Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the...
-
Upload
byron-waters -
Category
Documents
-
view
216 -
download
0
Transcript of Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the...
![Page 1: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/1.jpg)
Dr Sultan AhmedEngr Amanullah
Munshi Mohammad Hedayetullah
Capacity Building Programme on the Economics of Climate Change
Adaptation
Second Training Workshop, Bangkok, 30 Sep-4 Oct 2013
![Page 2: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/2.jpg)
Project Name: Community Based Adaptation to Climate Change through
Coastal Afforestation in Bangladesh
Funding Sources:
o Government of Bangladesh
o UNDP
o GEF (Global Environment Facility)
o SCD (Swiss Agency for Development and Cooperation)
o The Government of The Netherlands
![Page 3: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/3.jpg)
Implementing Agency: Forest Department, Department of Agricultural
Extension, Department of Livestock Services, Department of Fisheries,
Ministry of Land, Forests Research Institute, Bangladesh Water
Development Board
Project Status: RUNNING (January 2010-June 2014)
Total project investment: US$ 7.45 Million
Project Objectives: Vulnerability of coastal communities to the
impacts of climate change-induced risks in the coastal region reduced
Agriculture ProjectAgriculture Project
![Page 4: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/4.jpg)
Major Project Activities
Afforestation of coastal areas: 24,000 acres afforestation and 680 km strip plantation
Introduction of salt tolerant varieties (rice, maize, soyabean, chili, guaba and jujubi) at farmers level: Total 250 acres (rice 50 acres, maize 50 acres, soyabean 40 acres, juju 40 acres, guaba 40 acres, chilli 30 acres)
Culture fishery for the community: total area 100 acres (300 sites/ponds)
Poultry and cattle rearing: Poultry -300 beneficiaries with 3000 chicks; 120 beneficiaries with 120 cattle
![Page 5: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/5.jpg)
Benefit and Cost
Benefit: Increased crop production Increased nutritional food Enhanced livelihood Coastal protection
Cost: Cost of seed and seedlings/saplings Labour cost for all activities Cost of fertilizer and pesticide Cost of irrigation Cost of fencing Demonstration and farmers rally
Activity: Introduction of salt tolerant varieties
![Page 6: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/6.jpg)
Project Name: Coastal Polder 14/1 : FCDI Project in Koyra Upazial (sub-
district) under Khulna District
Funding Sources:
o Government of Bangladesh
o UNDP
o IDA (The World Bank)
o Government of The Netherlands
Implementing Agency: Bangladesh Water Development Board
![Page 7: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/7.jpg)
Project Status: Project Preparation Phase (FS)
Total project investment: US$ 3.00 million
Project Objective: People, crop and properties within the polder
protected and adapted to climate vulnerabilities and risks
Water ProjectWater Project
![Page 8: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/8.jpg)
Major Project ActivitiesPolder Rehabilitation
( i) Re-Sectioning of Embankment : 27.25 km
(ii) Construction of Retired Embankment : 3.25 Km
(iii) Construction of Drainage Sluice : 3 nos (under CEIP) and
3 nos (under AILA &WMIP)
(iv) Construction of flushing inlets: 4 nos
(v) Re-Excavation of Drainage channel:13 Km
(vi) Bank Protection Works: 0.58 Km
(vii) Slope Protection Works: 6.86 Km
(viii) Afforestation:30 ha
(ix) Land acquisition: 10.53 ha
Construction of Core Family Shelter (Cyclone Shelter): 265 nos
![Page 9: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/9.jpg)
Benefit and Cost
Activity: Polder Rehabilitation
Benefit: Protection of homesteads and crops from tidal surge and saline
water intrusion Disaster reduction Increased crop production and food security Poverty reduction Security of life and livelihood Enchanced protection of mainland areas
Cost: Cost of construction of embankment Cost of embankment protection works Cost of construction of regulatory structures
![Page 10: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/10.jpg)
Gorai River Watershed
![Page 11: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/11.jpg)
Watershed Assessment Data and Information
a. Monthly flow in targeted watershed (Gorai River) over several years: Discharge (Q cumec) data from 2001 to 2013
b. Area of watershed in ha: 17,620 sq km covering 18 districts with 76 sub-districts (full /partial)
c. Population of the watershed (rural and urban population): Collected
d. Farmland in the watershed (ha): Collected
e. Irrigated farmland in the watershed (ha): Collected
f. Map of the watershed with location of dams identified: Prepared
g. Average rural withdrawal of water per capita (for household use): Collected
![Page 12: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/12.jpg)
Agriculture HH Data Collection
o Questionnaire finalised for agriculture household survey
o Number of HHs: 300 @ 10 HHs for 30 AEZs
o Time required: 6 weeks
![Page 13: Dr Sultan Ahmed Engr Amanullah Munshi Mohammad Hedayetullah Capacity Building Programme on the Economics of Climate Change Adaptation Second Training Workshop,](https://reader035.fdocuments.net/reader035/viewer/2022062720/56649efa5503460f94c0bd67/html5/thumbnails/13.jpg)
Thank you.