DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA...

12
DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 1 OF 12 During Quentin Shaw’s 36 years of post-graduate engineering experience, he has specialised exclusively in the field of dam and hydropower engineering. He has worked on well over 150 dams, from 5 to 281 m in height, in 31 countries. He has been involved in the construction of 41 new dams (the highest being 275 m) and the rehabilitation or raising of a further 15. Quentin’s particular specialisation is concrete dams; RCC and CVC gravity & arch dams and he has had a direct involvement in more than 7 million m 3 of placed RCC to date, while he also has a broad experience across all dam types and all stages of project development. Quentin has acted as an expert/specialist in the fields of RCC, concrete and arch dams, as well as in dam instrumentation, dam safety and general dam engineering, on major international projects. He has further been a member of the expert/technical review panel, for clients including the World Bank, on 9 large dam & hydropower projects to date and has published more than 60 technical papers on dam engineering. Quentin’s PhD thesis developed a new understanding of the early behaviour of RCC in large dams, as recognised with the award to Changuinola 1 Dam of “International Milestone RCC Project” and his receipt of the ICOLD Award for Innovation in 2018. Quentin is the Chairman of SANCOLD and the Vice-Chairman of ICOLD’s Committee on Concrete Dams, on which he serves as South Africa’s representative. He was Lead Author for ICOLD Bulletin 177 on RCC dams. He is a Fellow of the Institution of Civil Engineers (UK), a Fellow of the South African Academy of Engineering and received the ICOLD Innovation Award in July 2018 in recognition of his work on stress- relaxation creep in Roller Compacted Concrete dams. K EY E XPERIENCE Name of firm ARQ (Pty) Ltd PERSONAL INFORMATION Profession Civil Engineer Date of Birth 18.09.1962 Years with firm 27 Nationality British / South African Qualifications PhD (RCC Materials/Engineering) – University of Pretoria, South Africa 2010. MSc (Dams) Distinction – University of Brighton, UK 2001. BSc (Civ Eng) – University of Birmingham, UK 1983. Membership of Professional Institutions Registered Professional Engineer ECSA since 1988 Chartered Engineer (UK- Engineering Council) since 1999 Fellow of the South African Institution of Civil Engineers Fellow of the UK Institution of Civil Engineers Fellow South African Academy of Engineers, 2018 Member SAICE since 1984; Member UK ICE since 1980 Member ECSA Committee on Professional Engineers for Dams since 2003 Chairman of SANCOLD Committee Vice-Chairman & SA representative on ICOLD Committee for Concrete Dams Countries of Work Experience Afghanistan, Angola, Cameroon, D.R. Congo, Equatorial Guinea, Gabon, India, Kenya, Laos, Lebanon, Lesotho, Liberia, Malawi, Mali, Malaysia, Mozambique, Namibia, Oman, Pakistan, Panama, Philippines, Rep. Congo, South Africa, Swaziland, Tanzania, Turkey, UAE, Uganda, USA, Vietnam and Zimbabwe. Languages English first language – Basic Communicational French & Afrikaans. Years’ experience 36 Employment Record 1993 to present ARQ (PTY) Ltd Director: Dams & Hydro 1990 to 1993 BKS (PTY) Ltd Senior Engineer 1984 to 1990 Dept. Water Affairs Engineer Email address [email protected]

Transcript of DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA...

Page 1: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 1 OF 12

During Quentin Shaw’s 36 years of post-graduate engineering experience, he has specialised exclusively in the field of dam and hydropower engineering. He has worked on well over 150 dams, from 5 to 281 m in height, in 31 countries. He has been involved in the construction of 41 new dams (the highest being 275 m) and the rehabilitation or raising of a further 15. Quentin’s particular specialisation is concrete dams; RCC and CVC gravity & arch dams and he has had a direct involvement in more than 7 million m3 of placed RCC to date, while he also has a broad experience across all dam types and all stages of project development.

Quentin has acted as an expert/specialist in the fields of RCC, concrete and arch dams, as well as in dam instrumentation, dam safety and general dam engineering, on major international projects. He has further been a member of the expert/technical review panel, for clients including the World Bank, on 9 large dam & hydropower projects to date and has published more than 60 technical papers on dam engineering. Quentin’s PhD thesis developed a new understanding of the early behaviour of RCC in large dams, as recognised with the award to Changuinola 1 Dam of “International Milestone RCC Project” and his receipt of the ICOLD Award for Innovation in 2018.

Quentin is the Chairman of SANCOLD and the Vice-Chairman of ICOLD’s Committee on Concrete Dams, on which he serves as South Africa’s representative. He was Lead Author for ICOLD Bulletin 177 on RCC dams. He is a Fellow of the Institution of Civil Engineers (UK), a Fellow of the South African Academy of Engineering and received the ICOLD Innovation Award in July 2018 in recognition of his work on stress-relaxation creep in Roller Compacted Concrete dams.

KE

Y E

XP

ER

IEN

CE

Name of firm ARQ (Pty) Ltd

PE

RS

ON

AL

IN

FO

RM

AT

ION

Profession Civil Engineer

Date of Birth 18.09.1962

Years with firm 27

Nationality British / South African

Qualifications PhD (RCC Materials/Engineering) – University of Pretoria, South Africa 2010. MSc (Dams) Distinction – University of Brighton, UK 2001. BSc (Civ Eng) – University of Birmingham, UK 1983.

