Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton...

24
Draft Environmental Assessment West Carleton Environmental Centre 6-100 chapter 6. detailed impact assessment of the undertaking Figure 6-31 Archaeology Study Area

Transcript of Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton...

Page 1: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-100

chapter 6. detailed impact assessment of the undertaking

Figure 6-31 Archaeology Study Area

Page 2: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-101

chapter 6. detailed impact assessment of the undertaking

Figure 6-32 Stage 2 Archaeological Assessment

Page 3: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-102

chapter 6. detailed impact assessment of the undertaking

6.7.6.1 Detailed Description of the Cultural Heritage Environment Potentially Affected

During the visual review of Cultural Heritage Resources it became apparent that there were a

number of cultural resources identified during the Existing Conditions field work in 2006 that

were no longer extant. These resources are described below.

BHF2 – 2491 Carp Road

A garden shed business occupied the property when the visual review was completed on January

9, 2012. This garden shed business appears to have been in place when the Existing Conditions

Report was done in 2006. That report identifies the building on that property as seeming to be

“abandoned.” A review of the aerial photographs shows that there was no evidence of the

structure by 2008. An email from the City of Ottawa’s heritage planner stated that there is a “shed

business on the southwest corner of Carp Road and Richardson Side Road. There have been a

number of demolition permits for buildings on this site; this may be one of them.”

BHF4 – 2511 Carp Road

The area where this house would have been was an open field when the visual review was

completed on January 9, 2012. A check of the air photos shows no evidence of the structures

on the 2008 images. An email from the heritage planner indicates only that the structures were

“demolished” but offers no date.

CLU7 – 2425 Carp Road

Access to this site was difficult because of the snow and the overgrown nature of the property.

However, despite views from several locations, this cultural resource could not be located

during the visual review completed January 9, 2012. The buildings show on the latest aerial

photograph (2008) and so must have been demolished in the last three years. The City of

Ottawa heritage planner reported that “building demolished, not clear which one.”

Accordingly the above-listed properties were removed from further consideration as built

heritage features (BHF) or cultural landscape units (CLU).

The City of Ottawa’s heritage planner also stated that 2431 Carp Road (BHF1) “appears to have

been demolished, permit issued 2007;” however, the property is a fairly large kitchen cabinet

factory and the demolition could have related to another building. The building shown in the

Cultural Heritage Existing Conditions Report (Supporting Document #1 – Existing

Conditions Technical Reports) is still standing and the built heritage feature which is identified

in the report remains on the list for further consideration.

Page 4: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-103

chapter 6. detailed impact assessment of the undertaking

The locations of the existing and no longer extant resources are shown in Figure 6-33.

6.7.6.2 Potential Effects on Cultural Heritage

The potential effects on cultural heritage resources from the Preferred Alternative Landfill

Footprint are described below.

BHF1 – 2413 Carp Road

The setting for this building has already been significantly altered to accommodate the use by

Laurysen kitchen manufacturers. Further work done as part of the construction of the WCEC will

not have an impact. WM has identified this building as having potential for a future landfill

administrative office. An appropriate use for the building, such as offices, is essential to the long

term preservation of its heritage values.

BHF3 – 2193 Richardson Side Road

Building is more than 0.6 km from the site operations. Heritage values will not be affected as

long as visual buffering is provided.

CLU4 – 27 William Mooney Road

Farm complex is more than 0.35 km from the site operations. Heritage values will not be

affected as long as visual buffering is provided.

CLU5 – 569 William Mooney Road

Farm complex is approximately 300 m from the site operations. Heritage values will not be

affected as long as visual buffering is provided.

CLU6 - 2485 Carp Road

Farm complex is almost 0.5 km from the site operations. Heritage values will not be affected as

long as visual buffering is provided.

6.7.6.3 Culture Heritage Mitigation and/or Compensation Measures

Measures to mitigate the potential effects on cultural heritage resources identified above are

described in the following paragraphs.

