DRAFT GEOTECHNICAL DATA REPORT
I-75 MODERNIZATION PROJECT OWNER’S REPRESENTATIVE CONSULTANT
TUNNEL DESIGN INVESTIGATIONNORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD
OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174
Owner:
Michigan Department of Transportation 18101 W. Nine Mile Road
Southfield, MI 48075
Prepared for:
WSP Michigan, Inc. 500 Griswold Street, Suite 2600
Detroit, Michigan 48226
2014195CAugust 22, 2017
DRAFTRTRT
AND COUANDMDOT JN: 122MDOT JN
MichM
3031 W. Grand Blvd, Suite 228, Detroit, Michigan 48202 web: www.somateng.com phone: 313-963-2721 fax: 313-963-2736 email: [email protected]
Infrastructure Engineering Solutions
August 22, 2017 2014195C
Mrs. Barbara J. Arens, PE, PTOEPresident, Central Region Operations Manager WSP Michigan, Inc.500 Griswold Street, Suite 2600 Detroit, Michigan 48226
RE: Draft Geotechnical Data Report I-75 Modernization Project
ORC Tunnel Design Investigation- North of 8 Mile Rd (M-102) to North of 12 Mile Rd Oakland County, Michigan MDOT JN: 122104O; CS: 63174
Dear Mrs. Arens:
We have completed the geotechnical investigation for the above referenced project. The following sections of this report will provide our understanding of the project, a description of our field investigation, the results of the field and laboratory tests, and the logs of test borings.
This draft report includes the borings performed during Phases 1 and 2 of the tunnel investigation. To date the field exploration program consisted of performing a total of sixty (60) soil borings throughout the project limits from north of 8 Mile Road to north of 12 Mile Road. We understand that more soil borings will be performed as part of Phase 3 geotechnical investigation for the proposed tunnel. Upon completion of the next phase of the geotechnical investigation, this draft report will be updated with the additional subsurface information when it becomes available.
WSP requested that the soil samples obtained from the tunnel borings (performed during Work Orders Numbers 3 and 4, under ORC MDOT JN: 122104O) should be retained until completion of tunnel construction. Typically, we retain the soil and rock samples for a period of 90 days from the date of the final geotechnical investigation report. After this retention period, we can relinquish the samples to MDOT for storage in their facilities. If however MDOT would not take custody of the samples, then Somat will be willing to retain them for the requested period of time in a climate controlled storage facility for a monthly storage rental fee. For budgetary purposes we assumed the need to store the samples for 12 months.
It was a pleasure working with you on this project. If you have any questions regarding this report, please do not hesitate to contact us.
Sincerely, Somat Engineering, Inc.
Jonathan D. Zaremski, P.E. Geotechnical Project Manager
DRAFTove referenced project. ove referenced pra description of a des our field ur fiel
gs.gs.
d during Phases 1 and 2Phasesf performing a total of performing a total of six
north ofh of 12 Mile Road. 12 Mile Road. fotechnical itechnical investigation fonvestigation fo
l investigation, l investigation, this draftthiomes available. omes availa
samples obtained from es obtained from r ORC MDOT JN: 122r ORC MDOT JN
y, we retain the soil and ry, we retain the soil andvestigation report. Aftevestigation report. Afte
heir facilities. If hheir facilities. Ietain them etain them
ental fental f
DRAFT GEOTECHNICAL DATA REPORT I-75 MODERNIZATION PROJECT
OWNER’S REPRESENTATIVE CONSULTANT TUNNEL DESIGN INVESTIGATIONNORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD
OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174
TABLE OF CONTENTS
PAGE1.0 INTRODUCTION ......................................................................................................................................... 1
1.1 GENERAL ...................................................................................................................................................... 11.2 PROJECT INFORMATION ........................................................................................................................... 21.3 SITE CONDITIONS ....................................................................................................................................... 3
2.0 SUBSURFACE INVESTIGATION ................................................................................................................. 4
2.1 FIELD EXPLORATION ................................................................................................................................. 42.1.1 Drilling Operations ............................................................................................................................... 62.1.2 Standard Penetration Test (SPT) ........................................................................................................... 62.1.3 Sampling ................................................................................................................................................ 72.1.4 In-Situ Field Vane Shear Tests .............................................................................................................. 82.1.5 Photoionization Detector (PID) Screening ............................................................................................ 92.1.6 Gas Monitoring ...................................................................................................................................... 92.1.7 Groundwater Level Observation Procedures ...................................................................................... 102.1.8 Groundwater Monitoring Well Installation Procedures ...................................................................... 102.1.9 Falling Head In-Situ Permeability Test ............................................................................................... 12
2.2 GEOTECHNICAL LABORATORY TESTING ........................................................................................... 122.2.1 Moisture Content Determination Tests ................................................................................................ 132.2.2 Unconfined Compressive Strength Tests ............................................................................................. 132.2.3 Unit Weight Determination Tests ........................................................................................................ 132.2.4 Grain Size Analyses ............................................................................................................................. 142.2.5 Atterberg Limits Tests .......................................................................................................................... 142.2.6 Direct Shear Test Results ..................................................................................................................... 142.2.7 One-Dimensional Consolidation Test Results ..................................................................................... 142.2.8 Consolidated Undrained Triaxial Test Results .................................................................................... 15
2.3 LIMITATIONS ............................................................................................................................................. 15
3.0 RESULTS OF SUBSURFACE INVESTIGATIONS.................................................................................... 15
3.1 SOIL STRATIFICATION AND GROUNDWATER CONDITIONS .......................................................... 153.2 GROUNDWATER LEVEL OBSERVATIONS ........................................................................................... 163.3 GAS MONITORING READING OBSERVATIONS .................................................................................. 17
4.0 FIELD TEST RESULTS ................................................................................................................................. 18
4.1 IN-SITU FIELD VANE SHEAR TEST RESULTS ...................................................................................... 184.2 FALLING HEAD IN-SITU PERMEABILITY TEST RESULTS ................................................................ 18
5.0 GENERAL QUALIFICATIONS .................................................................................................................... 19
DRAFT..................
........................................................................................
.......................................................................
....................................................................................
................................................................................................................
...........................................................................................................................................................
......................................................................PID) Screening ....................PID) Screening ........
..............................................................................bservbservation Procedures .......Procedures ...
itoring Well Ining Well Installation Prostallation Pro-Situ Permeability Test .......Situ Permeability Test .......
LABORATORYLABORATORY TESTINGTEContent DeConten termination Testrmination Tesed Compressive Strength ed Compressive Strength
t Determt Deter ination Testn Talyses .............alyses .............
TeTests .....sts .....esuesu
DRAFT GEOTECHNICAL DATA REPORT I-75 MODERNIZATION PROJECT
OWNER’S REPRESENTATIVE CONSULTANT TUNNEL DESIGN INVESTIGATIONNORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD
OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174
LIST OF APPENDICES
Appendix A ..................................................................................... Soil Boring Location Diagrams Appendix B ...................................................................................................... Logs of Test BoringsAppendix C ................................................................................................. Rock Core PhotographsAppendix D ....................................................................................... Field Vane Shear Test ResultsAppendix E ..................................................................... Photoionization Detector (PID) Readings Appendix F........................................................... Groundwater Monitoring Well Installation Logs Appendix G ............................. Monitoring Wells Groundwater Level Readings and Gas Readings Appendix H ............................................................... Field Falling Head Permeability Test Results Appendix I ..................................................................................... Summary of Laboratory Results Appendix J ......................................................... Grain Size Analysis and Hydrometer Test Results Appendix K ........................................................................................ Atterberg Limits Test ResultsAppendix L ........................................................................... Three-Point Direct Shear Test Results Appendix M .............................................................. One-Dimensional Consolidation Test Results Appendix N ........................................ Consolidated Undrained Triaxial Compression Test Results Appendix O ................................................................................................................ General Notes
DRAFT. Soi. So
............................................... R...............
................. Field Vane................. Fiel.... Photoionization .... Photoionization DetD
Groundwater MonitoGroundwater rininls Groundwater Level Roundwate
............ Field Falling H............ Field Fa...................................................................
.............. Grain Size An.... Grain Size An..........................................................................
...................................................................................................... O..................................
................. Consolidated........ Consolidated................................................................
DRAFT GEOTECHNICAL DATA REPORT I-75 MODERNIZATION PROJECT
OWNER’S REPRESENTATIVE CONSULTANT TUNNEL DESIGN INVESTIGATIONNORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD
OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174
1.0 INTRODUCTION
1.1 GENERAL
Upon authorization from WSP Michigan, Inc. (WSP) in Detroit, Michigan, Somat Engineering, Inc.
(Somat) has conducted a geotechnical investigation as part of the Owner’s Representative
Consultant (ORC) services for the proposed drainage/storage tunnel of a section of I-75 from north
of 8 Mile Road to north of 12 Mile Road in Oakland County, Michigan. The geotechnical
investigation was performed in general accordance with the following proposals and work plans:
Somat Proposal No. P140068 for Work Order 2, dated December 15, 2014;
“Proposed Scope of Work for the Tunnel Study Phase” dated September 9, 2015;
Somat Proposal No. P150404 for Work Order 3, dated January 21, 2016;
Somat Proposal No. P160384A for Work Order 4, dated December 6, 2016; and
MDOT Program/Project Management System (P/PMS) Task 3325 Geotechnical Structural
Site Characterization.
The following sections of this report will provide our understanding of the project, a description of
our field investigation, the results of the field and laboratory tests, and the logs of test borings. The
information presented in this data report is intended to be used to facilitate the design of the
geotechnical aspects of the project.
Detroit, Michigan, SomDetroit, Michiga
ion as part of the Oion as part of the O
inage/storage tunnel of a/storage t
oad ad in Oakland Countin Oakland C
accordance with the follance with the foll
40068 for Work Order 240068 for Work Order
of Work for the Tunnel Sof Work for the
al No. P150404 for Woral No. P150404 for Wo
al No. P160384A foal No. P160384A
roject Maroject Ma
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 2
1.2 PROJECT INFORMATION
The overall I-75 Modernization project consists of the design and reconstruction of I-75 from 8
Mile Road (M-102) to north of South Boulevard, encompassing approximately 18 miles of the I-
75 freeway. This stretch of freeway, which traverses through six (6) communities in Oakland
County, has been divided into a total of nine main segments for reconstruction.
As part of the I-75 reconstruction, a new drainage/storage tunnel from north of 8 Mile Road to
north of 12 Mile Road is planned to be constructed. The proposed tunnel is approximately 20,000
feet long and crosses through the communities of Hazel Park, Madison Heights, and Royal Oak.
The proposed tunnel will store and convey excess storm water during rain events, and the
proposed alignment is generally located under the northbound I-75 Service Drive (Stephenson
Highway/N. Chrysler Drive). The proposed tunnel finished diameter will be generally 12 to 14
feet, with the invert elevation ranging from 538 feet at the north end of the tunnel to 560 feet at
the south end. In addition to the tunnel, drop shaft structures and a new pump station are
proposed. This report addresses the geotechnical investigation for the design of a proposed
drainage/storage tunnel and associated structures.
The tunnel borings were performed in two phases. The following table lists the borings and the
groundwater monitoring wells performed/installed during each phase. The soil borings are
presented in order from north to south, following the downstream direction of the proposed
tunnel. This draft report includes the borings performed during Phases 1 and 2.
DRAFTnnel fromnnel f
oposed tunnel is oposed tun
el Park, Madison Heigel Park, Madison
cess storm water duriness storm water durin
er the northbound I-75northbo
sed tunnel d tunnel finished diamfinished d
g from 538 feetg from 538 feet at the nat the ntt
he tunnel, drhe tunnel, op shaft p s
esses the geotechnicalses the geotechnical
and associated structurand associated st
re performed inre performed
wells pwells p
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 3
Table 1.2 Summary of the Tunnel Investigation Soil Borings
Phase 1 Soil Boring ID
Phase 2 Soil Boring ID
Phase 2-A Phase 2-B TB-06* TB-06A TB-119 TB-05* SB-03 TB-118 TB-04 SB-03A TB-117
TB-03* SB-06* SB-09 TB-02 RW-40 SB-09A
TB-01* RW-40A RW-37 TB-05A RW-37A SB-12 RW-31 RW-20 RW-31A RW-13 RW-25 RW-08* RW-25A RW-08A RW-17 SB-17 RW-17A SB-17A SB-15 SB-17B SB-15A TB-04A SB-16 TB-116 SB-16A TB-114 SB-16B* TB-03A SB-18 TB-111* SB-18A TB-109 TB-115 TB-107 TB-113 TB-02A TB-112 TB-105 TB-110 TB-103 TB-108 TB-101 TB-106 TB-104 TB-102
Total 6 borings Total 26 borings Total 28 borings Grand total 60 borings
*Groundwater monitoring wells.
1.3 SITE CONDITIONS
I-75 carries three lanes of traffic in both directions, with a posted speed limit of 70 miles per
hour. The existing pavement surface consists of either asphaltic cement concrete or Portland
cement concrete. The service roads on the east side of I-75, including N. Chrysler Drive and
Stephenson Highway, consist of two-lane, one-way traffic, running northbound and parallel to
DRAFTTRW
TRWTTTRW-25ATTTFTRW-17RW
FTFTFTFTRWRWFTFTFTFT17A A FTFTFTFTB-17B
AFTFTFTFTB-04A TB-04A
AFFFFTB-116 TB-116 AFFFFTB-114 TB-114 AFTB-03A TB-03A
RARTB-111* TB-111
RRRARTB-109 TB-109RRRARTB-10TB-10RRRADRTB
DRDRDRDR
DRDRDRDR DRDRDRDR DDDDDDDDDgsgsD
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 4
NB I-75. Entrance and exit ramps from N. Chrysler Drive and Stephenson Highway to NB I-75
are typically one lane with paved shoulders. The proposed tunnel construction passes under the
I-696/I-75 interchange. The topography of the site is relatively level, with similar grades along
the service drives and the surrounding area. The mainline of I-75 within the project limits is
depressed at I-696 and the overpasses except for the 12 Mile Road interchange, where the
mainline has been built up over existing grades.
This area of Oakland County is generally residential in nature. The areas on either side of the
freeway along this stretch of I-75 are vegetated with trees and brushes, including some areas
between the ramps at the interchange of I-75 and I-696 as well as grass-covered areas between
NB I-75 and the adjacent access roads of N. Chrysler Drive and Stephenson Highway.
2.0 SUBSURFACE INVESTIGATION
2.1 FIELD EXPLORATION
To date the field exploration program consisted of performing a total of sixty (60) soil borings
throughout the project limits from north of 8 Mile Road to north of 12 Mile Road. This includes
six (6) soil borings performed during Phase 1, twenty-six (26) soil borings performed during
Phase 2-A, and twenty-eight (28) soil borings performed during Phase 2-B. We understand that
more soil borings will be performed as part of Phase 3 geotechnical investigation for the
proposed tunnel. The number, location and spacing of the soil borings were selected by WSP to
investigate the existing soils along the proposed tunnel alignment. The final locations of the soil
borings were selected and staked in the field by Somat, taking into consideration the locations of
the utilities (underground and overhead) and equipment accessibility. Ground surface elevations
and coordinates were obtained by Surveying Solutions, Inc. (SSI) using horizontal datum “North
American Datum of 1983” (NAD 83) (NSRS 2011) and vertical datum “North American
Vertical Datum of 1988” (NAVD 88). The ground surface elevations and coordinates were
provided to Somat for use in this report.
DRAFTe. The e. Th
es and brushes, es and br
96 as well as grass-cov96 as well as gras
sler Drive and Stephensler Drive and Stephens
ON N
N N
ration program consisteration program c
ect limits from north ofect limits from north of
rformed duringrformed durin
ht (28)ht (28)
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 5
The exploration depths of the soil borings were selected by WSP. The soil borings generally
extended to a minimum depth of 1.5 times the proposed tunnel diameter below the proposed
tunnel invert, based on a potential mined diameter of up to 16 feet. As such, the soil borings
generally extended a minimum of 25 feet below the proposed finished tunnel invert. Borings
RW-08, TB-102A, TB-106, TB-104 and TB-103 terminated at approximately 18 to 21 feet
below the proposed finished tunnel invert.Boring TB-107 terminated 13 feet below the proposed
finished tunnel invert. Some bridge structure borings extended deeper, with penetration into
rock, to provide data for bridge foundation design.
All of the soil borings were performed for the geotechnical investigation of the proposed tunnel;
however some of the soil borings served a dual purpose for both the proposed tunnel and
proposed structures along the I-75 Modernization Project Segment 2 from I-696 to south of 12
Mile Road. The following table summarizes the field exploration program for Phase 1 and Phase
2 of the tunnel design investigation:
Table 2.1Field Exploration Program Summary
Boring IDs Phase Number of Soil Borings
Purpose(Project Components)
TB-06, TB-05, TB-04, TB-03, TB-02, TB-01 1 6 Tunnel Borings
RW-40, RW-40A, RW-20, RW-13, RW-08, RW-08A 2-A 6 Retaining Wall/Noise Wall
Borings and Tunnel Borings SB-03, SB-03A, SB-06, SB-12,
SB-17, SB-17A, SB-17B 2-A 7 Bridge Structure Borings and Tunnel Borings
TB-06A, TB-05A, TB-04A, TB-03A, TB-02A 2-A 5 Tunnel Borings
TB-116, TB-114, TB-111, TB-109, TB-107, TB-105, TB-103, TB-101 2-A 8 Tunnel Borings
RW-37, RW-37A, RW-31, RW-31A, RW-25, RW-25A, RW-17, RW-17A 2-B 8 Retaining Wall/Noise Wall
Borings and Tunnel Borings SB-09, SB-09A, SB-15, SB-15A, SB-16,
SB-16A, SB-16B, SB-18, SB-18A 2-B 9 Bridge Structure Borings and Tunnel Borings
TB-119, TB-118, TB-117, TB-115,TB-113, TB-112, TB-110, TB-108,
TB-106, TB-104, TB-102 2-B 11 Tunnel Borings
DRW-20, RW-20, DR05, TB-04, 05, TB DRAFThnical investigation of thnical investigation
al purpose for both thal purpose for both th
ation Project Segment roject
izes the fis the field exploratioeld explorat
Table 2.1Table 2.Field Exploration Preld Exploration PrRA
Ds Ds Ph
DRRRR, TB-01 , TB-0DRR
08A 08A DD
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 6
Soil boring location diagrams are presented in Appendix A. The logs of soil borings and rock
cores are included in Appendix B.
2.1.1 Drilling Operations
The drilling operations for Phase 1 of the tunnel design investigation were performed on various
days between October 6, 2015 and October 20, 2015. The drilling operations for Phase 2 were
performed on various days between August 17, 2016 and March 23, 2017. The soil borings were
drilled using either a truck mounted drill rig or an all terrain vehicle (ATV) mounted drill rig, as
required by the site condition.
The soil borings were drilled using 4-inch diameter solid stem augers and 2¼-inch to 4¼-inch
diameter hollow stem augers. Deeper soil borings were drilled by advancing solid stem or
hollow stem augers before transitioning to a wash rotary drilling technique.
In some of the bridge structure borings that were serving as dual purpose for the tunnel
investigation, rock cores were obtained upon encountering bedrock. The rock cores were
obtained by means of a NQ wire-line double core barrel with a 1-7/8 inch (nominal) inside
diameter, advanced generally in 5 foot runs.
Upon completion, the soil borings were generally backfilled with a cement-bentonite grout
mixture. Three soil borings (RW-40, RW-31, and RW-17) were backfilled with soil cuttings.
Groundwater monitoring wells were installed in eight (8) of the boreholes (TB-06, SB-06,
TB-05, RW-08, SB-16B, TB-111, TB-03, and TB-01). Soil borings performed through
pavements were patched at the surface with asphalt cold-patch or quick-setting concrete to match
the existing conditions.
2.1.2 Standard Penetration Test (SPT)
Soil samples collected during the drilling portion of the subsoil exploration were labeled with the
soil boring designation and a unique sample number. Soil boring samples were obtained by
DRAFTehicle (Aehicle
eter solid stem augers ater solid stem augers a
borings were drilled bs were
o a wash rotary drilling wash rotary drillin
re borings thre borings at were t w
were obtained upon re obtained upon ee
a NQ wire-line doublea NQ wire-line
generally in 5 foot runsgenerally in 5 foot run
l borinl borin
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 7
Standard Penetration Tests in general accordance with ASTM D-1586 procedures, whereby a
conventional 2-inch O.D. split-spoon sampler is driven into the soil with a 140 pound hammer
repeatedly dropped through a free-fall distance of 30 inches. A hydraulically driven automatic
SPT hammer fixed to a drill rig was used to perform the test. The sampler is generally driven
three successive 6-inch increments, with the blows for each 6-inch increment being recorded.
The number of blows required to advance the sampler through 12 inches after an initial
penetration of 6 inches, is termed the Standard Penetration Test resistance (N-value) and is
presented graphically on the individual Logs of Test Borings. As added information, the number
of blows for each 6-inch increment are also presented on the boring logs.
A fourth 6-inch increment was driven on select SPT samples. In general, this method of SPT
sampling was utilized during continuous sampling intervals to obtain additional soil material.
The N-value is the sum of blows through the second and third 6-inch increments, regardless of
the presence of a fourth increment.
2.1.3 Sampling
Soil samples from the borings were recovered using SPT sampling procedures in general
accordance with ASTM Standard D-1586 (“Standard Method for Penetration Tests and Split
Barrel Sampling of Soils”). The soil samples were sealed in glass jars in the field to protect the
samples and maintain their natural moisture contents.
In general, the SPT samples were obtained at a regular interval of 2½ feet to a depth of 10 feet
below grade and at an interval of 5 feet thereafter to the exploration depth of the borings.
Additional sampling and testing was requested throughout the tunnel influence zone, an interval
from 20 feet above the proposed tunnel crown to 10 feet below the proposed tunnel invert.
Shelby tube sampling was generally performed within the tunnel influence zone, as well as
continuous SPT sampling in select soil borings.
DRAFTAs addeAs ad
he boring logs. he boring
SPT samples. In generSPT samples. In gener
mpling intervals to obtinterva
h the seche second and third ond and thir
borings were recoveborings were r
STM Standard D-1586STM Standard D-1586
ils”). The soil ils”). The soi
naturanatura
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 8
In addition to the split spoons, 3-inch diameter thin-walled (Shelby) tubes were obtained at
selected depth intervals where cohesive soils were anticipated. The Shelby tubes were collected
by use of the direct push method, per ASTM D-1587 (Standard Practice for Thin-Walled Tube
Sampling of Soils for Geotechnical Purposes). The Shelby tube samples were sealed
immediately at both ends with a wax plug and plastic end-caps. All tubes were identified with
information on boring number, sample number, sample depth and recovery. The tubes were
stored in a vertical position to minimize sample disturbance during transportation. These samples
include a sample number prefix of “ST” on the Logs of Test Borings.
Rock core samples retrieved from the rock core process were placed into wooden boxes labeled,
and photographed for documentation. The core boxes were transported to Somat Lab for further
testing, classification and logging. Photographs of the rock cores are included in Appendix C.
All soil samples were transported to Somat’s laboratory for further analysis and testing. WSP
requested that the soil samples obtained from the tunnel borings (performed during Work Orders
Numbers 3 and 4, under ORC MDOT JN: 122104O) should be retained until completion of
tunnel construction. Typically, we retain the soil and rock samples for a period of 90 days from
the date of the final geotechnical investigation report. After this retention period, we can
relinquish the samples to MDOT for storage in their facilities. However, if MDOT would not
take custody of the samples, then Somat will be willing to retain them for the requested period of
time in a climate controlled storage facility for a monthly storage rental fee. For budgetary
purposes we assumed the need to store the samples for 12 months.
2.1.4 In-Situ Field Vane Shear Tests
Field vane shear tests were generally performed using Acker vane shear test kit with a calibrated
torque head, in general accordance with ASTM D-2573. The in-situ field vane tests were
performed within the tunnel influence zone, where suitably soft to stiff clay layers were
encountered. These tests were performed to determine the in-place shear strength of the clay
soils. The test generally consists of pushing a four-bladed vane into the undisturbed soil and
DRAFTorings.orings
ss were placed into woss were placed int
oxes xes were transported twere transported t
hs of the rock cores are e rock
o Somat’s laborSomat’s laboratory foatory fo
btained from thbtained from the tunnee tu
RC MDOT JN: 12210C MDOT JN: 12210
pically, we retain the sopically, we retain
al geotechnical invesal geotechnical inves
to MDOT for to MDOT fo
, then , then
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 9
rotating it from the surface to determine the torsional force required to cause a cylindrical
surface to be sheared by the vane. This torsional force is then converted to a unit shearing
resistance of the cylindrical surface.
The vane was rotated at a rate of approximately 5 degrees per minute and torque readings were
obtained at 5-degree intervals. Following determination of the maximum shear strength, the
vane was rotated quickly to shear off the soil column and a remolded strength test was performed
following a 5-minute waiting interval. The undisturbed shear strength was compared to the
remolded shear strength to determine the sensitivity of the clay. The results of these field vane
shear tests are presented on the Logs of Test Borings with a sample number prefix of “VS” and
as detailed reports in Appendix D.
2.1.5 Photoionization Detector (PID) Screening
Soil samples from soil borings located at the primary drop shaft locations (TB-06A, TB-116, and
TB-101) were screened for general volatile organic compound vapor presence using a PID
screening meter. The PID is a portable vapor and gas instrument that detects a variety of organic
compounds with a detection range of approximately 0.1 to 10,000 parts per million (ppm). The
PID indicates if volatile organic compounds (VOCs) or semi volatile organic contents (SVOCs)
are present, but does not identify which type or the specific concentration. The PID was
calibrated prior to screening using 100-ppm isobutylene. Each soil sample was placed in a re-
sealable, plastic sample collection bag. This allowed for headspace expansion as the sample was
allowed to warm. Once expansion occurred, the bag was opened, the tip of the PID was inserted
in the bag and the result was recorded. A summary of the PID soil screening results is presented
in Appendix E.
2.1.6 Gas Monitoring
During drilling of the soil borings, the atmosphere within the breathing zone was being
monitored continuously throughout the drilling and rock coring of the borings. Gas monitoring
was performed using a four-gas detection meter. The meter simultaneously measures the Lower
DRAFTar strenar str
e clay. The resue clay. T
with a sample numberwith a sample num
Screening reening
ed at the primary drop sd at the primary drop s
neral volatileneral volat organic orga
s a portable vapor and portable vapor and gg
ction range of approximction range of ap
atile organic compounatile organic compoun
not identify wnot identify
g using usin
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 10
Explosive Limit (LEL) of combustible gases, oxygen, carbon monoxide, and hydrogen sulfide.
These gases are virtually undetectable by visual and olfactory methods (hydrogen sulfide has a
distinct odor, but the gas can paralyze the sense of smell). The four-gas meter was also utilized
every time water level readings were obtained from the groundwater monitoring wells.
Detectable levels of gas readings are recorded in Appendix G “Monitoring Wells Groundwater
Level Readings and Gas Readings”.
2.1.7 Groundwater Level Observation Procedures
Whenever possible, groundwater level observations were made during the drilling operations and
immediately after completion of drilling, and are shown on the individual Logs of Test Borings.
During drilling, the depth at which free water was observed, where drill cuttings became
saturated or where saturated samples were collected, was indicated as the groundwater level
during drilling. In granular, pervious soils, the indicated water levels are considered relatively
reliable when solid or hollow-stem augers are used for drilling. However, in cohesive soils,
groundwater observations are not necessarily indicative of the static water table due to the low
permeability rates of the soils, and due to the sealing off of natural paths of groundwater flow
during drilling operations. Further, the use of wash water in the drilling process makes detecting
groundwater seepage difficult.
It should be noted that seasonal variations and recent rainfall conditions may influence the level
of the groundwater table significantly.
2.1.8 Groundwater Monitoring Well Installation Procedures
As part of the scope of work for Phase 1 and Phase 2, open-standpipe monitoring wells were
installed at eight (8) of the soil boring locations. The standpipe wells were constructed out of 2-
inch diameter PVC pipe and each well consisted of a 10-foot to 15-foot long schedule 10 PVC
screen and several 10-foot pipe risers. A sand pack was placed in the annulus around the screen
and sealed at the top with bentonite. A flush mounted roadway box was placed over each well
DRAFTmade during the dmade durin
wn on the individual Lown on the individu
was observed, wherewas observed, where
collected, was indicated, was
ils, the , the indicated waterindicated wat
augers are usaugers are used for dred for dr
ot necessarily indicaot necessarily indic tiv
ils, and due to the s, and due to the sealeal
ns. Further, the use of wns. Further, the u
e difficult. e dif
onal vonal v
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 11
location for protection and security. A summary of the groundwater monitoring wells
constructed at the site is presented in Table 2.1.8.
Table 2.1.8 Summary of Monitoring Well Installations
BoringNumber Well Description
ScreenLength
(ft)
ApproximateScreen
Depth (ft)
ApproximateScreen
Elevation (ft) TB-06 Standpipe PVC Monitoring Well, Flush Mount 10 78 to 88 579.6 to 569.6
SB-06 Standpipe PVC Monitoring Well, Flush Mount 15 87 to 102 551.1 to 536.1
TB-05 Standpipe PVC Monitoring Well, Flush Mount 10 53 to 63 584.0 to 574.0
RW-08 Standpipe PVC Monitoring Well, Flush Mount 15 66 to 81 568.1 to 553.1
SB-16B Standpipe PVC Monitoring Well, Flush Mount 15 70.5 to 85.5 562.1 to 547.1
TB-111 Standpipe PVC Monitoring Well, Flush Mount 15 69 to 84 562.8 to 547.8
TB-03 Standpipe PVC Monitoring Well, Flush Mount 10 43 to 53 591.6 to 581.6
TB-01 Standpipe PVC Monitoring Well, Flush Mount 10 34 to 44 598.5 to 588.5
All of the monitoring wells were flushed out by the drilling contractor immediately after they
were installed and then they were developed by Somat within a week from the installation date.
The wells were developed utilizing manual bailing techniques or a submersible pump until the
water levels in the wells were lowered to the bottom of the well.
Per our scope of services, groundwater level readings will be subsequently obtained until the end
of 2017. In general, the readings will be obtained once per month at intervals of approximately
30 days. The monitoring well installation records and groundwater level readings are included in
Appendix F and G, respectively. An addendum to this report will be issued upon the completion
of the groundwater well monitoring program, which will include all of the well readings
obtained until the end of 2017.
7
5 87 to 15 TTT10 53 to 63 10 53 tTTTFFTunt 15 66 to 8unt 15 66 to 8FFFTFTFTFFTh Mount 15 70.t 15FFFTFTFTAFFT
Flush Mount 15 ush Mount 15 AFAFAFFFAFFWell, Flush Mount 1Well, Flush Mount 1AFAFAFAoring Well, Flush Mount oring Well, Flush MouRAAARAA
wells were flushed out wells were flushe
hen they were develophen they were develop
ped utilizing mped utilizing
re lowre low
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 12
2.1.9 Falling Head In-Situ Permeability Test
The falling head in-situ permeability test was performed after the water level in the well was
stabilized after development. Falling head permeability tests were performed in general
accordance with ASTM D-4044 and the Naval Facility Engineering Command (NAVFAC) DM
7.01 (Table 15-C) for cased holes. In this test, the well is filled with water to ground surface,
which is then allowed to seep into the soil. The change in head is measured and compared to the
long-term groundwater level determined by the groundwater well readings. The rate of
infiltration is calculated over a period of time required for the head of water to stabilize and
reach equilibrium at or near the long-term groundwater level. Graphical results of the falling
head in-situ tests are included in Appendix H.
2.2 GEOTECHNICAL LABORATORY TESTING
All samples were classified in general accordance with the Unified Soil Classification System.
Representative soil samples were subjected to laboratory tests consisting of moisture content
determinations, unit weight determinations, hand penetrometer tests, Torvane tests, unconfined
compressive strength tests, Atterberg Limits tests, and grain size/hydrometer analyses. Select Shelby
tube samples were subjected to other geotechnical lab tests, including three-point direct shear tests,
one-dimensional consolidation tests, and consolidated undrained triaxial tests. WSP assigned the lab
tests, testing depths and the required test parameters for each soil sample (SPT and Shelby tubes)
and provided the lab assignment sheets to Somat for testing.
A summary table of the laboratory tests is presented in Appendix I. The results of the laboratory tests
are included in Appendix B on the respective logs of test borings. All laboratory tests were
performed in general accordance with applicable ASTM procedures.
Upon approval from WSP and in order to meet the lab testing schedule for this tunnel investigation,
some of the tests were performed by outside geotechnical labs that are AMRL Certified. Those labs
are GeoTesting Express Inc. in Acton, MA and DLZ Laboratory in Columbus, OH.
he headhe he
level. Graphicallevel. Gra
Y TESTING ING
al accordance with the rdance with the
e subjected to laboratoe subjected to la
determinations, hand peeterminations, hand p
, Atterberg Limits tests,, Atterberg Lim
bjected to other geotechbjected to other geotec
olidation tests, and olidation tests, a
he requiredhe require
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 13
2.2.1 Moisture Content Determination Tests
All samples were sealed in the field to retain the natural moisture content of the soil specimen.
Moisture content determination tests were performed on cohesive samples in general
accordance with ASTM D-2216. Results of the moisture content determination tests are
included in Appendix B on the respective logs of test borings.
2.2.2 Unconfined Compressive Strength Tests
Standard test methods for unconfined compressive strength of cohesive soil were performed in
general accordance with ASTM D-2166 on selected cohesive samples from the soil borings. The
unconfined compression test consists of axially loading a small cylindrical soil sample at a slow rate
of strain, until failure occurs. Failure is defined as the maximum stress level in the soil sample or the
stress level at 15 percent strain, whichever is less. The results of these tests are shown on the
respective logs of test borings in Appendix B.
Estimation of unconfined compressive strength on remaining cohesive samples was obtained by
performing either a hand penetrometer test or a Torvane test. In the hand penetrometer test, the
shear strength of a cohesive soil sample is estimated by measuring the resistance of the sample to the
penetration of a small, calibrated spring-loaded cylinder. The maximum capacity of the
penetrometer is 4.5 tons per square foot. In the Torvane test, the shear strength of a cohesive soil
sample is estimated by measuring the resistance of the sample in shear when twisting a small,
calibrated spring-loaded vane pressed into the sample. The results of these tests are shown on the
respective logs of test borings in Appendix B.
2.2.3 Unit Weight Determination Tests
Unit weight determination tests were performed in general accordance with ASTM D-2166 on
selected cohesive samples from the soil borings. The results of these tests are shown on the
respective logs of test borings in Appendix B.
DRAFTf cohesif cohe
ive samples fromive sampl
a small cylindrical soil sa small cylindrical
he maximum stress levehe maximum stress leve
s less. The results of tThe re
B.
ressive strength ressive stre on remon
enetrometer test or a Tetrometer test or a T
ive soil sample is estimaive soil sample is
mall, calibrated springmall, calibrated spring
s per square foos per square fo
asuringasuring
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 14
2.2.4 Grain Size Analyses
Grain size/hydrometer analyses were performed in general accordance with ASTM D-422 and
D-136 on selected soil samples to evaluate the gradation of the soil represented by the sample.
The distribution of particle sizes larger than 75 micrometers (retained on the No. 200 sieve) is
determined by sieving, while the distribution of particle sizes smaller than 75 micrometers is
determined by a sedimentation process using a hydrometer. Graphical results of Grain Size Analyses
are included in Appendix J.
2.2.5 Atterberg Limits Tests
Standard test methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils known as
Atterberg Limits were performed in general accordance with ASTM D-4318 on selected cohesive
samples from the soil borings. Fine-grained soils are tested to determine the Liquid Limit (LL) and
Plastic Limits (PL), which are moisture contents that define boundaries between material
consistency states. The LL and PL values define the water content boundaries between non-plastic,
plastic and viscous fluid states. The plasticity index (PI) defines the complete range of plastic state.
Test results of the Atterberg Limits are included in Appendix K.
2.2.6 Direct Shear Test Results
Direct Shear tests were performed on Shelby tube sample ST-21 from soil boring SB-06, ST-18
from soil boring TB-111, and ST-9 from soil boring TB-02A. These tests were performed in
general accordance with ASTM D-3080. These results are included in Appendix L.
2.2.7 One-Dimensional Consolidation Test Results
One-dimensional consolidation tests were performed on Shelby tube sample ST-03 from soil
boring TB-06A, ST-17 from soil boring SB-06, ST-13 from soil boring TB-116, and ST-14 from
soil boring TB-103. The tests were performed in general accordance with ASTM D-2435. These
results are included in Appendix M.
DRAFTt, and Plasticity Indext, and Plasticity I
dance with ASTM D-dance with A 4343
ils are tested to determinested to
re contents that defincontents that def
lues defineues define the water co the water co
The plasticity index The plasticity index (PI)
Limits are included in Apmits are included in Ap
r Test Results r Test Results
e performed on e performed on
and STand ST
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 15
2.2.8 Consolidated Undrained Triaxial Test Results
Consolidated Undrained Triaxial testing was performed on Shelby tube sample ST-19 from soil
boring RW-20, ST-17 from soil boring TB-116, and ST-19 from soil boring TB-101. The tests
were performed in general accordance with ASTM D-4767. These results are included in
Appendix N.
2.3 LIMITATIONS
The scope of our services did not include any environmental assessment or investigation for the
presence or absence of wetlands or hazardous or toxic materials in the soil, surface water,
groundwater or air, on, below or around this site. This investigation was strictly geotechnical and
did not include any environmental investigation other than photoionization detector screening
and gas monitoring.
3.0 RESULTS OF SUBSURFACE INVESTIGATIONS
3.1 SOIL STRATIFICATION AND GROUNDWATER CONDITIONS
Soil conditions encountered at the test boring locations have been evaluated and are presented in
the form of Logs of Test Borings. The Logs of Test Borings presented in Appendix B include
approximate soil stratification with detailed soil descriptions and selected physical properties for
each stratum encountered in the test borings. In addition to the observed subsoil stratigraphy, the
boring logs present information relating to sample data, Standard Penetration Test results,
groundwater level conditions observed in the boring, personnel involved, and other pertinent
data. For information, and to aid in understanding the data as presented on the boring logs,
General Notes defining nomenclature used in soil descriptions are in Appendix O. It should be
noted that the Logs of Test Borings included with this report have been prepared on the basis of
laboratory classifications as well as field observations and logs of the soils encountered. It is
emphasized that the stratification lines shown on the Logs of Test Borings are approximate
assessmenasses
c materials in thec materials
s investigation was stris investigation was s
n other than photoioniother than p
ACE INVESTIGATIOACE INVESTIGATIO
CATION AND GROUON AND GROU
ountered at the test bountered at the te
st Borings. st Borings.
n wn w
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 16
indications of change from one soil type to another at the locations of the boreholes. The actual
transition from one stratum to the next may be gradual, and may vary within the area represented by
the test boring.
Please refer to the boring logs for the soil conditions at the specific boring locations. It is
emphasized that the stratification lines shown on the Logs of Test Borings are approximate
indications of change from one soil type to another at the locations of the boreholes. The actual
transition from one stratum to the next may be gradual, and may vary within the area represented by
the test boring.
3.2 GROUNDWATER LEVEL OBSERVATIONS
During the drilling process, groundwater was encountered in four of the soil borings (RW-37,
SB-16, TB-107, and TB-103) prior to the introduction of any drilling fluids. Groundwater was
not encountered during drilling and/or upon completion of drilling in any of the remaining soil
borings. Due to the use of drilling fluids in the boreholes, no groundwater level measurements
were obtained upon completion of drilling since these readings would not be reliable, and hence
were recorded as “Not Applicable” (N/A) in the soil boring logs.
