Drainage Design 2019-2020 and Beyond Jess Jefferies
Transcript of Drainage Design 2019-2020 and Beyond Jess Jefferies
![Page 1: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/1.jpg)
Drainage Design 2019, 2020 and Beyond
Presented by Jessica Jefferys & Mark Ellis
![Page 2: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/2.jpg)
Agenda
Overview of MicroDrainage 2019 & 2020
An exciting new chapter for
Drainage Design from Innovyze
Q&A
![Page 4: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/4.jpg)
Overview of MicroDrainage 2019 & 2020
![Page 5: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/5.jpg)
MicroDrainage 2019 Key Highlights…
Automatic Manhole Offset Calculation
Improved Manhole Schedules
MicroDrainage – Civil 3D: Utilise your own Parts Lists
New FloodFlow Engine – Improved 2D Analysis
![Page 6: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/6.jpg)
• MicroDrainage now allows automatic calculation or validation of user defined offset to ensure minimum benching is applied
• Speeding up what was previously a manual process
• Simplifies compliance with Sewers for Adoption requirements
Improved manhole design and reporting
Automatic Manhole Offset Calculation
![Page 7: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/7.jpg)
• Schematic drawing added to schedules to give visual context
• Schedule highlights any MH Offset details
• Helping you to demonstrate sewers for adoption requirements
Improved manhole design and reporting
Improved Manhole Schedules
![Page 8: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/8.jpg)
• One-click data exchange with AutoDesk Civil3D using Parts Mapping
• Improved data exchange to maintain representation of design
• Enables BIM requirements to be satisfied
Ensure design suitability with detailed parts representation
Civil 3D: Utilise your own Parts Lists
![Page 9: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/9.jpg)
• Better performance for typical surface water flows
• Local-Inertial Engine: More complete solution of Navier-Stokes equations
• Satisfy approving authorities by demonstrating flood mitigation and good surface water management
Advanced 2D analysis of flood flow paths
Improved FloodFlow Engine
![Page 10: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/10.jpg)
What’s New in MicroDrainage 2020
Half Drain Time
Run Time per storm duration in Wizards
Manhole Invert Level Annotations
Manhole Offset Details on Properties Form
Remember previous Parts Mapping Manager in Civil 3D
Available
Next Week!
![Page 11: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/11.jpg)
• Half Drain Time can now be viewed via the Summary Results for pipes or manholes that have an infiltration structure
• Increasing requirement from approving authorities across the UK
• Results enable easy population of regulatory requirements to speed up the approval process
Clearer assessment of SuDS attenuation
Half Drain Time Results
![Page 12: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/12.jpg)
• The Design Audit Wizard includes auditing Half Drain time for a specific return period/climate change parameters
• Audit results enable easy review of design against standards
Clearer assessment of SuDS attenuation
Half Drain Time Design Audit
![Page 13: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/13.jpg)
• Wizards now allow a run time (mins) to be entered per storm duration to allow for an in-depth assessment of drain down
• As SuDS slow down water, run times need to be extended to ensure the peak flow is captured
• Simplified workflow and saves time versus running individual storms
Clearer assessment of SuDS attenuation
Run Time per storm duration in Wizards
![Page 14: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/14.jpg)
• Simplified editing to ensure design can be updated and adhere to Sewers for Adoption
• Streamline workflow editing manhole intersection coordinates directly via properties
• These properties are editable when Access has been set to required
Enhanced manhole editing and layout
Manhole Offset Details on Properties
![Page 15: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/15.jpg)
• Manhole Invert Levels are now viewable via Properties form and annotation added on Plan
• Removes the need for some post-processing manual activities
• Levels can be exported to help deliver outputs in the right format for approval submission
Enhanced manhole editing and layout
Manhole Invert Level Annotations
![Page 16: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/16.jpg)
• Now the import and export process reverts to the previously mapped parts if no changes made
• Maintain data accuracy across tools and quickly deliver BIM outputs to required standards
• Streamlines round tripping data between packages
Intelligent data exchange with Civil3D
Civil3D – Parts Mapping Remembered
![Page 17: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/17.jpg)
An exciting new chapter forDrainage Design from Innovyze
![Page 18: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/18.jpg)
Challenges of Drainage DesignEveryday problems:
Must demonstrate
compliance to local
standards.
Difficult to express
information to non-
technical stakeholders.
Design iterations
often means starting
all over again.
Need to track different aspects
of the drainage design across
multiple packages.
