DGS DSA 403 PC-PRE (Revised 07/28/20) Page 1 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA 403 PC-PRE PRESCRIPTIVE METHOD – 2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS Division of the State Architect (DSA) documents referenced within this publication are available on the DSA Publications webpage. The form DSA 403-PC checklist is provided as a guide for submitting complete documents for plan review. Complete submittals must include all applicable items listed on the form DSA 403-PC, as indicated in Procedure PR 18-02: Pre-Check (PC) Permanent Modular or Relocatable Building Designs CALGreen/Energy Code Compliance Review. All projects submitted for review must be submitted electronically. This form must be signed by all applicable parties and submitted to the Division of the State Architect (DSA) with the plan review documents. Non-conformance with these submittal requirements will result in a failed submittal and rejection of the plan review application. The manufacturer shall place two (2) metal identification labels on the building, one mechanically fastened and visible from the exterior and the other mechanically fastened to the interior frame above the ceiling at the end of the module, both labels stating (in addition to any other information by the Division of the State Architect or other law) "Complies with Title 24, Part 6 for all Climate Zones” or list the specific Climate Zones that it is approved for; and the plans shall identify the location of the 2 labels. The following definitions apply to review of permanent and modular relocatable buildings: Module A repetitive construction unit. Modular Building A singular or repetitive number of modules which make up a singular unconditioned modular building, or a singular or repetitive number of modules which make up a conditioned modular building typically served by a single HVAC unit. PROJECT INFORMATION DSA Application #: Submittal contains: Unconditioned Modular Building and/or Conditioned Modular Building As applicable, a PDF of each of the following shall be uploaded to Bluebeam. Construction documents incorporating all applicable information in Part 1, Part 2, and Part 3 of this form. Applicable Certificates of Compliance (PDF). (See PART 1, SECTION A and B). Product manufacturer specifications for mechanical equipment and controls (cut sheets). Completed form DSA 403-PC Prescriptive Checklist (PDF). MODULAR MANUFACTURER OR PERMANENT MODULAR BUILDING DESIGNER SIGNATURE REQUIRED BELOW As Modular Manufacturer or Permanent Modular Building Designer the I understand that the information indicated above is required for a complete project submittal. I have reviewed the Project Plans and the Building Energy Analysis Reports and have confirmed that all information indicated as required above is included in this submittal. I understand that if any required information is not provided with this initial submittal, all Project Plans will not be reviewed until all required information is provided. Print Name: Signature: Date:

Transcript of DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa...

Page 1: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 1 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

403 PC-PRE PRESCRIPTIVE METHOD – 2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS Division of the State Architect (DSA) documents referenced within this publication are available on the DSA Publications webpage.

The form DSA 403-PC checklist is provided as a guide for submitting complete documents for plan review. Complete submittals must include all applicable items listed on the form DSA 403-PC, as indicated in Procedure PR 18-02: Pre-Check (PC) Permanent Modular or Relocatable Building Designs CALGreen/Energy Code Compliance Review. All projects submitted for review must be submitted electronically. This form must be signed by all applicable parties and submitted to the Division of the State Architect (DSA) with the plan review documents. Non-conformance with these submittal requirements will result in a failed submittal and rejection of the plan review application.

The manufacturer shall place two (2) metal identification labels on the building, one mechanically fastened and visible from the exterior and the other mechanically fastened to the interior frame above the ceiling at the end of the module, both labels stating (in addition to any other information by the Division of the State Architect or other law) "Complies with Title 24, Part 6 for all Climate Zones” or list the specific Climate Zones that it is approved for; and the plans shall identify the location of the 2 labels.

The following definitions apply to review of permanent and modular relocatable buildings:

Module – A repetitive construction unit.

Modular Building – A singular or repetitive number of modules which make up a singular unconditioned modular building, or a singular or repetitive number of modules which make up a conditioned modular building typically served by a single HVAC unit.