A lack of groundwater in the boreholes does not necessarily indicate that there is no
groundwater, due to the sealing off of natural flow paths due to the drilling process. In our
experience, the depth at which clayey soils change from brown to gray in color (an indication of
oxidation) is frequently indicative of the long term groundwater level. However, the groundwater
elevation can be better defined by groundwater observation wells. A total of eight groundwater
monitoring wells were installed within various boreholes at the site. It is important to note that
the clay soils may delay the recharge rate of the wells due to the low permeability of the existing
soil. The monitoring well groundwater level readings obtained to date are included in Appendix
G.
DRAFTvary wivary
TIONS TION
r was encountered in fwas encountered in
to the intro the introduction of aoduction of a
and/or upon completioand/or upon comp
drilling fluids in the boilling fluids in the bo
mpletion of drilling sincmpletion of drillin
ot Applicable” (N/A) iot Applicable” (N/A) i
n the n the
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 17
It should be noted that the elevation of the perched or natural groundwater table is likely to vary
throughout the year depending on the amount of precipitation, runoff, evaporation and
percolation in the area, as well as on the water level of surface water bodies in the vicinity
affecting the groundwater flow pattern. The possibility of perched water trapped in coarse
grained layers above the clay soils (above the long term level) should also be expected.
3.3 GAS MONITORING READING OBSERVATIONS
The gas meter readings taken from the four-gas meter (LEL, H2S, CO, O2) were documented
only where detected and observed. If the oxygen level was normal (20.9%) and no other gasses
were detected, the gas readings were considered to be non-detect.
Detectable gas readings were observed in two monitoring wells, TB-111 and RW-08. At
monitoring well TB-111, combustible gas at 100% LEL was sustained for 6 days after the well
was installed and dissipated gradually during the subsequent 8 days. At monitoring well RW-08,
combustible gas at 100% LEL was sustained for 206 days after the well was installed and
dissipated gradually during the subsequent 28 days to a current reading of 3% LEL as of April
28, 2017.
The gas was observed and reported in the referenced monitoring wells and was not observed
during drilling or upon completion of drilling in any of the boreholes. It is very important to
note that even though gas was not detected during drilling, it does not mean that there was
no gas. The heavy drilling mud used during the drilling process to keep the borehole open may
tend to suppress the gas and preclude it from rising up to the top of the augers and hence it would
not be detected. Cleaning the borehole by flushing out the drilling fluids may cause the borehole
to collapse, and per our discussions with WSP, it was critical to properly grout the boreholes to
minimize the creation of voids since several of these borings may be within the proposed tunnel
alignment. Hence, flushing out the borehole upon completion of drilling was not an option.
DRAFTLEL, HLEL, H22S, CO, S
l was normal (20.9%) l was normal (20.
o be non-detect. be non-dete
d in n two monitoring wtwo monitoring
le gas at 100%e gas at 100% LEL wa LEL wa
dually during the subseqdually during the su
LEL was sustained foL was sustained fo
ring the subsequent 28 ring the subsequ
reporrepor
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 18
WSP obtained water samples from each of the 8 wells in order to test them for dissolved gasses.
The results of water testing for dissolved gasses were reported by WSP under a separate cover.
The final version of this report will include additional groundwater level and gas readings.
4.0 FIELD TEST RESULTS
4.1 IN-SITU FIELD VANE SHEAR TEST RESULTS
Field vane shear tests were generally performed using Acker vane shear test kit with a calibrated
torque head, in general accordance with ASTM D-2573. The in-situ field vane tests were
performed within the tunnel influence zone, where suitably soft to stiff clay layers were
encountered. These tests were performed primarily to determine the in-place shear strength of
the clay soils. Based on the results of the field vane shear tests, the silty clays were determined
to be generally insensitive. Three vane shear tests were performed in sensitive clays, including:
VS-2 from TB-119 at a depth of 77.5 feet (EL. 555.9 feet), VS-5 from TB-119 at a depth of
101.5 feet (EL. 531.9 feet), and VS-3 from TB-112 at a depth of 73.5 feet (EL. 559.1 feet). The
results of these field vane shear tests are presented in detailed reports in Appendix D. The results
of the field vane shear tests are also presented as estimated unconfined compressive strength on
the Logs of Test Borings with a sample number prefix “VS”. The estimated unconfined
compressive strength is calculated by multiplying the calculated in-situ shear strength by a factor
of 2.
4.2 FALLING HEAD IN-SITU PERMEABILITY TEST RESULTS
The falling head in-situ permeability tests were performed in general accordance with ASTM
D-4044 and the Naval Facility Engineering Command (NAVFAC) DM 7.01 (Table 15-C) for
cased holes. The test was performed in all the groundwater monitoring wells. The following
table summarizes the coefficient of Permeability, Km calculated at each test:
cker vane shear testcker vane she
D-2573. The in-situ fiD-2573. The in-situ
where suitably soft there suitab
rimarily to determine trimarily to dete
the field vaeld vane shear testne shear tes
vane shear tevane shear tests were psts were p
of 77.5 feet (EL.of 77.5 feet (EL. 555 5
, and VS-3 from TB-1VS-3 from TB-1
ane shear tests are preseane shear tests are p
ear tests are also presear tests are also
ngs with a ngs with a
ulateulate
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 19
Table 4.2 Summary of the coefficient of permeability, Km
Monitoring well ID Estimated coefficient of permeability, Km
TB-06 1.071E-07 cm/sec
SB-06 9.285E-08 cm/sec
TB-05 1.603E-07 cm/sec
RW-08 8.168E-07 cm/sec
SB-16B 1.853E-07 cm/sec
TB-111 1.146E-07 cm/sec
TB-03 2.147E-05 cm/sec
TB-01 1.595E-07 cm/sec
Graphical results of the falling head in-situ tests are included in Appendix H.
5.0 GENERAL QUALIFICATIONS
This report and the attached Logs of Test Borings are instruments of service, which have been
prepared in accordance with generally accepted soil and foundation engineering practices. We
make no other warranties either expressed or implied as to the information presented in this
report.
Since the information obtained from test borings is specific to the exact test boring locations, soil
and water information could be different from those occurring at other locations of the site. This
report does not reflect variations which may occur between the borings. The nature and extent
of these variations may not become evident until the time of construction.
This report and the associated soil boring logs should be made available to bidders prior to
submitting their proposals and to the successful contractor and subcontractors for their
DRAFT1.853E1.85
T1.146E-07 1.146 cT2.147E-05 2.147E-0 cm
FT1.595E-0FTAAAFitu tests are included inests are included in
CATIONS CATIONS
tached Logs of Test Boached Logs of Tes
nce with generally acnce with generally ac
ies either expies either ex
DRAFT GEOTECHNICAL DATA REPORT AUGUST 22, 2017 I-75 MODERNIZATION PROJECT 2014195CORC TUNNEL DESIGN INVESTIGATION NORTH OF 8 MILE ROAD (M-102) TO NORTH OF 12 MILE ROAD OAKLAND COUNTY, MICHIGAN MDOT JN: 122104O; CS: 63174 PAGE 20
information only, and to supply them with facts relative to the subsurface investigation,
laboratory tests, etc.
The contents of this report have been prepared in order to aid in the evaluation of expected
subsoil properties to assist the engineer in the design of this project. If you have any questions
regarding this report, please contact us.
DRAFT
APPENDIX A
Soil Boring Location Diagrams
DRAFT
DRDRRRRRRRRDRDRDRDRDRDRDRDRDRDRDRRARARARARARAAAAAAAAAAAAARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARAARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARAAAAAAARARARRRRRRRRRRRRRRRRRRRRRRRRRRARARARARARARARARARARARARARARARARARARAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARRRARARARARARARARRRRRRRRRRRRDRDRRRRRRRRRRRRRRRRRRRRRDRDRDRDRDRDRDRDRDRDRDRDRRRRRRRRRRRRRRDRRDRDRDDRRRRDRDRDRDRDRDRDRDRRRRDRDRRDRRARRARARARADRRRADRDRRARARARAAFAFT
AFAFTRDRRRDRDRDRDDDDDDRDRDRRRRRRARARARAAAARARARARARD
FTRAAFT
DRDDDRDRDDDDDDDRAFTRRRRRRRRRRRRRRRRRRRRRRRRAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAARARARARARARARARARAFRADRRARAF
RARADRA
TTAFTFTTTAFTFTRRRRRRRARARARAAAARARARAAARRRRARRDRDRDRDRDRRRRRRRRRAFT
DDR
DRADRARARARRRRRRRRRRARRRRRRRAFTFAFT
RAFAFTRAFFAFAFAFAFT
AFTAAFAFAFAAFFFFFFFFFFTFTFTFTFTAFTFAFAFRAAFT
AFAFRAFFTFTTFFTTFFTTFTT
AAAAAAAAAAFAAAAFAFAFFFFAFAFFFFFFFTRARAFTFTFTFFFFFFFFFFFFFFFFFTFFFFFFFFFFFFFFFFTFTFTFTFTFTFTFTFTFTFTFTTTTTTTRRA
DRRRDDDDDDDRDDDDRDDDDDDDDDDDDDRDDDRDRRRDDDRDRRRDRDRDDDDDDDDDDRRDRRDRDDDDRDDRDRDRDDDDRDRRRRRDRDRDRDRDRDRDRDRDRDRDRRDRDRRRDDDRDRDRRDDRADRDRRRRARARADRARARARARARARARARARAFAFAFAAFAFAFAFAAFAFAFAFAFT
AFTAFAFAFAFTFTFTFTFTFTFTTTTTTTTTTTTTTTTTTTTFTTTTTTTTTTTTTTTTTTTTTTAAFAFRARARARADR
TTTFTT
DRDRFTFT
DRTTTTTTTT
DRTTTFTFFAFAFAFAFAAAAAFAFAFAFFF
RRRAARARARARAAAARARARARADRDRRDRDR
DDDDDRDRDDDDDDDDDDDDDDDDRDRRDRRRDDDDDDDRDRRRDRDRRDRDRRDRDRRDRDDRRDRRDRDDRDDDRDRDRDRRDRRRRRDRDRDRDRDRDRDRRDRADRADRADRADRADRADRADRARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARRARRRRRRRRRRRARARARARARARARADRARRAFARAAFAAF
RARAAFAARAAFAFFAFAFAFAFRARARARAFT
AFAFAFAFAFFTTFTFTFTFTFTFTFTFTFTFTFTFTFTFFTFTFTFFTFTFTFTFTFTTTTTTTTTTTTTTTTTTTTTFTTFTTTTTFTFTFTTTTFTTFTTFTTFTFTFTTTTTTTTTTTTTTTTTTTTTTRAAFAFRRARADRAFFTTTFTTT
RARADRAR
FFTFTTFFFTFTTTTTTTTTTTRDR
FFTRARADRADR
FFTFTFFAFAFAFAAAAAARARARARARAAAFAFAFFFAARARARATTTT
RADRDRRARARRRRRRRRRRARARARARARARARARARARARAARAAAA
TTTTTTTTTFTTFTTT
DRDR
DRDDRDRRDDRDRDRDDDDDDDDDRDRDRDDDDRDDRDRDRDDRDRRRDDDDRDDDRDDDDDRDRDRDRDRDRDRDRDRDDDRDDRDRDRDDDRRDRDRDRDRDDDRDDRDDDDDRDRDRRDRRRRRRDRDRDRDRDRDRDRDRDRDRDRDRDRDDRDRDDRDRRDRDDRDRDRDDRDRRRRDRRRRRRRRRRRRRRRRRRARARARRARARARARARARARARARARARARAARAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFTFTFFFFFFFFFFTFFTFTFTFTFTFTFTFTFTFTFTFTFTTFTTTTTTTTTTAFTFTFTAAAAFTFTFFFFFTFFTFTFTFTFTFTFTFTFTTFTFTFTFFTFTFTFTFTFTTTTFTTTTTTTTFTTTTTTFTFTTTTTTTTFTFTFTFTFTTFTFTFTFTFTFTTFTTTTTTTTTTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFTTTTTAFAFRARARARAFAFDRAARARAAFAFDR
FTTTFTFTFTTFTTT
DRDRTFTFT
DRTTTTTTTTTTTTTFTT
DRFTTFTTFTFAFAFAFAFAAAARARARARARAAAFAFAFAFFFAARARARARARRFTT
RDRDRFTFTFTFTFTTTFTFTFTTTTTTTTTTTTTTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFT
DDR
DRDDDDDDDDDDDDDDRDRDRRDDDDRDDDDDDDDDDDDDDDDDRRRDDDDRRDDDRRRRRDDDDDDDDDDRDRDRDRDRDDDDDDDDRRRDRDRDDDDDDDDDDRADRADRDRDRDRDRADRADRDRRARADRDRRARARARARADRADRADRAFT
AFRARAFT
AFAFTFTAFT
DRDRRARADRDRRARAAFAFAFFT
AFFAFFTFTFTAFTAFAFAFARARARARARAFTAFAFTAFFTRAAFAFT
AFRAAFTFAFAFAFAFAFRAFT
AAAARARARARRAAFAFTAFFT
DRADRAFTFT
DRRRDDDRDDDRRDRRRRRDRDRDRDRRRRRFTFTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT
DRATTTTTTTTT
DRADRD
TTFTFFFAFAFAFAAAAARARARARARAAFAFAFAFFFFRDRDR
TTTTTTTTTT
DDDR
RRRRARARARARARRRRRRRRARARARARARRRRADDRRDDDRDRARRDRDRADRDRRRRDRDRRDDDDDDDDRRRRRRRRRARARDRDRRARADRDDRRRADDDRDRRDDRDDRDRDRDRDRDRRADRDRRRDRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRARARARARADRRRARRARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARAARARARARARARAAAAAAAAAFAAAARARARARARARARRARARARAARARARARARARARARARARARARRRARDRARARARARARARARARARARARARARARDDRARAAAAAARRRRRRRARARAAARRARARARARARARARARARARAAARAAAAAAARARARARARRRRRRARARARARAAAAAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAAFAAFAAAFAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAFAFAFAFAFAFAAAAAAARARARAAAAARARARARARARAAAAAAFT
AAFAFAFFAFTAFAAFAFFRAFAAFAFFAAFAFAFFRAFAFAAFAFAFAFAFAAFAFAFAFAFAFAFAFAFAAAAAAAAAAAFAFAFAFAFAFAFAFAFAFAFAFAFAFAAAAAAAAAFTFTFTFTFTFTFFFFTFTFTFTTFTFTTTTFTFTFTFFFFTFTFTTTTFTFTFTFTFT
AFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTFTAFTFTFTTTTTTAFAFRARAAAAFAFRARAAFAFAFRARAAA
TTTTTAFRAFRAFAAFT
AFAFAFAAAFAFAFAFAFAFAFAFAFTAFAFTAFAFTFFFTFTFFFTFFTFFTFFTARARAF
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRDRDRDDDDDDDDDDDDDDDDRDRDDRDRDDDDDDRDRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRDRDDRDDDDDDDDDDDDDDDDDDDDDRDDDDRDDDDRDRDDRDRDDRDRDRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRDRDRDRDRDRDRDRDRDRDRDRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRDDDDDRDDDDDDDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDDRDRDRDRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRDRDDDDRDDDDDDRDRRRDRRDRRRRDRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRDRRDRDRRRRDRRRRRRRRRRRRRRRRRRRRRRRRRRDRDRRDRDRDRDRDRDRDRDRDRDRDRDRDRDRRDRDRRDRRRDRDRDRDRDRDRRRRRRRRRRRRRRRRRRRRRRRDRRDRDRRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRRRRRRRRRRRRRRRRDRRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDDDDDDRDRDRDRDRDRDRDRDRDRDRDRDRDRRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRAFTRRRRDRRRRADRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDDDDDRDRDRDRDRDRDRDRDDRADRRADRDRDRADRRRDRDRDRDRDRDRDRDRDRDDDDRRRRRRRDRADRDRDRDRDRDRDRRDRDDRDRRDRRDRDRDRDRRARADRDRDRDRDRRDRRDRRDRRDRDRDRDRDRDRDRDRDRRADDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRARRDDDDDDDRRRRRRRRRRRRRRRRRRRRRRRAFT
AFTAFTAFTAFTAFTAFTAFTFTFTFTFTFTFTFTFTFTFTT
DDDRDRRDRDRDRDRDDRFTAFTFTAFT
DRDRDRDDDDDRDRDDDDRDRDDRRRRRRRRRRRRADDD
FTTTTTTTTTTTTTTTTTTTTTTT
DDDDDDDDDDDDDDDDDRDRDRDDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRAFRADRAFAFAFAFAFAFAFAFAFAFAFAFAFTFAFAFAFT
AFTAFAFTAFTAFTAFAFTAFTAFTAFTAFTAFTAFTAFTFTAFTAFTAFTAFTFTFTTTTTTTTTTFTFTFFTFFFFFTRRDRDRDRDDDDDRDRDRRRDDDRDDDRDRDRDRDRDDDDRDDRDR
FTAFAFTAAFAFAFFTAFAFTAAFAFAFFAFTAFAFAFFTAFTAFAFAFAFFTAAAFTAFAFFTTTTTTTTTTTFFTFFFTFTFTTTTTTTTTTTTTTTTTTTTTA
DDDDDDDDDDDFTTTFTTTTTTTTTTTTTTTT
DRDDDDDDDDDDDDDDDDDDRRRRDRDRDRDRDRDRDRDDDDDRDDDDDDRDRDRDRDRDRDRDRDRDRDRDRDRDRDDRDDRDDDDDDDDDDDDDDDDDRAFTRARARADRRRRRRRRRRRRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDDDDRDDDDDDDRARARARRRRRARRADRAF
RAAFTTTTTTTFTTTFTFTFTFTFTFTFTFTFTFTFTFTFFFFFTFTRDR
TTTTTTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFFFFTFAFAFAFAFAFAAAAFTTTTTTTTFTRARAAFAFAFT
AFT
DRRARARARARRRRRRRARARARAARADRRAAFDRRARARRRARARDRAFDRDRRAAF
RADRAAAARARARARAAFAFAFAAARARAFAFAFAFAAARDRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
DRDRDRDDDDDDDDDRDRDRDRDRDRDDDDDDDDDDDDDDRDDRDRDRDRDRDRDRDRDRDRDRDRDRRRRDRRRRRRDRDRDRDRDRDRDRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRDRRDRDRDRRDRADRDRADRADRADRADRADRARAAARARARARRRRRRRRARARAAARRRRRARARAARARARARARARARRARARARAF
RAFAFARADRAFAFAFFAFAFTFTTTTFTTTFTTFTFTFTFTFTFTFTFTFTFTFTFTFTFTFFFFFFFFFTFTFTFTFTFTFTFTTFT
AFTFTFTTFTTFTTTTTTTTTTTTTTTTTTTTTTTTTTTTTFTFTFTFTFTFTFTFTFTFTFTTTTTTTFFFTFFFFAADRDRDRDRDRDRAFF
RAFRADRARARAARARAAAFDRAFT
AFRAARADRAFAFAFAFAARARAFFAFAFAFAAAAFFAFAFAFAAADRDRRDRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRDRDRRDRRRDDDRRRRDDDDDDDDR
DRDDDDDDDDDDRDRDRDRRRDRDRRRRRRRRRDRRDRDRDRDRDRDRDDRDDRAFTRARARAFAFDRAAFFFFFFFFFFFFTFTFTFTFDRRRRRRRRRRDRDRDRDRDRDRDRDRDRDRDRDDDDRDDDDDDDDDD
AFFTT
DRDRAFFTTAFFTFTFTFTFTFTFTFTFTFTFTFTFTTTTTTTTT
DRFT
DRAFTAFAFFFAFAFAFAFAAAFAFAFAFAFAAAFAFAFAFAFAAARA
DRARADRAFT
RAAFTRRADDDDDDRAFTFT
ARARARARARRRRRRARARARAAARRRRARARARAADRDRRDRDR
DRADDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRADRRRRDRDRDRADDDDDDDDDDDDRADDDDDDRADRADDRDDDDDDDDDDDDDDDDDDDDDDRDRDRDRDRARDRAARARARARARARARARARARRRRRRRRRRRDDDDDDDDDDDRADRDRDRRARRRRAFTFTFT
RAT
ARATTTTTTT
RAAFAFAATTFTFTFT
AFAFAFAAFAAFAFAFAFFFAAFFFFTFTFTTTA
TTTTTTTTTTTFTFTFTFTTTTFTFTFTFFTFTTAFAFRAAFT
AFFTRAFTTTTTTTTTTT
AFTFTTARARRRRRRRRRRRRRRRRRRRRRRRRRRRRRRARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARARAAAAAAAAAAAAAAAAAAAAAAAAAARARARARARARARARARARARRRRRRRRRAAAARARARARARARARARARARARARARARARARARARARARARRRRARRRRRRRRAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA
DRARADDRA
DRRDRDRDRDDDDDDDDDDDRDDDDRDRDRDRRRDDDDDDDDRDRDRDRADRADRADRDRDRAFTFTFTFTFTTFTFTFTT
RAAFAFRAFTRAAAAAFTFAFTFTFTRAAARARARARARRRARARARARARRRARARARARRDRDRD
FTFTAFTFTAFTFTAFRRARARARAAARAAAAAAAAAAAFAAFAFAFAFAFAFAFAFAFAFAFAFFAFFAFFFFFFFFFFFFT
DRDRADDDD
FTT
DRAFTRARARRRRRRRDRDRDRDRRRRRRRRARARARA
TAF
DRDAFTAF
DRRADRDDD
FTFTTTTTTTFFFFFFTTFFFFFFFFFFFFAFFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAFAAAADDDDDDDDDDDDDDDDDDDDDDDDDDDDD
FTFFTAF
DFFFTFTFTFFFTFFTFTFTFTFTFTFTFTFTFTFTFTTTTFTTTTTTTTTTFTTFTFTFFT
DDRAAARARARARAAAARARARARAAAARARARARRRARARAFFTFTFFAFDDDDDDDDDDDDDDDDDDDDD
AAAAAAAAAAAFTAFRARADDDDDDDDDDDDDDDDDDDDDD
DRDRDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDRDRDRDRDRDRDRDRDRDRDRDRRRRRRDRDRDRDDRDDDDDRDDDDDDRDRDRDRDDDDDRDRDRDDRDRADRDRADRADRARRARARARRRRRRARARARARARARARARARARARAF
RAFAAARARARARAAARARARARAAAAFAFAFAAFTAFFFFFFFFAFAFAFFAFAFAFAFAFAFAFAFAFAFAAAAFAAFFFFFFFFFFFFFFFFFFFFFFAFTAFTTTTFTTTFTTTTTTTFTTTTFTTTFTTTTFTTFTFTFTFTTFTFTTTFTFTTFTTTFTTTTFFTFTFTTFTFTFTFTFTFTFTFTFTFTFTFTFFFFTFFFFTTTFTTTFTFTTTFTTTFTFTAFAFAF
DRADRARARARARADR
F
APPENDIX B
Logs of Test Borings
DRAFT
7-8-21
4-4-5
2-3-1
1-6-8
4-7-9
5-7-7
4-6-9
7-7-10
633.1
627.4
624.4
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
11.1
12.2
18.4
19.6
17.9
16.1
17.6
18.0
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
29
9
4
14
16
14
15
17
0.3
6.0
9.0
5000*
6000*
2000*
6500*
5000*
5500*
3500*
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: A. PattersonDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:3/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 369381.3Easting: 13460991.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 120 ft.
DATE COMPLETED:3/9/2017 LOG OF TEST BORINGTB-119LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
3 inches of TOPSOIL
FILL - Very stiff lean claywith sand, trace gravel,trace roots above 5 ft.,brown (CL)
Stiff LEAN CLAY, tracesand, trace gravel, frequentfine sand seams above 8ft., brown (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL) DRSS66
SS7SS7DRDRDD2020
DDDDDDRA5-7-75-7-
ADRRAD
1616
14
ARARARADRAF15.015.0AAFRA
0*0*
5000*50 FAAFAFAFT19.61
17.97.9FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
3-4-5
2-4-4
2-3-4
1-4-4
1-3-5
1-1-3
1-2-3-4
583.4
35.0
40.0
45.0
50.0
55.0
60.0
64.0
26.9
24.2
18.1
27.5
28.2
27.9
29.5
SS9
SS10
SS11
SS12
SS13
SS14
SS15
9
8
7
8
8
4
5
50.0
2000*
2500*
3000*
2000*
1800#
1400#
1800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: A. PattersonDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:3/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 369381.3Easting: 13460991.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 120 ft.
DATE COMPLETED:3/9/2017 LOG OF TEST BORINGTB-119LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Medium to very stiff LEANCLAY, trace sand, tracegravel, gray (CL) DRSS133 RDDRDD55DDDDRA1-4-41-4-4
1-3-5RADRADRRA8 ARARARARAF45.00
50.050AFRAFRAAF3000*300
2000AFAFAAFDDDDRRADRAFT18.118.1
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTT
DAF
97
83
97
0-4-4-4
1-4-7-16
6-9-8-8
3-3-4-5
3-4-5-5
1-2-5-4
7-10-10-8
3-4-5-9
562.4
560.4
545.4
543.4
66.0
68.0
69.5
72.0
74.0
76.0
77.5
80.0
82.0
84.0
86.0
87.5
90.0
92.0
93.5
96.0
98.0
18
NP
19
29.1
30.3
27.6
24.8
27.5
29.4
27.2
22.6
27.7
24.9
32.7
29.1
94
97
99
98
SS16
ST17
VS1
SS18
SS19
ST20
VS2
SS21
SS22
SS23
ST24
VS3
SS25
ST26
VS4
DP27
SS28
39
21
42
8
11
17
7
9
7
20
9
71.0
73.0
88.0
90.0
1800#
3130
4970
1600#
1200#
4020
4100
1200#
1200#
1400#
3640
3950
3480
<>
1000#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: A. PattersonDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:3/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 369381.3Easting: 13460991.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 120 ft.
DATE COMPLETED:3/9/2017 LOG OF TEST BORINGTB-119LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Medium to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Medium dense SILTY FINESAND, dark gray, moist(SM)
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: Vane shear test at87.5 ft. terminated earlydue to high force gaugereadings.
Medium dense SILT withsand, gray, moist (ML)
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 96ft. due to sample falling outof sampler; direct pushedto 96 ft. to retrieve sample.
DRSS23SS23
ST24ST2
VS3
SS25SS25
RDRDRDDDD8585
DDDDDDDRA3-4-5-53-4-5-5
1-2-5-45-4 ARADRDRDD
77
9
7 AARARARARAF77.55
80.080.0
82.082.0
84.084.0
FAFARARAF40204020
4100410
1200#
1200#
FFAFAAAFAFDDRRAD88.088.0 DD
AFT24.824.8
27.5
29.429.4
2
FTFTAFAAF
97 TFTFTFF39TFTFTFFFTFTT97T1818TTTTTTT
AF
95
3-5-6-6
3-4-4-4
4-4-7
28-30-50
14-21-27
44-50
531.4
523.4
513.4
508.9
100.0
101.5
104.0
106.0
110.0
115.0
120.0
124.5
1930.4
33.3
34.7
30.7
8.9
15.6
95ST29
VS5
SS30
SS31
SS32
SS33
SS34
SS35
40
11
8
11
80
48
50+
102.0
110.0
120.0
124.5
2900
3920
400#
1200#
<>
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: A. PattersonDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:3/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 369381.3Easting: 13460991.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 120 ft.
DATE COMPLETED:3/9/2017 LOG OF TEST BORINGTB-119LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Very soft to medium LEANCLAY, trace sand, tracegravel, occasional siltseams, gray (CL)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
Extremely dense SILTYFINE SAND, trace gravel,occasional sandy clayseams, gray, moist (SM)
End of Boring at 124.5 ft.(Terminated upon SPTsample refusal)
DRSS344 RDDRD120DDRA28-30-5028-30-50
14-21-2714-21-27RADRADR
80 ARARARADDDDDDRDD120.0120 DRAF110.00
115.011AFRAFRA
<><>
9000AFAFAAFAFT30.730.7 TAFFTA
TTFFTTTFFTFTFTTTTTTTTTRA
T
DAF
8-12-13
5-4-6
3-5-6
5-8-10
8-10-11
8-11-11
10-8-12
7-10-16
657.0
654.6
652.6
649.1
634.1
629.1
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
14.3
12.9
14.7
14.3
22.8
18.8
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
25
10
11
18
21
22
20
26
0.6
3.0
5.0
8.5
23.5
28.5
4500*
7500*
7500*
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/12/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368372.1Easting: 13460985.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 657.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/14/2015 LOG OF TEST BORINGTB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
7 inches of CLAYEYTOPSOIL, brownFILL - Medium dense siltyfine sand, trace clay, tracegravel, trace topsoil, roots,and wood pieces, darkbrown, moist (SM)FILL - Very stiff lean clay,with sand, trace gravel,occasional topsoil pockets,brown (CL)FILL - Medium dense siltyfine sand, trace clay, tracegravel, dark gray, moist(SM)
Very stiff to hard LEANCLAY with sand, tracegravel, gray (CL)
Medium dense SILTY FINESAND, trace clay, traceorganics and roots, black,moist (SM) (An LOI test onSS7 indicated an organiccontent of 4.8%)
Hard LEAN CLAY, tracesand, trace gravel, brown(CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDDDRA8-11-118-11-
ADRRAD
2121
22
ARARARARAF15.015.0AAFRA
0*0*
7500*75 FAAFAFDRRAD23.523.5 D
AFT12.912
14.74.7FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
72
8-13-18
8-12-15
7-10-13
6-10-15
10-12-14
10-13-15
8-10-15
8-10-16
6-7-8
624.1
597.6
35.0
40.0
45.0
47.5
50.0
52.5
55.0
60.0
61.5
65.0
14
11.5
11.2
16.2
18.4
11.5
17.7
125
SS9
SS10
NR11
SS12
NR13
NR14
SS15
NR16
SS17
SS18
30
31
27
23
25
26
28
25
26
15
33.5
60.0
9000+*
9000+*
7500*
6500*
9000+*
5500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/12/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368372.1Easting: 13460985.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 657.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/14/2015 LOG OF TEST BORINGTB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Hard to very stiff LEANCLAY, few sand, tracegravel, gray (CL) (Drillerreported possible cobble at51.5 ft.)
NOTE: No recovery onSPT sample attempts at45, 50, and 52.5 ft. due topossible cobble; norecovery on Shelby tubeattempt at 60 ft. due topossible cobble.
Hard to very stiff LEANCLAY with sand, tracegravel, gray (CL)
DRNR144
SS155 RDRDRDRDD55DDRA10-12-1410-12-14
10-13-1510-13
8-10-158-10-15
ARADRDRARADRRA2525
26
28
AARARARARARADDDDDDRDRAF45.00
47.547.5
50.050AFARAFAFRARAAAAF7500*75AFAFAFAAFAFT
16.26.2AFAFTAFAFTTFFTFFTTFTFTFTFTTTTTTTT
RAT
DAF
92
97
96
97
3-5-6
5-8-9
5-7-8
4-6-9
4-8-10
5-8-8
5-7-8
4-5-7
3-5-6-7
590.6
587.1
582.6
563.1
70.0
72.0
75.0
77.0
78.5
80.0
82.0
83.5
85.0
87.0
88.5
90.0
91.5
93.0
94.5
96.0
98.0
32
17
24
25
21.7
20.6
19.3
26.8
28.9
27.1
27.4
28.6
28.7
27.1
27.0
28.1
102
99
99
99
98
99
SS19
SS20
SS21
ST22
VS1
SS23
ST24
VS2
SS25
ST26
VS3
SS27
VS4
SS28
VS5
SS29
SS30
54
39
45
47
11
17
15
15
18
16
15
12
11
67.0
70.5
75.0
94.5
3500*
5000*
3000*
4250
4850
2000*
4190
4790
3000*
3090
4410
3000*
4970
3500*
4720
2500*
2000#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/12/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368372.1Easting: 13460985.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 657.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/14/2015 LOG OF TEST BORINGTB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Hard to very stiff LEANCLAY with sand, tracegravel, gray (CL)
Stiff FAT CLAY, few sand,trace gravel, gray (CH)
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
DRVS2VS2
SS2525
ST26T26
VS3
SS27SS27
RRDRDDDDD8585
DDDRA4-8-104-8-1
ARARADRDDRA1515
18
AARARARRADDDDDDRDRAF00
78.5
80.080.0
82.082.0
83.583.5AFAFARARAAF0*0*
425042
4850850
2000*20
4190
FAFAFAAAFAFT19.31
26.8.8
28.98.9
2
FTAFTAFA
TFT999 TFTFTFTFT39TFTFTTFTFTT17TTTTTTTTTTRA
T
DAF
4-6-7-9
3-5-6
3-5-6547.6
100.0
105.0
110.0
27.3
29.6
27.1
SS31
SS32
SS33
13
11
11110.0
2500*
3000*
2500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/12/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368372.1Easting: 13460985.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 657.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/14/2015 LOG OF TEST BORINGTB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
End of Boring at 110 ft.
DRD120DDRAARADDDDDDRDRAF110.00
AFF2500*250
AFFAFAFT27.127.1
AFFTTFFTTFTFTFTFTTTTTTTRA
T
DAF
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368428.2Easting: 13460998.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 657.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 143 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-06ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 36 ft.
NOTE: Auger refusal at 24ft. on possible obstruction.Boring relocated 9 ft. N andcontinued.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
70
621.4
613.4
38.0
48.0
52.0 17
16.4
16.0
118
114
NR1
ST2
ST3 33
36.0
44.0
6230
6500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368428.2Easting: 13460998.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 657.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 143 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-06ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Shelby tube sampling; noSPT samples
NOTE: No recovery onShelby tube attempt at 38ft. due to sample falling outof sampler.
Very stiff LEAN CLAY withsand, few gravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 67.5ft. due to sample falling outof sampler. DRST3ST3
DRRDRARADRRARARARARAD55DDDDDDDRDRAF48.048.0
52.52.RAAFRA62306230AAFAAFAFT
16.46.4AAF11FFTFTTTTTRA
T
DAF
))
91
97
2-3-5
1-3-4
1-3-4
587.4
578.9
67.5
72.5
74.5
80.0
85.0
88.0
89.5
95.0
98.0
16
19
21.8
22.5
28.4
27.5
28.7
111
97
NR4
ST5
VS1
SS6
SS7
ST8
VS2
SS9
NR10
35
41
8
7
7
70.0
78.5
2680
4410
2200#
2000*
1360
3980
1800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368428.2Easting: 13460998.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 657.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 143 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-06ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff LEAN CLAY withsand, few gravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 67.5ft. due to sample falling outof sampler.
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attmept at 98ft. due to sample falling outof sampler. DRSS77
ST8
VS2S2DRDDRDRDD8585
DDDRA1-3-41-3-
ADRDRADR
88
7
ARARARADDDDDDRDRAF80.080.0AAFRA2200#22 FAAFAFAFT
22.52.5FTA
TAFFT
11
TFTTFFT3535
TFTTFTFTTTTTTTTTTRA
T
DAF
97
98
97
3-4-7
1-3-4
1-1-2
558.4
532.4
101.0
103.0
105.0
108.0
109.5
114.0
115.5
120.0
123.0
124.5
130.0
21
19
19
28.5
26.3
28.4
31.0
30.9
32.7
35.5
97
95
94
92
ST11
VS3
SS12
ST13
VS4
ST14
VS5
SS15
ST16
VS6
SS17
43
40
40
11
7
3
99.0
125.0
4080
3480
1600#
3670
4100
1940
3610
1200#
4000
3730
800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368428.2Easting: 13460998.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 657.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 143 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-06ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attmept at 98ft. due to sample falling outof sampler.
Soft LEAN CLAY, tracesand, trace gravel, gray(CL)
DRS5S5
SS155
ST1ST1
RDDRDDRA1-3-4RARA
DA
DRDRARAARAD120DDDDDDDRDRAF9.59.5
114.04.0
115.5115AFRARAAF
7070
41004
194040
36
FAFAAFAFAFT28.42
3131FT
AFTTAFFT95 TFTFTTFFT40TFTFTTTT1919TTTTT98TTTFTFTTT
RAT
DAF
2611-6-3
5-17-18
39-46-45
35-50/5"
524.9
522.4
517.4
508.4508.0
135.0
140.0
145.0
149.4
8.1
21.9
SS18
SS19
SS20
SS21
9
35
91
50 +
132.5
135.0
140.0
149.0149.4
5500*
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368428.2Easting: 13460998.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 657.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 143 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-06ALABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Soft LEAN CLAY, tracesand, trace gravel, gray(CL)
Loose SILTY FINE SAND,few gravel, gray, moist(SM)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Alternating layers of LEANCLAY and extremely denseSILT, with sand, tracegravel, gray (CL) (ML)
Extremely dense SILTYFINE SAND, gray, moist(SM)
End of Boring at 149.4 ft.(Terminated upon SPTsample refusal) DRSS21S21
DRRD150150
55DDDDDDDDRA5
35-50/5"35-50/5A
DRRA9191
50 +50 +ARARARARAF145.0145.0
1414AAF
RA0*0*
<> FAAFAFDRRADD
AFT21.92
FTA
TAFFTTFFTTFTFTTTTTTTTTT
DAF
3-3-4
3-4-6
3-5-8
4-4-5
6-13-10
10-21-22
5-5-8
4-8-11
655.4
646.9
640.9
636.9
632.4
630.9
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
14.2
10.2
13.8
12.8
11.1
21.7
25.3
14.2
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
7
10
13
9
23
43
13
19
0.5
9.0
15.0
19.0
23.5
25.0
9000*
9000+*
6000*
6500*
9000*
5500*
2500*
5000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:2/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368109.1Easting: 13460908.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 655.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 134 ft.
DATE COMPLETED:2/20/2017 LOG OF TEST BORINGTB-118LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
6 inches of TOPSOIL
FILL - Hard to very stifflean clay, few sand, tracegravel, trace roots above7.5 ft., occasional siltpartings and fine sandpartings, brown to gray(CL)
FILL - Alternating seamsand layers of silt, silty finesand and sandy lean clay,trace gravel,gray/brown/dark brown,moist (ML)(SM)(CL)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL) (Possible Fill)
Dense poorly graded FINESAND with silt, tracegravel, brown, moist(SP-SM) (Possible Fill)
Alternating layers of poorlygraded FINE SAND andstiff LEAN CLAY, tracegravel, brown, moist(SP)(CL) (Possible Fill)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDDDRA10-21-2210-21
ADRRAD
2323
43
ARARARARAF15.015.0AAFRA
0*0*
9000*90 FAAFAFDRRAD23.523.5 D
AFT12.812
11.11.1FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
76
4-7-9
4-6-7
4-5-7
4-4-9
6-10-11
4-5-9
2-4-5
620.9
602.4
595.9
35.0
40.0
45.0
50.0
55.0
60.0
65.0
18
16.6
16.7
17.9
18.8
11.0
26.4
20.9
SS9
SS10
SS11
SS12
SS13
SS14
SS15
35
16
13
12
13
21
14
9
35.0
53.5
60.0
5000*
3500*
4500*
4000*
9000*
5000*
1600#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:2/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368109.1Easting: 13460908.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 655.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 134 ft.