Membership of

Professional

Institutions

Registered Professional Engineer ECSA since 1988 Chartered Engineer (UK- Engineering Council) since 1999 Fellow of the South African Institution of Civil Engineers Fellow of the UK Institution of Civil Engineers Fellow South African Academy of Engineers, 2018 Member SAICE since 1984; Member UK ICE since 1980 Member ECSA Committee on Professional Engineers for Dams since 2003 Chairman of SANCOLD Committee Vice-Chairman & SA representative on ICOLD Committee for Concrete Dams

Countries of Work

Experience

Afghanistan, Angola, Cameroon, D.R. Congo, Equatorial Guinea, Gabon, India, Kenya, Laos, Lebanon, Lesotho, Liberia, Malawi, Mali, Malaysia, Mozambique, Namibia, Oman, Pakistan, Panama, Philippines, Rep. Congo, South Africa, Swaziland, Tanzania, Turkey, UAE, Uganda, USA, Vietnam and Zimbabwe.

Languages English first language – Basic Communicational French & Afrikaans.

Years’ experience 36

Employment

Record

1993 to present ARQ (PTY) Ltd Director: Dams & Hydro

1990 to 1993 BKS (PTY) Ltd Senior Engineer

1984 to 1990 Dept. Water Affairs Engineer Email address [email protected]

Page 2: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 2 OF 12

GROSS DAM RAISE, USA

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2018 – 2023 (2.5 weeks input to date) Location: Boulder, Colorado, USA

Client: Kiewit, Barnard JV Project Description: Raise of existing curved concrete gravity dam by 40 m to 143.5 m. Raising in

RCC and changing into an RCC arch-gravity dam. Value of Project: US$ 350 million

Position & Duties: RCC & RCC arch damn expert to Construction Manager/General Contractor

PONGOLAPOORT DAM Project Duration: 2018 – 2021 (1 month input to date)

Location: Jozini, Kwazulu-Natal, South Africa Client: Department of Water & Sanitation

Project Description: 78 m double-curvature, conventional concrete, arch dam. Safety rehabilitation, arch dam structural enhancement & spillway capacity increase.

Value of Project: US$ 85 million (preliminary estimate) Position & Duties: Approved Professional Person (Arch dam specialist) for design & construction

T.A. FOR OPTIMIZING MOUNT COFFEE & HYDROPOWER Project Duration: 2017 – 2018 (1 week involvement)

Location: Liberia Client: West African Power Pool / World Bank

Project Description: Preliminary study to identify optimal hydropower development on St Paul River, Liberia

Position & Duties: Technical specialist / internal reviewer

JANNEH DAM Project Duration: 2018 – 2021 (5 weeks input to date)

Location: Beirut, Lebanon Client: Artelia Eau & Environment, E.B.M.L. Lebanon

Project Description: 165 m RCC Arch/Gravity Dam Value of Project: US$ 240 million

Position & Duties: Engineer’s RCC Expert for Construction

KARAMÜRSEL ĪHSANIYE DAM Project Duration: 2017 (2.5 weeks involvement to date)

Location: North-west Turkey Client: CEYSU Construction Inşaat.

Project Description: 67 m high, 135 000 m3 RCC gravity dam for water supply. Value of Project: US$ 14 million

Position & Duties: RCC Expert - assistance & guidance with construction quality improvement, RCC mix design improvement & GEVR testing & development.

MENCHUM HPP Project Duration: 2017 – 2021 (4 weeks involvement to date)

Location: Cameroon, Northwest Province Client: Ministry of Water Resources and Energy of Cameroon

Project Description: Owner’s Engineer for the design, construction supervision and commissioning Value of Project: US$ 324 million

Position & Duties: Specialist dam engineer responsible for the review of the dam and civil works for the hydropower station.

MELEN DAM Project Duration: 2017 (2 week involvement to date)

Location: North-west Turkey Client: DSI. Ministry of Hydraulic Resources.

Project Description: Preliminary investigation of serious unexpected behaviour during construction of 120 m high, 2 million m3 RCC gravity dam.

Value of Project: US$ 105 million Position & Duties: Lead expert on problem investigation and solution development.

Page 3: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 3 OF 12

SAN VICENTE DAM RAISE

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2017 (2.5 months involvement to date) Location: San Diego, California, USA

Client: San Diego County Water Authority. Project Description: Claim litigation for RCC dam raising (highest in the world to date) of San

Vicente Dam (raised height 103 m – construction completed 2013). Value of Project: US$ 150 million

Position & Duties: Expert witness for RCC aspects in US$ 50 million claim litigation.

YUSUFELI DAM & HEPP Project Duration: 2013 – 2019 (24 months input to date)

Location: Yusufeli, Black Sea Region, Turkey Client: Limak Construction (EPC contractor)

Project Description: 275 m Conventional Mass Concrete, double curvature arch dam & 540 MW hydropower scheme.

Value of Project: US$ 900 million Position & Duties: Arch dam specialist & team leader for construction design, structural &

thermal analyses, construction logistics, plant advice & concrete mix designs.