PROJECT INFORMATION DSA Application #:

Submittal contains: ☐ Unconditioned Modular Building and/or ☐ Conditioned Modular Building

As applicable, a PDF of each of the following shall be uploaded to Bluebeam.

☐ Construction documents incorporating all applicable information in Part 1, Part 2, and Part 3 of this form.

☐ Applicable Certificates of Compliance (PDF). (See PART 1, SECTION A and B).

☐ Product manufacturer specifications for mechanical equipment and controls (cut sheets).

☐ Completed form DSA 403-PC Prescriptive Checklist (PDF).

MODULAR MANUFACTURER OR PERMANENT MODULAR BUILDING DESIGNER

SIGNATURE REQUIRED BELOW

As Modular Manufacturer or Permanent Modular Building Designer the I understand that the information indicated above is required for a complete project submittal. I have reviewed the Project Plans and the Building Energy Analysis Reports and have confirmed that all information indicated as required above is included in this submittal. I understand that if any required information is not provided with this initial submittal, all Project Plans will not be reviewed until all required information is provided.

Print Name: Signature: Date:

Page 2: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 2 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

PART 1: CALIFORNIA ENERGY CODE

CERTIFICATES OF COMPLIANCE CHECKLIST For conditioned modular buildings, provide compliance documentation indicated in Sections A and B.

For unconditioned modular buildings, provide compliance documentation indicated in Section B. All Energy Forms are required to be placed on the Plans, and PDFs are provided with the Project Submittal.

SECTION A (Conditioned Modular Buildings Only)

Is this PC project designed for all climate zones in California? ☐ Yes ☐ No

If "No," for which climate zone is this PC project designed?

Provide the following Certificates of Compliance:

☐ NRCC-MCH-E Mechanical Systems

Sheet # in Plans:

☐NRCC-CXR-E Building Commissioning

Sheet # in Plans:

☐NRCC-ENV-E Envelope

Sheet # in Plans:

SECTION B (Conditioned and Unconditioned Modular Buildings). Provide the following Certificates of

Compliance:

☐NRCC-LTI-E Indoor Lighting

Sheet # in Plans:

☐NRCC-LTO-E Outdoor Lighting

Sheet # in Plans:

NRCC-PLB-E Water Heating Systems Must be provided for each type of water heater included in the project.

Sheet # in Plans:

NRCC-ELC-E Electrical Power Distribution Electrical is Required for all projects.

Sheet # in Plans:

NRCC-SRA-E Solar Ready Solar Ready is required for each size of modular building in the project.

Sheet # in Plans:

Page 3: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 3 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

PART 2: CALIFORNIA ENERGY CODE PRESCRIPTIVE AND MANDATORY MEASURES CHECKLIST

All sections must be addressed for a complete submittal. For additional information, refer to the Energy Efficiency Standards and Nonresidential Manual.

The following requirements apply only to conditioned modular buildings.

ENVELOPE REQUIREMENTS

Modular buildings must meet all applicable prescriptive requirements of Energy Code 140.3(a)

Envelope

Plans must specify the required R-value and how insulation and air sealing will occur around headers and objects in the wall. Plans must illustrate how thermal envelope is continuous from foundation to wall to roof, and how continuity of the thermal envelope at the roof, wall and foundation (if applicable) is provided when modules are attached in the field.

Windows – All walls shall be assumed to be west facing and shall comply with Energy Code 140.3(a) 5.A.i.

The required U-factor for walls, roofs, and raised floors are found in Table 140.3. The Reference Appendices JA4 lists how much insulation is needed to meet the U-factor’s.

The minimum visual transmittance for windows and skylights shall be:

• Operable Windows: 0.32

• Fixed window: 0.42

• Tubular skylight: ≥0.38

Check one of the following:

The modular building is climate zone specific and the envelope requirements of Table 140.3-B are used for each climate zone and specified in the plans.

Sheet # in Plans:

The modular building is for use in all climate zones and the envelope requirements of Table 140.3-D are used and specified in the plans.

