Drift Tube Calibration and synchronization and Cosmic rays data

36
16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova 1 Drift Tube Calibration and synchronization and Cosmic rays data I report on - the parameters that define the performance of the DT chambers and of their trigger capability - the way we may extract them assuming we have the drift time and the trigger information. and on - preliminary results from cosmic rays data on DT with autotrigger slides 23-29 Preliminary

description

Drift Tube Calibration and synchronization and Cosmic rays data. I report on - the parameters that define the performance of the DT chambers and of their trigger capability - the way we may extract them assuming we have the drift time and the trigger information. and on - PowerPoint PPT Presentation

Transcript of Drift Tube Calibration and synchronization and Cosmic rays data

Page 1: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

1

Drift Tube Calibration and synchronization and Cosmic rays data

I report on

- the parameters that define the performance of the DT chambers

and of their trigger capability

- the way we may extract them assuming we have the drift time and the trigger information.

and on

- preliminary results from cosmic rays data on DT with autotriggerslides 23-29

Preliminary

Page 2: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

2

• Chambers. Chamber performance is defined by noise, dead channels , efficiency , drift time/position linearity,

• Local Trigger. LT performance is defined by efficiency , purity, bx assignment and local track parameter ( phi and phib) accuracy,

• Track reconstruction. Reconstruction performance (HLT and offline) is defined by muon pt resolution in standalone , barrel -tracker extrapolation efficiency, global muon pt resolution.

•I first introduce the calibration parameters for

the

DT Calibration and synchronization : outline

Random triggers , TP signals , tracks (cosmic rays and pp tracks)

•and after the way we can determine

them

using

during commissioning, magnet test and LHC startup

Page 3: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

3

****

****

***

*****

*

****H

H

L

H

HL (LH)

H

N

Ho

**

****H

N

Hi

BTI outer

BTI inner

HHTRACOTSS/TSM

*

*

*

L 3 points trackH 4 points track

The performance of the Local Trigger depends essentially on two of the parameters which must be set :

1) the parameter ST i.e the mean drift velocity set in each BTI of the minicrate and its relation to the mean drift velocity Vdrift of the chamber [~ ST *12.5 = d /Vdrift ns = Tmax ; ST=distance of staggered wires in units of BTI

frequency clock(80MHz)]. Granularity of ST is 1/2 i.e. tmax=6.25 ns = Tmax*1.6 % ]

2) The relative phase of the time of the track with respect to the clock in the Mini Crate [ the alignement is sampled at the clock frequency and its efficiency depends

on the phase of the clock of the Mini Crate with respect to the time of the track in the chamber].

3) Geometrical parameters that define the relative correlation between BTIs in the 2 PHI SLs .

DT Local Trigger parameters : introduction

Let a DT chamber in a space with a B(x,y,z) magnetic field, working in standard conditions, and a track with its time and direction passing the chamber in a zone where its ionization charges reach the wire

with a mean drift velocity vd,

Page 4: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

4

What do we know about the dependence of the

efficiency Vdrift (ST parameter ) in the Local Trigger ?

From Data ( see slice # 30):

TB 2003 CMS in 2004/045

Local Trigger efficiency does not change for Vdrift error of ~1.7%

TB 2000 (only BTI trigger i.e. trigger only from one SL )[ CMS NOTE 2001/052 ,NIM 1999]

Vdrift systematic error ~8 % with track angle 00 : BTI H trigger efficiency =~80 % as expected with no error

for 200 tracks , BTI H trigger efficiency drops at 68% (80% expected with no error)

for 350 tracks BTI H trigger efficiency drops at 30% (75 % expected with no error)

From EMULATOR :

The behavior of TB 2000 confirmed with old EMULATOR(zotto &CMS note 2001/052)

The behavior of TB2003 confirmed with new EMULATOR (Vanini talk and CMS in p)

Full dependence can be studied for any wanted Vdrift error.

