DRAFT EIA REPORT FOR PROPOSED ACTIVE PHARMACEUTICAL INGREDIENTS MANUFACTURING UNIT OF M/s. HEALTHGENIC CHEMICALS PVT. LTD. AT SURVEY NO.: 112 PAIKI 2 & 113 PAIKI 1 & PAIKI 2, VILLAGE: CHACHAPAR, TALUKA & DISTRICT: MORBI, GUJARAT. CATEGORY: 5 (F) BASELINE MONITORING PERIOD [OCTOBER 2017 TO DECEMBER 2017] PREPARED BY T. R. ASSOCIATES [NABET ACCREDITED EIA CONSULTANT] GANESH MERIDIAN, BLOCK NO.: C, OFFICE NO. 605-A, OPP. KARGIL PETROL PUMP, S. G. HIGHWAY, AHMEDABAD-380060 EMAIL: [email protected] CONTACT NO.: 09825371099 NABET ACCREDITATION NO.: NABET/EIA/1619/RA0033 MARCH 2018

Transcript of DRAFT EIA REPORT (12-03-2018) - gpcb.gujarat.gov.in · and also ensuring 33% of the project area to...

DRAFT EIA REPORT

FOR

PROPOSED ACTIVE PHARMACEUTICAL INGREDIENTS

MANUFACTURING UNIT

OF

M/s. HEALTHGENIC CHEMICALS PVT. LTD.

AT

SURVEY NO.: 112 PAIKI 2 & 113 PAIKI 1 & PAIKI 2, VILLAGE: CHACHAPAR, TALUKA & DISTRICT: MORBI, GUJARAT.

CATEGORY: 5 (F) BASELINE MONITORING PERIOD

[OCTOBER 2017 TO DECEMBER 2017]

PREPARED BY

T. R. ASSOCIATES [NABET ACCREDITED EIA CONSULTANT]

GANESH MERIDIAN, BLOCK NO.: C, OFFICE NO. 605-A, OPP. KARGIL PETROL PUMP, S. G. HIGHWAY, AHMEDABAD-380060

EMAIL: [email protected] CONTACT NO.: 09825371099

NABET ACCREDITATION NO.: NABET/EIA/1619/RA0033

MARCH 2018

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 1

TERMS OF REFERENCE (TOR) COMPLIANCE

Point wise compliance to the TOR points issued by EAC, MoEFCC, New Delhi vide their letter no. J-11011/328/2017-IA-II (I) dated 10th November, 2017 (attached as Annexure - 1) for proposed manufacturing of Active Pharmaceutical Ingredients at Survey No.: 112 paiki 2 & 113 paiki 1 & paiki 2, Village: Chachapar, Taluka & District: Morbi, Gujarat.

A tabular chart with index for point wise compliance is as given below:

Sr. No.

TOR Condition Compliance Status Page No.

A Additional TOR

1 Public hearing to be conducted and issues raised and commitments made by the project proponent on the same should be included in EIA/EMP Report in the form of tabular chart with financial budget for complying with the commitments made.

We will give after the Public hearing.

--

2 ESR plan for 5 years @ 5% of the project cost in consultation with nearby villagers to be submitted.

Given in section 8.5 in Chapter - 8 8.2

3 Layout plan earmarking space for development of greenbelt 5 m width along the plant periphery and also ensuring 33% of the project area to be developed as green area with native species plantation.

Given in figure - 2.6 in Chapter – 2 Please refer Table 10.1 of Chapter - 10

2.11

10.11

4 Compliance report for the existing environmental clearance, if any, duly certified by the concerned Regional Office of the Ministry to be submitted.

Not Applicable. --

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 2

Sr. No.

TOR Condition Compliance Status Page No.

ANNEXURE - I : GENERIC TOR WITH RESPECT TO INDUSTRY SECTOR

1 Executive Summary Executive summary of the project in both English & Gujarati language has been incorporated in the EIA report.

--

2 Introduction i. Details of the EIA Consultant

including NABET accreditation. Details of EIA consultant has been incorporated in Chapter – 12 of the EIA report. NABET accreditation certificate is attached as Annexure – 8.

12.1-12.4

ii. Information about the project proponent.

Refer Section 1.3 in Chapter - 1 1.2

iii. Importance and benefits of the project

Refer Section 1.4 in Chapter - 1 1.3

3 Project Description i. Cost of project & time of

completion Refer Section 2.4 of Chapter - 2 2.12

ii. Product with capacities for the proposed project

Refer Section 2.5 of Chapter - 2 2.13

iii. If expansion project, details of existing products with capacities and whether adequate land is available for expansion, reference of earlier EC if any

Not applicable as this is a proposed project.

--

iv. List of raw materials required and their source along with mode of transportation.

Refer Section 2.5 and 2.7 of Chapter - 2 2.13 & 2.49

v. Other chemicals & materials required with quantities and storage capacities

Refer Section 2.7 of Chapter - 2 2.49

vi. Details of emission, effluents, hazardous waste generation and their management.

Details of air emission i.e. process and flue gas emission is given in Section 2.11.2 of Chapter - 2

2.64

Details of domestic and industrial 2.58

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 3

Sr. No.

TOR Condition Compliance Status Page No.

effluent is given in Section 2.11.1 of Chapter - 2 Details of hazardous waste generation & their management is given in Section 2.11.3 of Chapter - 2

2.68

vii. Requirement of water, power, with source of supply, status of approval, water balance diagram, man-power requirement (regular and contract)

Refer Section 2.11.1 of Chapter - 2 for the details of water consumption and water balance diagram. It may be noted that we have already made application to CGWB for obtaining permission for groundwater abstraction. Proof of the same is attached as Annexure – 3. Refer Section 2.9.1 of Chapter - 2 for the details of power requirement and its source. Refer Section 2.9.2 of Chapter - 2 for the details of man-power requirement.

2.58

2.55

2.55

viii. Process description along with major equipments and machineries, process flow sheet (quantities) from raw material to products to be provided.

Process description along with process flow diagram and mass balance is given in Section 2.6 of Chapter - 2 and Manufacturing process along with mass balance attached as Annexure-4.

2.19

Major equipments & machineries are given in Section 2.9.5 of Chapter - 2

2.56

ix. Hazard identification and details of proposed safety systems.

Refer Section 7.3.2 and 7.3.3 of Chapter - 7.

7.4-7.14

x. Expansion/modernization proposals: a. Copy of all the Environmental

Clearance(s) including Amendments thereto

Not applicable as this is a proposed project

--

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 4

Sr. No.

TOR Condition Compliance Status Page No.

obtained for the project from MOEF/SEIAA shall be attached as an Annexure. A certified copy of the latest Monitoring Report of the Regional Office of the Ministry of Environment and Forest as per circular dated 30th May, 2012 on the status of compliance of conditions stipulated in all the existing environmental clearances including Amendments shall be provided. In addition, status of compliance of Consent to Operate for the ongoing/existing operation of the project from SPCB shall be attached with the EIA-EMO report.

b. In case the existing project has not obtained environmental clearance, reasons for not taking EC under the provisions of the EIA Notification 1994 and/or EIA Notification 2006 shall be provided. Copies of Consent to Establish/No Objection Certificate and Consent to Operate (in case of units operating prior to EIA Notification 2006, CTE and CTO of FY 2005-2006) obtained from the SPCB shall

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 5

Sr. No.

TOR Condition Compliance Status Page No.

be submitted. Further, compliance report to the conditions of consents form the SPCB shall be submitted.

4 Site Details i. Location of the project site

covering village, Taluka/ Tehsil, District and State, Justification for selecting the site, whether other sites were considered.

Refer Section 2.2 of Chapter - 2 for the requisite details.

2.1

ii. A toposheet of the study area of radius of 10 km and site location on 1:50,000/ 1:25,000 scale on an A3/A2 sheet. (Including all eco-sensitive areas and environmentally sensitive places.

A toposheet of the 10 km radius study area along with site location is incorporated as Figure 2.4 in the EIA Report.

2.5

iii. Details w.r.t. option analysis for selection of site.

Refer Section 1.5 of Chapter - 1 as well as Section 5.3 of Chapter - 5 of the EIA report for the requisite details.

1.3 -1.6

5.1

iv. Co-ordinates (lat-long) of all four corners of the site.

Refer Figure 1.1 of Chapter - 1 of the EIA report.

1.4-1.5

v. Google map-Earth downloaded of the project site.

Refer Figure 2.3 of Chapter - 2 of the EIA report.

2.4

vi. Layout maps indicating existing unit as well as proposed unit indicating storage area, plant area, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layout of Industrial Area indicating

Refer Figure 2.6 of Chapter – 2 of the EIA report for detailed Plant Layout of the project.

2.11

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 6

Sr. No.

TOR Condition Compliance Status Page No.

location of unit within the Industrial area/Estate.

vii. Photographs of the proposed and existing (if applicable) plant site. If existing, show photographs of plantation/ greenbelt, in particular.

Refer Photograph 1.1 of Chapter - 1 of the EIA report.

1.6

viii. Land use break-up of total land of the project site {identified and acquired}, government/private- agricultural, forest, wasteland, water bodies, settlements, etc. shall be included.(not required for industrial area).

Refer Section 2.3 of Chapter - 2 for the land use break-up of project site. Refer Section 2.2.3 of Chapter - 2 for the salient features of the proposed project site.

2.10

2.6

ix. A list of major industries with name and type within study area {10 km radius} shall be incorporated. Land use details of the study area

Refer Section 2.2.3 of Chapter - 2 for the requisite details.

2.7

Land use details of the study area is given in Section 3.7 of Chapter - 3

3.41 -3.51

x. Geological features and Geo-hydrological status of the study area shall be included.

Refer Section 3.6 of Chapter – 3 for the requisite details.

3.34-3.40

xi. Details of Drainage of the project upto 5 km radius of study area. If the site is within 1 km radius of any major river, peak and lean season river discharge as well as flood occurrence frequency based on peak rainfall data of the past 30 years. Details of Flood Level of the project site and maximum Flood Level of the river shall also be provided. (mega green field projects)

Refer Section 3.6 of Chapter – 3 for the requisite details.

3.34-3.40

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 7

Sr. No.

TOR Condition Compliance Status Page No.

xii. Status of acquisition of land. If acquisition is not complete, stage of the acquisition process and expected time of complete possession of the land.

