Draft FY09-13 NSTX EBW Research Plan G. Taylor NSTX Wave-Particle Research Planning Meeting
description
Transcript of Draft FY09-13 NSTX EBW Research Plan G. Taylor NSTX Wave-Particle Research Planning Meeting
1Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
Draft FY09-13 NSTX EBW Draft FY09-13 NSTX EBW Research PlanResearch Plan
G. TaylorG. Taylor
NSTX Wave-Particle Research Planning MeetingNSTX Wave-Particle Research Planning Meeting June 28, 2007 June 28, 2007
• Research goals
• Status of ST EBW research
• FY09-13 NSTX EBW research plan
2Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
EBWCD Supports Solenoid-Free ST Development & Can EBWCD Supports Solenoid-Free ST Development & Can Enhance Performance of Fusion Component Test FacilityEnhance Performance of Fusion Component Test Facility
• EBWH and/or ECH can EBWH and/or ECH can assist solenoid-free ST assist solenoid-free ST plasma startup & off-axis plasma startup & off-axis EBWCD can stabilize & EBWCD can stabilize & sustain sustain > 20% ST plasmas> 20% ST plasmas
• Adding 1 MA of off-axis Adding 1 MA of off-axis EBWCD to CTF plasma EBWCD to CTF plasma generating wall loading of generating wall loading of 1 MW/m1 MW/m22 can decrease can decrease llii
from 0.5 to 0.25 & increase from 0.5 to 0.25 & increase qqoo from ~ 2 to ~ 4 from ~ 2 to ~ 4
Y-K. M. Peng, et al., Plasma Phys. Control. Fusion, Y-K. M. Peng, et al., Plasma Phys. Control. Fusion, 4747 B263 (2005) B263 (2005)
li=0.5qo~2
li=0.25qo~4
Add 1 MAEBWCD
Pnb=30 MWPebw=10 MW
Pnb=30 MW
3Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
Long-Term NSTX EBW Research Goal to Long-Term NSTX EBW Research Goal to Assess EBWCD Assess EBWCD as a Tool for Sustaining as a Tool for Sustaining > 20% Solenoid-Free Plasma > 20% Solenoid-Free Plasma
FY09-13 Research Goals:FY09-13 Research Goals:• Develop ECH-assisted plasma startup to increase TDevelop ECH-assisted plasma startup to increase Tee sufficiently for sufficiently for
effective HHFW couplingeffective HHFW coupling• Evaluate EBWH-assisted overdense plasma IEvaluate EBWH-assisted overdense plasma Ipp ramp-up ramp-up
• Demonstrate efficient EBW coupling at RF powers ~ 300 kWDemonstrate efficient EBW coupling at RF powers ~ 300 kW– Assess effect of ponderomotive force, heating & parametric decay Assess effect of ponderomotive force, heating & parametric decay
@ UHR on EBW coupling efficiency @ UHR on EBW coupling efficiency
• Test EBW heating at RF powers ~ 600 kW: Test EBW heating at RF powers ~ 600 kW: – Benchmark EBW code predictions for heating efficiency & localization
• Test off-axis EBWH & core EBWCD with RF powers ~ 1 MW– Benchmark EBW code predictions for core Fisch-Boozer CD
4Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
Modeling Predicts EBWCD Can Provide Stabilizing Current Modeling Predicts EBWCD Can Provide Stabilizing Current Needed for Needed for > 20% Non-Inductive NSTX Scenarios > 20% Non-Inductive NSTX Scenarios
NSTX, NSTX, tt = 42%, = 42%, polpol = 1.6 = 1.6 BBtt = 0.34 T , I = 0.34 T , Ip p = 1 MA= 1 MA
TotalTotal
BootstrapBootstrapNBCDNBCD
r/a
RFCD00
101066
110.50.500
TSC Simulation
C. Kessel, et al ., Nucl. Fusion C. Kessel, et al ., Nucl. Fusion 4545, 814 (2005), 814 (2005) G. Taylor, et al ., Phys. Plasmas G. Taylor, et al ., Phys. Plasmas 1111, 4733 (2004), 4733 (2004)
J||
(A/Wb)
J(A/cm2)
Deposition similar for 14 GHz & 28 GHz and = 20-40%
CQL3D
5Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
Measured 80% fMeasured 80% fcece B-X-O Coupling in NSTX L-Mode Edge B-X-O Coupling in NSTX L-Mode Edge Plasmas, Consistent with ModelingPlasmas, Consistent with Modeling
G. Taylor et al., , Phys. Plasmas Phys. Plasmas 1212, 052511 (2005) , 052511 (2005) J. Preinhaelter et al., AIP Proc. J. Preinhaelter et al., AIP Proc. 787787, 349 (2005), 349 (2005)
• 3-D ray tracing & full wave3-D ray tracing & full wave EBW mode conversion model EBW mode conversion model using EFIT magnetic equilibriumusing EFIT magnetic equilibrium & Thomson scattering T& Thomson scattering Tee & n & nee
f =16.5 GHz
NSTX Shot 113544
CalculatedEBW Trad
NSTX Shot 113544EBW Frequency = 16.5 GHz
Te of EBWEmission Layer
Time-AveragedMeasuredEBW Trad
1.5
1.0
0
Trad & Te(keV)
1.5
1.0
R (m)
0 0.3 0.6
Radius of EBWEmission Layer
RLCFS
Raxis
TIME (s)
0.5
Frequency = 16.5 GHz, Bt(0) = 4.5 kG
1.2
-1
0
1
1.6
fce 2fce
Z(m)
R(m)0.80.4
UHR
LCFSEBWRays
2fce
xO
kperp
O-Mode
UpperHybrid
Resonance
RadiusxL
Slow X-Mode
EBWElectromagnetic
Antenna
6Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
30-50% B-X-O Coupling Efficiency Recently Measured at 30-50% B-X-O Coupling Efficiency Recently Measured at ffcece & 2f & 2fcece in Li-Conditioned, High in Li-Conditioned, High , f, fBSBS, H-mode Plasmas, H-mode Plasmas
• Preliminary analysis of recent NSTX EBW emission measurements show 30-50% B-X-O coupling for 18 GHz (fce) & 28 GHz (2fce)
• Li conditioning with LITER increased fce B-X-O coupling:
– Li increased Te in the fce B-X-O coupling layer, reducing EBW collisional damping
7Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
EBW Heating via O-X-B Coupling EBW Heating via O-X-B Coupling Demonstrated on MAST & TCVDemonstrated on MAST & TCV
TCVTCV
TTee
(keV)(keV)
0.70.7
000.20.2 0.90.9R (m)R (m)
Without Without EBWHEBWH
With With EBWHEBWH
00 0.30.3Time (s)Time (s)
Time = 0.18 sTime = 0.18 s
Bt(0) = 1.5 T, , f = 82.7 GHz (2fce) MASTMAST
<n<neel>l>(10(102020mm-2-2))
SXRSXR(a.u.)(a.u.)
0.80.8
000.40.4
0033
00
PowerPower(MW)(MW)
f = 60 GHz (2fce & 3fce)
• Non-inductive MAST startup plasma recently heated by 90kW, 28 GHz to Te ~ 500 eV, at ne ~ 2x1018 m-3,
generating Ip ~ 32 kA (May 2007)
A. Mueck, et al ., A. Mueck, et al ., Phys. Rev. Lett. 98, 175004 (2007)
V. Shevchenko, et sl., Proc. EC-14, p. 54 (2006)V. Shevchenko, et sl., Proc. EC-14, p. 54 (2006)
8Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
350 kW, 28 GHz, 500 ms, Heating System Being Installed on 350 kW, 28 GHz, 500 ms, Heating System Being Installed on NSTX for Initial Operation in FY09NSTX for Initial Operation in FY09
ProposedO-X-B
Launcher
• Additional Gyrotrons proposed for FY10 & FY11 operation, providing ~ 1 MW of 28 GHz power by FY12• Possible operation at 15.3 GHz for fce EBWH on NSTX
9Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
Proposed Pegasus 2.45 GHz EBW Heating ProgramProposed Pegasus 2.45 GHz EBW Heating ProgramCould Complement NSTX 28 GHz EBW ProgramCould Complement NSTX 28 GHz EBW Program
• Significant hardware available at 2.45 GHz– Plan to use PLT LH system– Klystrons at PPPL and ORNL (up to 1 MW available)
• EBW heating power comparable to Ohmic heating
• New tools coming online– Plasma control system to maintain stationary edge in 2007– Hard/soft X-ray camera for absorption imaging / q-profile diagnostic
• Extended periods of dedicated runtime available