Recreating design data from
one format into another is time
consuming.
![Page 19: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/19.jpg)
![Page 20: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/20.jpg)
![Page 21: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/21.jpg)
Roadmap
InfoDrainage2020.1(Feb 2020)
InfoDrainage2021.1(Q1 2021)
Essentials
Advanced
Premium
3D View
InfoDrainage2020.2(Q3 2020)
BIM Workflows – Civil 3D Integration
2D Analysis for Exceedance Mapping
SuDS Design & Analysis Expanded Auditing Toolkit 3D View, Foul Design
*Roadmap correct at time of publication, Innovyze will not be held to these dates or deliverables.
![Page 22: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/22.jpg)
Saving time on sustainable designOptimising designs and obtaining approvals faster
than ever before.
Define true-to-site structures
quickly and effectively to
make best use of space.
Visualize and export design
data to a variety of
stakeholders of quick approval.
Analyze and optimize the
system as a whole rather
than individual structures.
Next
Generation
Interface
Graphical
Layout
Rigorous,
Detailed
Hydraulic
Analysis
Conceptual
& Detailed
in One
Package
Multiple
Benefits
Approach
Validation
& Visual
Tools
Better
Integration
Adaptable
to Local
Market
![Page 23: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/23.jpg)
Discover InfoDrainage
![Page 24: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/24.jpg)
Leverage Existing Topography
Deluge to understand Site Layout
Identify blue green corridors
![Page 25: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/25.jpg)
Faster Model Setup
Import Catchment Areas
CAD/GIS
• VIDEO
![Page 26: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/26.jpg)
Streamlined Design Process
Network layout on plan
Easier editing
![Page 27: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/27.jpg)
Reduction in Rework
Layout SuDS design
Detailed treatment structure layout
• VIDEO
![Page 28: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/28.jpg)
Improved Hydraulic Representation
Animated Profile View
Results Warnings on Plan
![Page 29: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/29.jpg)
Meet Regional Review Specifications
Clear Templated Outputs
Easier to Approve Designs
• VIDEO
![Page 30: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/30.jpg)
Upcoming Dates
9th March 2020Software Available
May 2020Webinar – Optimal
SuDS Design with
InfoDrainage
![Page 31: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/31.jpg)
UserVoice
https://feedback.innovyze.com/
Received
More Info Needed
Declined
In Discussion
On Roadmap
In Development
Completed
![Page 32: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/32.jpg)
![Page 33: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/33.jpg)
Thanks for your time & engagement
Mark Ellis
Solutions Engineer
Email: [email protected]
Jessica Jefferys
Product Manager
Email: [email protected]
![Page 34: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/34.jpg)
![Page 35: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/35.jpg)
Parking Lot
![Page 36: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/36.jpg)
MicroDrainage in 2020 & beyond
![Page 37: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/37.jpg)
The future of MicroDrainage – 2020
MicroDrainage 2020.1 Feature Release March 2020
Support 3rd Party Software Integration during 2020
•ReFH2 and Civil3D Planned
Support for Important Legislative Updates (if required)
•e.g. Design & Construction Guide
Major bug fixes (if required)
Fully supported by Innovyze for Training and Technical Support needs
![Page 38: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/38.jpg)
2021 & Beyond
• Choose which product to use by making both products available
• to the market for a period. In 2021 and beyond MicroDrainage will move to mature
• product status where it will remain supported and training will continue to be provided as required
![Page 39: Drainage Design 2019-2020 and Beyond Jess Jefferies](https://reader031.fdocuments.net/reader031/viewer/2022022609/6218ab2b1edab253890d6fa3/html5/thumbnails/39.jpg)
Challenges Capabilities Outcome
Ensuring optimum sizingOver-sized structures are costly for clients;
undersized ones can be disastrous; getting a
‘Goldilocks’ solutions is crucial to good
design.
Understanding Water QualityLegislation rapidly changing to force a
quantitative approach to water quality
improvement.
Lack of OptioneeringDue to time sunk into creating one design,
engineers don’t often push the envelop
when optioneering, stifling creativity.
Conflict with natureEnsure the best use of land and understand
overland flows
• Automated sizing tools
• Cutting-edge SuDS
representation & analysis
• Pollutant modelling
• Phase management for
optioneering
• Identification of exceedance
routing
So that … you can
deliver sustainable,
optimally sized, cost
effective designs on
time and on budget that
meet regulatory
requirements.
Delivering multiple benefits