LESOTHO HIGHLAND WATER PROJECT PHASE 2 Project Duration: 2013 – 2022 (4.5 months input to date)

Location: Lesotho Client: Lesotho Highlands Development Authority

Project Description: 160 m CFRD + Delivery Tunnel. Value of Project: US$ 1.2 Billion

Position & Duties: Key Specialist Dams for Programme management unit.

INGA I & II HEPPs, DEM. REPUBLIC OF CONGO Project Duration: 2011 – 2018 (4.5 months input)

Location: Matadi, Bas Congo Client: SNEL / World Bank

Project Description: 350 MW & 1400 MW Hydropower Schemes with 52 m Concrete Buttress + 35 m Concrete Buttress Dams.

Value of Project: US$ 800 million Position & Duties: Expert for Dams on International Panel of Experts to Owner for investigation,

design and construction supervision.

MOUNT COFFEE HEPP REHABILITATION Project Duration: 2013 – 2018 (4.25 months input)

Location: Monrovia, Liberia Client: The Liberian Electricity Corporation

Project Description: Rehabilitation of breached dam & looted Hydropower station (66 MW). Value of Project: US$ 330 million

Position & Duties: Panel of Experts Member for Dam Engineering & Dam Safety

TZANEEN DAM RAISING Project Duration: March 2016 – April 2020 (3 month involvement to date)

Location: Groot Letaba River, Limpopo Province, South Africa Client: Blackhead Consulting

Project Description: 3 m raising of existing 56 m earthfill embankment dam, with central concrete Value of Project: US$ 52 million

Position & Duties: Approved Professional Engineer (RSA Dam Safety Legislation) for design and construction supervision of Category III dam.

Page 4: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 4 OF 12

KOTANLI DAM & HEPP (50 MW)

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2010 – 2015 (8 months to date) Location: North eastern Turkey

Client: Ünal AS Construction & Trade Project Description: 72 m (240 000 m3) RCC Arch/gravity.

Value of Project: US$ 120 million Position & Duties: Chief Dam Designer & Project Manager for detailed dam design and construction

supervision. Instrumentation design & quality assurance plan. Assistance with construction plant design & specifications, etc.

RATLE DAM & HEPP Project Duration: 2013 – 2015 (8 months input to date)

Location: Chenab River, Jammu & Kashmir, northern India Client: Larsen & Toubro

Project Description: 133 m RCC gravity dam with 13 800 m3/s spillway and comprising 1.3 million m3 RCC + 850 MW hydropower station.

Value of Project: US$ 1.4 Billion Position & Duties: Project Manager & RCC Specialist.

TRUNG SON DAM & HEPP Project Duration: 2013 – 2016 (2.5 month input to date)

Location: Ma River, north western Vietnam. Client: AECOM New Zealand (EVN)

Project Description: 88 m high RCC gravity dam (800 000 m3) + 260 MW hydropower station. Value of Project: US$ 430 million

Position & Duties: RCC Specialist Advisor to Owner’s Engineer.

KÖROĞLU DAM & HEPP (80 MW) Project Duration: 2013 – 2017 (5 months to date)

Location: North eastern Turkey Client: Ünal AS Construction & Trade

Project Description: 105 m (650 000 m3) & RCC arch/gravity. Value of Project: US$ 165 million

Position & Duties: Chief Dam Designer & Project Manager for detailed dam design and construction supervision. Instrumentation design & quality assurance plan. Assistance with construction plant design & specifications, etc.

AYVALI DAM & HEPP Project Duration: 2008 – 2014 (8.5 months input to date).

Location: North eastern Turkey (Black Sea Region) Client: Özdogan Enerji AS

Project Description: 178 m RCC gravity dam, 1 650 000m3 for 150 MW hydropower scheme. Value of Project: US$ 250 million

Position & Duties: Chief Dam Designer for dam type selection. Site selection, overall design concepts & responsibility, directing investigations & design studies. Owners engineer, specialist structural & thermal studies & RCC Specialist for construction. Materials analysis & direction of RCC mix development programme. Plant advice, foundation evaluations, etc.

PADCAL TSF3 SPILLWAY Project Duration: 2013 – 2017 (5 months input to date)

Location: Tuba, Benguet, Philippines Client: Golders Australia / Philex Mining

Project Description: 31 m concrete gravity dam on weathered rock foundations to form crest for chute spillway on 210 m tailings facility.

Value of Project: US$ 70 million Position & Duties: Project Manager & Dam Design Specialist

Page 5: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 5 OF 12

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

NWAMITWA DAM TENDER DESIGN Project Duration: 2016 – 2017 (2.5 months input)

Location: Groot Letaba River, Limpopo Province, South Africa Client: Lepelle Northern Water

Project Description: Composite earthfill embankment with a concrete river section to accommodate the spillway and outlet works.

Value of Project: US$ 270 million Position & Duties: Specialist dam engineer for all aspects of the detailed design and tender

documentation. RCC Specialist.

WADI UMTI DAM Project Duration: 2012 – 2014 (7 weeks input)

Location: Izki, Dakhliyah, Central Oman Client: Premier International Projects

Project Description: 23 m high Hardfill dam in wadi for Aquifer recharge Value of Project: US$ 25 million

Position & Duties: Construction programming & method statements for construction. Dam design revision. RCC specialist & quality control assistance to Contractor.