• $300k to implement
• Could be install & commissioned in 2 years
10Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
Pegasus 2.45 GHz EBW Program has Important GoalsPegasus 2.45 GHz EBW Program has Important Goalsbut Lacks Fundingbut Lacks Funding
• Program could demonstrate significant EBW heating & current drive in an ST at fce
– 1 MW of 2.45 GHz microwave power -> ~ 400 kW coupled to EBW– Presently plan for O-X-B launch– Pebwh ~ Poh
• Validate models of ray tracing and absorption– Recent observation of possible peeling modes at edge complicates coupling
physics
• Study lower hybrid parametric instability– Should be readily destabilized with 20-100 kW for Pegasus conditions
• Originally planned to start installation in 2007, but now indefinitely delayed due to lack of funding
11Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
FY09-10 EBW Research PlanFY09-10 EBW Research Plan
• 350 kW 28 GHz gyrotron system operational350 kW 28 GHz gyrotron system operational– 500ms pulse length500ms pulse length– Possibly 100-200 kW at 15.3 GHz Possibly 100-200 kW at 15.3 GHz
• ECH-assisted startup using fixed horn launcher at Bay G midplane:ECH-assisted startup using fixed horn launcher at Bay G midplane:– Heat CHI & PF-only startup plasma to ~ 300 eV for HHFW couplingHeat CHI & PF-only startup plasma to ~ 300 eV for HHFW coupling
FY09FY09
FY10FY10• Install second 350 kW 28 GHz gyrotronInstall second 350 kW 28 GHz gyrotron• Install fixed (or locally-steered) O-X-B launcher for IInstall fixed (or locally-steered) O-X-B launcher for Ipp flat top at Bay G: flat top at Bay G:• 300 kW EBW coupling & core heating expts:300 kW EBW coupling & core heating expts:
– High resolution edge THigh resolution edge Tee MPTS MPTS– Edge reflectometer at launcher for measuring local LEdge reflectometer at launcher for measuring local Lnn – Antenna probe for measuring lower hybrid parametric instabilityAntenna probe for measuring lower hybrid parametric instability
• Install fixed EBW horn launcher for EBW-assisted startup & IInstall fixed EBW horn launcher for EBW-assisted startup & Ipp ramp up expts. ramp up expts.
12Draft NSTX FY09-13 EBW Research Plan - G. Taylor - June 28, 2007
FY11-13 EBW Research PlanFY11-13 EBW Research Plan
• 600 kW EBW core & off-axis heating expts600 kW EBW core & off-axis heating expts• Continue EBW-assisted startup & IContinue EBW-assisted startup & Ipp ramp up expts. ramp up expts.
FY11FY11
FY12-13FY12-13• Install third 350 kW 28 GHz gyrotronInstall third 350 kW 28 GHz gyrotron• Install remotely-steered O-X-B launcher next to HHFW antennaInstall remotely-steered O-X-B launcher next to HHFW antenna• 1 MW off-axis EBW heating & core EBWCD (Fisch-Boozer CD) expt.1 MW off-axis EBW heating & core EBWCD (Fisch-Boozer CD) expt.
ProposedRemotely-Steered
EBW Launcher
8-Strap HHFWAntenna
NSTX Double FeedHHFW Antenna
(circa 2012)
13
2009-13 EBW Research Plan Timeline2009-13 EBW Research Plan Timeline
300kW EBW
Coupling& CoreEBWH
5 year
ECH Assisted Startup
08 09 10 11 12 13FY07 14
Tools
PhysicsPhysics
EBW Plasma Startup Launcher
1st 350 kW 28 GHz Gyrotron
EBW Emission Measurements
Remotely Steered EBW Launcher
ECH Launcher
3rd 350 kW 28 GHz Gyrotron
2nd 350 kW 28 GHz Gyrotron
Fixed or Locally Steered EBW
Launcherfor Ip Flat Top
EBW assisted startup& Ip Ramp Up
600kW EBWH
1 MW Off-Axis EBWH & Core EBWCD
8-40 GHz EBW Radiometers with Remotely Steered Antennas