Sheet # in Plans:

Page 4: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 4 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

HVAC REQUIREMENTS FOR VENTILATION & INDOOR AIR QUALITY

Modular buildings must meet all applicable Mandatory Measures of Energy Code 120.1

For each size modular building an air-distribution system design (duct design) shall be shown on the plans in accordance with Energy Code Section 120.1(a)2.

Sheet # in Plans:

Installed filter shall have designated efficiency equal or greater than MERV 13 and shall be 2-inch minimum depth per Energy Code 120.1(c)1.

Sheet # in Plans:

Provide a note that the thermostat will be programed when the modular buildings is placed on a site to ensure the minimum air rate will be supplied to the space at all usually occupied times and programmed to provide a pre-occupancy purge one hour prior to the modular building being normally occupied per Energy Code 120.1(d)1.

Sheet # in Plans:

If an economizer is installed, or if the outside air is capable of being modulated, install Demand Control Ventilation (DCV) devices according to Energy Code Section 120.1(d)3. and 4:

• List the equipment needed for operating DVC.

• Show CO2 sensor locations and wiring diagram.

• CO2 sensors shall display the ppm in the space.

Sheet # in Plans:

REQUIRED CONTROLS FOR SPACE-CONDITIONING SYSTEMS

Check applicable HVAC controls as required for the design of the HVAC system of Energy Code 120.2

HVAC Controls

Heat pumps using supplementary electric resistance heating must use a thermostat designed for heat pumps and meet Section 120.2(d) and 110.2(b). List the model number of the thermostat in the plans.

Sheet # in Plans:

Manual override shall be installed that allows the occupant to turn on the system for 4 hours and meets Section 120.2(e). List the model number of the device in the plans.

Sheet # in Plans:

Fault Detection and Diagnostics (FDD) must be installed for cooling systems that are greater than 54,000 Btu/hour (4.5 Tons) and have installed an air economizer in accordance with Section 120.2(i). List the model number of the FDD system in the plans and provide proof of certification from the California Energy Commission.

Sheet # in Plans:

Page 5: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 5 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

PRESCRIPTIVE COMPLIANCE FOR SPACE CONDITIONING SYSTEMS

Load calculations for proper equipment sizing per Energy Code Section 140.4(b) may be requested by DSA for plan approval.

Space Conditioning Systems

Economizers – If the cooling capacity is over 54,000 Btu/hour (4.5 Tons) an economizer is required, or the efficiency of the HVAC equipment must be improved Per Table 140.4-D. Check applicable:

Economizer Installed:

• List the model number of the economizer in the plans.

• Economizer must be programmed to the temperature in Table 140.4-E. Provide Table 140.4-Ein the mechanical plans. Submit verification of certification from the Energy Commission.

Sheet # in Plans:

Improved Efficiency of HVAC Equipment: • List the equipment installed on the plans.

• Include Table 140.4-D on the mechanical plans.

Sheet # in Plans:

INTERLOCK CONTROLS

Modular buildings containing operable windows and doors without automatic closing devices must have interlock controls that disable or reset the temperature setpoint per section 140.4(n). Specify interlock controls and include wiring diagram in plans.

Sheet # in Plans:

The following requirements apply to both conditioned and unconditioned modular buildings.

LIGHTING CONTROL ENERGY CODE 130.1

Include luminaire schedule, lighting control diagram, and sequence of operations that demonstrate compliance with the requirements for Energy Code section 130.1.

Sheet # in Plans:

EQUIPMENT MANUALS

Provide note on plans that upon site placement or site construction, the operation and maintenance documentation for all mechanical and lighting systems and controls shall be provided by the modular building manufacturer, or the general contractor for the permanent modular relocatable building and delivered to the owner.