Page 5: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-104

chapter 6. detailed impact assessment of the undertaking

Figure 6-33 Location of Cultural Heritage Components

Page 6: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-105

chapter 6. detailed impact assessment of the undertaking

BHF1 – 2413 Carp Road

Prior to any alterations to the building an assessment should be undertaken to identify specific

heritage resources and values of BHF1 and recommended mitigation. Where specific heritage

resources and values are identified, any intervention should be done in accordance with the

Standards and Guidelines for the Conservation of Historic Places in Canada. Alterations to the

area surrounding BHF1 should be suitably planned in a manner that avoids any interventions to

the building.

BHF3 – 2193 Richardson Side Road

Ensure that adequate visual buffering is in place.

CLU4 – 27 William Mooney Road; CLU5 – 569 William Mooney Road, CLU6 - 2485 Carp Road

Ensure that adequate visual buffering is in place.

6.7.6.4 Culture Heritage Net Effects

Implementation of the proposed mitigation measures will result in no net effects on the heritage

values of the cultural heritage resources identified within the Study Area, with the exception of

BHF1 – 2413 Carp Road, which may experience a minor impact to its known heritage value.

6.7.7 Transportation

6.7.7.1 Transportation (Effects from Truck Traffic)

The Transportation Effects from Truck Traffic On-Site and Site-Vicinity Study Areas for the

Preferred Alternative Landfill Footprint at the WCEC are shown in Figure 6-34 and listed below:

On-Site ............. the lands required for the Preferred Alternative Landfill

Footprint;

Site-Vicinity ...... the area that extends south of the Highway 417 eastbound

ramps and ramp terminals on the south side of Highway 417;

east of Carp Road, the Highway 417 westbound off ramp and

eastbound on ramp; north of Richardson Side Road; and West

of William Mooney Road, the Highway 417 westbound on ramp

and the eastbound off ramp

Page 7: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-106

chapter 6. detailed impact assessment of the undertaking

Figure 6-34 Transportation Effects from Truck Traffic Detailed Impact Assessment Study Area

Page 8: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-107

chapter 6. detailed impact assessment of the undertaking

Additional Investigations

Traffic Volumes

The expected traffic volumes generated at the site were estimated in the FCR (Supporting

Document #4 – Facility Characteristics Report). The traffic volumes associated with Phase 2

Operations “Approaching Closure” were used in the analysis to match the timeline of the City of

Ottawa traffic projections which have been prepared for the year 2031. This represents the

maximum traffic on Carp Road and the second busiest period for site traffic, which together

were considered “worst case” conditions for traffic. The City of Ottawa 2031 traffic projections

are for the AM peak period only. Since traffic volumes are relatively similar northbound and

southbound on Carp Road, volumes were reversed to undertake a PM peak analysis.

The number of trips entering and exiting the site in the analysis hour was estimated at 70 (35

entering and 35 exiting) and to this was added 45 trips during the peak AM and PM hours

associated with the ancillary uses (35 entering and 10 exiting in the AM, reversed in the PM).

Since few trips are expected to arrive at the site from the north, only 5 trips were assigned to

this direction and the remainder were considered to arrive from the south as northbound left

turning vehicles.

Traffic volumes for the driveway immediately east of the proposed site access were estimated in

consultation with the business owner. Of the 25 employees estimated to arrive/leave in the peak

hour, 20 were assigned from and to the south and 5 were assigned from and to the north. Few

trucks use this driveway. Occasionally a truck from the north will turn left.

Detailed Description of the Transportation (Effects from Truck Traffic) Environment

Potentially Affected

Traffic Volumes (Site-Vicinity)

The anticipated level of service for the traffic on Carp Road and for the traffic using the site

access was assessed during the review of the preferred landfill footprint. In addition, the impact

of potential future widening of Carp Road from 2 to 4 lanes on traffic operations was assessed.

While this widening is not included in the City’s Transportation Master Plan at this time, traffic

volumes at Carp Road and Richardson Side Road indicate that this section may also require

widening in the future if growth occurs in this area.

Traffic Operations and Level of Service(Site-Vicinity)

The results of the analysis are shown below in Table 6-6 in terms of delay and the related level

of service. The analysis was performed using the Synchro software version 7.0 and the results

Page 9: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-108

chapter 6. detailed impact assessment of the undertaking

are taken from the SimTraffic model, which examined the operations of the proposed site

access as well as the adjacent signalized intersections at Richardson Side Road and the

eastbound Highway 417 ramp terminal intersection. The SimTraffic model is useful for analyzing

the effects of signals on adjacent driveways as in this situation.