DATE COMPLETED:2/20/2017 LOG OF TEST BORINGTB-118LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Stiff to very stiff LEANCLAY with sand, tracegravel, gray (CL)
Hard to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRSS133 RDDRD55DDDDDDRA4-4-94-4-9
6-10-116-10-11RADRADR
13 ARARARARAF45.00
50.050AFRAFRA
4500*450
4000AFAFAAFDDRRADD
53.553.5
DDAFT17.917.9
AFFTA
TFFT353
TFTFTFTFTT1
TTTTTTAF
56
3-5-7
3-5-6
4-5-7
2-3-5-7
2-3-5-7
3-5-6-8
3-5-6-6
585.9
573.9
565.9
561.9
70.0
75.0
80.0
82.0
82.5
84.0
86.0
87.5
90.0
92.0
94.0
95.5
98.0
8
17.3
28.3
17.7
15.9
14.7
23.4
24.6
26.1
14.7
12.2
26.4
101
SS16
SS17
SS18
SS19
ST20
DP21
ST22
VS1
SS23
SS24
ST25
VS2
SS26
24
12
11
12
8
8
11
11
70.0
82.0
90.0
94.0
2200#
1600#
1600#
2000#
<>
1800#
2740
4660
1600#
4000*
3000*
5030
1600#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:2/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368109.1Easting: 13460908.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 655.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 134 ft.
DATE COMPLETED:2/20/2017 LOG OF TEST BORINGTB-118LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Medium to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: Poor recovery onShelby tube ST20 at 84 ft.;direct pushed to 84 ft. toretrieve sample.
Very stiff to stiff SANDYLEAN CLAY, trace gravel,gray (CL)
Very stiff to soft LEANCLAY, trace sand, tracegravel, gray (CL)
2020
DP21DP21
ST22ST2
VS1
SS23SS23
RRDRDRDDDDD8585
DDDDDDDDRA2-3-5-72-3-5-7 ARARADRDRDDRA1212
8 ARARARARADRAF80.080.0
82.082.0
82.582.
84.084.0ARARARAFAF1600#16
2000#
<AAAAF0#0#
FAFAFAFT28.328
17.77.7FTA
TAFFTFTTFFTFTTFTFTTTTTTTTT
DRT
RAT
DAF
ft.;ft.;
94
95
2-4-5-7
2-4-6-7
1-5-5-6
1-5-6-6
1-4-5-4
2-5-5-5
2-5-6-6
2-4-4-5
2-2-3-4
100.0
102.0
104.0
105.5
108.0
110.0
112.0
113.5
116.0
118.0
120.0
122.0
123.5
125.5
130.0
19
20
27.5
25.4
25.4
28.4
29.6
28.2
34.8
28.0
27.2
32.2
35.2
33.3
101
98
91
SS27
SS28
ST29
VS3
SS30
SS31
ST32
VS4
SS33
SS34
SS35
ST36
VS5
SS37
SS38
41
42
9
10
10
11
9
10
11
8
5
1600#
1400#
1410
4540
1200#
1200#
1640
5410
1200#
800#
1000#
2170
4910
1200#
1200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:2/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368109.1Easting: 13460908.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 655.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 134 ft.
DATE COMPLETED:2/20/2017 LOG OF TEST BORINGTB-118LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to soft LEANCLAY, trace sand, tracegravel, gray (CL)
DRS33S33
SS344
SS3535
ST3636
VV
RDRDDDRA1-4-5-44
2-5-5-52-5-
2-5-6-6-6
ARARADRDRARA9
10
AARARARRARAD120DDDDDDDRDRAF10.00.0
112.01
113.53.5
116.0116.AFAFRARARAAF
0#0#
1200#120
1640
54105410
1
FAFAFAAAFAFT28.42
29.629.6
28.228.2
TFTAFAFA
TFT98
TTFTFFTFTTTFTFTTTTTTTTTTTFTFTTTRA
T
DAF
8-15-24-45
36-88
522.9
520.9
516.9
135.0
139.0
13.4
8.8
SS39
SS40
39
88+
133.0
135.0
139.0
8000*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:2/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 368109.1Easting: 13460908.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 655.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 134 ft.
DATE COMPLETED:2/20/2017 LOG OF TEST BORINGTB-118LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Very stiff to soft LEANCLAY, trace sand, tracegravel, gray (CL)
Hard LEAN CLAY withsand, trace gravel, gray(CL)
Hard LEAN CLAY withsand, trace gravel,occasional fine sandpartings, gray (CL)(Possible Hardpan)
End of Boring at 139 ft.(Terminated upon SPTsample refusal on possiblehardpan)
DRARAD
150150
55DDDDDDDDRDRAFFAFRA
DAFT8.88.8
FTTFTTFTTFTFTTTTTTTTTTAF
65
4-4-5
8-9-12
7-3-5
5-5-8
6-9-11
4-6-8
7-9-10
5-6-9
639.5638.9
636.4
631.4
626.4
621.4
609.9
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0 20
10.6
10.6
16.3
11.9
14.0
17.3
16.4 121
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8 36
9
21
8
13
20
14
19
15
0.30.9
3.5
8.5
13.5
18.5
30.0
9000+*
9000+*
9000*
9000*
3500*
2000*
5000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/12/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367633.8Easting: 13460725.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 639.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 112 ft.
DATE COMPLETED:9/14/2016 LOG OF TEST BORINGSB-03LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
4 inches of ASPHALTICCEMENT CONCRETE7 inches of PORTLANDCEMENT CONCRETEFILL - Loose poorly-gradedfine to medium sand withsilt and gravel, trace coarsesand, brown, moist(SP-SM)Hard LEAN CLAY, tracesand, trace gravel,gray-brown (CL)
Hard LEAN CLAY, tracesand, trace gravel,occasional silt partings,brown (CL)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
Stiff to very stiff SANDYLEAN CLAY, few gravel,gray (CL) DRSS66
SS7SS7DRDRDD2020
DDDDDDRA4-6-84-6-
ADRRAD
2020
14
ARARARADRAF15.015.0AAFRA
0*0*
9000*90 FAAFAFAFT16.316
11.91.9FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
65
5-6-7
5-7-8
5-8-10
4-3-4
3-4-5
4-4-6
589.9
583.4
35.0
40.0
45.0
50.0
55.0
56.5
60.0
65.0
7
15.7
15.1
19.3
13.4
16.0
27.0
25.0
116
100
SS9
SS10
SS11
SS12
ST13
VS1
SS14
SS15
22
13
15
18
7
9
10
50.0
56.5
3000*
2000*
2000*
2000*
2500
5530
1480
2200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/12/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367633.8Easting: 13460725.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 639.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 112 ft.
DATE COMPLETED:9/14/2016 LOG OF TEST BORINGSB-03LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff LEAN CLAY with sand,trace to few gravel,occasional fine sandpartings 48.5-50 ft., gray(CL)
Stiff to very stiff SANDYSILTY CLAY, few gravel,gray (CL-ML)
Medium to stiff LEANCLAY, trace sand, gray(CL)
DRST133
VS11
RDDDRD55DDDDDDDRA4-3-44-3-4
RADRADR
7 ARARARRARAF45.00
50.050AFRAFRA
2000*200
2000AFAFAAFDRRAD55
AFT19.319.3
AFFTA
TFFTTFTFTFTFTTTTTTTT
DAF
96
3-4-6
3-4-4
3-4-4
4-4-4
3-4-5
4-4-5
551.4
70.0
75.0
80.0
85.0
90.0
95.0
25
26.8
27.2
26.5
27.9
27.6
31.3
SS16
SS17
SS18
SS19
SS20
SS21
47
10
8
8
8
9
9
88.5
1200#
2200#
1400#
2000#
1800#
1400#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/12/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367633.8Easting: 13460725.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 639.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 112 ft.
DATE COMPLETED:9/14/2016 LOG OF TEST BORINGSB-03LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Medium to stiff LEANCLAY, trace sand, gray(CL)
Medium to soft SANDYLEAN CLAY, trace gravel,gray (CL)
DRSS199
SS20SS20DRDRDD8585
DDDDDDRA4-4-44-4-
ADRRAD
88
8
ARARARAD88.588.5 DRAF80.080.0AAFRA
0#0#
1400#14 FAAFAFAFT27.22
26.56.5FTA
TAFFTTF
477
FTTFTFTT96TT2525TTTT
DDDRT
RAT
DAF
61
52
4-5-6
4-5-4
5-11-15
23-53/3"
26-45-40/4"
10-23-29
30-36-50/5"
530.9
526.4
521.4
511.4
100.0
105.0
110.0
114.3
119.8
125.0
129.9
24
15
29.5
30.7
12.9
23.2
SS22
SS23
SS24
SS25
SS26
SS27
SS28
44
32
11
9
26
53 +
85/10"
52
86/11"
109.0
113.5
118.5
128.5
1600#
800#
<>
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/12/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367633.8Easting: 13460725.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 639.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 112 ft.
DATE COMPLETED:9/14/2016 LOG OF TEST BORINGSB-03LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
Medium to soft SANDYLEAN CLAY, trace gravel,gray (CL)
Medium dense SANDYSILT, trace gravel, gray,moist (ML)
SANDY LEAN CLAY, fewgravel, occasional sandysilt pockets, gray (CL)
Hard LEAN CLAY, tracesand, trace gravel, frequentsilt partings below 120 ft.,gray (CL)
NOTE: Driller reportedpossible cobbles 125-126ft.
DRSS266DDRDD120DDDRA23-53/3"23-53/3"
26-45-40/426-45-40/4RADRADRRA53 ++ ARARARARAF110.00
114.3114AFRAFRAAF
<>AFAFAAFDDDDDRRADD
118.5118.
DDAFTAFFTAFTTFFTFT
444
TFTFTFTFTT2
TTTTTTTAF
18-53-47/3"
75/5"
80
506.4
504.9
495.9
134.8
138.9
144.0
SS29
SS30
SS31
100/9"
75 +
80+
133.5
135.0
144.0
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/12/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367633.8Easting: 13460725.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 639.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 112 ft.
DATE COMPLETED:9/14/2016 LOG OF TEST BORINGSB-03LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Extremely dense SILT,trace sand, trace gravel,gray, moist (ML)
Extremely dense SILTYFINE SAND, trace gravel,gray, moist (SM)
Extremely dense FINEGRAVEL (possiblefractured bedrock), tracesilt, trace sand, gray, wet(GP)
End of Boring at 144 ft.(Boring continued as RockCore)
DRAA80+80+ AARAD
150150
55DDDDDDDDRDRAF144.0144AFAFAFAFAFRA
DAFTFTAFTAFFTFTFTFFTFTTFTFTTTTTTTTTTAF
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367624.6Easting: 13460719.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 639.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/12/2016 LOG OF TEST BORINGSB-03ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 68 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367624.6Easting: 13460719.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 639.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/12/2016 LOG OF TEST BORINGSB-03ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 68 ft.
DRD55DDDDDDRARARAFAFDDRRADD
AFTFTFTTTTTTAF
95
571.6
548.1
70.0
71.5
80.0
81.5
90.0
91.5
18
26.9
27.7
27.1
100
99
99
ST1
VS1
ST2
VS2
ST3
VS3
38
68.0
91.5
3490
2860
3660
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367624.6Easting: 13460719.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 639.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/12/2016 LOG OF TEST BORINGSB-03ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 68 ft.
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
NOTE: Vane shear tests at71.5, 81.5, and 91.5 ft.terminated early due tohigh force gauge readings.
Medium LEAN CLAY, tracesand, trace gravel, gray(CL)
DRST3ST3DDDD
8585
DDDRAARAD
ARAARADDDDDDRDRAF80.080.0
81.581.5ARAAF2860AAAFAFAFT27.727.7AAFFT
99
TFFTTFFTFTTTTTTRA
T
DAF
0-0-3540.1
530.6
99.5
102.0
103.5
107.0
109.0
26.8
28.5
33.8
95
92
SS4
ST5
VS4
NR6
ST7
399.5
109.0
1200#
3080
2860
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367624.6Easting: 13460719.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 639.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/12/2016 LOG OF TEST BORINGSB-03ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
NOTE: Vane shear test at103.5 ft. terminated earlydue to high force gaugereadings. No recovery onShelby tube attempt at 107ft. due to sample falling outof sampler.
End of Boring at 109 ft.
DRD120DDDRARARAFF28602860 FFAFDDDDDRRADD
AFT33.8FTFT92FTFTTTFTFTTFTFTTTTTTTTTTAF
8-9-7
4-5-5
2-4-6
3-5-9
3-5-7
3-6-9
5-9-13
7-10-13
621.7621.5
619.9
597.4
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
16.4
17.4
16.3
15.6
16.2
17.7
SS1
SS2
SS3
SS4
NR5
SS6
SS7
SS8
16
10
10
14
12
15
22
23
0.70.9
2.5
25.0
<>
3000*
5000*
4000*
<>
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: N. OttoDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:2/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367161.8Easting: 13460473.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 622.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 100 ft.
DATE COMPLETED:2/20/2017 LOG OF TEST BORINGTB-117LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of ASPHALTICCEMENT CONCRETEField Engineer reported 3inches of gravel FILL (BaseMaterial)FILL - Medium densepoorly graded fine tomedium sand, trace silt,trace gravel, brown, moist(SP)
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: Poor recovery onSPT sample SS2 at 5 ft. Norecovery on SPT sampleattempt at 15 ft. due tosample falling out ofsampler.
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDDDRA3-6-93-6-
ADRRAD
1212
15
ARARARARAF15.015.0AAFRA
0*0*
FAAFAFDRRADRAFT16.316
FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
5-9-10
1-3-3
1-2-3
2-3-3
1-3-4-6
1-2-3-4
2-3-3-3
587.435.0
40.0
45.0
50.0
53.0
54.5
57.0
59.0
61.0
62.5
65.0
25.0
24.2
27.0
27.3
27.0
26.4
28.6
27.4
27.7
99
99
SS9
SS10
SS11
SS12
ST13
VS1
SS14
SS15
ST16
VS2
SS17
19
6
5
6
7
5
6
35.02500*
2500*
2000*
2000#
4820
3290
1000#
1400#
3890
3360
1800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: N. OttoDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:2/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367161.8Easting: 13460473.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 622.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 100 ft.
DATE COMPLETED:2/20/2017 LOG OF TEST BORINGTB-117LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
DRST133
VS1S1
SS1414
RDRDDRDDD55DDDDRA2-3-32-3-3
RADRDRARAD
6 ARARRARARARAF45.00
50.050AFRAFRARA
2000*200
2000AFAFAAFDDDDRRADRAFT27.027.0
AFFTAFTTFFTFTTFTFTFTFTTTTTTTT
DAF
98
97
49
1-2-3-4
2-3-5-6
3-5-7-8
2-2-3-3
1-3-3
1-3-4
5-4-3-3
4-13-19-28
551.4
529.4
527.4
67.0
69.0
71.0
73.0
74.5
77.0
79.0
80.5
83.0
85.0
86.5
89.0
90.5
93.0
95.0
21
19
28.1
26.7
26.1
25.0
28.7
32.9
28.9
31.0
28.0
31.1
19.9
92
95
94
SS18
SS19
SS20
ST21
VS3
SS22
ST23
SS24
NR25
ST26
SS27
ST28
VS4
SS29
SS30
43
41
5
8
12
5
6
7
7
32
71.0
93.0
95.0
1800#
1400#
1200#
<>
2800
1600#
2480
800#
2360
<>
3410
2050
800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: N. OttoDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:2/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367161.8Easting: 13460473.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 622.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 100 ft.
DATE COMPLETED:2/20/2017 LOG OF TEST BORINGTB-117LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Stiff to soft LEAN CLAY,trace sand, occasional siltseams below 90 ft., gray(CL)
NOTE: Poor recovery onShelby tube ST21 at 73 ft.No recovery on Shelbytube attempt at 83 ft. due tosample falling out ofsampler.
Dense CLAYEY FINESAND, trace gravel, gray,moist (SC)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
DR55
ST2626
SS27SS27
ST288
VSVS
RDRDRDDDD8585
DDDRA3
1-3-4-3-4
ARARADRDRRADRARARA66 ARARRARADDDDDDRDRAF00
79.0
80.55
83.083
88AFAF
RARARAAF1600#16
248080
800#800# FAFAFAFAAFAFT28.7.7
32.932
28.99
TFTAFTAFAFTAFT
92
TFTFTFFTFT4
TTFTFTFTFTFTTTTTTTTTTTTTRA
T
DAF
8-16-34-47
17-43-35-39
70-50/2"
77-50/3"
522.4
508.6
100.0
105.0
108.7
113.8
30.2SS31
SS32
SS33
SS34
50
78
50 +
50 +
100.0
113.8
7000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: N. OttoDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:2/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 367161.8Easting: 13460473.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 622.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 100 ft.
DATE COMPLETED:2/20/2017 LOG OF TEST BORINGTB-117LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Very dense to extremelydense SILTY FINE SAND,occasional silty fine tomedium sand layers, finegravel layer atapproximately 113 ft., gray,moist (SM)
End of Boring at 113.8 ft.(Terminated upon SPTsample refusal)
77-50/3"7-50/3
RARA50 ++
RARARAD120DDDDDDDRDRAF77
113.8113.8F
RARAFAFAAFAFTFTFTAFTTFTFTFTTFTFTTTTTTTTFTFTTT
RAT
DAF
8-15-13
7-8-10
20-9-9
8-12-12
19-13-12
5-5-5
4-7-9
5-7-10
636.7636.5
618.4
607.1
3.0
5.0
7.5
10.0
15.0
20.0
25.0
30.0
17.3
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
28
18
18
24
25
10
16
17
1.41.6
19.7
31.0
3000*
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: L. Martinez/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366663.2Easting: 13460361.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 638.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 119 ft.
DATE COMPLETED:10/10/2016 LOG OF TEST BORINGSB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 6TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
16.5 inches of PORTLANDCEMENT CONCRETEField Engineer reported 3inches of gravel FILL
FILL - Medium densepoorly-graded fine tocoarse sand, trace silt,trace gravel, brown, moist(SP)
NOTE: Driller reportedpossible cobble at 13.5 ft.
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDDDRA2
5-5-55-5-
ADRRAD
2525
10
ARARARARAF15.015.0AAFRAFAAFAF
DRRADD
AFTFTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
67
5-11-12
6-9-9
5-3-4
2-2-3
11-8-7
3-4-5
3-4-5
594.6
578.1
35.0
40.0
45.0
50.0
55.0
56.0
60.0
65.0
14
8.4
12.3
17.6
19.3
25.8
27.5
29.5
94
SS9
SS10
SS11
SS12
NR13
DP14
SS15
SS16
28
23
18
7
5
15
9
9
43.5
60.0
9000+*
4000*
1200#
<>
<>
3070
1400#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: L. Martinez/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366663.2Easting: 13460361.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 638.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 119 ft.
DATE COMPLETED:10/10/2016 LOG OF TEST BORINGSB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 6TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Hard to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
Medium to stiff SANDYLEAN CLAY, trace gravel,gray (CL)
NOTE: No recovery onSPT sample attempt at 55ft. due to sample falling outof sampler, direct pushedto 56 ft. to retrieve sample.
Medium to very stiff LEANCLAY, trace to few sand,trace gravel, gray (CL)
DRNR133
DP144
RDDDRD55DDDDDDRA2-2-32-2-3
11-8-77RADDRADR
5 ARARARADRAF45.00
50.050AFRAFRA
1200#120
<>AFAFAAFAFT17.617.6
AFFTA
TFFT28TFTFTFTFTT1TTTT
DDRT
RAT
DAF
le.le.
89
95
3-3-5
3-4-4
70.0
71.5
75.0
80.0
81.5
85.0
90.0
91.5
95.0
96.5
20
28
24.0
29.7
26.5
29.0
30.4
26.5
100
98
99
94
99
ST17
VS1
SS18
ST19
VS2
SS20
ST21
VS3
ST22
VS4
38
48
8
8
3500*
4660
2890
3750
5470
1800#
1500*
4160
3680
4660
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: L. Martinez/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366663.2Easting: 13460361.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 638.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 119 ft.
DATE COMPLETED:10/10/2016 LOG OF TEST BORINGSB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 6TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Medium to very stiff LEANCLAY, trace to few sand,trace gravel, gray (CL)
DRSS2020
ST21ST21DRDRDDRA3-4-43-4-
ARADRRAD
8
ARARARARAD
8585
DDDDDDDDRDRAF80.080.0
81.581.5ARAAFRA
00
3750
5470FAAAFAF
RAD
AFT29.72
26.526.5FTA
TAFFT98
99
TFTTFFTTFTTFFTFTTTTTTTTTTTAF
99
56
3-3-4
11-18-18
11-15-21
12-39-44
46-50/5"
30-50/5"
533.1
524.1
519.1
518.1
508.7
100.0
105.0
110.0
115.0
120.0
124.4
129.4
8
18.8
24.0
8.7
26.8
25.5
93
SS23
ST24
SS25
SS26
SS27
SS28
SS29
23
7
36
36
83
50 +
50 +
105.0
114.0
119.0
120.0
129.4
1600#
2000
9000+*
4000*
4500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: L. Martinez/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366663.2Easting: 13460361.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 638.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 119 ft.
DATE COMPLETED:10/10/2016 LOG OF TEST BORINGSB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 6TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Medium to very stiff LEANCLAY, trace to few sand,trace gravel, gray (CL)
Hard SANDY LEAN CLAY,trace gravel, gray (CL)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Extremely dense poorlygraded FINE SAND, tracesilt and gravel, occasionalsilty fine sand pockets,gray, moist (SP)
Extremely densepoorly-graded FINE TOMEDIUM SAND with silt,trace gravel, gray, wet(SP-SM)
DRSS277 RDDRDD120DDDRA11-15-2111-15-21
12-39-4412-39-44RADRADR
36 ARARARARAF110.00
115.011AFRAFRA
9000+*9000
4000AFAFAAFDDDDDRRADDD119.01
120.0120 DDDAFT8.78.7
AFFTAFTTFFTFT
2323
TFFTFTFTTTTTTTTAF
48-45-45
40-50/1"
50/5"
38-50/0"
50/5"
50/4"
503.1
493.1
483.1
135.0
139.1
143.9
148.9
153.9
158.8
SS30
SS31
SS32
SS33
SS34
SS35
90
50 +
50 +
50 +
50 +
50 +
135.0
145.0
155.0
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: L. Martinez/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366663.2Easting: 13460361.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 638.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 119 ft.
DATE COMPLETED:10/10/2016 LOG OF TEST BORINGSB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 6TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
>>
>>
Extremely densewell-graded FINE TOCOARSE SAND with silt,trace gravel, gray, wet(SP-SM)
Extremely dense CLAYEYSAND, trace silt, tracegravel, gray, wet (SC)
Extremely dense mixedCLAYEY SAND andSHALE pieces, dark gray,wet (SC)
Extremely weatheredSHALE, black
DRSS33S33
SS34S34DRDRDDD150150
55DDDDDDDDRA38-50/0"8-50/0"
ADRDRAD
50 +50 +
50 +50 +ARARARARAF143.9143
1414AF
RAFRAFAFAFAF
DRRADRAFTFT
AFTAFFTFTFTFFTFTTFTFTTTTTTTTTTT
DAF
50/1"474.5
163.6SS36 50 +163.6
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: L. Martinez/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366663.2Easting: 13460361.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 638.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 119 ft.
DATE COMPLETED:10/10/2016 LOG OF TEST BORINGSB-06LABORATORY DATA
DRAFT
7/28/17
PAGE 6 of 6TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
165
170
175
180
185
190
195
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
End of Boring at 163.6 ft.(Boring continued as RockCore)
DRD185DDDDDDDRARARAFAFDRRADRAFTFTFTTTTTT
DAF
12-14-18
10-7-12
5-7-9
7-8-8
9-9-11
3-4-4
4-6-7
3-4-7
635.5
617.9
616.4
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
11.5
15.6
15.7
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
32
19
16
16
20
8
13
11
0.9
18.5
20.06000*
3500*
4000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366352.1Easting: 13460333.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 125 ft.
DATE COMPLETED:11/9/2016 LOG OF TEST BORINGSB-09LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
11 inches of PORTLANDCEMENT CONCRETE
FILL - Dense to mediumdense poorly graded fine tocoarse sand, trace silt,trace gravel, occasionallean clay layers below 7.5ft., brown, moist (SP)
Very stiff LEAN CLAY,trace sand, trace gravel,brown (CL)
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDDDRA3-4-43-4-
ADRRAD
2020
8
ARARARARAF15.015.0AAFRAFAAFAF
DRRAD
.00
DAFTFTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
6-9-11
3-3-5
3-4-6
2-4-4
4-5-6
3-4-5
586.4
35.0
40.0
45.0
50.0
55.0
56.5
60.0
65.0
15.7
16.7
15.8
17.4
26.5
25.2
26.3
101
SS9
SS10
SS11
SS12
ST13
VS1
SS14
SS15
20
8
10
8
11
9
50.0
<>
3000*
4000*
2000*
3490
3790
1400#
1800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366352.1Easting: 13460333.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 125 ft.
DATE COMPLETED:11/9/2016 LOG OF TEST BORINGSB-09LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL) DRA2-4-42-4-4
RADRADRST133
VS11
RDDDR8 ARARARRA
D55DDDDDDDRDRAF45.00
50.050AFRAFRA
4000*400
2000AFAFAAFAFTTT15.815.8
AFFTA
TFFTTFTFTTFTFTTTRA
T
DAF
2-3-3
3-3-4
3-4-5
2-3-3
2-2-2
1-2-3
70.0
75.0
80.0
85.0
90.0
95.0
26.7
28.5
28.6
30.2
31.8
28.7
SS16
SS17
SS18
SS19
SS20
SS21
6
7
9
6
4
5
1400#
1800#
1800#
1000#
1200#
1000#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366352.1Easting: 13460333.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 125 ft.
DATE COMPLETED:11/9/2016 LOG OF TEST BORINGSB-09LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
DRSS199
SS20SS20DRDRDDD8585
DDDDRA2-3-32-3-
ADRRADRA99 A
6
ARARARARAF80.080.0AAFRAAF
0#0#
1800#18 FAAFAFDDDDDRRADD
AFT28.528
28.68.6FTA
TAFFTFTTFFTFTFTTFTTTTTTTTTTTAF
2-1-2
7-2-3
6-12-28
7-11-21
20-32-33
16-28-37
21-37-50
536.4
531.4
526.4
517.9
516.4
510.4
100.0
105.0
110.0
115.0
120.0
125.0
130.0
26.1
8.4
22.3
11.6
SS22
SS23
SS24
SS25
SS26
SS27
SS28
3
5
40
32
65
65
87
100.0
105.0
110.0
118.5
120.0
126.0
1200#
9000+*
4000*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366352.1Easting: 13460333.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 125 ft.
DATE COMPLETED:11/9/2016 LOG OF TEST BORINGSB-09LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Loose SILT, trace sand,gray (ML)
Hard LEAN CLAY, withsand, trace gravel, gray(CL)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Very dense SILTY FINESAND, trace gravel, gray,wet (SM)
Very dense SILTY FINETO COARSE SAND, tracegravel, gray, wet (SM)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
DRA7-11-217-11-21
20-32-3320-32-33RADRADRSS266 RDDR
32 ARARARAD120DDDDDDDRDDD
118.5118.
120.0120 DDRAF110.00
115.011AFRAFRA
9000+*9000
4000AFAFAAFRA
DAFT8.48.4
AFFTA
TFFTTFTFTFTFTTTTTTTTAF
yy
21-41-43
21-47-40
22-43-46
48-50/2"
50/3"
502.9
492.9
487.9
482.6
135.0
140.0
145.0
149.2
153.8
SS29
SS30
SS31
SS32
SS33
84
87
89
50 +
50 +
133.5
143.5
148.5
153.8
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366352.1Easting: 13460333.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 125 ft.
DATE COMPLETED:11/9/2016 LOG OF TEST BORINGSB-09LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
>>
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
Extremely densewell-graded FINE TOCOARSE SAND with silt,few gravel, gray, wet(SP-SM)
Extremely dense poorlygraded FINE TO MEDIUMSAND with silt, few gravel,gray, wet (SP-SM)
NOTE: Cave-in reported at145 ft.
Completely weathered darkgray SHALE (Residual Soil)
End of Boring at 153.8 ft.(Boring continued as RockCore)
6
48-50/2"8-50/2"A
DRDRAD
145.0145.0
1414AAF
RASS32S32
SS33S33DRDRD8989
50 +50 +ARARA
3.8.8 DFAAF
RAAFD
150150
55DDDDDDDDRRAD
AFTTTTTFTA
TAFFTTFFTTTFTFTTTAF
rkkSoil)Soil)
635.7
634.6
0.9
2.0
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45Engineer on Rig: A. PattersonDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:3/16/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366351.9Easting: 13460340.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:3/23/2017 LOG OF TEST BORINGSB-09ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
11 inches of PORTLANDCEMENT CONCRETEFILL - Poorly graded fine tocoarse sand, few gravel,trace silt, brown, moist (SP)
Profile drilled to 59 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
2-4-5-6
577.6
61.0
63.0
64.5
28.9
26.4 100
SS1
ST2
VS1
9
59.0
1600#
5340
3480
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45Engineer on Rig: A. PattersonDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:3/16/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366351.9Easting: 13460340.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:3/23/2017 LOG OF TEST BORINGSB-09ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 59 ft.
Medium to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRD55DDDDDDRARARAFAFDDRRADD
AFTFTFTTTTTTAF
96
96
98
1-3-4-5
1-3-5-6
1-2-3-5
1-2-3-4
1-2-2-4
1-2-3-5
1-2-2-4
3-3-3-4
1-2-2-3
545.6
67.0
69.0
71.0
73.0
74.5
77.0
79.0
81.0
83.0
84.5
87.0
89.0
90.5
93.0
95.0
97.0
21
19
22
27.4
27.7
28.5
27.9
28.4
28.4
27.5
27.5
31.8
30.4
28.4
34.5
29.5
98
96
93
SS3
SS4
SS5
ST6
VS2
SS7
SS8
SS9
ST10
VS3
SS11
ST12
VS4
SS13
SS14
DP15
43
40
45
7
8
5
5
4
5
4
6
4
91.0
1800#
1600#
1200#
5210
3170
1600#
1800#
1400#
3630
2920
1200#
4200
2300
600#
1200#
800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45Engineer on Rig: A. PattersonDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:3/16/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366351.9Easting: 13460340.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:3/23/2017 LOG OF TEST BORINGSB-09ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Medium to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Soft to medium LEANCLAY, trace sand, tracegravel, occasional siltlayers below 99 ft., gray(CL)
NOTE: No recovery onShelby tube attempt at 97ft. due to sample falling outof sampler; direct pushed
DR00
VS3VS3
SS11S11
ST122
VSVS
RDRDDDRDD8585
DDDDRA3-5
1-2-2-42-2-4
ARARADRDDRRA
44
55 ARARARRRARAF00
79.0
81.00
83.083
8484AFAF
RARAAF1600#16
1800#00#
1400#1400#
363
FAFAFAFAFDDDDDRRADD
AFT28.4.4
28.428
27.527
TFTAFTAFAFTFT
9898
TFTFTFFTFTFT43
TTFTFTFTFTT21
TTTTTTTTTTTTAF
7-6-9-7535.6
98.5
101.0 26.1
VS5
SS16 15101.0
1990
1200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45Engineer on Rig: A. PattersonDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:3/16/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 366351.9Easting: 13460340.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:3/23/2017 LOG OF TEST BORINGSB-09ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
to 97 ft. to retrieve sample.
End of Boring at 101 ft.
DRD120DDDDDDDRARARAFAFDRRADRAFTFTFTTTTTT
DAF
4-3-3
4-6-7
3-4-8
2-4-6
1-4-7
3-6-9
3-6-10
4-5-10
630.6
628.1
600.6
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
14.1
13.9
14.4
13.7
14.5
14.3
15.5
124
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
6
13
12
10
11
15
16
15
0.1
2.5
30.0
8000*
<>
7000*
7500*
6000*
8500
6500*
BORING LOCATION INFORMATIONUpon Completion: none
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45BEngineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSAMethod Notes:Hammer Type: AutomaticBackfilled With: CuttingsChecked By: ALOGQA/QC By: JA
DATE STARTED:9/15/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365742.0Easting: 13460353.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 630.6 ft
Remarks:
DATE COMPLETED:9/15/2016 LOG OF TEST BORINGRW-40LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
1 inch of TOPSOILFILL - Loose well-gradedfine to coarse sand, tracesilt, trace gravel, brown,moist (SW)
Hard to very stiff LEANCLAY, trace sand, tracegravel, Field Engineerreported sand seams 29-30ft., gray (CL)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA3-6-93-6-
ADRRAD
1111
15
ARARARADRAF15.015.0AAFRA
0*0*
7500*75 FAAFAFAFT14.414
13.73.7FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
4-8-12
5-7-14
595.6
590.6
35.0
40.0
8.3
17.2
SS9
SS10
20
21
35.0
40.0
9000+*
8000*
BORING LOCATION INFORMATIONUpon Completion: none
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45BEngineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSAMethod Notes:Hammer Type: AutomaticBackfilled With: CuttingsChecked By: ALOGQA/QC By: JA
DATE STARTED:9/15/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365742.0Easting: 13460353.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 630.6 ft
Remarks:
DATE COMPLETED:9/15/2016 LOG OF TEST BORINGRW-40LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
End of Boring at 40 ft.
DRD55DDDDDDRARARAFAFDDRRADD
AFTTTTFTFTTTTTTTAF
629.5628.8
623.8
0.3
1.0
6.0
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 9 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365755.1Easting: 13460348.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 629.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling at 110 ft.
DATE COMPLETED:10/19/2016 LOG OF TEST BORINGRW-40ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
4 inches of PORTLANDCEMENT CONCRETEField Engineer reportedbrown gravelly sand FILL(Base Material)Field Engineer reportedbrown SILTY SAND
Profile drilled to 38.5 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
93
96
4-6-8
8-10-11
2-5-6
1-3-6
1-0-3
591.3
587.3
584.8
568.3
40.0
45.0
50.0
55.0
59.5
61.5
63.5
23
22
22.0
14.2
25.7
34.1
27.1
SS1
SS2
NR3
SS4
SS5
VS1
ST6
44
40
14
21
11
9
3
38.5
42.5
45.0
61.5
5000*
5000*
2500*
<>
4720
2500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 9 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365755.1Easting: 13460348.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 629.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling at 110 ft.
DATE COMPLETED:10/19/2016 LOG OF TEST BORINGRW-40ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 38.5 ft.
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Very stiff LEAN CLAY withsand, trace gravel, gray(CL)
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 50ft. due to sample falling outof sampler.
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
DRA2-5-62-5-6
1-3-6RADRADRSS4 RDDR
11 ARARARAD55DDDDDDDRDRAF45.00
50.050AFRAFRA
5000*500
AFAFAAFAFTTT14.214.2
AFFTA
TFFTTFTFTTFTFTTTRA
T
DAF
5050tt
97
2-3-4
1-3-3
0-2-4
548.3
534.8
71.0
72.5
77.5
80.0
81.5
86.0
88.0
90.0
92.5
95.0
96.5
22
25.9
26.8
27.4
30.1
29.9
34.9
30.1
101
98
91
ST7
VS2
SS8
ST9
VS3
NR10
DP11
SS12
SS13
ST14
VS4
40
7
6
6
81.5
95.0
3300
3360
2000#
3540
3980
<>
1400#
<>
870
3420
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 9 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365755.1Easting: 13460348.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 629.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling at 110 ft.
DATE COMPLETED:10/19/2016 LOG OF TEST BORINGRW-40ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
Medium to soft LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempts at 86and 88 ft. due to samplefalling out of sampler, directpushed at 88 ft. to retrievesample
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
NR10NR
DP11
SS12SS12DRDDDRDDD8585
DDDDDDDDRAARADRDDRD
AARAARRARAF77.55
80.080.0
81.581.5AFARAFAFR
2000#200
3540
3980AFAAFAFAFDRRADRAFT26.826.8
27.427.4AFAFTAF98
TFFTFTTFFTFFTFTTTTTTTT
DAF
94
0-1-3
4-4-2
8-19-22
14-50-51
22-58-72
529.8
522.8
512.8
509.8
100.0
105.0
110.0
115.0
120.0
14
22.2SS15
SS16
SS17
SS18
SS19
30
4
6
41
101
130
100.0
107.0
117.0
120.0
<>
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 9 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365755.1Easting: 13460348.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 629.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling at 110 ft.
DATE COMPLETED:10/19/2016 LOG OF TEST BORINGRW-40ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
LEAN CLAY, few sand,gray (CL)
Dense to extremely denseSILTY FINE SAND,frequent lean clay pocketsabove 110 ft., gray, moist(SM)
Extremely densepoorly-graded FINE TOCOARSE SAND with silt,trace gravel, gray, wet(SP-SM)
End of Boring at 120 ft. DRA14-50-5114-50-51
22-58-7222-58-72RADRADRSS199 RDDR
101 ARARARAD120DDDDDDDRDD120.0120 DDRAF110.00
115.011AFRAFRAAFAFAAFRA
DAFTAFFTA
TFFT303
TFTFTFTFTT1
TTTTTTAF
3-4-6
4-2-6
4-6-7
3-5-6
3-4-7
5-6-7
3-5-7
2-5-6
635.8635.5
632.5
631.5
626.5
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
26.1
20.7
18.4
14.8
15.9
16.5
SS1
SS2
SS3
SS4
SS5
NR6
SS7
SS8
10
8
13
11
11
13
12
11
0.71.0
4.0
5.0
10.0
5500*
3500*
5000*
3500*
3500*
2000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 4 inch SSA/WRMethod Notes:Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/14/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365157.8Easting: 13460445.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 4 feet
Ground Surface Elevation 636.5 ft
Remarks: Wash rotary starting at 20 ft.
DATE COMPLETED:11/15/2016 LOG OF TEST BORINGRW-37LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of PORTLANDCEMENT CONCRETEField Engineer reportedFILLFILL - Medium dense toloose poorly graded fine tomedium sand with silt,trace gravel, occasionalsilty fine sand layers,brown, moist to wet(SP-SM)Very stiff LEAN CLAY,trace sand, trace gravel,brown (CL)Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Stiff LEAN CLAY, few sand,trace gravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 20ft. due to sample falling outof sampler. Sample SS9 at35 ft taken from augercuttings. DRNR66
SS7SS7DRDRDD2020
DDDDDDRA5-6-75-6-
ADRRAD
1111
13
ARARARADRAF15.015.0AAFRA
0*0*
3500*35 FAAFAFAFT18.418
14.84.8FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
00outout
7-8-11
5-9-10
2-3-6
2-4-5
3-4-5
3-4-6
601.535.0
40.0
45.0
50.0
55.0
60.0
65.0
15.3
19.5
26.7
27.9
33.0
SS9
ST10
SS11
SS12
SS13
SS14
SS15
19
19
9
9
9
10
35.0<>
<>
5000*
2000*
2000*
<>
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 4 inch SSA/WRMethod Notes:Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/14/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365157.8Easting: 13460445.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 4 feet
Ground Surface Elevation 636.5 ft
Remarks: Wash rotary starting at 20 ft.
DATE COMPLETED:11/15/2016 LOG OF TEST BORINGRW-37LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
DRA2-3-62-3-6
2-4-5RADRADRSS133 RDDR
9 ARARARAD55DDDDDDDRDRAF45.00
50.050AFRAFRA
5000*500
2000AFAFAAFRA
DAFT15.315.3
AFFTA
TFFTTFFTFTFTTTTTTTTAF
3-4-5566.5
70.0 28.1SS16 970.0
1200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 4 inch SSA/WRMethod Notes:Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/14/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365157.8Easting: 13460445.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 4 feet
Ground Surface Elevation 636.5 ft
Remarks: Wash rotary starting at 20 ft.
