DT 1320 BIM
description
Transcript of DT 1320 BIM
![Page 1: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/1.jpg)
DT 1320 BIMUNIT 1 INTRO TO ARCHITECTURAL DESIGN AND
BIM
![Page 2: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/2.jpg)
THE PROFESSIONAL PRACTICE OF ARCHITECTURAL WORKING DRAWINGS
4TH EDITION
![Page 3: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/3.jpg)
PROFESSIONAL
FOUNDATIONS
CHAPTER
1
THE OFFICE
![Page 4: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/4.jpg)
THE PHYSICAL OFFICE:
I. LOCAL FIRMS
II. GLOBAL FIRMS
![Page 5: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/5.jpg)
THREE MAJOR COMPONENTS:
I. ADMINISTRATION
II. DESIGN
III. PRODUCTION
![Page 6: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/6.jpg)
Administration
Design Production
• Job Captain• Senior Technician• Intermediate
Technician• Junior Technician
• Project Architect• Job Captain• Senior Technician• Intermediate
Technician• Junior Technician
Architect(s)/Principal(s)Oversee
Page 5, 4th ed.
• Human Resources• Accounting• Marketing
![Page 7: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/7.jpg)
ARCHITECTURAL SUPPORT:
I. BOARDS/ORGANIZATIONS
II. RESEARCH SOURCES
III. AFFILIATIONS
![Page 8: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/8.jpg)
NATIONAL ARCHITECTURAL ACCREDITING BOARD
(NAAB)
ARCHITECTURE
REGISTRATION EXAMINATION (ARE)
Page 5, 4th ed.
![Page 9: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/9.jpg)
INTERN DEVELOPMENT PROGRAM (IDP)
NATIONAL COUNCIL OF ARCHITECTURAL
REGISTRATION BOARDS (NCARB)
Page 5, 4th ed.
![Page 10: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/10.jpg)
MASTERFORMAT GROUPS, SUBGROUPS, AND DIVISIONS PROCUREMENT AND
CONTRACTING
REQUIREMENTS GROUP
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
INTRODUCTORY INFORMATION
PROCUREMENT REQUIREMENTS
CONTRACTING REQUIREMENTS
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP
DIVISION 01 – GENERAL REQUIREMENTS
Page 6, 4th ed.
![Page 11: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/11.jpg)
FACILITY CONSTRUCTION SUBGROUP
DIVISION 02 – EXISTING CONDITIONS
DIVISION 03 – CONCRETE
DIVISION 04 – MASONRY
DIVISION 05 – METALS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
DIVISION 08 – OPENINGS
DIVISION 09 – FINISHES
DIVISION 10 – SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 – SPECIAL CONSTRUCTION
DIVISION 14 – CONVEYING EQUIPMENT
DIVISION 15-19 – RESERVED FOR
FUTURE EXPANSION
FACILITY SERVICES SUBGROUP
DIVISION 20 – RESERVED FOR FUTURE EXPANSION
DIVISION 21 – FIRE SUPPRESSION
DIVISION 22 – PLUMBING
DIVISION 23 – HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
DIVISION 24 – RESERVED FOR FUTURE EXPANSION
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
DIVISION 29 – RESERVED FOR FUTURE EXPANSION
Page 6, 4th ed.
![Page 12: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/12.jpg)
SITE AND INFRASTRUCTURE SUBGROUP
DIVISION 30 – RESERVED FOR FUTURE EXPANSION
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
DIVISION 36-39 – RESERVED FOR FUTURE EXPANSION
PROCESS EQUIPMENT SUBGROUP
DIVISION 40 – PROCESS INTEGRATION
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE EQUIPMENT
DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT
DIVISION 45 – INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
DIVISION 47 – RESERVED FOR FUTURE EXPANSION
DIVISION 48 – ELECTRICAL POWER GENERATION
DIVISION 49 – RESERVED FOR FUTURE EXPANSION
Page 6, 4th ed.
![Page 13: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/13.jpg)
PROCESS EQUIPMENT SUBGROUP
DIVISION 40 – PROCESS INTEGRATION
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
DIVISION 42 – PROCESS HEATING, COOLING, AND DRYING
EQUIPMENT
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING,
PURIFICATION, AND STORAGE EQUIPMENT
DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT
DIVISION 45 – INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
DIVISION 47 – RESERVED FOR FUTURE EXPANSION
DIVISION 48 – ELECTRICAL POWER GENERATION
DIVISION 49 – RESERVED FOR FUTURE EXPANSION
Page 6, 4th ed.
![Page 14: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/14.jpg)
AMERICAN INSTITUTE OF ARCHITECTS
(AIA)
LEADERSHIP
IN ENERGY AND ENVIRONMENTAL DESIGN (LEED )
Page 7, 4th ed.