WADI KALBOUH DAM Project Duration: 2013 – 2014 (2 weeks input to date)

Location: Wilayat Nizwa, Dakhliya Governorate, Oman Client: Premier International Projects

Project Description: 16 m high Plastic-concrete core Rockfill dam in wadi for Aquifer recharge Value of Project: US$ 15 million

Position & Duties: Construction programming & method statements & dams specialist for construction.

CHANGUINOLA 1 DAM & HEPP Project Duration: 2006 – 2013 (23 months involvement)

Location: Bocas del Torro, Panama Client: Changuinola Civil Works Joint Venture (contractor)

Project Description: 105 m RCC arch/gravity dam, 875 000 m3 for 230 MW hydropower scheme. Value of Project: US$ 450 million

Position & Duties: Dams project manager & Chief Dam Designer for dam design & implementation verification, including seismic design of structure, river diversion, bottom outlet, spillway, foundation grouting, structural analyses, thermal study, etc, for EPC Contractor. In team with Fosce & MDA.

ÇINE DAM Project Duration: 1996 – 2010 (14 months involvement)

Location: South western Turkey Client: Özkar Construction

Project Description: 136.5 m high, 1,65 million m3 RCC gravity dam + 43 m high RCC coffer dam. Value of Project: US$ 650 million

Position & Duties: RCC specialist for feasibility, design & construction. Responsibilities included mix designs, construction method development, thermal analyses, construction quality control, etc.

NECKARTAL DAM Project Duration: 2010 – 2016 (2.5 months input to date)

Location: Namibia Client: Knight Piesold (South Africa)

Project Description: 70 m RCC Gravity Dam on weak foundations (950 000 m3). Value of Project: US$ 170 million

Position & Duties: RCC Specialist + Dam design assistance.

Page 6: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 6 OF 12

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

PORT ST. JOHNS DAM Project Duration: 2012 – 2016 (2 weeks input)

Location: Eastern Cape, South Africa Client: OR Thambo District Municipality

Project Description: 23 m rubble masonry concrete arch dam, 13 000 m3 RMC. Value of Project: R 50 million

Position & Duties: Specialist assistance, design review and advice.

AKSU DAM Project Duration: 2011 (1 month input)

Location: North eastern Turkey Client: Çalik Enerji

Project Description: 160 m (900 000 m3) heavy-section RCC Arch Dam Value of Project: US$ 190 million

Position & Duties: Team leader/Chief Designer for Preliminary Design.

MESICA DAM Project Duration: 2009 – 2010 (1 month input)

Location: Namialo, Nampula Province, Mozambique Client: Norfund & Matanuska Mozambique Ltd

Project Description: Structural FE Analysis & Safety Inspection of 32 m RMC arch dam. Value of Project: US$ 2 million

Position & Duties: Project Director & Safety Inspection Engineer.

WADI DAYQAH DAM Project Duration: 2005 – 2009 (3.5 months input)

Location: Quriyat, Oman Client: Ministry of Regional Municipalities, Environment & Water Resources

Project Description: 75 m RCC gravity dam (600 000 m3) + rockfill saddle dam + 18000 m3/s total spillway capacity.

Value of Project: US$ 200 million Position & Duties: RCC specialist and design assistance for design & construction supervision.

INGULA PUMP STORAGE SCHEME (1330 MW) Project Duration: 2004 – 2011 (32 months involvement)

Location: Drakensburg, KZN, South Africa Client: Eskom

Project Description: 1350 MW pump storage hydropower scheme, with an operating head of approximately 500m. Project includes upper 50 m rockfill dam and lower 38 m RCC gravity dam.

Value of Project: US$ 2.5 billion Position & Duties: Team leader for dams in final design and document stage. Responsible person

(APP) & design expert for supervision.

SPRING GROVE DAM Project Duration: 2008 - 2013 (4 months input)

Location: Rosetta, KZN, South Africa Client: TCTA

Project Description: 38 m high RCC gravity dam for water supply. Design & Construction. Value of Project: US$ 100 million

Position & Duties: Member of Expert Review Panel.

Page 7: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 7 OF 12

De HOOP DAM

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2006 to 2012 (4 months involvement) Location: Mpumalanga, South Africa

Client: Department of Water Affairs & Forestry Project Description: 88 m high, 1 million m3 RCC gravity dam for water supply to new platinum

mining development, etc. Value of Project: US$ 300 million

Position & Duties: Member of External Review Panel for design & construction.

BERG RIVER DAM Project Duration: 2002 – 2009 (5 months input)

Location: Franschhoek, Cape Province, South Africa Client: TCTA

Project Description: 65 m high rockfill dam for Cape Town water supply. Embankment fill volume = appr. 4 million m3. Side channel spillway + large capacity IFR outlet. Supplement pumping scheme.

Value of Project: US$ 300 million Position & Duties: Member of Client’s Expert Review Panel for design and construction.

Review of consultant’s work and reports.

