Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly...
Transcript of Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly...
![Page 1: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/1.jpg)
Public Information Meeting
Orange Camp Road
Dr. Martin Luther King Jr. Beltway to I-4
Presented by:Volusia CountyAugust 2, 2018
1
![Page 2: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/2.jpg)
Project Goals
To improve the operations and safety for Orange Camp Road (OCR) and the Dr. Martin Luther King, Jr. (MLK) Beltway
Gateway Opportunity
Complete Streets• Pedestrian and bicycle accommodations• Public transportation
Improvements accommodates future widening on MLK Beltway
2
![Page 3: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/3.jpg)
Existing Conditions
• Orange Camp Road (OCR)• Posted Speed = 50 MPH • Minor Arterial Urban Roadway• 2-Lane with un-paved shoulders
• Dr. Martin Luther King Jr. (MLK) Beltway• Formerly known as West Volusia Beltway• Posted Speed = 55 MPH• Minor Arterial Urban Roadway• 2-Lane with paved shoulders
• Bicycle/Pedestrian Facilities• Existing 10’ concrete multi-use trail from West of Blue Lake to East of MLK Beltway
on south side of OCR
3
![Page 4: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/4.jpg)
Orange Camp Road Improvements
4
![Page 5: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/5.jpg)
Orange Camp Road – Typical Section
• Proposed Improvements• Curb & Gutter with Design Speed of 45 MPH• Two 12’ travel lanes plus a 5’ bike lane (EB & WB)• 10’ concrete multi-use trail on south side
5
![Page 6: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/6.jpg)
Dr. Martin Luther King, Jr. (MLK) Beltway -Typical Section
• Proposed Improvements• Two 12’ travel lanes with 5’ paved shoulder NB• 40’ Raised Median with potential landscaping
• Type E Curb & Gutter
6
![Page 7: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/7.jpg)
Special Considerations
• Pedestrian Improvements• Currently only 2-legs of intersection have marked crosswalks
• Leg crossing OCR is designated as a School Crossing• Provide temporary crossings in adjacent quadrants during construction
• Repair 10’ concrete multi-use trail as needed throughout the project
• Mid-block crossing at Victoria Commons
• Temporary Traffic Control Phasing• Minimize impacts to traffic:
• Vehicular, Public, Bicycle & Pedestrians• Temporary Drainage
7
![Page 8: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/8.jpg)
Environmental Considerations• Wetlands
• Multiple existing wetlands/mitigation areas adjacent to both north and south sides of OCR as well as west side of MLK Beltway
• Multiple efforts to avoid/minimize through design include:• NO Southbound lane widening on MLK Beltway adjacent to wetland conservation
area• Widening to south of OCR to avoid wetland impacts
• No impacts to existing conservation easements
8
![Page 9: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/9.jpg)
Roundabout Benefits
9
• Safety • Fewer crashes (90% fewer fatalities and 75% fewer injuries)• Intersection works during power outage
• Time • Reduction in amount of delay through intersection
• Environment• Reduction in pollution from cars waiting at signal• Less pavement area
• Aesthetics• Provides area for landscaping
• Cost • No yearly maintenance cost
![Page 10: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/10.jpg)
Existing Traffic Conditions
AM Peak: LOS E, Delay = 60.5 Sec
PM Peak: LOS E, Delay = 58.9 Sec
10
![Page 11: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/11.jpg)
Proposed Signal Option
AM Peak: LOS D, Delay = 38.9 Sec
PM Peak: LOS C, Delay = 34.9 Sec
11
![Page 12: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/12.jpg)
Roundabout Screening• Intended to quickly assess project specific conditions to determine the viability of the
roundabout alternative
Yes No
Existing Project Traffic Control
ROUNDABOUT SCREENING
If Yes, give brief description
Is the intersection located within a coordinated signal network
Does the intersection have Pedestrians with special needs that would have difficulty crossing the road?
Does the Major roadway AADT exceed 90% of total intersection AADT
Screening CriteriaDoes the intersection have physical or geometric constraints that would limit visibility or complicate construction?
√
√
√
DesignExisting Project Classification
Signalized
N/A
√
√
√
Is there Downstream traffic control or a condition that would cause queue back up into the roundaboutAre there Right-of-way issues? Would the installation of a roundabout create impacts to historical sites and environmentally sensitive sites? Would the relocation of residences or businesses be required?
N/A
School Crossing
N/A
N/A
N/A
12
![Page 13: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/13.jpg)
Intersection Results• AM
• LOS C• Delay 20.0 Sec.
• PM• LOS C• Delay 21.6 Sec.
Proposed Roundabout Option
Image Provided From FDOT Flyer for “Alert Today, Alive Tomorrow – A Guide to Modern Roundabouts”
13
![Page 14: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/14.jpg)
Victoria Garden Intersection• Signal warrant analysis is being completed• Pedestrian crossing will be provided
• On-demand Pedestrian Signal (capable offuture expansion to a full traffic signal)
• Pedestrians, Bicyclists
INSTALL PEDON DEMAND
SIGNAL
INSTALL SPECIALEMPHASIS CROSSWALK
16
![Page 15: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/15.jpg)
• Construction Cost – estimated at $11,351,488• Utilize existing pavement• Sidewalk/trail construction and repair• Proposed drainage • Contingency
Preliminary Cost Estimate
17
![Page 16: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/16.jpg)
Orange Camp RoadProject Schedule
Year
Design
Construction
2017 2018 2019 2020
Permitting
2021 2022
18
![Page 17: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/17.jpg)
What’s Next
19
• Tonight Submit comments
• Future Review and evaluate comment cards Finalize intersection option
![Page 18: Dr. Martin Luther King Jr. Beltway to I-4...Dr. Martin Luther King Jr. (MLK) Beltway • Formerly known as West Volusia Beltway • Posted Speed = 55 MPH • Minor Arterial Urban Roadway](https://reader031.fdocuments.net/reader031/viewer/2022040520/5e78eee79d16e1624511c9d2/html5/thumbnails/18.jpg)
Public Information Meeting
ORANGE CAMP ROAD
Thank you!
20