CONCLUSION: 1.7% accuracy is good enough on Vdrift parameter for the efficiency of the LT

Page 5: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

5

vdrift dependence in the DT cell

Dependence of mean drift velocity as a function of angle

Dependence of mean drift velocity as a function of magnetic field

Drift velocity is constant in the Ar/CO2 gas mixture 85/15 at the nominal HV cell setting. The apparent drift velocity varies only due to Lorenz angle in presence of B field normal to the wire and with the angle of incidence of the track.

The dependence of the drift velocity on angle and B field has been measured [TB2000 CMS NOTE 2001/041] and computed with Garfield cell simulation [Bologna CMS NOTE 99/064 and Madrid CMS note in preparation] . The simulation results have been verified with the measured ones.

At trigger level we cant correct for the angle phi but for high pt tracks it is well within ~400, neither for the magnet field but the expected B field should be below 0.3 T everywhere except only in MB1 stations in the wheel #+2 and #-2 where it may be of some relevance (up to .8 T).

Page 6: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

6

FE input & BTI ( phase=0)

Clk_ch4

Clk_ch3

Clk_

ch2

Clk_ch1

TOF (ch,track)

0

LocalTrigger MiniCrate output

25 ns

LT_out

Clk Phase

Clk + TS Phase

TS Sector Collector output/input Track Finder

Drift-t ime+wirePropagation

Local S

am

plin

g S

yncro

nis

atio

n

SC

trasm

ission S

yncro

nisa

tion

There are two Synchronizations process

a) inside each chamber (sampling phase)

b) between each chamber and the Sector Collector (transmission phase) M. Dalla Valle talk ,

HH efficiency in a given chamber as a function of phase.

For tracks completely out of sampling_phase, the local trigger is output in two contiguous bx and the trigger quality is deteriorated.

Synchronization

Page 7: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

7

From TB 2001 data: CMS NOTE 2001/51

Single SL data : depending on the phase of the sampling clock the Htrig efficiency ranges from 70% to 80%.

From TB 2003 data: CMS IN 2004/045

For Configuration HH+HL+LL in the Traco, the Local Trigger efficiency varies from 90% to 65% for any phase

From EMULATOR :

TB 2003 and 2001 behavior confirmed with EMULATOR .

TB 2003 and 2001 behavior confirmed with EMULATOR .

Full dependence can be studied for any wanted error.

Dependence of

Trigger efficiency Local Trigger Phase (Sampling Phase)

Page 8: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

8

efficiency vs sampling phase

The procedure exists ( coded) , has been tested with TB Data 2003 (CMS IN 2004/042) and with TB2004 for 2 chambers. The algorithm is luminosity independent .It is based on the fact that for in phase tracks the output of correlated triggers is always in the same bx , for out of phase events is in two bx. The Mean Time RMS distribution & / or the HL/HH trigger quality ratio as function of phase are used.

HH+HL+LL Trigger efficiency as a function of phase

MT RMS

HL/HH

Track- clolck phase (arbitrary offset ) TTCrx delay ns

How best Sampling_phase for bunched particles can be measured.

Page 9: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

9

Remarks on vdrift and on sampling_phase setting in the Local Trigger

a)The Local Trigger drift velocity (ST parameter) could be set individually in each BTI but drift velocity and sampling_phase of the Local Trigger are correlated and there is only 1 sampling phase value for each Mini Crate i.e. for each DT chamber so just one setting per chamber for the phi SL is reasonable. Different values of vdrift on Theta SL BTIs can be set since in theta the angle of track is fix but compromise with sampling_phase have to be found.

b) The apparent mean drift velocity in the CMS DT chambers at LHC can be measured or can be computed from simulation. The range of variation inside a chamber is anyway ~2% due to track angle (TN 2001/041 , TN 2003/052) and that can be correct for only on HLT and offline. The same for the error in MB1/+-2 due to the B field.

c) The signal propagation along the wire produces an intrinsic phase error which ranges from 0 up 4.5 ns/meter of wire length (TN 2003/042) [9ns for phi wires and 14 ns for theta MB3 wires].

d) The intrinsic phase error for cosmic rays on just one chamber ranges from 0 to 25 ns.