In the AM peak, no traffic is estimated to be leaving the east side driveway or turning left out of

the WCEC.

Table 6-6 Intersection Analysis Results

AM

Carp Road WM Access

Northbound Southbound Eastbound

Left Through Right Left Through Right Right

Volume 75 1016 20 5 983 5 45 Delay (s) 22 15 10 10 2 0 16

LOS C B A A A A B

PM

Carp Road WM Access East Side Dwy

Northbound Southbound Eastbound Westbound

Left Through Right Left Through Right Left Right Left Right

Volume 45 1026 0 0 1053 0 5 75 20 5

Delay (s) 12 8 0 0 2 0 136 25 85 57

LOS B A A A A A F C F F

The delays estimated for through vehicles during the simulation indicate that they are required

to slow down for vehicles in front of them turning right into driveways. Similarly, delays for right

turning vehicles indicate that they are slowing down to complete their turns. The longest delays

are experienced by vehicles turning left to exit the WCEC and vehicles turning left to exit the

east driveway due to the high volumes of through traffic on Carp Road with a single lane in each

direction.

If the City of Ottawa widens Carp Road to two lanes in each direction, the level of service at the

site access and east side driveway will improve and delays will be reduced.

The results of the analysis indicate that the traffic on Carp Road will continue to flow under good

operating conditions. The trucks entering and exiting the WM site will experience delays,

especially for vehicles electing to turn left.

Page 10: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-109

chapter 6. detailed impact assessment of the undertaking

Road Network (Site-Vicinity)

The transportation road network in the vicinity of the WCEC is characterized by:

Carp Road, which provides site access and a route to the north and south of

the site;

Highway 417, which provides a major route and connections to the east, west

and north of the site; and

Richardson Side Road, which provides access to the residential areas north

and west of the site as well as an alternative east-west route to Kanata.

These roads were described in detail in the existing conditions.

Driveways to other industrial and commercial operations, including production of aggregates

and precast concrete are located along Carp Road between Highway 417 and Richardson Side

Road. These operations contribute to the level of truck traffic observed along Carp Road in the

site vicinity. One driveway serving an industrial property east of Carp Road is located in the

vicinity of the site access.

Construction of the expansion of Highway 417 in the site vicinity commenced in 2011. The

rehabilitation and widening of the Carp Road bridge over Highway 417 will require one-way

operation (signal controlled) during construction. This work is scheduled for completion before

2014, which is estimated to be the earliest that the landfill expansion would commence.

Potential Effects on Transportation (Effects from Truck Traffic)

More conflicts between left turning trucks and through traffic on Carp Road are anticipated to

occur with the construction and operation of the Preferred Alternative Landfill Footprint. Truck

traffic volumes will be similar to those during previous operations; however, the volume of

through traffic will increase over time. Increased delay for northbound traffic on Carp Road due

to left turning trucks waiting in the roadway to complete their turn is also expected with the

construction and operation of the Preferred Alternative Landfill Footprint. The proposed

northbound left turn lane will add a minor amount of paved surface with minimal effect on runoff,

maintenance and related activities. Other improvements on Carp Road by the MTO and the City

of Ottawa are planned to address traffic operations issues resulting from non-site-related traffic

at locations adjacent to the Site.

Mitigation and/or Compensation Measures for Transportation (Effects from Truck Traffic)

A new site access is proposed that is further north of Highway 417 than the existing entrance

(i.e., the new access would be closer to Richardson Side Road). The new access will include a

Page 11: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-110

chapter 6. detailed impact assessment of the undertaking

northbound left turn lane on Carp Road, designed and constructed in accordance with the

standards and practices of the City of Ottawa and the Province of Ontario and with

consideration for the likely number of trucks that could be present at one time. The location

selected for the access provides improved sight distance over the existing location.

This new left turn lane will improve safety by reducing conflicts between northbound left turning

and through vehicles, by reducing driver frustration and by improving sight distances.

Northbound through drivers will not be forced to wait behind a turning truck until a suitable gap

is available for the truck driver to complete the turn.