DATE COMPLETED:11/15/2016 LOG OF TEST BORINGRW-37LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
End of Boring at 70 ft.
DRD8585
DDDDDDRARADRAFAFAFTFTFTTTT
DDDRT
RAT
DAF
635.6 0.8
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. Hiske/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/27/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365145.5Easting: 13460447.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 636.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:2/1/2017 LOG OF TEST BORINGRW-37ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
9 inches of PORTLANDCEMENT CONCRETE
Profile drilled to 62 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
2-3-5-6
574.4
64.0 27.0SS1 8
62.0
2200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. Hiske/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/27/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365145.5Easting: 13460447.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 636.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:2/1/2017 LOG OF TEST BORINGRW-37ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 62 ft.
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRD55DDDDDDRARARAFAFDDRRADD
AFTFTFTTTTTTAF
97
98
3-4-5-5
2-2-3-4
2-2-3-5
2-3-3-4
2-2-3-5
2-2-3-4
1-2-3-3
1-2-4-4
566.4
66.0
68.0
69.5
72.0
74.0
76.0
77.5
80.0
82.0
84.0
85.5
88.0
90.0
91.5
94.0
96.0
98.0
21
25
27.4
23.4
28.0
27.2
27.0
28.1
28.5
27.6
30.9
29.4
30.8
28.3
25.3
103
98
98
95
100
SS2
ST3
VS1
SS4
SS5
ST6
VS2
SS7
SS8
ST9
VS3
SS10
ST11
VS4
SS12
SS13
ST14
43
47
9
5
5
6
5
5
5
6
70.0
2200#
4110
3540
1400#
2200#
3930
3610
1600#
1400#
3630
2860
1600#
3150
3170
1400#
1400#
2770
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. Hiske/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/27/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365145.5Easting: 13460447.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 636.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:2/1/2017 LOG OF TEST BORINGRW-37ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Medium to stiff LEANCLAY, trace sand, gray(CL)
DRAF2-2-3-52-2-3-5
2-2-3-42
ARADRDRDDR
77.55
80.080.0
82.082.0
84.084.0
FAFARARAFST9ST9
VS3V
SS10
ST11ST11
RDRDRDDDR66
5 AARARRA39303930
3610361
1600#
1400#
FFAFAAAFRAAF
D8585
DDDDDDDDRRAD
AFTTTTT.2.2
27.0
28.128.1
2
FTFTAFAAF
98 TFTFTFFTFTFTFFTFTFTTTAF
47
1-2-4-4
1-1-2-3
20-17-13
17-50/5"
16-35-56
15-24-36
527.9
522.9
516.4
511.4
99.5
102.0
104.0
110.0
114.4
120.0
125.0
22.2
32.3
11.9
18.4
VS5
SS15
SS16
SS17
SS18
SS19
SS20
6
3
30
50 +
91
60
108.5
113.5
120.0
125.0
2920
1200#
1200#
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. Hiske/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/27/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 365145.5Easting: 13460447.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 636.4 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:2/1/2017 LOG OF TEST BORINGRW-37ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Medium to stiff LEANCLAY, trace sand, gray(CL)
Dense SILTY FINE SAND,trace gravel, gray, moist(SM)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
Very dense SILT, tracesand, gray, moist (ML)
End of Boring at 125 ft.
DRA17-50/5"17-50/5"
16-35-5616-35-56RADRADRSS199DDR
50 + ARARARAD120DDDDDDDRDD120.0120 DRAF110.00
114.4114AFRAFRA9000+*AFAFAAFAFTTTAFFTA
TFFTTFFTTFTFTTTRA
T
DAF
7-13-13
9-10-8
5-5-7
8-11-15
7-6-6
6-10-13
7-11-14
5-6-10
636.3
633.5
632.0
629.0
617.0
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
21.5
12.2
12.9
16.3
17.2
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
26
18
12
26
12
23
25
16
0.7
3.5
5.0
8.0
20.0
7000*
<>
8000*
9000+*
8000*
7000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/19/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364612.7Easting: 13460449.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 637.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/20/2015 LOG OF TEST BORINGTB-05LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of SANDYTOPSOIL, brownFILL - Medium dense siltyfine sand, trace topsoil,trace clay, trace gravel,occasional clay pocketsand sandy silt pockets,brown, moist (SM)Medium dense poorlygraded FINE SAND, withsilt, trace gravel, brown,moist (SP-SM)Very stiff LEAN CLAY,trace sand, trace gravel,occasional sandy siltseams, brown (CL)
Very stiff to hard LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Poor samplerecovery in SPT sampleSS4 at 10 ft.
Very stiff LEAN CLAY withsand, trace gravel, gray(CL)
SS66
SS7SS7DRDRDD2020
DDDDDDRA6-10-136-10-
ADRRAD
1212
23
ARARARAD
.00
DRAF15.015.0AAFRA8000*80 FAAFAFAFT
12.22.2FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
85
91
48
94
6-13-15
6-8-13
6-9-12
5-8-13
7-12-23
7-23-21
10-31-36
21-63
47-45
33-37-35
33-29-30
12-19-23
11-15-18
7-11-13
592.0
590.5
585.5
582.0
576.0
35.0
40.0
45.0
46.5
48.5
50.0
51.5
53.0
54.0
55.6
58.5
60.0
62.5
64.0
65.5
18
28
23
16.4
16.3
14.2
14.8
17.8
11.6
8.8
22.7
25.4
119
114
121
103
SS9
SS10
SS11
SS12
ST13
SS14
NR15
SS16
NR17
SS18
SS19
NR20
SS21
NR22
SS23
35
51
44
28
21
21
21
35
44
67
63+
45+
72
59
42
33
24
45.0
46.5
51.5
55.0
61.0
6500*
6500*
6500*
4000*
4410
5000*
9000+*
<>
9000+*
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/19/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364612.7Easting: 13460449.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 637.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/20/2015 LOG OF TEST BORINGTB-05LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
Very stiff LEAN CLAY withsand, trace gravel, gray(CL)
Very stiff FAT CLAY, fewsand, trace gravel, gray(CH)Very stiff LEAN CLAY, fewsand, trace gravel, gray(CL)
NOTE: No recovery onSPT sample attempt at 44ft. due to sample falling outof sampler.Hard SANDY LEAN CLAY,trace gravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 54ft. due to possible cobble.
Very dense SILTY SAND,few gravel, gray, moist(SM)
NOTE: No recovery onSPT sample attempt at 60ft. due to possible cobble.
DRNR15NR15
SS16S
NR17R17
SS18
SS
RDRDRDRDDDDD55DDDRA7-12-237-12-23
7-23-213-21
10-31-3610-3
21-63-63
47-4
ARARADRDRDRDDRA
2121
A35
4444
67
AARARARRRARAF45.00
46.5
48.55
50.050
51.551.5AFAFRARAR
FAF6500*650
4000*0*
44104410
5000AFAFAAFAFDDDDDRRADD55.055 D
AFT14.214.2
14.814
17.817AFAFAFTFT99
114
TFFFTFT353
TFTFTFTFTT1
TTTTTTT
DAF
44
96
94
4-5-6
4-5-7
3-4-6
3-5-7
4-5-6547.0
67.5
69.0
70.5
75.0
80.0
85.0
90.0
17
18
25.3
26.7
25.9
23.2
27.8
28.0
102
104
ST24
VS1
SS25
SS26
SS27
SS28
SS29
39
38
11
12
10
12
1190.0
4200
5660
2000#
3000*
2000*
3500*
2500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/19/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364612.7Easting: 13460449.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 637.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/20/2015 LOG OF TEST BORINGTB-05LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Hard to stiff LEAN CLAY,few sand, trace gravel, gray(CL)
NOTE: No recovery onSPT sample attempt at 64ft. due to possible cobble.Poor sample recovery inSPT sample SS27 at 80 ft.
End of Boring at 90 ft.DRSS2828
SS29SS29DRDRDD8585
DDDDDDDRA3-5-73-5-
ADRRAD
1010
12
ARARARARAF80.080.0AAFRA
0*0*
2000*20 FAAFAFDDRRADD
AFT25.92
23.23.2FTA
TAF
104
FTTF388
FTTFTFTT94TT1818TTTTTTAF
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364639.0Easting: 13460452.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 636.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 118 ft.
DATE COMPLETED:10/26/2016 LOG OF TEST BORINGTB-05ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 63 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
573.9
65.0 28.3ST1
63.0
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364639.0Easting: 13460452.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 636.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 118 ft.
DATE COMPLETED:10/26/2016 LOG OF TEST BORINGTB-05ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 63 ft.
DRD55DDDDDDRARARAFAFDDRRADD
AFTFTFTTTTTTAF
95
98
0-2-4
543.4
70.0
71.5
77.0
78.5
85.0
86.5
92.0
93.5
95.0
17
17
24.9
26.3
26.3
27.2
31.2
103
100
101
99
ST2
VS1
ST3
VS2
ST4
VS3
ST5
VS4
SS6
37
39
6
93.5
3840
5030
2900
4720
3060
4540
3140
4040
1200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364639.0Easting: 13460452.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 636.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 118 ft.
DATE COMPLETED:10/26/2016 LOG OF TEST BORINGTB-05ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: Poor samplerecovery in Shelby tubeST1 at 65 ft.
Soft to stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
DRST4T4
VS3VS3
DRDRRDDD8585
DDDRADRDRRARAARRARADDDDDDRDRAF00
78.5
88AFAF
RAAF290029
4720720
AFAFFAFAFT26.3.3
AFTAFFTFT1001 TFTFFTFT37FTFTTFTFTFTT17TTTTTTTT
RAT
DAF
57
0-1-4
0-3-4
6-5-12
53-50/3"
94
535.4
527.4
518.4517.9
512.9
100.0
101.5
105.0
110.0
115.0
119.3
124.1
26.5
28.8
28.0
10.8
96ST7
VS5
SS8
SS9
SS10
SS11
SS12
5
7
17
50 +
94+
101.5
109.5
118.5119.0
124.0
790
3920
1600#
1800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364639.0Easting: 13460452.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 636.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 118 ft.
DATE COMPLETED:10/26/2016 LOG OF TEST BORINGTB-05ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Soft to stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Medium LEAN CLAY, tracesand, trace gravel, gray(CL)
Medium dense SANDYSILT, trace gravel, gray,wet (ML)
Extremely dense poorlygraded FINE SAND, tracesilt, trace gravel, gray, wet(SP)Extremely dense poorlygraded MEDIUM TOCOARSE SAND, trace silt,trace gravel, gray, wet (SP)
End of Boring at 124 ft.(Terminated upon SPTsample refusal)
DRSS1111 RDDRD120DDRA6-5-126-5-12
53-50/3"0/3"RADRADR
17 ARARARADDDDDDRDDD
118.5118.119.01 DDRAF110.00
115.011AFRAFRA
1800#180
AFAFAAFAFT28.028.0
AFFTA
TFFTTFTFTFTFTTTTTTTRA
T
DAF
ee
10-6-4
4-5-8
3-6-7
2-5-6
2-4-6
9-15-14
2-6-10
25-15-9
625.8
624.7
602.7
596.7
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
12.9
15.3
15.9
15.5
15.1
12.6
14.2
SS1
SS2
SS3
SS4
SS5
NR6
SS7
SS8
10
13
13
11
10
29
16
24
0.4
1.5
23.5
29.5
7000*
6500*
7000*
6000*
6500*
6500*
7500*
BORING LOCATION INFORMATIONUpon Completion: none
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 55Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSAMethod Notes:Hammer Type: AutomaticBackfilled With: CuttingsChecked By: ALOGQA/QC By: JA
DATE STARTED:10/31/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364059.8Easting: 13460503.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 626.2 ft
Remarks:
DATE COMPLETED:10/31/2016 LOG OF TEST BORINGRW-31LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
4.5 inches of TOPSOILField Engineer reportedsand FILL
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
NOTE: No recovery in SPTsample attempt at 20 ft.
Very stiff LEAN CLAY, fewsand, trace gravel, gray(CL)
Dense SILTY FINE SAND,trace gravel, occasionallean clay layers, gray,moist (SM)
DRNR66
SS7SS7DRDRDD2020
DDDDDDDDRA9-15-149-15-
ADRRAD
1010
29
ARARARARAF15.015.0AAFRA
0*0*
6500*65 FAAFAFDRRAD23.53.5 D
AFT15.51
15.15.1FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
14-22-20
2-5-7
587.7
586.2
35.0
40.0 15.6
SS9
SS10
42
12
38.5
40.06000*
BORING LOCATION INFORMATIONUpon Completion: none
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 55Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSAMethod Notes:Hammer Type: AutomaticBackfilled With: CuttingsChecked By: ALOGQA/QC By: JA
DATE STARTED:10/31/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364059.8Easting: 13460503.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 626.2 ft
Remarks:
DATE COMPLETED:10/31/2016 LOG OF TEST BORINGRW-31LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Dense SILTY FINE SAND,trace gravel, occasionallean clay layers, gray,moist (SM)
Very stiff LEAN CLAY, fewsand, trace gravel, gray(CL)
End of Boring at 40 ft.
D55DDDDDDRARARAFAFDDRRADD
AFTTTTFTFTTTTTTTAF
625.4 0.4
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. WajedDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:2/22/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364049.8Easting: 13460501.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 625.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling at 96 ft.
DATE COMPLETED:3/3/2017 LOG OF TEST BORINGRW-31ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
5 inches of ASPHALTICCEMENT CONCRETE
Profile drilled to 40 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
96
8-9-8-11
3-5-6-8
2-4-6-8
2-2-4-5
1-3-3-5
585.8
568.8
42.0
45.0
50.0
55.0
56.5
59.0
61.0
63.0
64.5
19
17.7
21.9
25.0
24.9
26.1
25.9
27.2
101
99
SS1
SS2
SS3
ST4
VS1
SS5
SS6
ST7
VS2
40
17
11
10
6
6
40.0
57.0
4000*
2500*
2500*
4620
3360
1200#
1600#
3950
3920
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. WajedDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:2/22/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364049.8Easting: 13460501.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 625.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling at 96 ft.
DATE COMPLETED:3/3/2017 LOG OF TEST BORINGRW-31ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 40 ft.
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRST44
VS11
RDDDRDDRA2-4-6-82-4-6-8
RADRADR
10 ARARARRAD55DDDDDDDRDRAF45.0.0
50.050AFRARA
2500*25
2500*
FAFAFAAFRA
DAFT17.77.7
21.921.9FTAFFTAFTFTFTFTFTFTFTFTFTTTTTTTTTTTAF
95
98
48
1-3-3-5
1-2-4-3
4-3-3-4
1-2-4-5
1-2-4-5
2-2-4-4
1-2-4-4
8-9-16-15
18-25-24-32
540.8
533.3
67.0
69.0
71.0
73.0
75.0
77.0
78.5
81.0
82.5
85.0
89.0
91.0
92.5
95.0
97.0
19
24
NP
26.0
27.0
26.3
25.4
26.7
26.6
24.7
34.8
26.1
30.2
8.3
100
101
96
SS8
SS9
SS10
SS11
SS12
ST13
VS3
ST14
VS4
SS15
SS16
ST17
VS5
SS18
SS19
39
48
14
6
6
6
6
6
6
6
25
49
85.0
92.5
1600#
1200#
1600#
1800#
1600#
3150
3110
3430
3050
1000#
800#
2070
5160
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. WajedDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:2/22/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364049.8Easting: 13460501.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 625.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling at 96 ft.
DATE COMPLETED:3/3/2017 LOG OF TEST BORINGRW-31ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Soft to very stiff LEANCLAY, trace sand, gray(CL)
Medium dense to verydense SILTY CLAYEYSAND, few gravel, gray,moist (SC-SM)
DRSS1515
SS166
STST
RDRDRDDD8585
DDDDRA2-2-4-42-2-4-4
1-
RARADRARADRA
66ARARARARARARAF00
78.5
81.00
82.582
88AFAF
RARAAFRAAF
##
315031
3110110
34303430
3050
FAFAFAAAFAFDDDDDRRAD
.00
DDAFT26.726.7
26.6.6
24.724
TFTAFTAFAAFFT1001 TFTFTFFFTFTTTFTFTFTTTTTTTTTTTTAF
12-24-44-50
7-17-57-33
18-29-54
20-32-44
29-40-43
524.8
515.8
510.8
99.0
101.0
105.0
110.0
115.0
14.1
18.5
SS20
SS21
SS22
SS23
SS24
68
74
83
76
83
101.0
110.0
115.0
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. WajedDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:2/22/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 364049.8Easting: 13460501.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 625.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling at 96 ft.
DATE COMPLETED:3/3/2017 LOG OF TEST BORINGRW-31ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
>>
Medium dense to verydense SILTY CLAYEYSAND, few gravel, gray,moist (SC-SM)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
Extremely dense poorlygraded FINE SAND, tracesilt, trace gravel, gray,moist (SP)
End of Boring at 115 ft. RDD120DDDDRA29-40-4329-40-43
RARARA83 ARARARARAF110.00
115.011AFRAFRAAF9000+*9000
AFFAFAAFDDDDRRADRAFT18.518.5
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTT
DAF
44
6-8-10
5-6-7
4-7-9
3-5-8
2-6-7
13-14-9
3-6-8
3-7-10
635.8
632.0
627.5
617.5
613.0
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
24.2
19.2
13.2
14.1
15.6
13.9
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
18
13
16
13
13
23
14
17
0.7
4.5
9.0
19.0
23.5
8000*
7000*
6500*
3500*
4000*
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: C. SchroederDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/27/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363432.7Easting: 13460749.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 103 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGSB-12LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of PORTLANDCEMENT CONCRETEFILL - Medium densepoorly graded fine sand,trace silt, trace gravel,occasional lean claypockets, brown, moist (SP)
Hard to very stiff LEANCLAY, trace sand, tracegravel, brown (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: Driller reportedpossible cobble at 17 ft.
Medium dense SILTY FINETO MEDIUM SAND, fewgravel, occasional sandyclay seams, gray, moist(SM)
Very stiff to stiff SANDYLEAN CLAY, trace gravel,gray (CL)
NOTE: Field Engineerreported layers of fine tocoarse gravel, with sandand clay 23.5-24 ft. and34-34.5 ft.
DRSS66
SS7SS7DRDRDD2020
DDDDDDDDRA13-14-913-14
ADRRAD
1313
23
ARARARARAF15.015.0AAFRA
0*0*
3500*35 FAAFAFDRRAD23.523.5 D
AFT13.21
14.14.1FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
67
94
5-7-10
17-35-18
4-7-8
3-3-6
1-3-5
1-3-6
597.5
592.0
587.5
35.0
40.0
45.0
50.0
55.0
60.0
65.0
14
19
15.0
11.9
26.5
24.1
25.5
25.3
96
101
SS9
SS10
SS11
SS12
SS13
SS14
ST15
29
40
17
53
15
9
8
9
39.0
44.5
49.0
<>
<>
3650
2000#
2000#
5540
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: C. SchroederDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/27/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363432.7Easting: 13460749.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 103 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGSB-12LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Very stiff to stiff SANDYLEAN CLAY, trace gravel,gray (CL)
NOTE: Field Engineerreported layers of fine tocoarse gravel, with sandand clay 23.5-24 ft. and34-34.5 ft.
Very dense SILTY FINESAND, trace gravel, gray,moist (SM)
LEAN CLAY, trace sand,trace gravel, gray (CL)
Very stiff to medium LEANCLAY, trace to few sand,trace gravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 80ft. due to sample falling outof sampler.
DRSS133 RDDRDD55DDDDRA3-3-63-3-6
1-3-5RADRADRRA9 ARARARARAF45.00
50.050AFRAFRAAF<><>
3650AFAFAAFDDDDRRADRAFT11.911.9
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTT
DAF
90
2-3-5
1-2-4
0-2-3
0-2-2
0-2-3
550.0
70.0
75.0
80.0
82.0
85.0
86.5
90.0
92.0
95.0
19
39.0
27.7
26.8
26.8
31.0
27.0
102
101
SS16
SS17
NR18
ST19
SS20
VS1
SS21
NR22
SS23
39
8
6
5
4
5
86.5
1600#
2550
3720
1400#
2440
800#
1000#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: C. SchroederDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/27/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363432.7Easting: 13460749.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 103 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGSB-12LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, trace to few sand,trace gravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 80ft. due to sample falling outof sampler.
Soft to medium LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 92ft. due to sample falling outof sampler.
DRSS2020
VS1VS1
SS21SS21
RDRDRDRDD8585
DDDDDDDRA0-2-30-2-
ARADRDRRAD
5
ARARARARARAF80.080.0
82.082.0ARAAFRA
00
3720
FAAAFAFDDRRADD86.58 DD
AFT27.72
2
FTA
TAF
102
FTTFFTTFFTFTTTTTTTTTTAF
86
0-0-3
12-26-41
12-22-87
37-47-54
103/4"
100/4"
536.5
531.5
526.5
517.9
512.7
100.0
102.0
105.0
110.0
115.0
118.8
123.8
23
26.9
31.4
15.1
SS24
ST25
SS26
SS27
SS28
SS29
SS30
43
3
67
109
101
103 +
100 +
100.0
105.0
110.0
118.6
123.8
800#
<>
8500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: C. SchroederDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/27/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363432.7Easting: 13460749.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 636.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 103 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGSB-12LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
>>
Hard LEAN CLAY, fewsand, few gravel, gray (CL)
Extremely dense SILT withsand, occasional lean clayseams, gray, moist (ML)
Extremely dense poorlygraded FINE SAND withsilt, trace gravel, traceshale pieces, gray, moist(SP-SM)
Extremely dense poorlygraded FINE GRAVEL,trace silt, trace coarsesand, weathered dark grayshale at 123.8 ft., gray,moist (GP)
End of Boring at 123.8 ft.(Boring continued as RockCore)
37-47-5437-47-54
103/4"/4"RADRRADRSS2929 RDRDR
101 ARARARAD120DDDDDDDRDD118.6118 DRAF110.00
115.011AFRAFRAAFAFAAFRA
DAFTAFFTA
TFFTTFTFTFTFTTTTTTTTAF
7-7-4
2-3-5
4-8-10
5-8-9
6-6-8
4-6-6
3-5-7
3-5-7
634.0633.7632.7632.2
624.7
604.7
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
15.1
26.9
13.3
12.9
15.5
14.9
15.2
15.6
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
11
8
18
17
14
12
12
12
0.81.0
2.02.5
10.0
30.0
4000*
8000*
9000+*
8500*
4500*
4000*
3000*
2000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes:Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/15/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363093.5Easting: 13460836.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.7 ft
Remarks:
DATE COMPLETED:11/15/2016 LOG OF TEST BORINGRW-25LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
9 inches of PORTLANDCEMENT CONCRETEField Engineer reported 3inches of FILLFILL - Medium densepoorly graded fine tomedium sand, trace silt,trace gravel, brown, moist(SP)FILL - Very stiff sandy leanclay, trace gravel, darkbrown (CL)
NOTE: Foreign odor wasdetected in SPT sample at2.5 ft.Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
NOTE: Foreign odor wasdetected in SPT sample at5 ft.
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Medium dense CLAYEYFINE SAND/SANDY LEANCLAY, trace gravel, gray(SC)/(CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA4-6-64-6-
ADRRAD
1414
12
ARARARADRAF15.015.0AAFRA
0*0*
4500*45 FAAFAFAFT12.912
15.55.5FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
7-11-13
9-10-10
7-8-12
7-8-8
599.7
589.7
584.7
35.0
40.0
45.0
50.0
10.5
15.4
16.9
SS9
SS10
SS11
SS12
24
20
20
16
35.0
45.0
50.0
6000*
4500*
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes:Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/15/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363093.5Easting: 13460836.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.7 ft
Remarks:
DATE COMPLETED:11/15/2016 LOG OF TEST BORINGRW-25LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff LEAN CLAY, fewsand, trace gravel, gray(CL)
Stiff LEAN CLAY, tracesand, trace gravel, frequentfine sand partings andpockets, gray (CL)
End of Boring at 50 ft.
DRRDD55DDDRA7-8-87-8-8
RARARA16 ARARARARAF45.00
50.050AFRAFRAA3000AF4500*450 FAFAFAAF
DDDDDRRADD
AFT15.415.4
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTTAF
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: R. Calkins/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/26/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363082.2Easting: 13460839.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 115 ft.
DATE COMPLETED:2/1/2017 LOG OF TEST BORINGRW-25ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 50 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
5-5-8-8
3-5-6-6
3-5-5-5
4-5-6-7
3-4-5-7
584.7
572.7
52.0
54.0
56.0
58.0
60.0
61.5
64.0
18.3
24.4
23.5
21.0
24.7
25.1
103
SS1
SS2
SS3
SS4
ST5
VS1
SS6
13
11
10
11
9
50.0
62.0
3500*
2000*
2500*
2000*
4790
4790
2500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: R. Calkins/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/26/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363082.2Easting: 13460839.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 115 ft.
DATE COMPLETED:2/1/2017 LOG OF TEST BORINGRW-25ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 50 ft.
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
SS1SS1
SS2SS2
SS3
SS4SS4DRDRDRD55DDRA5-5-8-85-8-8
3-5-6-63-5-6-6
3-5-53DRDRDRA1313RRARADDDDDDRDRAF
52.52.RAAAFAFTFTFTTTTTRA
T
DAF
95
94
3-4-5-6
3-5-5-6
2-3-5-6
2-4-5-6
2-5-5-7
2-5-5-7
2-4-4-6
1-3-4-6
1-3-4-6
564.7
550.7
66.0
68.0
70.0
72.0
73.5
76.0
78.0
80.0
82.0
83.5
86.0
88.0
89.5
92.0
94.0
96.0
97.5
18
21
27.7
21.3
23.2
27.3
26.9
26.2
26.2
25.7
29.6
29.3
36.1
26.6
28.5
98
101
96
99
SS7
SS8
SS9
ST10
VS2
SS11
SS12
SS13
ST14
VS3
SS15
ST16
VS4
SS17
SS18
ST19
VS5
39
42
9
10
8
9
10
10
8
7
7
70.0
84.0
2500*
2400#
1400#
2820
4160
2200#
2000#
2200#
4030
3790
1800#
4420
4230
1400#
1600#
2750
3730
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: R. Calkins/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/26/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363082.2Easting: 13460839.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 115 ft.
DATE COMPLETED:2/1/2017 LOG OF TEST BORINGRW-25ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Medium to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
DRVS3VS3
SS15SS
ST16
VS4S4
RRDRDDDRDDRA2-4-4-62-4-4
ARARADRDDRDRA1010
8
AARARARRAF78.0
80.080.0
82.082.0
83.583.5
FAFARARARAF2000#2000# F200#200#
F2200#
4030
FAFAAFRAAF
D8585
DDDDDDDDRRAD
AFT26.9
26.226.2
26.226.2
2
TFTAFAFTFTTTFTFFTFTTTFTFFTTTTTTTTTTTFTFTTTAF
549-19-28-49
18-30-52
16-21-37
8-13-21
72
536.2
534.7
521.2
517.7
515.7
100.0
105.0
110.0
115.0
119.0
712.3
14.8
19.9
SS20
SS21
SS22
SS23
SS24
1947
82
58
34
72+
98.5
100.0
113.5
117.0
119.0
<>
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: R. Calkins/S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/26/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 363082.2Easting: 13460839.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 115 ft.
DATE COMPLETED:2/1/2017 LOG OF TEST BORINGRW-25ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
SANDY SILTY CLAY, fewgravel, gray, (CL-ML)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
Dense SILT, occasionallean clay layers, FieldEngineer reported 6-inchsilty sand layer 114.5-115ft., gray, moist (ML)
Completely weatheredblack SHALE
End of Boring at 119 ft.(Terminated upon SPTsample refusal on possiblebedrock)
SS2424 RDRDRDRA8-13-218-13-21
722RADRRADR
34 ARARARAD120DDDDDDDRDD119.01 DDRAF110.00
115.011AFRAFRA
9000+*9000
AFAFAAFRA
DAFT19.919.9
AFFTA
TFFTFTFTTFTFTFTTTTTTTTAF
6-8-5
5-4-4
3-5-6
2-4-5
4-6-9
4-7-9
3-6-7
4-7-13/5"
633.3
630.1
620.6
2.5
5.0
7.5
10.0
15.0
20.0
25.0
29.9
21.3
21.0
25.4
14.6
14.3
15.1
13.5
125
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
13
8
11
9
15
16
13
20/11"
0.8
4.0
13.5
4000*
4500*
2500*
4000*
4000*
4190
3500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/23/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 362438.4Easting: 13460986.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS from vane shear test estimatedby 2x field shear strength. Possibleobstruction at 29.9 ft., boring relocated 5 ft. Sand 3 ft. E and continued. Driller reportedhard drilling at 95 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGRW-20LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
10 inches of PORTLANDCEMENT CONCRETEFILL - Medium densepoorly-graded fine tomedium sand with silt,trace coarse sand, tracegravel, brown, moist(SP-SM)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, occasional sandysilt partings and seamsabove 7.5 ft., brown to gray(CL)
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: SPT samplerrefusal at 29.9 ft. onpossible obstruction.Boring relocated 5 ft. S and3 ft. E and continued. DRSS66
SS7SS7DRDRDD2020
DDDDDDRA4-7-94-7-
ADRRAD
1515
16
ARARARADRAF15.015.0AAFRA
0*0*
4000*40 FAAFAFAFT25.42
14.64.6FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
94
4-7-9
4-8-12
4-3-4
4-5-8
4-4-7
3-6-5
594.1
589.1
579.1
35.0
40.0
45.0
50.0
55.0
60.0
61.5
65.0
16
14.4
16.8
30.7
15.9
23.5
24.6
25.7
107
103
SS9
SS10
SS11
SS12
SS13
ST14
VS1
SS15
37
16
20
7
13
11
11
40.0
45.0
55.0
3000*
2500*
1400#
2500*
3230
5080
4480
1200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/23/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 362438.4Easting: 13460986.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS from vane shear test estimatedby 2x field shear strength. Possibleobstruction at 29.9 ft., boring relocated 5 ft. Sand 3 ft. E and continued. Driller reportedhard drilling at 95 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGRW-20LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: SPT samplerrefusal at 29.9 ft. onpossible obstruction.Boring relocated 5 ft. S and3 ft. E and continued.
Medium LEAN CLAY, tracesand, trace gravel, gray(CL)
Stiff LEAN CLAY, few sand,trace gravel, gray (CL)
Very stiff to medium LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Vane shear test at81.5 ft. terminated earlydue to possible cobble.
DRA4-5-84-5-8
4-4-7RADRADRSS133 RDDR
13 ARARARAD55DDDDDDDRDD55.055 DRAF45.00
50.050AFRAFRA
1400#140
2500AFAFAAFRA
DAFT30.730.7
AFFTA
TFFTTFTFTFTFTTTTTTTTAF
92
63
85
2-4-5
4-5-6
6-8-10
552.1
549.1
539.1
70.0
71.5
76.0
80.0
81.5
85.0
89.0
95.0
18
12
22
26.7
25.8
25.9
26.0
23.9
29.3
101
102
95
SS16
VS2
ST17
SS18
VS3
ST19
SS20
ST21
39
27
43
9
11
18
82.0
85.0
95.0
1200#
2860
2650
1800#
3500*
2000*
4500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/23/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 362438.4Easting: 13460986.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS from vane shear test estimatedby 2x field shear strength. Possibleobstruction at 29.9 ft., boring relocated 5 ft. Sand 3 ft. E and continued. Driller reportedhard drilling at 95 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGRW-20LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Vane shear test at81.5 ft. terminated earlydue to possible cobble.
Stiff SANDY LEAN CLAY,gray (CL)
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Driller reportedpossible cobble at 85 ft.
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
DRST1919
SS200DRDRDDD8585
DDDRA6
ARADRRAD
1111 ARARARARADDDDDDRD
.00
DRAF80.080.0
81.581.5
88
FARAAFRA
26502650
1800#18 FAAFAFAFAFT25.8
25.95.9FTAFTAFFT101 TFTFTFFT39TFTFTFTFTT92T1818TTTTTT
RAT
DAF
25-40-50/5"
14-27-32
10-11-15
31-65
60-54/1"
529.1
524.1
515.0
99.9
105.0
110.0
114.5
119.1
13.7
20.2
29.3
SS22
SS23
SS24
SS25
SS26
90/11"
59
26
65+
54 +
105.0
110.0
119.1
9000+*
9000+*
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/23/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 362438.4Easting: 13460986.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS from vane shear test estimatedby 2x field shear strength. Possibleobstruction at 29.9 ft., boring relocated 5 ft. Sand 3 ft. E and continued. Driller reportedhard drilling at 95 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGRW-20LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
Extremely dense mixedCLAYEY SAND andcompletely weatheredSHALE pieces, tracegravel, dark gray, moist(SC)
NOTE: Driller reportedpossible cobble at 117-118ft.
End of Boring at 119.1 ft.(Terminated due to SPTsample refusal on possibleobstruction) DRSS2626 RDRDRD120DDDDDDDRA31-6531-65
60-54/1"4/1"RADRRADR
65+ ARARARARAF110.00
114.5114AFRAFRA
3000*300
AFAFAAFDRRADD119.11 D
AFT29.329.3
AFFTA
TFFTTFTFTFTFTTTTTTTT
DAF
8-7-5
3-5-8
6-15-20
6-15-20
10-12-15
6-8-12
6-9-11
5-9-14
633.4
632.0
629.0
615.5
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
18.9
20.1
13.5
12.6
13.6
14.0
17.6
13.5
119
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
12
13
35
35
27
20
20
23
0.6
2.0
5.0
18.5
2000*
5000*
9000*
9000*
8000*
6500*
5400
5000*
BORING LOCATION INFORMATIONUpon Completion: none
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: D 50Engineer on Rig: M. WajedDrilling Method: 2 1/4 inch HSAMethod Notes:Hammer Type: ManualBackfilled With: Cuttings/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/1/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361867.7Easting: 13461130.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.0 ft
Remarks:
DATE COMPLETED:9/1/2016 LOG OF TEST BORINGRW-17LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
7 inches of PORTLANDCEMENT CONCRETEFILL - Medium densepoorly graded fine tomedium sand, trace silt,trace gravel, brown, moist(SP)FILL - Stiff to very stiff leanclay, few sand, trace roots,trace gravel, dark gray tomottled brown and gray(CL)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA5
6-8-126-8-1
ADRRAD
2727
20
ARARARADRAF15.015.0AAFRA
0*0*
8000*80 FAAFAFDDDRRAD
AFT12.612
13.63.6FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTTAF
8-12-16
8-10-13
8-10-15
5-9-12584.0
35.0
40.0
45.0
50.0
16.0
16.3
15.6
13.4
SS9
SS10
SS11
SS12
28
23
25
2150.0
5500*
4000*
5000*
2500*
BORING LOCATION INFORMATIONUpon Completion: none
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: D 50Engineer on Rig: M. WajedDrilling Method: 2 1/4 inch HSAMethod Notes:Hammer Type: ManualBackfilled With: Cuttings/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/1/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361867.7Easting: 13461130.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.0 ft
Remarks:
DATE COMPLETED:9/1/2016 LOG OF TEST BORINGRW-17LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
End of Boring at 50 ft.
DRRDD55DDDRA5-9-125-9-12
RARARA21 ARARARARAF45.00
50.050AFRAFRAA2500AF5000*500 FAFAFAAF
DDDDDRRADD
AFT15.615.6
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTTAF
633.3 0.7
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. Wajed/S. SwaminathanDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/19/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361861.4Easting: 13461128.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:1/26/2017 LOG OF TEST BORINGRW-17ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of PORTLANDCEMENT CONCRETE
Profile drilled to 50 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
93
4-6-8-13
5-6-8-10
1-3-5-7
1-3-5-6
2-3-4-5
584.0
576.0
52.0
54.0
56.0
58.0
60.0
61.5
64.0
18
16.6
18.0
26.0
25.6
24.7
26.3
103
SS1
SS2
SS3
SS4
ST5
VS1
SS6
39
14
14
8
8
7
50.0
58.0
5000*
2500*
2500*
2500*
6050
3850
1600#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. Wajed/S. SwaminathanDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/19/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361861.4Easting: 13461128.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:1/26/2017 LOG OF TEST BORINGRW-17ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 50 ft.
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff to medium LEANCLAY, few sand, tracegravel, gray (CL)
DRSS1SS1
SS2SS2
SS3
SS4SS4DRDRDRD55DDRA4-6-8-13-8-13
5-6-8-10-6-8-1
1-3-5DRDRDRA1414RRARADDDDDDRDRAF
52.52.RAAAFAFTFTFTTTTTRA
T
DAF
93
94
2-3-5-6
1-4-5-6
2-3-4-5
2-4-3-5
1-2-3-4
1-3-4-5
14-9-7-8
5-7-9-12
53-80/3"
60-50/3"
47-34-36-50/5"
566.5
558.0
549.2
548.0
544.5
543.0
542.0
538.0
537.0
66.0
67.5
70.0
72.0
74.0
76.0
78.0
79.5
82.0
84.0
84.8
87.0
89.5
92.0
92.8
94.8
97.9
21
22
25.6
25.3
27.1
26.3
26.4
28.2
27.6
27.0
29.2
26.3
21.4
11.8
102
101
98
ST7
VS2
SS8
SS9
SS10
SS11
ST12
VS3
SS13
SS14
ST15
SS16
VS4
SS17
SS18
SS19
SS20
42
42
8
9
7
7
5
7
16
16
80 +
50 +
70
67.5
76.0
84.8
86.0
89.5
91.0
92.0
96.0
97.0
3780
4230
2000#
1800#
2200#
2000#
4240
3920
2000#
1800#
3190
1400#
3980
1800#
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. Wajed/S. SwaminathanDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/19/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361861.4Easting: 13461128.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:1/26/2017 LOG OF TEST BORINGRW-17ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Very stiff to medium LEANCLAY, few sand, tracegravel, gray (CL)
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff to medium LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Poor recovery onShelby tube ST15 at 84.8ft.
Medium dense poorlygraded FINE SAND, tracesilt, trace gravel, gray,moist (SP)Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Medium dense SILTY FINESAND/SANDY SILT, gray,wet (SM/ML)Medium LEAN CLAY, tracesand, trace gravel, gray(CL)Extremely dense SILTYFINE SAND/SANDY SILT,gray, wet (SM/ML)
Hard LEAN CLAY, tracesand, trace gravel, gray
DRA1-2-3-41-2-3-4
1-3-4-54-5
14-9-7-89-7-8
ARADRDRD
ADRD
SS14SS14
ST155
SS16S16
VS4S4
RDRDRDDDRDD5
7 AARARRARRAD
8585
DDDDDDDDRDD8
86.086.0
DDRAF78.0
79.579.
82.082.0
84.084.0
FAFAFRARA
000#000#
42404240
3920
2000#
FFAFAFAAAFRA
DAFT.1.1
26.3
26.426.4
2
FTFTAFAFA
101 TFTFTFF42TFTFTFFTFTTTTTTTTTTAF
13-29-38-55
17-66-54
13-21-37
11-15-19
536.0
529.0
519.0
100.0
105.0
110.0
115.0
13.6
14.8
19.7
20.4
SS21
SS22
SS23
SS24
67
120
58
34
98.0
105.0
115.0
9000*
9000*
5000*
4500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. Wajed/S. SwaminathanDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/19/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361861.4Easting: 13461128.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:1/26/2017 LOG OF TEST BORINGRW-17ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
(CL)Very dense SILTY FINESAND/SANDY SILT, tracegravel, gray, wet (SM/ML)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
End of Boring at 115 ft.
