Developing a Simulation Model to Evaluate the Capacity of Weaving Sections. Dr Hamid AL- Jameel. 1.The aims and objectives 2.Definition of a weaving section 3.Limitations of existing methods 4.Data Collection and Analysis 5.Car-following sub-model 6.Gap Acceptance sub-model - PowerPoint PPT Presentation

Transcript of Dr Hamid AL- Jameel

Page 1: Dr  Hamid  AL- Jameel

Dr Hamid AL-Jameel

1

Developing a Simulation Model to Evaluate the

Capacity of Weaving Sections

Page 2: Dr  Hamid  AL- Jameel

2

1.The aims and objectives

2.Definition of a weaving section

3.Limitations of existing methods

4.Data Collection and Analysis

5.Car-following sub-model

6.Gap Acceptance sub-model

7.Weaving rules

8.Calibration of the developed model

9.Validation of the developed model

10.The application of the developed model

11.Management scenarios used by the developed model

12.Conclusions and recommendations

Page 3: Dr  Hamid  AL- Jameel

3

The aims of this research are to build a simulation model capable of representing the factors influencing the behaviour of weaving vehicles and to evaluate the weaving capacity.

The aim of this study

The aim of this study

Page 4: Dr  Hamid  AL- Jameel

4

1.To determine the factors/variables that affect weaving capacity based on previous

literature research.

2.To build a simulation model that is capable of representing weaving section using

Visual Compact Fortran.

3.To collect data from several weaving sections with different geometric design.

4.To calibrate the system with field data and to validate the model using another set of

field data.

5.To introduce countermeasures to improve the capacity of weaving section such as

selection of the best location for warning signs or guide signs, and applying different

types of management in terms of changing some geometric designs using pavement

markings.

ObjectivesObjectives

Page 5: Dr  Hamid  AL- Jameel

Weaving area: the crossing of two or more traffic streams while travelling in the same general direction without the aid of traffic control devices (HCM 2000).

5

DefinitionDefinition

Page 6: Dr  Hamid  AL- Jameel

Weaving area: the crossing of two or more traffic streams while travelling in the same general direction without the aid of traffic control devices (HCM 2000).

6

DefinitionDefinition

On-ramp

Motorway

Off-ramp

Motorway

R-R

M-M

M-R

R-M

W1= R-M or M-R

W2=R-M or M-R

Vw= W1+W2

VR=VW/V

R=W1/Vw

Page 7: Dr  Hamid  AL- Jameel

7

DefinitionDefinition

Entrance point

Exit point

Page 8: Dr  Hamid  AL- Jameel

8

Data have been collected from different sites in the UK . More than 50 hours video recording have been gathered from 7 weaving sections. Besides these data, MIDAS data and published data have been used.

Some of these investigated characteristics are:

1. Effective length For weaving length > 300m is 200m. For weaving length < 150m is all actual length. 2. merging points for merging point < 100m is 80%. for diverging point < 100m is 90%.

2. Volume ratio and weaving ration.

3. Upstream characteristics and gap acceptance for the selected samples from these sites.

Data collectionData collection

Page 9: Dr  Hamid  AL- Jameel

9

A new safety car-following model has been developed and calibrated with field data

Car-followingCar-following

Page 10: Dr  Hamid  AL- Jameel

10

The developed model for weaving section has been developed as integrated model for different sub-models such as car- following, lane changing, gap acceptance and weaving. then the developed model has been calibrated with field data such as flow and speed taken from the upstream loop detector as input data and comparison with output data from the two down stream loops from both simulated and field data.

Calibration processCalibration process

Upstream loop After merging loop After diverging loop

M60 9034B M60 9030B M60 9026B

190m 200m 90m

Page 11: Dr  Hamid  AL- Jameel

11

Calibration processCalibration process

Page 12: Dr  Hamid  AL- Jameel

12

Validation processValidation process

Page 13: Dr  Hamid  AL- Jameel

13

The applicationThe application

Page 14: Dr  Hamid  AL- Jameel

14

The applicationThe application

Page 15: Dr  Hamid  AL- Jameel

15

The applicationThe application

Page 16: Dr  Hamid  AL- Jameel

16

The applicationThe application

Page 17: Dr  Hamid  AL- Jameel

17

The applicationThe application

Page 18: Dr  Hamid  AL- Jameel

18

The developed model has been used to investigate the effect of some characteristics and

new management scenarios on the capacity of weaving sections. These are:

The HGVs have large effect the capacity of weaving sections because the HGVs occupy

large spacing and poor capability in terms of acceleration and deceleration rates.

The PCE (passenger car equivalent) has been found slightly higher than corresponding

values obtained by other studies such as Vermijs and Shuurman (1998).

Different speed limits have been applied using the developed model. The results show that

the speed limit has no noticeable effect to increase the efficiency of operations at weaving

sections.

new management has been applied by shifting diverging vehicles for a specific distance

downstream of the entrance point. This shifting has been applied using longitudinal solid

line of pavement marking to prevent diverging vehicles from changing lane. Different lengths

of this solid line have been applied using the developed model. A 150m was found to be the

optimum value among others.

Page 19: Dr  Hamid  AL- Jameel

19

A new management has been applied by this developed model after its calibration and validation. This new management can be summarised by changing the weaving section type from ramp weave (Type A) to Type B using just pavement markings. This change could be applied under specific conditions. The results of applying this management show more encouraging outputs in terms of increasing the level of speed and reducing the effect of bottleneck and queue formation for the field case taken from the Northenden Site 1.