This new left turn lane will similarly improve traffic operations by allowing through traffic to

proceed around left turning vehicles, providing an improved level of service. Given the

estimated northbound and southbound traffic volumes on Carp Road, the northbound left turn

lane is warranted in accordance with provincial standards.

The inconvenience to the public during the construction of the left turn lane will be temporary

and similar to that experienced during other similar road construction projects. Staging of traffic

during construction will be done in accordance with City and provincial standards for safety of

construction workers, vulnerable road users and vehicular traffic as well as for reasonable traffic

operations.

Left Turn Lane Design

The appropriate length of the Carp Road northbound left turn lane to the proposed WCEC site

access was assessed using traffic volumes generated for the expected operating conditions

with consideration for the ancillary facilities potentially present at the site as described above.

The experience of WM with respect to the number of trucks potentially arriving at one time was

also considered.

Using the left turn lane warrant graphs in the MTO Geometric Design Standards and the

following data:

Advancing Volume ......................... 983

Opposing Volume ......................... 1016

Left Turning Volume ......................... 75

Design Speed ......................... 100 km/h

% Trucks ...................................... 100%

The storage lane length for a left turn lane into the WCEC facility was determined to be 40 m.

Normal geometric design standards would potentially underestimate the length of left turn lane

Page 12: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-111

chapter 6. detailed impact assessment of the undertaking

required because of the concentration of trucks in the left turning stream at the WCEC and their

operating characteristics, especially when fully loaded. These trucks need a larger gap to

complete their turn. Once the percentage of trucks is considered, the length of the northbound

left turn lane is increased to 75 m. In accordance with MTO standards, 230 m was added to

provide a deceleration lane and a taper length.

For the southbound direction, a left turn lane was added opposite the northbound left turn lane.

The southbound left turning volumes are expected to be small and consist mainly of passenger

vehicles with some trucks. As a result, a minimum storage length of 15 m was applied to the

design of the southbound left turn lane.

Mapping

Mapping was obtained from WM to provide a basis for the design of the northbound left turn

lane from Carp Road to the proposed WCEC site access road. The area was then reviewed in

the field to check for any changes observed since the mapping was created, such as utility

locations and drainage features.

Net Transportation (Effects from Truck Traffic) Effects

With the planned mitigation measures, the resulting net effects on transportation will be as follows:

There will be improved safety when compared with existing conditions with

the separation of northbound through and left turning traffic and the relocation

of the entrance to a location with improved sight distances;

Operations will be improved for northbound through traffic in comparison with

existing conditions since they will not have to wait behind left turning vehicles

at the site access; and

During construction of the proposed left turn lane, minor temporary effects will

remain.

6.7.7.2 Transportation (Integrated Gull Management)

Detailed Description of the Transportation (Integrated Gull Management) Environment

Potentially Affected

In 2009, an Integrated Gull Management Plan (IGMP) was implemented at the Ottawa WMF

(now closed). The Plan included both active and passive management techniques that were

employed by WM on a daily basis in order to reduce the number of gulls using the facility.

Page 13: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-112

chapter 6. detailed impact assessment of the undertaking

A full-time wildlife management officer was employed who was responsible for minimizing the

number of loafing and feeding gulls at the facility. Through the implementation of the

recommendations contained in the IGMP, the landfill was able to successfully reduce the

number of birds using the facility. Data recorded by the Wildlife Management Officer at the

landfill, and correspondence with management at the Carp Airport indicate that there was a

decrease in gull use at the landfill after the program was initiated.

Potential Effects on Transportation (Integrated Gull Management)

The presence of large numbers of gulls can be undesirable for several reasons, including

human sensitization to large gull numbers and the fouling of rooftops, playing fields, water

supply reservoirs and other human use areas in the vicinity of a waste disposal facility.

Gulls may be attracted by the following components of the Preferred Alternative Landfill

Footprint and WCEC facility:

Active tipping face;

Standing fresh water (use it for drinking and bathing purposes and to avoid

ground predators);

Staff lunching outdoors (gulls looking for handouts);

Wind-blown waste (attract gulls that are not familiar with the property); and

Existing and any new buildings that are constructed on the subject property

(could attract loafing gulls).

