DPWH MAJOR STRATEGIC INFRASTRUCTURE PROGRAM AND POLICIES:
FY 2017 FY 2018
Traffic Decongestion Program(Implement High Standard Highways/Expressways; Construct / widen national roads and bridges; Construct by-passes/diversion roads; Construct flyovers; interchanges and underpasses)
P 113.1 B($2.3B)
P 149.7 B($3.0B)
Integrated and Seamless Transport System(Mindanao Infrastructure Logistics Network, MLIN; Construct/improve roads leading to growth corridors in Western Mindanao; Study and implement Inter-island linkage projects; Connect gaps along national roads; Construct/replace bridges)
P 88.0 B($1.8B)
P 101.5 B($2.0B)
Convergence and Rural Road Development Program(Construct/upgrade local access roads to designated tourism destinations, RORO ports / seaports and airports; Construct/improve roads leading to industrial trade corridors.)
P 18.1 B($0.4B)
P 49.8B($1.0B)
Livable, Sustainable & Resilient CommunitiesIntegrated Water Resources Management Program
(Construct/rehabilitate flood mitigation structures along major river basins and principal rivers; Construct water impounding projects; Construct water supply/septage & sewerage/rain collectors; Upgrade drainage capacity)
Disaster Risk Reduction and Climate Change Adaptation Program(Rehabilitate, retrofit and strengthen existing bridges; Provide safe access to highly vulnerable areas; Improve national roads vulnerable to flooding, landslide and slope failure; Build evacuation centers)
P 106.8 B($2.1B)
P 165.0 B($3.3B)
US $ 1 = Php 509
11
Earthquake Impact Reduction Study for
Metropolitan Manila (MMEIRS)
Vision:
“A Safer Metropolitan Manila from Earthquake
Impact”.
Goals:1. To develop a national system resistant to
earthquake impact
2. To improve Metropolitan Manila’s urban structure
resistant to earthquake
3. To enhance effective risk management system
4. To increase community resilience
5. To formulate reconstruction systems
6. To promote research and technology development
for earthquake impact reduction measures
Metro Manila cities transected by the
West Valley Fault:
1. Quezon City
2. Marikina City
3. Pasig City
4. Makati City
5. Municipality of Pateros
6. Taguig City
7. Muntinlupa City
Taguig City
Muntinlupa City
Makati City
Pasig City
Quezon City
Marikina City
Pateros
13
Possible Regional Separation:
North
Caloocan City
Quezon City
Valenzuela City
San Juan City
Mandaluyong City
EastPasig City
Marikina City
West
Manila City
Malabon City
Navotas City
South
Las Piñas City
Makati City
Muntinlupa City
Parañaque City
Taguig City
Municipality of Pateros
Pasay City
West
East
South
North
The concerned DPWH Regional Offices * were already instructed to
ensure the compliance on the following responsibilities of the DPWH
under the Oplan Yakal Plus:
1. Conduct of Reconnaissance and Rapid Damage and Needs
Assessment (RDNA) immediately after the earthquake.
2. Establish Command Centers and Staging Areas which will monitor
and provide instruction likewise provide support on the clearing
operation coming from other region.
3. Provide Clearing Operations once the MMDA is done conducting
search and rescue operations.
4. Grant Assistance in the Establishment and Maintenance of
Evacuation Camps by deploying personnel to the identified
evacuation camps.
5. Conduct of Post Disaster Needs Assessment after earthquake to
prioritize reconstruction/rehabilitation projects
6. Reconstruct/ Rehabilitate structures and facilities damaged by the
earthquake.
*DPWH Regional Office I, II, V, VI, VII, X, XI ,CAR and NCR
16
Vulnerability and Risk Assessment:
DPWH has conducted vulnerability and risk assessment on critical facilities and infrastructure along the west valley fault.
Metro Manila Logistics Improvement ProjectFrom 30 bridges to 42 bridges crossing Pasig River, Marikina River and Manggahan Floodway
BINONDO-INTRAMUROS BR.
NORTH & SOUTH HARBOR BR.
PALANCA-VILLEGAS BR.
BEATA-MANALO BR.
BLUMENTRITT-ANTIPOLO BR.
STA. MONICA-LAWTON BR.