DRRDD120DDDRA11-15-1911-15-19
RARARA34 ARARARARAF110.00
115.011AFRAFRAA4500AF5000*500 FAFAFAAF
DDDDDRRADD
AFT19.719.7
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTTAF
48
2-2-2
3-4-6
4-8-11
7-11-12
4-7-9
5-5-9
3-4-6
5-7-8
634.5
633.2
629.2
627.2
625.2
615.2
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
9
14.4
14.1
12.3
12.5
14.0
15.0
23.6
15.8
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
22
4
10
19
23
16
14
10
15
0.7
2.0
6.0
8.0
10.0
20.0
4500*
5000*
9000*
9000*
6000*
5500*
<>
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/23/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361380.7Easting: 13461259.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 635.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 93 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGRW-13LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of PORTLANDCEMENT CONCRETEFILL - Poorly-graded fine tomedium sand with silt,trace coarse sand, tracegravel, occasional sandylean clay seams, brown,moist (SP-SM)Very stiff SANDY LEANCLAY, few gravel, brown(CL)Medium dense CLAYEYSAND, few gravel, brown(SC) (Based on AtterbergLimits, SPT sample at 7.5ft. reacts similar to CL)Hard SANDY LEAN CLAY,few gravel, brown (CL)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Stiff SANDY LEAN CLAY,trace gravel, gray (CL)
DRSS66
SS7SS7DRDRDDD2020
DDDRA5-5-95-5-
ADRRAD
1616
14
ARARARADDDDDDRD
.00
DRAF15.015.0AAFRA
0*0*
6000*60 FAAFAFAFT12.512
14.04.0FTA
TAFFTTFTTFFT
222
TFTTTFTFTTTTTTTTTTRA
T
DAF
67
3-5-7
4-6-7
6-6-9
2-3-4
3-3-5
1-5-5
2-4-4
595.2
590.2
35.0
40.0
45.0
50.0
55.0
57.0
58.5
60.5
62.0
64.0
65.5
15
16.3
16.0
13.4
24.9
25.0
26.0
28.1
117SS9
SS10
SS11
SS12
SS13
NR14
SS15
NR16
SS17
NR18
VS1
29
12
13
15
7
8
10
8
40.0
45.0
3380
2000*
4500*
2400#
2000*
2000#
<>
4160
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/23/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361380.7Easting: 13461259.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 635.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 93 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGRW-13LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff SANDY LEAN CLAY,trace gravel, gray (CL)
Very stiff LEAN CLAY, fewsand, trace gravel, gray(CL)
Stiff to very stiff LEANCLAY, trace to few sand,trace gravel, gray (CL)
NOTE: No recovery onShelby tube attempts at 57,60.5, and 64 ft. due tosample falling out ofsampler. DRSS133
NR1414
SS
RDDDRD55DDDDDDRA2-3-42-3-4
3-3-5RADRADR
7 ARARARARAF45.00
50.050AFRAFRA
4500*450
2400AFAFAAFDDRRADD
AFT13.413.4
AFFTA
TFFT292
TFTFTFTFTT1
TTTTTTAF
92
91
6-6-10
3-6-6
3-5-9
3-8-9
50/5"
565.2
553.2
547.2
68.0
70.0
75.0
78.0
80.0
82.0
85.0
87.0
90.0
93.9
26
25
25.8
28.6
29.7
28.3
27.3
24.6
8.6
100
105
ST19
SS20
VS2
NR21
SS22
SS23
SS24
ST25
ST26
NR27
47
44
16
12
14
17
50 +
70.0
82.0
88.0
3370
<>
1000#
800#
1200#
2990
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/23/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361380.7Easting: 13461259.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 635.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 93 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGRW-13LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Medium to soft LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: Vane shear test at75 ft. terminated early dueto possible cobble. Norecovery on Shelby tubeattempt at 78 ft. due tosample falling out ofsampler.
Medium to stiff LEANCLAY, few sand, tracegravel, gray (CL)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
NOTE: No recovery onSPT sample attempt at93.9 ft. due to samplerrefusal on possible boulderor cobble.
DRSS2424
ST25T25
ST26ST26
RDRDDRDDD8585
DDDDRA3-5-93-5-9
3-8-93-8-
ARADRDRARADRA1212
14
17
AARARARARARARAF78.0
80.080.0
82.082.0AFARAFAFRARAAF1000#10
800#
FAFAAFAFAAFDDDDDRRAD88.088.0 DD
AFT29.79.7FT
AFATFT
AFAFTFTFTFTFFTFTFTFTFTFTTTTTTTTTTTTAF
14-29-46
12-24-34
36-50/5"
55/5"
530.2
525.2
521.3
100.0
105.0
109.4
113.9
12.2
17.4
9.3
SS28
SS29
SS30
SS31
75
58
50 +
55 +
105.0
110.0
113.9
9000+*
9000*
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/23/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 361380.7Easting: 13461259.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 635.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 93 ft.
DATE COMPLETED:10/3/2016 LOG OF TEST BORINGRW-13LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
NOTE: No recovery onSPT sample attempt at93.9 ft. due to samplerrefusal on possible boulderor cobble.
Extremely dense SILTYFINE SAND, trace clay,trace gravel, gray, moist(SM)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL) (Possible Hardpan)
End of Boring at 113.9 ft.(Terminated due to SPTsample refusal on possiblehardpan)
DRD120DRA55/5"55/5"
RARARA55 ++
RARARARADDDDDDDRDRAF09.49.4
113.9113AFRAFRAAF
<>AFAFAAFRA
DAFTAFTFTAFTTFTFTFTTFTTFTFTFTTTTTTTTTTAF
5-9-5
1-2-4
4-8-13
3-7-10
4-7-9
3-6-8
4-6-9
3-6-10
632.5632.2631.2
626.2
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
21.6
17.8
15.7
15.8
18.1
18.9
16.2
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
14
6
21
17
16
14
15
16
0.81.0
2.0
7.0
3000*
5000*
4000*
3000*
<>
<>
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360786.6Easting: 13461476.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.2 ft
Remarks: Driller reported hard drilling startingat 90 ft.
DATE COMPLETED:9/9/2016 LOG OF TEST BORINGSB-15LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
9 inches of PORTLANDCEMENT CONCRETEField Engineer reported 3inches of gravel FILLFILL - Medium densepoorly graded fine tomedium sand, trace silt,trace gravel, brown, moist(SP)Stiff to very stiff LEANCLAY, trace sand, tracegravel, brown (CL)
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
SS66
SS7SS7DRDRDD2020
DDDDDDRA3-6-83-6-
ADRRAD
1616
14
ARARARADRAF15.015.0AAFRA
0*0*
3000*30 FAAFAFAFT15.71
15.85.8FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
3-5-9
5-9-12
5-6-9
1-4-5
2-4-5
2-4-5
3-5-8
578.2
35.0
40.0
45.0
50.0
52.0
55.0
60.0
65.0
16.1
12.0
19.1
26.5
23.5
25.8
25.7
30.7
133
106
103
SS9
SS10
SS11
SS12
ST13
SS14
SS15
SS16
14
21
15
9
9
9
13
55.0
3500*
4550
<>
2200#
3500
1800#
1420
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360786.6Easting: 13461476.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.2 ft
Remarks: Driller reported hard drilling startingat 90 ft.
DATE COMPLETED:9/9/2016 LOG OF TEST BORINGSB-15LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Medium LEAN CLAY, tracesand, trace gravel, gray(CL)
NOTE: Poor recovery onSPT sample SS21 at 90 ft.
ST13ST13
SS144 RDRDDRDD55DDDRA1-4-51-4-5
2-4-5RADRDRADR
9 ARARRARARAF45.00
50.050
52.52.AFRAFRA
<><>
2200AFAFAAFDDDDDRRADD55.055 DD
AFT19.119.1
AFFTAFT
3333
TFFTFTTFTFTFTFTTTTTTTTAF
2-4-4
3-4-4
2-4-4
2-3-4
10-20-16
40-54-56
543.2
70.0
75.0
80.0
85.0
90.0
95.0
25.2
29.2
28.1
22.6
99
SS17
SS18
SS19
SS20
SS21
SS22
8
8
8
7
36
110
90.0
1600#
1600#
1930
1800#
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360786.6Easting: 13461476.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.2 ft
Remarks: Driller reported hard drilling startingat 90 ft.
DATE COMPLETED:9/9/2016 LOG OF TEST BORINGSB-15LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Medium LEAN CLAY, tracesand, trace gravel, gray(CL)
NOTE: Poor recovery onSPT sample SS21 at 90 ft.
Extremely dense poorlygraded FINE SAND, tracesilt, trace gravel, gray,moist (SP)
DRSS2020
SS21SS21DRDRDDD8585
DDDRA2-3-42-3-
ADRRADRA88
7
ARARARADDDDDDRDRAF80.080.0AAFRAAF
0#0#
193019 FAAFAFAFT29.22
28.18.1FTA
TAFFT
9FTTFFTFTTFTFTTTTTTTTTTRA
T
DAF
45-50/5"
15-48-44
34-50/5"
35-50/4"
15-21-38
54-60/4"
17-21-28
533.2
508.2
99.4
105.0
109.4
114.3
120.0
124.3
130.0 15.8
SS23
SS24
SS25
SS26
SS27
SS28
SS29
50 +
92
50 +
50 +
59
60 +
49
100.0
125.0
7000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360786.6Easting: 13461476.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.2 ft
Remarks: Driller reported hard drilling startingat 90 ft.
DATE COMPLETED:9/9/2016 LOG OF TEST BORINGSB-15LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
>>
>>
Extremely dense CLAYEYSAND, trace silt, tracegravel, gray, moist (SC)
Very stiff LEAN CLAY,trace sand, trace gravel,occasional clayey siltseams, gray (CL)
DRSS277DDRDD120DDDDDDDRA35-50/4"35-50/4"
15-21-3815-21-38RADRADRRA50 +
RARARARARAF09.49.4
114.3114AFRAFRAAFAFAFAAF
DRRADRAFT
AFTFTAFTTFTFTFTTFTTFTFTFTTTTTTTTTT
DAF
501.2 132.0
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360786.6Easting: 13461476.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.2 ft
Remarks: Driller reported hard drilling startingat 90 ft.
DATE COMPLETED:9/9/2016 LOG OF TEST BORINGSB-15LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
End of Boring at 132 ft.(Boring continued as RockCore)
DRD150150
55DDDDDDRARADRAFAFAFTFTFTTTT
DDDRT
RAT
DAF
632.3 0.8
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. Calkins/M. WajedDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/9/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360780.4Easting: 13461479.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 91 ft.
DATE COMPLETED:1/18/2017 LOG OF TEST BORINGSB-15ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
10 inches of PORTLANDCEMENT CONCRETE
Profile drilled
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
95
6-8-9-9
3-4-6-6
3-4-5-7
579.2
575.2
56.0
58.0
60.0
61.5
64.0
17
25.6
25.8
24.1
25.4
103
SS1
SS2
ST3
VS1
SS4
38
17
10
9
54.0
58.0
1600#
2200#
3270
4040
1600#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. Calkins/M. WajedDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/9/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360780.4Easting: 13461479.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 91 ft.
DATE COMPLETED:1/18/2017 LOG OF TEST BORINGSB-15ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled
Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff to medium LEANCLAY, few to trace sand,trace gravel, gray (CL)
DRA6-8-96DDR
SS1
SS2SS2DDRRAD55DDDDDDDRDD54.05 DRAFAFRA
DAFTFTFTTTTTTAF
95
98
10
3-5-6-7
2-5-6-7
2-4-5-5
3-4-4-6
2-3-2-4
8-10-7-14
17-45-79-96
6-50-98-89
561.2
542.2
538.2
66.0
68.0
69.5
72.0
74.0
76.0
77.5
80.0
82.0
83.5
86.0
88.0
90.0
93.0
95.0
18
17
25.5
25.5
24.5
27.2
25.3
27.3
28.7
32.5
13.7
102
99
97
SS5
ST6
VS2
SS7
SS8
ST9
VS3
SS10
ST11
VS4
SS12
NR13
NR14
SS15
SS16
40
37
11
11
9
8
5
17
124
148
72.0
91.0
95.0
1400#
4020
4540
2000#
1800#
2430
4350
1800#
2940
3670
1400#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. Calkins/M. WajedDrilling Method: 4 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/9/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360780.4Easting: 13461479.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 91 ft.
DATE COMPLETED:1/18/2017 LOG OF TEST BORINGSB-15ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Very stiff to medium LEANCLAY, few to trace sand,trace gravel, gray (CL)
Medium to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 88ft. due to sample falling outof sampler. No recovery onSPT sample attempt at 90ft. due to possible cobble.
Extremely dense poorlygraded FINE SAND withsilt, trace gravel, gray,moist (SP-SM)
End of Boring at 95 ft.
DRVS4VS4
SS12SS
NR133
NR14NR14
RRDRDDDRDD8585
DDDDDDDDRA2-3-2-42-3-2
ARARADRDDRRA88
5
AARARAARRARAF77.55
80.080.0
82.082.0
83.583.5
FAFARARAAFRAF4350435 F
24302430
F1800#
2940
FFAFAAAFAFDRRADRAFT.2.2
25.3
27.327.3
2
FTFTAFAAFFT99 TFTFTFFFTTFTFTFFFTFTTTTTTTTTTT
DAF
29-7-8
5-8-10
9-16-22
7-9-11
6-9-13
4-6-8
5-8-12
4-7-9
633.5
632.3
628.6
620.6
609.1
2.5
5.0
7.5
10.0
15.0
16.5
20.0
25.0
30.0
15.9
17.4
12.5
12.0
16.0
15.6
16.2
14.6
121
SS1
SS2
SS3
SS4
NR5
DP6
SS7
SS8
SS9
15
18
38
20
22
14
20
16
0.6
1.8
5.5
13.5
25.0
9000+*
9000*
9000*
7500*
4000*
3000*
3930
4500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 750Engineer on Rig: C. KennedyDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:8/30/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360426.4Easting: 13461583.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 89 ft. Methane gas wasencountered in monitoring well at 100% LEL.
DATE COMPLETED:9/6/2016 LOG OF TEST BORINGRW-08LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
7 inches of PORTLANDCEMENT CONCRETEFILL - Poorly graded finesand, trace silt, tracegravel, brown, moist (SP)Hard LEAN CLAY, tracesand, trace gravel, mottledbrown and gray (CL)
Hard to very stiff LEANCLAY, trace sand, tracegravel, brown to gray (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onSPT sampler attempt at 15ft. due to sample falling outof sampler; direct pushedto 16.5 ft. to retrievesample.
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
DRSS77
SS8SS8DRDRDDRA4-6-84-6-
ARADRRAD
2222
14
ARARARARAD
2020
DDDDDDDDRDRAF15.015.0
16.516.5ARAAFRA
0*0*
4000*FAAAFAF
RAD
AFT12.012
11FT
AT
AFFTTFTTFFTTFTTTFTFTTTTTTTTTTTAF
94
5-7-11
5-7-10
2-4-6
2-3-6
2-4-5
2-4-4
1-3-5
590.6
35.0
40.0
45.0
50.0
55.0
60.0
62.0
63.5
65.0
19
13.4
17.0
22.9
17.7
24.1
25.1
25.7
25.0
108
101
SS10
SS11
SS12
SS13
SS14
SS15
ST16
VS1
SS17
40
18
17
10
9
9
8
8
43.5
3500*
3000*
1320
2000*
2000*
2000*
4460
3850
2000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 750Engineer on Rig: C. KennedyDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:8/30/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360426.4Easting: 13461583.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 89 ft. Methane gas wasencountered in monitoring well at 100% LEL.
DATE COMPLETED:9/6/2016 LOG OF TEST BORINGRW-08LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
Medium to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 72ft. due to sample falling outof sampler; direct pushedto 72 ft. to retrieve sample. DRSS144 RDDRDD55DDDRA2-3-62-3-6
2-4-5RADRADRRA9 ARARARARAF45.00
50.050AFRAFRAAF1320132
2000AFAFAAFDDDDDRRADD
AFT22.922.9
AFFTAFT108 TFFTFTFFTTTFTFTFTTTTTTTTTAF
81
3-3-5
3-5-6
4-6-7
1-3-5
5-11-22
16-24-30
562.1
554.6
546.1
540.6
70.0
72.0
74.0
75.5
78.0
79.5
81.0
83.0
85.0
87.5
89.5
95.0
25.4
25.7
26.2
28.0
26.8
10.7
SS18
DP19
NR20
SS21
NR22
VS2
SS23
NR24
SS25
VS3
SS26
SS27
8
11
13
8
33
54
72.0
79.5
88.0
93.5
2400#
2000#
2000#
4480
1200#
1600#
4350
1600#
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 750Engineer on Rig: C. KennedyDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:8/30/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360426.4Easting: 13461583.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 89 ft. Methane gas wasencountered in monitoring well at 100% LEL.
DATE COMPLETED:9/6/2016 LOG OF TEST BORINGRW-08LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Medium to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 72ft. due to sample falling outof sampler; direct pushedto 72 ft. to retrieve sample.
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 74ft. or on Denison samplerattempt at 78 ft. due tosample falling out ofsampler.
Medium to very stiff LEANCLAY with sand, tracegravel, gray (CL)
NOTE: No recovery onDenison sampler attempt at83 ft. due to sample fallingout of sampler.
Medium LEAN CLAY withsand, trace gravel, gray(CL)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
DR44
SS2525
VS3
SS26S26
RDRDDRDRDD8585
DDDDDDDRA6-7
1-3-51-3-
ARARADRDRADRD
133
8
AARARARRARARAF78.0
79.579.
81.0.0
83.083AFAFRARAFRA
00#00#
4480
1200#1200# FFAFAFAFAFDDRRAD88.088.0 DD
AFT26.22
28.028.FTFTAFAFAFTTFTFTFFFTTFTFTFFTFTFTTTTTTTTTTTTAF
10-25-36
9-16-21529.1
100.0
105.0
12.0
15.3
SS28
SS29
61
37105.0
9000+*
9000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 750Engineer on Rig: C. KennedyDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:8/30/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360426.4Easting: 13461583.2
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 89 ft. Methane gas wasencountered in monitoring well at 100% LEL.
DATE COMPLETED:9/6/2016 LOG OF TEST BORINGRW-08LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
End of Boring at 105 ft.
DRD120DDDDDDRARARAFAFDDRRADD
AFTTTTFTFTTTTTTTAF
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: JD HoksbergenDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360417.8Easting: 13461584.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 90 ft.
DATE COMPLETED:10/12/2016 LOG OF TEST BORINGRW-08ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 58.5 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
3-5-7
2-3-5
575.5
60.0
65.0
21.5
26.2
SS1
SS2
12
8
58.5
1800#
1800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: JD HoksbergenDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360417.8Easting: 13461584.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 90 ft.
DATE COMPLETED:10/12/2016 LOG OF TEST BORINGRW-08ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 58.5 ft.
Medium to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Vane shear test at70.5 ft. terminated earlydue to high force gaugereadings.
DRD55DDDDDDRARARAFAFDDRRADD
AFTFTFTTTTTTAF
94
97
2-2-3
37-32-41
560.5
544.0
69.0
70.5
75.0
80.0
84.0
85.5
90.0
95.0
23
27
24.8
26.5
30.2
34.1
33.2
10.7
101
95
95
ST3
VS1
SS4
ST5
ST6
VS2
ST7
SS8
44
46
5
73
73.5
90.0
4250
2000#
3580
3700
4410
3400#
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: JD HoksbergenDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360417.8Easting: 13461584.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 90 ft.
DATE COMPLETED:10/12/2016 LOG OF TEST BORINGRW-08ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Medium to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Vane shear test at70.5 ft. terminated earlydue to high force gaugereadings.
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
DRST6ST6
VS2V
ST7ST7DRDRDRDD8585
DDDDDDRAADRDRRAD
ARRARARADRAF80.080.0
84.084.0ARAFRA
0#0#
3580 FAAFAAFAFT26.526
30.230.2FTA
TAF95FTTFFTTFFTFTTTTTTTT
DDDRT
RAT
DAF
13-33-41
18-37-40529.0
100.0
105.0
13.5
14.1
SS9
SS10
74
77105.0
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: JD HoksbergenDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360417.8Easting: 13461584.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 90 ft.
DATE COMPLETED:10/12/2016 LOG OF TEST BORINGRW-08ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
End of Boring at 105 ft.
D120DDDDDDRARARAFAFDDRRADD
AFTTTTFTFTTTTTTTAF
14-9-8
5-5-5
4-3-5
5-6-9
3-7-8
4-7-9
4-5-8
7-8-11
631.6
630.1
627.1
626.1
624.1
617.6
605.6
2.5
5.0
7.5
10.0
15.0
20.0
25.0
26.5
30.0
22.8
11.7
11.7
19.1
14.3
SS1
SS2
SS3
SS4
SS5
SS6
SS7
DP8
SS9
17
10
8
15
15
16
13
19
1.0
2.5
5.5
6.5
8.5
15.0
27.0
2000*
6500*
5500*
<>
<>
<>
5000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45BEngineer on Rig: L. MartinezDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360015.1Easting: 13461700.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 5.5 feet
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:9/8/2016 LOG OF TEST BORINGSB-16LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
12 inches of PORTLANDCEMENT CONCRETEFILL - Medium densepoorly graded fine sand,trace silt, trace gravel,brown, moist (SP)FILL - Medium densepoorly graded fine sand,few gravel, trace clay andsilt, brown, moist (SP)Stiff LEAN CLAY, tracesand, trace gravel, brown(CL)Loose SANDY SILT, traceclay, brown (ML)
Very stiff LEAN CLAY, fewsand, trace gravel, gray(CL)
LEAN CLAY, few sand,trace gravel, gray (CL)
NOTE: Poor recovery onSPT samples SS6 at 20 ft.and SS7 at 25 ft.
Very stiff LEAN CLAY, fewsand, trace gravel, gray(CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA4-7-94-7-
ADRRAD
1515
16
ARARARADRAF15.015.0AAFRA
0*0*
5500*55 FAAFAFAFT11.71
11.71.7FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
nnft.ft.
7-25-29
5-7-13
2-3-3
3-5-7
2-3-6
3-3-3
3-3-4
598.6
595.6
590.6
583.6
580.1
35.0
40.0
45.0
48.0
50.0
55.0
57.0
60.0
65.0
9.2
33.9
17.5
24.9
26.3
113
106
SS10
SS11
SS12
ST13
SS14
SS15
VS1
SS16
SS17
54
20
6
12
9
6
7
34.0
37.0
42.0
49.0
52.5
9000*
<>
1440
1990
2000*
1200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45BEngineer on Rig: L. MartinezDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360015.1Easting: 13461700.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 5.5 feet
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:9/8/2016 LOG OF TEST BORINGSB-16LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>Very dense poorly gradedfine to medium sand withsilt, trace gravel, gray, wet(SP-SM)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
Medium LEAN CLAY, tracesand, trace gravel, gray(CL)
Medium dense SILTY FINETO MEDIUM SAND, tracegravel, occasional lean claylayers, dark gray, wet (SM)
Stiff to soft LEAN CLAY,trace sand, trace gravel,gray (CL)
NOTE: Vane shear test at57 ft. terminated early dueto high force gaugereadings.
DRSS155
VS1S1
RDDDRDDD55DDDDDDDRA3-5-73-5-7
2-3-6RARADRADRDRA12 ARARAARARARAF45.00
48.048.0
50.050AFRARAFAFRAAF<><>
14401440AFAAFAFAAFDRRAD
.55
DAFT33.933.9
17.57.5AFAFTAFAFT
11
TFFTFFTTFTFTFTFTTTTTTTTT
DAF
3-4-5
3-3-5
2-2-4
2-3-4
2-2-4
19-41-50/3"
540.6
70.0
75.0
80.0
85.0
90.0
94.8
26.5
25.8
29.3
28.4
19.8
13.8
105
SS18
SS19
SS20
SS21
SS22
SS23
9
8
6
7
6
91/9"
92.0
1400#
920
<>
1800#
1400#
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45BEngineer on Rig: L. MartinezDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360015.1Easting: 13461700.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 5.5 feet
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:9/8/2016 LOG OF TEST BORINGSB-16LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Stiff to soft LEAN CLAY,trace sand, trace gravel,gray (CL)
NOTE: Vane shear test at57 ft. terminated early dueto high force gaugereadings.
Hard to very stiff LEANCLAY, few sand, tracegravel, occasional finesand layers below 100 ft.,gray (CL)
NOTE: Field Engineerreported possible cobble at
DRSS2121
SS22SS22DRDRDDD8585
DDDRA2-3-42-3-
ADRRADRA66
7
ARARARADDDDDDRDRAF80.080.0AAFRAAF
00
<> FAAFAFAFT25.82
29.39.3FTA
TAFFT105
FTTFFTFTTFTFTTTTTTTTTTRA
T
DAF
23-45-50/3"
22-34-50/4"
41-50/3"
14-52-56
27-29-37
43-50-80/4"
32-77
523.1
513.6
510.9
509.1
99.8
104.8
109.3
115.0
120.0
124.8
129.5
13.9
13.7
10.5
8.8
SS24
SS25
SS26
SS27
SS28
SS29
SS30
95/9"
84/10"
50 +
108
66
130/10"
77+
109.5
119.0
121.7
123.5
9000+*
7000*
9000+*
9000*
9000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45BEngineer on Rig: L. MartinezDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360015.1Easting: 13461700.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 5.5 feet
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:9/8/2016 LOG OF TEST BORINGSB-16LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
>>
>>
>>
92 and 102 ft.
Hard to very stiff LEANCLAY, few sand, tracegravel, occasional finesand layers below 100 ft.,gray (CL)
NOTE: Field Engineerreported possible cobble at92 and 102 ft.
Extremely dense SILTYFINE SAND, trace gravel,gray, moist (SM)
Very dense FINE TOMEDIUM SAND with silt,trace gravel, dark gray,moist (SP/SM)Rock coring attempted,recovered granite cobbles
NOTE: Heaving pluggedcore barrelHard LEANCLAY/extremely denseCLAYEY SILT, few sand,trace gravel, occasionalsand seams, FieldEngineer reported cobblesat 130.5 and 131.5 ft., gray(CL/ML)
DRSS288 RDDRDD120DDDRA14-52-5614-52-56
27-29-3727-29-37RADRADRRA108
RARARARAF09.39.3
115.011AFRAFRAAF9000+*90
AFAFAAFDDDDDRRADD119.01 DD
AFTAFTFTAFTTFTFTFTTFTTFTFTFTTTTTTTTTTAF
107/3"
499.6498.8 133.8SS31 107 +
133.0
133.8
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 45BEngineer on Rig: L. MartinezDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360015.1Easting: 13461700.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 5.5 feet
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:9/8/2016 LOG OF TEST BORINGSB-16LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>Extremely weatheredSHALE, black
End of Boring at 133.8 ft.(Boring continued as RockCore)
D150150
55DDDDDDRARADRAFAFAFTFTFTTTT
DDDRT
RAT
DAF
631.6 0.8
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/11/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360029.4Easting: 13461698.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 632.4 ft
Remarks:
DATE COMPLETED:1/11/2017 LOG OF TEST BORINGSB-16ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
10 inches of PORTLANDCEMENT CONCRETE
Profile drilled
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
4-4-6-6
2-4-5-6
580.4
574.4
54.0
56.0
25.0
24.7
SS1
SS2
10
9
52.0
58.0
2200#
2400#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:1/11/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360029.4Easting: 13461698.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 632.4 ft
Remarks:
DATE COMPLETED:1/11/2017 LOG OF TEST BORINGSB-16ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 2TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
End of Boring at 58 ft.(Boring terminated at 58 ft.due to sand collapse)
SS1SS1
SS2DRDDRDD55DDDRA4-4-6-64-4-6-6
2-4-52DRDDRRRARAFAFDDDDDRRADDD
AFTFTFTTTTTTAF
13-10-8
3-4-4
3-4-5
4-5-8
4-4-6
5-7-9
4-4-7
4-7-8
631.8
626.6
624.1
604.1
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
18.6
13.2
13.8
15.5
14.8
SS1
SS2
SS3
SS4
SS5
NR6
SS7
SS8
18
8
9
13
10
16
11
15
0.8
6.0
8.5
28.5
8000*
4500*
3000*
3000*
3500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:1/13/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360008.6Easting: 13461702.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:1/19/2017 LOG OF TEST BORINGSB-16BLABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
10 inches of PORTLANDCEMENT CONCRETE
FILL - Medium dense toloose poorly graded finesand, trace silt, tracegravel, brown (SP)
Hard LEAN CLAY, tracesand, trace gravel,occasional sandy siltlayers, brown (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 20ft. due to sample falling outof sampler.
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
NR66
SS7SS7DRDRDD2020
DDDDDDRA5-7-95-7-
ADRRAD
1010
16
ARARARADRAF15.015.0AAFRA
0*0*
3000*30 FAAFAFAFT13.21
13.83.8FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
34
93
5-7-9
5-7-7
3-3-4
5-7-6
4-4-6-7
3-4-6-7
4-6-6-7
589.6
584.1
580.6
35.0
40.0
45.0
50.0
54.0
56.0
58.0
59.5
62.0
64.0
7
19
9.6
11.1
19.7
24.7
25.2
25.2
25.3
24.6
103
101
SS9
SS10
SS11
SS12
SS13
ST14
SS15
VS1
SS16
ST17
21
40
16
14
7
13
10
10
12
43.0
48.5
52.0
7000*
6000*
1000#
2400#
3300
1800#
4600
1600#
3460
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:1/13/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360008.6Easting: 13461702.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:1/19/2017 LOG OF TEST BORINGSB-16BLABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
Medium LEAN CLAY, tracesand, trace gravel, gray(CL)
Medium dense SILTYCLAYEY SAND with gravel,occasional silty fine sandlayers, gray, moist (SC-SM)
Very stiff to medium LEANCLAY, few sand, trace tofew gravel, gray (CL)
NOTE: Poor recovery onShelby tube SS21 at 74 ft.
DRSS13SS13
ST14
SS1SS1
RDRDDRD55DDDDDDDRA5-7-65-7-6
4-4-6-74-4-6-7RADRDRADR
13 ARARARRARAF45.00
50.050AFRAFRA
1000#100
AFAFAAFDRRADD
AFT19.719.7
AFFTA
TFFTTFTFTFTFTTTTTTTT
DAF
81
89
2-3-5-6
2-3-5-6
2-4-5-7
3-4-5-6
3-3-4-6
2-4-4-6
14-12-18-33539.6
538.6
66.0
67.5
70.0
72.0
74.0
76.0
77.5
80.0
82.0
83.5
86.0
88.0
90.0
91.5
94.0
19
16
25.9
26.5
26.1
24.7
27.6
29.3
30.5
23.6
14.1
SS18
VS2
SS19
SS20
ST21
ST22
VS3
ST23
SS24
VS4
SS25
ST26
SS27
VS5
SS28
39
37
8
8
9
9
7
8
3093.0
94.0
2000#
3730
1400#
1800#
<>
3000*
3480
1820
1400#
3850
1200#
<>
1600#
2670
9000+#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:1/13/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 360008.6Easting: 13461702.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:1/19/2017 LOG OF TEST BORINGSB-16BLABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, few sand, trace tofew gravel, gray (CL)
NOTE: Poor recovery onShelby tube SS21 at 74 ft.
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
End of Boring at 94 ft.
DRVS4VS4
SS25SS2
ST26
SS27SS27
RRDRDDDRDD8585
DDDDRA3-4-5-63-4-5-6
3-3-4-63-3-4
ARARADRDDRRA9
7
AARARAARRARAF77.55
80.080.0
82.082.0
83.583.5
FAFARARAAFRAF
000*000*
F3480348
1820
1400#
FFAFAAAFAFDDDDDRRADD
AFT24.7
2
FTFTAFAAFFTTFTFTFFFTFT39TFTFTFFFTT1919TTTT81TTTTTAF
4-3-3
3-4-7
3-6-9
3-6-8
5-5-7
4-7-9
3-5-5
3-5-7
632.3
630.5
626.8
624.3
611.8
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
18.0
17.1
14.2
11.6
17.0
13.1
14.2
125
126
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
6
11
15
14
12
16
10
12
0.5
2.3
6.0
8.5
21.0
4000*
9000+*
6500*
3000*
2500*
6200
4960
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. ValentineDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 7.5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359865.4Easting: 13461747.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 120 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-17LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
6 inches of PORTLANDCEMENT CONCRETEFILL - Loose poorly gradedfine sand with silt, tracegravel, occasional lean clayseams, brown withoccasional layers of black(SP-SM)Very stiff LEAN CLAY,trace sand, trace gravel,frequent fine sand partings,mottled brown and gray(CL)Hard LEAN CLAY/CLAYEYSILT, trace sand, tracegravel, brown (CL/ML)
Very stiff to stiff LEANCLAY, few sand, tracegravel, fine gravel layer atapproximately 14 ft., gray(CL)
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDRA4-7-94-7-
ADRRAD
1212
16
ARARARARAF15.015.0AAFRA
0*0*
3000*30 FAAFAFDDDDDRRADD
21.021.0
DDAFT14.214
11.61.6FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTTAF
67
2-6-4
1-2-2
2-3-2
2-3-2
1-3-4
2-4-4
582.8
35.0
40.0
45.0
50.0
53.0
54.5
60.0
65.0
13
11.9
28.5
15.5
15.6
19.8
24.9
23.0
111
103
SS9
SS10
SS11
SS12
ST13
VS1
SS14
SS15
29
10
4
5
5
7
8
50.0
3500*
2000*
2000*
<>
2720
4100
2560
2200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. ValentineDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 7.5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359865.4Easting: 13461747.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 120 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-17LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
Very stiff to stiff SANDYLEAN CLAY, trace gravel,gray (CL) DRST133
VS1S1 RDRDRD55DDDDDDDRA2-3-22-3-2
RADRDRARA5 ARARRARARARAF45.00
50.050AFRAFRARA
2000*200
<>AFAFAAFDRRADRAFT15.515.5
AFFTA
TFFTTFTFTFTFTTTTTTTT
DAF
98
2-3-3
1-4-4
2-3-4
1-3-4
6-12-18
6-12-12
562.8
547.8
538.3
70.0
75.0
78.0
80.0
85.0
88.0
89.5
91.0
95.0
29
25.0
27.6
28.6
31.7
15.8
105SS16
SS17
NR18
SS19
SS20
NR21
VS2
SS22
SS23
52
6
8
7
7
30
24
70.0
85.0
94.5
2350
1800#
1800#
1400#
3480
1000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. ValentineDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 7.5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359865.4Easting: 13461747.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 120 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-17LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff SANDYLEAN CLAY, trace gravel,gray (CL)
Medium FAT CLAY, tracesand, gray (CH)
NOTE: No recovery onShelby tube attempt at 78ft. due to sample falling outof sampler.
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 88ft. due to sample falling outof sampler.
Alternating layers of LEANCLAY and SILTY FINESAND, trace gravel,occasional clayey sand
DRSS2020
NR21
VS2S2
SSDRDDRDRDD8585
DDDDDDRA1-3-41-3-
ADRDRADRRA77
7
AARARARAD
.00
DRAF78.0
80.080.0AFAFAFRAAF
0#0#
1800#18 FAFAFAFAFAFT27.62
28.68.6FTAFA
TFTAFFTFTFTFTFFTFTFTFTFTFTTTTTTTTTT
DDDRT
RAT
DAF
12-21-29
41-48-40
25-22-26
11-17-26
24-27-21
66
28-42-50/5"
534.8
530.3
522.8
512.8
100.0
105.0
110.0
115.0
120.0
124.0
129.9
17.3 117SS24
SS25
SS26
SS27
SS28
SS29
SS30
50
88
48
43
48
66+
92/11"
98.0
102.5
110.0
120.0
10810
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. ValentineDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 7.5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359865.4Easting: 13461747.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 120 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-17LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
seams, gray (CL)(SM)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
Alternating layers of LEANCLAY, CLAYEY SAND andCLAYEY SILT, tracegravel, occasional finesand layers, gray, moist(CL)(SC)(ML)
Dense CLAYEY SILT, tracesand, gray, moist (ML)
Extremely dense CLAYEYSAND, trace gravel, traceshale pieces, gray, moist(SC)
DRSS288 RDDRDD120DDDDRA11-17-2611-17-26
24-27-2124-27-21RADRADRRA43 ARARARARAF110.00
115.011AFRAFRAAFAFAFAAF
DDDDRRADD120.0120 D
AFTAFFTAFTTFFTFTTFTFTFTFTTTTTTTTT
DAF
23-50/5"
50/1"
499.3
494.2
134.4
138.6
SS31
SS32
50 +
50 +
133.5
138.6
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. ValentineDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 7.5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359865.4Easting: 13461747.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 120 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-17LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Extremely dense CLAYEYSAND, trace gravel, traceshale pieces, gray, moist(SC)
Completely weatheredSHALE pieces, dark gray
End of Boring at 138.6 ft.(Boring continued as RockCore)
DRD150150
55DDDDDDDDRARARAFAFDRRADRAFTTTTTTTFTFTTTTTTTTTT
DAF
72
5-7-4
2-5-8
8-15-16
4-7-10
4-7-9
5-6-9
4-6-10
4-7-10
632.0631.8630.8
625.3
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
19
28.3
12.9
12.4
15.0
24.3
119
SS1
SS2
SS3
SS4
SS5
NR6
SS7
NR8
34
11
13
31
17
16
15
16
17
0.81.0
2.0
7.5
8500*
9000*
3000*
5000*
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359848.7Easting: 13461750.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:9/6/2016 LOG OF TEST BORINGSB-17ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
9 inches of PORTLANDCEMENT CONCRETEField Engineer reported 3inches of sand and gravelFILL (Base Material)FILL - Poorly graded finesand, trace silt, tracegravel, brown, moist (SP)Hard LEAN CLAY, tracesand, trace gravel, brown(CL)
Stiff to very stiff LEANCLAY with sand, tracegravel, occasional finesand layers below 30 ft.,gray (CL)
NOTE: No recovery onSPT sample attempts at 20and 30 ft. due to samplefalling out of sampler. DRNR66
SS7SS7DRDRDD2020
DDDDDDRA5-6-95-6-
ADRRAD
1616
15
ARARARADRAF15.015.0AAFRA
0*0*
5000*50 FAAFAFDDDRRAD
AFT12.412
15.05.0FTA
TAF111
TFTTFTFTTTFTFTTTTTTTTTTTAF
2020
92
16-24-29
7-19-17
2-3-3
1-2-4
1-5-4
2-3-5
597.8
582.8
35.0
40.0
45.0
46.5
50.0
55.0
56.5
60.0
65.5 18
11.7
10.5
17.0
19.0
24.5
26.4
25.2
102
100
SS9
SS10
SS11
VS1
SS12
NR13
SS14
SS15
ST16 38
53
36
6
6
9
8
35.0
50.0
6000*
3500*
2000*
<>
2000#
1800
2500
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359848.7Easting: 13461750.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:9/6/2016 LOG OF TEST BORINGSB-17ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Stiff LEAN CLAY, tracesand, trace gravel,occasional fine sand layers,gray (CL)
NOTE: Vane shear test at46.5 ft. terminated earlydue to possible cobble.
Stiff to medium LEANCLAY, trace to few sand,trace gravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 55ft. due to sample falling outof sampler.