MNDWAKA DAM Project Duration: 2009 – 2014 (1 month input to date)

Location: Eastern Cape, South Africa Client: Amathole District Municipality

Project Description: 32 m multiple arch buttress RMC (masonry) dam – 30 000 m3 RMC. Value of Project: R 52 million (US$ 6.5 million)

Position & Duties: Design reviewer, guidance & dam specialist advisor.

STIEGLER’S GORGE DAM & HEPP Project Duration: 2008 (6 months involvement)

Location: Tanzania Client: Energem Limited

Project Description: 135 m high, 1,0 million m3 RCC double-curvature arch dam for 800 MW hydropower and flood control. Update 1980 preliminary design study.

Value of Project: US$ 2.1 billion Position & Duties: Project Director for ARQ. Overall design management & responsibility.

NAM THEUN 1 DAM & HEPP Project Duration: 2006 – 2007 (5 months involvement)

Location: Laos Client: Gamuda (developer & contractor)

Project Description: 177 m RCC gravity dam, 3 100 000 m3 for 500 MW hydropower scheme. Value of Project: US$ 600 million

Position & Duties: Chief Dam Designer for EPC Contractor at detailed and construction design stages. In team with Maunsell, New Zealand.

KEMBE 60 MW HEPP Project Description: 60 MW hydropower scheme on Kotto River, CAR. Feasibility Study.

Project Duration: 2007 – 2008 (2 month input) Value of Project: US$ 240 million

Position & Duties: Project Manager and Design Team Manager.

DWAF Dam Safety Rehabilitation Programme: Group 1 Dams Project Description: The rehabilitation of 9 dams to be brought into line with acceptable standards of

safety, in accordance with South African dam safety legislation. Including the preparation of Operation & Maintenance Manuals and Emergency Preparedness Plans.

Project Duration: 2006 to 2010 (9 months involvement) Value of Project: R 400 million (US$ 50 million)

Position & Duties: Chief Design Engineer & Project Director.

Page 8: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 8 OF 12

RIABA MINI HEPP, EQUATORIAL GUINEA

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 2006 – 2009 (6 months involvement) Project Description: 5 MW hydropower scheme. Mechanical & Electrical Repair.

Value of Project: Euro 1,2 million Position & Duties: Project Manager.

MUSOLA MICRO HEPP, EQUATORIAL GUINEA Project Duration: 2003 – 2008 (5 months involvement)

Location: Equatorial Guinea Project Description: 0.5 MW hydropower schemes. Rehabilitation & reconfiguration to accept

crossflow turbines Value of Project: US$ 2,1 million

Position & Duties: Project Manager and Civil Works Manager.

SOUNDA 1000 MW HYDROELECTRIC POWER PROJECT Project Duration: 2004 – 2011 (6 months involvement)

Location: Republic of Congo Client: IDF (PTY) Ltd

Project Description: 1000 MW hydropower project encompassing 132 m RCC arch and river diversion with 2500 m3/s capacity.

Value of Project: US$ 2 200 million Position & Duties: Engineering project manager, team leader for dams & hydropower for pre-

feasibility study.

BASHA DIAMER DAM Project Duration: 2003 – 2004 (2 months involvement)

Location: Chilas, Indus River, Pakistan Client: WAPDA

Project Description: 280 m high RCC gravity dam at final feasibility design stage. (3rd highest dam in the world when completed in 2015). The dam comprises approximately 9 million m3 of RCC and will impound 11 billion m3 of water.

Value of Project: US$ 6.0 billion Position & Duties: Preliminary thermal analysis, specialist assistance with structural design and RCC

specialist for the dam.

SOUTH AFRICAN RCC SPECIFICATION Project Duration: 2003 – 2005 (2 months involvement)

Client:: Department of Water Affairs & Forestry Project Description: Compilation of a state of the art South African RCC specification to replace the

existing outdated 1986 edition. Position & Duties: Editor and main author of the specification, with assistance and input from DWAF

specialists.

THUKELA WATER PROJECT Project Duration: 1997 – 2000 (18 months involvement)

Location: Kwa-Zulu Natal, South Africa Client: Department of Water Affairs & Forestry

Project Description: Water transfer scheme encompassing 185 m high dam on Thukela River (RCC or rockfill) & 98 m high dam on Bushmans River (RCC arch or rockfill).

Value of Project: US$ 1.5 billion (2000) Position & Duties: Team leader for dams at feasibility level. Design of all dams.

EPUPA HYDROPOWER PROJECT Project Duration: 1996 – 1997 (4 months involvement)

Location: Kunene River, Namibia/Angola border. Client: Nampower

Project Description: 350 MW Hydropower scheme encompassing several dam sites + 220 m composite RCC arch/gravity and rockfill Baynes Dam.

Value of Project: US$ 500 million Position & Duties: Arch dam specialist for feasibility study. Design of Baynes Dam.

Page 9: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 9 OF 12

WOLWEDANS DAM

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Duration: 1986 – 1997 (46 months involvement) Location: Southern Cape, South Africa

Client: Department of Water Affairs & Forestry Project Description: 70m high RCC arch/gravity dam.

Value of Project: US$ 30 million (1989) Position & Duties: Planning, design (including structural analyses), construction supervision and

assistance with first safety inspection.

BELLAIR DAM, BARRYDALE, CAPE PROVINCE Project Description: 22 m rubble masonry concrete multiple arch buttress dam, 13 000 m3 RMC.