MARIKINA-VISTA REAL BR.
J.P. RIZAL-LOPEZ JAENA BR.
J.P. RIZAL-ST. MARY BR.
MERCURY-EVANGELISTA BR.
EAST BANK-WEST BANK BR. 1
EAST BANK-WEST BANK BR. 2
ESTRELLA-PANTALEON BR.
GUADALUPE BR.
LAMBINGAN BR.
17
BONIFACIO GLOBAL CITY-ORTIGAS CENTER LINK ROAD PROJECT(Sta. Monica-Lawton Bridge and Lawton Ave.-Global City Viaduct)Bonifacio Global City to Ortigas Central Business District in 12 minutes.
START: 2017
COMPLETION: 2020
PROJECT COST: P5.72 B ($114.4M)
18
BINONDO-INTRAMUROS BRIDGE734 lm Steel Arch Bridge (Basket Handle Type) connecting Intramuros (at Solana Street and Riverside Drive) and Binondo(at San Fernando Street with a viaduct over the creek adjacent to Muelle del Binondo).
START: 2018
COMPLETION: 2020
INDICATIVE COST:LP:GOP:
P 4.607B ($92M)P 3.944 BP 0.663 B
19
ESTRELLA-PANTALEON BRIDGEReplacement of the existing bridge into a three-span box girder bridge with corrugated steel webs with 4-lane deck concrete deck slab of approximately 560 lineal meters to connect Estrella Street at Makati side to Barangka Drive at Mandaluyong side.
START: 2018
COMPLETION: 2020
INDICATIVE COST:LP:GOP:
P 1.367 B ($27M)P 1.074 BP 0.293 B
20
METRO MANILA PRIORITY BRIDGES SEISMIC IMPROVEMENT PROJECT, PHASE IWill ensure safety of 365,000 motorists who use the Guadalupe Bridge and 30,257 motorists that pass Lambingan Bridge every day.
START: 2019
COMPLETION: 2022
PROJECT COST:LP:GOP:
P 4.29 B ($85.8M)P 3.79 BP 0.50 B
21
Effective Flood Control Program Adopting Integrated Water Resources Management Principles and River Basin Approach
Complete and update the flood control and drainage
master plans and feasibility studies of the 18 Major
River Basins & critical Principal Rivers.
23
Tropical Rainfall Measuring Mission (TRMM) / NASA – Multi Satellite
Precipitation Analysis (MPA) showed Typhoon ‘Ketsana’ poured 575 mm of
rainfall (6hr Rainfall)
Monthly average (November) rainfall record in Manila was poured over in 1 day.
Affected Families 993,227
Total Displaced Families 15,798
Fatalities 464
Injured 529
Missing 37
Total Cost of Damages: P11.0 B ($ 220 M)
Effects of Typhoon Ketsana (Ondoy) – September 2009
Based on river basins:Pasig-Marikina River Basin and Laguna Lake Basin.
Total area: 4,354 km2
Total Population: 17.1 M
Boundary of Study
Area and the River
Basins
Master Plan for Flood Management in Metro Manila and Surrounding Areas
Name of Project Est. Cost (P’B)
Pasig-Marikina River Improvement and Dam Construction
198.44
Meycauayan River Improvement 14.04
Malabon-Tullahan River Improvement 21.64
South Parañaque-Las Piñas River Improvement 17.34
East Mangahan Floodway (Cainta & Taytay River Improvement)
25.90
West Laguna Lakeshore Land Raising 25.19
Land Raising for Small Cities around Laguna Lakeshore
7.16
Improvement of the Inflow Rivers to Laguna Lake 0.64
Manila Core Area Drainage Improvement 27.26
West Mangahan Area Drainage Improvement 5.52
Valenzuela-Obando-Meycauayan (VOM) Improvement
8.61
Total Estimated Requirement: P351.72 B($7.03B)
25
START: 2014
COMPLETION: 2017
PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT-PHASE IIIChannel improvement works at remaining sections of Pasig River and priority critical sections of Lower Marikina River. It will decrease flood inundation by 18% and reduce flood damages by P14.3 B ($286 M).