NR1313
SS144
RDDDRDRA1-2-41-2-4 ARADRADR
6 AARARARRAD55DDDDDDDRDRAF45.00
46.5
50.050AFAFRAFRA
2000*200
<>AFAFAFAAFAFT17.017.0
AFAFFTAFTTFFFTFTTFTFTTTTTTFTFTTT
RAT
DAF
2-4-5565.8
67.0 26.8SS17 967.0
2000#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 750XEngineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 5 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:9/6/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359848.7Easting: 13461750.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:9/6/2016 LOG OF TEST BORINGSB-17ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
End of Boring at 67 ft.
DRD8585
DDDDDDRARADRAFAFAFTFTFTTTT
DDDRT
RAT
DAF
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: C. Shroeder/S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359833.7Easting: 13461754.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/14/2016 LOG OF TEST BORINGSB-17BLABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 53 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
79
579.8
55.0 1519.2 117ST1 31
53.0
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: C. Shroeder/S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359833.7Easting: 13461754.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/14/2016 LOG OF TEST BORINGSB-17BLABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 53 ft.
Stiff to very stiff LEANCLAY with sand, tracegravel, gray (CL)
DRST11DDRD55DDDDDDRADDRRRARAFAFDDRRAD
53.053.0
DDAFTFTFTTTTTTAF
98
19-34-50
554.8
540.8
537.3
75.0
76.5
80.0
81.5
94.0
95.5
21
25.9
28.1
14.7
16.3
99
98
124
ST2
VS1
ST3
VS2
ST4
SS5
40
53
78.0
92.0
95.5
4140
4720
3650
4100
22720
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: C. Shroeder/S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359833.7Easting: 13461754.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 632.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/14/2016 LOG OF TEST BORINGSB-17BLABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Stiff to very stiff LEANCLAY with sand, tracegravel, gray (CL)
Stiff to very stiff LEANCLAY, trace sand, gray(CL)
Very hard to hard LEANCLAY, trace sand, tracegravel, gray (CL)
End of Boring at 95.5 ft.
DRD8585
DDDRAARARAAARAARADDDDDDRDRAF55
80.080.0
81.581.5FARAAFAF4720472
3650
4100FFAAAFAFAFT25.925.9
28.128.1FTFTA
TAFFT99
98FTFTTFFTFTFTTFFTFTTTTTTTTTTTRA
T
DAF
10-6-5
3-4-5
5-6-9
4-8-8
4-4-6
5-5-7
4-7-7
6-7-8
632.6632.3
631.0
625.8
620.8
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
27.9
22.9
19.0
12.1
15.0
14.9
15.7
124
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
11
9
15
16
10
12
14
15
0.71.0
2.3
7.5
12.5
5500*
8500*
6000*
3500*
4500*
4150
3500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: C. KennedyDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359622.4Easting: 13461819.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-18LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of PORTLANDCEMENT CONCRETEField Engineer reported 4inches of gravel FILL (BaseMaterial)FILL - Medium densepoorly graded fine sand,trace silt, trace gravel, traceasphalt debris, occasionallean clay layers, brown,moist (SP)Very stiff to hard LEANCLAY, trace sand, tracegravel, occasional siltpartings, mottled brownand gray (CL)Very stiff LEAN CLAY,trace sand, trace gravel,occasional fine sandpartings and silt partings,brown (CL)
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL) DRSS66
SS7SS7DRDRDD2020
DDDDDDRA5-5-75-5-
ADRRAD
1010
12
ARARARADRAF15.015.0AAFRA
0*0*
3500*35 FAAFAFAFT19.01
12.12.1FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
7-8-11
4-5-7
2-4-5
4-4-4
4-5-6
2-3-3
4-4-5
592.3
35.0
40.0
45.0
49.0
50.5
52.0
55.0
60.0
64.0
65.5
13.3
10.3
23.7
16.0
18.7
24.0
23.9
24.7
122
107
SS9
SS10
SS11
ST12
SS13
VS1
SS14
SS15
NR16
SS17
19
12
9
8
11
6
9
41.0
4500*
5000*
2200#
2170
<>
2250
2400#
2400#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: C. KennedyDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359622.4Easting: 13461819.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-18LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
NOTE: Vane shear test at52 ft. terminated early dueto high force gaugereadings. No recovery onShelby tube attempt at 64ft. due to sample falling outof sampler.
1313
VS1VS1
SS144 RDRDDRD55DDDDDDDRA4-4-4
4-5-6RARADRD
ADR
8 ARARARARARAF45.00
49.09.0
50.550.
5252AF
RARAFAF2200#220
217070
<AFAFAFAFDRRADRAFT23.723.7
1616AFFTAFTFFTFTFTFTFTFTTTTTTTT
DAF
nn
4-5-6
4-5-6
7-7-9
3-5-6
3-5-3
34-43-46
567.8
563.3
554.3
552.8
541.3
536.3
67.0
70.0
75.0
79.0
80.5
82.0
85.0
90.0
95.0
25.8
22.2
25.8
25.3
27.6
104
100
VS2
SS18
SS19
ST20
SS21
VS3
SS22
SS23
SS24
11
11
16
11
8
89
65.5
70.0
79.0
80.5
92.0
97.0
4720
1150
4000*
4290
<>
3420
2000#
1800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: C. KennedyDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359622.4Easting: 13461819.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-18LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Alternating seams ofSANDY LEAN CLAY andSILTY FINE SAND, gray(CL)(SM)
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Extremely dense CLAYEYSAND, trace gravel, gray(SC)
DRSS2222
SS23SS23
RDRDRDDRA9
3-5-63-5-
ARARADRRAD
1616
11
ARARARRARAD
8585
DDDDDDDDRDRAF79.0
80.55
82.082.0AFRARAAFRA
0*0*
429090
<><>
3420
FAFAAAFAFRA
DAFT22.222
25.825FTAFA
TAFTFT
100FTFTFTFTFTTFTFTFTTTTTTTTTTTAF
22-46-46
14-32-39
7-11-14
22-30-54
26-36-38
41-56-50/4"
39-46-50/3"
524.8
522.3
517.3
507.3
100.0
105.0
110.0
115.0
120.0
124.8
129.8
10.9
13.2
11.7
12.6
9.8
SS25
SS26
SS27
SS28
SS29
SS30
SS31
92
71
25
84
74
106/10"
96/9"
108.5
111.0
116.0
126.0
9000+*
9000+*
3000*
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: C. KennedyDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359622.4Easting: 13461819.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-18LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
>>
>>
Hard LEAN CLAY, fewsand, trace gravel,occasional silty fine sandpockets, gray (CL)
Stiff LEAN CLAY with sand,trace gravel, gray (CL)
Hard LEAN CLAY, tracesand, trace gravel,occasional silt partings,gray (CL)
Very dense to extremelydense CLAYEY SILT, tracesand, trace gravel, drillerreported possible gravellayer 125-126 ft., gray (CL)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
DRSS299 RDDRDD120DDDDRA22-30-5422-30-54
26-36-3826-36-38RADRADRRA84 ARARARARAF110.00
115.011AFRAFRAAF3000*300
9000AFAFAAFDDDDRRADRAFT11.711.7
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTT
DAF
12-20-26
74/2"
495.3494.6
135.0
138.7
24.8SS32
SS33
46
74 +
138.0
138.7
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: C. KennedyDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:8/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359622.4Easting: 13461819.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:8/18/2016 LOG OF TEST BORINGSB-18LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
SHALE pieces, dark gray
End of Boring at 138.7 ft.(Boring continued as RockCore)
DRD150150
55DDDDDDDDRARARAFAFDRRADRAFTTTTTTTFTFTTTTTTTTTT
DAF
632.6632.3
0.71.0
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: C. SchroederDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359642.2Easting: 13461812.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 91 ft.
DATE COMPLETED:1/9/2017 LOG OF TEST BORINGSB-18ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of PORTLANDCEMENT CONCRETEField Engineer reported 4inches of sand and gravelFILL (Base Material)
Profile drilled to 52 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
96
3-3-4-5
2-3-4-5
581.3
53.5
56.0
57.5
60.0
62.0
64.0
65.5
21
26.0
14.5
24.8
24.2
24.3
105
102
DP1
ST2
VS1
SS3
SS4
ST5
VS2
40
7
7
52.0
<>
1470
3480
2500*
2500*
3710
3170
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: C. SchroederDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359642.2Easting: 13461812.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 91 ft.
DATE COMPLETED:1/9/2017 LOG OF TEST BORINGSB-18ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 52 ft.
Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 54ft. due to sample falling outof sampler; direct pushedat 53.4 ft. to retrievesample. Poor samplerecovery on STP sampleSS7 at 70 ft.
DRDP1DP1
ST2
VS1VS1DRDDDRDRD55DDDDDDDRADRDDRDRRRARAFAFDRRADD
AFTFTFTTTTTT
DAF
98
99
2-2-4-5
7-8-11-12
2-2-5-5
1-3-4-5
2-2-3-5
3-20-50/5"
35-50/2"
557.3
547.3
542.3
540.6
68.0
70.0
72.0
74.0
75.5
78.0
80.0
81.5
84.0
86.0
88.0
89.5
91.4
92.7
22
25
24.9
37.9
25.6
25.0
26.4
21.9
28.9
33.3
30.1
34.6
86
107
93
SS6
SS7
SS8
ST9
VS3
SS10
ST11
VS4
SS12
DP13
ST14
VS5
SS15
SS16
42
46
6
19
7
7
5
70/11"
50 +
76.0
86.0
91.0
92.7
2000*
<>
2000*
3100
3290
1800#
3940
3790
1400#
600#
2140
3790
1200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: C. SchroederDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359642.2Easting: 13461812.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 91 ft.
DATE COMPLETED:1/9/2017 LOG OF TEST BORINGSB-18ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 54ft. due to sample falling outof sampler; direct pushedat 53.4 ft. to retrievesample. Poor samplerecovery on STP sampleSS7 at 70 ft.
Stiff to soft LEAN CLAY,trace sand, trace gravel,gray (CL)
NOTE: No recovery onShelby tube attempt at 86ft. due to sample falling outof sampler; direct pushedto 86 ft. to retrieve sample.
Stiff to medium LEANCLAY, trace sand, gray(CL)
Extremely dense SILTYFINE SAND, trace gravel,gray, moist (SM)
End of Boring at 92.7 ft.(Terminated due to SPTsampler refusal)
DRSS12SS12
DP13DP
ST14
VS5S5DRDRDDRDDD8585
DDDRA2-2-3-53-5 ARADRDRDRARA5 AARARRARADDDDDDRDD
86.086.0
DRAF78.0
80.080.0
81.581.5
84.084.0AFARARF
RAAF290290
1800#1800#
3940
3790FFAFAAFAAFAFT.0.0
26.426.4
21.921.9FTFTAFAFTFT8686
107
TFTFTFFTFTTFTFTFFTFTFTTTTTTTTTTTTRA
T
DAF
69
22-19-17
7-8-8
6-8-10
6-8-10
6-6-7
5-7-9
5-6-9
6-9-12
4-6-8
632.2
628.5
626.0
623.5
604.0
2.5
5.0
7.5
10.0
15.0
20.0
25.0
27.5
30.0 15
27.6
14.4
14.5
15.5
16.4
14.9 120
SS1
SS2
SS3
SS4
SS5
SS6
NR7
SS8
SS9 30
36
16
18
18
13
16
15
21
14
0.3
4.0
6.5
9.0
28.5
7000*
9000+*
8000*
8500*
6500*
6500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/8/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359374.6Easting: 13461895.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/8/2015 LOG OF TEST BORINGTB-04LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
4 inches of SANDYTOPSOIL, brownish blackFILL - Mixed dense poorlygraded fine sand andtopsoil, with silt, tracegravel, trace glass debris,dark brown, moistVery stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Medium dense SANDYSILT, occasional clayseams, brown, moist (ML)
Hard to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 25ft. due to sample falling outof sampler. DRSS66
NR7NR7DRDRDD2020
DDDDDDRA5-7-95-7-
ADRRAD
1313
16
ARARARADRAF15.015.0AAFRA
+*+*
8000*80 FAAFAFAFT14.414
14.54.5FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
69
92
76
92
5-7-10
7-10-14
5-8-9
5-6-8
5-7-8
4-6-9
5-7-8
589.5
585.5
570.5
35.0
37.0
38.5
40.0
45.0
46.5
50.0
54.5
60.0
62.0
63.5
65.0
10
21
13
22
14.2
14.6
17.0
23.8
15.8
17.0
16.8
24.1
24.8
25.4
124
102
109
101
105
SS10
ST11
VS1
SS12
ST13
SS14
SS15
SS16
SS17
ST18
VS2
SS19
25
43
31
43
17
24
17
14
15
15
15
43.0
47.0
62.0
6000*
6620
6500*
3010
2000*
5000*
3500*
2500*
2790
4910
2200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/8/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359374.6Easting: 13461895.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/8/2015 LOG OF TEST BORINGTB-04LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff SANDY LEANCLAY, trace gravel, gray(CL)
NOTE: Vane shear test at38.5 ft. terminated earlydue to high force gaugereadings.
Stiff LEAN CLAY, few sand,trace gravel, gray (CL)
Very stiff to stiff LEANCLAY with sand, tracegravel, gray (CL) DRSS1616 RDDRD55DDDDDDDRA5-6-85-6-8
5-7-87-8
ARADRADR
1717
14 AARARARRARAF45.0.0
46.5
50.050AFAFRARA
301030
2000*0*
5000AFAFAFAAFDRRADRAFT23.823.8
15.815
AFAFFTA
102 TFFFT43TTFFTFTFTTT21TTTTTT
DAF
4-5-6
3-5-6
6-7-8552.5
70.0
75.0
80.0
25.8
25.4
25.5
SS20
SS21
SS22
11
11
1580.0
2200#
2000#
2400#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/8/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359374.6Easting: 13461895.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/8/2015 LOG OF TEST BORINGTB-04LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Poor recovery onSPT sample SS22 at 80 ft.
End of Boring at 80 ft.
DRAA1515 AARAD
8585
DDDDDDDDRDRAF80.080.0AAF0#0#
2400#24 FAAFAFRA
DAFT25.42
25.55.5FTA
TAFFTFTTFFTFTTFTFTTTTTTTTTTAF
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359412.2Easting: 13461874.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 633.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 90 ft.
DATE COMPLETED:10/13/2016 LOG OF TEST BORINGTB-04ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 56 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
91
577.0
58.0
59.5
1823.9 101ST1
VS1
37
56.0
3470
3850
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359412.2Easting: 13461874.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 633.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 90 ft.
DATE COMPLETED:10/13/2016 LOG OF TEST BORINGTB-04ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 56 ft.
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
DRST1ST1DD55DDRADRADDDDDDRD56.056.0 DRAFAFAFTFTFTTTTTRA
T
DAF
88
99
82
53
2-4-5
2-3-4
30-32-50/2"
552.5
546.0
543.0
536.5
68.0
69.5
73.0
74.5
79.0
80.5
85.0
87.0
90.0
94.7
16
16
25.9
25.9
25.9
28.2
26.3
27.3
8.5
102
101
103
99
ST2
VS2
ST3
VS3
ST4
VS4
SS5
ST6
SS7
SS8
36
35
9
7
82/8"
80.5
87.0
90.0
96.5
2780
3920
2310
4850
2110
4480
1800#
4760
1200#
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359412.2Easting: 13461874.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 633.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 90 ft.
DATE COMPLETED:10/13/2016 LOG OF TEST BORINGTB-04ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
Medium to very stiff LEANCLAY, trace sand, tracegravel, occasional clayeyfine to medium sand layersabove 85 ft., gray (CL)
Medium LEAN CLAY withsand, trace gravel,occasional clayey fine tomedium sand layers above85 ft., gray (CL)
Hard SANDY LEAN CLAY,trace gravel, gray (CL)
NOTE: Driller reportedcobbles 96-96.5 ft.
SS55
ST6ST6
SS7SS7DRDDRDDD8585
DDDDRA2-4-52-4-
ARADRDRAD
9
ARARRARARAF79.0
80.55AFRAAFRA
211010
44804480 FAFAAFAFDDDDDRRADD87.0 DD
AFT25.925
TFTAFAAFT
0101
103
TFTFFTFTFT3
TFTTFTFTTTTTTTTTTTAF
24-36-36
16-24-33
12-18-27
9-14-20518.0
100.0
105.0
110.0
115.0
14.5
14.8
15.3
17.2
SS9
SS10
SS11
SS12
72
57
45
34115.0
9000+*
9000+*
9000+*
7500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/11/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359412.2Easting: 13461874.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 633.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 90 ft.
DATE COMPLETED:10/13/2016 LOG OF TEST BORINGTB-04ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Hard to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
End of Boring at 115 ft.
DRRDD120DDDRA9-14-209-14-20
RARARA34 ARARARARAF110.00
115.011AFRAFRAA7500AF9000+*9000 FAFAFAAF
DDDDDRRADD
AFT15.315.3
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTTAF
99
7-4-3
4-4-6
2-4-5
4-4-6
5-7-9
5-5-10
4-5-6
630.6
628.1
624.1
621.6
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
11
29.7
28.8
18.6
14.0
15.1
15.3
15.0
119
124
SS1
SS2
SS3
SS4
ST5
SS6
SS7
SS8
28
7
10
9
10
16
15
11
1.0
3.5
7.5
10.0
5000*
3000*
5000*
7160
4000*
3500*
2500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359097.8Easting: 13462338.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 128.5 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-116LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
12 inches of ASPHALTICCEMENT CONCRETEFILL - Loose poorly-gradedfine to medium sand withsilt, trace coarse sand,trace gravel, brown, moist(SP-SM)Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff LEAN CLAY,trace sand, gray (CL)
Very stiff to medium LEANCLAY with sand, tracegravel, gray (CL)
NOTE: Vane shear test at36.5 ft. terminated earlydue to possible cobble. DRSS66
SS7SS7DRDRDDD2020
DDDRA5-7-95-7-
ADRRAD
16
ARARARADDDDDDRDRAF15.015.0AAFRA
0*0*
7160 FAAFAFAFT18.618
14.014.0FTA
TAFFT119
124
TFTTFFT288TFTTTFFTFTT99TT111TTTTTTRA
T
DAF
atat
73
89
5-8-8
3-6-5
5-5-6
591.6
35.0
36.5
40.0
45.0
50.0
55.0
56.5
60.0
65.0
12
26
18.3
15.9
15.8
24.2
28.9
24.8
25.0
118
117
99
102
ST9
VS1
SS10
ST11
SS12
ST13
VS2
SS15
ST16
28
45
16
11
11
40.0
1730
2000*
1070
2200#
500*
4910
2000*
5260
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359097.8Easting: 13462338.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 128.5 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-116LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY with sand, tracegravel, gray (CL)
NOTE: Vane shear test at36.5 ft. terminated earlydue to possible cobble.
Very stiff to medium LEANCLAY, trace to few sand,trace gravel, gray (CL)
NOTE: Driller reportedpossible cobble at 76 ft.and 92 ft.
3-6-53-6-5
RADRADRST133
VS22
RDDDR11 ARARARRA
D55DDDDDDDRDRAF45.0.0
50.050AFRARA
107010
2200AFAFAAFAFTTTT15.815.8
AFFTA
117 TFFTTFTFTTFTFTTTRA
T
DAF
95
57
4-5-6
3-5-5
70
545.6
539.6
537.6
66.5
70.0
74.0
75.5
80.0
84.0
85.5
88.0
89.5
91.5
93.0
19
10
25.1
25.0
27.5
26.1
27.2
11.7
100
100
100
VS3
SS17
ST18
VS4
SS19
ST20
VS5
ST21
VS6
ST22
SS23
38
21
11
10
70+
86.0
92.0
94.0
6090
2000*
2000*
5400
1600#
4930
5280
4670
4970
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359097.8Easting: 13462338.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 128.5 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-116LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Very stiff to medium LEANCLAY, trace to few sand,trace gravel, gray (CL)
NOTE: Driller reportedpossible cobble at 76 ft.and 92 ft.
Very stiff SANDY LEANCLAY, few gravel, gray(CL)
NOTE: Driller reportedpossible cobble at 92 ft.
Extremely dense CLAYEYFINE SAND with silt, tracegravel, gray, moist (SC)
Hard SANDY LEAN CLAY,few gravel, gray (CL)
DRST20ST20
VS5V
ST21
VS6S6DRDRDDRDRDD8585
DDDDDDDRAADRDRDRADR
1010 ARRARARARAF80.080.0
84.084.0ARAFRAAF
400400
1600#16 FFAAFAAFDDRRADD
86.086.0
DDAFT.0.0
27.57.5FTFTAAFFT100100
FTFTTFFT3838
FTFTTFTFTT19TTTT9TTTTTTAF
64
89
96
62
19-33-44
15-19-26
12-21-25
7-9-12
6-10-10
31-30-36
50-50/4"
529.6
526.6
510.1
503.1
100.0
105.0
110.0
115.0
120.0
125.0
129.3
10
15
22
10
12.4
14.8
17.3
22.1
20.7
10.8
117
SS24
SS25
SS26
SS27
SS28
SS29
SS30
24
33
42
24
77
45
46
21
20
66
50 +
102.0
105.0
121.5
128.5
9000+*
9000+*
6500
3500*
3000*
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359097.8Easting: 13462338.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 128.5 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-116LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Hard SANDY LEAN CLAY,few gravel, gray (CL)
Hard LEAN CLAY, fewsand, gray (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, occasional siltpartings below 115 ft., gray(CL)
Very dense SILTY FINESAND, few gravel, gray,moist (SM)
NOTE: Driller reportedpossible cobble at 123.5 ft.
SANDY LEAN CLAY, tracegravel, moist (CL)
DRSS288 RDDRD120DDDDDDRA7-9-127-9-12
6-10-106-10-10RADRADR
21 ARARARARAF110.00
115.011AFRAFRA
6500650
3500AFAFAAFDDRRAD55 D
AFT17.317.3
AFFTA
117 TFFT333
TFTFTFTFTT1
TTTTTTAF
106/3"498.1497.8 133.8SS31 106 +
133.5133.8
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/3/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 359097.8Easting: 13462338.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 128.5 ft.
DATE COMPLETED:10/6/2016 LOG OF TEST BORINGTB-116LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
SANDY LEAN CLAY, tracegravel, moist (CL)
Completely weatheredSHALE, dark gray
End of Boring at 133.8 ft.(Terminated upon SPTsample refusal on possiblebedrock)
DRD150150
55DDDDDDRARADRAFAFAFTFTFTTTT
DDDRT
RAT
DAF
5-5-4-1
3-5-9-6
3-4-6-5
3-5-6-8
2-5-7-7
5-7-9-11
4-6-8-8
7-12-12-12
660.8
659.0
651.3
631.3
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
13.5
10.3
12.3
11.8
18.9
15.6
13.5
10.6
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
9
14
10
11
12
16
14
24
0.5
2.3
10.0
30.0
3000*
7000*
9000*
9000*
6500*
7500*
5500*
8000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:3/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 358433.9Easting: 13462410.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 661.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 122 ft.
DATE COMPLETED:3/21/2017 LOG OF TEST BORINGTB-115LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
6.5 inches of PORTLANDCEMENT CONCRETEFILL - Loose poorly gradedfine to coarse sand with silt,few gravel, brown, moist(SP-SM)
Stiff to hard LEAN CLAY,trace sand, trace gravel,occasional fine sandseams below 5 ft., gray(CL)
Very stiff to hard LEANCLAY, trace sand, tracegravel, occasional siltseams above 20 ft., gray(CL)
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
DRSS6S6
SS7SS7DRDRDD2020
DDDDDDRA5-7-9-115-7-9-1
ADRRAD
1212
1616ARARARA
DRAF15.015.0
22AAF
RA6500* FAAFAFAFT11.811.8
18.918.9FTA
TAFTFTTFTFTTFFTFTTTTTTTTT
DDDRT
RAT
DAF
62
2-3-3-6
4-4-6-7
3-6-8-11
7-10-10-10
3-3-6-8
3-5-7-10
5-6-8-11
618.3
606.3
35.0
40.0
45.0
50.0
55.0
60.0
65.0
11
21.2
19.9
12.8
13.2
15.5
16.3
SS9
SS10
SS11
NR12
SS13
SS14
SS15
24
6
10
14
20
9
12
14
43.0
55.0
3000*
2500*
4500*
4000*
3500*
2000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:3/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 358433.9Easting: 13462410.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 661.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 122 ft.
DATE COMPLETED:3/21/2017 LOG OF TEST BORINGTB-115LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
Very stiff SANDY LEANCLAY, trace gravel, gray(CL)
NOTE: No recovery onSPT sample attempt at 50ft. due to sample falling outof sampler.
Very stiff to medium LEANCLAY, few sand, tracegravel, gray (CL)
SS133 RDDRDD55DDDRA7-10-10-107-10-10-10
3-3-6-8-8RADRADRRA20 ARARARRARAF45.0.0
50.050AFRARAAF4500*45
AFAFAAFDDDDDRRADD55.055 DD
AFT12.812.8
AFFTAFTTFFTFT24TFFTFTFTT11TTTTTTTTAF
94
94
11-12-8-10
9-4-7-9
2-4-6-7
2-4-7-7
2-5-6-6
2-4-5-7
3-4-4-7
4-5-6-3
70.0
75.0
80.0
81.5
84.0
86.0
88.0
90.0
92.0
93.5
96.0
98.0
21
22
16.5
12.9
24.0
26.0
25.9
26.6
26.0
24.6
25.4
24.9
103
102
SS16
SS17
ST18
VS1
SS19
SS20
SS21
SS22
ST23
VS2
SS24
SS25
42
42
20
11
10
11
11
9
8
11
2000*
3500*
5210
3420
1800#
2500*
2000*
2000*
4850
3920
2000*
2000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:3/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 358433.9Easting: 13462410.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 661.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 122 ft.
DATE COMPLETED:3/21/2017 LOG OF TEST BORINGTB-115LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, few sand, tracegravel, gray (CL)
DRSS19SS19
SS20SS2
SS21
SS22SS22DRDRDDRDD8585
DDDRA2-4-6-76-7
2-4-7-72-4-7
2-5-6-62
ARADRDRDRA10
11
ARARARARADDDDDDRDRAF80.080.0
81.581.5
84.084.0ARARAFRA5210
3420FAAAFAAFAFT12.912.9
24.024.0FTA
TAFFT
103FTTFFTFTTFFTFTTTTTTTTTRA
T
DAF
87
3-5-7-7
3-4-7-8
2-5-5-6
2-4-4-7
2-3-5-6
1-3-9-19
30-33-48-60
15-30-48-67
559.3
539.8
538.3
100.0
102.0
103.5
106.0
108.0
110.0
111.5
114.0
116.0
117.5
120.0
122.0
125.0
130.0
10
22.1
20.9
25.6
28.7
37.6
25.6
21.0
26.6
11.9
14.5
112
101
SS26
ST27
VS3
SS28
NR29
SS30
VS4
SS31
ST32
VS5
SS33
SS34
SS35
SS36
27
12
11
10
8
8
12
81
78
102.0
121.5
123.0
1400#
2190
4720
1600#
1200#
4910
2000#
1970
3420
1200#
1600#
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:3/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 358433.9Easting: 13462410.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 661.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 122 ft.
DATE COMPLETED:3/21/2017 LOG OF TEST BORINGTB-115LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Very stiff to medium LEANCLAY, few sand, tracegravel, gray (CL)
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 108ft. due to sample falling outof sampler.
SANDY LEANCLAY/CLAYEY FINESAND, gray (CL)/(SC)
Hard to very stiff SILTYCLAY, trace sand, tracegravel, occasional finesand partings above 125ft., gray (CL)
DRT32T32
VS55
SS3333
SS3434
RDRDDDRDD120DDDDDDDRA4-4-7
2-3-5-6-6
1
ARARADRD
ADRRA88 AARARARARRARAF10.00.0
111.5
114.04.0
116.0116.AFAFRARAAFAF49100
AF1200#120 F2000#2000#
1
FAFAFAAFAFDRRAD55
AFT28.728.7
3737
TFTAFAFAFFTTFTFFTFFTTTFTFTFTFTTTTTTTTTTTT
DAF
12-25-37-42
6-9-13-16521.3
135.0
140.0
20.0
15.9
SS37
SS38
62
22140.0
9000+*
4500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: M. WajedDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:3/6/2017
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 358433.9Easting: 13462410.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 661.3 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 122 ft.
DATE COMPLETED:3/21/2017 LOG OF TEST BORINGTB-115LABORATORY DATA
DRAFT
7/28/17
PAGE 5 of 5TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
130
135
140
145
150
155
160
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>Hard to very stiff SILTYCLAY, trace sand, tracegravel, occasional finesand partings above 125ft., gray (CL)
End of Boring at 140 ft.
DRD150150
55DDDDDDDDRARARAFFAFDRRADRAFT15.915.9
FTTFTTFTTFTFTTTTTTTTTT
DAF
66
6-6-7
3-4-5
3-4-5
5-5-7
3-6-8
4-4-5
3-6-8
4-4-5
632.3632.1
629.6
608.1
603.1
3.0
5.0
7.5
10.0
15.0
20.0
25.0
30.0 13
26.0
16.3
14.2
12.7
14.5
12.8
12.6
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8 28
13
9
9
12
14
9
14
9
0.81.0
3.5
25.0
30.0
4000*
6000*
7500*
5000*
5000*
5000*
6000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/31/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 357735.1Easting: 13462416.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Direct pushed 24 in. toretrieve sample at vane shear locations.
DATE COMPLETED:11/2/2016 LOG OF TEST BORINGTB-114LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
10 inches of ASPHALTICCEMENT CONCRETEField Engineer reported 2inches of gravel FILL (BaseMaterial)FILL - Medium densepoorly graded fine sandwith silt, trace gravel,brown, moist (SP-SM)
Very stiff LEAN CLAY, fewsand, trace gravel, gray(CL)
Very stiff SANDY LEANCLAY, trace gravel, gray(CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA4-4-54-4-
ADRRAD
1414
9
ARARARADRAF15.015.0AAFRA
0*0*
5000*50 FAAFAFAFT14.214
12.72.7FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
92
4-6-10
6-7-7
6-4-6
569.6
35.0
40.0
45.0
52.0
53.5
54.0
62.0
63.5
64.0
17
19.0
13.2
12.4
20.4
24.7
24.2
22.7
109
103
SS9
SS10
SS11
ST12
VS1
DP13
ST14
VS2
DP15
36
16
14
10
63.5
4500*
4500*
4500*
4550
4600
<>
3270
4600
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/31/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 357735.1Easting: 13462416.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Direct pushed 24 in. toretrieve sample at vane shear locations.
DATE COMPLETED:11/2/2016 LOG OF TEST BORINGTB-114LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, few sand, tracegravel, silty fine sand layerat approximately 39 ft.,gray (CL)
DRST12ST12
VS1VS1
DP13P13DRDRDRRDD55DDDDDDDRADRDRDRRARAARRARARAF45.00
52.52.AFFRAAF4500*450
AFFAAFDRRADRAFT12.412.4
AFFTFTTFFTFTTFTFTFTFTTTTTTTTT
DAF
94
48
2-4-5-7
3-3-5-6
4-4-5-6
2-4-4-6
3-4-6-8
3-6-10-10
2-3-3-6
4-8-21-36
16-17-29-34
13-22-28
563.1
545.1
542.1
66.0
68.0
70.0
72.0
73.5
74.0
76.0
78.0
80.0
81.5
82.0
84.0
86.0
88.0
90.0
92.0
95.0
19
24.7
25.7
25.9
24.2
26.0
26.6
25.9
26.4
24.4
10.9
15.9
26.5
7.3
13.3
13.5
102
102
93
SS16
SS17
SS18
ST19
VS3
DP20
SS21
SS22
ST23
VS4
DP24
SS25
SS26
ST27
SS28
SS29
SS30
39
9
8
9
8
10
16
6
29
46
50
70.0
88.0
91.0
2500*
2000*
1800#
3020
4290
<>
2000#
2200#
3400
<>
3500*
1600#
780
9000*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/31/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 357735.1Easting: 13462416.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Direct pushed 24 in. toretrieve sample at vane shear locations.
DATE COMPLETED:11/2/2016 LOG OF TEST BORINGTB-114LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff to soft LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Vane shear test at81.5 ft. terminated earlydue to high force gaugereading.
Medium dense to denseSILTY FINE SAND, fewgravel, gray, moist (SM)
Hard to very stiff LEANCLAY, trace sand, tracegravel, silty fine sand andsilty medium sand layersabove 92 ft., gray (CL)
SS25SS25
SS26SS
ST27
SS28SS28
RDRDRDDDD8585
DDRA3-6-10-100-10
2-3-3-62-3-3
ARARADRDRDR6RA16RAAARARARRADDDDDDDRD88.088.0 DRAF78.0
80.080.0
81.581.5
82.082
84.084.0
FAFARARARAF000#000#
2200#2200#
3400
<>
FFAFAAAAFRA
DAFT26.026.0
26.6
25.925.9
26.426.4
TFTFTAFAFT
102
TTFTFTFFT3939
TTFTFTFFTFTTTTTTTTTTTTTAF
11-18-25
11-16-25
5-10-15
7-11-15518.1
100.0
105.0
110.0
115.0
14.1
15.0
13.5
14.4
SS31
SS32
SS33
SS34
43
41
25
26115.0
9000+*
9000+*
8500*
5000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/31/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 357735.1Easting: 13462416.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Direct pushed 24 in. toretrieve sample at vane shear locations.
DATE COMPLETED:11/2/2016 LOG OF TEST BORINGTB-114LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Hard to very stiff LEANCLAY, trace sand, tracegravel, silty fine sand andsilty medium sand layersabove 92 ft., gray (CL)
End of Boring at 115 ft.
DRRDD120DDDRA7-11-157-11-15
RARARA26 ARARARARAF110.00
115.011AFRAFRAA5000AF8500*850 FAFAFAAF
DDDDDRRADD
AFT13.513.5
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTTAF
7
8-11-14
6-10-11
9-12-13
7-12-11
6-8-7
3-1-1
3-5-6
4-5-7
633.5632.8632.7
610.2
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
8.1
14.8
14.8
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
25
21
25
23
15
2
11
12
0.20.91.0
23.5
5500*
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. Whoolery/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/8/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 357051.5Easting: 13462310.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:12/22/2016 LOG OF TEST BORINGTB-113LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
2 inches of ASPHALTICCEMENT CONCRETE8 inches of PORTLANDCEMENT CONCRETEField Engineer reported 2inches of FILL
Medium dense to veryloose poorly graded FINESAND with silt, tracegravel, brown, moist(SP-SM)
Very stiff to medium LEANCLAY, trace sand, tracegravel, occasional sandysilt seams 66-68 ft., gray(CL)
NOTE: Vane shear testattempt at 87 ft. cancelled;unable to extend more than12 in. due to silt layer.
DRSS66
SS7SS7DRDRDD2020
DDDDDDDDRA3-1-13-1-
ADRRAD
1515
2
ARARARARAF15.015.0AAFRAFAAFAF
DRRAD23.523.5 D
AFTFTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
98
5-5-7
6-5-7
8-9-10
3-5-6-7
2-4-5-6
3-4-5-6
3-5-7-8
35.0
40.0
45.0
50.0
52.0
53.5
56.0
58.0
60.0
61.5
64.0
22
15.8
14.5
18.1
19.0
24.9
25.4
25.1
24.0
24.7
103
103
SS9
SS10
SS11
SS12
ST13
VS1
SS14
SS15
ST16
VS2
SS17
42
12
12
19
11
9
9
12
2500*
3500*
2000*
2500*
3870
4290
2000*
2000*
4720
4660
2500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. Whoolery/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/8/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 357051.5Easting: 13462310.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:12/22/2016 LOG OF TEST BORINGTB-113LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to medium LEANCLAY, trace sand, tracegravel, occasional sandysilt seams 66-68 ft., gray(CL)
NOTE: Vane shear testattempt at 87 ft. cancelled;unable to extend more than12 in. due to silt layer. DRST13ST13
VS1VS1
SS14
SS1SS1
RDRDRDDRDD55DDDDRA3-5-6-73-5-6-7
2-4-52RA
DRDRDRADR
11 ARARRARARAF45.00
50.050
52.52.AFRAFRA
2000*200
2500*AFAFAAFDDDDRRADRAFT18.118.1
AFFTAFTTFFTFTTFTFTFTFTTTTTTTT
DAF
99
55
3-6-8-9
4-9-8-7
7-8-8-9
4-6-9-9
4-5-6-6
3-6-7-8
14-27-50/5"
42-52/4"
21-42-53
546.7
540.2
66.0
68.0
70.0
72.0
74.0
75.5
78.0
79.5
82.0
84.0
86.0
87.0
88.4
89.8
95.0
21
23.5
30.6
22.5
25.2
25.5
27.4
25.1
23.3
25.6
6.7
12.0
101
98
105
SS18
SS19
SS20
SS21
ST22
VS3
ST23
VS4
SS24
ST25
SS26
VS5
SS27
SS28
SS29
42
14
17
16
15
11
13
77/11"
52 +
95
87.0
93.5
2000*
3000*
3000*
2000*
6230
4410
5000
4290
2400#
3500
1200#
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. Whoolery/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/8/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 357051.5Easting: 13462310.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:12/22/2016 LOG OF TEST BORINGTB-113LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Very stiff to medium LEANCLAY, trace sand, tracegravel, occasional sandysilt seams 66-68 ft., gray(CL)
NOTE: Vane shear testattempt at 87 ft. cancelled;unable to extend more than12 in. due to silt layer.
Extremely dense SANDYSILT, trace gravel, gray,moist (ML)
Hard LEAN CLAY, tracesand, trace gravel,occasional fine sandseams, trace shale piecesbelow 100 ft., gray (CL)
DRST25ST25
SS26SS2
VS55
SS27
SS28SS28
RDRDRDDDDDD8585
DDDDDDDRA4-5-6-64-5-6-6
3-6-7-83-6-7
14-2714
ARADRDRDD
ARA11
13
AARARARARAF78.0
79.579.
82.082.0
84.084.0AFAFRAR
FAAF410410
50005000
4290
2400#
FFAFAFAFAAFDDRRADD87.0 DD
AFT.5.5
27.427.4
2
FTFTAFAFFTAFT101101
98 TFTFTFFFTFT42FFTTFTFTFTFTFTTTTTTTTTTTTTAF
26-39-45
39-32-38
8-17-20
23-35-38
520.2
518.7
100.0
105.0
110.0
115.0
10.1
15.5
22.2
SS30
SS31
SS32
SS33
84
70
37
73
113.5
115.0
9000+*
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. Whoolery/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/8/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 357051.5Easting: 13462310.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:12/22/2016 LOG OF TEST BORINGTB-113LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Hard LEAN CLAY, tracesand, trace gravel,occasional fine sandseams, trace shale piecesbelow 100 ft., gray (CL)
Very dense SANDY SILT,gray, moist (ML)
End of Boring at 115 ft.
DRRDD120DDDDRA23-35-3823-35-38
RARARA73 ARARARARAF110.00
115.011AFRAFRAAF9000+*9000
AFFAFAAFDDDDRRADRAFT22.222.2
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTT
DAF
5-5-6
7-10-16
18-8-6
7-9-12
4-6-11
7-12-15
7-11-15
5-7-10
4-7-12
632.1
629.8629.6
626.6
604.6
2.5
5.0
7.5
10.0
15.0
20.0
22.5
25.0
30.0
24.1
22.1
25.4
14.9
14.4
17.4
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
SS9
11
26
14
21
17
27
26
17
19
2.5
4.85.0
8.0
30.0
7000*
5000*
<>
6000*
5000*
5000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: H. Bharadwaj/R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/7/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 356520.7Easting: 13462498.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/8/2015 LOG OF TEST BORINGTB-03LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
30 inches of SANDYTOPSOIL, trace roots,brownFILL - Medium densepoorly graded fine sand,trace silt, trace gravel,occasional topsoil seamswith roots, brown, moist(SP)FILL - Medium densepoorly graded fine sandwith silt, trace gravel, gray(SP-SM)FILL - Medium dense silt,trace sand, occasionaltopsoil layers, brown-gray(ML)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
NOTE: Poor recovery onSPT sample SS6 at 20 ft.