It may be noted that the land is on lease. NA permission is attached as Annexure – 2.

--

xiii. R&R details in respect of land in line with state Government policy

Not applicable --

5 Forest and Wildlife related Issues (if applicable):

i. Permission and approval for the use of forest land (forestry clearance), if any, and recommendations of the State Forest Department. (if applicable)

Not Applicable --

ii. Landuse map based on High resolution satellite imagery (GPS) of the proposed site delineating the forestland (in case of projects involving forest land more than 40 ha)

Not Applicable --

iii. Status of Application submitted for obtaining the stage I forestry clearance along with latest status shall be submitted.

Not Applicable --

iv. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing

Not applicable as no wild life sanctuary is located within 10 km radius of the project site.

--

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 8

Sr. No.

TOR Condition Compliance Status Page No.

these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden-thereon

v. Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State Government for conservation of Schedule I fauna, if any exists in the study area

Not Applicable --

vi. Copy of application submitted for clearance under the Wildlife (Protection) Act, 1972, to the Standing Committee of the National Board for Wildlife

Not Applicable --

6 Environmental Status i. Determination of atmospheric

inversion level at the project site and site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall.

Site specific micro-meteorological data are given in Annexure – 5. Refer Section 3.2.1 of Chapter – 3 for requisite details.

--

3.2 - 3.6

ii. AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and other parameters relevant to the project shall be collected. The monitoring stations shall be based CPCB guidelines and take into account the pre-dominant wind direction, population zone and sensitive receptors including

Refer Section 3.2.2 of Chapter – 3 for requisite AAQ data.

3.7 – 3.13

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 9

Sr. No.

TOR Condition Compliance Status Page No.

reserved forests.

iii. Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the NAQQM Notification of Nov. 2009 along with – min., max., average and 98% values for each of the AAQ parameters from data of all AAQ stations should be provided as an annexure to the EIA Report.

Refer Table 3.6 of Chapter – 3 for requisite detail. Please refer Annexure – 6 for raw data of all AAQ measurement for 12 weeks for all selected sampling stations.

3.11-3.12

--

iv. Surface water quality of nearby River (100 m upstream and downstream of discharge point) and other surface drains at eight locations as per CPCB/MoEF&CC guidelines.

Refer Table 3.12 of Chapter – 3 for surface water quality data.

3.26 - 3.28

v. Whether the site falls near to polluted stretch of river identified by the CPCB/MoEF & CC, if yes give details.

Not Applicable --

vi. Ground water monitoring at minimum at 8 locations shall be included.

Refer Table 3.11 of Chapter – 3 for ground water quality data.

3.21- 3.23

vii. Noise levels monitoring at 8 locations within the study area.

Refer Table 3.9 of Chapter – 3 for Noise Level Monitoring Data.

3.16 - 3.17

viii. Soil characteristic as per CPCB guidelines.

Refer Table 3.14 of Chapter – 3 for Soil Characteristic Data.

3.32-3.33

ix. Traffic study of the area, type of vehicles, frequency of vehicles for transportation of materials, additional traffic due to proposed project, parking arrangement etc.

Refer Section 3.10 of Chapter 3 for traffic study data.

3.91-3.93

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 10

Sr. No.

TOR Condition Compliance Status Page No.

x. Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area shall be given with special reference to rare, endemic and endangered species. If Schedule-I fauna are found within the study area, a Wildlife Conservation Plan shall be prepared and furnished.

Refer Section 3.8 of Chapter – 3 for ecology & biodiversity study data.

3.52-3.78

xi. Socio-economic status of the study area.

Refer Section 3.9 of Chapter – 3 for socio economic status of the study area.

3.79 -3.91

7 Impact and Environment Management Plan i. Assessment of ground level

concentration of pollutants from the stack emission based on site-specific meteorological features. In case the project is located on a hilly terrain, the AQIP Modelling shall be done using inputs of the specific terrain characteristics for determining the potential impacts of the project on the AAQ. Cumulative impact of all sources of emissions (including transportation) on the AAQ of the area shall be assessed. Details of the model used and the input data used for modelling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project

Please refer Section 4.8 as well as Figure 4.1, 4.2, 4.3, 4.4, 4.5 & Table 4.10, 4.11, 4.12, 4.13, 4.14 of Chapter – 4 for requisite details.

4.18 -4.27

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 11

Sr. No.

TOR Condition Compliance Status Page No.

site, habitation nearby, sensitive receptors, if any.

ii. Water Quality modelling – in case of discharge in water body

Not applicable, as no wastewater discharge from the industry in any type of water body.

--

iii. Impact of the transport of the raw materials and end products on the surrounding environment shall be assessed and provided. In this regard, options for transport of raw materials and finished products and wastes (large quantities) by rail or rail-cum road transport or conveyor-cum-rail transport shall be examined.

Refer Section 4.9 of Chapter – 4 for requisite data.

4.27 -4.28

iv. A note on treatment of wastewater from different plant operations, extent recycled and reused for different purposes shall be included. Complete scheme of effluent treatment. Characteristics of untreated and treated effluent to meet the prescribed standards of discharge under E(P) Rules.

Refer Section 2.11.1 of Chapter - 2 for the requisite details.

2.56 -2.61

v. Details of stack emission and action plan for control of emissions to meet standards.

Refer Section 2.11.2 of Chapter - 2 for the requisite details.

2.64

vi. Measures for fugitive emission control

Refer Section 2.11.2 of Chapter - 2 for the requisite details.

2.64

vii. Details of hazardous waste generation and their storage,

Refer Section 2.11.3 of Chapter - 2 for the requisite details.

2.68

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 12

Sr. No.

TOR Condition Compliance Status Page No.

utilization and management. Copies of MOU regarding utilization of solid and hazardous waste in cement plant shall also be included. EMP shall include the concept of waste-minimization, recycle/reuse/recover techniques, Energy conservation, and natural resource conservation.

Refer Section 10.10 of Chapter - 10 for the details of cleaner production.

10.14-10.15

viii. Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 2009. A detailed plan of action shall be provided.

Refer Section 10.5.1 of Chapter - 10 of the EIA report.

10.4

ix. Action plan for the green belt development plan in 33 % area i.e. land with not less than 1,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shall be included. The green belt shall be around the project boundary and a scheme for greening of the roads used for the project shall also be incorporated.

Refer Section 10.6 of Chapter – 10 for detailed greenbelt development plan.

10.11 – 10.12

x. Action plan for rainwater harvesting measures at plant site shall be submitted to harvest rainwater from the roof tops and storm water drains to recharge the ground water and also to use for the various activities at the project site to

Refer Section 10.7 of Chapter – 10 for the detail of rain water harvesting scheme.

10.12-10.13

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 13

Sr. No.

TOR Condition Compliance Status Page No.

conserve fresh water and reduce the water requirement from other sources.

xi. Total capital cost and recurring cost/annum for environmental pollution control measures shall be included.

Refer Section 10.11 of Chapter – 10 of the EIA report.

10.15 – 10.16

xii. Action plan for post-project environmental monitoring shall be submitted.

Refer Section 6.2 of Chapter – 6 of the EIA report.

6.2 - 6.3

xiii. Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency Management Plan including Risk Assessment and damage control. Disaster management plan should be linked with District Disaster Management Plan.

Refer Section 7.10 & 7.11 of Chapter – 7 of the details.

7.61 – 7.74

8 Occupational Health i. Plan and fund allocation to

ensure the occupational health & safety of all contract and casual workers

Refer Section 10.11 of Chapter – 10 of the EIA report.

10.15 – 10.16

ii. Details of exposure specific health status evaluation of worker. If the workers’ health is being evaluated by pre designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far & Near vision, colour vision and any other ocular defect) ECG, during pre-placement and periodical examinations give the details of

Not applicable as this is a proposed project

--

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 14

Sr. No.

TOR Condition Compliance Status Page No.

the same. Details regarding last month analyzed data of above mentioned parameters as per age, sex, duration of exposure and department wise.

iii. Details of existing Occupational & Safety Hazards. What are the exposure levels of hazards and whether they are within Permissible Exposure level (PEL). If these are not within PEL, what measures the company has adopted to keep them within PEL so that health of the workers can be preserved

It may be noted that this is a proposed project. Nevertheless, measures to be taken by the company after commissioning of the project are given in the Section 7.9 of Chapter - 7

7.56-7.61

iv. Annual report of health status of workers with special reference to Occupational Health and Safety.

Not applicable as this is a proposed project

--

9 Corporate Environment Policy i. Does the company have a well

laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report.

At present, we have not laid down environment policy. We will lay down such a policy once our unit is in operation.

--

ii. Does the Environment Policy prescribe for standard operating process /procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions? If so, it may be detailed in the EIA.

Our unit has yet not started production. Nevertheless, we shall see to it that Environmental Policy that we have frozen will bring things into focus and any future issues related to the environment.

--

iii. What is the hierarchical system or Administrative order of the

Not applicable as our project is the proposed project but environment

10.3

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 15

Sr. No.

TOR Condition Compliance Status Page No.

company to deal with the environmental issues and for ensuring compliance with the environmental clearance conditions? Details of this system may be given.

management cell will be established and details for the same is given in Section 10.4.3 of Chapter – 10 of the EIA Repot.

iv. Does the company have system of reporting of non-compliances/violations of environmental norms to the Board of Directors of the company and/or shareholders or stakeholders at large? This reporting mechanism shall be detailed in the EIA report

We have not yet started production. However, we shall definitely set up a system to report such issues to partners.

--

10 Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase.

Workers including casual workers such as truck drivers will be provided with basic amenities like water supply, sanitation facilities, first aid, personal protective equipments, approach roads, communication etc.

--

11 Enterprise Social Commitment (ESC) i. Adequate funds (at least 2.5 % of

the project cost) shall be earmarked towards the Enterprise Social Commitment based on Public Hearing issues and item-wise details along with time bound action plan shall be included. Socio-economic development activities need to be elaborated upon.

Refer Section 8.6 of Chapter – 8 of the EIA report for requisite details.

8.3

12 Any litigation pending against the project and/or any

Not applicable as this is a proposed project

--

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

TOR Compliance 16

Sr. No.