PROJECT COST:LP:GOP:
P 7.55B ($151.0M)P 6.54 BP 1.01 B
Pasig-Marikina River Channel Improvement, Phase IVChannel improvement works for Upper Marikina River (Rosario Bridge-Marikina Bridge) including construction of Marikina Control Gate Structure (MCGS)Indicative Cost: P26.8 B ($536.0M)Schedule: 2018-2022
26
START: 2013
COMPLETION: 2016
MANDALUYONG MAIN DRAINAGE PROJECTProtects 182 hectares composed of 10 barangays and four major roads, namely Boni Avenue (East), Boni Avenue (West), San Francisco Street and Martinez Road. Resulted in the decrease in inundation depth from chest deep to just about six (6) inches while the duration of flooding decreased from four (4) hours to only about 30 minutes.
PROJECT COST: P609 M ($12 M)
27
The Detention Tank • is not meant to detain water
for other uses • is meant to temporarily
detain “post development run-off” only
• should always be empty • is fully automated
PADRE BURGOS CIRCLE, FORT BONIFACIO GLOBAL CITY
Affected Families 131,618
Fatalities 1,268
Injured 6,071
Missing 181
Total Cost of Damages: P2.07 B ($ 41 M)
Effects of Typhoon Washi (Sendong) – December 2011
1 US $ - P 49.987 (as of Feb. 20, 2017)
START: 2018
COMPLETION: 2022
FLOOD RISK MANAGEMENT PROJECT IN CAGAYAN DE OROProtects 290 ha. area and 18,100 structures
PROJECT COST:LP:GOP:
P 8.55 B ($171.0M)P 5.01 BP 3.54 B
31
Affected Families 1,472,251
Displaced Families 918,261
Damaged Houses 1,171,469
Fatalities 6,300
Missing 1,601
Injured 28,689
Total Cost of Damages & Losses: P571.11 Billion ($ 11.4 B)*
Estimated Recovery and Reconstruction Needs: P360.89 Billion ($ 7.22 B)*
* Based on Reconstruction Assistance on Yolanda (RAY), Report as of December 16, 2013
Effects of Super Typhoon Haiyan (Yolanda) – November 2013
START: 2016
COMPLETION: 2022
LEYTE TIDE EMBANKMENT27.3 km tide embankment from Brgy Diit, Tacloban City to Brgy Ambao, Tanauan, Leyte. Will protect 33,185 houses / buildings and 33.7sq.km area from destructive effects of Storm Surges.
PROJECT COST: P 7.9 B ($158M)
34
DPWH Regional Evacuation Centers:
CONCEPTUAL DESIGN FOR ALTERNATIVE EVACUATION CENTERS IN URBANIZED CITIES
Total Estimated Cost: • P85.5 Million
Total Floor Area: • 1,857.75 sq.m
Minimum Lot Area: • 1,200 sq.m
Number of Floor: • Four (4) Storey with roof deck
Number of Persons (Capacity):
• 500
Features: • OCD & RDMMC Office
• Lobby
• Accommodation Area (116 beds)
• Washing Area
• Breastfeeding Area
• Cooking Area
• Dining Area
• Prayer Room
• Garbage Disposal Area
• Communication Room
• Electrical Area
• Storage Area
• Laundry Area
• Drying Area
* Based on the Conceptual Design prepared by DPWH and approved by the National Disaster Risk Reduction and Management Council (NDRRMC)
35
DPWH Regional Evacuation Centers:
CONCEPTUAL DESIGN FOR REGIONAL EVACUATION CENTERS IN RURAL AREAS
Total Estimated Cost: • P36.1Million
Total Floor Area: • 1,606. 42 sq.m
Minimum Lot Area: • 3,000 sq.m.