Project Duration: 2004 – 2005 (1 month input) Value of Project: R 10 million

Position & Duties: Approved professional person (APP) and designer for design and construction.

ALOE COVE DAM, KRUGERSDORP Project Description: 23 m high rubble masonry concrete multiple arch buttress dam

Project Duration: 2000 – 2006 (6 months involvement) Value of Project: R 8 million

Position & Duties: Approved professional person (APP), design and construction supervision.

LUCILIA POORT DAM, ZIMBABWE Project Description: 42 m Rubble Masonry Concrete Arch Dam.

Project Duration: 2002 – 2005 (1 month involvement) Value of Project: US$ 2 million

Position & Duties: Design & construction review of international precedent for Anglo American.

MIDMAR DAM RAISING, HOWICK, KZN Project Description: 3,5 m raising of composite embankment/concrete gravity dam by means of a

reinforced concrete fixed labyrinth. Project Duration: 1998 to 2003 (13 months involvement) Value of Project: R 30 million

Position & Duties: Project Director, Chief Design Engineer, concept designer.

KAMUZU DAM II, MALAWI Project Description: 5 m raising of 26m high earthfill embankment dam.

Project Duration: 1998 – 1999 (4 man months involvement) Value of Project: US$ 8 million

Position & Duties: Raising designer & construction supervision assistance.

EIKENHOF DAM, GRABOUW, SOUTH AFRICA Project Description: 1,5 m raising of 47m high earthfill embankment dam.

Project Duration: 1998 (3.5 months involvement) Value of Project: R 1,5 million

Position & Duties: Design of raising, flood hydrology, spillway evaluation and redesign. Construction supervision assistance.

KARACASU DAM, TURKEY Project Description: Asphaltic concrete faced rockfill dam 60 m, or 75 m in height.

Project Duration: 1999 – 2001 (2 months involvement) Value of Project: US$ 60 million

Position & Duties: Dam designer at feasibility level.

BIRI DAM, ZIMBABWE Project Description: 44 m composite earthfill and concrete gravity dam on Manyame River.

Project Duration: 1996 – 1997 (5 months involvement) Value of Project: R 80 million

Position & Duties: Tender design of dam and appurtenant works.

Page 10: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 10 OF 12

STERKSPRUIT DAM, MPUMALANGA, SOUTH AFRICA

SE

LE

CT

ED

DA

MS

& H

YD

RO

PO

WE

R E

XP

ER

IEN

CE

Project Description: 27 m CVC massive arch buttress concrete dam. Project Duration: 1991 – 1995 (8 months involvement) Value of Project: R 6 million

Position & Duties: Approved professional person (APP) for design & construction supervision.

MOHALE DAM Project Duration: 1996 (1,5 months involvement)

Location: Lesotho Client: Group 5 & Dragados

Project Description: 145 m high RCC arch/gravity alternative for tender. Value of Project: R 520 million (1996)

Position & Duties: Analysis and design of arch/gravity dam for contractor’s tender alternative.

SELECTED MINOR DAMS AND MINOR TASKS ON DAMS:

METOLONG DAM, LESOTHO Project Description: 83 m RCC Dam – RCC Arch Tender Alternative Saving 36% Concrete Volume

Project Duration: 2011 – 1 month Value of Project: US$ 100 million

Position & Duties: Team Leader for Alternative Dam & Inlet Tower Design

GHORQAND GHURIAH DAM, TZIR TANGI DAM, etc, AFGHANISTAN Project Duration: 11 m & 10 m rubble masonry concrete arch dams for rural water supply.

Client:: 2005 (4 week input), Ghorqand Ghuriah completed August 2005 Project Description: US$ 150 000 & US$ 250 000

Position & Duties: Dam design, technical lectures and design team training.

VARIOUS RUBBLE MASONRY CONCRETE DAMS Projects: Hogsback Dam - 12m Star Dam - 11m

Welgevonden Dam - 16m Bakubung Dam - 15m Project Duration: Rubble masonry concrete dams for various uses.

Client:: 1995 – 2003 (appr 9 months input) Project Description: R 400 000 – R 700 000

Position & Duties: Design & construction supervision (usually as Approved Prof. Eng.)

1. The Quality Control of Rollcrete placed at the Wolwedans arch/gravity dam.” - The Civil Engineer in South

Africa. SAICE September 1990.

2. “Quality Control Standards for the Construction of Rollcrete Dams.” - Symposium for Dam Safety: Four Years

on. CSIR September 1990.

3. “Ageing of Concrete Dams: Some South African Examples.” - Prepared Contribution: Q65. 17th ICOLD

Congress. Vienna June 1991.

4. “The Development of Concrete Technologies in Dam Engineering.” - Concrete Society of Southern Africa Silver

Jubilee Commemoration National Convention - Concrete Meets the Challenge. Sun City September 1994.

5. “Concrete Technologies in Dam Engineering” - WITS SAICE Lecture Series - May 8th 1996.

6. “Rubble Masonry Concrete Dam Design and Construction. Part 1: New Generation RMC Dams in RSA, as

illustrated through the Bakubung, Welgevonden and Genadendal Dams.” SAICE Journal – April 1998.