Page 10: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

10

How do we check the value of the mean drift velocity with bunched particles (i.e. all events with ~ the same phase )

• from track fit minimization with vdrift as free parameter CMS NOTE 2001/041,CMS NOTE 2003/001,etc

• from Mean Time & Time box (slide #31)

Commissioning and magnet test will be performed with cosmic rays.

Can we measure the Drift Velocity with autotriggered data on cosmic rays? with which accuracy ?

From tests on cosmic rays and autotrigger performed in Legnaro even if the T0 ( necessary for a good drift velocity measurement) varies event by event from 0 up to 25ns, there are hints that , with some easy(?) software implementation, a T0 and so Tmax and vdrift accuracy of 3% at least can be set .

Can we autotrigger on cosmic rays ? With which purity ?

( see second part of the talk, COSMIC RAYS with AUTOTRIGGER slides 23-29)

Page 11: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

11

verify DT chamber performance and working point ( minimum noise, max efficiency , best drift time linearity and resolution)

the parameters are : HV and Threshold

Operations at commissioning

step 0- with TP signals, FE channels and Mini Crate connections are checked ( DCS local DAQ …)

step 1- with random triggers (L1A) the noise is measured as a function of HV and of Threshold up to values a little above the working voltage ( DCS local DAQ…).

step 2- The efficiency of one SL as a function of HV and Threshold can be checked

- setting the others SLs at nominal HV and Th,

- Trigger : L1A from the autotrigger type H of the chamber (*) (BTI SL under test masked. Only H trigger on the

other SLs. Best configuration ?? )

Commissioning

Page 12: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

12

Operations at commissioning continue

- scan in HV and Threshold in the SLi (*)

- Results from TDC data : occupancy in time window * , timebox shape *, Mean Time shape *, ( DCS local DAQ…),

- from track reconstruction cell resolution , Drift Time / position linearity * and efficiency * (?)

- with standard configuration on all BTIs, check trigger efficiency of the Sli from the ratio of HL/HH trigger quality

-Quasi automatic algorithm must be implemented *?

NB: is necessary a quasi automatic HV scan procedure and analysis

* semi automatic analysis programs have been already prepared and used in the on line program

* semi automatic analysis programs not ready

(*) trigger operation not done yet , must bedefined in Legnaro and at ISR

Page 13: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

13

What do we know of Single SL Local Trigger :

The BTI H trigger efficiency is 80% with less then 5% wrong bx assignment. NIM A 438(1999) 302 and CMS NOTE 2001/051

Standard acceptance Minimal acceptance

Page 14: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

14

For HV & Threshold efficiency curve we may use the

•occupancy in time window

•Track reconstruction efficiency ( even with large error 12*55m~600m/hit

•Drift velocity can be measured at 3 % (software to be implemented) and

•x(t,B=0,angle) parameterization can be verified

Work to be done before commissioning :

• test the 1 SL autotrigger capability and define the best trigger configuration for that

(people ? , hardware ?, software implementation ? in Legnaro and at ISR)

•define a standard sequence with DCS and DAQ and define quality cuts for commissioning likes production cuts

Page 15: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

15

GOALS ( as far as I understood but see Benvenuti talk):

- Cabling and signal distribution checks

- Study the cell performance with the real B field

- Learn how to synchronize a sector as in TB2004 but without external scintillators. Particles are not bunched so the synchronization process is not between the particle generation ( 40MHz clock) and each chamber but between different chambers ( see E. Conti and Dalla Valle talks).

Synchronization in the cosmic challenge and magnet tests

Page 16: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

16

Sequence of operation:

a) with TP

-Check all cabling compatibility and TTC signal distribution timing with TP signals generated in the 4 Minicrates of the sector on a common LDAQ signal.