Very stiff to stiff LEANCLAY with sand, tracegravel, gray (CL)
DRSS66
SS7
SS8SS8DRDDRDRDD2020
DDDDDDDRA7-12-157-12-
7-11-157-11-15
ADRDRADRD
1717
27
ARARARARAF15.015.0AAFRA
0*0*
5000*50 FAAFAFDDRRADD
AFT24.124
22.12.1FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTTAF
73
71
93
4-9-12
5-10-11
6-9-17
5-9-9
5-9-11
5-7-9
4-5-7
5-8-11
588.6
35.0
40.0
42.5
45.0
47.5
50.0
51.5
53.5
55.0
60.0
65.5
16
15
17
15
15.4
15.7
16.3
17.3
23.9
26.0
24.1
24.4
25.8
25.7
120
119
107
104
SS10
SS11
SS12
SS13
SS14
SS15
VS1
ST16
SS17
SS18
ST19
32
30
38
34
21
21
26
18
20
16
12
19
46.0
4500*
4000*
4000*
3000*
3000*
2000#
4480
<>
2000*
2000#
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: H. Bharadwaj/R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/7/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 356520.7Easting: 13462498.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/8/2015 LOG OF TEST BORINGTB-03LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY with sand, tracegravel, gray (CL)
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Poor recovery onShelby tubes ST16 at 53.5ft. and ST19 at 65.5 ft. DRVS1VS1
ST16ST
SS177 RDRDRDDD55DDRA5-7-95-7-9
4-5-7
ARADRDRDRARA16
RA2020 AAARARARARADDDDDDRDRAF45.00
47.547.5
50.050
51.551.5AFARARFAF
RAAF0*0*
3000*300
3000*30
2000
FAFAAFAFAAFAFT16.316
17.317.3
23.93.9FTAFA
TFTAFAFT119 TFTFTFTFFT30TFTFTTFTFTFTT1TTTTTTTTTT
RAT
DAF
6-7-11
7-9-10
4-5-7
566.6
554.6
67.0
70.0
75.0
80.0
28.1
24.4
28.7
VS2
SS20
SS21
SS22
18
19
12
68.0
80.0
4040
3000*
2200#
1800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: H. Bharadwaj/R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/7/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 356520.7Easting: 13462498.3
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/8/2015 LOG OF TEST BORINGTB-03LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
End of Boring at 80 ft.
DRAA1212 AARAD
8585
DDDDDDDDRDRAF80.080.0AAF0#0#
1800#18 FAAFAFRA
DAFT24.424
28.78.7FTA
TAFFTFTTFFTFTTFTFTTTTTTTTTTAF
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/26/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 356515.6Easting: 13462465.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 633.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 105 ft.
DATE COMPLETED:10/29/2016 LOG OF TEST BORINGTB-03ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 48.5 ft.
DRD2020
DDDDDDRARADRAFAFDDDRRAD
AFTFTFTTTTTTAF
4-5-6
2-4-4
2-4-3
585.0
573.5
50.0
55.0
60.0
61.5
65.0
24.3
24.3
25.4
104
SS1
ST2
SS3
VS1
SS4
11
8
7
48.5
60.0
2500*
5220
1200#
4230
2200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/26/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 356515.6Easting: 13462465.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 633.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 105 ft.
DATE COMPLETED:10/29/2016 LOG OF TEST BORINGTB-03ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 48.5 ft.
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRST22 RDDRD55DDDRA4-5-64-5-6
RADRADR
11
RARARRARAF50.050
RARA2500AAAFDDDDDRRADRAFT
AFTFTTTTTT
DAF
NN
29
53
2-5-6
2-5-6
2-3-5
1-5-6
6-14-26
12-22-28
563.5
561.5
553.5
545.5
543.5
67.0
68.5
70.0
72.0
73.5
75.0
77.0
78.5
80.0
85.0
87.0
88.4
90.0
95.0
10
18
6
24.8
26.3
10.1
28.2
27.1
29.0
10.5
11.3
14.0
102
99
130
ST5
VS2
SS6
ST7
VS3
SS8
ST9
VS4
SS10
SS11
ST12
VS5
SS13
SS14
25
38
17
11
11
8
11
40
50
70.0
72.0
80.0
88.0
90.0
4450
4850
2200#
<>
4350
2200#
5450
3420
1600#
2000*
2770
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/26/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 356515.6Easting: 13462465.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 633.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 105 ft.
DATE COMPLETED:10/29/2016 LOG OF TEST BORINGTB-03ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
CLAYEY MEDIUM SANDwith silt, trace gravel, gray,moist (SC) (Based onAtterberg Limits, Shelbytube sample at 72 ft. reactssimilar to CL)
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Stiff SANDY SILTY CLAY,few gravel, gray (CL-ML)
NOTE: Vane shear test at88.4 ft. terminated earlydue to sand layer.
Dense SILTY FINE SAND,trace gravel, gray, moist(SM)
Hard to stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
DRSS111
ST12T12
VS5
SS13SS13DRDDDRDDD8585
DDRA1-5-61-5-
ADRDDRADRA88
11
AARRARADDDDDDDRD88.088.0 DRAF00
78.5
80.080.0AFAFARAAF1600#16AF3420420
AF545054 F0#0#
FAFAFAAFRA
DAFT28.228
27.1.1
29.09.0
TFTAFTAFAFT999 TTFTFTFFT
2525
TTFTFTFTFTTTTTTTTTTTTTAF
99
16-23-32
6-9-16
25-30-29
25-30-33
21-31-44
533.5
528.5
519.5
513.5
100.0
105.0
110.0
115.0
120.0
15
20.9
23.5
SS15
SS16
SS17
SS18
SS19
36
55
25
59
63
75
100.0
105.0
114.0
120.0
3000*
4000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/26/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 356515.6Easting: 13462465.0
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 633.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 105 ft.
DATE COMPLETED:10/29/2016 LOG OF TEST BORINGTB-03ALABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
Hard to stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Very stiff LEAN CLAY,trace sand, gray (CL)
Very dense SILT with sand,gray, moist (ML)
Very dense SILTY FINESAND, trace gravel, gray,wet (SM)
End of Boring at 120 ft. DRSS199 RDDRDRA25-30-3325-30-33
21-31-4421-31-44RADRADR
63 ARARARAD120DDDDDDDRDD120.0120 DRAF110.00
115.011AFRAFRAAFAFAAFAFTAFFTAFTTFFTFT
363
TFTFTT1
TTTTFTFTTTRA
T
DAF
46-18-19
7-4-8
5-5-8
5-5-7
5-6-9
5-7-9
5-6-8
5-7-9
631.5
628.6
622.6
602.6
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
21.2
21.2
18.9
15.0
14.2
16.1
14.3
109
120
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
37
12
13
12
15
16
14
16
1.1
4.0
10.0
30.0
5500*
6500*
5500*
3000*
5500*
2000*
10170
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. Swaminathan/M. HiskeDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 355920.4Easting: 13462613.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 85 ft.
DATE COMPLETED:12/9/2016 LOG OF TEST BORINGTB-112LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
13 inches of ASPHALTICCEMENT CONCRETE
FILL - Dense poorly gradedfine sand, trace silt, tracegravel, brown, moist (SP)
Very stiff LEAN CLAY,trace sand, trace gravel,brown to gray (CL)
Stiff to hard LEAN CLAY,trace sand, trace gravel,gray (CL)
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA5-7-95-7-
ADRRAD
1515
16
ARARARADRAF15.015.0AAFRA
0*0*
3000*30 FAAFAFDDDRRAD
AFT18.918
15.05.0FTA
TAF
0909
TFTTFTFTTTFTFTTTTTTTTTTTAF
91
4-6-10
4-4-7
3-3-5
4-6-9-8
5-4-5-8
4-6-5-9
3-4-6-7
572.6
35.0
40.0
45.0
50.0
52.0
53.5
56.0
58.0
60.0
62.0
63.5
20
15.3
17.3
22.5
23.3
22.8
23.6
24.0
23.3
23.7
105
SS9
SS10
SS11
ST12
SS13
VS1
SS14
SS15
ST16
SS17
VS2
39
16
11
8
15
9
11
10
60.0
3000*
2200#
2200#
3400*
2000#
5030
2400#
2400#
5010
1800#
4290
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. Swaminathan/M. HiskeDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 355920.4Easting: 13462613.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 85 ft.
DATE COMPLETED:12/9/2016 LOG OF TEST BORINGTB-112LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
DRSS13SS13
VS1VS1
SS14
SS1SS1
RDRDRDDRDD55DDDDRA4-6-9-86-9-8
5-4-55RA
DRDRDRADR1515 ARARRARARAF45.00
50.050
52.52.AFRAFRA
2200#220
3400*AFAFAAFDDDDRRADRAFT22.522.5
AFFTAFTTFFTFTTFTFTFTFTTTTTTTT
DAF
81
98
59
64
4-4-6-7
2-4-6-6
7-4-5-8
3-3-4-5
3-4-5-7
20-11-17-40
6-11-25-35
20-25-45-45
27-30-50
564.6
552.6
548.6
537.6
66.0
68.0
70.0
72.0
73.5
76.0
78.0
79.5
82.0
84.0
86.0
88.0
90.0
95.0
19
25
8
11
26.1
25.0
22.2
27.7
28.9
19.4
26.6
7.9
11.0
8.2
9.0
107
99
SS18
SS19
ST20
SS21
VS3
SS22
NR23
VS4
SS24
ST25
SS26
SS27
SS28
SS29
34
43
20
25
10
10
9
7
9
28
36
70
80
68.0
80.0
84.0
95.0
2000#
1400#
1390
1800#
2360
1400#
4040
1600#
4270
9000+*
9000+*
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. Swaminathan/M. HiskeDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 355920.4Easting: 13462613.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 85 ft.
DATE COMPLETED:12/9/2016 LOG OF TEST BORINGTB-112LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Medium to very stiff LEANCLAY with sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube at 78 ft. due tosample falling out ofsampler.
Medium to very stiff LEANCLAY, trace sand, gray(CL)
Hard SANDY LEAN CLAY,few gravel, gray (CL)
Extremely dense SILTYFINE SAND, occasionalsandy silt layers, gray,moist (SM)
DRST25ST25
SS26SS2
SS27
SS28SS28
RDRDRDDDRA3-4-5-73-4-5-7
20-11-17-4020-11-1
6-11-25-6-
ARADRDRD
ADRA9
28
AARARARAF78.0
79.579.
82.082.0
84.084.0
FAFAFRARAAF
400#400#
F4040
1600#
FAFAFAFARAAFD
8585
DDDDDDDDRRAD
AFT28.9 TFTAFAFFTAFTTTFTFFFTFTTTFTFFTTTTTTTTTTTFTFTTTAF
50-50/4"
36-50/5"528.2
99.3
104.4
SS30
SS31
50 +
50 +104.4
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. Swaminathan/M. HiskeDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/7/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 355920.4Easting: 13462613.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.6 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 85 ft.
DATE COMPLETED:12/9/2016 LOG OF TEST BORINGTB-112LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Extremely dense SILTYFINE SAND, occasionalsandy silt layers, gray,moist (SM)
End of Boring at 104.4 ft.(Terminated upon SPTsample refusal)
DRD120DDDDRARARAFAFDDDDRRADRAFTTTTFTFTTTTTTT
DAF
94
69
27-36-24
56-7-9
6-13-10
5-6-7
9-7-6
5-7-9
631.6630.8
627.8
626.8
624.3
616.8
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
6
15
16.1
11.7
13.2
13.7
13.2
13.7
127
125
SS1
SS2
SS3
SS4
ST5
SS6
ST7
SS8
25
29
60
16
23
13
13
16
0.2
1.0
4.0
5.0
7.5
15.0
8000*
6000*
8500*
11200
3500*
7530
4000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/25/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 355343.8Easting: 13462820.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 85 ft.
Methane gas was encountered in monitoringwell at 100% LEL.
DATE COMPLETED:10/28/2016 LOG OF TEST BORINGTB-111LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
2 inches of ASPHALTICCEMENT CONCRETE10 inches of PORTLANDCEMENT CONCRETEFILL - Very dense poorlygraded fine to mediumsand, trace silt, tracegravel, brown, moist (SP)Hard LEAN CLAY, fewsand, trace gravel, brown(CL) (Possible Fill)Very stiff SILTY CLAY, fewsand, trace gravel, brown,moist (CL-ML)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
Stiff to very stiff SANDYLEAN CLAY, trace gravel,gray (CL) DRSS66
ST7ST7DRDRDD2020
DDDDDDDDRA9-7-69-7-
ADRRAD
13
ARARARARAF15.015.0AAFRA
0*0*
11200 FAAFAFDRRADRAFT11.71
13.213.2FTA
TAF127
TFTTF252
TFTTTFFTFTTTTTTTTTTT
DAF
30
83
91
6-9-7
48-37-17
3-4-4
5-6-6
593.3
591.8
586.8
567.8
35.0
40.0
45.0
50.0
55.0
56.5
60.0
64.0
14
19
14.0
18.2
23.9
23.4
24.7
18.0
113
105
SS9
SS10
ST11
SS12
ST13
VS1
SS14
ST15
31
38
16
54
8
12
38.5
40.0
45.0
64.0
4000*
5330
2200#
5620
4600
2500*
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/25/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 355343.8Easting: 13462820.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 85 ft.
Methane gas was encountered in monitoringwell at 100% LEL.
DATE COMPLETED:10/28/2016 LOG OF TEST BORINGTB-111LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Stiff to very stiff SANDYLEAN CLAY, trace gravel,gray (CL)
Very dense SILTY FINESAND, few gravel,occasional lean clay layers,gray, moist (SM)
Very stiff LEAN CLAY withsand, trace gravel, gray(CL)
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Shelby tubeperformed at 64 ft. waspushed only 12 inches;unable to advance furtherdue to sand layer.
ST133
VS11
RDDDRD55DDDDDDDRA3-4-43-4-4
RADRADR
8 ARARARRARAF45.0.0
50.050AFRARA
533053
2200AFAFAAFDRRADRAFT18.218.2
AFFTA
113 TFFT31TFTFTFTFTTT14TTTTTT
DAF
98
3-4-5
8-9-10
26-26-27
48-50
28-30-42
561.8
548.3
70.0
75.0
77.0
79.0
80.5
85.0
89.6
95.0
22
18.7
26.5
27.8
17.9
8.5
10.4
12.2
97
DP16
SS17
ST18
NR19
SS20
SS21
SS22
SS23
44
9
19
53
50+
72
70.0
83.5
3000*
5000*
<>
9000+*
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/25/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 355343.8Easting: 13462820.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 85 ft.
Methane gas was encountered in monitoringwell at 100% LEL.
DATE COMPLETED:10/28/2016 LOG OF TEST BORINGTB-111LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
SILTY MEDIUM TOCOARSE SAND, traceclay, trace gravel,occasional lean clay layers,gray, wet (SM)
NOTE: No recovery onShelby tube attempt at 70ft. due to sample falling outof sampler; direct pushedto 70 ft. to retrieve sample
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 79ft. due to sample falling outof sampler
Hard LEAN CLAY, fewsand, trace gravel,occasional silt seams andlayers, gray (CL)
DRSS2121
SS22SS22DRDRDDD8585
DDDDDDDDRA0
26-26-2726-26
ARADRRAD
1919
53
ARARRARARAF00
79.0
80.55AFAFRARA
0*0*
5000*50
<><> FAFAFAAFDRRADRAFT26.526
27.8.8
17.99FTAFTAFA
T979FTFTFT44FTFTTFTFTTTT22TTTTTTT
DAF
29-30-42
20-30-41
30-36-37
526.8
521.8
100.0
105.0
110.0
12.9
11.7
SS24
SS25
SS26
72
71
73
105.0
110.0
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/25/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 355343.8Easting: 13462820.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 85 ft.
Methane gas was encountered in monitoringwell at 100% LEL.
DATE COMPLETED:10/28/2016 LOG OF TEST BORINGTB-111LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Hard LEAN CLAY, fewsand, trace gravel,occasional silt seams andlayers, gray (CL)
Very dense SILT, tracesand, gray, moist (ML)
End of Boring at 110 ft.
DRD120DDDDRAARARAF110.00
AFFAFFAFDDDDRRADRAFT
AFFTTFFTTFTFTFTFTTTTTTTT
DAF
57
5-7-6
3-4-5
3-5-7
1-2-1
3-5-7
3-5-8
8-9-9
9-12-13
631.9631.0
628.7
623.7
618.7
612.2
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
14
14.6
12.9
14.2
15.1
SS1
SS2
SS3
SS4
SS5
SS6
SS7
NR8
27
13
9
12
3
12
13
18
25
0.3
1.2
3.5
8.5
13.5
20.0
8000*
7500*
4500*
4000*
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. Calkins/S. SwaminathanDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/5/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 354769.0Easting: 13462980.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 86 ft.
DATE COMPLETED:12/13/2016 LOG OF TEST BORINGTB-110LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
3 inches of ASPHALTICCEMENT CONCRETE11 inches of PORTLANDCEMENT CONCRETEFILL - Medium densepoorly graded fine sand,trace silt, trace gravel,brown, moist (SP)Hard to very stiff LEANCLAY, few sand, tracegravel, brown (CL)
Very loose poorly gradedFINE SAND, trace silt,trace gravel, brown, moist(SP)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Stiff SANDY LEAN CLAY,trace gravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 30ft. due to sample falling outof sampler.
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA3-5-83-5-
ADRRAD
1212
13
ARARARAD
.00
DRAF15.015.0AAFRA4500*45 FAAFAFAFT
14.24.2FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
59
98
3-5-10
8-15-14
3-7-8
2-3-4-5
2-3-5-6
2-3-4-6
2-4-4-6
3-3-5-6
592.2
570.2
35.0
40.0
45.0
48.0
50.0
52.0
53.5
56.0
58.0
60.0
61.5
64.0
13
20
15.0
18.0
15.2
17.2
22.9
24.4
24.1
26.6
23.0
24.8
113
104
SS9
SS10
SS11
ST12
SS13
SS14
VS1
SS15
SS16
ST17
VS2
SS18
27
39
15
29
15
7
8
7
8
8
40.0
62.0
3500*
<>
3500*
5140
2000#
2400#
5030
2200#
1800#
4100
4850
1600#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. Calkins/S. SwaminathanDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/5/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 354769.0Easting: 13462980.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 86 ft.
DATE COMPLETED:12/13/2016 LOG OF TEST BORINGTB-110LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff SANDY LEAN CLAY,trace gravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 30ft. due to sample falling outof sampler.
Very stiff to medium LEANCLAY, trace sand, gray(CL)
DRSS14SS14
VS1VS1
SS15
SS1SS1
RDRDRDDRDD55DDRA2-3-4-52-3-4-5
2-3-5-63-5-6
2-3-42RARA
DRDRDDRRA7
88 ARARARARADDDDDDRDRAF45.00
48.048.0
50.050
52.52.AFRARAFAFAF51405140
2000#AAAF3500*350
AFFAFAFAFT15.215.2
17.27.2AFAFTAFFT
11
TFFTFFT272
TFTFTFTFTT1
TTTTTTRA
T
DAF
90
3-3-4-5
3-5-6-7
2-3-4-5
3-4-5-7
2-2-4-4
3-13-21-30
35-60/4"
12-25-35
546.2
543.4
66.0
68.0
70.0
72.0
73.5
76.0
78.0
80.0
82.0
84.0
85.5
88.0
88.8
95.0
12
26.6
25.0
27.5
26.1
27.5
26.8
27.1
26.3
14.1
99
99
98
SS19
SS20
SS21
ST22
VS3
SS23
ST24
VS4
SS25
ST26
VS5
SS27
SS28
SS29
26
7
11
7
9
6
34
60 +
60
86.0
88.8
1600#
1800#
1800#
1440
1000#
4540
5100
1800#
3930
4970
9000#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. Calkins/S. SwaminathanDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/5/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 354769.0Easting: 13462980.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 86 ft.
DATE COMPLETED:12/13/2016 LOG OF TEST BORINGTB-110LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17 >>
>>
Medium to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Vane shear test at73.5 ft. terminated earlydue to high force gaugereadings.
Dense to extremely denseSILTY FINE SAND, tracegravel, gray, wet (SM)
Hard to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRST26ST26
VS5V
SS27
SS2828
RDRDRDDDRDD8585
DDDDDDDRA2-2-4-42-2-4-4
3-13-21-3-
3
ARADRDRDDDRRA6 AARARRRADD
86.086.0
88 DDRAF78.0
80.080.0
82.082.0
84.084.0
FAFARARAF000#000#
45404540
5100
1800#
FAFAAFAFAFT27.5
26.826.8
2
TFTAFAFTFT99 TTFTFFTFT26TTFTFFTFTFTTTTTTTTTTT
DDRT
RAT
DAF
sese
15-25-37
15-19-29527.2
100.0
105.0
15.1
15.0
SS30
SS31
62
48105.0
6000#
5000#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. Calkins/S. SwaminathanDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/5/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 354769.0Easting: 13462980.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 86 ft.
DATE COMPLETED:12/13/2016 LOG OF TEST BORINGTB-110LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Hard to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
End of Boring at 105 ft.
D120DDDDDDRARARAFAFDDRRADD
AFTTTTFTFTTTTTTTAF
73
76
4-3-4
2-2-2
3-4-5
5-7-10
5-7-10
4-5-8
5-6-8
4-6-9
631.3
628.8
626.3
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
16
16
32.6
20.1
10.9
13.9
15.3
15.2
16.2
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
31
32
7
4
9
17
17
13
14
15
2.5
5.0
7.5
2500*
6500*
8000*
8500*
4000*
4500*
4000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/24/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 354124.0Easting: 13463256.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 115 ft.
DATE COMPLETED:10/25/2016 LOG OF TEST BORINGTB-109LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Sandy TOPSOIL
Stiff LEAN CLAY, tracesand, trace gravel,occasional fine sandseams, brown (CL)Very stiff LEAN CLAY,trace sand, trace gravel,trace roots, occasional siltseams, mottled brown andgray (CL)
Hard to stiff LEAN CLAYwith sand, trace gravel,gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA4-5-84-5-
ADRRAD
1717
13
ARARARADRAF15.015.0AAFRA
0*0*
8500*85 FAAFAFAFT10.91
13.93.9FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
51
4-6-9
4-6-9
4-8-9
3-6-7
2-4-6
585.8
583.8
570.8
35.0
40.0
45.0
49.5
55.0
60.0
63.0
64.5
6
15.1
15.4
16.2
9.0
22.7
22.2 107
SS9
SS10
SS11
ST12
SS13
SS14
ST15
VS1
18
15
15
17
13
10
48.0
50.0
63.0
4500*
4000*
3000*
9000+*
2400#
<>
3910
4790
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/24/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 354124.0Easting: 13463256.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 115 ft.
DATE COMPLETED:10/25/2016 LOG OF TEST BORINGTB-109LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Hard to stiff LEAN CLAYwith sand, trace gravel,gray (CL)
Hard SANDY SILTY CLAY,trace gravel, gray (CL-ML)
NOTE: Shelby tubeperformed at 49.5 ft waspushed only 18 inches;unable to advance furtherdue to possible cobble.
Stiff LEAN CLAY with sand,trace gravel, gray (CL)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
DRSS133 RDDRDD55DDDDDDRA3-6-7RA
DRADRRARARAARARARAF45.00
49.549.5AFRAFRAAF3000*300
9000+*AFAFAAFDDRRADD
AFT16.216.2
AFFTAFTTFFTFTTFTFTFTFTTTTTTTTTAF
95
6-11-26
14-24-33
17-27-27
549.8
70.0
71.5
75.0
76.5
80.0
81.5
85.0
90.0
95.0
2024.0
12.9
22.8
8.9
13.7
12.9
103
123
106
ST16
VS2
ST17
VS3
ST18
VS4
SS19
SS20
SS21
41
37
57
54
84.0
6510
5720
5800
4660
6420
4850
8500*
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/24/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 354124.0Easting: 13463256.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 115 ft.
DATE COMPLETED:10/25/2016 LOG OF TEST BORINGTB-109LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Hard to very stiff LEANCLAY with sand, tracegravel, gray (CL)
DRSS199
SS20SS20DRDRDDRA6-11-266-11-
ARADRRAD
37
ARARARARAD
8585
DDDDDDDDRDRAF55
80.080.0
81.581.5FARAAF
RA4660466
6420
4850FFAAAFAF
RAD
AFT12.912.9
22.822.8FTFTA
TAFFT123
106
TFTFTTFFTTFTFTTFFTFTTTTTTTTTTTTAF
12-20-25
12-16-22
15-17-22
5-8-11
15-22-32
523.8
518.8
513.8
100.0
105.0
110.0
115.0
120.0
12.5
11.3
14.7
26.6
SS22
SS23
SS24
SS25
SS26
45
38
39
19
54
110.0
115.0
120.0
9000+*
7500*
<>
6000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/24/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 354124.0Easting: 13463256.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 633.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 115 ft.
DATE COMPLETED:10/25/2016 LOG OF TEST BORINGTB-109LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Hard to very stiff LEANCLAY with sand, tracegravel, gray (CL)
Very stiff LEAN CLAY,trace sand, trace gravel,frequent silt partings andseams, gray (CL)
Alternating layers of verydense SILTY FINE SANDand SANDY SILT, gray,moist (SM)(ML)
End of Boring at 120 ft. DRA5-8-115-8-11
15-22-3215-22-32RADRADRSS266 RDDR
19 ARARARAD120DDDDDDDRDD120.0120 DRAF110.00
115.011AFRAFRA
<><>
6000AFAFAAFRA
DAFT14.714.7
AFFTA
TFFTTFTFTFTFTTTTTTTTAF
64
5-6-9
8-4-5
5-6-7
6-7-12
5-6-9
5-5-9
3-7-8
4-7-9
631.7631.2631.0
629.5
627.0
619.0
617.0
602.0
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
14
19.4
12.1
15.8
13.4
13.6
14.3
14.8 124
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
29
15
9
13
19
15
14
15
16
0.30.81.0
2.5
5.0
13.0
15.0
30.0
4000*
9000*
9000*
5500*
6500*
6500*
8870
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: M. Hiske/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 353505.9Easting: 13463439.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:12/21/2016 LOG OF TEST BORINGTB-108LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
3 inches of ASPHALTICCEMENT CONCRETE6 inches of PORTLANDCEMENT CONCRETEField Engineer reported 3inches of gravel FILL (BaseMaterial)FILL - Medium densepoorly graded fine sandwith silt, trace gravel,brown, moist (SP-SM)FILL - Stiff lean clay, tracesand, trace gravel,occasional fine sandpartings and clayey finesand seams, brown andgray (CL)Hard LEAN CLAY, tracesand, trace gravel, brown(CL)
Very stiff SANDY LEANCLAY, few gravel, gray(CL)
Very stiff to hard LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA5-5-95-5-
ADRRAD
1515
14
ARARARADRAF15.015.0AAFRA
0*0*
5500*55 FAAFAFAFT15.81
13.43.4FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
97
96
3-5-8
4-5-7
4-7-7
4-4-6-9
3-4-5-5
3-6-7-7
3-5-6-8
582.0
35.0
40.0
45.0
50.0
52.0
53.5
56.0
58.0
60.0
61.5
64.0
65.5
22
16
14.5
16.7
14.1
23.4
22.5
23.2
23.6
23.2
25.0
105
103
SS9
SS10
SS11
ST12
SS13
VS1
SS14
ST15
SS16
VS2
SS17
VS3
41
35
13
12
14
10
9
13
11
50.0
5000*
5000*
6000*
2650
3500*
5470
2500*
4780
2000*
3000*
4540
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: M. Hiske/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 353505.9Easting: 13463439.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:12/21/2016 LOG OF TEST BORINGTB-108LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: Vane shear test at61.5 ft. terminated earlydue to high force gaugereadings.
DRSS13SS13
VS1VS1
SS14
ST1ST1
RDRDRDDRDD55DDDDRA4-4-6-94-6-9
3-4-53RA
DRDRDRADR1010 ARARRARARAF45.00
50.050
52.52.AFRAFRA
6000*600
2650AFAFAAFDDDDRRADRAFT14.114.1
AFFTAFTTFFTFTTFTFTFTFTTTTTTTT
DAF
89
88
36
3-6-6-6
3-4-6-5
4-6-7-8
13-18-20-24
17-32-33-50/4"
13-20-27-30
12-17-31-46
26-29-50/4"
20-36-34
5-10-13
564.0
556.0
546.0
538.5
68.0
70.0
72.0
73.5
76.0
78.0
80.0
81.8
84.0
86.0
87.3
90.0
95.0
10
14
25.7
24.0
23.2
15.8
11.2
11.9
11.5
14.3
12.3
11.8
17.4
106
120
SS18
SS19
ST20
VS4
ST21
SS22
SS23
SS24
SS25
SS26
SS27
SS28
SS29
25
29
12
10
13
38
65
47
48
79/10"
70
23
68.0
76.0
86.0
93.5
2000#
1600#
1570
3920
2680
2000*
9000+*
9000+*
9000+*
9000*
3500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: M. Hiske/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 353505.9Easting: 13463439.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:12/21/2016 LOG OF TEST BORINGTB-108LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
Medium to stiff LEANCLAY, few sand, tracegravel, gray (CL)
Stiff to hard LEAN CLAYwith sand, trace gravel,occasional fine sandseams, gray (CL)
Extremely dense to verydense SILTY FINE SAND,trace gravel, occasionallean clay layers, gray,moist (SM)
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRSS25SS25
SS26SS2
SS277
SS28SS28DRDRDDRDDD8585
DDDDDDDRA4
32-33-50/4"2-33-5
13-20-27-3027-30
12-17-31-462-17-3
26-29-50/426-29-50/4
ARADRDRDRADRA" A3838
655
47
48
AARARRARARAF78.0
80.080.0
81.881.8
84.084.0
FAFARARRAAF26802680
2000*2000
9000+*9
9000+*
FAFAAFAAFDDRRADD
86.086.0
DDAFT15.8
11.211.2
11.911.9
11
TFTAFAFTFT120 TTFTFFTFT
2525
29TTFTFFTFTFTT1414TTTTT88TTTTTTAF
5-12-13
6-10-16
12-17-25522.0
100.0
105.0
110.0
12.0
14.8
12.3
SS30
SS31
SS32
25
26
42110.0
3500*
4000*
4500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: M. Hiske/R. CalkinsDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:12/13/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 353505.9Easting: 13463439.1
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.0 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:12/21/2016 LOG OF TEST BORINGTB-108LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
End of Boring at 110 ft.
DRD120DDRAARADDDDDDRDRAF110.00
AFF4500*450
AFFAFAFT12.312.3
AFFTTFFTTFTFTFTFTTTTTTTRA
T
DAF
71
6-8-9
2-4-5
4-5-7
6-7-8
6-8-9
4-6-8
4-7-9
4-6-8
632.4
629.7
627.2
618.2
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
12
18.2
14.5
12.5
14.6
15.9
14.4
14.6
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
27
17
9
12
15
17
14
16
14
0.8
3.5
6.0
15.0
9000*
9000+*
8000*
7500*
3500*
4500*
6000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352835.6Easting: 13463680.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 7 feet
Ground Surface Elevation 633.2 ft
Remarks: Driller reported hard drilling startingat 72 ft.
DATE COMPLETED:10/22/2016 LOG OF TEST BORINGTB-107LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
9 inches of PORTLANDCEMENT CONCRETEFILL - Medium densepoorly graded fine sandwith silt, trace gravel,brown, moist (SP-SM)FILL - Hard lean clay, tracesand, trace gravel, brown(CL)
Hard to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
Stiff to very stiff LEANCLAY with sand, tracegravel, gray (CL) DRSS66
SS7SS7DRDRDD2020
DDDDDDRA4-6-84-6-
ADRRAD
1717
14
ARARARADRAF15.015.0AAFRA
0*0*
7500*75 FAAFAFAFT12.512
14.64.6FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
66
92
5-6-10
4-7-9
4-7-9
5-7-7
3-5-7
594.7
589.7
585.2
35.0
40.0
45.0
48.0
50.0
55.0
60.0
65.0
13
18
14.7
12.3
14.1
11.6
16.3
24.2
25.1
26.7
128
104
102
SS9
SS10
SS11
ST12
SS13
ST14
SS15
ST16
28
38
16
16
16
14
12
38.5
43.5
48.0
5000*
5500*
3000*
9680
3000*
4770
3000*
3870
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352835.6Easting: 13463680.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 7 feet
Ground Surface Elevation 633.2 ft
Remarks: Driller reported hard drilling startingat 72 ft.
DATE COMPLETED:10/22/2016 LOG OF TEST BORINGTB-107LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to very stiff LEANCLAY with sand, tracegravel, gray (CL)
Very stiff SANDY LEANCLAY, trace gravel, gray(CL)
Stiff to hard LEAN CLAY,trace sand, trace gravel,gray (CL)
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL) DRST144 RDDRDD55DDDDRA5-7-75-7-7
RARADRADR
14 ARARAARARRARAF45.00
48.048.0
50.050AFRARAFAFRA
3000*300
96809680
3000AFAAFAFAAFDDDDRRADRAFT14.114.1
11.6.6AFAFTAFAFT
11
TFFTFFT282
TFTFTFTFTT1
TTTTTT
DAF
56
4-6-8
50
17-29-32
17-24-30
10-17-25
563.2
559.7
554.7
548.2
543.2
70.0
72.0
74.0
80.0
85.0
90.0
7
24.0
13.0
11.2
14.3
14.6
SS17
ST18
SS19
SS20
SS21
SS22
20
14
50+
61
54
42
70.0
73.5
78.5
85.0
90.0
2000#
9000+*
9000+*
9000*
8500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352835.6Easting: 13463680.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 7 feet
Ground Surface Elevation 633.2 ft
Remarks: Driller reported hard drilling startingat 72 ft.
DATE COMPLETED:10/22/2016 LOG OF TEST BORINGTB-107LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Stiff to very stiff LEANCLAY, few sand, tracegravel, gray (CL)
Hard SANDY SILTY CLAY,few gravel, gray (CL-ML)
NOTE: Shelby tubeperformed at 72 ft waspushed only 12 inches;unable to advance furtherdue to hard soils.Extremely dense SILTYFINE SAND, trace gravel,gray, wet (SM)
Hard LEAN CLAY withsand, trace gravel, gray(CL)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
End of Boring at 90 ft.DRSS2121
SS22SS22DRDRDD8585
DDDDDDRA2
17-24-3017-24
ADRRAD
6161
54
ARARARAD
.00
DRAF80.080.0AAFRA9000+*900 FAAFAF
DDDRRAD
AFT11.21.2FT
AT
AFTFTTF2020
TFTTTFTFTTTTTTTTTTTAF
72
0-0-25
7-11-17
6-10-12
6-7-9
7-10-11
9-6-8
5-6-8
7-8-11
7-8-10
6-9-13
5-10-11
633.8
628.3
621.3
606.3
2.5
5.0
7.5
10.0
15.0
20.0
25.0
26.5
28.0
30.0
32.5
15
15.1
16.0
16.9 120
NR1
SS2
SS3
SS4
SS5
SS6
NR7
NR8
NR9
SS10
NR11
30
25
28
22
16
21
14
14
19
18
22
21
1.0
6.5
13.5
28.5
9000+*
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/14/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352482.8Easting: 13463994.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/15/2015 LOG OF TEST BORINGTB-02LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
12 inches of CLAYEYTOPSOIL, brownish blackMedium dense poorlygraded FINE TO MEDIUMSAND, trace silt, tracegravel, brown, moist (SP)
NOTE: No recovery onSPT sample attempt at 2.5ft. due to possible cobble.
Medium dense SANDYSILT, gray, moist (ML)
Hard LEAN CLAY withgravel, trace sand, gray(CL)
NOTE: No recovery onSPT sample attempts at25, 26.5, and 28 ft. due topossible cobble. DRSS66
NR7NR7DRDRDD2020
DDDDDDDDRA9-6-89-6-
ADRRAD
2121
14
ARARARARAF15.015.0AAFRA9000+*900 FAAFAF
DRRADRAFT
15.15.1FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
72
70
75
6-9-11
6-10-12
5-10-13
6-10-15
9-12-16
7-11-13
5-9-13
7-10-13
6-4-5
4-5-5
3-5-7
4-7-9
594.8
592.8
583.8
35.0
36.5
38.5
40.0
41.5
43.0
45.0
46.5
48.0
49.5
51.0
52.5
54.0
55.5
57.0
58.5
60.0
65.0
13
14
14
14.4
14.6
14.0
16.0
14.9
15.3
14.5
16.1
16.4
18.0
18.6
23.7
24.6
26.6
124
122
123
120
119
SS12
SS13
ST14
SS15
SS16
VS1
ST17
SS18
SS19
SS20
VS2
SS21
SS22
VS3
SS23
VS4
SS24
SS25
29
29
30
20
22
23
25
28
24
22
23
9
10
12
16
40.0
42.0
51.0
8500*
8500*
7740
6500*
6000*
4470
3500*
5500*
5500*
6000*
2000*
5660
3500*
4790
3500*
4000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/14/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352482.8Easting: 13463994.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/15/2015 LOG OF TEST BORINGTB-02LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Hard to very stiff LEANCLAY with sand, tracegravel, gray (CL)
NOTE: No recovery onSPT sample attempt at32.5 ft. due to samplefalling out of sampler.Very stiff SANDY LEANCLAY, trace gravel, gray(CL)
Very stiff to stiff LEANCLAY with sand, fewgravel, possiblecobble/boulder reported at42 to 43 ft., gray (CL)
NOTE: Vane shear tests at43 and 51 ft. terminatedearly due to high forcegauge readings.
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRVS2VS2
SS2121
SS22SS22
VS3
SS23S23
VV
RRDRDRDDDD55DDDDRA13
5-9-135-9-13
7-10-137-10-
6-4-56-4-5
ARARARADRDRDRA
2828
A2424
22
23
AARARARARRARAF45.0.0
46.5
48.00
49.549.5
51.051.0AFAFRARARAAF447044
3500*0*
5500*5500*
5500*
FFAFAFAAAFDDDDRRADRAFT4.94.9
15.315.3
14.514
16.11FTFTAFAFAFT123123
120 TFTFTFFFT2929TTFTFTFFTFTT14TTTT70TTTTTT
DAF
4-7-10
5-10-10
24-32556.3
555.3
70.0
75.0
79.5
24.8
22.1
11.8
SS26
SS27
SS28
17
20
32+78.5
79.5
4000*
2000*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: R. CalkinsDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/14/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352482.8Easting: 13463994.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.8 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength.
DATE COMPLETED:10/15/2015 LOG OF TEST BORINGTB-02LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
End of Boring at 79.5 ft.(Terminated due to SPTsampler refusal on possibleobstruction)
DRD8585
DDDDDDDDRAA32+32+ AARARAF79.579.5AFAF0*0*
9000+*9 FAFAFAFDRRADRAFT22.122
11.811.8FTAFTAFFTFTFTFFTFTTFTFTTTTTTTTTTT
DAF
5-8-11
4-7-11
611.2
25.0
30.0 14.7
NR1
SS2
19
18
23.5
3500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: JD HoksbergenDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352467.3Easting: 13463993.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 75 ft.