TOR Condition Compliance Status Page No.

direction/order passed by any Court of Law against the project, if so, details thereof shall also be included. Has the unit received any notice under the Section 5 of Environment (Protection) Act, 1986 or relevant Sections of Air and Water Acts? If so, details thereof and compliance/ATR to the notice(s) and present status of the case.

13 A tabular chart with index for point wise compliance of above TORs.

Complied --

14 The TORs prescribed shall be valid for a period of three years for submission of the EIA-EMP reports.

We have taken note of the same --

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 1

EXECUTIVE SUMMARY – ENGLISH & GUJARATI

Executive Summary – ENGLISH

1. INTRODUCTION

M/s. Healthgenic Chemicals Pvt. Ltd. is proposing to manufacture Active Pharmaceutical Ingredients at Survey No.: 112 paiki 2 & 113 paiki 1 & paiki 2, Village: Chachapar, Taluka & District: Morbi, Gujarat-382220 for sell purpose. Production details are given below:

Details of Proposed Products

Sr. No. Name of Product Capacity (MT/Month)

1. Povidon Iodine 30

2. Bronopol 4

3. Diclofenac Sodium 4

4. Diclofenac Potassium 4

5. Sodium Citrate 15

6. Carvedilol 4

7. Metformin Hydrochloride 4

8. Pentoxifylline 10

9. Pregabalin 4

10. Pentoprazole Sodium 4

11. Glimepiride 4

12. Topiramate 4

13. Gabapentin 4

14. Atorvastatin Calcium 30

Total 125

M/s. Healthgenic Chemicals Pvt. Ltd. has a total land area of 13,304 m2. Out of the above stated land area approximately 4,590 m2 is green belt area (approx. 34.5 % of

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 2

the total land area). Non Agriculture (NA) permission has been already obtained by the land owner from the concerned authority.

The total estimated cost of the proposed project is Rs. 4.0 Crores. Total budget allocation towards Environmental Management Facilities will be approx. Rs. 70 Lakhs.

M/s. T. R. Associates (NABET Accredited EIA Consultant) was appointed M/s. Healthgenic Chemicals Pvt. Ltd. to carry out the Environmental Impact Assessment study for their proposed project.

Production of Active Pharmaceutical Ingredients falls under clause No.5 (f) of category “A” as stated in Environment Impact Assessment Notification published on 14th September 2006 and its amendments, further, the location of proposed project is outside the notified industrial estate and not fall in small scale Industrial Unit criteria as per the Notification dated 25th June 2014. Hence, project proponent has to obtain the Environmental Clearance from the Ministry of Environment, Forests & Climate Change (MoEFCC), New Delhi. As a part of this procedure, Public Hearing is required to be carried out as per the notification as well as the TOR granted to the unit by the Expert Appraisal Committee (Industry-2). This study of Environment Impact assessment (EIA) is based on studies carried out during the month of October 2017 to December 2017. The environmental parameters (ambient air, water, soil, noise, flora and fauna) selected for study are those, which are likely to be most affected by the project. The study area is defined as an area within 10 km. radius from centre of the project site.

Salient Features within 10 km radius surroundings area as follows: Sr. No. Important Features Description

1. Location Survey No.: 112 paiki 2 & 113 paiki 1 & paiki 2, Village: Chachapar, Taluka & District: Morbi, Gujarat-382220.

2. GPS Coordinates 22°45'25.01"N 70°43'26.73"E

3. Mean Sea Level 34 m

4. Nearest power station Paschim Gujarat Vij Company Ltd., Morbi

5. Temperature range 180 C to 430 C

6. Annual Rain fall 601 mm

7. Nearest Road SH 24 @ 7.2 km, ESE

8. Nearest Railway station Nazarbaug Railway Station @ 14.85 km, NE

9. Nearest city Morbi @ 14 km, East Direction

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 3

Sr. No. Important Features Description

10. Nearest village Chachapar – 3.7 km , WSW

11. Nearest River/water body Phulki river @ 4.7 km ENE Demi River @ 3.6 km WSW Aji Dam@ 5.3 km SSE

12. Seismic Zone Zone-III (medium risk zone)

13. National Parks / Sanctuary None within 10 Km radius.

2. AIR ENVIRONMENT

The base line Ambient Air Quality (AAQ) status within 10 km study area has been assessed through a monitoring network of 8 AAQ sampling stations during October 2017 to December 2017. Map showing 10 km radius area is shown here. Design of network for Ambient Air Quality monitoring locations were decided on meteorology & available infrastructure facilities. The base-line Ambient Air Quality of the study area was monitored for Particulate Matter (PM10 & PM2.5), Sulphur Dioxide (SO2) and Nitrogen Dioxide (NO2), CO, VOC, Ammonia and HCl. The result for the same is given as below:

Location Results (98th Percentile)

PM2.5 PM10 SO2 NO2 Project Site 36.52 85.88 24.86 35.87 Village:- Chachapar 34.03 79.63 20.92 32.68 Village:- Rajpar* 30.03 69.94 17.12 23.96 Village:- Thorala 31.63 73.72 22.66 26.70 Village:- Saktasanala* 25.62 59.61 15.57 22.05 Village:- Lajai 28.28 65.95 14.39 26.66 Village:- Nasitpar 32.96 76.66 17.61 29.91 Village:- Khanpar 26.88 62.52 13.68 31.60

Permissible limit [NAAQ standards-2009] 60 μg/m3 100 μg/m3 80 μg/m3 80 μg/m3

Note: CO: Below Detectable Limit; VOC: Below Detectable Limit; NH3: Below Detectable Limit; HCL: Below Detectable Limit. * Downwind villages.

Analysis of ambient air samples revealed that the Air quality is found well within the prescribed limits of National Ambient Air Quality standards. The main source of gaseous emission is flue gas emission from stack attached to Steam Boiler and D. G. set & process gas emission from production of Active Pharmaceutical Ingredients.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 4

Agro-Waste / Briquettes will be used as a fuel & the requirement shall be 7 MT/Day. Adequate stack height will be provided for proper atmosphere dispersion of pollutant. The probable emitted pollutants will be PM, SO2, NO2, NH3 and HCl. Cyclone separator followed by bag filter will be provided as APCM. Since Diesel will be used as a fuel for D. G. Set (back–up system) the flue gas emission will also be well within prescribed norms and there is no need of any air pollution control measures for D. G. Set. Caustic scrubber followed by stack and HCL scrubber followed by stack will be provided respectively for HCL and NH3 gas emission form Process. Two stage Condenser followed by activated carbon and scrubber will be provided for VOC from process.

3. WATER ENVIRONMENT

Analysis of ground water and surface water samples revealed that it is suitable for domestic activity including agricultural activity. Ground water and surface water quality in the area meets the Water Quality Standards (IS 10500) for drinking water except for Turbidity, E. coli. and Coliforms at some locations. Water Requirement The total water requirement for the proposed project will be 32 kl/day. Out of this said fresh water quantity 4 kl/day will be used for domestic purpose, 46 kl/day will be used for industrial activities and 14 kl/day will be used for greenbelt development purpose. The required water will be obtained through Borewell. Wastewater Generation and its Disposal The total generation of domestic wastewater will be 3.5 kl/day from the proposed project activity. The domestic wastewater generated will be disposed off through septic tank/soak pit system. Total industrial wastewater generation will be 53.8 kl/day out of which 13 KL KLD high COD water & washing. Total 40.8 kl/day wastewater from boiler blow down, cooling blow down, RO-1 reject, process (low COD), scrubber and ammonia stripper will be taken to ETP after treatment it will be passed to RO-2. Permeate from RO-2 will be recycle back for industrial process. 3.1 kl/day waste water from process containing Ammonical Nitrogen will be treated in ammonia stripper and then will be mixed with other low COD streams. 13 kl/day High COD water as well as RO-2 reject will be sent to MEE/MVR. 25 KLD condensate from MEE/MVR will be sent to ETP for further treatment. Therefore no effluent will be required to be discharged and the stated process would be a ZERO DISCHARGE process.

4. LAND / SOIL ENVIRONMENT During operation activity the impact of air, water and solid waste pollution on soil causes direct / indirect effect on soil.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 5

As all necessary air pollution control steps will be provided and based on the results of the dispersion model for the Ground Level Concentrations of various pollutants after commissioning of the proposed project, there will not be any adverse impact of air pollution on soil.

It may be noted that there will be no disposal of untreated effluent on land. So, there will be no adverse effect on land / soil due to water.

All necessary control steps will be provided for handling, storage and disposal of solid/hazardous waste generated from the plant. Thus, there will not be any significant impact of solid/hazardous waste on the soil environment.

5. NOISE ENVIRONMENT Noise level was recorded at eight locations within the study area to provide the baseline data to describe the existing situations. Sr. No.

Location Noise Level (Leq) in dBA (Day Time)

Noise Level (Leq) in dBA (Night Time)

Measured Permissible Limit Measured Permissible Limit 1 Project Site 59.1 75 39.5 70 2 Thorala 58.3 55 40.6 45 3 Chachapar 55.3 55 37.0 45 4 Khanpar 55.4 55 43.2 45 5 Rajpar 51.0 55 42.5 45 6 Nasitpar 51.9 55 35.9 45 7 Lajai 53.6 55 34.5 45 8 Saktasanala 53.0 55 36.0 45

6. SOCIO-ECONOMIC ENVIRONMENT

An assessment of socio-economic environment forms an integral part of an EIA study. Socio-economic environment – demographic & related socio-economic data was collected from District Census Handbook to assess socio-economic status of the study area.

For proposed project activity, total 40 nos. of skilled and unskilled employees/ workers will be required. The indirect employment will be generated by way of transportation, shopkeepers and other casual employment for many people. Local people will be given preference wherever found suitable for all the jobs in the plant. Economic status of the local people will improve due to the increased business

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 6

opportunities, thereby, making a positive impact. Educational, medical and housing facilities in the study area will considerably improve.

7. ECOLOGY & BIODIVERSITY The study area was dominated by agriculture landscape. The floral and faunal diversity was very less. Domestic tree species found in the study area are Baval, Neem, Gulmohar, Karanj, Kesudo, Khijado and Asopalav. Major crops in the study area are Cotton, Sesame, Rice, Wheat, Millet, and Sorghum. The commonly spotted bird species of this area were Drongo, Green Bee eater, Houses wift, Kingfisher, Common Myna, Lapwing, Rosering Parakeet. The wild mammals found other than domesticated ones from study area were Nilgai, Golden Jackal, Grey Mongoose, Hare and Wild Boar.