-Choose the trasmission_phase in order to have 100% trasmission efficiency from the LT in the chambers to the Sector Collector. ( How ? ) .

b) Set each chamber at the HV and Th working point defined at commissioning .

c) Chose 1 chamber for HH+HL autotrigger and set SC so that it picks the autotrigger signal of the chosen chamber and sends it back as L1A to all chambers of the sector.

d) Find in each chamber the sampling_phase for local synchronization to the triggered events in the other chambers with SC L1A (see E.Conti).

e) Take data with magnetic field with SC L1A or DTTF L1A (see E.Conti).

Synchronization in cosmic challenge and Magnet test

Page 17: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

17

How can we synchronize two or more chambers in the cosmic test : example

bx 103 in MB1

The color gives the bx of the autotrigger in each chamber for a given time of the cosmic ; the y axis gives the efficiency that any cosmic produce a autotrigger (HH or HL or LL) in that chamber passing at a the time set in the x axis.

In the example , lets a cosmic at t=12 ns. The probability that chamber MB3 has a autotrigger is 90% , and the trigger output is at bx # 102 with ~100% probability.

The same cosmic in MB1 has a probability of 70% to trigger and half a probability to be in bx #101 and half at bx #102.

Setting in phase the chamber MB1 with respect MB3 means to move the TTCrx delay ( in the example of 12 ns ) so each chamber gives the same bx

cosmic time ns

bx 102 in MB3 bx 103 in MB3

bx 101 in MB1 bx102 in MB1

Page 18: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

18

Expected BN in the first layer of MB1

stations in sector #4 for the 3 wheels .TB 2000

Dependence of 1 SL H trigger efficiency as a function of magnetic field

TB2000

Dependence of mean drift velocity as a function of BN

v/v= 6 %

Dependence of mean drift velocity as a function of magnetic field in the expected range

Can we measure the drift velocity in the magnet test and check the cell and the trigger behavior ?

Yes but with a accuracy do to T0 jitter of 3% ; better if event by event T0 corrections possible

wheel +2

wheel +1

wheel 0

Page 19: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

19

Operations at startup : chambers already set at nominal HV and Threshold as from magnet and cosmic tests; Local Trigger configuration 0 loaded. The sampling_phase is set as a function of mean TOF in the chamber with respect to TP syncrhonization.

Step 1- in technical runs with random triggers (L1A) the noise is measured ( ? as a function of HV and of Threshold up to the working voltage? DCS local DAQ operation).

Step 2 - data are collected locally in autotrigger chamber by chamber , •from timebox and MT verify bx assignment and Drift velocity, •Measure/verify sampling phase and adjust TTCrx fine delay in each chamber (TOF+phase), •adjust trasmission of any chamber to the SC ,•DT LT information sent to DTTF for DTTF synchronization.

LHC startup

After step 1 we can start to be read out and to sent LT segments at least with ~70% efficiency for correlated ones. In the worst situation, being completely out of phase, the good output trigger of each chambers may be in 2 contiguous bx with 65% efficiency. The probability to send at the same bx the 2 LT of 2 completely out of phase chambers is so ~24 % but in a sector there are 6 possible combination of 2 chambers. So we should trigger with some reasonable efficiency. From analysis of Drift Time data (MT in the LDAQ) we can find if the bx assignment was wrong of +1 or -1 bx with respect an expected one . The fine phase can be adjusted locally and the coarse phase in different chambers of this doublet can be checked and adjusted at SC or at SC level. With a iterative process all chamber of a sector can be syncrhonized

Page 20: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

20

Conclusion : DT CALIBRATION AND SYNCHRONIZATION at LHC

LOCAL TRIGGER CALIBRATION : we want to verify the Drift Velocity i.e. to measure the mean drift velocity in each chamber from drift time data (slide#31). A sample of ~10000 events/chamber is a good starting statistic ; the measure can be performed locally, at LDAQ or/and at the HLT farms level, the vdrift corrections with respect the nominal values is expected to be ~ 1.6% which is also the granularity on the hardware.