Mitigation and/or Compensation Measures for Transportation (Integrated Gull Management)

An IGMP will be implemented to manage the presence of gulls at the WCEC facility. The

management of wildlife generally, and especially gulls, at outdoor facilities that handle food

waste inevitably requires the use of active management and deterrents. Deterrents to be

employed as part of the IGMP at the WCEC may include such things as pyrotechnics, propane

cannons, lethal reinforcement, etc.

In addition to the deterrents described above, the IGMP may include some of the recommended

measures described below.

Recommended active tipping face mitigation measures:

Nightly cover should be applied with diligence to the active face;

During the daily cover process efforts should be made to minimize the

amount of waste that protrudes through the cover or is exposed such that it

attracts gulls;

Page 14: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-113

chapter 6. detailed impact assessment of the undertaking

Cover operations must be monitored daily and especially prior to weekends

for exposed waste and additional cover placed over areas where food waste

is at the surface;

Food waste and waste containers should be inaccessible to gulls during

daylight hours; and

Cover must be of a type that does not limit the use of pyrotechnics (due to fire

risk).

Recommended mitigation measures for open fresh water:

Drainage features in low grade areas should be permitted (where feasible) to

in-fill with a moderate amount of emergent vegetation (i.e., cattails);

Stormwater management ponds should, where feasible, be elongated and all

should have deep, steep banks (3:1) that will discourage bird use by blocking

their line of site and making them feel threatened by possible predators. This

will also prevent birds from walking into the ponds;

Vegetation around the ponds should be uncut or long grass at a length of at

least 10 cm; and

Should existing ponds on the site begin to regularly attract numbers of gulls it

may be necessary to overwire the water areas (using engineered posts and

independently attached aircraft wire at 10 m intervals).

Recommended mitigation measures for wind blow waste:

Measures should be taken to minimize the tracking of garbage with food

scraps by waste haulers traveling on the site and exiting from the site;

Wildlife-proof outdoor litter containers should be placed near the buildings;

Conifer shrub landscaping should be at an increased density around the

buildings; and

Regular litter management procedures and techniques should be applied to

reduce the presence of blown litter across the site (when necessary).

Recommended mitigation measure for loafing gulls:

Buildings over one storey in height should have bird spikes (i.e., needle or

porcupine wire) affixed to the ridge lines of the structures.

In order to operate a successful IGMP there must also be adequate staffing, sufficient

communication, and thorough training of all employees at the WCEC facility.

Page 15: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-114

chapter 6. detailed impact assessment of the undertaking

Net Transportation (Integrated Gull Management) Effects

With the proper implementation of an IGMP at the WCEC facility, the presence of gulls at the

WCEC will be minimized.

6.7.8 Land Use

For the purposes of the Detailed Impact Assessment, the On-Site Study Area is defined as the

lands for the Preferred Alternative Landfill Footprint; the Site-Vicinity Study Area is defined as all

properties lying wholly or partially within a 500 m radius of the Preferred Landfill Footprint; and

the Regional Study Area extends an additional 1 km from the Site-Vicinity Study Area (refer to

Figure 6-35).

6.7.8.1 Detailed Description of the Land Use Environment Potentially Affected

On-Site

The existing land uses in the On-Site Study Area are a combination of industrial uses,

agricultural uses, wooded area and shrubland. Despite the presence of agricultural uses, a

wooded area, and shrubland, the future uses planned for the lands are for heavy and light

industrial uses, as outlined in the policies of the City of Ottawa Official Plan and Carp Road

Corridor Rural Employment Area.

A new landfill footprint is consistent with the policy framework of the Ottawa Official Plan and

Carp Road Corridor Rural Employment Area and amendments to these plans are not

anticipated to be needed. An amendment to the Ottawa Comprehensive Zoning By-law;

however, would be required.

Site-Vicinity

There are seven residential lots located within the Site-Vicinity Study Area. Four lots are

currently non-conforming with future planned uses as outlined in the Official Plan (three lots are

located on Richardson Side Road, just west of Cardevco Road, one lot is located on Carp Road,

south of Richardson Side Road). A further two lots are located on lands either owned or

optioned by WM (located on William Mooney Road). One lot at the corner of William Mooney

Road and Richardson Side Road conforms with current Official Plan policies.