Number of Buildings/Facilities:
• Eight (8)
Number of Persons (Capacity):
• 500
Features: • Two Storey Accommodation Building (133 beds)
• One Storey Male Toilet & Bathroom Building
• One Storey Female Toilet & Bathroom Building
• Three Storey Laundry / Drying Area and Water Tank
• Two Storey Office and Infirmary Building
• One Storey Pump Room
• One Storey Garbage Disposal
• Additional Facilities and Equipment
* Based on the Conceptual Design prepared by DPWH and approved by the National Disaster Risk Reduction and Management Council (NDRRMC)
DPWH Regional Evacuation Centers, RECs (Status as of February 2018):
Bacnotan, La Union
Paoay, Ilocos Norte
Target: 137 RECsCompleted: 7 RECsOn-going: 100 RECsNYS: 30 RECs
Total Estimated Cost: P5 B ($100 M)
THE PHILIPPINE
GREEN BUILDING CODE (GB CODE)June 2015
A Referral Code
of the
NATIONAL BUILDING CODE OF THE PHILIPPINES
(P.D. 1096)
Objectives of GB Code:
Improve efficiency of building performance through set of standards
Counter harmful gases responsible for effect of climate change
Efficient use of resources, site, design, construction maintenance
…without significant increase in cost.
Performance Standards:
The GB Code shall observe the following:
Energy Efficiency
Water Efficiency
Materials Sustainability
Solid Waste Management
Site Sustainability
Indoor Environmental Quality 37
Legal Framework
38
CURRENT• National Building Code:
PD 1096 (1977) and other national legislations such as Fire Code of 2008
• IRR• Referral Codes
PROPOSED• Philippine Building Act of
2018 and other national legislations such as Fire Code of 2008
• IRR• Reference Standards
Philippine Building Act of 2018
Next Steps
• Advocacy among various sectors
• Coordination among regulatory agencies
• Transitory work for the implementing rules and regulations, and
reference standards
• Protocols for periodic review and revision
• Capacity building in both private sector and government agencies, for
compliance and enforcement
• Reporting and monitoring – Data gathering
39
Ac t
40
Re fe re n c e S t a n d a rd sPhilippine Building Act of 2018 and its IRR to
Mainstream Disaster Risk Reduction
PROPOSED
• SECTION 2. Declaration of Principles and Policies. The State shall safeguard life, health, property, and public welfare, consistent with principles of sustainable development. Towards this end, it shall be the policy of the State to provide for all buildings and structures, a framework of minimum standards and requirements, mainstreaming disaster risk reduction and management, to regulate and control their location, siting, planning, design,construction, occupancy, and maintenance. In pursuit of these policies, the State shall institutionalize a system that will provide for periodic review and flexible mechanisms in the updating of regulations and standards and will strengthen the participation of relevant stakeholders, taking into account the importance of allowing for continuing innovation in building design and construction.
DRRM Highlights
41
PROPOSED• Policy of the State to mainstream disaster risk reduction and
management (Section 2)
• Objective of the Act to reduce and manage hazards, exposures, and vulnerabilities, thereby minimizing disaster risk (Section 3)
• General requirements for design considering multiple hazards at the specific location, site and zone (Section 14, Section 15, Section 17, Section 19, Section 23)
DRRM Highlights
42
PROPOSED• Risk-informed provisions of alternate procedures for various
types of building or structure (Section 10, Section 37, Section 53, Section 54, Section 62)
• General provisions for post-disaster or post-crisis recovery and reconstruction (Section 18)
• General requirements for maintenance of existing or old (including heritage) buildings, and provisions for corresponding incentives (financial or otherwise) for retrofit (Section 38, Section 67)
43
Mainstream of Disaster Risk Reduction Management (DRRM) and Climate Change Adaptation (CCA) in national
and local development planning.
Invest on Research and Development (R&D) for a more effective and evidence-based DRR & CCA policies and
strategies.
Use geo-hazard maps for infrastructure planning and disaster risk reduction measures.
Engage local communities in monitoring hazards and risks and strengthen partnerships, at the local, national and
international levels.
Capacity building for National Government Agencies (NGAs) and Local Government Units (LGUs).
Build resilient public infrastructure facilities for emergency situations and disaster mitigation.
Adopt Integrated Water Resource Management (IWRM) principles.
Implement River Basin Approach to Flood Management and Water Optimization.
Adopt “Build Back Better” principle in recovery, rehabilitation and reconstruction.
Strategic Policies:(Disaster Risk Reduction and Climate Change Adaptation Program)
“Building a culture of
prevention is not easy. While
the costs of prevention have to
be paid in the present, its
benefits lie in a distant future.
Moreover, the benefits are not
tangible; they are the disasters
that did not happen.”
Kofi Annan, 1999
Secretary General, United Nations