Project Status ReportDate: Friday 1 July 2016
The ProjectConstruction of a two level 116 bed hospital.
Current Status
Works carried out this week:
Lay fire and potable water services
Lay main sewer drain
Lay stormwater drains
Formwork construction to building one, second and third floor suspended slabs
Scaffold erection around building one and building two
Place and tie reo bar to building one, level two suspended slab
Prepare and pour building one, level two suspended slab roof area
Installation of site power trenching and laying of conduit
On site subcontractors:
C & V Concreters carrying out concrete pours to level two suspended slabs
Project Plumbing averaging 24 men a day carrying out works to:
1. main sewer drains;
2. fire and potable water services lines;
3. stormwater drains.
NT Scaffold – Erecting scaffold to buildings one and two
NT Proform P/L – Averaging 36 men a day on site. Carrying out formwork construction of buildings one, level two and three suspended slabs and building one, level two to three columns.
Man hours worked on site for week 20 June 2016 to 24 June 2016 were 4960 hrs.
OHS Incidents: Nil.
The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments
PALMERSTON REGIONAL HOSPITAL
Environmental Controls:
Main access road to site has been spray sealed to ensure sufficient dust control measures are in place.
Site watering to manage dust control. Head works road construction progressing and monitored. Fire break maintenance and management implemented, managed and
inspected weekly throughout dry season.
Works for the forthcoming week:
Lay main sewer drains
Lay stormwater drains
Lay potable and fire service water mains
Continue formwork erection for building one, level three suspended slabs
Concrete pour to building one, level two suspended slab
Scaffold erection to buildings one and two
Continuation of site power trenching and laying of conduit.
Future Trade Packages pending award: Electrical services Mechanical services Hydraulic services Block work Lift services
Current trade packages awarded to local firms:
The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments
Bulk excavation & site clearing Allan King & Sons
Boundary fencing & gates Totem Fencing P/L
Footings & columns C & V Concrete P/L
Site survey & set out works Bennett & Bennett P/L
Quantity surveying services QS Services P/L
Early works hydraulic services Project Plumbing P/L
Tower crane High Rise & Rigging P/L
Reinforcement supply One Steel Darwin P/L
Site surveillance camera Intech NT
Genset fuel supply Mini Tankers P/L
Formwork NT Pro Form P/L
Concrete supply HB Concrete Darwin P/L
Reinforcement supply One Steel Darwin
Concrete place C & V Concreters NT P/L
Reinforcement fix Reo Fast NT P/L
Concrete pumping Darwin Concrete Pumping P/L
Early works electrical Nilsen NT
Site accommodation NT Link P/L
Rubbish removal VEOLIA Environmental Darwin
Civil early works - stormwater Allan King & Sons P/L
Traffic control Core Staff NT P/L
Scaffold NT Scaffold
Site amenities cleaning & consumable
Corestaff NT & Shemrock Chemicals
The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments
Headworks to hospital entrance road.
Headworks to hospital entrance road.
The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments
Placed & tied reo bar to Building 2, level 2 suspended slab
Concrete pour to Building 2, level 2 suspended slab.
The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments
Concrete finishing to Building 2, level 2 suspended slab.
Placed and tied reo bar to HV cable pits.
The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments
Level 2 to 3, column construction building 1.
Installation of fire main and potable water services.
The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments
Building 1, level 3 suspended slab construction works.
Column concrete pouring with kibble.
The Palmerston Regional Hospital project is jointly funded by the Australian and Northern Territory Governments