DPW Procurement Bidding and Contracts Project Bid Submittals

description

DPW Procurement. Bidding and Contracts Project Bid Submittals. Project Bid Submittals. Plans and Specs Table of Content Bid Data Sheet Bid Release Assessment Checklist Bid Release Sheet. Electronic Files of the Plans & Specs. Specifications One (1) PDF File per Volume - PowerPoint PPT Presentation

Transcript of DPW Procurement

Page 1: DPW Procurement

DPW Procurement

Bidding and ContractsProject Bid Submittals

Page 2: DPW Procurement

Project Bid Submittals

• Plans and Specs• Table of Content • Bid Data Sheet • Bid Release Assessment Checklist • Bid Release Sheet

Page 3: DPW Procurement

Electronic Files of the Plans & Specs

• Specifications– One (1) PDF File per Volume

• Plans/Drawings– One(1) PDF File per Volume

• Table of Content– Check with us for the latest version– Word Document

Page 4: DPW Procurement

Assessment Checklist

Page 5: DPW Procurement

Bid Data Sheet

Page 6: DPW Procurement

Bid Release

• http://www.ct.gov/dpw%2Dbdc/site/default.asp

• Bid Stage link• Bid Release link• Bid Release Assessment Checklist• Bid Release Procedures/Instructions -

tab• Form 600 – tab - The Bid Release Sheet

Page 7: DPW Procurement

Bid Release Sheet

Page 8: DPW Procurement

Procedures/Instructions

Page 9: DPW Procurement

DAS Pre-qualification Classification

• DAS Pre-qualification is only required for projects with an estimated value over $500,000.

• If you use more than one classification then make sure you are clear whether you mean one or the other or both.– For example,

• Use “or” for either• Use “and” for both

• I prefer one classification

Page 10: DPW Procurement

DAS Pre-qualification Classification

• The classification is in the “Invitation To Bid”

• The Bidder must be DAS Pre-certified in the classification on the Invitation To Bid

• Make sure you review the DAS List and its definitions before entering a classification – they are part of Bid Release Sheet Procedures

Page 11: DPW Procurement

General Building Classification

• General Building A

– Building without interior finish

• Ex.– Warehouse– Dormitory

Page 12: DPW Procurement

General Building Classification

• Gen. Bldg. Const. B

– Building with INTERIOR FINISH

• Ex.– Office Buildings– Classrooms– Adm. Offices– Auditoriums

Page 13: DPW Procurement

General Building Classification

• Gen. Bldg. Const. C

– CUSTOM, SCIENTIFIC– COMPLEX Mechanical & Electrical

– Ex.– Hospitals– Historical

Page 14: DPW Procurement

Supplementals

• Only up to the Maximum Available Amount.– This means that in your Bid Release, the

Base plus the Supplementals should not exceed the Maximum Available Amount.

– Make sure that the base and supplemental calculations in the Bid Release Sheet match with those in the Data Sheet.

Page 15: DPW Procurement

Date Planning Began

• CGS 4-252(e) requirement for purchases at $50,000 or more

• For bonded projects this is the date B100S was accepted

Page 16: DPW Procurement

Funding Authorized

• Date• Section

Page 17: DPW Procurement

Pre-bid Meeting

• If the pool of bidders is limited and you make the pre-bid meeting mandatory then chances are that you may need to rebid.

• Make sure that you only allow SBSA contractors in pre-bid conference for SBSA projects (most Informals)

Page 18: DPW Procurement

Sub-trades

• The sub-trades are for formal projects, those over $500,000 and the individual sub-trades over $25,000

• The sub-trades should only be the four (4) noted in the statue:– Electrical– Mechanical other than HVAC– HVAC– Masonry

Page 19: DPW Procurement

Set-aside Waiver

• Set-aside waivers are request from Bruce Bockstael, Chief Architect

• You must explain in detail and verify your justification for your request for a Set-aside Waiver.

Page 20: DPW Procurement

Special Requirements

• Any special requirement is intent for information that the bidders should know up-front before they bid because it may cause their bid to be rejected.

• This information will be place in the Invitation To Bid.

• So anything you want on the Invitation to Bid put it here.

Page 21: DPW Procurement

Insurances

• Builders Risk• Special Hazard

– Asbestos Abatement– Type "X", "C", "U" – Explosion, Collapse,

Underground in accordance with Article 35 of the General Conditions.

Page 22: DPW Procurement

Unit Prices

• Make sure that the Unit Prices in the Bid Release Sheet match with those in the Data Sheet.

Page 23: DPW Procurement

Additional Remarks

• Additional remarks are NOT made part of the Invitation to Bid.

• Let us know here if the GC will be required to have asbestos removed.

Page 24: DPW Procurement

Asbestos Abatement By GC

• Attached the Report.

Page 25: DPW Procurement

Addenda

• Addenda must be submitted with enough time for the Bidding and Contracts staff to post on the Web site - this is seven (7) days in advance

• NO addenda on Fridays

• Addenda issues through AFAO

Page 26: DPW Procurement

Addenda

• Bureau of Design & Construction Intranet• Bid Stage link• Addendum Format link• Addendum Transmittal link

Page 27: DPW Procurement

Addendum Format

Page 28: DPW Procurement

Addendum Format

• Addenda Number• Addenda Date• Project Number• Project Title• Changes

– Item No.– Name and Number of Section– Change From To

• End of Addendum

Page 29: DPW Procurement

Sequence of Changes

• Changes to PRIOR ADDENDA• Changes to BIDDING REQUIREMENTS• Changes to GENERAL CONDITIONS • Changes to SPECIFICATIONS/Technical

Section• Changes to DRAWINGS/PLANS

Page 30: DPW Procurement

Addendum Transmittal

Page 31: DPW Procurement

Addenda

• Before you submit an addendum consider the future consequences– For example, some addenda generated more

addenda that in turn reverse the previous addenda– In one project, the outcome was ten (10) addenda– In this same project, some items were supposed to be

color code but this was not communicated; thus, requiring another addendum

Page 32: DPW Procurement

Recommend

Page 33: DPW Procurement

Start Date Notice to Proceed

Page 34: DPW Procurement

Milestones• Bid Opening• Set-aside Schedule• Contractors Qualification Reviews• Recommends • Affirmative Action Plan [cc PMs] – CHRO approval• Bond Commission Funding Approval or Transfer posted• Letter of Intent [cc PMs] - Contract Documents • Contract Approval – Project Clearance Memo [to PMs]• Construction Schedule Approval• Start Date & Notice To Proceed

Page 35: DPW Procurement

Time Line After Bid Opening• Set-aside Schedule – 10 Days• Affirmative Action Plan

– Contractor file w/i 30 days, CHRO accept or reject w/i 60 days• Recommends (?)• Bond Commission Funding Approval (?)• Letter of Intent – 15 Days• Contract Package – 2 days• Contract Approval – 2 weeks

– Legal– Commissioner– AG’s – average of 7 Days

• Project Clearance Memo (?)

Page 36: DPW Procurement
Page 37: DPW Procurement
Page 38: DPW Procurement
Page 39: DPW Procurement

Efficiency

• Project managers are copied on the AAP Letter, Letter of Intent, and are notified of the award via the Clearance Memo.

• Inquiries to fiscal officers for information they already provided time away from processing.

• Please be brief with your inquiries and comments to the fiscal officers.

Page 40: DPW Procurement

Efficiency

• Please allow the staff to go through the bidding and contracting process for your request.– Are we there yet?

• Please keep in mind that the staff is working on multiple projects.