There is one livestock operation within the Site-Vicinity Study Area, located west of William

Mooney Road. Livestock operations are considered sensitive to landfilling activities. The lands

fronting on William Mooney Road south of Richardson Side Road are either owned or optioned

by WM. Lands designated for heavy industrial, light industrial, and mineral extraction activities

envision future land uses that are compatible with landfilling activities.

Page 16: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-115

chapter 6. detailed impact assessment of the undertaking

Figure 6-35 Land Use Detailed Impact Assessment Study Area

Page 17: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-116

chapter 6. detailed impact assessment of the undertaking

Lands designated for commercial and rural activities envision future land uses that may or may

not be compatible with landfilling activities.

Policies for Waste Disposal Sites (Section 3.8) of the Official Plan require that development

proposals within 500 m of a waste disposal site demonstrate that the landfill will not have an

impact on the proposed use and that there will be no impacts from the proposed use on landfill

operations. Therefore, despite uses sensitive to landfilling activities being permitted in some of

the Official Plan land use designations, Carp Road Corridor Community Design Plan (CDP) land

use designations, and in certain Zones of the Zoning By-law, within the Site-Vicinity Study Area,

these uses would not be permitted if they were proposed. The policies of Section 3.8 in the

Ottawa Official Plan prevail.

Regional

There are many residential land uses located within the Regional Study Area. These uses are

concentrated in two country lot subdivisions in the rural northwestern portion of the Study Area.

All of these residential uses are in conformity with the policies of the Official Plan. These uses

are beyond the generalized 500 m prescribed influence area of a landfill site, as outlined in

MOE Guideline D-4 and Ottawa Official Plan policies.

Many of the future uses in the Regional Study Area are intended for industrial, commercial,

mineral extraction, and natural uses which are not considered sensitive to landfilling operations.

Although some of the future uses in the Regional Study Area, such as residential and some

types of commercial and agricultural uses are considered sensitive to landfilling operations, the

Official Plan does not restrict sensitive land uses on properties located greater than 500 m from

a landfill footprint.

6.7.8.2 Potential Effects on Land Use

Current Land Uses

The main land use effects for the Preferred Alternative Landfill Footprint are the loss of some

rural/agricultural lands as well as some wooded and shrub lands. There is also some industrial

land that would be converted for the new footprint, including an exhausted sand pit that was

previously used to extract daily cover material.

There are seven residential properties and one livestock operation (i.e., cattle) that fall within the

500 m Site-Vicinity Study Area. No other potentially sensitive land uses (as defined in

Guidelines D-1 and D-4, and associated Procedures) are found within 500 m of the Preferred

Alternative Landfill Footprint.

Page 18: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-117

chapter 6. detailed impact assessment of the undertaking

Planned Future Land Uses

The Preferred Alternative Landfill Footprint falls completely within the planning area of the Carp

Road Corridor CDP. The lands that would be used to construct this option are designated Heavy

Industrial and Light Industrial in the CDP. These designations do not permit waste disposal

operations but they are more compatible with waste disposal uses than rural or residential uses.

The CDP anticipates the potential expansion of the landfill site and indicates that if an expansion

proceeds, a zoning by-law amendment will be required in addition to the EA.

Four of the residences within the 500 m Site-Vicinity Study Area are designated for Light

Industrial uses in the Carp Road Corridor CDP and are therefore non-conforming to the future

land use vision for this area. These residences include three adjacent properties along

Richardson Side Road (north side, next to Cardevco-West Hunt Industrial Area) and one

property immediately south of the intersection of Carp Road and Richardson Side Road.

The Carp Road Corridor CDP also identifies a Convenience Commercial node at the

intersection of Carp Road and Richardson Side Road, a portion of which falls within the 500 m

Site-Vicinity Study Area. The purpose of the Convenience Commercial nodes in the Carp Road

Corridor is to satisfy some of the day to day service and retail requirements of area residents

and employees. As such, examples of Convenience Commercial land uses include convenience

stores, professional offices, business offices, gas bars, banks, and restaurants. Some of these

uses, in particular restaurants and offices, may be considered sensitive land uses.

