Dr. Samuel Mudd Elementary School - ccboe.comMudd Elementary School was originally constructed in...

2
104 Project Order Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities Map Legend >140% 130%-139% 120%-129% 110%-119% 100%-109% 90%-99% < 89% Priority Funding Area William B. Wade 132.1% William A. Diggs 100.8% J. P. Ryon 92.5% Eva Turner 139.9% Dr. Samuel Mudd 118.3% Dr. Gustavus Brown 130.7% Daniel of St. Thomas Jenifer 156.8% C. Paul Barnhart 121.2% Arthur Middleton 108.7% 03 Water Damage Earthquake Damage ADA Issues Leaking Issues Prototype School P Poor Daylight Undersized Essential Spaces Mudd Elementary School was originally constructed in 1967, and received an addition in 1995. Interior finishes are in fair condition, and ceilings show signs of leaking. Earthquake damage is evident in some bearing walls. Some inboard classrooms have no access to natural light. The building layout is efficient, but wayfinding is confusing. The school lacks sufficient administrative and storage space. Essential spaces are undersized, and there is a general lack of specialty programs housed within the school. Exterior cladding is in fair condition, and shows some cracking and water damage. Exterior glazing does not provide sufficient thermal insulation. Toilet rooms lack accessible fixtures. Mechanical systems require upgrades, a back-flow preventer is needed, and HVAC systems especially are functioning poorly. Electrical systems require significant upgrades. The site provides ample acreage, and vehicle circulation is efficient. Dr. Samuel Mudd Elementary School Building Facts Poor Thermal Performance Lack of Specialty Classrooms

Transcript of Dr. Samuel Mudd Elementary School - ccboe.comMudd Elementary School was originally constructed in...

  • 104

    Project Order

    Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities

    Map Legend

    >140%

    130%-139%

    120%-129%

    110%-119%

    100%-109%

    90%-99%

    < 89%

    Priority Funding Area

    William B. Wade132.1%

    William A. Diggs100.8%

    J. P. Ryon92.5%

    Eva Turner139.9%

    Dr. Samuel Mudd118.3%

    Dr. Gustavus Brown130.7%

    Daniel of St. Thomas Jenifer156.8%

    C. Paul Barnhart121.2%

    Arthur Middleton108.7%

    03

    Water Damage

    Earthquake Damage

    ADA IssuesLeaking Issues

    Prototype School

    PPoor DaylightUndersized

    Essential Spaces

    Mudd Elementary School was originally constructed in 1967, and received an addition in

    1995. Interior finishes are in fair condition, and ceilings show signs of leaking. Earthquake

    damage is evident in some bearing walls. Some inboard classrooms have no access to

    natural light. The building layout is efficient, but wayfinding is confusing. The school

    lacks sufficient administrative and storage space. Essential spaces are undersized,

    and there is a general lack of specialty programs housed within the school. Exterior

    cladding is in fair condition, and shows some cracking and water damage. Exterior

    glazing does not provide sufficient thermal insulation. Toilet rooms lack accessible

    fixtures. Mechanical systems require upgrades, a back-flow preventer is needed, and

    HVAC systems especially are functioning poorly. Electrical systems require significant

    upgrades. The site provides ample acreage, and vehicle circulation is efficient.

    Dr. Samuel MuddElementary School

    Building Facts

    Poor Thermal Performance

    Lack of Specialty

    Classrooms

  • 105

    Current Building Score

    MaintenancePriority

    Prescribed Work Cost Analysis

    Recommendations

    N/A

    2.59

    Major Renovation, Addition OR Replacement.

    It is recommended that Mudd Elementary receive a

    major systemic renovation and addition to increase

    capacity. A feasibility study will demonstrate whether a

    major renovation/addition or a 768-seat replacement on

    site is most appropriate.

    ARCH

    MEP

    SITE

    SURVEY 1.00

    3.60

    2.67

    2.65

    4 Maintenance

    SurveyCategories 2.59

    This School Project Determination

    BuildingScore

    Description Qty. Unit County Share State Share Cost/Unit TOTAL

    ARCH

    Major Renovation 45,746 sf $1,607,972 $2,737,898 $95 $4,345,870

    Roof Replacement 45,746 sf $118,482 $201,740 $7 $320,222

    Exterior Walls 45,746 sf $91,492 $- $2 $91,492

    Addition 14,000 sf $1,010,100 $1,719,900 $195 $2,730,000

    MEP

    Full Systemic Renovation 45,746 sf $1,100,191 $1,873,299 $65 $2,973,490

    Security & Fire Alarm System Upgrade 45,746 sf $72,782 $123,926 $4 $196,707.80

    Lighting System Upgrade 45,746 sf $135,408 $230,560 $8 $365,968

    SITE

    Drainage 1 ls $200,000 $- $200,000 $200,000

    Stormwater Management/Water Quality 1 ls $129,500 $220,500 $350,000 $350,000

    Parking Lot 3,000 sy $216,000 $- $72 $216,000

    Subtotals $4,681,927 $7,107,822 $11,789,750

    Total Including Soft Costs $9,575,558 $7,107,822 $16,683,380

    Current

    404

    604

    OptimumSRC 768

    Proposed

    Cost of New Construction (est.) $21,600,000

    IntroductionRecommendationsAppendix