7. “Rubble Masonry Concrete Dam Design and Construction. Part 2: Proposed Design Standards and Related

Influences.” SAICE Journal – April 1998.

8. “Fusegates Enhance Safety and Increase Capacity at Eikenhof.” - The International Journal of Hydropower

and Dams. Vol. 6 Issue 6. 1999.

9. “Factors of Influence on the Selection of Surface Spillway Control Systems in Developing Countries.” – Q.79

ICOLD 2000, Beijing.

SE

LE

CT

ED

TE

CH

NIC

AL

PA

PE

R, E

TC

.

Page 11: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 11 OF 12

10. “Progress with the Construction of Turkey’s Çine Dam.” - The International Journal of Hydropower and Dams.

Vol. 8. Issue 3. 2001.

11. “The Role of Temperature in Relation to the Structural Behaviour and Performance of Continuously

Constructed RCC and RMC Dams.” MSc Thesis. University of Brighton, UK. 2001.

12. “Concrete Dam Engineering”. UNESCO Encyclopaedia of Life Support Systems. UNESCO. UK. 2002

13. “Factors of Importance for the Design & Behaviour of RMC & RCC Dams.” SANCOLD. Design & Rehabilitation

of Dams Course. University of Stellenbosch. June 2002.

14. “Civil Engineering Aspects of Hydropower Projects.” SANCOLD. Design & Rehabilitation of Dams Course.

University of Stellenbosch. June 2002.

15. “The Development of RCC Arch Dams”. 4th Symposium on RCC Dams. Madrid. Spain. November 2003.

16. “The Basics of Roller Compacted Concrete Dams”. SANCOLD Planning, Design and Management of Dams

Course. Stellenbosch, January 2005.

17. “Factors of Importance in Relation to the Design and Behaviour of RMC Arch Dams”. SANCOLD Planning,

Design and Management of Dams Course. Stellenbosch, January 2005.

18. “Rubble masonry Concrete Dams”. Invited Lecture, University of Herat, Afghanistan. March 2005.

19. “The Design of Small Dams”. 5 day course, University of Herat, Afghanistan. August 2005.

20. “RCC Dams”. Advanced Concrete Technology Programme. Cement & Concrete Institute. June 2006.

21. “Roller Compacted Concrete for Dams”. Concrete Society QTM July 2006.

22. “Large RCC Dams for Hydropower Schemes”. SANCOLD Dam Design Course. June 2007.

23. “An Investigation into the Thermal Behaviour of Roller Compacted Concrete in Large Dams”. 5th Symposium

on Roller Compacted Concrete Dams. Guiyang, China. November 2007.

24. “A New Model for the Behaviour of Roller Compacted Concrete in Dams under Early Thermal Loading”. 5th

Symposium on Roller Compacted Concrete Dams. Guiyang, China. November 2007.

25. “Roller Compacted Concrete for Dams”. Chapter 22. Fulton’s Concrete Technology. Edited by BJ Addis & G

Owens. 9th Edition. 2009.

26. “Roller Compacted Concrete (RCC) Dams”. SANCOLD Design of Hydraulic Structures. Stellenbosch. 2009.

27. “Investigating the Early Behaviour of RCC in Large Dams”. Proceedings. SANCOLD Congress. 2009.

28. “Modern RCC Dam Engineering”. Co-authored with M vd Berg. Proceedings. SANCOLD Congress. 2009.

29. “Seismic Analysis Techniques for Major RCC Dams”. Co-authored with R Greyling. Proceedings. SANCOLD

Congress. November 2009.

30. “Innovation in Dam Rehabilitation.” Co-authored with DG Cameron-Ellis. Proceedings. SANCOLD Congress.

November 2009.

31. “A New Understanding of the Early Behaviour of RCC in Large Dams”. PhD Thesis. University of Pretoria.

2010.

32. “The Early Behaviour of RCC in Large Dams”. International Journal on Hydropower & Dams. Volume 17, Issue

2, 2010.

33. “The Impact on Dam Design of a New Materials Model for the Early Behaviour of RCC”. International

Journal on Hydropower & Dams. Volume 17, Issue 4, 2010. 34. “The Early Creep Behaviour of RCC in Large Dams”. Proceedings. SANCOLD Symposium: Specialized Dam

Engineering& Related Topics. 2010.

35. “RCC Dam Construction in Adverse Weather Conditions”. Co-authored with M vd Berg. Proceedings.

SANCOLD Symposium: Specialized Dam Engineering & Related Topics. 2010.

36. “State of the Art Thermal Analysis for Large RCC Dams”. Co-authored with R Greyling. Proceedings. SANCOLD

Symposium: Specialized Dam Engineering & Related Topics. 2010.

37. “South African RCC Arch Technology Yields Significant Benefits at Changuinola 1 Dam in Panama”.

Proceedings. SANCOLD Symposium. Management & Design of Dams in Africa. November 2011.

38. “The Beneficial Behavioural Characteristics of Fly Ash-Rich RCC Illustrated Through Changuinola 1

Arch/Gravity Dam”. Proceedings. USSD Conference. Innovative Dam and Levee Design and Construction for

Sustainable Water Management. April 2012.