Local trigger SYNCHRONIZATION : we have to find the best phase of the considered tracks with respect to the sampling clock. The best phase is TOF dependent so it must be performed with pp tracks. The best phase is vdrift parameter dependent and so few values of vdrift parameter should be checked. ~5000-10000 events /phase/chamber are enough with 25 steps in phase of 1 ns. The measure can be done locally in the LDAQ or/and at the HLT farms level .

How can we trigger in order to have data for checking Vdrift and for synchronization?Even if chambers are not synchronized , LT efficiency is above 65 % for any phase value.Once chambers are locally synchronized , SC synchronization and DTTF synchronization can be easily performed as in TB2004 (Marcellini talk).

full L1 efficiency: what is the impact of no calibration in the LT ? We do not have data but in HLT code LT is perfectly simulated. In HLT there is a perfect LT synchronization ( mean TOF in a chamber set to 0 ) but all drift time errors are included (cell non linearity, wire propagation, TOF differences) and there is just one LT Vdrift parameter for all chambers so HLT L1 simulated results (A.Vanini and S.Lacaprara talks) refer at a perfect synchronization but at a minimum calibration.

Page 21: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

21

Conclusion : DT CALIBRATION AND SYNCHRONIZATION

In HLT and OFFLINE code , once a rough track angle and position is computed in both projections, the T0 incertitude for the propagation along the wire is corrected for, the B field and the position in the cell and the angle are known and so x can be computed from x=x(t,B,angle) parameterization. That is what is done in the current reconstruction code of the simulated data. Offline calibration is so to compute -the relative difference in time between the channels of a chamber (with TP data , done already at commissioning. The measured differences are of the order of 1ns in all fully equipped chambers as expected from cabling accuracy), -the T0 of each chamber (from residuals and/or from time box and MT) and verify that -the parameterization is correct from residuals and from t = t (x) relation. The other aspect is -alignment (see Matorras ) between chambers. For LHC this can be performed with alignment data and with well locally reconstructed pp tracks . -B field map accuracy.The worst situation for no calibration in offline – other then B field and alignment- can be a local DT reconstruction without parameterization, with a uniform constant vdrift velocity and T0 in each chamber, vdrift velocity and T0 computed chamber by chamber directly from data (that is what is done in the cosmic data reconstruction ). One could have events with global L1A shifted of 1 bx depending of the kind of trigger (muon RPC, muon CSC, Muon DT , Ecal, Hcal and in each one could have a sector or wheel dependence). That is local (DTTF from sector to sector for DT) and global trigger synchronization that can be performed only checking the data (timebox and MT) as a function of the different trigger origin.

Page 22: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

22

the parameters are HV and Threshold defined at commissioning but verification in B field and at startup needed see commissioning slide.11

Chamber

HLT and offline

the parameters are drift velocity (1/Chamber but no strong variation expected if a fix value in all detector is used) and sampling_phase (1/Chamber must be measured with data ) see LT introduction slide 4

Local Trigger :

(consideration only for DT) the parameters are T0 (1/Chamber), x= x( tdrift ,

B, angle) parameterization or vdrift(angle,B) and geometry alignments. The channel by channel T0 variation is very little by construction i.e. ~1 ns, is constant in time and is measured with TP.

see Amapane Lacaprara Matorras talks and CMS notes

CONCLUSION : DT Calibration and synchronization

WORK to DO :

- Verify completeness of calibration and synchronization analysis and of foreseen processes.

-Prepare semiautomatic procedure interacting with trigger , DCS and DAQ people.

-Test procedure.

Page 23: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

23

Scint 5

MB3 CH2

MB3 CH1

Mini Crate MB3 CH2

Mini Crate MB3 CH1 Autotrigg CH1

Autotrigg CH2

L1A

DAQ

Trig Scint 5

Signals in input to CH1 TDC channels for monitoring

g

cosmic trackCosmic rays set up

LNL : MB3 chambers

BTI and TRACO set quiet configuration, the so called sync388 set-up i.e. only very high quality trigger in the TRACO: HH, HL or a H certified by a H_trigger in the theta view.

