DR. GEORGI POPOV, QEP, CMCCONSTRUCTION SAFETY PRESENTATION
Prevention through Design (PtD) for Hazards in
Construction
2
You will learn how to use Prevention through Design (PtD) methodology for hazards specific to the construction industry. You will take away a downloadable PtD Risk Assessment tool which successfully identifies three NIOSH and OSHA case studies relevant to current issues within construction safety and health.
The purpose of this presentation is to demonstrate the use of PtD risk assessment tool.
Safety, Health and Environmental (SH&E) professionals have to learn how to incorporate PtD principles into projects, design, and re-design phase.
Overview
3
PtD RA Tool Overview
The PtD tool highlights a 4-step approach to risk assessment:
Most importantly, this tool requires the user to develop balanced process and a logic based risk assessment methodology designed to engage the participants through the hazard assessment and risk prioritization process.
4
Why PtD Risk Assessment Tools?
ANSI/ASSE Z590.3-2011 Prevention through Design standard addresses occupational safety and health needs and RA methodologies
ANSI/ASSE/ISO (Z690-2011) Risk Management Standards Package - This standard provides principles and generic guidelines on risk management.
ANSI/AIHA/ASSE Z10-2012: The standard defines minimum requirements for an OSHMS. It also includes risk assessment components not previously included.
ISO 45001 OSHMS also includes risk assessment components .
5
ANSI Z10 Requirements – Section 4.1
6
ANSI Z10 Requirements – Section 4.2
7
ANSI Z10 Section 4.2 Recommended Practices
Notice:Multiple RA
methodsFinancial ImpactRegulatory
compliance Include:Business IssuesSetting
Priorities
High Severity
8
ANSI Z10 Section 4.2 Recommended practices
Establish priorities based on levels of risk (RAM)
Potential for system improvements (PtD HofC)
Business consequences (Bow – tie analysis).
9
ANSI Z10 & PtD
10
Risk Assessment Process and the PtD Model
ISO 31000/ANSI Z690.2 and ANSI Z590.3 -2011 Integration
7.12 Document the Results
7.13 Follow Up on Action Taken
ISO 31000/ANSI Z690.2 Risk Management Process ANSI Z590.3 PtD Hazard Analysis and Risk Assessment Process
7.5 Consider the Failure Modes
7.6 Assess the Severity of Consequences
7.7 Determine Occurrence Probability
7.8 Define the Initial Risk
7.10 Assess the Residual Risk
7.11 Risk Acceptance Decision Making
7.9 Select and Implement Risk Reduction and Control Methods
7.1 Management Direction
7.2 Select a Risk Assessment Matrix
7.3 Establish the Analysis Parameters
7.4 Anticipate/Identify the Hazards
Communication and consultation
(5.2)
Establishing the context (5.3)
Monitoring and review (5.6)
Risk identification (5.4.2)
Risk analysis (5.4.3)
Risk evaluation (5.4.4)
Risk treatment (5.5)
Risk assessment (5.4)
11
Risk Assessment Process and the
PtD Model
As illustrated in the previous slide and Figure to the right, the two standards are similar in the process steps with a few differences.
1) Data gathering – Injury and protective data
2) Set scope or Limits of Assessment
3) Develop and charter risk reduction team
4) Identify task and hazards
5) Assess risk – Initial risk scoring system
6) Reduce risk – Hazard control hierarchy
7) Assess Risk – residual risk scoring system
Identify current controls
Test/verify current controls
Identify new controls
Residual risk acceptable?
8) Results/Documentation
Evaluation complete
9) Controls measurement system
Yes
10) New hazard ID
Reevaluate tasks and hazards
No
Risk Identification (5.4.2)
Establish the context (5.3)
Communication and consultation (5.2)
Risk Analysis (5.4.3)
Risk evaluation (5.4.4)
Risk treatment (5.5)
Monitor and review (5.6)
ANSI/ASSE Z690.2/ISO 31000 ANSI/ASSE Z590.3 PtD
Comparisons of Risk Assessment in ISO
31000/ANSI Z690.2 and ANSI Z590.3
12
Hazard ID -OSHA 300 Form
13
OSHA 300 Incidence Rate Comparison
Source: http://data.bls.gov/iirc/
14
Financial Losses
Non- Financial Losses???
15
PtD RA Tool
16
Hand-Operated Grinders: Identify Tasks and Hazards
Silica Dust: “Activities that may produce crystalline silica dust include jack hammering, rock/well drilling, concrete mixing, concrete drilling, and brick and concrete block cutting and sawing.”
Electric and pneumatic hand operated grinders used for surface finishing and cutting jobs may produce silica dust.
Sources: https://www.osha.gov/dsg/topics/silicacrystalline/hazard_recognition_silica.htmlhttps://www.osha.gov/Publications/3362silica-exposures.pdf
17
Hand-Operated Grinders: Identify Tasks and Hazards
Vibration Hazards: Extent of ExposureBased on a 1974 study of occupational
exposures to vibration, NIOSH estimates that 1.2 million workers in the United States are potentially exposed to hand-arm vibration
Source: http://www.cdc.gov/niosh/docs/83-110/
18
Hand-Operated Grinders: Identify Tasks and Hazards
Noise: According to OSHA
“Prolonged exposures to loud noise can lead to a gradual, but permanent, loss of hearing.”
Current State controls:
Source: https://www.osha.gov/Publications/3498noise-in-construction-pocket-guide.pdf
19
Hand-Operated Grinders: Identify Tasks and Hazards
Employees produce dusts containing silica when they grind on concrete and similar materials. Data compiled by the Occupational Safety and Health Administration (OSHA) indicate that, among employees who grind concrete, most are exposed to silica at levels that exceed OSHA’s benchmark of 0.1mg/m³ (milligrams of silica per cubic meter of air)
Source: https://www.osha.gov/Publications/3362silica-exposures.pdf
20
H&S Risk Assessment
21
Risk of business continuity loss from Hazardous Work Environment
22
Hazards and Consequences 30,000 ft. overview
23
PtD HoC
24
H&S Hazards - New Controls
25
H&S Risk Assessment - New Controls
26
Risk of business continuity loss from Work Environment – New Controls
27
Hazards and Consequences 30,000 ft. overview – New Controls
28
Assess Residual Risk and Risk Reduction
29
Conclusion
Risk Assessment is a critical component of ANSI/AIHA Z-10 and PtD standards.
Through the use of the PtD risk assessment, newly designed power tools, and improved controls can successfully reduce injuries and illnesses within construction industry.
Additional steps: Cost-benefit analysis can demonstrate the need for tool replacement and highlight financial and non-financial benefits.
30
Questions?
I hope it was a value added session…
Remember – the best RA method is…
the one that you have developed
31
https://www.osha.gov/Publications/3362silica-exposures.pdf
http://www.cdc.gov/niosh/topics/ptd/pubs.html
http://www.cdc.gov/niosh/docs/83-110/
http://www.cdc.gov/niosh/docs/wp-solutions/2009-115/pdfs/2009-115.pdf