Sheet # in Plans:

Page 6: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 6 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

COMPLIANCE STATEMENT BY DESIGNER IN RESPONSIBLE CHARGE

SIGNATURE REQUIRED BELOW

As the Designer in Responsible Charge, I affirm that I have coordinated the construction documents with the energy compliance documentation and the mechanical and lighting systems design, and that the applicable mandatory measures for nonresidential buildings of the current CALGreen Code (Title 24, Part 11) and Energy Code (Title 24, Part 6) are incorporated in the design of the building and documented in the construction documents and specifications for the project.

Print Name: Signature: Date:

Work Phone #: License #:

COMPLIANCE STATEMENT BY MECHANICAL SYSTEMS DESIGNER

SIGNATURE REQUIRED BELOW

As the Mechanical Systems Designer, I affirm that the mechanical systems design is in compliance with the requirements of the current Energy Code (Title 24, Part 6), and the work has been coordinated with the energy compliance forms included in the project submittal.

Print Name: Signature: Date:

Work Phone #:

COMPLIANCE STATEMENT BY LIGHTING SYSTEMS DESIGNER

SIGNATURE REQUIRED BELOW

As the Lighting Systems Designer, I affirm that the lighting systems design is in compliance with the requirements of the current Energy Code (Title 24, Part 6), and all and the work has been coordinated with the energy compliance forms included in the project submittal.

Print Name: Signature: Date:

Work Phone #:

Page 7: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 7 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

PART 3: CALGREEN MANDATORY MEASURES CHECKLIST All sections must be addressed for a complete submittal.

For information on the CALGreen Mandatory Measures refer to DSA GL-4: CALGreen Code.

WATER EFFICIENCY CALGreen 5.3

Water Conserving Plumbing Fixtures and Fittings. Check one:

5.303.3

☐ There are no plumbing fixtures provided in the project.

☐ Plumbing fixture flow rates are shown on plumbing fixture schedule.

Sheet # in Plans:

MATERIAL CONSERVATION & RESOURCE EFFICIENCY CALGreen 5.4

Water Resistance and Moisture Management. For all modular buildings, provide:

5.407.2.2.1

Plans and finish schedule show the location of the minimum required interior door protection and indicate the non-absorbent floor and wall finishes to be installed 2 feet around and perpendicular to the primary entrances.

Sheet # in Plans:

Plans and sections indicate the minimum exterior door protection with the location and details for a 4 feet deep awning, roof overhang, recessed area, or other appropriate method at the primary entrances.

Sheet # in Plans:

5.407.2.2.2 ☐ Details indicate flashings integrated with a drainage plane.

Sheet # in Plans:

Construction Waste Management. Check one:

5.408.1

As the modular building manufacturer, I have provided in the drawings a Construction Waste Management Plan for the factory in accordance with the requirements of CALGreen, which includes the required information provided by the hauling company (See Appendix A for Sample CWM Plan). A minimum of 65% of construction waste will be diverted.

Sheet # in Plans:

As the permanent modular building designer, I have provided in the drawings a Construction Waste Management Plan in the specifications to be filled out by the General Contractor for the project in accordance with the requirements of CALGreen, which includes the required information provided by the hauling company (See Appendix A for Sample CWM Plan). A minimum of 65% of construction waste will be diverted.

Sheet # in Plans:

Page 8: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 8 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

ENVIRONMENTAL QUALITY CALGreen 5.5

Covering of Mechanical Equipment. Provide for conditioned modular buildings.

5.504.3 ☐

At the time of rough installation, during storage in the factory or on the construction site, during shipment (if applicable) and until final startup of the heating cooling and ventilating equipment, all, duct and other related distribution component openings and mechanical equipment shall be protected to reduce the amount of dust, water and debris which enter the system.

Specification Section or Sheet # in Plans:

Pollutant Control. Identify that finish materials meet the following. If not provided in the project, mark with “N/A.”

5.504.4.1 ☐

Adhesive, sealants and caulks comply with VOC limits in Tables 5.504.4.1 and 5.504.4.2.

Sheet # in Plans:

5.504.4.3 ☐

Paints and coatings comply with VOC limits in Table 5.504.4.3 and requirements of 5.504.4.3.