The 1.5 km Regional Study Area takes in a greater portion of the Carp Road Corridor CDP area.

The lands in the southern end of the corridor are designated primarily for industrial uses, which

are mainly concentrated in the A.G. Reed Industrial Park on the south side of Highway 417 and

the Cardevco-West Hunt Industrial Area on the north side of Richardson Side Road. The vacant

lots in these industrial parks indicate that there will be more industrial development in the

corridor in the future; however, industrial uses are generally considered compatible with a

landfill and its related uses. Outside the corridor, there are some marginal agricultural lands and

country lot subdivisions. Within the country lot subdivisions, there are some vacant lots which

are expected to be filled in with new residences in the longer term.

Types and Proximity of Off-site Recreational Resources within 500 m of Landfill Footprint

Off-site recreational resources of the type considered under this indicator are described in

provincial land use Procedure D-1-3 (Land Use Compatibility: Definitions) issued by the

Province of Ontario in July 1995. These include uses such as a trailer park or picnic area.

During the evaluation, no recreational resources were found within 500 m of the Preferred

Alternative Landfill Footprint. There are no effects with respect to this indicator.

Page 19: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-118

chapter 6. detailed impact assessment of the undertaking

Type(s) and Proximity of Off-site Sensitive Land Uses (i.e., dwellings, churches, cemeteries,

parks) within 500 m of Landfill Footprint

Similar to the above, off-site sensitive land uses are described in provincial land use Procedure

D-1-3 (July 1995). These land uses generally include places where people sleep (i.e.,

dwellings), churches, cemeteries and parks. There are seven residences within 500 m of the

landfill footprint. Measures would need to be put in place to manage any potential nuisance

(e.g., noise, odour, visual impact) resulting from the construction and operation of the landfill site

within 500 m of these residences.

6.7.8.3 Mitigation and/or Compensation Measures for Land Use

The Carp Road Corridor CDP includes compatibility guidelines to ensure that industrial uses in the

Carp Road Corridor can co-exist with adjacent residential uses. These guidelines include locating

all unsightly and noise-generating elements (e.g., service lanes, loading zones, and outdoor

storage) away from residential properties, and physically buffering industrial uses from adjacent

residential uses with landscaping (e.g., berms and dense evergreen plantings). These measures

may provide some degree of mitigation from any visual and noise effects generated by the landfill.

The City of Ottawa Official Plan also provides a number of complementary compatibility criteria

which seek to avoid land use conflicts between uses. Of particular application to the landfill site

and the residential properties in the vicinity are those relating to noise and air quality. BMPs

identified by other technical disciplines (i.e., air, noise, etc.) will therefore be required to

minimize the potential for significant adverse effects on adjacent sensitive land uses relative to

noise, odours and other emissions. Mitigation measures are expected to include:

Daily cover of the landfill;

Installation of a LFG collection system;

Berms and evergreen buffers; and

Fencing.

While it is expected that the mitigation measures will be sufficient to avoid significant negative

effects on sensitive land uses within the Site-Vicinity Study Area, there may be situations where

it is appropriate to compensate neighbours for certain effects. In terms of land use, in the ToR

WM committed to developing a property value protection plan as part of the EA.

6.7.8.4 Land Use Net Effects

With the implementation of the mitigation and compensation measures described above there

will be minimal net effects of the Preferred Alternative Landfill Footprint on adjacent land uses.

Page 20: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-119

chapter 6. detailed impact assessment of the undertaking

6.7.9 Agriculture

The Study Areas for the Agriculture environmental component are shown in Figure 6-36 and

described as follows:

On-Site .............. the lands required for the Preferred Alternative Landfill

Footprint; and

Site-Vicinity ....... the lands in the vicinity of the Preferred Alternative Landfill

Footprint, bounded by Highway 417, Richardson Side Road,

and Carp Road.

6.7.9.1 Detailed Description of the Agriculture Environment Potentially Affected

On-Site

The cleared agricultural land on the Preferred Alternative Landfill Footprint is comprised of four

fields abutting William Mooney Road for a distance of approximately 295 m, and stretching

toward Carp Road for approximately 835 m. The area of the four fields is estimated to be

approximately 24 ha. The four fields are mainly Osgoode sand with some Kars soil toward the

part of the Preferred Landfill Footprint nearest Carp Road (refer to Figure 6-37). The Osgoode

soil has an agriculture soil capability rating of Class 3, and the Kars soil is a Class 4. The fields

are farmed by the dairy farmer on the west side of William Mooney Road to provide feed for his

herd.