![Page 15: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/15.jpg)
ARCHITECT/CLIENT RELATIONSHIP: I. WORKING RELATIONSHIP
A. CONTRACT
B. RETAINER
C. PROJECT PROGRAM
D. CLIENT REVIEW
E. CLIENT APPROVAL
![Page 16: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/16.jpg)
SCHEMATIC DESIGN (SD) I. DESIGN AND REVIEWS
A. ARCHITECTURE PROGRAM
1. ESTIMATED SQ. FT.
2. TYPE OF USE
3. OTHER ELEMENTS
Page 7-9, 4th ed.
![Page 17: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/17.jpg)
SCHEMATIC DESIGN (SD)
B. STUDY DRAWINGS, DOCUMENTS, AND
OTHER MEDIA
1. CONCEPTS
2. SPATIAL RELATIONS
3. SCALE
4. FORM
5. CLIENT REVIEW
Page 7-9, 4th ed.
![Page 18: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/18.jpg)
SCHEMATIC DESIGN (SD)
C. RESEARCH PHASE
1. ZONING
2. PLANNING
3. BUILDING
4. ENVIRONMENTAL
5. ENGINEERING
6. SITE ANALYSIS
Page 7-9, 4th ed.
![Page 19: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/19.jpg)
SCHEMATIC DESIGN (SD)
D. PRODUCE SCHEMATIC
1. CLIENT REVIEW
2. ESTIMATE COST
3. SITE & FLOOR PLAN
4. SECTION &
ELEVATION
5. MODEL/RENDERING
6. OVERALL DIMENSION
7. CLIENT APPROVAL
Page 7-9, 4th ed.
![Page 20: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/20.jpg)
DESIGN DEVELOPMENT (DD) II. DESIGN AND REVIEWS
A. LAYOUT & DETERMINE
1. MECHANICAL
2. ELECTRICAL
3. PLUMBING
4. STRUCTURAL DETAILS
5. ARCHITECTURAL
DETAILS
6. MATERIAL TYPES
7. DOOR/WINDOW LOCATIONS
8. OTHER ELEMENTS
Page 9, 4th ed.
![Page 21: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/21.jpg)
DESIGN DEVELOPMENT (DD)
B. PRODUCE DESIGN
1. CLIENT REVIEW
2. ESTIMATE COST
3. SITE & FLOOR PLANS
4. SECTIONS &
ELEVATIONS
5. OUTLINE
SPECIFICATIONS
6. CLIENT APPROVAL
Page 10, 4th ed.
![Page 22: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/22.jpg)
CONSTRUCTION DOCUMENTS (CD) III. DESIGN AND REVIEWS
A. LAYOUT & DETERMINE
1. DRAWINGS WITH GREATER
DETAIL
2. SPECIFICATIONS
3. DETAILS
4. MATERIALS
Page 12, 4th ed.
![Page 23: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/23.jpg)
CONSTRUCTION DOCUMENTS(CD)
B. PRODUCE DOCUMENTS
1. CLIENT REVIEW
2. CLIENT APPROVAL
3. AGENCY REVIEW
4. AGENCY APPROVAL
5. OUT TO BID
Page 12, 4th ed.
![Page 24: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/24.jpg)
BIDDING & NEGOTIATING I. PUBLICALLY OWNED PROJECTS
A. QUALIFIED BIDDERS
1. UNLIMITED NUMBER
2. LOWEST BID
3. BID DELIVERED ON TIME
Page 12, 4th ed.
![Page 25: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/25.jpg)
BIDDING & NEGOTIATING II. PRIVATELY OWNED PROJECTS
A. OWNER/ARCHITECT
DETERMINED
1. BID/NEGOTIATED
2. 4 TO 5 BIDDERS
3. BUDGET OR TIME
Page 12, 4th ed.
![Page 26: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/26.jpg)
CONSTRUCTION ADMINISTRATION (CA) I. OBSERVE PHASES OF
CONSTRUCTION
A. ARCHITECTS ROLE
1. FIELD ACTIVE
2. FIELD VISIT
3. WRITTEN REPORTS
4. RFI
5. PUNCH LIST
Page 13, 4th ed.
![Page 27: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/27.jpg)
BUILDING CODES I. PURPOSE
A. LIFE SAFETY
1. REVISED OFTEN
2. CATASTROPHIC CONDITIONS
A. HURRICANES
B. SEISMIC
C. FIRES
3. DETAILS
4. STRUCTURE
Page 13, 4th ed.
![Page 28: DT 1320 BIM](https://reader035.fdocuments.net/reader035/viewer/2022062309/56813cd8550346895da67c9d/html5/thumbnails/28.jpg)
BUILDING CODES II. PROCEDURE
B. BUILDING USE &
OCCUPANCY
1. CLASSIFY USE
2. FIRE RATED
ASSEMBLIES
3. LOCATE BUILDING ON SITE
4. DETERMINE FLOOR AREAS
5. DETERMINE HEIGHT OF BUILDING 6. BUILDING EXITING
Page 13, 4th ed.