8. SOLID WASTE MANAGEMENT

The main hazardous waste generation will be ETP Sludge + Evaporation Residue, Used Oil, Discarded Plastic Bags/Drums, Distillation Residue, Process Residue, Spent Catalyst, Off specification product/drugs and Spent Carbon. ETP Sludge + Evaporation Residue will be disposed off at approved TSDF site. Used Oil will be reused within premises as a lubricant or sold to registered recycler. Discarded Plastic Bags/Drums will be sold to authorized vendor. Off specification product/drugs, Distillation Residue, Spent Catalyst and Spent Carbon will be disposed off to CHWIF site. The unit will provide isolated area for the storage of hazardous waste. Thus, hazardous waste management system provided by the unit will be adequate and there will not be any major impact on the environment due to hazardous waste.

9. ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan has been prepared for mitigation of the adverse impacts. The Environmental Management Plan describes in brief, the management’s plan for proper and adequate implementation of treatment and control system for pollutants and for maintaining the environment. It also includes development of green belt, proper safety of workers, environmental monitoring plan, fire protection system and measures etc.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 7

An Environmental Management Cell will be formed for effective implementation of Environmental Management Plan.

10. ENVIRONMENT MONITORING PROGRAME

Monitoring of environmental factors will enable us to identify the changes in the environmental impacts at various locations and their mitigative measures. To ensure the effective implementation of the EMP, monitoring of ambient air quality, stack emissions, analysis & monitoring of water environment and noise level will be carried out as required / specified by statutory authority.

11. RISK ASSESSMENT Risk analysis and study have been carried out for identification of hazards, selection of maximum credible scenarios, risk mitigation measures etc. All the hazardous chemicals will be stored and handled as per MSDS guidelines. Personal protective equipments will be provided to the workers.

12. GREEN BELT DEVELOPMENT

A greenbelt of approximately 4,590 m2 is developed within the project site to minimize the air pollution, noise pollution, balancing eco-environment, soil erosion / protection etc. Greenbelt area is 34.5 % of the total plot area.

13. PROJECT BENEFITS:

The proposed project will become beneficial to the surrounding area or community in terms of infrastructural development, social development, employment and other benefits. The proposed project has a potential for employment of skilled, semi-skilled and unskilled employees during construction phase as well as operation phase. A total 40 nos. of person is likely to get employment due to the proposed project. The project will earmark 2.5 % of project cost for socio-economic development activities in surrounding villages.

14. CONCLUSION: Negligible impacts will occur on air quality. However, all the necessary air

pollution control measures will be provided. No ecological damage will occur. No adverse impacts will occur on water environment. Local employment opportunities will increase. Various other environment parameters like Forest/ National Park/ Sanctuary and

Religious / Historical Places will not be affected.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 8

Environment Management Plan has been formulated to control all the pollutant parameters and Environment Management Cell has been set-up to ensure that these parameters do not exceed the norms set out by the concerned authorities.

After commissioning of the proposed project the Environmental Management Cell will take care of all the pollution control measures.

It can be concluded on a positive note that after the implementation of the mitigation measures and environmental management plan during the construction & operational phase, there will be negligible impact on the environment.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 1

Executive Summary – Gujarati

સં ી ત અહવાલ

૧. તાવના:-

મેસસ હ થ નીક કમીક સ ાઈવેટ લિમટડ. એ તાિવત એકમ છે. આ તાિવત એકમે

સવ ન.ં -૧૧૨ પૈક ૨ અને ૧૧૩ પૈક ૧ & પૈક ૨, ગામ:- ચાચાપર, તા કુો અને લો:-

મોરબી , જુરાત રાજય ખાતે એપીઆઈ (એ ટવ ફામા ુ ટકલ ઇ ે ડએ સ) ગ ઉ પાદન

કરવા માટની દરખા ત કરલ છે.

તાિવત ોડ ટ (ઉ પાદન) ની િવગત

Sr. No. Name of Product Capacity (MT/Month)

૧. પ િવડોન આયો ડન ૩૦

૨. ોનોપોલ ૪

૩. ડાયકલોફનક સો ડયમ ૪

૪. ડાયકલોફનક પોટિશયમ ૪

૫. સો ડયમ સાઇ ટ ૧૫

૬. કાવડ લોલ ૪

૭. મેટફોિમન હાય ો લોરાઇડ ૪

૮. પટો સફાયલન ૧૦

૯. ેગાબલીન ૪

૧૦. પે ટો ાઝોલ સો ડયમ ૪

૧૧. લમપીરાઇડ ૪

૧૨. ટોિપરામેટ ૪

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 2

Sr. No. Name of Product Capacity (MT/Month)

૧૩. ગાબાપૅ ટ ન ૪

૧૪. એટોવા ટટ ન ક શયમ ૩૦

Total ૧૨૫

તાિવત હ થ નીક કમીક સ ાઈવેટ લિમટડ એકમનો ુલ િવ તાર આશર ૧૩,૩૦૪ ચો.

મીટર છે. માથંી ૪,૫૯૦ ચો.મી. (આશર ુલ િવ તારના ૩૪.૫%) જમીન ીન બે ટ માટ

ફાળવવામા ંઆવશે. બીનખેતી માટની મં ૂર અગાઉથી સબંિધત સ ા પાસેથી જમીન મા લક

ારા મેળવેલ છે.

તાિવત એકમન ે થાિપત કરવાની કમત િપયા ૪.૦ કરોડ થશે તથા પયાવરણીય

યવ થાપન પ ધિત માટ આશર િપયા ૭0 લાખ ફાળવવામા ંઆવશ ે

મેસસ હ થ નીક કમીક સ ાઈવેટ લિમટડ ારા મેસસ ટ . આર. એસોસીએ સની તાિવત

એકમનો પયાવરણીય ૃ થકરણ અસર અ યાસ (EIA) કરવા માટ િનમ ૂકં કરવામા ંઆવેલ

છે.

અ ે ન ધનીય છે ક એપીઆઈ ગ ુ ં ઉ પાદન એ EIA નોટ ફ કશન-૨૦૦૬ ના િવભાગ-

૫(એફ)મા ંઆવે છે. ત ્ ઉપરાતં એકમની જ યા ૂચત ઓ ોગક િવ તારની બહાર છે અને

ૂચત પર યોજના ૨૫ ૂન ૨૦૧૪ના નોટ ફ કશન માણે નાના પાયાના ઓ ોગક એકમ

તગત આવતો નથી તેથી MoEF&CC (Ministry Of Environment, Forest & Climate

Change), નવી દ હ પાસેથી પયાવરણીય મં ૂર (Environmental Clearance) મેળવવાની

જ ર યાત રહલ છે. આ ક યાના ભાગ પ ેપયાવરણીય લોક નુાવણી એ હરનામા માણે

તથા એ પટ એ ાઈઝલ કમીટ (ઇ ડ -૨) એ િુનટને આપેલા TOR માણે કરવામા ં

આવશે.

પયાવરણ ૃ થકરણ અસર અ યાસ (Environmental Impact Assessment Study) ઓકટોબર

૨૦૧૭ થી ડસે બર ૨૦૧૭ દરિમયાન કરવામા ં આવેલ છે. પયાવરણીય ઘટકો વા ક

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 3

(આસપાસ ની હવા, પાણી, જમીન, વિન, વન પિતઓ અને ાણીઓ) તાિવત એકમથી

અસર પામી શક તેમ છે, તેનો અ યાસ કરવામા ંઆ યો છે. તાિવત એકમને ક મા ંલઈને

૧૦ કમી. િ યાના વ ળુાકાર િવ તારને અ યાિસત ે તર ક ન કરવામા ંઆવેલ છે.

આસપાસના ૧૦ કમી િ યાના િવ તારની ુ ય લા ણકતાઓ નીચે માણે છે.

માકં ુ ય લા ણ તાઓ વણન ૧ તાિવત એકમ ુ ં થાન સવ ન.ં -૧૧૨ પૈક ૨ અને ૧૧૩ પૈક ૧ &

પૈક ૨, ગામ:- ચાચાપર, તા કુો અને લો:- મોરબી , જુરાત

૨ અ ાશં – રખાશં

અ ાશં:- ૨૨0 ૪૫’ ૨૫.૦૧” N

રખાશં:- ૭૦0 ૪૩’ ૨૬.૭૩” E સ ુ ી તરના સરરાશ ૩૪ મીટર ૩ ન ક ુ ંિવજળ મથક પિ મ જુરાત િવજ કંપની લિમટડ ૪ તાપમાન ૧૮.૦°સે. થી ૪૩.૦°સે. (સરરાશ) ૫ વાિષક વરસાદ ૬૦૧ મી.મી (સરરાશ)

૮ ન કનો રા ય ધોર માગ ટટ હાઈવે ૨૪ – ૭.૨ કમી, ESE ૯ ન ક ુ ંર વે ટશન નઝરબાગ ર વે ટશન – ૧૪.૮૫ કમી, NE ૧૦ ન ક ુ ંશહર મોરબી – ૧૪ કમી, East ૧૧ ન ક ુ ંગામ ચાચાપર- ૩.૭ કમી, WSW ૧૩ ન કના જમીન પરના પાણીના

ોત ક નદ - ૪.૭ કમી ENE

ડમી નદ - ૩.૬ કમી WSW આ ડમ:- ૫.૩ કમી SSE

ૂકંપ ઝોન ઝોન- ૩ (ઓ સ ય) ૧૪ રા ય ઉપવન - જગંલી

ાણીઓ માટ ુ ંઅ યાર ય

૧૦ કમી ી યામા ંનથી.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 4

૨. હવા ુ ંપયાવરણ (Air Environment) :-

વતમાન આસપાસની હવાની (Ambient Air) ણુવ ા ણવા માટ તાિવત એકમના

થળથી ૧૦ કમી િ યાના વ ળુાકાર િવ તારમા ં૮ અલગ અલગ થળેથી ઓ ટોબર ૨૦૧૭

થી ડ સે બર ૨૦૧૭ દરિમયાન ન નૂા લઈને તેની ચકાસણી કરવામા ંઆવી હતી. હવાની

ણુવ ા ન કરવા માટના થળની પસદંગી વા શુા , CPCB ની માગદિશકા અને ન કની

ા ત િુવધાઓના આધાર ન કરલ હતી. હવાની ણુવ ા ન કરવા માટ પા ટકલ મેટર

(PM10 & PM2.5), સ ફર ડાયોકસાઈડ (SO2), નાઈ ોજન ડાયોકસાઈડ (NO2), CO, VOC, NH3

અને HCl ની ચકાસણી કરવામા ંઆવી હતી. ના પ રણામો નીચેના ટબલમા ંદશા યા જુબ

છે.

