEDJE-DENOUIDLE-ServCI Plot
After Swap SEDJE-DENOUIDLE-ServCI Plot
Comments: No sector inversion
CAN NOT ACESS BECAUSE THERE IS WATER
CAN NOT ACESS BECAUSE THERE IS WATER STILL EXIST
SEDJ E-DENOU POST IDLE -ServCI (N/A)
40023 (13) 0.5%
40581 (46) 1.9%
40881 (89) 3.7%
40951 (56) 2.3%
42071 (404) 16.8%
42072 (542) 22.6%
42073 (759) 31.6%
42062 (491) 20.5%
6 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
3.2 Coverage (RxLev in Idle Mode) Plot for Pre and Post Drive test Before Swap SEDJE-DENOUIDLE-RxLev Plot
After Swap SEDJE-DENOUIDLE-RxLev Plot
Comments: RxLev on Idle mode become litlle poor .
SEDJE_DENOU PRE IDLE-ServRxLevIdle (dBm)
Below -95 (21) 1,2%
>= -95 to < -85 (417) 24,6%
>= -85 to < -75 (454) 26,8%
Above -75 (800) 47,3%
SEDJE-DENOU POST IDLE ServRxLevIdle (dBm)
Below -95 (41) 2.6%
>= -95 to < -85 (500) 31.3%
>= -85 to < -75 (499) 31.2%
Above -75 (557) 34.9%
7 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
3.3 Coverage (RxLev in Dedicated Mode) Plot for Pre and Post Drive test Before Swap SEDJE-DENOUDedicated-RxLev Plot
After Swap SEDJE-DENOUDedicated-RxLev Plot
Comments: On dedicated mode RxLev becomes more improved
SEDJE_DENOU PRE DEDICATED-ServRxLevSub (dBm)
Below -95 (6) 0,2%
>= -95 to < -85 (618) 25,6%
>= -85 to < -75 (871) 36,1%
Above -75 (921) 38,1%
SEDJE-DENOU DEDICATED-ServRxLevSub (dBm)
Below -95 (0) 0.0%
>= -95 to < -85 (259) 10.9%
>= -85 to < -75 (952) 39.9%
Above -75 (1172) 49.2%
8 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
3.4 Signal Quality (RxQual in Dedicated) Plot for Pre and Post Drive test
Before Swap SEDJE-DENOUDedicated-RxQual Plot
After Swap SEDJE-DENOUDedicated-RxQual Plot
Comments: Good Received Quality but still following coverage behaviour
SEDJE_DENOU PRE DEDICATED-ServRxQualSub (RxQual)
>= 0 to < 3 (1854) 76,7%
>= 3 to < 5 (354) 14,7%
>= 5 to < 8 (208) 8,6%
SEDJ E-DENOU DEDICATED-ServRxQualSub (RxQual)
>= 0 to < 3 (1885) 79.1%
>= 3 to < 5 (358) 15.0%
>= 5 to < 8 (140) 5.9%
9 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
4 HOSR Performance Plot for Pre and Post Drive test
Before Swap SEDJE-DENOUHOSR Performance Plot
After Swap SEDJE-DENOUHOSR Performance Plot
Serving Cell Band Target Cell Band of the Target Cell No. of Handover Attempts
Handover Success (%)
Handover Reversion (%)
Handover Lost (%)
Data Availability
(%)
Comment: Handovers performance is good.
SEDJE_DENOU PRE DEDICATED-EventHandoverOK (EVENT)
U 1 (25) 1,0%
SEDJE-DENOU DEDICATED-EventHandoverOK (EVENT)
U 1 (15) 0.6%
10 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
5 KPI STATISTICS
SEDJE-DENOUKPI STATISTICS
CELL Date Traffic (E) TCH Drop (%) TCH Cong (%) CSSR (%) HOSR (%)
6 CONCLUSION
Globaly, site performance is not too bad
SDCCH Drop (%)
11 (17)
Commercial in ConfidencePrepared (also subject responsible if other) No.
Fidèle F.Approved Checked Date Rev.
Alex Botwe 10/29/2014 A
7 Moov BENIN Drive Test Acceptance Certificate
SITE SEDJE-DENOU
has been implemented anddemonstrated, as per the Contract between the Moov BENIN and Ericsson.
Pending Items, if any, are listed in the Outstanding Items List.
For Moov BENIN For ERICSSON
...................................................... ......................................................(Authorized Signatory) (Authorized Signatory)
Name: Name:
Designation: Designation:
Place: COTONOU Place: COTONOU
Date: .........................…..…............ Date: .........................…..…............
This is to certify that the SITE SEDJE-DENOU
SECTOR_1 SECTOR_2
SECTOR_2 SECTOR_3
SECTOR_3
SECTOR_1 SECTOR_2
SECTOR_2 SECTOR_3
SECTOR_3