Autotrigger SELECTION only H in CH2

Trigger : autotrigger L1A of the Mini Crate

Cosmic rays autotriggered by a MB3 chamber in Legnaro.CMS in 04/045

Page 24: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

24

Cosmic ray autotrigger with 1 chamber ,

The time of the scintillators signals recorded with respect to the autotrigger are 90% within 25 ns

With autotrigger, the gitter of the cosmic time with respect to the L1A trigger was verified from the time of the scintillator recorded with respect to the autotrigger.

Page 25: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

25

Autotriggers Cosmic rays have flat distribution in time but L1A stops the TDC always in phase with the eadge of the clock : any event has an error do to the clock of about 25ns/(sqrt 12). The range of the offset can be seen on the Mean Time plot. Tmax distribution ~flat in ~50 ns ( 64 tdc units).

1 TDC count =0.78 ns

But the offset is the same in all the drift times recorded , event by event

From the correlation a 3% accuracy on Tmax should be reachable (15ns/500ns ) , correcting To_ev event by event from the plot above .

Or with a minimization fit ( event by event) of all the residuals of the reconstructed tracks segments with To_ev as parameter,

Cosmic ray autotrigger with 1 chamber

Page 26: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

26

angle distribution of the tracks reconstructed in the event

MB3 #36 no alignments corrections

fit performed : - in with 3 or 4 layers

-in with at least 3 and up to 8 layers

layer 1 450 m

layer 7 550 m

Residual 7 point fit 400 m error

Cosmic ray : autotrigger with chamber CH2

Autotrigger purity. Reconstructing offline the track segment of the triggering chamber with the standard Orca package (with no T0 correction event by event), in 99% of the events a track in both projections has been found ; in 0.5 % of the total events the chambers had many hits ( cosmic shower ). The expected single point error is around 500 m as it should with a 12 ns time error.

Page 27: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

27

Cosmic ray : autotrigger with 1 chamber,

drift time data and autotrigger signal from chamber1 and chamber 2

Residuals of the Position of the track Reconstructed in ch1 extrapolated to ch2

Track segment Reconstruction with standard Orca package (with no T0 correction event by event) : 99% efficiency on the triggering chamber. In the other chamber , due only to geometrical reason .( taking in account the cell disconnected ) the track reconstruction efficiency is arounf 96%.

NB the T0 of the two chambers are shifted of ~12ns : the shift cannot due to TOF (not more than 2 ns). It is due essentially to a the phase of the sampling clock in each chamber with respect to the muon.,

>>

Occupacy in the 2 chambers

Tbox of the 2 chambers

xch2-xch1extrapolated cm

Page 28: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

28

The recorded autotrigger signal of CH2, the autotriggering chamber, is a spike and 100% efficient. In 3 % of the events there was a double autotrigger but in the 5s window of tdc, compatible with the cosmic rate ( ~2K Hz).

The recorded autotrigger signal of CH1 presents instead two spikes 25 ns apart (32 tdc units) , is ~68 % efficient and the shift in time with respect to the CH2 autotrigger signal is 10 ns ( the two autotriggers are recorded in 2 channels of the same TDC). That agrees with the 12 ns shift of the time boxes and 2 ns of TOF . The clock of CH1 is displaced of 10 ns with respect to the clock of CH2 so it is completely out of phase for the muons recorded by the CH1 chamber. The experimental results agrees completely.

Relative autotrigger output time of the 2 chambers

50000 ev

TDC units

Time

TDC units

Time

50000 ev

Page 29: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

29

Conclusions : cosmic rays data studies with DT autotrigger

The test performed in Legnaro with the autotrigger signal as L1A, shows that with cosmic rays the Mini Crate can work and data give plain information as far as uniformity is concerned-on the chamber performance-on the trigger performance and -on the role of phase in different chambers.