Sheet # in Plans:

5.504.4.4 ☐

Carpet systems meet testing and product requirements of Table 5.504.4.4.

Carpet cushion meets Carpet and Rug Institute's Green Label Program.

Carpet adhesive complies with VOC limits in Table 5.504.4.1.

Sheet # in Plans:

5.504.4.5 ☐

Hardwood plywood, particleboard, and medium density fiberboard composite wood products meet formaldehyde requirements and limits.

Sheet # in Plans:

5.504.4.6 ☐ Resilient flooring systems meet testing and product requirements.

Sheet # in Plans:

Filter Specification. Provide for conditioned modular buildings.

5.504.5.3 ☐

Mechanical specification or note includes information requiring a minimum MERV 13 filter(s) or higher.

Sheet # in Plans:

Page 9: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 9 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

Indoor Moisture Control. Provide for all modular buildings.

5.505.1

Moisture control at unvented antics must comply with CBC 1202.3. Check one:

Insulation batts are installed directly below and in contact with the roof sheathing and a continuous layer of ridged sheet insulation is provided above the roof sheathing to the value in CBC Table 1202.3. Insulation board must be sealed to the adjoining sheet with a product approved by the insulation manufacturer to form a continuous airtight layer.

Sheet # in Plans:

Table 1202.3

Climate Zone R-Value of Rigid Insulation

3-15 R-5

1 & 2 R-10

16 R-15

☐ All the roof/ceiling insulation required by the Energy Code is installed as rigid insulation directly above the structural roof sheathing in compliance with CBC 1203.3.5.1.4.

Moisture control at raised floor foundation. Check if applicable.

Module has raised floor foundation and requires underfloor ventilation (if applicable). Meet requirements of CBC 1202.4.

Sheet # in Plans:

Exterior Noise Transmission. Check one.

5.507.4.1

Exterior wall and roof ceiling assemblies meet minimum 50 STC and windows meet minimum 40 STC.

Wall Tested Detail/Sheet #: Roof Tested Detail/Sheet #:

A note on the coversheet that states: “This PC will not be placed on any campus in any of the following locations:

1. Within the 65 CNEL noise contour of an airport;2. Within the 65 CNEL or Ldn noise contour of a freeway, expressway, railroad, or

industrial source guideway;3. Where exposed to noise level of 65dB Leq-1-hr during any hour of operation.”

Interior Sound Transmission. Provide if applicable.

5.507.4.3 ☐

Interior walls separating classrooms, and interior walls separating classrooms from bathrooms shall meet minimum 40 STC.

Wall Tested Detail/Sheet #:

Page 10: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 10 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

APPENDIX A

Page 11: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 11 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

7/1/2020 California Green Building Standards Code, Title 24, Part 11 (W/ ERRATA & SUPPLEMENT), 2019

https://www.madcad.com/library/243995/view/# 1/1

SAMPLE

Page 12: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 12 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

7/1/2020 California Green Building Standards Code, Title 24, Part 11 (W/ ERRATA & SUPPLEMENT), 2019

https://www.madcad.com/library/243995/view/# 1/1

SAMPLE

Page 13: DSA 403 PC-PRE - 2019 CALGreen & Energy Code Compliance Checklist for Pre … · 2020-06-01 · dsa 403 pc-prescriptive method 2019 calgreen & energy code compliance checklist for

DSA 403 PC-PRESCRIPTIVE METHOD

2019 CALGREEN & ENERGY CODE COMPLIANCE CHECKLIST FOR PRE-CHECKED (PC) PERMANENT & MODULAR RELOCATABLE BUILDING DESIGNS

DGS DSA 403 PC-PRE (Revised 07/28/20) Page 13 of 13 DIVISION OF THE STATE ARCHITECT DEPARTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

7/1/2020 California Green Building Standards Code, Title 24, Part 11 (W/ ERRATA & SUPPLEMENT), 2019

https://www.madcad.com/library/243995/view/# 1/1

SAMPLE