થળ પ રણામ (98thટકાવાર ) PM2.5 PM10 SO2 NO2

ો ટ સાઈટ ૩૬.૫૨ ૮૫.૮૮ ૨૪.૮૬ ૩૫.૮૭

ચાચાપર ૩૪.૦૩ ૭૯.૬૩ ૨૦.૯૨ ૩૨.૬૮

રાજપર ૩૦.૦૩ ૬૯.૯૪ ૧૭.૧૨ ૨૩.૯૬

થોરાલા ૩૧.૬૩ ૭૩.૭૨ ૨૨.૬૬ ૨૬.૭૦

શ ત શનાળા ૨૫.૬૨ ૫૯.૬૧ ૧૫.૫૭ ૨૨.૦૫

લ ઈ ૨૮.૨૮ ૬૫.૯૫ ૧૪.૩૯ ૨૬.૬૬

નસીતપર ૩૨.૯૬ ૭૬.૬૬ ૧૭.૬૧ ૨૯.૯૧

ખાનપર ૨૬.૮૮ ૬૨.૫૨ ૧૩.૬૮ ૩૧.૬૦

વીકાય મયાદા ૬૦ μg/m3 ૧૦૦ μg/m3 ૮૦ μg/m3 ૮૦ μg/m3

ન ધ: CO: Below Detectable Limit; VOC: Below Detectable Limit; NH3: Below Detectable Limit; HCL: Below Detectable Limit.

આસપાસની હવાના પ રણામ પરથી તારણ કાઢ શકાય ક હવાની ણુવતા નેશનલ એ બીયટં

એર વોલીટ ના ધારાધોરણ જુબ છે.

હવાના ૂષણનો ુ ય ોત ચીમની માથંી નીકળતા ૂગેસ ઉ સ ન ક ટ મ બોઈલર

અને થિમક ડુ હ ટર, D. G. Set અને એપીઆઈ ગ ઉ પાદનમાથંી િનકળતો મુાડો છે.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 5

એ ો વે ટ/ કટસ બળતણ તર ક વાપરવામા ંઆવશે ની જ રયાત ૭ મે ક ટન/ દવસ

રહશે. સભંિવત બહાર િનકળતા ૂષકો PM, SO2 & NO2 હશે ના વાતાવરણમા ંયો ય

ફલાવ માટ ચીમની ની પયા ત ચાઈ રાખવામા ંઆવશે ટ મ બોઈલર સાથે હવા ૂષણ

િનયં ક તર ક સાય લોન સેપરટર અને બેગ- ફ ટર લગાવવામા ંઆવશે. યાર D. G. SET ક

પાવર કટ વખતે વપરાશે તેમા ંબળતણ તર ક ડ ઝલ વાપરવામા ંઆવશે અને ૂગેસ

ઉ સ ન પણ િનયત ધારાધોરણો જુબ રહશે તેથી D. G. Set માટ હવા ૂષણ િનયં ક

જ ર નથી. ઉ પાદન કયા દર યાન ઉ પ થતા ંહાઈ ો લોર ક એસીડ અને એમોનીયા ગસે

ઉ સ ન માટ ચમની સાથે હાઈ ો લોર ક એસીડ બર તથા કો ટ ક બર લગાવવામા ં

આવશે. ોસેસથી ઉ પ થતા ંVOC માટ બે ટજ ક ડ સર સાથે સ ય કાબન અને બર

લગાવવામા ંઆવશે.

૩. જળ પયાવરણ (Water Environment):-

ગૂભ જળ તેમજ જમીન પરના પાણીના ન નૂાઓની ણુવ ા પર ણ પરથી તારણ કાઢ

શકાય ક અ યાિસત િવ તાર ુ ં ગૂભ જળ તેમજ જમીન પર ુ ંપાણી ૃિષ િૃ સ હત

થાિનક િૃ માટ યો ય છે. કટલાક થળોના ગૂભ જળ તેમજ જમીન પરના પાણીના

ન નૂાઓ મા ંડહોળાશ અને બૅ ટર યા જોવા મળેલ છે તે િસવાય ગૂભ જળ તેમજ જમીન

પર ુ ંપાણી પીવાલાયક પાણીની ણુવ ાના ધારાધોરણો (આઇ.એસ. ૧૦૫૦૦) ની જુબ છે.

પાણીની જ ર યાત:-

તાિવત પર યોજના માટ પાણીનો ુલ વપરાશ ૩૨.૦ કલોલીટર/ દવસ રહશે માથંી

ઘરગ ુવપરાશ માટ ૪.૦ કલોલીટર/ દવસ ટ ુ ંપાણી વપરાશે યાર ઓ ોગક વપરાશ

માટ ૪૬.૦ કલોલીટર/ દવસ ટ ુ ં પાણી તેમજ ીન બે ટ ડવલોપમે ટ માટ ૧૪

કલોલીટર/ દવસ ટ ુ ંપાણી વપરાશે. તાિવત પર યોજના માટ જ ર પાણી બોરવેલ

ારા મેળવવામા ંઆવશે.

ગદંાપાણીનો ઉદભવ અને ગદંાપાણીનો િનકાલ:-

તાિવત પર યોજના માથંી ૩.૫ કલોલીટર/ દવસ ટ ુ ંઘરગ ુગં ુ પાણી ઉદભવશે. આ

ઘરગ ુગદંા પાણીનો િનકાલ સે ટ ક ટક/સો પીટ સી ટમ ારા કરવામા ંઆવશે.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 6

તાિવત પર યોજનામા ં ુલ ૫૩.૮ કલોલીટર/ દવસ ટ ુ ંઓ ોગક ગં ુ પાણી ઉ પિ હશ,ે

માથંી ૧૩ કલોલીટર/ દવસ High COD પાણી હશે. ુલ ૫૩.૮ કલોલીટર/ દવસ ટ ુ ંગં ુ

પાણી ુલ ગ ટાવર, બોઈલર લોડાઉન, ોસેસ, બર, એમોિનયા પર અને RO-૧ ર ટ

બહાર નીકળશે આ ગદંા પાણીને ETP(Effluent Treatment Plant)મા ં ુ કરણ કરવામા ં

આવશે, યારબાદ RO -૨ મા ં પસાર કરવામા ં આવશે. ૩.૧ કલોલીટર/ દવસ ટ ુ ં

એમોિનયમ નાઇ ોજન ધરાવતા ગદંા પાણીને એમોિનયા પર ટમે ટ કરવામા ંઆવશે અન ે

પછ અ ય LOW COD વાહો સાથે િમિ ત કરવામા ંઆવશે. 13 કલોલીટર/ દવસ High

COD પાણી તેમજ RO-2 ર ટ પાણી MEE / MVR ને મોકલવામા ંઆવશે. MEE / MVR

માથંી નીકળતા ૨૫ કલોલીટર/ દવસ ગદંા પાણીને સારવાર માટ ETP મોકલવામા ંઆવશે..

થી આ કયામાથંી કોઈ ગં ુ પાણી ઉદભવશે ન હ અને એકમ ઝીરો ડ ચા રહશે.

૪. જમીન પયાવરણ

કામગીર તબ ા દર યાન હવા, પાણી, ઘનકચરાના ૂષણથી જમીન પર સીધી અથવા

આડકતર અસરો થાય છે.

હવાના ૂષણને રોકવા માટ જ ર બધાજ પગલા લેવામા ંઆવશે થી જમીન પર કોઈ જ

આડઅસર થશે ન હ. હવાના ૂષણથી જમીન પર સીધી અથવા આડકતર અસરો થાય છે

મા ં લા ટના કામગીર તબ ા દર યાન જમીન ની સપાટ પર હવાના િવિવધ ૂષકોની

મા ા (Ground Level Concentration) ના પર ણામો પરથી કહ શકાય ક જમીન પર કોઈ

ન ધનીય આડઅસર થશે ન હ.

અ ે ન ધનીય છે ક ગં ુ પાણી જમીન પર છોડવામા ંઆવ ુ ંનથી થી જમીન પર કોઈ

આડઅસર થશે ન હ.

ઘન કચરાને સભંાળવા, સં હ કરવા અને તેના િનકાલ માટના દરક િનયં ીત પગલાઓ

લેવામા ંઆવશે થી ઘન કચરાને કારણે જમીન પર કોઈ આડઅસર થશે ન હ.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 7

૫. વિન પયાવરણ :-

અ યાિસત ે મા ં વતમાન વિન ુ ંમાપદંડ કાઢવા માટ ૮ અલગ- અલગ થળે ઘ ઘાટની

ચકાસણી કરવામા ંઆવી હતી. ના પર ણામો નીચે માણે છે.

માકં થળ ઘ ઘાટ ુ તર (Leq) in dBA

( દવસ દર યાન)

ઘ ઘાટ ુ તર (Leq) in dBA

(રા ી દર યાન)

માપન વીકાય મયાદા માપન વીકાય મયાદા

૧ ો ટ સાઈટ ૫૯.૧ ૭૫ ૩૯.૫ ૭૦

૨ થોરાલા ૫૮.૩ ૫૫ ૪૦.૬ ૪૫

૩ ચાચાપર ૫૫.૩ ૫૫ ૩૭.૬ ૪૫

૪ ખાનપર ૫૫.૪ ૫૫ ૪૩.૨ ૪૫

૫ રાજપર ૫૧.૦ ૫૫ ૪૨.૫ ૪૫

૬ નસીતપર ૫૧.૯ ૫૫ ૩૫.૯ ૪૫

૭ લ ઈ ૫૩.૬ ૫૫ ૩૪.૫ ૪૫

૮ તસનાળા ૫૩.૦ ૫૫ ૩૬.૦ ૪૫

ઘ ઘાટની ચકાસણીના પ રણામ પરથી તારણ કાઢ શકાય ક ઘ ઘાટ ુ તર િનયત ધારાધોરણ

જુબ છે.