SE

LE

CT

ED

TE

CH

NIC

AL

PA

PE

RS, L

EC

TU

RE

S, E

TC

.

Page 12: DR QUENTIN HW SHAW · DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER PAGE 2 OF 12 GROSS DAM RAISE, USA S D D & H Position & Duties E E Project Duration: 2018 – 2023 (2.5 weeks input

DR QUENTIN HW SHAW SPECIALIST DAM ENGINEER

PAGE 12 OF 12

39. “The Low Stress Relaxation Creep Characteristics of Flyash-rich Roller Compacted Concrete”. Co-authored

with Dr M Dunstan. 6th Symposium on Roller Compacted Concrete Dams. Zaragosa, Spain. October 2012.

40. “The Influence of Low Stress Relaxation Creep on the Design of Large RCC Arch and Gravity Dams”. 6th

Symposium on Roller Compacted Concrete Dams. Zaragosa, Spain. October 2012.

41. “The Development of the Design of Changuinola 1 Dam”. Co-authored with G Erlendsson, D Cameron-Ellis &

M Dunstan. 6th Symposium on Roller Compacted Concrete Dams. Zaragosa, Spain. October 2012.

42. “Proposing a Standardized Approach to Stress/Strain Instrumentation for RCC Dams. Co-authored with M

Conrad & M Dunstan. 6th Symposium on Roller Compacted Concrete Dams. Zaragosa, Spain. October 2012.

43. “Ratle Dam & HEPP.” Proceedings. SANCOLD Conference. Advances in Dam Technology for Water & Energy in

Southern Africa. November 2013.

44. “Roller Compacted Concrete Dams – The State of the Art 2013.” Proceedings. SANCOLD Conference. Advances

in Dam Technology for Water & Energy in Southern Africa. November 2013.

45. “The design & construction challenges of the 273m Yusufeli Concrete Arch Dam.” - SANCOLD Conference

2014. Towards Sustainable Dams in South Africa.

46. “A first experience of hardfill on the Wadi Umti Dam, Oman.” - SANCOLD Conference 2014. Towards Sustainable Dams in South Africa. November 2014.

47. “Update of ICOLD Bulletin 126 on RCC Dams.” - SANCOLD Conference 2014. Towards Sustainable Dams in

South Africa. November 2014.

48. “The Structural Function of Different Arch Dam Types.” Proceedings. SANCOLD Conference. Dam safety,

maintenance and rehabilitation of dams in Southern Africa. September 2015.

49. “RCC Quality Control Requirements.” Proceedings. SANCOLD Conference. Dam safety, maintenance and

rehabilitation of dams in Southern Africa. September 2015.

50. “Update of ICOLD Bulletin 126 on RCC Dams”. 7th Symposium on Roller Compacted Concrete Dams. Chengdu,

China. September 2015.

51. “The First Two RCC Arch Dams in Turkey”. 7th Symposium on Roller Compacted Concrete Dams. Chengdu,

China. September 2015.

52. “The Rehabilitation of the Mount Coffee Hydropower Project in Liberia”. Co-authored with WD Hakin, R

Guimond & B Taraldsten-Brunes. Proceedings of 84th ICOLD Annual Meeting & Symposium. Johannesburg,

South Africa. May 2016.

53. “Structural Design to Accommodate Challenging Rock Mass Conditions at Yusufeli Dam”. Proceedings. 10th

ICOLD European Club Symposium. Antalya, Turkey. October 2016.

54. “Innovation in the Thermal Design and Application for the Köroglu RCC Arch/Gravity Dam”. Proceedings. 10th ICOLD European Club Symposium. Antalya, Turkey. October 2016.

55. “The Influence of Stress Relaxation Creep on the Design of Large RCC Dams”. Symposium – Knowledge based Dam Engineering. 85th Annual ICOLD Meeting. Prague, Czech Republic. July 2017.

56. “The 10 Basic Rules of RCC Dam Construction”. DSI RCC and Dams Conference. Antalya, Turkey. 31st October & 1st November 2017.

57. “RCC Dam Facing Systems”. DSI RCC and Dams Conference. Antalya, Turkey. 31st October & 1st November 2017.

58. “Aligning RCC Dam Design, Specification and Construction”. DSI RCC and Dams Conference. Antalya, Turkey. 31st October & 1st November 2017.

59. “Concrete Dam Types and the Circumstances and Conditions that Favour One Type over Another”. SANCOLD Conference. Pretoria. 15 to 17th November 2017.

60. “Rubble Masonry Concrete (RMC): An Appropriate Technology for Small Dams in Developing Countries”. Proceedings. Question 103. ICOLD 26th Conference. Vienna. July 2018.

61. “Modern Concrete for Concrete Dams”. Proceedings. USSD Annual Conference. Chicago, USA. April 2019. 62. “Design of Hydraulic Structures - An Introduction to Concrete Dams”. Hydraulic Structures Course, University

of Stellenbosch, South Africa, May 2019. 63. “An Introduction to Roller Compacted Concrete Dams”. Hydraulic Structures Course, University of

Stellenbosch, South Africa, May 2019.

SE

LE

CT

ED

TE

CH

NIC

AL

PA

PE

RS, L

EC

TU

RE

S, E

TC

.