Site-Vicinity

There are two active farms within the Site-Vicinity Study Area, both of which are located across

William Mooney Road, west of the Preferred Alternative Landfill Footprint. One is a dairy farm

and the other is a part-time beef farm. The two farms include more than 62 ha of cleared land.

6.7.9.2 Potential Effects on Agriculture

Four cultivated fields totalling approximately 24 ha are located within the area bounded by

William Mooney Road, the existing landfill, Carp Road, and the northern extent of the Site-

Vicinity Study Area, half of which lies within the Preferred Landfill Footprint. These fields are

owned by the dairy farmer on the west side of William Mooney Road and produce feed for the

farmer’s dairy herd. Construction of the Preferred Landfill Footprint will result in the loss of this

cropland to the dairy farm.

Page 21: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-120

chapter 6. detailed impact assessment of the undertaking

Figure 6-36 Agriculture Detailed Impact Assessment Study Area

Page 22: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-121

chapter 6. detailed impact assessment of the undertaking

Figure 6-37 Soils and Farm Locations

Page 23: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-122

chapter 6. detailed impact assessment of the undertaking

The dairy farm cropland located within the Preferred Landfill Footprint consists of roughly half

Class 3 and half Class 4 agricultural capability soil. A strip of Class 3 soil between the Preferred

Landfill Footprint and William Mooney Road, as well as a strip of land consisting of Class 3 and

Class 4 soils along the north side of the Preferred Landfill Footprint, between the footprint and

the property boundary, will remain following construction of the Preferred Landfill Footprint. East

of the cropland is an area of Class 4 soil and an old gravel pit, both of which are designated as

Mineral Extraction areas on the Ottawa Zoning Map (Ottawa Comprehensive Zoning By-law

2008-250). The south part of the cropland is zoned as Rural Heavy Industrial, and the northern

part is zoned as Rural General Industrial, as shown on the Ottawa Zoning Map.

6.7.9.3 Mitigation and/or Compensation Measures for Agriculture

The following two compensation measures are available to address the loss of cropland to the

dairy farm: 1) purchase the entire dairy farm, including the cropland east of William Mooney

Road, then re-sell or lease the land and buildings on the west side of William Mooney Road; or

2) purchase the cropland from the dairy farmer, who could in turn buy or lease other cropland to

replace the portion sold, or contract his feed supply on an annual basis from other farmers.

6.7.9.4 Net Effects on Agriculture

The loss of the dairy farm’s cropland to the Preferred Alternative Landfill Footprint could

conceivably result in the loss of the dairy farm, should the farmer decide to sell the rest of his

land or retire. However; the location of the Preferred Alternative Landfill Footprint on the east

side of William Mooney Road preserves the farm infrastructure on the west side of the road,

including farm buildings, farm roads, fences and drainage systems on the dairy farm and the

adjacent part-time beef farm. With the core of the dairy farm operation remaining intact, the

additional feed requirements can be met elsewhere.

6.7.10 Socio-Economic Environment

6.7.10.1 Socio-Economic Environment

For the purposes of the Socio-Economic Detailed Impact Assessment, the general Study Areas

are shown in Figure 6-38 and described below:

On-Site .............. the lands required for the Preferred Alternative Landfill Footprint;

Site-Vicinity ....... the lands in the vicinity of the Preferred Alternative Landfill

Footprint, extending approximately 500 m in all directions; and

Regional ............ the lands and neighbourhoods within approximately 3 km of the

perimeter of the Preferred Alternative Landfill Footprint.

Page 24: Draft Environmental Assessment West Carleton ......Draft Environmental Assessment West Carleton Environmental Centre 6-103 chapter 6. detailed impact assessment of the undertaking

Draft Environmental Assessment West Carleton Environmental Centre

6-123

chapter 6. detailed impact assessment of the undertaking

Figure 6-38 Socio-Economic Detailed Impact Assessment Study Area