૬. સામા ક-આિથક પયાવરણ:-

સામા ક અથ ય થાનો અ યાસ એ પયાવરણ ૃ થકરણ અસર અ યાસ માટની બૂ જ

મહ વની િવગત છે. આ કારણસર અ યાિસત ે મા ંસામા ક અથ ય થાની મા હતી વીક

વ તી ુ ં માણ, કામગીર નો કાર વગેર લા વ તીગણતર ુ તકામાથંી મેળવેલ છે.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 8

તાિવત પર યોજનાને કારણે ુલ ૪૦ ટલા ુશળ અને અધ ુશળ કાર ગરોને સીધી ર ત ે

રોજગાર ા ત થશે. તાિવત પર યોજનાને કારણે આડકતર ર તે વી ક વાહન વહાર,

ુ કાનોમા ંવગેરમા ંરોજગાર ની તકો ઉભી થશે.

આ લા ટની કામગીર માટ જ ર લાગે યા ં થાિનક લોકોની તેમની ુશળતાના આધાર

પસદંગી કરવામા ં આવશે. આ ુબા ુના િવ તારમા ં ધધંાની ઉ વળ તકોને કારણે યાનંા

થાિનક લોકોની આિથક પ ર થતી ધુરશે અને તેથી એકમને કારણે હકારા મક અસર થશે.

આ ુબા ુના િવ તારમા ંસા રતા, આરો ય અને રહણીકરણીમા ં ધુારો થશે.

૭. વ પ ર થતી અને વ િવિવધતા શા :-

અ યાિસત ે નો િવ તાર ુ ય વે ખેતીલાયક જમીન ધરાવે છે. આ િવ તારમા ંવન પિત

અને ાણી-પ ીઓની િવિવધતા બ ુ ઓછ જોવા મળેલ છે.

અ યાિસત ે મા ં થાિનક વન પિતની િતઓ વી ક બાવળ, લીમડો, લુમહોર, કરંજ,

ખીજડો, ક ડુો અને આસોપાલવ જોવા મળેલ છે. કપાસ, તલ, ચોખા, ઘઉં, બાજર , અને ુવાર

અ યાિસત ે ના ુ ય ખેતીલાયક પાકો છે.

અ યાિસત ે મા ંસામા ય ર તે દખાતા પ ીઓમા ંકાળો કોશી, લીલો પતરંગો, ટટોડ , પોપટ

જોવા મળે છે. અ યાિસત િવ તારમા ંપાલ ુ ં ાણીઓ ઉપરાતં જગંલી સ તન ાણીઓ

જોવા મળેલ હતા ંતેમા ંિનલગાય, િશયાળ, નોળ યો,સસલા અને જગંલી વુરનો સમાવેશ થાય

છે.

૮. સોલીડ વે ટ મેનેજમે ટ :-

ુ ય હઝાડસ વે ટમા ંઈટ પી કચરો + ઈવેપોરશન રસીડ ,ુ વપરાયે ુ ંઓઈલ અને નકામી

થેલીઓ અને મ, ડ ટ લેશન રસીડ ,ુ ોસેસ રસીડ ,ુ પે ટ કટાલી ટ, નકામી ગ અને

પે ટ કાબન નો સમાવેશ થાય છે.

ઈટ પી કચરાનો + ઈવેપોરશન રસીડ ુ નો મં ુર થયેલ TSDF Site મા ં િનકાલ કરવામા ં

આવશે. વપરાયે ુ ં ઓઈલ ુ ીક ટ તર ક નુઃ વપરાશે અથવા ર સાઈકલરને વેચાશે,

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 9

નકામી થેલીઓ અને મ મં ૂર થયેલ વે ડર ને વેચાશે અને તેમજ ડ ટ લેશન રસીડ ,ુ ોસેસ

રસીડ ,ુ પે ટ કટાલી ટ, નકામી ગ પે ટ કાબનને કોમન ઈ સીનરરશન ફસીલીટ (CHWIF)

મા ંમોકલવામા ંઆવશે.

એકમ હઝાડસ વે ટના સં હ માટ અલગ જ યા ફાળવશે આથી એકમ ારા અપાયેલી હઝાડસ

વે ટ મેનેજમે ટ પ ત રૂતી હશે અને હઝાડસ વે ટ ના લીધે પયાવરણ પર કોઈ આડઅસર

થશે નહ .

૯. પયાવરણીય યવ થાપન યોજના:-

પયાવરણ પર થતી આડઅસરોને રોકવા/નાથવા માટ પયાવરણીય યવ થાપન યોજના

બનાવવામા ં આવેલ છે. આ પયાવરણીય યવ થાપન યોજનામા ં પયાવરણને યથાવત

ળવવા માટ અને ૂષકોને િનયં ીત મા ામા ં રાખવા માટ જ ર અને યો ય પગલાઓં

વા ક ીન બે ટ ડવલપ કરવો અને તે ુ ં જતન કર ુ,ં કામદારોની યો ય સલામતી,

પયાવરણીય ઘટકોની ચકસણી યોજનાનો અમલ કરવો, વરસાદના પાણીનો સં હ કરવો, આગ

ન લાગે તેવા તકદાર ના પગલા લેવા અને આગ નાથવાના સાધનો રાખવા વગેરનો સમાવેશ

કરવામા ંઆવે છે.

આ પયાવરણીય ય થાપન યોજનાના અસરકારક અમલીકરણ માટ પયાવરણીય ય થાપન

એકમની રચના કરવામા ંઆવશે.

૧૦. પયાવરણીય ચકાસણી યોજના:-

પયાવરણીય પ રબળોની ચકાસણી િવિવધ થળોએ પયાવરણીય અસરો તથા તેના ફરફારો

ઓળખવા માટ મદદ પ થશે. આ હ થુી પયાવરણીય યવ થાપન યોજનાના પાલન માટ

આસપાસની હવાની ણુવ ાની ચકાસણી, ચીમનીમાથંી િનકળતા ૂષકો તથાપાણી ુ ં

પયાવરણની ચકાસણી તેમજ વિન માપદંડની ચકાસણી કાયદામા ંજણા યા જુબ કરવામા ં

આવશે.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 10

૧૧. જોખમનીઆકારણી:-

જોખમ આકારણીનો અ યાસ જોખમી રસાયણો માટ કરવામા ંઆવેલ છે. બધા જ જોખમી

રસાયણોનો સં હણ અને િનયં ણ MSDS ની માગદિશકા હઠળ કરવામા ંઆવશે. ય તગત

ર ા મક સાધનો કાર ગરો ને આપવામા ંઆવશે.

૧૨. ીન બે ટ ડવલપમે ટ :-

આશર ુલ ૪,૫૯૦ ચો.મી. ટલો ીન બે ટ િવ તાર ો ટ સાઈટની દર ડવલોપ

કરવામા ંઆવશે ક વિન ૂષણ તથા હવા ૂષણ નાથવા, જમીન ુ ં ૂષણ/ધોવાણ

અ ટકાવવા વા ે ોમા ં મદદ પ થશે. ુલ ો ટ િવ તારના ૩૪.૫ % ટલો િવ તાર

ીનબે ટ તર ક િવકસાવવામા ંઆવશે.

૧૩. ો ટ થી થતા લાભો:-

ૂચત ો ટ આસપાસના િવ તારના સ દુાયના અથવા માળખાક ય િવકાસ, સામા ક િવકાસ, રોજગાર અને અ ય ફાયદાઓની ટએ લાભદાયી બનશે.

ૂચત ો ટ ુશળ, અધ ુશળ અને બન ુશળ કાર ગરો ને બાધંકામ તબ ા અને કામગીર તબ ા દરિમયાન રોજગાર આપવાની મતા ધરાવે છે. ુલ ૪૦ ટલા ય તઓને ૂચત ો ટ ારા રોજગાર મળ શક છે. આ ો કટ ુલ નફાના ૨.૫% ટલો ખચ સામા ક તેમજ

આિથક િવકાસ માટ કરાશ.ે

૧૪.ઉપસહંાર :-

આ પયાવરણ અસર ૃ થકરણ અ યાસ પરથી કહ શકાય ક... હવાની ણુવ ા પર ન વી અસર થાય છે. જો ક હવા ૂષણ િનયં ણ માટના તમામ પગલા લેવામા ંઆવશે.

કોઈ ઈકોલો કલ કુશાન થશે ન હ. જળ પયાવરણ પર કોઈ િત ળૂ અસર થશે ન હ. થાિનક રોજગાર ની તકો વધશે.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - Gujarati 11

િવિવધ પયાવરણીય પ રમાણો વા ક જગંલ, રા ય બગીચા, અ યાર ય અને ધામ ક તથા ઐતીહાિસક થળો પર કોઈ અસર થશે ન હ.

પયાવરણીય યવ થાપન યોજના બધા ૂષણ પ રમાણોને િનયિં ત કરવા માટ ઘડવામા ં આવી છે. અને આ પ રણામો સબંિધત સ ાિધકારો ારા થપાયેલ ધારાધોરણ કરતા વધી ના ય એ માટ પયાવરણ ય થાપન એકમ ારા િુનિ ત કરવામા ંઆવે છે.

પયાવરણ ય થાપન એકમ ૂચત ો કટની શ આત પછ ૂષણ િનયં ણના ંપગલા ંલેશે.

આથી અ મુાન કર શકાય ક બાધંકામ અને કામગીર તબ ા દરિમયાન કૂવામા ંઆવેલ પયાવરણીય ય થાપન યોજના અને શમનના પગલાનંા હકારા મક અમલીકરણથી પયાવરણ પર થતી અસરોને ઘટાડ શકાશે.

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 1

INDEX

CHAPTER

NO. CONTENT

PAGE NO.