DATE COMPLETED:10/24/2016 LOG OF TEST BORINGTB-02ALABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Profile drilled to 23.5 ft.
Stiff to very stiff LEANCLAY with sand, tracegravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 25ft. due to sample falling outof sampler.
DRNR1NR1DDD
2020
DDDDDDDRADRARAFAFDDRRAD23.53.5 DD
AFTFTFTTTTTTAF
71
93
92
599.7
583.7
578.7
35.0
45.0
48.0
50.0
53.0
54.5
58.0
59.5
62.0
63.5
14
28
23
14.0
14.9
13.5
26.6
24.2
24.0
122
126
104
104
ST3
DP4
ST5
VS1
ST6
VS2
ST7
VS3
ST8
VS4
28
52
42
35.0
51.0
56.0
7390
<>
6050
3500*
5570
5530
4980
5840
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: JD HoksbergenDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352467.3Easting: 13463993.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 75 ft.
DATE COMPLETED:10/24/2016 LOG OF TEST BORINGTB-02ALABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff LEAN CLAY withsand, trace gravel, gray(CL)
NOTE: No recovery onShelby tube attempt at 45ft. due to sample falling outof sampler; direct pushedto 45 ft. to retrieve sample.Driller reported possiblecobble at 48 ft. Vane sheartest at 50 ft. terminatedearly due to possiblecobble.
Very stiff FAT CLAY, fewsand, trace gravel, gray(CH)
NOTE: Vane shear test at54.5 ft. terminated earlydue to possible cobble.
Very stiff LEAN CLAY, fewto trace sand, trace gravel,gray (CL)
DRST6
VS2S2
ST7ST7
RDRDRDDRARARADRDRARAD
ARARARARARARAD55DDDDDDDRD56.056.0 DRAF45.0.0
48.048.0
50.050AFRARAAFRARA
<><
60506050AFAAFAFAAFAFT14.914.9
13.53.5AFAFTAFA 11FFTFFFTFTFTTTTTTT
RAT
DAF
atat
96
5-6-7
25-36-50
22-36-45
20-50/5"
25-30-36
563.2
559.7
539.7
66.0
70.0
71.5
75.0
80.0
85.0
89.4
95.0
2625.8
24.8
20.3
11.3
13.2
13.5
11.7
101
102
ST9
ST10
VS5
SS11
SS12
SS13
SS14
SS15
45
13
86
81
50 +
66
71.5
75.0
95.0
6000*
5290
5220
2200#
9000+*
9000+*
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: JD HoksbergenDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/21/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352467.3Easting: 13463993.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: n/a
Ground Surface Elevation 634.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 75 ft.
DATE COMPLETED:10/24/2016 LOG OF TEST BORINGTB-02ALABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
Very stiff LEAN CLAY, fewto trace sand, trace gravel,gray (CL)
Stiff LEAN CLAY, tracesand, trace gravel, gray(CL)
Hard LEAN CLAY, fewsand, trace gravel,occasional fine sandpartings, gray (CL)
NOTE: Driller reportedcobbles at 75 ft., 88 ft. and91 ft.
End of Boring at 95 ft.
DRSS133
SS14SS14DRDRDD8585
DDDDDDDRA0
22-36-4522-36
ADRRAD
8686
81
ARARARADRAF80.080.0AAFRA
0#0#
9000+*900 FAAFAFAFT20.32
11.31.3FTA
TAFTFTTFTFTTFTFTTTTTTTTT
DDRT
RAT
DAF
ndnd
72
2-4-3
2-2-4
3-6-8
5-6-9
6-6-8
3-4-6
3-3-5
4-5-7
633.1
628.1
626.6
609.1
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0 17
17.0
16.7
17.9
15.7
15.4
15.8
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8 30
7
6
14
15
14
10
8
12
1.0
6.0
7.5
25.0
9000*
3500*
2000*
3000*
2000*
4500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:12/5/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352166.8Easting: 13464524.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 78 ft.
DATE COMPLETED:12/7/2016 LOG OF TEST BORINGTB-106LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Field Engineer reportedTOPSOIL and FILL
FILL - Loose poorly gradedfine sand, trace silt, tracegravel, brown, moist (SP)
Hard LEAN CLAY, tracesand, trace gravel, brown(CL) (Possible Fill)
Stiff LEAN CLAY, tracesand, trace gravel, brown(CL)
Very stiff to stiff LEANCLAY with sand, tracegravel, gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA3-4-63-4-
ADRRAD
1414
10
ARARARADRAF15.015.0AAFRA
0*0*
2000*20 FAAFAFAFT16.716
17.97.9FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
94
5-4-7
4-4-7
24-14-7
4-4-4-5
2-4-6-6
4-5-6-7
3-4-6-7
2-5-5-7
594.1
586.1
574.1
35.0
40.0
44.5
46.0
48.0
50.0
51.5
52.0
54.0
56.0
58.0
59.5
60.0
62.0
64.0
24
17.5
15.6
11.4
11.8
15.8
25.3
22.6
24.1
24.2
25.1
27.2
27.0
26.2
120SS9
SS10
ST11
SS12
SS13
ST14
VS1
DP15
SS16
SS17
ST18
VS2
DP19
SS20
SS21
43
11
11
21
8
10
11
10
10
40.0
48.0
60.0
7140
3000*
<>
<>
2500*
4500*
4660
<>
2200#
2200#
3000*
4230
<>
<>
1200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:12/5/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352166.8Easting: 13464524.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 78 ft.
DATE COMPLETED:12/7/2016 LOG OF TEST BORINGTB-106LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY with sand, tracegravel, gray (CL)
Stiff LEAN CLAY, few sand,trace gravel, occasionalfine sand partings below 46ft., gray (CL)
NOTE: Shelby tubesampler refusal at 44.5 ft.,sample taken from cuttingsdue to observed samplerdamage. Poor recovery onSPT sample SS12 at 46 ft.
Very stiff to stiff LEANCLAY, few sand, gray (CL)
Medium to very stiff LEANCLAY, trace sand, gray(CL)
DRVS1VS1
DP155
SS16SS16
SS17
ST1ST1
RDRDRDRDDD55DDDRA5
2-4-6-62-4-6-6
4-5-64RARA
DRDRDRDRA1
88 ARARARRRARAF44.55
46.0
48.048.0
50.050
51.551.5AFAFRARAR
FA4500*AF2500*2500AF<><>
<><>
AFFAFAAFAFDDDDDRRADRAFT11.411.4
11.81
15.85.8AFTAFAFTFTTFTFFTFTTFTTFTFTFTTTTTTTTTT
DAF
CL)CL)
98
41
3-4-6-6
2-3-4-5
5-6-12-50/5"
14-50/5"
12-21-23-35
27-50/5"
50/5"
29-43-45
47-50/5"
556.6
554.1
552.1
550.1
546.1
544.1
539.7
66.0
67.5
68.0
70.0
72.0
74.0
75.5
76.0
77.9
78.9
82.0
82.9
84.4
90.0
94.4
23
8
25.7
26.1
29.4
26.6
28.1
21.1
17.6
9.5
9.1
101
99
ST22
VS3
DP23
SS24
SS25
ST26
VS4
DP27
SS28
SS29
SS30
SS31
SS32
SS33
SS34
43
20
10
7
18
50 +
44
50 +
50 +
88
50 +
77.5
80.0
82.0
84.0
88.0
90.0
94.4
3760
4410
<>
<>
1400#
4410
3610
<>
1400#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:12/5/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 352166.8Easting: 13464524.9
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 634.1 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 78 ft.
DATE COMPLETED:12/7/2016 LOG OF TEST BORINGTB-106LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
>>
>>
Medium to very stiff LEANCLAY, trace sand, gray(CL)
Extremely dense CLAYEYFINE SAND/SANDY LEANCLAY, trace gravel, gray,moist (SC/CL)Dense SILTY FINE SAND,trace gravel, gray, moist(SM)Extremely dense CLAYEYFINE SAND/SANDY LEANCLAY, trace gravel, gray,moist (SC/CL)
Extremely dense SILTYFINE SAND, trace gravel,gray, moist (SM)
Extremely dense CLAYEYSAND with gravel, gray,moist (SC)
Alternating seams ofextremely dense SANDYSILT and SILTY SANDYCLAY, trace gravel, traceshale pieces, gray, moist(ML/SM)
End of Boring at 94.4 ft.(Terminated upon SPTsample refusal)
DRS31S31
SS322
SS33SS33
RRDRDDRDD8585
DDDDDDDDRA-21-23-35-21-23-3
27-50/5"5"
50/5"50/5
ARARADRADRD
50 +50 +
44
50 +
50 +
AARARARAARRARAF00
77.9
78.9
82.082.0
82.982.9
FAFAFRARAAFAR
610610
<><>
1400#1400 FFFAFAFAAFAAFDRRAD88.088.0 D
AFT.1.1
21.11
17.617.6FTFTFTAFAFAFA
9999 TFTFTFTFFF4343TFTFTFTFFFTFTT9TT23TTTTTTTT
DAF
72
9-5-2
2-2-3
3-5-9
5-11-17
6-9-12
4-8-9
4-6-9
4-8-8
631.9
628.9
626.9
619.4
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
15
20.5
14.1
17.1
14.2
15.5
15.2
15.1 123
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
31
7
5
14
28
21
17
15
16
1.0
4.0
6.0
13.5
4000*
9000+*
9000+*
8000*
4000*
3500*
6330
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/19/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351971.6Easting: 13465160.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 95 ft.
DATE COMPLETED:10/21/2016 LOG OF TEST BORINGTB-105LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
12 inches of TOPSOIL
FILL - Loose crushedlimestone aggregate
FILL - Very stiff LEANCLAY, trace sand, tracegravel, mottled brown andgray (CL)
Hard LEAN CLAY, fewsand, trace gravel, brown(CL)
Hard to stiff LEAN CLAYwith sand, trace gravel,gray (CL)
NOTE: No recovery onSPT sample attempt at 35ft. due to sample falling outof sampler DRSS66
SS7SS7DRDRDD2020
DDDDDDRA4-8-94-8-
ADRRAD
2121
17
ARARARADRAF15.015.0AAFRA
+*+*
8000*80 FAAFAFAFT17.11
14.24.2FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
92
75
76
7-8-10
4-6-9
3-3-5
4-4-6
592.9
587.9
35.0
40.0
45.0
46.5
50.0
55.0
56.5
60.0
65.0
23
11
16
16.8
25.8
22.7
21.2
20.7
17.6
102
104
NR9
SS10
ST11
VS1
SS12
ST13
VS2
SS14
ST15
45
25
30
18
15
8
10
40.0
45.0
3000*
3110
4790
<>
3500*
5840
2000*
2500*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/19/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351971.6Easting: 13465160.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 95 ft.
DATE COMPLETED:10/21/2016 LOG OF TEST BORINGTB-105LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Hard to stiff LEAN CLAYwith sand, trace gravel,gray (CL)
NOTE: No recovery onSPT sample attempt at 35ft. due to sample falling outof sampler
Stiff LEAN CLAY, few sand,trace gravel, gray (CL)
Very stiff to stiff LEANCLAY with sand, few totrace gravel, gray (CL)
ST133
VS22
RDDDRD55DDDDDDDRA3-3-53-3-5 ARADRADR
8 AARARARRARAF45.0.0
46.5
50.050AFAFRARA
311031
47900
<>AFAFAFAAFDRRADRAFT25.825.8
AFAFFTA
102 TFFFT45TFTFTFTFTTT23TTTTTT
DAF
98
3-4-5
4-5-6
13-16-17
11-14-15
8-8-9
560.9
551.4
546.4
537.9
66.5
70.0
74.0
75.5
78.0
80.0
81.5
86.5
91.5
95.0
19
23.3
26.5
26.1
99
102
VS3
SS16
ST17
VS4
SS18
ST19
VS5
SS20
SS21
SS22
38
9
11
33
29
17
72.0
81.5
86.5
95.0
4480
2000#
4460
5470
<>
4500
4350
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/19/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351971.6Easting: 13465160.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 95 ft.
DATE COMPLETED:10/21/2016 LOG OF TEST BORINGTB-105LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY with sand, few totrace gravel, gray (CL)
Very stiff LEAN CLAY,trace sand, gray (CL)
Dense SILTY FINE SAND,trace clay and gravel, gray,wet (SM)
Medium dense poorlygraded MEDIUM TOCOARSE SAND with silt,trace gravel, gray, wet(SP-SM)
Driller reported gravellysand, unable to advanceSPT sampler due tocollapse
DRSS20SS20
DRDRDDD8585
DDDDDDDRA13-16-17-16-17
ARADRDRAARARRARAF78.0
80.080.0
81.581.5AFARAFAF470470
<><>
4500
4350FFAFAAFAF
DDRRADD86.58 DD
AFT.5.5
26.126.1FTFTAFAFTFT9999
102FTFTFTFTFT3838
FTFTFTFTFTFTT19TTTTT9TTTTTTAF
519.4 113.5
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite GroutChecked By: ALOGQA/QC By: JA
DATE STARTED:10/19/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351971.6Easting: 13465160.7
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.9 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 95 ft.
DATE COMPLETED:10/21/2016 LOG OF TEST BORINGTB-105LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Driller reported gravellysand, unable to advanceSPT sampler due tocollapse
End of Boring at 113.5 ft.
DRD120DDDDDDRARARAFAFDDRRADD
AFTFTFTTTTTTAF
3-4-6
7-6-5
5-4-6
3-4-9
4-6-8
3-7-9
2-5-7
3-6-10
631.0630.3
629.2
624.7
611.2
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
19.2
19.6
12.5
14.7
15.8
14.9
124
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
10
11
10
13
14
16
12
16
0.20.9
2.0
6.5
20.0
7500*
9000*
5500*
9540
6000*
5000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: C. SchroederDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/29/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351668.2Easting: 13465647.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 77 ft.
DATE COMPLETED:12/1/2016 LOG OF TEST BORINGTB-104LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
2.5 inches of ASPHALTICCEMENT CONCRETE7.5 inches of PORTLANDCEMENT CONCRETEFILL - Medium densepoorly graded fine sand,with silt, trace gravel,occasional seams of blackand gray fine sand, brown,moist (SP-SM)Medium dense SILTY FINESAND, trace gravel,occasional sandy siltlayers, brown, moist (SM)(Possible Fill)
Very stiff to hard LEANCLAY, trace sand, tracegravel, occasional siltpartings above 7.5 ft.,brown to gray (CL)
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDDDRA3-7-93-7-
ADRRAD
1414
16
ARARARARAF15.015.0AAFRA
0*0*
5500*55 FAAFAFDRRAD
.00
DAFT19.61
12.52.5FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF
97
4-6-8
3-4-6
3-5-6-7
1-3-3-4
3-5-6-9
3-3-5-4
4-3-3-2
4-4-6-8
2-4-6-6
10-12-5
3-3-2
591.2
587.2
580.7
579.2
568.7
35.0
40.0
42.0
44.0
46.0
48.0
49.5
51.5
53.5
55.5
57.5
59.5
61.0
62.5
64.0
65.5
31
18.5
19.1
21.4
21.8
36.4
14.1
26.2
25.6
22.8
21.8
22.7
24.8
SS9
SS10
SS11
SS12
ST13
SS14
VS1
SS15
SS16
NR17
SS18
SS19
ST20
SS21
VS2
SS22
53
14
10
11
6
11
8
6
10
10
17
5
40.0
44.0
50.5
52.0
62.5
<>
3500*
5000*
1600#
3000*
4500*
1600#
<>
1400#
4000*
2000#
1490
1200#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: C. SchroederDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/29/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351668.2Easting: 13465647.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 77 ft.
DATE COMPLETED:12/1/2016 LOG OF TEST BORINGTB-104LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Very stiff LEAN CLAY,trace sand, gray (CL)
NOTE: Vane shear test at49.5 ft. terminated earlydue to high force gaugereadings.
Loose SILT, trace sand,gray (ML)
Medium to very stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube sampleattempt at 55.5 ft. due topossible cobble. Shelbytube sampler refusal at 61ft.
Medium to very stiff LEANCLAY, few sand, gray (CL)
DRSS15SS15
SS16SS
NR177
SS18SS18
RDRDRDDDRA9
3-3-5-45-4
4-3-3-24-3-3RARADRDRDRA1111
8
6
ARARARRAD55DDDDDDDRDDRAF46.0
48.048.0
49.549.5
51.551.5
FAFRARARAF1600#1600
3000*3000*
4500*4500 FFAFAAAFRA
DAFT21.421.4
21.8
36.436
14.14.1FTFTAFAFTTFTFTFFT
53TFTFTTFTFTTTTTTTTTTT
AFNN
94
95
41
4-6-7
2-4-6-5
3-6-14-50/4"
37-50
38-43-50/5"
50/5"
41-50/5"
34-50/4"
554.2
550.2
547.2
546.2
541.2
536.9
67.5
69.0
71.0
72.5
73.0
75.0
77.0
78.8
80.0
82.4
83.9
89.4
94.3
20
19
25.1
23.4
23.3
25.2
26.0
23.7
22.9
103
105
106
ST23
SS24
ST25
VS3
DP26
SS27
ST28
SS29
SS30
SS31
SS32
SS33
34
38
37
13
10
20
50+
93/11"
50 +
50 +
50 +
77.0
81.0
84.0
85.0
90.0
94.3
2880
<>
1820
3790
<>
1600#
4190
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: C. SchroederDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/29/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351668.2Easting: 13465647.6
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.2 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 77 ft.
DATE COMPLETED:12/1/2016 LOG OF TEST BORINGTB-104LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
>>
>>
>>
Medium to very stiff LEANCLAY, few sand, gray (CL)
Medium dense to extremelydense CLAYEY FINESAND, trace gravel,frequent sandy lean clayseams, gray, moist (SC)
Extremely dense poorlygraded FINE TO MEDIUMSAND with silt, tracegravel, gray, moist (SP-SM)Extremely dense SILTYFINE TO COARSE SAND,few gravel, gray, wet (SM)
Extremely dense poorlygraded FINE SAND withsilt, trace gravel, gray, wet(SP-SM)
Extremely dense poorlygraded FINE TO MEDIUMSAND with silt, tracegravel, gray, wet (SP-SM)
End of Boring at 94.3 ft.(Terminated upon SPTsample refusal)
DRSS32S32
SS33SS33
RDRDRDD8585
DDDDDDRA38-43-50/5"38-43-50/5"
50/5"50/5"AARA
DRARARAD
20
50+50+
93/11""
50 +50 +AARARARARARA
DD.00
DRAF00
78.8
80.080.0
82.482
8383AFAFARARAF
RARA##
419041
<>> FAFAFAAAFAAFAFT22
26.026.0
23.7.7
22.92
TFTAFTAFAAFA
1061 TTFTFTFF37TTTFTFTFTFTTTT19TTTTTT
DDDRT
RAT
DAF
4-6-6
11-12-14
24-10-7
4-6-9
4-6-8
4-7-9
4-5-10
4-5-8
632.0
623.7
607.7
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
18.9
11.4
15.6
16.6
15.7
119
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
12
26
17
15
14
16
15
13
0.8
9.0
25.0
6500*
4500*
4500*
10870
3000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351211.7Easting: 13466133.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 7 feet
Ground Surface Elevation 632.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:10/18/2016 LOG OF TEST BORINGTB-103LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
9 inches of PORTLANDCEMENT CONCRETE
FILL - Medium densepoorly graded fine sandwith silt, trace gravel, tracetopsoil above 2.5 ft., brown,moist (SP-SM)
Very stiff to hard LEANCLAY, trace sand, tracegravel, gray (CL)
Stiff LEAN CLAY with sand,trace gravel, gray (CL)
DRSS66
SS7SS7DRDRDD2020
DDDDDDRA4-7-94-7-
ADRRAD
1414
16
ARARARADRAF15.015.0AAFRA
0*0*
4500*45 FAAFAFAFT18.918
11.41.4FTA
TAFTFTTFTFTTTFTFTTTTTTTTT
DDDRT
RAT
DAF
83
35
87
92
4-5-8
4-14-20
15-17-9
3-4-6
593.7
588.7
582.7
35.0
40.0
45.0
50.0
55.0
56.5
60.0
61.5
65.0
26
18
17
23.5
16.0
16.2
23.0
22.1
22.8
118
109
102
105
SS9
SS10
SS11
ST12
SS13
VS1
ST14
VS2
ST15
46
34
37
13
34
26
10
39.0
44.0
50.0
2500*
4500*
6170
4630
3000*
5780
4500
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351211.7Easting: 13466133.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 7 feet
Ground Surface Elevation 632.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:10/18/2016 LOG OF TEST BORINGTB-103LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff LEAN CLAY with sand,trace gravel, gray (CL)
Dense to medium denseSILTY FINE SAND withgravel, gray, moist (SM)
Very stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Vane shear test at56.5 ft. terminated earlydue to high force gaugereadings.
DRSS133
VS11
RDDDRDD55DDDDRA3-4-6RA
DRADRRAARARARARAF45.00
50.050AFRAFRAAF4500*450
6170AFAFAAFDDDDRRADRAFT16.016.0
AFFTAFTTFFTFTFFTTTFTFTFTTTTTTTTT
DAF
97
3-4-4
4-4-5
100
43-60
557.7
545.7
538.2
66.5
70.0
71.5
75.0
80.0
81.5
85.0
89.0
94.5
18
23.4
27.9
25.1
23.6
7.9
9.1
102
103
VS3
ST16
VS4
SS17
ST18
VS5
SS19
SS20
SS21
38
8
9
100+
60+
75.0
87.0
94.5
4970
4400
4790
2000*
4520
5970
2200#
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 75Engineer on Rig: S. SwaminathanDrilling Method: 4 inch SSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 351211.7Easting: 13466133.5
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: 7 feet
Ground Surface Elevation 632.7 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:10/18/2016 LOG OF TEST BORINGTB-103LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Very stiff to stiff LEANCLAY, few sand, tracegravel, gray (CL)
NOTE: Vane shear test at56.5 ft. terminated earlydue to high force gaugereadings.
Very stiff to stiff LEANCLAY, trace sand, gray(CL)
Hard LEAN CLAY, tracesand, trace gravel, gray(CL)
End of Boring at 94.5 ft.(Terminated upon SPTsample refusal)
DRSS199
SS20S20DRDRDDD8585
DDDDDDDDRA4-4-54-4-
ARADRRAD
9
ARARARARARAF80.080.0
81.581.5ARAAFRA
0*0*
4520
5970FAAAFAF
DRRADD87.0 D
AFT27.92
25.125.1FTA
TAF103
TFTTFTFTTFFTFTTTTTTTTTTT
DAF
87
8-7-9
6-5-5
3-4-5
3-4-7
4-7-8
3-6-8
3-5-7
3-6-8
631.9631.5
626.5
624.5
622.5
2.5
5.0
7.5
10.0
15.0
20.0
25.0
30.0
7
20.6
13.7
13.9
15.6
14.8
15.2
123
SS1
SS2
SS3
SS4
SS5
SS6
SS7
SS8
24
16
10
9
11
15
14
12
14
0.71.0
6.0
8.0
10.0
9000*
6500*
6000*
6500*
4500*
4000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/28/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 350654.1Easting: 13466456.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:12/1/2016 LOG OF TEST BORINGTB-102LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of PORTLANDCEMENT CONCRETEField Engineer reported 4inches of FILLFILL - Medium densepoorly graded fine sand,trace silt, trace gravel,brown, moist (SP)
Hard LEAN CLAY, tracesand, trace gravel, darkbrown (CL) (Possible Fill)Very stiff SILTY CLAY, fewsand, occasional silt layers,gray (CL-ML)
Very stiff to stiff LEANCLAY, few sand, gray (CL)
NOTE: Poor recovery onShelby tube ST11 at 44 ft.Vane shear test at 45.5 ftterminated early due tohigh force gauge readings. DRSS66
SS7SS7DRDRDDD2020
DDDDRA3-6-83-6-
ADRRAD
1515
14
ARARARARAF15.015.0AAFRA
0*0*
6000*60 FAAFAFDDDDDRRADRAFT13.71
13.93.9FTA
TAFTFTTFFTFT244TFTTTFTT87TT77TTTTTTT
DAF
ft.ft.
74
3-4-8
3-5-7
4-7-10-14
4-6-9-10
3-5-7-9
4-5-7-9
1-3-5-6
2-3-5-5
586.5
576.5
35.0
40.0
44.0
45.5
46.0
48.0
50.0
52.0
54.0
56.0
57.5
58.0
60.0
62.0
64.0
65.5
14
16.9
16.8
9.3
11.6
16.1
17.2
18.6
16.3
19.7
22.7
23.9
24.0
23.1
128
116
105
SS9
SS10
ST11
VS1
DP12
SS13
SS14
SS15
ST16
SS17
VS2
DP18
SS19
SS20
ST21
VS3
29
12
12
17
15
12
12
8
8
46.0
56.0
2000*
3500*
2350
<>
4000*
3500*
3500*
3900
2500*
4790
<>
2200#
2200#
2780
3980
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/28/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 350654.1Easting: 13466456.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:12/1/2016 LOG OF TEST BORINGTB-102LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff LEANCLAY, few sand, gray (CL)
NOTE: Poor recovery onShelby tube ST11 at 44 ft.Vane shear test at 45.5 ftterminated early due tohigh force gauge readings.
Very stiff to stiff LEANCLAY with sand, tracegravel, gray (CL)
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
SS15SS15
ST16ST16
SS17
VS2VS2
DD
RDRDRDDDRA14
4-6-9-104-6-9-10
3-5-7-95-7-9
4-5-74RARA
DRDRDRA1717
15
1212 AARARARRAD55DDDDDDDRD56.056.0 DRAF45.5
46.0
48.048.0
50.050
52.52.
FAFAFRARAAF23502350
<>
4000*4000
3500*
FAFAFAAFAFAFT9.3
11.611
16.16.1FTAFAFAFTFT128 TFTFFFTFTTFTFTFTTTTTTTTFTFTTT
RAT
DAF
96
2-4-5-7
1-1-4-5
2-4-4-6
2-3-5-5
2-4-4-7
5-8-11
50/5"
60
545.5
66.0
68.0
70.0
71.5
72.0
74.0
76.0
78.0
79.5
80.0
82.0
84.0
85.5
88.9
94.0
24
24.6
25.2
24.5
20.3
25.0
25.6
26.1
25.5
23.0
24.4
23.8
8.1
9.4
103
102
DP22
SS23
ST24
VS4
DP25
SS26
SS27
ST28
VS5
DP29
SS30
SS31
SS32
SS33
SS34
41
9
5
8
8
8
19
50 +
60+
87.0
<>
2000*
3570
3290
<>
2500*
1800#
2320
3540
<>
1800#
1800#
1200#
9000+*
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/28/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 350654.1Easting: 13466456.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:12/1/2016 LOG OF TEST BORINGTB-102LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
>>
Very stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
Hard LEAN CLAY, withsand, trace gravel, frequentclayey sand seams,occasional silty sandlayers, gray (CL)
DRSS31SS31
SS32S
SS33S33
RDRDRDDD8585
DDDDDDDDRA2-3-5-52-3-5-5
2-4-4-74-7
5-8-115-8
AARADRDRDD
8
8
19
AAARARRRARAF78.0
79.579.
80.00
82.082.0
84.084.0
FAFAFRARAR
800#800#
23202320
3540
<><>
1800#
FFAFAFAAAFDRRADD87.0 D
AFT.0.0
25.6
26.126.1
25.55
2
FTFTAFAFA
102 TTFTFTFFTTFTFTFFTFTTTTTTTTTTT
DAF
37-50/5"533.1 99.4 11.3SS35 50 +99.4
9000+*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:11/28/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 350654.1Easting: 13466456.8
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 87 ft.
DATE COMPLETED:12/1/2016 LOG OF TEST BORINGTB-102LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
End of Boring at 99.4 ft.(Terminated upon SPTsample refusal)
DRD120DDDDDDDRARARAFAFDRRADRAFTFTFTTTTTT
DAF
66
4-5-5
4-6-8
2-2-5
3-5-6
3-5-6
5-6-8
3-7-9
630.8
629.0
626.5
2.5
5.0
7.5
10.0
15.0
20.0
23.0
25.0
30.0
11
25.1
20.6
14.4
14.7
14.2
14.6
14.8 122
SS1
SS2
SS3
SS4
SS5
SS6
ST7
SS8
ST9
25
10
14
7
11
11
14
16
0.7
2.5
5.0
6500*
6500*
7500*
5000*
6000*
5000*
6860
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 350068.3Easting: 13466604.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:10/21/2016 LOG OF TEST BORINGTB-101LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
8 inches of PORTLANDCEMENT CONCRETEFILL - Medium densepoorly graded fine sandwith topsoil, trace silt, tracegravel, dark brown, moist(SP)Medium dense poorlygraded FINE SAND, tracesilt, trace gravel, brown,moist (SP) (Possible Fill)
Very stiff to stiff SANDYLEAN CLAY, trace gravel,gray (CL)
DRSS66
ST7
SS8SS8DRDDRDRDDD2020
DDDDDDDDRA5-6-85-6-
ADRDRADRD
1111
14
ARARARARAF15.015.0AAFRA
0*0*
7500*75 FAAFAFDRRADRAFT20.62
14.44.4FTA
TAFFTTFTTFFTTFTTTFTFTTTTTTTTTTTT
DAF
34
83
5-7-13
16-12-10
3-4-5
594.5
588.5
573.5
35.0
37.0
40.0
45.0
48.0
49.5
56.0
58.0
59.5
62.0
63.5
10
22
14.5
18.9
27.1
33.6
19.5
20.6
24.2
93
102
SS10
ST11
SS12
SS13
ST14
VS1
DP15
ST16
VS2
ST17
VS3
26
40
20
22
9
37.0
43.0
58.0
3500*
3500*
<>
1520
3610
<>
1500*
4160
2500*
3540
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 350068.3Easting: 13466604.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:10/21/2016 LOG OF TEST BORINGTB-101LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff to stiff SANDYLEAN CLAY, trace gravel,gray (CL)
Medium dense SILTY FINESAND, few gravel, gray,moist (SM)
Medium to stiff LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 56ft. due to sample falling outof sampler, direct pushedto 56 ft. to retrieve sample
Very stiff to stiff LEANCLAY, few sand, few totrace gravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 75and 78 ft. due to samplefalling out of sampler, directpushed to 75 ft. to retrievesample
DRDP15
ST1ST1
RDDRD55DDRARARADDRARARAARADDDDDDRDRAF45.00
48.048.0
49.549.5AFRARAFAF<><>
15201520
3610AFAAFAFAFAFT27.127.1
33.63.6AFAFTAF9
TFFTFTFTFTFTFTTTTTTTRA
T
DAF
90
96
44
3-4-5
2-3-4
9-13-18
31-43-50/5"
553.5
543.0
539.5
66.0
68.0
69.5
75.0
78.0
80.0
81.5
85.0
90.0
94.9
19
19
24.7
24.5
29.9
28.1
23.3
10.2
101
97
SS18
ST19
VS4
DP20
NR21
ST22
VS5
SS23
SS24
SS25
39
39
9
7
31
93/11"
78.0
88.5
92.0
2000#
3910
3110
<>
930
3790
2000#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 350068.3Easting: 13466604.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:10/21/2016 LOG OF TEST BORINGTB-101LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
Very stiff to stiff LEANCLAY, few sand, few totrace gravel, gray (CL)
NOTE: No recovery onShelby tube attempt at 75and 78 ft. due to samplefalling out of sampler, directpushed to 75 ft. to retrievesample
Soft to stiff LEAN CLAY,trace sand, trace gravel,gray (CL)
Dense SILTY FINE SAND,trace gravel, gray, wet (SM)
Extremely dense to verydense poorly-graded FINETO COARSE SAND withsilt, trace gravel,occasional lean clay/clayeysand layers, gray, wet(SP-SM)
DRSS2323
SS24SS24DRDRDDD8585
DDDDDDDDRA2-3-42-3-
ARADRRAD
7
AARARRARARAF78.0
80.080.0
81.581.5AFARAFRA930
3790FAFAAFAF
DRRAD88.588.5 D
AFT29.929.9
28.128.1FTAFA
TFT97FTFTFTFTFTFTFTFTTTTTTTTTTT
DAF
28-30-34531.5
100.0SS26 64100.0
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: DLZDrill Rig: CME 55Engineer on Rig: S. WhooleryDrilling Method: 2 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Cement-Bentonite Grout/PatchChecked By: ALOGQA/QC By: JA
DATE STARTED:10/17/2016
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 350068.3Easting: 13466604.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 631.5 ft
Remarks: UCS at vane shear estimated by 2xfield shear strength. Driller reported harddrilling starting at 92 ft.
DATE COMPLETED:10/21/2016 LOG OF TEST BORINGTB-101LABORATORY DATA
DRAFT
7/28/17
PAGE 4 of 4TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
100
105
110
115
120
125
130
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
>>
End of Boring at 100 ft.
DRD120DDDDDDDRARARAFAFDRRADRAFTFTFTTTTTT
DAF
70
75
7-6-5
5-5-6
3-8-11
8-10-14
22-17-16
5-8-11
9-11-16
8-9-11
6-9-14
5-10-17
631.5
629.5
624.5
616.5
612.5
2.5
5.0
7.5
10.0
15.0
17.5
20.0
22.5
25.0
30.0
15
18
27.1
12.3
15.5
17.0
16.3
119
120
SS1
SS2
SS3
SS4
NR5
SS6
SS7
SS8
SS9
SS10
31
35
11
11
19
24
33
19
27
20
23
27
1.0
3.0
8.0
16.0
20.0
9000*
7000*
<>
7000*
6500*
5000*
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: H. BharadwajDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/6/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 349288.8Easting: 13466716.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks:
DATE COMPLETED:10/6/2015 LOG OF TEST BORINGTB-01LABORATORY DATA
DRAFT
7/28/17
PAGE 1 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
0
5
10
15
20
25
30
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
12 inches of CLAYEYTOPSOIL, brownFILL - Medium densemixed poorly graded finesand and topsoil, trace silt,trace clay, trace gravel,brown and dark brown,moistFILL - Alternating layers ofmedium dense poorlygraded fine sand andtopsoil, trace silt, brownand dark brown, moist (SP)
Hard LEAN CLAY, fewsand, trace gravel, gray(CL)
NOTE: No recovery onSPT sample attempt at 15ft. due to sample falling outof sampler.
Very stiff SANDY LEANCLAY, trace gravel, gray(CL)
NOTE: Poor recovery onSPT sample SS7 at 20 ft.
Very stiff LEAN CLAY withsand, trace gravel,occasional clayey sandseams below 40 ft., gray(CL)
DRSS77
SS8
SS9SS9
RDRDDRDRDDD2020
DDDDDDDDRA6
5-8-115-8-11
9-11-169-11-
8-9-111
ARADRDRARADRDRA3333
19
27
ARARARARARARAF15.015.0
17.517ARAAFRARAA7000AF
0*0*
FAAAFAAFDRRAD
.00
DAFT27.12
FTA
TAFAFTTFTTFFTTFTTTFTFTTTTTTTTTTTT
DAF
70
65
5-9-12
5-9-14
13-11-11
3-3-4
3-4-5
3-4-6
4-6-7
589.5
585.5
35.0
40.0
45.0
50.0
55.0
60.0
65.0
14
13
15.5
15.9
19.2
24.4
32.0
41.6
24.5
120SS11
SS12
SS13
SS14
SS15
SS16
SS17
30
30
21
23
22
7
9
10
13
43.0
47.0
4500*
5000*
3500*
2000*
2000#
1000#
1800#
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: H. BharadwajDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/6/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 349288.8Easting: 13466716.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks:
DATE COMPLETED:10/6/2015 LOG OF TEST BORINGTB-01LABORATORY DATA
DRAFT
7/28/17
PAGE 2 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
35
40
45
50
55
60
65
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Very stiff LEAN CLAY withsand, trace gravel,occasional clayey sandseams below 40 ft., gray(CL)
Stiff SANDY LEAN CLAY,trace gravel, gray (CL)
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 70ft. due to sample falling outof sampler. Poor recoveryon SPT samples SS19 at72.5 and SS21 at 80 ft.
DRA3-3-43-3-4
3-4-5RADRADRSS155 RDDR
7 ARARARAD55DDDDDDDRDRAF45.00
50.050AFRAFRA
3500*350
2000AFAFAAFAFT1
TT19.219.2
AFFTA
TFFT303
TFTFTTFTFTTTRA
T
DAF
4-6-7
5-6-7
4-6-8
3-5-6552.5
70.0
72.5
75.0
80.0
28.5
34.5
NR18
SS19
SS20
SS21
13
13
14
1180.0
<>
1200#
<>
BORING LOCATION INFORMATIONUpon Completion: n/a
Coordinates/GSE determined by:Survey
#*
<>
SPT N VALUE 10 20 30 40
% P
AS
SIN
G #
200
Drilling Company: Brax DrillingDrill Rig: CME 75Engineer on Rig: H. BharadwajDrilling Method: 3 1/4 inch HSA/WRMethod Notes: WR drilling started at 10 ft.Hammer Type: AutomaticBackfilled With: Monitoring WellChecked By: ALOGQA/QC By: JA
DATE STARTED:10/6/2015
NO
. OF
BLO
WS
FOR
6-in
chD
RIV
E
ELE
VA
TIO
Nft
Northing: 349288.8Easting: 13466716.4
SA
MP
LE T
IPD
EP
TH (f
t)
PLA
STI
CIT
Y IN
DE
X
UCC STRENGTH (psf) 2000 4000 6000 8000
KEY
FIELD DATA
First Encountered: none
Ground Surface Elevation 632.5 ft
Remarks:
DATE COMPLETED:10/6/2015 LOG OF TEST BORINGTB-01LABORATORY DATA
DRAFT
7/28/17
PAGE 3 of 3TorvanePenetrometerDisturbed Sample
MO
ISTU
RE
CO
NTE
NT
(%)
DR
Y D
EN
SIT
Y (p
cf)
DE
PTH
(ft)
65
70
75
80
85
90
95
SA
MP
LE N
O.
LIQ
UID
LIM
IT
N V
ALU
E
MOISTURE CONTENT (%) 10 20 30 40
PROJECT NO. 2014195C
GROUNDWATER READINGS
LOG OF SOIL PROFILE
I-75 Modernization ProjectORC Tunnel Design InvestigationNorth of 8 Mile Rd (M-102) to South of 12 Mile RdOakland County, Michigan
UN
CO
NFI
NE
D C
OM
PS
TRE
NG
TH (p
sf)
Somat Engineering, Inc.
LOG
OF
TES
T B
OR
ING
I-7
5 D
ES
IGN
BU
ILD
MO
DE
RN
IZA
TIO
N 2
018.
GP
J S
OM
AT.
GD
T 7
/28/
17
Stiff to medium LEANCLAY, trace sand, tracegravel, gray (CL)
NOTE: No recovery onSPT sample attempt at 70ft. due to sample falling outof sampler. Poor recoveryon SPT samples SS19 at72.5 and SS21 at 80 ft.
End of Boring at 80 ft.
DRD8585
DDDDDDDDRAA1111 AARARAF80.080.0AAF0#0#
<> FAAFAFDRRADRAFT28.528
34.54.5FTA
TAFTFTTFTFTTTFTFTTTTTTTTTTT
DAF