BACK UP SLIDES >>>>>

Page 30: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

30

NB: The efficiency for tracks normal to the chamber does not depend strongly on the assigned drift velocity

if the error is within 8%. It is relevant as soon as the tracks hits cells not in the same column.

Angle with respect to normal to the chamber degrees

CMS NOTE 2004/045

TB2003 bunched beam : Local Trigger

HH+HL+LL Local Trigger efficiency (vs phase) for 2 different vdrift in the BTI and 2 track angles

Vdrift=50m/s.

Vdrift=55.1m/s

CMS NOTE 2001/052

TB2000 Only 1 SL

BTI and emulator H efficiency (within 6 ns window phase) for different vdrift in the BTI vs track angle

0.6

0.9

Page 31: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

31

How do we check the value of the mean drift velocity [in external scintillator bunched

cosmics or with bunched particles: all events with ~ the same T0 ]?

• with track fit with vdrift as free parameter CMS NOTE 2001/041,CMS NOTE 2003/001,etc

• from Mean Time & Time box

T0 of the drift time is measured from the Tbox; it depends on TOF , cables etc etc

From the MeanTime we measure Tmax

and so the drift velocity

TmaxT0

T4

T3T2

T1

d staggering=21mm

Vdrift = d / Tmax

Tmax =(T4 +2T3 + T2)/ 2 with T2,3,4= t (tdc)234-T0

Page 32: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

32

END

BACK UP SLIDES >>>>>

Page 33: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

33

Commissioning

-Measure Vdrift and phase

- update configurationST & and Phase

has been done at TB and with cosmic ray and can be always used during data taking ; standard procedures under study

The algorithms is used in the HLT simulation. Tuning has been done partially (see Vanini talk ) on TB and cosmic ray (point c). Can be used on data offline.

Magnet Test & LHC

LHP pp : Local Trigger configuration 1 loaded Local Trigger configuration 0 loaded

1

x,y, z ,B & angles from (CMSIM) OSCAR simulation hits in the specific cell+TB

a)

c)

Drift time from parametrisation:

t=F( xloc,yloc, zloc, B, philoc,thetaloc) [ see Amapane

talk) and Bologna &Madrid drift time cell simulation (Garfield ) and parametrization]

Emulate the Local Trigger performance as a function of the ST parameter and phase ( see Vanini talk) ; vary the ST and phase parameter and find the best value

b)

1

3

Data ( Drift Time and LT)

Calibration schem

e (….. F

or discussion…)

0

configuration 1

0

-Measure Vdrift and phase

- update configuration ST & and Phase

Data ( DTand LT)

configuration 2

Page 34: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

34

TP_go or Orbit signl L1A signal SC/Global

L1A signal inside CH1

Clock in CH1

TP in CH1

TDC fine counts in CH1

TDC window in CH1

LT trigger cotput by CH1, bx =i

Clock in CH2

TP in CH2

~Tmax/2

TP signals : flow of command with TP ( In the plot TP is generated within 0 ns between staggered cell i.e emulates normal tracks in the middle of a semicell )

TDC window in CH2

TDC fine counts in CH2

LT trigger cotput by CH2, bx =i

L1A signal inside CH2

Page 35: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

35

Introduction to DT Local Triggr parameters

Glossary

Configuration : it contains the parameters for the Read Out and for the Local Trigger (masks, triggers parameters and requirements) , see Marina Passaseo talk.

Autotrigger : signal that is generated under specific requirement on the Local Trigger quality of a chamber. It can be used for the L1A generation only locally or used by the Sector Collector that receives the track segments from 4(5) chambers to generate the L1A for all the chambers of the sector. (see Dalla Valle talk).

Nominal HV & Nominal Threshold are the working point of the chamber defined at TB & at ISR

Standard configuration : the configuration foreseen for normal condition LHC

Page 36: Drift Tube Calibration and synchronization and Cosmic rays data

16/11/2004 Muon PRS workshop @Torino A.Meneguzzo-Padova

36