1 INTRODUCTION 1.1- 1.11 1.1 Preamble 1.1 1.2 Purpose of the report 1.2 1.3 Promoters and their back ground 1.2 1.4 Need of the project and its importance in the country 1.3 1.5 Location of the proposed project and siting criteria 1.4 1.6 Scope of EIA study 1.7 1.7 Regulatory frame work 1.9

2 PROJECT DESCRIPTION 2.1-2.67 2.1 Introduction 2.1 2.2 Project location 2.1 2.2.1. Justification of site selection 2.6 2.2.2. Salient features of the proposed project site 2.6 2.2.3. List of major industries within 10 km study area 2.7 2.3 Details of project land & plant lay-out 2.10 2.4 Capital cost of the proposed project 2.12 2.5 Details of product and raw material consumption 2.13 2.6 Manufacturing Process 2.19 2.6.1 Povidon Iodine 2.19 2.6.2 Bronopol 2.20 2.6.3 Diclofenac Sodium 2.21 2.6.4 Diclofenac Potassium 2.24 2.6.5 Sodium Citrate 2.28 2.6.6 Carvedilol 2.29 2.6.7 Metformin Hydrochloride 2.31 2.6.8 Pentoxifylline 2.32 2.6.9 Pregabalin 2.33 2.6.10 Pentoprazole Sodium 2.37 2.6.11 Glimepiride 2.39 2.6.12 Topiramate 2.42 2.6.13 Gabapentin 2.44

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 2

CHAPTER NO.

CONTENT PAGE NO.

2.6.14 Atorvastatin Calcium 2.46 2.7 Storage details of raw materials and products 2.49 2.8 Solvent requirement & recovery system 2.53 2.9 Requirement of Resources 2.55 2.9.1. Electricity / Power 2.55 2.9.2. Manpower 2.55 2.9.3. Water 2.55 2.9.4. Fuel 2.56 2.9.5. Plant, Machineries & Utilities 2.56 2.10 Energy Balance 2.57 2.11 Pollution Potential & Mitigation Measures 2.58 2.11.1 Water Pollution 2.58 2.11.2 Air Pollution 2.64 2.11.3 Solid / Hazardous Waste 2.68 2.11.4 Noise & Vibration 2.69

3 DESCRIPTION OF ENVIRONMENT 3.1-3.93 3.1 Introduction 3.1 3.1.1 Study Area 3.1 3.2 Air Environment 3.2 3.2.1 Micrometeorological Data 3.2 3.2.1.1 Meteorological Data from Secondary Sources 3.3 3.2.1.2 Meteorology - Data Generated at the Project Site 3.5 3.2.2 Sampling Methodology and Analysis 3.7 3.2.3 Selection of AAQ Stations 3.7 3.2.4 Interpretation of AAQ of Study Area 3.13 3.3 Noise Environment 3.13 3.3.1 Existing Noise Levels 3.14 3.3.2 Interpretation of Ambient Noise Quality 3.17 3.4 Water Environment 3.17 3.4.1 Water Quality 3.17 3.4.1.1 Sample Collection and Analysis 3.18 3.4.1.2 Interpretation of Ground Water 3.24

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 3

CHAPTER NO.

CONTENT PAGE NO.

3.4.1.3 Interpretation of Surface Water 3.29 3.5 Soil Environment 3.30 3.5.1 Methodology of Sample Collection and Analysis 3.30 3.5.2 Sampling Locations and Results 3.30 3.5.2 Interpretation of Soil Quality 3.33 3.6 Geo-Hydrological Features 3.34 3.6.1 Geological Features 3.34 3.7 Land Use Status 3.41 3.7.1 Introduction 3.41 3.7.2 Land use & Land cover Classification 3.41 (A) Data Used 3.42 (B) Methodology 3.42 (C) Interpretation of Remote Sensing Data 3.43 3.7.1 Topography 3.49 3.8 Ecology 3.52 A Floral Status 3.52 B Faunal Status 3.52 3.8.1 Biodiversity Status 3.53 A Biodiversity - Status of Flora 3.53 B Biodiversity - Status of Fauna 3.56 3.8.2 Conclusion 3.60 3.9 Socio Economic Environment 3.79 3.9.1 Introduction 3.79 3.9.2 Socioeconomics 3.79 3.9.3 Households 3.80 3.9.4 Population 3.80 3.9.5 Occupational Structure 3.82 3.9.6 Literacy 3.84 3.9.7 Amenities 3.85 3.9.8 Site Specific Studies 3.90

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 4

CHAPTER NO.

CONTENT PAGE NO.

3.10 Traffic Survey 3.91

4 ANTICIPATED IMPACTS & MITIGATION MAESURES 4.1- 4.28 4.1 Preamble 4.1 4.2 Prediction and Evaluation of Impacts 4.2 4.3 Impact Identification 4.3 4.4 Assessment of Impacts 4.6 4.5 Quantification of Impacts 4.9 4.5.1 Environmental Attributes & Relative Importance 4.9 4.5.2 Magnitude Criteria 4.10 4.5.3 Matrix Development 4.11 4.6 Mitigation Measures for Impacts on environment during

Construction Phase 4.14

4.7 Mitigation Measures for Impacts on Environment during Operational Phase

4.15

4.8 Impact on Air Quality 4.18 4.9 Existing Traffic & Vehicular Pollution 4.27

5 ANALYSIS OF ALTERNATIVES 5.1-5.3 5.1 Introduction 5.1 5.2 Project Details 5.1 5.3 Site Alternatives 5.1 5.4 Alternative for Technologies 5.2

6 ENVIRONMENT MONITORING PROGRAM 6.1-6.4 6.1 Introduction 6.1 6.2 Environment Monitoring Program 6.2 6.3 Budget for Implementation of Environmental Monitoring Plan 6.3

7 ADDITIONAL STUDIES 7.1-7.74 A Public Consultation 7.1 B Risk Assessment Study 7.1 C Social Impact Assessment, R & R Action Plan 7.1 7.1 Overview of Project 7.2 7.2 Surrounding Area 7.2

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 5

CHAPTER NO.

CONTENT PAGE NO.

7.2.1 Objective and Scope 7.2 7.2.2 Risk Analysis Methodology 7.3 7.3 Hazard Identification and Risk Analysis 7.3 7.3.1 Hazard Identification and Risk Analysis 7.4

7.3.2 Identification of Hazardous Chemicals used within

Premises 7.4

7.3.3 Storage Details of Raw Material and Products 7.14 7.3.4 Credible Accident Sources/Worst Case Scenarios 7.22 7.4 Consequence Modeling 7.23 7.4.1 Damage Criteria 7.23 7.4.2 Details of Model Used for Consequence Analysis 7.26 7.5 Failure Frequency 7.52 7.6 Estimation of Effect of Damage / Impact Identification 7.53 7.7 Summary 7.54 7.8 Proposed Risk Reduction Measures 7.54

7.9 Occupational Health Surveillance Program 7.56 7.9.1 Treatment Facilities Provided to Workers affected by

accidental Spillage of Chemicals 7.57

7.9.2 Minimization of the manual handling of hazardous substance

7.58

7.9.3 DO’S and DONT’S 7.58 7.10 Disaster Management Plan 7.61 7.10.1 Disaster 7.61 7.10.2 Statutory Provisions 7.61 7.10.3 On-Site Emergency Plan 7.62 7.10.4 Site Plan of the Factory and Surrounding 7.62 7.10.5 Types of Overall Emergencies 7.62 7.10.6 Assessment of In-plant Hazards 7.63 7.10.7 Emergency Control System 7.64 7.10.8 General Procedures and responsibilities 7.67 7.11 Offsite Emergency Preparedness Plan 7.69

8 PROJECT BENEFITS 8.1-8.3 8.1 Introduction 8.1 8.2 Employment Potential 8.1 8.3 Improvement in Physical & Social Infrastructure 8.1

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 6

CHAPTER NO.

CONTENT PAGE NO.

8.4 Other Tangible Benefits 8.2 8.5 Enterprise Social Responsibility (ESR) 8.2 8.6 Corporate Social Responsibility (CSR) 8.3

9 ENVIRONMENTAL COST BENEFIT ANALYSIS 9.1 9.1 Environmental cost benefit analysis 9.1

10 ENVIRONMENTAL MANAGEMENT PLAN 10.1-10.16 10.1 Introduction 10.1 10.2 Environmental Management Plan for Construction Phase 10.1 10.3 Environmental Management Plan for Operation Phase 10.2 10.4 Components of EMP 10.2 10.4.1 Environment Management System (EMS) 10.2 10.4.2 Environmental Health & Safety (EHS) 10.2 10.4.3 Environmental Management Cell (EMC) 10.3 10.5 Environmental Management Plan for Proposed Project 10.4 10.5.1 Environmental Management during Operation Phase 10.4 10.6 Greenbelt Development Plan 10.11 10.7 Rain Water Harvesting Scheme 10.12 10.8 Occupational Health Management Plan 10.13 10.9 Fire & Safety Management Plan 10.14 10.10 Cleaner Production Technologies 10.14 10.11 Budget for Environment Protection Measures 10.15

11 SUMMARY & CONCLUSION 11.1–11.4 11.1 Justification for Implementation of the Project 11.1 11.2 Anticipated Adverse Environmental Impacts and Mitigation

Measures 11.1

11.3 Conclusions 11.5

12 DISCLOSURE OF CONSULTANT ORGANIZATION 12.1-12.4 12.1 Declaration for Involvement in EIA study 12.1 12.2 Company Profile 12.3

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 7

LIST OF TABLES

TABLE NO.

LIST OF TABLES PAGE NO.

1.1 Details of Proposed Product 1.1 1.2 Promoters and their Background 1.2 1.3 General Siting Criteria 1.6 1.4 Scope of the study 1.8 1.5 Regulatory Frame Work 1.9

2.1 Salient Features of the Proposed Project Site 2.6 2.2 List of Major Industries within 10 km study area 2.7 2.3 Area Break-up of Project Site 2.10 2.4 Break-up of capital cost for Proposed Project 2.12 2.5 Details of Product 2.13 2.6 Details of Raw Material Consumption 2.15 2.7 Details of Proposed Raw Materials 2.49 2.8 Details of Proposed Raw Materials Storage Tank 2.52 2.9 Solvent Recovery Details 2.53

2.10 Manpower Requirement 2.55 2.11 Fuel Requirement 2.56 2.12 List of Plant, Machineries and Utilities 2.56 2.13 List of Vessels and Machineries 2.57 2.14 Energy Balance 2.57 2.15 Stream-wise Water Requirement and Wastewater Generation 2.58 2.16 Stream-wise Quality of Effluent 2.61 2.17 Details of ETP units 2.62 2.18 Details of Flue Gas Emissions 2.64 2.19 Details of Air Pollution Control System 2.64 2.20 Details of Process Gas Emissions 2.66 2.21 Details of APCM for Process Gas Emissions 2.66 2.22 Details of Hazardous Waste Management 2.68

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 8

TABLE NO.

LIST OF TABLES PAGE NO.

3.1 Period of Meteorological Data Collection 3.2 3.2 Monthly Mean values of Meteorological Data (Secondary Data) 3.3 3.3 Air – Parameters Analyzed and Sampling Duration 3.7 3.4 Ambient Air Quality – Methodology 3.7 3.5 Ambient Air Monitoring Locations 3.8 3.6 Ambient Air Monitoring Results 3.11 3.7 Interpretation of Ambient Air Quality 3.13 3.8 Noise Monitoring Locations 3.14 3.9 Noise Level Monitoring Data 3.16

3.10 Water Monitoring Locations 3.20 3.11 Water Quality - Physico-Chemical Analysis of Ground Water 3.21 3.12 Water Quality - Physico-chemical Analysis of Surface Water 3.26 3.13 Soil Sampling Locations 3.30 3.14 Physico-Chemical Characteristic of Soil 3.32 3.15 Rainfall Data of the Region 3.35 3.16 Land Use / Land Cover Classification 3.43 3.17 Taxonomic Status of Plant Species 3.53 3.18 Life Form Status of Plant Species 3.54 3.19 Common Tree Species 3.54 3.20 Wild/Forest Tree Species 3.55 3.21 List of Agriculture and Commercial Crop Species Recorded 3.56 3.22 Taxonomical Status of Herpetofauna 3.56 3.23 Overall Status of Terrestrial and Aquatic Birds 3.57 3.24 Overall Status of Mammals 3.59 3.25 List of Plant Species Suggested for Greenbelt Development 3.61

3.26 Habitat wise checklist of plant species recorded in and around the Project site

3.63

3.27 List of villages in 10 km Radius area 3.79 3.28 Population Distribution in the Study Area 3.80 3.29 Occupational Structure in the Study Area 3.83 3.30 Literacy Status in the Study Area 3.84 3.31 Basic amenities detail for study villages covered in 10 km radius 3.86 3.32 Traffic Count Data 3.91

4.1 Impact Identification Matrix 4.4 4.2 Assessment of Impacts 4.7

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 9

TABLE NO.

LIST OF TABLES PAGE NO.

4.3 Environmental Attributes 4.9 4.4 The Activity – Impact Evaluation Matrix 4.11 4.5 Cumulative Impact Matrix 4.13 4.6 Construction Phase: Impacts & its Mitigation Measures 4.14 4.7 Operation Phase: Impacts & its Mitigation Measures 4.15 4.8 Details of Flue Gas Stacks 4.18 4.9 Expected Pollutants and its Emission Rate 4.19

4.10 Predicted 24 Hourly Short term incremental concentration of PM10 4.25 4.11 Predicted 24 hourly short term incremental Concentrations of SO2 4.25 4.12 Predicted 24 hourly short term incremental Concentrations of NO2 4.26 4.13 Predicted 24 hourly short term incremental Concentrations of NH3 4.26 4.14 Predicted 24 hourly short term incremental Concentrations of HCl 4.27 4.15 Assessment of Proposed Traffic Load 4.28

5.1 Proposed Technology Alternatives 5.2

6.1 Environmental Monitoring Program 6.2 6.2 Budget for Implementation of Environmental Monitoring Plan 6.3

7.1 Chemical Properties of Hazardous Chemicals 7.5 7.2 Storage Details of Products 7.14 7.3 Identification Hazard Associated with Storage of Raw Materials 7.15 7.4 Scenarios Considered for MCA Analysis 7.22 7.5 Damage Due to Incident Radiation Intensities 7.24 7.6 Radiation Exposure and Lethality 7.24 7.7 Damage Due to Peak Over Pressure 7.25

7.8 Consequence analysis and Damage Distance (Failure of raw material storage tanks)

7.28

7.10 Atmospheric Storage Tank Leak/ Tank Fire Frequencies 7.52 7.11 Estimation of Fatality 7.53 7.12 Types of Emergencies 7.63 7.13 Details of Fire Extinguishers 7.66 7.14 Offsite Action Plan 7.73

8.1 Action Plan for Socio-Economic Development Activities 8.2

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 10

TABLE NO.

LIST OF TABLES PAGE NO.

10.1 Details of Plant Species in Greenbelt 10.11 10.2 Budgetary allocation towards Environmental Management 10.23

11.1 Anticipated Adverse Environmental Impacts and Mitigation Measures

11.1

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 11

LIST OF FIGURES

FIGURE NO.

LIST OF FIGURES PAGE NO.

1.1 Location of the project site 1.5

2.1 Index Map 2.2

2.2 Google Image showing surrounding 500 m radius area from the project site

2.3

2.3 Google Image showing surrounding 1,5,10 km radius area from the project site

2.4

2.4 Survey of India Topo sheet showing Proposed Project Site 2.5 2.5 Google Map showing nearby Industries 2.9 2.6 Plant Lay-out 2.11 2.7 Solvent Recovery System 2.54 2.8 Water Balance Diagram 2.60 2.9 Schematic Flow Diagram of Effluent Treatment Plant 2.63

2.10 Primary and Secondary Condenser followed by scrubber and carbon column

2.67

3.1 Wind Rose Diagram of Entire Year (Secondary Source) 3.4 3.2 Wind Rose Diagram based on Primary Meteorological Data 3.6 3.3 Map showing Ambient Air Quality Locations 3.10 3.4 Map Showing Noise Sampling Locations 3.15 3.5 Map showing Ground Water Quality Locations 3.20 3.6 Map showing Surface Water Quality Locations 3.25 3.7 Map showing Soil Sampling Locations 3.32 3.8 Ground Water Prospect Map 3.40 3.9 Land use and Land cover map of the 10 km radius study area 3.46

3.10 Satellite Image of the 10 km radius study area 3.47 3.11 Infrastructure Map of the 10 km radius study area 3.48 3.12 Topography Map of the 10 km radius study area 3.51 3.13 Percentage of Total Population Distribution 3.81 3.14 Percentage Distribution of Workers 3.84 3.15 Percentage Distribution of Literacy Levels 3.85 3.16 Image showing Traffic Surveying Location 3.92

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 12

FIGURE NO.

LIST OF FIGURES PAGE NO.

4.1 Ground Level Concentration of PM10 4.20 4.2 Ground Level Concentration of SO2 4.21 4.3 Ground Level Concentration of NO2 4.22 4.4 Ground Level Concentration of NH3 4.23 4.5 Ground Level Concentration of HCl 4.24

7.1 Methanol BLEVE- (5 m/s weather condition – stability class D) 7.32 7.2 Methanol POOL fire (5 m/s weather condition –stability class D) 7.33

7.3 Methanol Toxic Dispersion(5 m/s weather condition – stability class D)

7.34

7.4 Methanol Toxic Dispersion (1.5 m/s weather condition – stability class F)

7.35

7.5 Methanol BLEVE- Worst Case Scenario (1.5 m/s weather condition – stability class F)

7.36

7.6 Methanol POOL fire(Threat Zone) (1.5 m/s weather condition – stability class F)

7.37

7.7 Acetonitrile BLEVE (5 m/s weather condition–stability class D) 7.38

7.8 Acetonitrile TOXIC Dispersion (5 m/s weather condition – stability class D)

7.39

7.9 Acetonitrile BLEVE (1.5 m/s weather condition – stability classF) 7.40

7.10 Acetonitrile TOXIC Dispersion (1.5 m/s weather condition – stability class F)

7.41

7.11 Chloroform TOXIC Dispersion (1.5 m/s weather condition – stability class F)

7.42

7.12 Chloroform TOXIC Dispersion (5 m/s weather condition – stability class D)

7.43

7.13 N-Hexane BLEVE (5 m/s weather condition – stability class D) 7.44

7.14 N-Hexane TOXIC Dispersion (1.5 m/s weather condition – stability class F)

7.45

7.15 N-Hexane BLEVE (1.5 m/s weather condition –stability class F) 7.46 7.16 IPA BLEVE (5 m/s weather condition – stability class D) 7.47

7.17 IPA TOXIC Dispersion (5 m/s weather condition –stability class D)

7.48

7.18 IPA BLEVE (1.5 m/s weather condition – stability class F) 7.49

7.19 IPA TOXIC Dispersion (1.5 m/s weather condition – stability class F)

7.50

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 13

FIGURE NO.

LIST OF FIGURES PAGE NO.

7.20 IPA POOL Fire (1.5 m/s weather condition – stability class F) 7.51 7.21 Off-Site Emergency Plan 7.70

10.1 Environmental Management Cell 10.3

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 14

LIST OF PHOTOGRAPHS

PHOTOGRAPH NO.

LIST OF PHOTOGRAPHS PAGE NO.

1.1 Photograph of the project site 1.6

3.1 Photograph showing Automatic Weather Station installed near project site

3.5

3.2 Photograph showing Ambient Air Monitoring 3.9 3.3 Photograph showing Noise Measurement 3.16

3.4 Photograph showing Ground & Surface Water Sample Collection

3.19

3.5 Photograph showing Soil Sample Collection 3.31 3.6 Photograph showing LU Survey 3.45 3.7 Photographs showing Surrounding Habitat 3.62 3.8 Photograph showing Socio-Economic Data Collection 3.89

Environmental Impact Assessment Report for Proposed API Project

M/s. Healthgenic Chemicals Pvt. Ltd. Survey No.: 112 paiki2 and 113 paiki 1 & paiki2,

Village: Chachapar, Taluka & District: Morbi, Gujarat

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 15

LIST OF ANNEXURES

ANNEXURE NO.

LIST OF ANNEXURES

1 TOR Letter issued by MoEFCC, New Delhi

2 Lease Deed Copy including NA permission

3 Proof of CGWB Application

4 Manufacturing Process along with Material balance

5 Site Specific Primary Meteorological Data

6 Raw data of all AAQ measurement for all Sampling Locations

7 Material Safety Data Sheets of Raw Materials

8 Copy of NABET Accreditation Certificate

9 Copy of NABL Accreditation Certificate